← Back to daily report

Quality History

511 POs (past due or unknown due date)
Monthly risk mix (by due month, last 6 months)
Jun1
Jul109
Aug157
Sep205
Oct25
■ High risk ■ Watch ■ Normal
All🔴 High risk🟠 Watch🟢 Normal
Stage boxes:All PASSAll FAIL1/5 FAIL1 of 5 judged reports failedNo resultQC Inline 14/20actual/required reports (2 per line per production day)DHU 8%QC Endline (ETS rework records, 1st check, cumulative)No report
Oct 2026 25 · 🔴 7 🟠 13 🟢 5
Final Random FAIL: 1 POs
Most common in later stages: BA Thread ends (24), AD Fabric stains (16), EA Unsmooth/puckering/bubbling (16)
🔴 Lines with most 🔴: CS05 (1), CS15 (1), CS17 (1), CS23 (1), CS25 (1)
261226 GECL · CS05/CS15/CS17… · Due 10/06Final Random PASS Not fixed: CF Pulling yarn
No reportPP Sample
No reportPilot Run
07/27–07/28QC 1st Bundle2 reports
07/28QA 1st Bundle2 reports
63/184QC Inlineactual/required · 34%
DHU 10.0%QC Endline45 days
All FAILQA Inline11 reports
All FAILShipment Sample3 reports2 no result
All PASSPre-final4 reports
All PASSFinal Random3 reports
Order/Ship qty35,960 / 3,500
PDF reports89
Last report09/21

Cross-stage findings

Not fixed: CF Pulling yarn

Found 51 times (213 pcs, 07/29–09/18) in earlier stages; latest Final Random (09/21) still has 3 major

Missed in earlier stages: 3

CG Grinning (Shipment Sample 07/31), DH Pressing mark (Pre-final 08/03), HA Poor pressing (Final Random 08/31): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/21): AD Fabric stains 2 (earlier 141 times)

Found earlier but still reached later stages: 8

ED Gathering crease 9, EC Asymmetry 5, CB Broken stitch 5, GA Missing bartack/button 1, DJ Pleat 2, BD Snagging 1, EA Unsmooth/puckering/bubbling 4, EI Inaccurate/skewed stitching 2 pcs (later stages total)

47 defects recorded as 'Others' without detail

QC 1st Bundle 2, QA 1st Bundle 6, QA Inline 16, QC Inline 15, Final Random 4, Pre-final 4; cannot compare across stages

QC Endline data errors: 45

07/29 CS23 261226A-2 (defective pcs 69 > defects 48), 07/30 CS23 261226A-2 (defective pcs 71 > defects 39), 07/31 CS23 261226A-2 (defective pcs 56 > defects 22), 08/03 CS23 261226A-2 (defective pcs 96 > defects 52)…

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BD Snagging (4 Major), CE Broken seam (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: CA Thread tension (4), DE Cut to broken (2), DD Thread not straight/waving (1), FC Wrong label (1), EC Asymmetry (1), GB Missing sewing operation (1), GA Missing bartack/button (1), DB Run-off stitching (1), CB Broken stitch (1); Both: ED Gathering crease (3/6), BA Thread ends (7/2), DI High-low/uneven (6/2), DJ Pleat (4/3); DHU QC 1st Bundle 87.5% / QA 1st Bundle 62.5%

Caught in earlier stages

CC Skip stitch (519), DB Run-off stitching (222), DF Twisted seam/skewing (141), CE Broken seam (138), DI High-low/uneven (91) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—87.5%
QA 1st Bundle2 reports—62.5%
QC Inline64 reports
required on prod. days 63/184 (34%)
—28.4%
QC Endline45 days—10.0%
QA Inline11 reports1142.0%
Shipment Sample3 reports1—
Pre-final4 reports03.0%
Final Random3 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS235.8%
15641 / 25 days
45.3%PASS
07/28–09/19
BA Thread ends, CC Skip stitch, DF Twisted seam/skewing
CS159.2%
10586 / 30 days
42.2%PASS
07/27–09/08
BA Thread ends, ED Gathering crease, AD Fabric stains
CS0516.2%
4749 / 15 days
50.0%—
08/31–09/17
AD Fabric stains, BA Thread ends, CF Pulling yarn
CS1712.7%
2935 / 12 days
51.6%—
07/29–08/11
BA Thread ends, AD Fabric stains, ED Gathering crease
CS2524.1%
2634 / 10 days
25.0%PASS
08/05–08/21
BA Thread ends, CC Skip stitch, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS15306023 (38%)30708/25, 08/26, 08/28, 08/29, 09/08
CS23255019 (38%)25608/20, 08/21, 08/29, 08/31, 09/19
CS05153012 (40%)15309/12, 09/14, 09/15, 09/16, 09/17
CS1712246 (25%)12608/06, 08/07, 08/08, 08/10, 08/11
CS2510203 (15%)10708/11, 08/13, 08/14, 08/17, 08/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends72172106631103
AD Fabric stains110817912
ED Gathering crease367645218243
CC Skip stitch76443
Others (no detail)26151851644
DB Run-off stitching1911228
CF Pulling yarn441636233
CB Broken stitch1137632
261147 LOGE · CP07/CP16/CP17 · Due 10/07Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
09/17QC 1st Bundle1 reports
09/17QA 1st Bundle1 reports
8/34QC Inlineactual/required · 24%
DHU 11.9%QC Endline14 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty10,000 / 10,000
PDF reports14
Last report10/01

Cross-stage findings

Not fixed: ED Gathering crease

Found 21 times (343 pcs, 09/17–10/02) in earlier stages; latest Final Random (10/01) still has 3 major

Recurring in small numbers: 3

Latest Final Random (10/01): AD Fabric stains 1 (earlier 14 times), CE Broken seam 2 (earlier 26 times), CC Skip stitch 1 (earlier 14 times)

QC Endline data errors: 1

09/17 CP07 261147 (defective pcs 35 > defects 21)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (9 Major), EC Asymmetry (2 Major), BA Thread ends (1 Major); Only QC 1st Bundle: DI High-low/uneven (1), DB Run-off stitching (1), DC Join stitching (1); Both: AD Fabric stains (10/1), ED Gathering crease (3/3), EA Unsmooth/puckering/bubbling (2/2), DJ Pleat (1/1), CB Broken stitch (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%

Caught in earlier stages

EC Asymmetry (62), EA Unsmooth/puckering/bubbling (43), CB Broken stitch (40), EI Inaccurate/skewed stitching (24), EB Measurement issue (22) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—100.0%
QC Inline8 reports
required on prod. days 8/34 (24%)
——
QC Endline14 days—11.9%
QA Inline3 reports351.0%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0711.9%
9900 / 14 days
51.0%PASS
09/17–10/03
BA Thread ends, ED Gathering crease, CC Skip stitch
CP170.0%
40 / 2 days
——
09/21–09/23
—
CP160.0%
20 / 1 days
——
09/18–09/18
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0714288 (29%)14609/29, 09/30, 10/01, 10/02, 10/03
CP17240 (0%)2209/21, 09/23
CP16120 (0%)1109/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends16639336
ED Gathering crease33322153
CC Skip stitch22421
CE Broken seam24542
AD Fabric stains1014471
EC Asymmetry232199
EA Unsmooth/puckering/bubbling22363
CB Broken stitch1138
261460 RTMS · CB36 · Due 10/07Shipment Sample No result Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
09/25QC 1st Bundle1 reports
09/25QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 11.8%QC Endline6 days
All FAILQA Inline4 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty1,500 / 1,500
PDF reports10
Last report10/07

Cross-stage findings

Not fixed: AD Fabric stains

Found 16 times (37 pcs, 09/23–10/08) in earlier stages; latest Pre-final (10/06) still has 5 major

Not fixed: CB Broken stitch

Found 4 times (6 pcs, 10/03–10/07) in earlier stages; latest Pre-final (10/06) still has 1 major

Missed in earlier stages: 2

DF Twisted seam/skewing (Shipment Sample 09/28), BC Sticker left (Pre-final 10/06): first found in later stages, never recorded before

Found earlier but still reached later stages: 1

DB Run-off stitching 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA 1st Bundle 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (1 Major), CG Grinning (1 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: DB Run-off stitching (1); Both: EA Unsmooth/puckering/bubbling (4/3), DJ Pleat (2/1), AD Fabric stains (1/1), BA Thread ends (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (54), ED Gathering crease (41), EC Asymmetry (13), EB Measurement issue (13), EA Unsmooth/puckering/bubbling (12) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline1 reports
required on prod. days 1/12 (8%)
——
QC Endline6 days—11.8%
QA Inline4 reports427.3%
Shipment Sample2 reports1—
Pre-final1 reports16.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3611.8%
1490 / 6 days
27.3%—
09/23–10/08
CC Skip stitch, ED Gathering crease, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB366121 (8%)6509/25, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
CC Skip stitch1494
AD Fabric stains112695
ED Gathering crease338
BA Thread ends112812
EC Asymmetry211
EB Measurement issue13
EA Unsmooth/puckering/bubbling4341
DB Run-off stitching161
261557 LOGE · CP18 · Due 10/07Final Random FAIL Latest Final Random (09/26) FAILED
No reportPP Sample
No reportPilot Run
09/15QC 1st Bundle1 reports
09/16QA 1st Bundle1 reports
3/32QC Inlineactual/required · 9%
DHU 5.1%QC Endline16 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
1/2 FAILFinal Random2 reports
Order/Ship qty10,000 / 10,000
PDF reports11
Last report09/30

Cross-stage findings

Latest Final Random (09/26) FAILED

31 major: ED Gathering crease 19, CC Skip stitch 1, EC Asymmetry 3, CB Broken stitch 2, DJ Pleat 1, CE Broken seam 5

Not fixed: EC Asymmetry

Found 11 times (17 pcs, 09/15–09/30) in earlier stages; latest Final Random (09/26) still has 3 major

Not fixed: DJ Pleat

Found 3 times (7 pcs, 09/15–09/29) in earlier stages; latest Final Random (09/26) still has 1 major

Not fixed: CB Broken stitch

Found 5 times (9 pcs, 09/15–09/29) in earlier stages; latest Final Random (09/26) still has 2 major

Not fixed: ED Gathering crease

Found 20 times (177 pcs, 09/15–10/05) in earlier stages; latest Final Random (09/26) still has 19 major

Not fixed: CE Broken seam

Found 4 times (7 pcs, 09/16–09/29) in earlier stages; latest Final Random (09/26) still has 5 major

Not fixed: CC Skip stitch

Found 16 times (101 pcs, 09/15–10/05) in earlier stages; latest Final Random (09/26) still has 1 major

Missed in earlier stages: 2

GB Missing sewing operation (Shipment Sample 09/17), DE Cut to broken (Final Random 09/25): first found in later stages, never recorded before

QA Inline DHU is 8.8× QC Endline

QA Inline DHU 44.8% vs QC Endline 5.1% (09/15–10/05, 16 days, 9960 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects; Final Random 9.0%

Found earlier but still reached later stages: 3

EA Unsmooth/puckering/bubbling 1, AD Fabric stains 1, EI Inaccurate/skewed stitching 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 13); zero in QC Endline records

QC Endline data errors: 5

09/26 CP18 261557 (defective pcs 14 > defects 13), 09/28 CP18 261557 (defective pcs 38 > defects 34), 10/01 CP18 261557 (defective pcs 30 > defects 19), 10/03 CP18 261557 (defective pcs 12 > defects 9)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (2 Major), CE Broken seam (2 Major), BB Missing cut seam allowance (2 Major), EI Inaccurate/skewed stitching (1 Major), HB Missing/wrong trims (1 Major); Only QC 1st Bundle: CB Broken stitch (2), GA Missing bartack/button (1), CG Grinning (1), DB Run-off stitching (1); Both: BA Thread ends (3/2), EA Unsmooth/puckering/bubbling (2/3), DJ Pleat (3/2), EC Asymmetry (3/2), ED Gathering crease (1/1); DHU QC 1st Bundle 85.0% / QA 1st Bundle 90.0%

Caught in earlier stages

EA Uneven seam allowance (22), CA Thread tension (6), DB Run-off stitching (5), DK Twisted shoulder strap (5) did not reach later stages

Report line differs from production line

QGR2642940 Final Random (09/25) CP02, QGR2643203 Final Random (09/26) CP09; actual production line(s) CP18 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—85.0%
QA 1st Bundle1 reports—90.0%
QC Inline3 reports
required on prod. days 3/32 (9%)
—46.0%
QC Endline16 days—5.1%
QA Inline3 reports344.8%
Shipment Sample1 reports1—
Final Random2 reports19.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP185.1%
9960 / 16 days
44.8%—
09/15–10/05
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1816323 (9%)161309/29, 09/30, 10/01, 10/03, 10/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends3251741032
ED Gathering crease118167219
CC Skip stitch9651
AD Fabric stains213831
EC Asymmetry324823
EA Uneven seam allowance22
EA Unsmooth/puckering/bubbling238151
CE Broken seam21228
261643 RTMS · CP12 · Due 10/07Final Random PASS Not fixed: AD Fabric stains
No resultPP Sample1 reports
No reportPilot Run
09/08QC 1st Bundle1 reports
09/07QA 1st Bundle1 reports
2/16QC Inlineactual/required · 12%
DHU 23.7%QC Endline8 days
3/4 FAILQA Inline4 reports
No reportShipment Sample
All FAILPre-final2 reports
All PASSFinal Random1 reports
Order/Ship qty2,400 / 2,400
PDF reports12
Last report09/29

Cross-stage findings

Not fixed: AD Fabric stains

Found 12 times (187 pcs, 09/07–09/15) in earlier stages; latest Final Random (09/29) still has 3 major

Recurring in small numbers: 3

Latest Final Random (09/29): CB Broken stitch 1 (earlier 4 times), ED Gathering crease 1 (earlier 15 times), CC Skip stitch 1 (earlier 10 times)

4 defects recorded as 'Others' without detail

Pre-final 4; cannot compare across stages

QC Endline data errors: 1

09/08 CP12 261643 (defective pcs 80 > defects 70)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (6 Major), BA Thread ends (2 Major), GA Missing bartack/button (1 Major), CA Thread tension (1 Major); Only QC 1st Bundle: DB Run-off stitching (4), DI High-low/uneven (3), CC Skip stitch (2), DD Thread not straight/waving (2), DC Join stitching (1); Both: EA Unsmooth/puckering/bubbling (2/4), DJ Pleat (3/1), ED Gathering crease (1/3), CB Broken stitch (1/2); DHU QC 1st Bundle 95.0% / QA 1st Bundle 100.0%

Caught in earlier stages

EA Uneven seam allowance (50), EC Asymmetry (32), Q61 Lace raw edge or broken lace (26), EA Unsmooth/puckering/bubbling (17), CA Thread tension (14) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—95.0%
QA 1st Bundle1 reports—100.0%
QC Inline2 reports
required on prod. days 2/16 (12%)
—28.1%
QC Endline8 days—23.7%
QA Inline4 reports319.5%
Pre-final2 reports211.2%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1223.7%
2380 / 8 days
19.5%PASS
09/07–09/15
AD Fabric stains, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP128162 (12%)8609/10, 09/11, 09/12, 09/14, 09/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
AD Fabric stains5177583
BA Thread ends2151424137
ED Gathering crease13470211
CC Skip stitch2156221
EA Uneven seam allowance50
EC Asymmetry6323
Q61 Lace raw edge or broken lace26
EA Unsmooth/puckering/bubbling2447
261746 OSIT · CS02 · Due 10/07Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
09/14QC 1st Bundle1 reports
09/15QA 1st Bundle1 reports
12/22QC Inlineactual/required · 55%
DHU 15.5%QC Endline11 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty3,000 / 3,000
PDF reports21
Last report10/02

Cross-stage findings

Not fixed: ED Gathering crease

Found 11 times (43 pcs, 09/14–09/22) in earlier stages; latest Final Random (10/02) still has 3 major

Missed in earlier stages: 2

IA 2nd operation issue (Pre-final 09/18), BD Snagging (Final Random 10/02): first found in later stages, never recorded before

Found earlier but still reached later stages: 4

DA Exceed seam allowance 1, CB Broken stitch 9, EI Inaccurate/skewed stitching 1, CC Skip stitch 2 pcs (later stages total)

7 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 6; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (3 Major), BA Thread ends (2 Major), DA Exceed seam allowance (1 Major), CD Needle hole (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: DF Twisted seam/skewing (2), CG Grinning (1); Both: DJ Pleat (3/2), ED Gathering crease (2/2), EA Unsmooth/puckering/bubbling (2/2), DD Thread not straight/waving (2/1), AD Fabric stains (1/1); DHU QC 1st Bundle 10.4% / QA 1st Bundle 85.0%

Caught in earlier stages

EC Asymmetry (138), DB Run-off stitching (50), EA Unsmooth/puckering/bubbling (35), DJ Pleat (15), CE Broken seam (11) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—10.4%
QA 1st Bundle1 reports—85.0%
QC Inline12 reports
required on prod. days 12/22 (55%)
—35.3%
QC Endline11 days—15.5%
QA Inline3 reports338.5%
Shipment Sample2 reports1—
Pre-final1 reports111.2%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0215.5%
2938 / 11 days
38.5%PASS
09/14–09/29
BA Thread ends, EC Asymmetry, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS02112212 (55%)7309/16, 09/17, 09/22, 09/25, 09/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends28152465
EC Asymmetry117120
CC Skip stitch106742
DB Run-off stitching491
ED Gathering crease22533123
EA Unsmooth/puckering/bubbling221993
CB Broken stitch39727
AD Fabric stains119411
261971 RTMS · CP15 · Due 10/07Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/09QA 1st Bundle1 reports
0/28QC Inlineactual/required · 0%
DHU 10.3%QC Endline14 days
All FAILQA Inline4 reports
No reportShipment Sample
All FAILPre-final2 reports
All PASSFinal Random1 reports
Order/Ship qty3,300 / 3,300
PDF reports8
Last report09/29

Cross-stage findings

Not fixed: AD Fabric stains

Found 14 times (99 pcs, 09/09–09/29) in earlier stages; latest Final Random (09/29) still has 4 major

Missed in earlier stages: 1

BC Sticker left (Pre-final 09/14): first found in later stages, never recorded before

Found earlier but still reached later stages: 1

CB Broken stitch 4 pcs (later stages total)

QC Endline data errors: 2

09/15 CP15 261971 (defective pcs 41 > defects 39), 09/17 CP15 261971 (defective pcs 34 > defects 33)

Caught in earlier stages

ED Gathering crease (92), EA Unsmooth/puckering/bubbling (53), CC Skip stitch (19), EA Uneven seam allowance (17), EB Measurement issue (16) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/28 (0%)
——
QC Endline14 days—10.3%
QA Inline4 reports434.4%
Pre-final2 reports23.6%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1510.3%
3119 / 14 days
34.4%PASS
09/09–09/30
AD Fabric stains, ED Gathering crease, EA Unsmooth/puckering/bubbling

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1514280 (0%)141409/23, 09/26, 09/28, 09/29, 09/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlinePre-finalFinal Random
AD Fabric stains592264
ED Gathering crease6815
BA Thread ends3992711
EA Unsmooth/puckering/bubbling476
CC Skip stitch1144
EA Uneven seam allowance17
EB Measurement issue16
DF Twisted seam/skewing14
253713 MKSC · CB06/CB16 · Due 10/07Final Random PASS Missed in earlier stages: 2
No resultPP Sample1 reports
No reportPilot Run
09/01QC 1st Bundle1 reports
07/06QA 1st Bundle1 reports
4/18QC Inlineactual/required · 22%
DHU 8.5%QC Endline8 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,940 / 1,440
PDF reports12
Last report09/11

Cross-stage findings

Missed in earlier stages: 2

BA Thread ends (Final Random 07/15), EA Unsmooth/puckering/bubbling (Final Random 09/02): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/11): CC Skip stitch 1 (earlier 5 times)

Found earlier but still reached later stages: 1

AC Fabric hole 2 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 3, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

Caught in earlier stages

ED Gathering crease (58), CE Broken seam (45), DB Run-off stitching (16), CG Grinning (12), CD Needle hole (12) did not reach later stages

QC 1st Bundle vs QA 1st Bundle

Only QC 1st Bundle: DJ Pleat (1); Both: ED Gathering crease (4/2), CG Grinning (2/2), EC Asymmetry (1/1); DHU QC 1st Bundle 61.5% / QA 1st Bundle 46.2%

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—61.5%
QA 1st Bundle1 reports—46.2%
QC Inline4 reports
required on prod. days 4/18 (22%)
—36.5%
QC Endline8 days—8.5%
QA Inline2 reports223.4%
Final Random3 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB168.5%
1872 / 8 days
23.4%PASS
07/06–09/09
BA Thread ends, CE Broken seam, Others (no detail)
CB060.0%
10 / 1 days
——
09/03–09/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB168164 (25%)8409/02, 09/03, 09/04, 09/05, 09/09
CB06120 (0%)1109/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease423220
BA Thread ends3414
CE Broken seam1332
Others (no detail)12931
DB Run-off stitching16
CG Grinning12261
CD Needle hole12
CC Skip stitch81
260273 MKSC · CP06 · Due 10/07Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/10QA 1st Bundle1 reports
3/12QC Inlineactual/required · 25%
DHU 4.1%QC Endline6 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty2,400 / 1,400
PDF reports8
Last report10/02

Cross-stage findings

Missed in earlier stages: 3

HA Poor pressing (Final Random 07/21), CA Thread tension (Final Random 08/01), BD Snagging (Final Random 10/02): first found in later stages, never recorded before

QA Inline DHU is 6.1× QC Endline

QA Inline DHU 25.0% vs QC Endline 4.1% (07/10–07/16, 6 days, 2709 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (10/02): EA Unsmooth/puckering/bubbling 1 (earlier 13 times), BA Thread ends 1 (earlier 17 times), AD Fabric stains 1 (earlier 12 times)

1 defects recorded as 'Others' without detail

QA 1st Bundle 1; cannot compare across stages

QC Endline data errors: 16

07/10 CP06 260273A (defective pcs 3 > defects 1), 07/10 CP06 260273B (defective pcs 3 > defects 1), 07/11 CP06 260273B (defective pcs 20 > defects 10), 07/11 CP06 260273C (defective pcs 23 > defects 13)…

Caught in earlier stages

ED Gathering crease (35), DI High-low/uneven (18), EC Asymmetry (16), CE Broken seam (5) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—95.0%
QC Inline3 reports
required on prod. days 3/12 (25%)
—25.0%
QC Endline6 days—4.1%
QA Inline1 reports125.0%
Final Random3 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP064.1%
2709 / 6 days
25.0%PASS
07/10–07/16
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP066123 (25%)6307/11, 07/13, 07/14, 07/15, 07/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends26326
AD Fabric stains181611
ED Gathering crease4292
EA Unsmooth/puckering/bubbling731252
DI High-low/uneven18
EC Asymmetry16
CE Broken seam23
CC Skip stitch31
260277 MKSC · CB13/CB15/CB30 · Due 10/07Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
5/68QC Inlineactual/required · 7%
DHU 14.5%QC Endline27 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
1/6 FAILFinal Random6 reports
Order/Ship qty2,450 / 750
PDF reports12
Last report10/06

Cross-stage findings

Missed in earlier stages: 3

AB Shading (Final Random 07/13), GA Missing bartack/button (Final Random 07/27), EI Inaccurate/skewed stitching (Final Random 07/27): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (10/06): AD Fabric stains 1 (earlier 30 times), BA Thread ends 1 (earlier 17 times), ED Gathering crease 1 (earlier 15 times)

Found earlier but still reached later stages: 6

EC Asymmetry 2, CB Broken stitch 1, CG Grinning 2, DJ Pleat 1, CE Broken seam 1, EA Unsmooth/puckering/bubbling 5 pcs (later stages total)

3 defects recorded as 'Others' without detail

Final Random 2, QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 7); zero in QC Endline records

QC Endline data errors: 6

06/19 CB13 260277A-L (defective pcs 20 > defects 15), 06/24 CB13 260277A-L (defective pcs 10 > defects 7), 06/25 CB13 260277B-L (defective pcs 10 > defects 9), 06/29 CB13 260277B-S (defective pcs 25 > defects 24)…

Caught in earlier stages

CC Skip stitch (299), AC Fabric hole (39), Q61 Lace raw edge or broken lace (33), DD Thread not straight/waving (13), DE Cut to broken (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline5 reports
required on prod. days 5/68 (7%)
—44.8%
QC Endline27 days—14.5%
QA Inline1 reports125.0%
Final Random6 reports16.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1313.9%
5303 / 23 days
25.0%PASS
06/16–08/01
CC Skip stitch, AD Fabric stains, BA Thread ends
CB1518.5%
848 / 9 days
—PASS
06/13–08/01
BA Thread ends, ED Gathering crease, Q61 Lace raw edge or broken lace
CB300.0%
20 / 2 days
——
07/08–07/30
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1323465 (11%)231807/18, 07/20, 07/21, 07/31, 08/01
CB159180 (0%)9906/20, 06/23, 07/25, 07/30, 08/01
CB30240 (0%)2207/08, 07/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
CC Skip stitch10289
AD Fabric stains172784
BA Thread ends1513910
ED Gathering crease6928
AC Fabric hole39
Q61 Lace raw edge or broken lace33
EC Asymmetry15132
CE Broken seam7151
260287 MKSC · CB08/CB30 · Due 10/07Final Random PASS Missed in earlier stages: 5
No reportPP Sample
No resultPilot Run3 reports
07/08QC 1st Bundle1 reports
07/09QA 1st Bundle1 reports
7/38QC Inlineactual/required · 18%
DHU 15.1%QC Endline19 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty950 / 500
PDF reports19
Last report09/19

Cross-stage findings

Missed in earlier stages: 5

DA Exceed seam allowance (Shipment Sample 07/15), DF Twisted seam/skewing (Final Random 07/24), BD Snagging (Shipment Sample 08/03), CC Skip stitch (Final Random 08/19), BB Missing cut seam allowance (Final Random 09/19): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/19): BA Thread ends 1 (earlier 14 times)

Found earlier but still reached later stages: 5

ED Gathering crease 1, EC Asymmetry 2, EA Unsmooth/puckering/bubbling 2, CB Broken stitch 1, AD Fabric stains 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA Inline 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC Endline data errors: 3

07/16 CB08 260287A-S (defective pcs 5 > defects 4), 08/13 CB08 260287B-S (defective pcs 5 > defects 4), 08/14 CB08 260287C-L (defective pcs 14 > defects 13)

Caught in earlier stages

CD Needle hole (21), CG Grinning (19), EB Measurement issue (18), DD Thread not straight/waving (14), DJ Pleat (10) did not reach later stages

QC 1st Bundle vs QA 1st Bundle

Only QC 1st Bundle: CH Incorrect stitch density (2), DD Thread not straight/waving (2), DJ Pleat (2), EA Unsmooth/puckering/bubbling (2); Both: ED Gathering crease (6/3), CG Grinning (2/4), EC Asymmetry (4/1); DHU QC 1st Bundle 153.8% / QA 1st Bundle 61.5%

Report line differs from production line

QGR2629540 Final Random (07/24) CB04; actual production line(s) CB08/CB30 (cards show production lines only)

Stage summary

StageCountFAILDHU
Pilot Run3 reports0—
QC 1st Bundle1 reports—153.8%
QA 1st Bundle1 reports—61.5%
QC Inline7 reports
required on prod. days 7/38 (18%)
—53.1%
QC Endline19 days—15.1%
QA Inline2 reports221.9%
Shipment Sample2 reports2—
Final Random3 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0815.1%
1932 / 18 days
21.9%PASS
07/09–09/10
BA Thread ends, ED Gathering crease, EC Asymmetry
CB300.0%
1 / 1 days
——
08/15–08/15
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0818367 (19%)181108/14, 08/17, 08/18, 08/31, 09/10
CB30120 (0%)1108/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends12723
ED Gathering crease163159611
EC Asymmetry241363252
CD Needle hole21
CG Grinning2413
EB Measurement issue1611
DD Thread not straight/waving212
EA Unsmooth/puckering/bubbling26211
261128 MKSC · CP06 · Due 10/07Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/29QA 1st Bundle1 reports
4/16QC Inlineactual/required · 25%
DHU 12.9%QC Endline8 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,600 / 2,000
PDF reports9
Last report09/29

Cross-stage findings

Missed in earlier stages: 2

BD Snagging (Shipment Sample 09/03), GA Missing bartack/button (Shipment Sample 09/03): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/29): CC Skip stitch 2 (earlier 13 times), CF Pulling yarn 1 (earlier 3 times)

Found earlier but still reached later stages: 6

EA Unsmooth/puckering/bubbling 5, CB Broken stitch 2, EI Inaccurate/skewed stitching 2, AD Fabric stains 2, DI High-low/uneven 1, EC Asymmetry 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 4; cannot compare across stages

Caught in earlier stages

DB Run-off stitching (36), ED Gathering crease (32), DD Thread not straight/waving (30), EB Measurement issue (19), EA Uneven seam allowance (9) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—95.0%
QC Inline4 reports
required on prod. days 4/16 (25%)
—41.0%
QC Endline8 days—12.9%
QA Inline1 reports138.0%
Shipment Sample1 reports1—
Final Random2 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0612.9%
2580 / 8 days
38.0%PASS
08/29–09/26
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP068164 (25%)8409/02, 09/03, 09/08, 09/14, 09/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends2208715
CC Skip stitch5532
EA Unsmooth/puckering/bubbling102065
DB Run-off stitching432
ED Gathering crease32
DD Thread not straight/waving30
AD Fabric stains42211
EB Measurement issue19
261135 MKSC · CP06 · Due 10/07Final Random PASS QA Inline DHU is 2.6× QC Inline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/21QA 1st Bundle1 reports
4/20QC Inlineactual/required · 20%
DHU 13.0%QC Endline10 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty3,500 / 1,000
PDF reports10
Last report09/25

Cross-stage findings

QA Inline DHU is 2.6× QC Inline

QA Inline DHU 62.5% vs QC Inline 24.1%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (09/25): CE Broken seam 1 (earlier 14 times), EA Unsmooth/puckering/bubbling 1 (earlier 10 times)

Found earlier but still reached later stages: 4

BB Missing cut seam allowance 1, CC Skip stitch 2, EB Measurement issue 1, CB Broken stitch 2 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 3, Final Random 1; cannot compare across stages

QC Endline data errors: 3

08/24 CP06 261135 (defective pcs 84 > defects 78), 08/26 CP06 261135 (defective pcs 55 > defects 53), 08/28 CP06 261135 (defective pcs 75 > defects 71)

Caught in earlier stages

ED Gathering crease (82), DB Run-off stitching (69), EC Asymmetry (35), AD Fabric stains (21), DI High-low/uneven (20) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline4 reports
required on prod. days 4/20 (20%)
—24.1%
QC Endline10 days—13.0%
QA Inline2 reports262.5%
Final Random3 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0613.0%
3504 / 10 days
62.5%PASS
08/21–09/08
BA Thread ends, DB Run-off stitching, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0610204 (20%)10608/28, 08/29, 09/02, 09/03, 09/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends31311156
ED Gathering crease316594
CC Skip stitch46312
DB Run-off stitching366
EC Asymmetry3257
EA Unsmooth/puckering/bubbling310141
CE Broken seam161431
Others (no detail)3201
261174 MKSC · CB03/CB30 · Due 10/07Final Random PASS Missed in earlier stages: 2
All FAILPP Sample1 reports
No reportPilot Run
08/18QC 1st Bundle1 reports
08/18QA 1st Bundle1 reports
17/52QC Inlineactual/required · 33%
DHU 14.6%QC Endline24 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty5,336 / 1,000
PDF reports27
Last report09/30

Cross-stage findings

Missed in earlier stages: 2

DA Exceed seam allowance (Shipment Sample 08/21), AB Shading (Shipment Sample 08/21): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/30): EA Unsmooth/puckering/bubbling 1 (earlier 32 times), CB Broken stitch 1 (earlier 16 times), BA Thread ends 1 (earlier 37 times)

Found earlier but still reached later stages: 4

EC Asymmetry 4, CG Grinning 1, ED Gathering crease 2, DB Run-off stitching 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA Inline 3, Final Random 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: CE Broken seam (4), CB Broken stitch (3); Both: EA Unsmooth/puckering/bubbling (3/5), EC Asymmetry (4/3); DHU QC 1st Bundle 107.7% / QA 1st Bundle 84.6%

Caught in earlier stages

EB Measurement issue (194), CC Skip stitch (76), CE Broken seam (52), DJ Pleat (37), EA Uneven seam allowance (36) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports1—
QC 1st Bundle1 reports—107.7%
QA 1st Bundle1 reports—84.6%
QC Inline17 reports
required on prod. days 17/52 (33%)
—51.5%
QC Endline24 days—14.6%
QA Inline4 reports432.8%
Shipment Sample1 reports1—
Final Random2 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0314.6%
5311 / 24 days
32.8%PASS
08/18–09/25
BA Thread ends, EB Measurement issue, ED Gathering crease
CB300.0%
20 / 2 days
——
08/26–09/10
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB03244817 (35%)24709/10, 09/11, 09/12, 09/15, 09/25
CB30240 (0%)2208/26, 09/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends2813
EB Measurement issue194
ED Gathering crease13104711
EA Unsmooth/puckering/bubbling3356661122
CC Skip stitch967
EC Asymmetry243356104
CB Broken stitch3522
CG Grinning25211
261178 MKSC · CP06 · Due 10/07Final Random PASS QA Inline DHU is 1.8× QC Inline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/15QA 1st Bundle1 reports
3/14QC Inlineactual/required · 21%
DHU 11.9%QC Endline7 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty2,750 / 1,500
PDF reports10
Last report09/07

Cross-stage findings

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 38.5% vs QC Inline 21.2%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (09/07): CC Skip stitch 2 (earlier 13 times), AD Fabric stains 1 (earlier 3 times)

Found earlier but still reached later stages: 2

CE Broken seam 2, DJ Pleat 2 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 2; cannot compare across stages

Caught in earlier stages

ED Gathering crease (62), DB Run-off stitching (61), EA Unsmooth/puckering/bubbling (22), EB Measurement issue (20), GB Missing sewing operation (13) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—70.0%
QC Inline3 reports
required on prod. days 3/14 (21%)
—21.2%
QC Endline7 days—11.9%
QA Inline3 reports338.5%
Final Random3 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0611.9%
2750 / 7 days
38.5%PASS
08/14–08/21
BA Thread ends, DB Run-off stitching, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP067143 (21%)7408/17, 08/18, 08/19, 08/20, 08/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends37445
CC Skip stitch155536
ED Gathering crease1565
DB Run-off stitching2581
CE Broken seam16162
EA Unsmooth/puckering/bubbling859
EB Measurement issue20
DJ Pleat152
261181 MKSC · CS19 · Due 10/07Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
07/30QC 1st Bundle1 reports
07/30QA 1st Bundle1 reports
2/14QC Inlineactual/required · 14%
DHU 9.2%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,270 / 1,270
PDF reports7
Last report08/28

Cross-stage findings

Missed in earlier stages: 2

DH Pressing mark (Pre-final 08/08), AD Fabric stains (Pre-final 08/08): first found in later stages, never recorded before

QA Inline DHU is 2.1× QC Inline

QA Inline DHU 53.1% vs QC Inline 25.0%; QC Inline may be missing defects

QA Inline DHU is 5.8× QC Endline

QA Inline DHU 53.1% vs QC Endline 9.2% (07/29–08/05, 7 days, 1278 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/28): EC Asymmetry 1 (earlier 7 times), ED Gathering crease 2 (earlier 5 times)

Found earlier but still reached later stages: 1

HA Poor pressing 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 1, Final Random 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: HA Poor pressing (2 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: EC Asymmetry (6), CG Grinning (3); Both: BA Thread ends (3/4), DI High-low/uneven (4/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 55.0%

Caught in earlier stages

CC Skip stitch (23), DI High-low/uneven (15), CG Grinning (6), DB Run-off stitching (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—55.0%
QC Inline2 reports
required on prod. days 2/14 (14%)
—25.0%
QC Endline7 days—9.2%
QA Inline1 reports153.1%
Pre-final1 reports03.2%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS199.2%
1278 / 7 days
53.1%PASS
07/29–08/05
BA Thread ends, CC Skip stitch, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS197142 (14%)7507/31, 08/01, 08/03, 08/04, 08/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends341463323
CC Skip stitch23
Others (no detail)21711
EC Asymmetry61211
DI High-low/uneven4173
ED Gathering crease1732
CG Grinning33
HA Poor pressing231
261446 MKSC · CS19 · Due 10/07Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
09/23QC 1st Bundle1 reports
09/23QA 1st Bundle1 reports
7/12QC Inlineactual/required · 58%
DHU 10.1%QC Endline6 days
No reportQA Inline
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,250 / 500
PDF reports11
Last report09/30

Cross-stage findings

Missed in earlier stages: 3

HA Poor pressing (Pre-final 09/28), AC Fabric hole (Pre-final 09/28), BD Snagging (Pre-final 09/28): first found in later stages, never recorded before

Pre-final DHU is 1.0× QC Endline

Pre-final DHU 10.4% vs QC Endline 10.1% (09/22–09/29, 6 days, 1244 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 4

DI High-low/uneven 2, DJ Pleat 1, EA Unsmooth/puckering/bubbling 5, CB Broken stitch 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA 1st Bundle 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EA Unsmooth/puckering/bubbling (QA 5), HA Poor pressing (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), ED Gathering crease (2 Major), CE Broken seam (2 Major), BC Sticker left (2 Major), DA Exceed seam allowance (1 Major); Only QC 1st Bundle: EC Asymmetry (2), DD Thread not straight/waving (1), DJ Pleat (1); Both: CG Grinning (2/5), DI High-low/uneven (1/4); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (29), CC Skip stitch (25), CG Grinning (22), EC Asymmetry (16), DD Thread not straight/waving (13) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline7 reports
required on prod. days 7/12 (58%)
——
QC Endline6 days—10.1%
Pre-final1 reports110.4%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1910.1%
1244 / 6 days
—PASS
09/22–09/29
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS196127 (58%)3209/22, 09/23, 09/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlinePre-finalFinal Random
BA Thread ends346722
ED Gathering crease2522
CC Skip stitch223
DI High-low/uneven14162
CG Grinning2515
EC Asymmetry214
DD Thread not straight/waving112
EA Unsmooth/puckering/bubbling341
261813 OSIT · CS09/CS10/CS11 · Due 10/07Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
09/11QC 1st Bundle1 reports
09/10QA 1st Bundle1 reports
3/16QC Inlineactual/required · 19%
DHU 17.9%QC Endline6 days
No reportQA Inline
All FAILShipment Sample2 reports1 no result
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty5,000 / 5,000
PDF reports9
Last report09/21

Cross-stage findings

Missed in earlier stages: 2

DJ Pleat (Shipment Sample 09/11), CG Grinning (Final Random 09/21): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/21): EC Asymmetry 2 (earlier 12 times)

Found earlier but still reached later stages: 3

IA 2nd operation issue 3, EI Inaccurate/skewed stitching 2, EA Unsmooth/puckering/bubbling 2 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (3 Major), DI High-low/uneven (3 Major), CC Skip stitch (2 Major), DF Twisted seam/skewing (2 Major), BD Snagging (1 Major), IA 2nd operation issue (1 Major); Only QC 1st Bundle: EI Inaccurate/skewed stitching (1), EA Unsmooth/puckering/bubbling (1); Both: BA Thread ends (4/3), EC Asymmetry (4/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 80.0%

Caught in earlier stages

DB Run-off stitching (72), CC Skip stitch (64), ED Gathering crease (24), DF Twisted seam/skewing (7), AB Shading (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—80.0%
QC Inline3 reports
required on prod. days 3/16 (19%)
—43.3%
QC Endline6 days—17.9%
Shipment Sample2 reports1—
Pre-final1 reports02.5%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0918.0%
4485 / 6 days
—PASS
09/10–09/16
BA Thread ends, CC Skip stitch, EC Asymmetry
CS100.0%
10 / 1 days
——
09/12–09/12
—
CS110.0%
10 / 1 days
——
09/15–09/15
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS096123 (25%)6309/11, 09/12, 09/14, 09/15, 09/16
CS10120 (0%)1109/12
CS11120 (0%)1109/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SamplePre-finalFinal Random
BA Thread ends431564075
DB Run-off stitching3735
EC Asymmetry41114912
CC Skip stitch2458
ED Gathering crease24
EA Unsmooth/puckering/bubbling1192
IA 2nd operation issue143
DF Twisted seam/skewing25
261814 OSIT · CS09/CS10/CS11 · Due 10/07Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
09/02QC 1st Bundle1 reports
09/02QA 1st Bundle1 reports
6/24QC Inlineactual/required · 25%
DHU 24.9%QC Endline9 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty6,000 / 6,000
PDF reports15
Last report09/14

Cross-stage findings

Missed in earlier stages: 3

BD Snagging (Pre-final 09/05), AB Shading (Pre-final 09/05), CF Pulling yarn (Final Random 09/14): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/14): EC Asymmetry 1 (earlier 25 times), CB Broken stitch 1 (earlier 5 times), CC Skip stitch 1 (earlier 7 times)

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA Inline 1, Final Random 4; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (2 Major), DF Twisted seam/skewing (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CA Thread tension (1 Major); Only QC 1st Bundle: EI Inaccurate/skewed stitching (4); Both: EC Asymmetry (2/1), CB Broken stitch (1/1), BA Thread ends (1/1); DHU QC 1st Bundle 61.5% / QA 1st Bundle 40.0%

Caught in earlier stages

DB Run-off stitching (123), ED Gathering crease (79), EI Inaccurate/skewed stitching (10), FC Wrong label (7), DI High-low/uneven (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—61.5%
QA 1st Bundle1 reports—40.0%
QC Inline6 reports
required on prod. days 6/24 (25%)
—24.7%
QC Endline9 days—24.9%
QA Inline3 reports324.0%
Shipment Sample2 reports1—
Pre-final1 reports03.5%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0925.0%
5487 / 9 days
24.0%PASS
09/02–09/14
BA Thread ends, EC Asymmetry, CC Skip stitch
CS100.0%
15 / 2 days
——
09/08–09/10
—
CS110.0%
8 / 1 days
——
09/05–09/05
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS099186 (33%)9309/08, 09/09, 09/10, 09/12, 09/14
CS10240 (0%)2209/08, 09/10
CS11120 (0%)1109/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends1110963275
EC Asymmetry21581546221
CC Skip stitch12411
DB Run-off stitching4677
ED Gathering crease23551
EA Unsmooth/puckering/bubbling12311
CB Broken stitch119121
EI Inaccurate/skewed stitching442
261973 RTMS · CP14 · Due 10/07Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/18QC 1st Bundle1 reports
09/19QA 1st Bundle1 reports
0/16QC Inlineactual/required · 0%
DHU 21.8%QC Endline8 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,800 / 1,800
PDF reports8
Last report10/02

Cross-stage findings

Missed in earlier stages: 1

BD Snagging (Pre-final 09/26): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (10/02): CB Broken stitch 1 (earlier 5 times)

2 defects recorded as 'Others' without detail

Pre-final 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

CB Broken stitch (QA 4); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (4 Major), DJ Pleat (1 Major), ED Gathering crease (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: EH Poor lamination/bonding (2), DA Exceed seam allowance (1); Both: AD Fabric stains (4/5), EC Asymmetry (5/3), BA Thread ends (1/2), CA Thread tension (2/1), CB Broken stitch (1/2); DHU QC 1st Bundle 80.0% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (28), Q95 HTL position incorrect (24), EH Poor lamination/bonding (19), EC Asymmetry (9), EI Inaccurate/skewed stitching (7) did not reach later stages

Found before bulk production (Shipment Sample): 1

AD Fabric stains: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline8 days—21.8%
QA Inline2 reports242.2%
Shipment Sample2 reports1—
Pre-final1 reports111.2%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1421.8%
1434 / 8 days
42.2%PASS
09/18–09/29
AD Fabric stains, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP148160 (0%)8809/22, 09/23, 09/25, 09/26, 09/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineShipment SamplePre-finalFinal Random
AD Fabric stains4520073105
BA Thread ends1235713
ED Gathering crease1261
Q95 HTL position incorrect24
EH Poor lamination/bonding217
EC Asymmetry531
CB Broken stitch12211
EI Inaccurate/skewed stitching43
261366 MKSC · CP04/CP06 · Due 10/03No final No major issue (3 minor notes)
No reportPP Sample
No resultPilot Run1 reports
10/02QC 1st Bundle1 reports
10/02QA 1st Bundle1 reports
2/12QC Inlineactual/required · 17%
DHU 13.9%QC Endline6 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty6,804 / 6,804
PDF reports6
Last report10/07

Cross-stage findings

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

QC Endline data errors: 2

10/03 CP04 261366A (defective pcs 51 > defects 48), 10/06 CP04 261366A (defective pcs 71 > defects 66)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), BA Thread ends (2 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: DB Run-off stitching (4), CB Broken stitch (3), EA Unsmooth/puckering/bubbling (2); Both: AD Fabric stains (7/4), ED Gathering crease (1/3), EC Asymmetry (3/1); DHU QC 1st Bundle — / QA 1st Bundle 65.0%

Caught in earlier stages

BA Thread ends (135), AD Fabric stains (117), EB Measurement issue (71), CC Skip stitch (69), ED Gathering crease (68) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—65.0%
QC Inline2 reports
required on prod. days 2/12 (17%)
——
QC Endline6 days—13.9%
QA Inline1 reports159.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0413.9%
3199 / 6 days
59.4%—
10/02–10/08
BA Thread ends, AD Fabric stains, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP046122 (17%)6410/03, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends21303
AD Fabric stains7410942
EB Measurement issue701
CC Skip stitch168
ED Gathering crease213260
EC Asymmetry3315102
CE Broken seam113
DJ Pleat13
260291 MKSC · CS10/CS19 · Due 10/07Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No resultPilot Run2 reports
07/10QC 1st Bundle1 reports
07/10QA 1st Bundle1 reports
3/14QC Inlineactual/required · 21%
DHU 5.5%QC Endline7 days
No reportQA Inline
No resultShipment Sample2 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,670 / 400
PDF reports11
Last report08/20

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (08/20): ED Gathering crease 1 (earlier 4 times)

Found earlier but still reached later stages: 4

EC Asymmetry 1, EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 1, DJ Pleat 2 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), DJ Pleat (1 Major), ED Gathering crease (1 Major); Only QC 1st Bundle: DI High-low/uneven (4), HA Poor pressing (2), EC Asymmetry (1); Both: BA Thread ends (5/3), CG Grinning (3/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 60.0%

Caught in earlier stages

DI High-low/uneven (15), CC Skip stitch (13), CG Grinning (9), DB Run-off stitching (6), AD Fabric stains (5) did not reach later stages

Found before bulk production (Shipment Sample): 2

DK Twisted shoulder strap, CE Broken seam: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—60.0%
QC Inline3 reports
required on prod. days 3/14 (21%)
—25.8%
QC Endline7 days—5.5%
Shipment Sample2 reports0—
Final Random2 reports03.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS195.5%
1668 / 7 days
—PASS
07/09–07/29
BA Thread ends, Others (no detail), CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS197143 (21%)7407/11, 07/13, 07/14, 07/15, 07/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SampleFinal Random
BA Thread ends5319514
Others (no detail)315
DI High-low/uneven411
EC Asymmetry111011
CC Skip stitch13
CG Grinning315
ED Gathering crease133
DB Run-off stitching24
261126 MKSC · CB04/CB22 · Due 10/07Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No resultPilot Run2 reports
No reportQC 1st Bundle
09/04QA 1st Bundle1 reports
7/26QC Inlineactual/required · 27%
DHU 14.9%QC Endline13 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty2,212 / 1,000
PDF reports16
Last report10/01

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (10/01): BA Thread ends 1 (earlier 12 times), AD Fabric stains 1 (earlier 4 times)

Found earlier but still reached later stages: 5

EA Unsmooth/puckering/bubbling 1, ED Gathering crease 1, DJ Pleat 1, BB Missing cut seam allowance 1, CD Needle hole 2 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA 1st Bundle 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

CD Needle hole (QA 4); zero in QC Endline records

Caught in earlier stages

EC Asymmetry (54), DB Run-off stitching (46), CC Skip stitch (42), CE Broken seam (22), CB Broken stitch (16) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QA 1st Bundle1 reports—76.9%
QC Inline7 reports
required on prod. days 7/26 (27%)
—39.4%
QC Endline13 days—14.9%
QA Inline3 reports326.0%
Final Random3 reports04.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2214.9%
2212 / 13 days
26.0%PASS
09/04–09/18
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2213267 (27%)13609/14, 09/15, 09/16, 09/17, 09/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends13825
ED Gathering crease23781
EC Asymmetry2214306
DB Run-off stitching27181
CC Skip stitch636
CE Broken seam9121
AD Fabric stains1811
CB Broken stitch1123
261136 MKSC · CP02/CP03 · Due 10/07Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/22QA 1st Bundle1 reports
0/24QC Inlineactual/required · 0%
DHU 16.0%QC Endline12 days
All FAILQA Inline4 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty4,070 / 1,000
PDF reports7
Last report10/06

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (10/06): CC Skip stitch 1 (earlier 13 times), EA Unsmooth/puckering/bubbling 1 (earlier 14 times), CB Broken stitch 1 (earlier 3 times)

Found earlier but still reached later stages: 1

AD Fabric stains 1 pcs (later stages total)

11 defects recorded as 'Others' without detail

QA 1st Bundle 4, QA Inline 6, Final Random 1; cannot compare across stages

QC Endline data errors: 6

08/22 CP02 261136 (defective pcs 62 > defects 50), 08/24 CP02 261136 (defective pcs 276 > defects 119), 08/25 CP02 261136 (defective pcs 98 > defects 48), 08/28 CP02 261136 (defective pcs 82 > defects 63)…

Caught in earlier stages

EC Asymmetry (167), ED Gathering crease (124), EB Measurement issue (73), AB Shading (26), EA Uneven seam allowance (13) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/24 (0%)
——
QC Endline12 days—16.0%
QA Inline4 reports441.4%
Final Random2 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0216.1%
3945 / 11 days
41.4%PASS
08/22–09/09
EC Asymmetry, BA Thread ends, ED Gathering crease
CP0312.0%
125 / 1 days
——
10/02–10/02
BA Thread ends, CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0211220 (0%)111108/31, 09/01, 09/02, 09/03, 09/09
CP03120 (0%)1110/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
EC Asymmetry11624
BA Thread ends213454
ED Gathering crease21166
EB Measurement issue73
EA Unsmooth/puckering/bubbling454122
CC Skip stitch15931
AB Shading26
EA Uneven seam allowance13
261167 MKSC · CB01/CB05/CB06… · Due 10/07Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No resultPilot Run7 reports
09/18QC 1st Bundle1 reports
09/19QA 1st Bundle1 reports
11/18QC Inlineactual/required · 61%
DHU 39.6%QC Endline8 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,737 / 0
PDF reports23
Last report10/01

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (09/30): ED Gathering crease 1 (earlier 30 times), EA Unsmooth/puckering/bubbling 1 (earlier 9 times)

5 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 3, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (3 Major), DC Join stitching (1 Major), DH Pressing mark (1 Major); Only QC 1st Bundle: ED Gathering crease (3), EI Inaccurate/skewed stitching (1), DB Run-off stitching (1), EC Asymmetry (1); Both: EA Unsmooth/puckering/bubbling (2/1), AD Fabric stains (1/1); DHU QC 1st Bundle 90.0% / QA 1st Bundle 61.5%

Caught in earlier stages

AD Fabric stains (210), DB Run-off stitching (148), CE Broken seam (110), CC Skip stitch (77), CD Needle hole (77) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run7 reports0—
QC 1st Bundle1 reports—90.0%
QA 1st Bundle1 reports—61.5%
QC Inline11 reports
required on prod. days 11/18 (61%)
—120.7%
QC Endline8 days—39.6%
QA Inline2 reports221.9%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1639.7%
2697 / 8 days
21.9%PASS
09/19–09/29
BA Thread ends, ED Gathering crease, AD Fabric stains
CB300.0%
10 / 1 days
——
09/28–09/28
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1681611 (69%)3209/26, 09/28, 09/29
CB30120 (0%)1109/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends30022
ED Gathering crease53522121
AD Fabric stains11521551
DB Run-off stitching111136
CE Broken seam3107
CC Skip stitch473
CD Needle hole77
EC Asymmetry711112
Sep 2026 205 · 🔴 52 🟠 110 🟢 43
Final Random FAIL: 14 POs
Most common in later stages: BA Thread ends (185), CB Broken stitch (135), ED Gathering crease (112)
🔴 Lines with most 🔴: CP07 (7), CB30 (6), CP17 (5), CP11 (5), CB29 (4)
260789 LOGE · CB29/CB31 · Due 09/02Shipment Sample FAIL Latest Shipment Sample (08/05) FAILED
No resultPP Sample1 reports
No reportPilot Run
07/16QC 1st Bundle1 reports
07/15QA 1st Bundle1 reports
12/32QC Inlineactual/required · 38%
DHU 6.6%QC Endline15 days
All FAILQA Inline5 reports
All FAILShipment Sample2 reports
No reportPre-final
No reportFinal Random
Order/Ship qty6,000 / 6,000
PDF reports22
Last report08/05

Cross-stage findings

Latest Shipment Sample (08/05) FAILED

8 major: GB Missing sewing operation 1, EC Asymmetry 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, EE Raw edge 1, ED Gathering crease 1, CG Grinning 1, EA Unsmooth/puckering/bubbling 1

Not fixed: EA Unsmooth/puckering/bubbling

Found 5 times (8 pcs, 07/13–07/25) in earlier stages; latest Shipment Sample (08/05) still has 3 major

Not fixed: EC Asymmetry

Found 30 times (93 pcs, 07/15–07/30) in earlier stages; latest Shipment Sample (08/05) still has 4 major

Not fixed: EE Raw edge

Found 3 times (4 pcs, 07/15–07/30) in earlier stages; latest Shipment Sample (08/05) still has 2 major

Not fixed: ED Gathering crease

Found 3 times (12 pcs, 07/18–07/22) in earlier stages; latest Shipment Sample (08/05) still has 2 major

Missed in earlier stages: 2

GB Missing sewing operation (Shipment Sample 08/05), CG Grinning (Shipment Sample 08/05): first found in later stages, never recorded before

QA Inline DHU is 5.4× QC Endline

QA Inline DHU 35.6% vs QC Endline 6.6% (07/15–08/01, 15 days, 5634 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 9); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 9 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (1 Major), EE Raw edge (1 Major), DB Run-off stitching (1 Major), EA Unsmooth/puckering/bubbling (1 Major), DE Cut to broken (1 Major), EI Inaccurate/skewed stitching (1 Major), DJ Pleat (1 Major), DF Twisted seam/skewing (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: AC Fabric hole (1); Both: EC Asymmetry (4/1), CE Broken seam (1/2); DHU QC 1st Bundle 46.2% / QA 1st Bundle 92.3%

Caught in earlier stages

CE Broken seam (162), CC Skip stitch (118), BA Thread ends (108), DJ Pleat (31), DB Run-off stitching (24) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—46.2%
QA 1st Bundle1 reports—92.3%
QC Inline12 reports
required on prod. days 12/32 (38%)
—32.3%
QC Endline15 days—6.6%
QA Inline5 reports535.6%
Shipment Sample2 reports2—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB316.6%
5624 / 15 days
35.6%—
07/15–08/01
CC Skip stitch, CE Broken seam, BA Thread ends
CB290.0%
10 / 1 days
——
07/24–07/24
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB31153012 (40%)15307/27, 07/28, 07/29, 07/30, 08/01
CB29120 (0%)1107/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
CE Broken seam12441114
CC Skip stitch2116
BA Thread ends1053
EC Asymmetry41532694
DJ Pleat1273
DB Run-off stitching11193
EH Poor lamination/bonding19
ED Gathering crease392
260791 LOGE · CB30/CB32 · Due 09/02Shipment Sample FAIL Latest Shipment Sample (08/07) FAILED
No reportPP Sample
No reportPilot Run
07/16QC 1st Bundle1 reports
07/15QA 1st Bundle1 reports
13/38QC Inlineactual/required · 34%
DHU 7.0%QC Endline17 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty6,000 / 6,000
PDF reports19
Last report08/07

Cross-stage findings

Latest Shipment Sample (08/07) FAILED

10 major: ED Gathering crease 1, AB Shading 1, EA Unsmooth/puckering/bubbling 1, EA Unsmooth/puckering/bubbling 1, EB Measurement issue 1, CA Thread tension 1, CA Thread tension 1, EC Asymmetry 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1

Not fixed: EB Measurement issue

Found 12 times (37 pcs, 07/15–08/01) in earlier stages; latest Shipment Sample (08/07) still has 1 major

Not fixed: EC Asymmetry

Found 17 times (39 pcs, 07/15–07/30) in earlier stages; latest Shipment Sample (08/07) still has 2 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 6 times (11 pcs, 07/15–08/03) in earlier stages; latest Shipment Sample (08/07) still has 3 major

Not fixed: ED Gathering crease

Found 13 times (36 pcs, 07/16–08/03) in earlier stages; latest Shipment Sample (08/07) still has 1 major

Missed in earlier stages: 2

AB Shading (Shipment Sample 08/07), CA Thread tension (Shipment Sample 08/07): first found in later stages, never recorded before

QA Inline DHU is 5.1× QC Endline

QA Inline DHU 35.4% vs QC Endline 7.0% (07/16–08/04, 17 days, 5960 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 8); zero in QC Endline records

QC Endline data errors: 5

07/17 CB32 260791-S (defective pcs 14 > defects 13), 07/28 CB32 260791-S (defective pcs 9 > defects 8), 07/29 CB32 260791-S (defective pcs 16 > defects 14), 07/29 CB32 260791-L (defective pcs 22 > defects 21)…

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (3 Major), EB Measurement issue (2 Major), BA Thread ends (2 Major), BB Missing cut seam allowance (2 Major), EA Unsmooth/puckering/bubbling (1 Major), EI Inaccurate/skewed stitching (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: DE Cut to broken (2), DA Exceed seam allowance (1), CE Broken seam (1); Both: AD Fabric stains (2/1); DHU QC 1st Bundle 46.2% / QA 1st Bundle 100.0%

Caught in earlier stages

BA Thread ends (201), CC Skip stitch (67), AD Fabric stains (57), AC Fabric hole (56), CE Broken seam (42) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—46.2%
QA 1st Bundle1 reports—100.0%
QC Inline13 reports
required on prod. days 13/38 (34%)
—32.8%
QC Endline17 days—7.0%
QA Inline3 reports335.4%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB327.0%
5940 / 17 days
35.4%—
07/16–08/04
BA Thread ends, CC Skip stitch, AC Fabric hole
CB300.0%
20 / 2 days
——
07/31–08/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB32173413 (38%)17407/30, 07/31, 08/01, 08/03, 08/04
CB30240 (0%)2207/31, 08/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends21945
CC Skip stitch562
AD Fabric stains219432
AC Fabric hole19442
CE Broken seam1401
EC Asymmetry33062
EB Measurement issue2351
ED Gathering crease361
260792 LOGE · CS09/CS10 · Due 09/02Shipment Sample FAIL Latest Shipment Sample (07/17) FAILED
No reportPP Sample
No reportPilot Run
07/13QC 1st Bundle1 reports
07/13QA 1st Bundle1 reports
6/34QC Inlineactual/required · 18%
DHU 17.0%QC Endline16 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty10,000 / 10,000
PDF reports14
Last report08/04

Cross-stage findings

Latest Shipment Sample (07/17) FAILED

9 major: GA Missing bartack/button 3, CB Broken stitch 1, CB Broken stitch 1, EA Unsmooth/puckering/bubbling 1, GA Missing bartack/button 1, EC Asymmetry 1, Others (no detail) 1

Missed in earlier stages: 1

GA Missing bartack/button (Shipment Sample 07/17): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Pre-final (07/27): EA Unsmooth/puckering/bubbling 2 (earlier 10 times), BA Thread ends 1 (earlier 24 times)

Found earlier but still reached later stages: 2

EC Asymmetry 2, CB Broken stitch 4 pcs (later stages total)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EA Unsmooth/puckering/bubbling (QA 8), EC Asymmetry (QA 5); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), DJ Pleat (1 Major), BB Missing cut seam allowance (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: ED Gathering crease (2), FA Wrong material (1); Both: BA Thread ends (4/3), EA Unsmooth/puckering/bubbling (3/2); DHU QC 1st Bundle 76.9% / QA 1st Bundle 76.9%

Caught in earlier stages

ED Gathering crease (105), CC Skip stitch (84), DB Run-off stitching (29), DA Exceed seam allowance (27), EI Inaccurate/skewed stitching (14) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—76.9%
QC Inline6 reports
required on prod. days 6/34 (18%)
—63.8%
QC Endline16 days—17.0%
QA Inline4 reports435.9%
Shipment Sample1 reports1—
Pre-final1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1017.1%
9962 / 16 days
35.9%—
07/13–08/19
BA Thread ends, Others (no detail), ED Gathering crease
CS090.0%
40 / 1 days
——
07/17–07/17
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1016326 (19%)161008/05, 08/06, 08/10, 08/18, 08/19
CS09120 (0%)1107/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends43711315238
Others (no detail)1841
ED Gathering crease21021
CC Skip stitch84
DB Run-off stitching10181
DA Exceed seam allowance252
EA Unsmooth/puckering/bubbling328512
EC Asymmetry1932
260793 LOGE · CB31/CB32 · Due 09/02Shipment Sample FAIL Latest Shipment Sample (07/18) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
7/38QC Inlineactual/required · 18%
DHU 9.2%QC Endline18 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty6,000 / 6,000
PDF reports9
Last report07/18

Cross-stage findings

Latest Shipment Sample (07/18) FAILED

8 major: CG Grinning 1, GA Missing bartack/button 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, CB Broken stitch 1, DG Fastening loose/misplaced 1, EI Inaccurate/skewed stitching 1, DJ Pleat 1

Not fixed: DJ Pleat

Found 4 times (9 pcs, 07/06–07/13) in earlier stages; latest Shipment Sample (07/18) still has 1 major

Not fixed: EC Asymmetry

Found 10 times (29 pcs, 07/06–07/13) in earlier stages; latest Shipment Sample (07/18) still has 1 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 3 times (7 pcs, 06/30–07/13) in earlier stages; latest Shipment Sample (07/18) still has 1 major

Missed in earlier stages: 3

CG Grinning (Shipment Sample 07/18), GA Missing bartack/button (Shipment Sample 07/18), DG Fastening loose/misplaced (Shipment Sample 07/18): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

CB Broken stitch 1, EI Inaccurate/skewed stitching 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

QC Endline data errors: 1

07/15 CB32 260793-S (defective pcs 8 > defects 7)

Caught in earlier stages

BA Thread ends (293), AD Fabric stains (119), CC Skip stitch (79), AC Fabric hole (54), EB Measurement issue (16) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline7 reports
required on prod. days 7/38 (18%)
—33.7%
QC Endline18 days—9.2%
QA Inline1 reports137.5%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB329.2%
5990 / 18 days
37.5%—
06/27–07/24
BA Thread ends, AD Fabric stains, CC Skip stitch
CB310.0%
10 / 1 days
——
07/13–07/13
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3218367 (19%)181107/13, 07/14, 07/15, 07/16, 07/24
CB31120 (0%)1107/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends2903
AD Fabric stains18101
CC Skip stitch376
AC Fabric hole153
EC Asymmetry2451
EB Measurement issue16
CE Broken seam122
ED Gathering crease13
260794 LOGE · CS10 · Due 09/02Shipment Sample FAIL Latest Shipment Sample (07/20) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
5/20QC Inlineactual/required · 25%
DHU 15.3%QC Endline10 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty10,000 / 10,000
PDF reports8
Last report07/27

Cross-stage findings

Latest Shipment Sample (07/20) FAILED

7 major: Others (no detail) 1, DJ Pleat 1, Others (no detail) 1, Others (no detail) 1, EI Inaccurate/skewed stitching 1, Others (no detail) 1, AD Fabric stains 1

Missed in earlier stages: 1

GA Missing bartack/button (Pre-final 07/27): first found in later stages, never recorded before

Found earlier but still reached later stages: 4

EI Inaccurate/skewed stitching 1, CB Broken stitch 2, AD Fabric stains 3, DJ Pleat 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

Shipment Sample 4; cannot compare across stages

Caught in earlier stages

ED Gathering crease (170), CC Skip stitch (57), EA Unsmooth/puckering/bubbling (18), EC Asymmetry (16), BB Missing cut seam allowance (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline5 reports
required on prod. days 5/20 (25%)
—68.4%
QC Endline10 days—15.3%
QA Inline1 reports121.9%
Shipment Sample1 reports1—
Pre-final1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1015.3%
9980 / 10 days
21.9%—
07/02–07/13
BA Thread ends, ED Gathering crease, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1010205 (25%)10507/08, 07/09, 07/10, 07/11, 07/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends71119137
ED Gathering crease170
Others (no detail)1044
CC Skip stitch57
EI Inaccurate/skewed stitching191
EA Unsmooth/puckering/bubbling18
EC Asymmetry16
CB Broken stitch82
260888 LOGE · CS21 · Due 09/02Final Random PASS Not fixed: CB Broken stitch
No reportPP Sample
No reportPilot Run
08/07QC 1st Bundle1 reports
08/07QA 1st Bundle1 reports
13/32QC Inlineactual/required · 41%
DHU 12.9%QC Endline16 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty7,000 / 7,000
PDF reports20
Last report09/01

Cross-stage findings

Not fixed: CB Broken stitch

Found 35 times (67 pcs, 08/07–08/24) in earlier stages; latest Final Random (09/01) still has 3 major

Not fixed: DJ Pleat

Found 10 times (15 pcs, 08/10–08/24) in earlier stages; latest Final Random (09/01) still has 3 major

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 08/11): first found in later stages, never recorded before

QA Inline DHU is 1.6× QC Inline

QA Inline DHU 40.6% vs QC Inline 26.0%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (09/01): DE Cut to broken 1 (earlier 15 times), CE Broken seam 1 (earlier 15 times)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 5); zero in QC Endline records

QC Endline data errors: 3

08/15 CS21 260888-S (defective pcs 52 > defects 51), 08/20 CS21 260888-S (defective pcs 71 > defects 70), 08/21 CS21 260888-S (defective pcs 39 > defects 35)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), CG Grinning (1 Major), DD Thread not straight/waving (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (2), DE Cut to broken (2), AC Fabric hole (1), DF Twisted seam/skewing (1); Both: EI Inaccurate/skewed stitching (2/2), CB Broken stitch (3/1), EC Asymmetry (1/2), CE Broken seam (2/1), CC Skip stitch (1/1), DB Run-off stitching (1/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 65.0%

Caught in earlier stages

CC Skip stitch (212), DB Run-off stitching (114), ED Gathering crease (96), GA Missing bartack/button (13), AC Fabric hole (5) did not reach later stages

Found before bulk production (Shipment Sample): 5

IC Broken needle/metal contamination, EC Asymmetry, CG Grinning, EI Inaccurate/skewed stitching, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—65.0%
QC Inline13 reports
required on prod. days 13/32 (41%)
—26.0%
QC Endline16 days—12.9%
QA Inline2 reports240.6%
Shipment Sample1 reports1—
Final Random2 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2112.9%
7000 / 16 days
40.6%PASS
08/06–08/24
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS21163213 (41%)16308/19, 08/20, 08/21, 08/22, 08/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends27545114
CC Skip stitch11241788
DB Run-off stitching1123854
ED Gathering crease987
CB Broken stitch31633
DE Cut to broken22111
CE Broken seam211422
EC Asymmetry121023
260889 LOGE · CS10/CS11 · Due 09/02Shipment Sample FAIL Latest Shipment Sample (08/04) FAILED
No reportPP Sample
No reportPilot Run
07/27QC 1st Bundle1 reports
07/27QA 1st Bundle1 reports
12/36QC Inlineactual/required · 33%
DHU 11.6%QC Endline17 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty11,000 / 0
PDF reports20
Last report08/10

Cross-stage findings

Latest Shipment Sample (08/04) FAILED

7 major: EC Asymmetry 1, CG Grinning 1, CB Broken stitch 1, EC Asymmetry 1, Others (no detail) 1, EC Asymmetry 1, ED Gathering crease 1

Not fixed: CB Broken stitch

Found 7 times (24 pcs, 07/27–08/06) in earlier stages; latest Shipment Sample (08/04) still has 1 major

Not fixed: EC Asymmetry

Found 9 times (31 pcs, 07/27–08/10) in earlier stages; latest Shipment Sample (08/04) still has 3 major

Not fixed: ED Gathering crease

Found 13 times (95 pcs, 07/27–08/08) in earlier stages; latest Shipment Sample (08/04) still has 1 major

Missed in earlier stages: 3

FA Wrong material (Pre-final 07/30), DI High-low/uneven (Pre-final 07/30), DJ Pleat (Pre-final 07/30): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

CG Grinning 4, BA Thread ends 4 pcs (later stages total)

100 defects recorded as 'Others' without detail

QC 1st Bundle 8, QC Inline 91, Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

CE Broken seam (QA 6); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (3 Major), DB Run-off stitching (3 Major), DE Cut to broken (2 Major), EI Inaccurate/skewed stitching (2 Major), CC Skip stitch (1 Major), CA Thread tension (1 Major), AC Fabric hole (1 Major), CE Broken seam (1 Major); Only QC 1st Bundle: EC Asymmetry (3); Both: CB Broken stitch (5/1), EA Unsmooth/puckering/bubbling (3/2); DHU QC 1st Bundle 0.0% / QA 1st Bundle 85.0%

Caught in earlier stages

CC Skip stitch (366), AC Fabric hole (14), GA Missing bartack/button (14), DE Cut to broken (11), EA Unsmooth/puckering/bubbling (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—85.0%
QC Inline12 reports
required on prod. days 12/36 (33%)
—0.0%
QC Endline17 days—11.6%
QA Inline4 reports428.1%
Shipment Sample1 reports1—
Pre-final1 reports15.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1111.7%
10905 / 17 days
28.1%—
07/27–08/17
BA Thread ends, CC Skip stitch, ED Gathering crease
CS100.0%
20 / 1 days
——
08/03–08/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS11173412 (35%)17508/10, 08/11, 08/12, 08/13, 08/17
CS10120 (0%)1108/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends580944
CC Skip stitch13641
Others (no detail)8911
ED Gathering crease313791
EC Asymmetry3283
CB Broken stitch5114415
AC Fabric hole1121
GA Missing bartack/button122
260891 LOGE · CS01/CS02 · Due 09/02Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
08/06QC 1st Bundle1 reports
08/07QA 1st Bundle1 reports
14/30QC Inlineactual/required · 47%
DHU 17.6%QC Endline15 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty11,000 / 11,000
PDF reports20
Last report09/01

Cross-stage findings

Not fixed: AD Fabric stains

Found 8 times (34 pcs, 08/12–08/22) in earlier stages; latest Final Random (09/01) still has 3 major

Missed in earlier stages: 1

BD Snagging (Final Random 09/01): first found in later stages, never recorded before

QA Inline DHU is 4.1× QC Inline

QA Inline DHU 59.4% vs QC Inline 14.5%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (09/01): CG Grinning 2 (earlier 10 times)

Found earlier but still reached later stages: 5

CC Skip stitch 1, EI Inaccurate/skewed stitching 1, ED Gathering crease 1, DJ Pleat 2, DE Cut to broken 3 pcs (later stages total)

3 defects recorded as 'Others' without detail

Shipment Sample 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (4 Major), CC Skip stitch (3 Major), CB Broken stitch (3 Major); Only QC 1st Bundle: EB Measurement issue (3), EC Asymmetry (2), DB Run-off stitching (2); Both: CG Grinning (3/2), BA Thread ends (2/3); DHU QC 1st Bundle 37.5% / QA 1st Bundle 75.0%

Caught in earlier stages

EC Asymmetry (169), DB Run-off stitching (111), EA Unsmooth/puckering/bubbling (31), DK Twisted shoulder strap (30), Q61 Lace raw edge or broken lace (28) did not reach later stages

Report line differs from production line

QGR2637994 Final Random (09/01) CS10; actual production line(s) CS01/CS02 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—37.5%
QA 1st Bundle1 reports—75.0%
QC Inline15 reports
required on prod. days 14/30 (47%)
—14.5%
QC Endline15 days—17.6%
QA Inline1 reports159.4%
Shipment Sample1 reports1—
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0217.6%
10820 / 15 days
59.4%—
08/07–08/26
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS02153014 (47%)14208/19, 08/20, 08/21, 08/22, 08/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends237111016
CC Skip stitch31921011
ED Gathering crease1820831
EC Asymmetry245122
DB Run-off stitching21099
Others (no detail)453
AD Fabric stains723413
EA Unsmooth/puckering/bubbling4324
260893 LOGE · CP14/CP17/CP20 · Due 09/02Final Random PASS Not fixed: EC Asymmetry
No reportPP Sample
No reportPilot Run
08/11QC 1st Bundle1 reports
08/07QA 1st Bundle1 reports
1/32QC Inlineactual/required · 3%
DHU 13.1%QC Endline14 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty9,000 / 9,000
PDF reports5
Last report08/21

Cross-stage findings

Not fixed: EC Asymmetry

Found 6 times (25 pcs, 08/06–08/17) in earlier stages; latest Shipment Sample (08/21) still has 3 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 10 times (55 pcs, 08/07–08/17) in earlier stages; latest Shipment Sample (08/21) still has 1 major

Not fixed: ED Gathering crease

Found 10 times (178 pcs, 08/07–08/17) in earlier stages; latest Shipment Sample (08/21) still has 1 major

Not fixed: AD Fabric stains

Found 11 times (142 pcs, 08/07–08/17) in earlier stages; latest Shipment Sample (08/21) still has 1 major

Missed in earlier stages: 1

AE Yellowing (Final Random 08/11): first found in later stages, never recorded before

Found earlier but still reached later stages: 4

EI Inaccurate/skewed stitching 1, BA Thread ends 6, CB Broken stitch 2, CG Grinning 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

Shipment Sample 3; cannot compare across stages

QC Endline data errors: 6

08/06 CP17 260893 (defective pcs 20 > defects 15), 08/07 CP17 260893 (defective pcs 139 > defects 131), 08/11 CP17 260893 (defective pcs 167 > defects 124), 08/14 CP17 260893 (defective pcs 146 > defects 85)…

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (2 Major), BA Thread ends (2 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: AD Fabric stains (4), DE Cut to broken (3), ED Gathering crease (2), DJ Pleat (2), CG Grinning (2), CB Broken stitch (2); Both: EC Asymmetry (1/8), EA Unsmooth/puckering/bubbling (1/3), DB Run-off stitching (2/1); DHU QC 1st Bundle 95.0% / QA 1st Bundle 85.0%

Caught in earlier stages

CC Skip stitch (56), EB Measurement issue (17), GB Missing sewing operation (17), AA Fabric defect (7), AC Fabric hole (7) did not reach later stages

Report line differs from production line

QGR2633364 Final Random (08/11) CP13; actual production line(s) CP14/CP17/CP20 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—95.0%
QA 1st Bundle1 reports—85.0%
QC Inline1 reports
required on prod. days 1/32 (3%)
—43.8%
QC Endline14 days—13.1%
Shipment Sample1 reports1—
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1713.1%
8860 / 14 days
——
08/06–09/01
BA Thread ends, ED Gathering crease, AD Fabric stains
CP140.0%
20 / 1 days
——
08/19–08/19
—
CP200.0%
20 / 1 days
——
08/12–08/12
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1714281 (4%)141308/17, 08/18, 08/19, 08/25, 09/01
CP14120 (0%)1108/19
CP20120 (0%)1108/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SampleFinal Random
BA Thread ends26496
ED Gathering crease217612
AD Fabric stains421361
EA Unsmooth/puckering/bubbling132491
CC Skip stitch254
EC Asymmetry18163
EB Measurement issue17
GB Missing sewing operation17
261280 LOGE · CP11 · Due 09/02Shipment Sample FAIL Latest Shipment Sample (08/12) FAILED
No reportPP Sample
No reportPilot Run
08/26QC 1st Bundle1 reports
08/28QA 1st Bundle1 reports
0/4QC Inlineactual/required · 0%
DHU 10.2%QC Endline2 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty500 / 500
PDF reports4
Last report08/28

Cross-stage findings

Latest Shipment Sample (08/12) FAILED

7 major: ED Gathering crease 1, ED Gathering crease 1, AD Fabric stains 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, EC Asymmetry 1

QC Endline data errors: 2

08/26 CP11 261280 (defective pcs 59 > defects 18), 08/28 CP11 261280 (defective pcs 47 > defects 33)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (4 Major), ED Gathering crease (3 Major), CG Grinning (3 Major), DF Twisted seam/skewing (2 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: GB Missing sewing operation (5), DA Exceed seam allowance (2), AD Fabric stains (2), EI Inaccurate/skewed stitching (1), CE Broken seam (1), CB Broken stitch (1); Both: BA Thread ends (5/2), DI High-low/uneven (3/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 85.0%

Caught in earlier stages

BA Thread ends (29), CC Skip stitch (21), DI High-low/uneven (8), GB Missing sewing operation (7) did not reach later stages

Found before bulk production (Shipment Sample): 4

ED Gathering crease, AD Fabric stains, EC Asymmetry, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—85.0%
QC Inline0 reports
required on prod. days 0/4 (0%)
——
QC Endline2 days—10.2%
QA Inline1 reports140.6%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1110.2%
500 / 2 days
40.6%—
08/26–08/28
CC Skip stitch, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP11240 (0%)2208/26, 08/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineShipment Sample
BA Thread ends52202
CC Skip stitch21
ED Gathering crease3422
EC Asymmetry4133
DI High-low/uneven323
GB Missing sewing operation52
AD Fabric stains221
CG Grinning3
261281 LOGE · CP11 · Due 09/02Shipment Sample FAIL Latest Shipment Sample (08/12) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/29QA 1st Bundle1 reports
0/4QC Inlineactual/required · 0%
DHU 9.6%QC Endline2 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty500 / 500
PDF reports2
Last report08/29

Cross-stage findings

Latest Shipment Sample (08/12) FAILED

11 major: EC Asymmetry 1, EC Asymmetry 1, ED Gathering crease 1, EC Asymmetry 1, DB Run-off stitching 1, DB Run-off stitching 1, EC Asymmetry 1, ED Gathering crease 1, EC Asymmetry 1, ED Gathering crease 1, EE Raw edge 1

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 5); zero in QC Endline records

QC Endline data errors: 2

08/28 CP11 261281 (defective pcs 33 > defects 10), 08/29 CP11 261281 (defective pcs 75 > defects 38)

Caught in earlier stages

BA Thread ends (26), CC Skip stitch (23) did not reach later stages

Found before bulk production (Shipment Sample): 4

EC Asymmetry, ED Gathering crease, DB Run-off stitching, EE Raw edge: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—60.0%
QC Inline0 reports
required on prod. days 0/4 (0%)
——
QC Endline2 days—9.6%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP119.6%
500 / 2 days
——
08/28–08/29
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP11240 (0%)2208/28, 08/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineShipment Sample
BA Thread ends323
CC Skip stitch23
ED Gathering crease213
EC Asymmetry5
DB Run-off stitching2
DJ Pleat2
DI High-low/uneven2
CG Grinning2
261680 LOGE · CP04/CP05 · Due 09/02Shipment Sample PASS Not fixed: EC Asymmetry
No resultPP Sample1 reports
No reportPilot Run
08/11–08/15QC 1st Bundle2 reports
08/11–08/15QA 1st Bundle2 reports
1/34QC Inlineactual/required · 3%
DHU 23.3%QC Endline17 days
All FAILQA Inline1 reports
2/3 FAILShipment Sample3 reports
No reportPre-final
No reportFinal Random
Order/Ship qty2,000 / 2,000
PDF reports11
Last report08/29

Cross-stage findings

Not fixed: EC Asymmetry

Found 35 times (132 pcs, 08/11–08/26) in earlier stages; latest Shipment Sample (08/29) still has 3 major

Missed in earlier stages: 2

AB Shading (Shipment Sample 08/25), CF Pulling yarn (Shipment Sample 08/25): first found in later stages, never recorded before

1 later-stage PDF report(s) blank

Shipment Sample 08/29 QGR2638054 (FAIL); please check if the report was completed

Recurring in small numbers: 3

Latest Shipment Sample (08/29): EA Unsmooth/puckering/bubbling 1 (earlier 5 times), EI Inaccurate/skewed stitching 2 (earlier 5 times), DB Run-off stitching 2 (earlier 3 times)

Found earlier but still reached later stages: 2

ED Gathering crease 2, CG Grinning 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC Endline data errors: 3

08/12 CP04 261680-2 (defective pcs 59 > defects 32), 08/17 CP04 261680-1 (defective pcs 40 > defects 27), 08/18 CP04 261680-1 (defective pcs 55 > defects 54)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (3 Major), DE Cut to broken (3 Major), CG Grinning (3 Major), EI Inaccurate/skewed stitching (2 Major), BB Missing cut seam allowance (2 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: ED Gathering crease (6), CE Broken seam (2), GB Missing sewing operation (1), DI High-low/uneven (1); Both: EC Asymmetry (11/5), BA Thread ends (6/4), DJ Pleat (6/4), CB Broken stitch (5/1), EA Unsmooth/puckering/bubbling (1/3), AD Fabric stains (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 80.0%

Caught in earlier stages

BA Thread ends (343), CC Skip stitch (241), CE Broken seam (35), AC Fabric hole (24), EB Measurement issue (22) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—100.0%
QA 1st Bundle2 reports—80.0%
QC Inline2 reports
required on prod. days 1/34 (3%)
—73.4%
QC Endline17 days—23.3%
QA Inline1 reports162.5%
Shipment Sample3 reports2—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0423.3%
3940 / 17 days
62.5%—
08/10–08/29
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0417341 (3%)171608/24, 08/25, 08/26, 08/28, 08/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends6433282
CC Skip stitch134233
ED Gathering crease1641562
EC Asymmetry4115129554
CE Broken seam233
AC Fabric hole24
EB Measurement issue22
DB Run-off stitching1172
261210 LOGE · CB09/CB15 · Due 09/03Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
08/06QC 1st Bundle1 reports
08/07QA 1st Bundle1 reports
10/76QC Inlineactual/required · 13%
DHU 18.0%QC Endline22 days
All FAILQA Inline6 reports
No resultShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty8,000 / 8,000
PDF reports23
Last report08/29

Cross-stage findings

Not fixed: AD Fabric stains

Found 22 times (131 pcs, 08/06–09/02) in earlier stages; latest Final Random (08/29) still has 3 major

Missed in earlier stages: 1

GA Missing bartack/button (Shipment Sample 08/21): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (08/29): CB Broken stitch 1 (earlier 9 times), CC Skip stitch 2 (earlier 30 times), ED Gathering crease 2 (earlier 15 times)

Found earlier but still reached later stages: 4

EC Asymmetry 4, EA Unsmooth/puckering/bubbling 1, EI Inaccurate/skewed stitching 3, DJ Pleat 1 pcs (later stages total)

13 defects recorded as 'Others' without detail

QC Inline 13; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (2 Major), BA Thread ends (2), EI Inaccurate/skewed stitching (2 Major), EA Unsmooth/puckering/bubbling (1 Major), DE Cut to broken (1 Major), GB Missing sewing operation (1 Major); Only QC 1st Bundle: EG Wrong panel assembly (2), EB Measurement issue (1), FB Material defect (1), CE Broken seam (1), CB Broken stitch (1); Both: EC Asymmetry (5/5), AD Fabric stains (1/3); DHU QC 1st Bundle 92.3% / QA 1st Bundle 75.0%

Caught in earlier stages

CD Needle hole (95), EB Measurement issue (88), AC Fabric hole (68), CE Broken seam (46), Q61 Lace raw edge or broken lace (34) did not reach later stages

Report line differs from production line

QGR2637241 Final Random (08/29) CB24;CB29; actual production line(s) CB09/CB15 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—75.0%
QC Inline13 reports
required on prod. days 10/76 (13%)
—32.0%
QC Endline22 days—18.0%
QA Inline6 reports630.2%
Shipment Sample1 reports0—
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0917.6%
4035 / 19 days
28.1%—
08/06–09/02
BA Thread ends, EC Asymmetry, CC Skip stitch
CB1518.6%
3036 / 19 days
32.3%—
08/08–09/02
BA Thread ends, CD Needle hole, AC Fabric hole

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0919388 (21%)191108/24, 08/25, 08/28, 08/29, 09/02
CB1519382 (5%)191708/28, 08/29, 08/31, 09/01, 09/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends27378810
EC Asymmetry556223294
CC Skip stitch281672
AD Fabric stains13811363
CD Needle hole95
EB Measurement issue187
AC Fabric hole671
ED Gathering crease261112
261212 LOGE · CS26 · Due 09/03Shipment Sample FAIL Latest Shipment Sample (08/19) FAILED
No reportPP Sample
No reportPilot Run
08/08QC 1st Bundle1 reports
08/08QA 1st Bundle1 reports
12/38QC Inlineactual/required · 32%
DHU 16.7%QC Endline19 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty6,000 / 5,940
PDF reports18
Last report08/26

Cross-stage findings

Latest Shipment Sample (08/19) FAILED

10 major: Others (no detail) 1, AD Fabric stains 1, Others (no detail) 1, EC Asymmetry 1, CG Grinning 1, Others (no detail) 1, Others (no detail) 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1

Not fixed: EC Asymmetry

Found 18 times (56 pcs, 08/08–08/26) in earlier stages; latest Shipment Sample (08/19) still has 4 major

Not fixed: AD Fabric stains

Found 19 times (143 pcs, 08/08–08/25) in earlier stages; latest Shipment Sample (08/19) still has 1 major

Not fixed: CG Grinning

Found 6 times (14 pcs, 08/08–08/26) in earlier stages; latest Shipment Sample (08/19) still has 1 major

Missed in earlier stages: 1

DJ Pleat (Pre-final 08/15): first found in later stages, never recorded before

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 37.5% vs QC Inline 22.0%; QC Inline may be missing defects

Found earlier but still reached later stages: 6

CE Broken seam 1, EA Unsmooth/puckering/bubbling 1, BA Thread ends 8, DD Thread not straight/waving 3, CC Skip stitch 1, GB Missing sewing operation 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

Shipment Sample 4; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

QC Endline data errors: 1

08/18 CS26 261212-S (defective pcs 50 > defects 49)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (2 Major), BA Thread ends (1 Major), DD Thread not straight/waving (1 Major), CG Grinning (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: EC Asymmetry (6), DE Cut to broken (2); Both: CE Broken seam (2/2), AD Fabric stains (2/1), DA Exceed seam allowance (2/1), CA Thread tension (2/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 55.0%

Caught in earlier stages

ED Gathering crease (57), CB Broken stitch (25), CD Needle hole (20), DI High-low/uneven (13), DA Exceed seam allowance (11) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—55.0%
QC Inline12 reports
required on prod. days 12/38 (32%)
—22.0%
QC Endline19 days—16.7%
QA Inline2 reports237.5%
Shipment Sample1 reports1—
Pre-final1 reports15.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2616.7%
6000 / 19 days
37.5%—
08/08–08/31
BA Thread ends, CC Skip stitch, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS26193812 (32%)19708/25, 08/26, 08/28, 08/29, 08/31

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends11151528
CC Skip stitch1728521
AD Fabric stains2114124212
EC Asymmetry64824
ED Gathering crease255
CB Broken stitch124
CE Broken seam221631
CD Needle hole20
260911 LOGE · CS10 · Due 09/09Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
08/06QC 1st Bundle1 reports
08/06QA 1st Bundle1 reports
2/18QC Inlineactual/required · 11%
DHU 7.1%QC Endline9 days
All FAILQA Inline5 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty8,035 / 8,035
PDF reports10
Last report08/26

Cross-stage findings

Not fixed: ED Gathering crease

Found 9 times (58 pcs, 08/06–08/13) in earlier stages; latest Final Random (08/26) still has 3 major

QA Inline DHU is 2.7× QC Inline

QA Inline DHU 43.8% vs QC Inline 16.2%; QC Inline may be missing defects

QA Inline DHU is 6.2× QC Endline

QA Inline DHU 43.8% vs QC Endline 7.1% (08/06–08/22, 9 days, 8181 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/26): CB Broken stitch 1 (earlier 5 times), EA Unsmooth/puckering/bubbling 2 (earlier 15 times)

Found earlier but still reached later stages: 2

BB Missing cut seam allowance 4, AD Fabric stains 2 pcs (later stages total)

9 defects recorded as 'Others' without detail

QC Inline 9; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 50); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (2 Major), BA Thread ends (2 Major), CG Grinning (1 Major), ED Gathering crease (1 Major); Only QC 1st Bundle: CC Skip stitch (1), DA Exceed seam allowance (1); Both: EA Unsmooth/puckering/bubbling (3/3), DB Run-off stitching (3/1), CB Broken stitch (2/2); DHU QC 1st Bundle 76.9% / QA 1st Bundle 60.0%

Caught in earlier stages

DB Run-off stitching (69), CC Skip stitch (20), DJ Pleat (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—60.0%
QC Inline2 reports
required on prod. days 2/18 (11%)
—16.2%
QC Endline9 days—7.1%
QA Inline5 reports543.8%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS107.1%
8181 / 9 days
43.8%PASS
08/06–08/22
BA Thread ends, Others (no detail), DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS109182 (11%)9708/11, 08/12, 08/13, 08/19, 08/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends2537327
Others (no detail)972
DB Run-off stitching3165
EA Unsmooth/puckering/bubbling3311482
ED Gathering crease1114423
CC Skip stitch1181
AD Fabric stains1222
CB Broken stitch2291
260942 LOGE · CP04/CP09/CP10… · Due 09/09Final Random PASS Not fixed: CE Broken seam
No reportPP Sample
No reportPilot Run
08/24–08/28QC 1st Bundle2 reports
07/28–08/29QA 1st Bundle3 reports
3/68QC Inlineactual/required · 4%
DHU 6.8%QC Endline25 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty9,000 / 9,000
PDF reports10
Last report09/07

Cross-stage findings

Not fixed: CE Broken seam

Found 5 times (7 pcs, 08/24–08/31) in earlier stages; latest Final Random (09/07) still has 3 major

Found earlier but still reached later stages: 1

BB Missing cut seam allowance 3 pcs (later stages total)

1 defects recorded as 'Others' without detail

Final Random 1; cannot compare across stages

QC Endline data errors: 12

08/06 CP11 260942-3 (defective pcs 10 > defects 4), 08/24 CP10 260942-1 (defective pcs 58 > defects 57), 08/25 CP10 260942-1 (defective pcs 72 > defects 47), 08/26 CP10 260942-1 (defective pcs 62 > defects 54)…

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CA Thread tension (5 Major), EA Unsmooth/puckering/bubbling (4 Major), ED Gathering crease (2 Major), EI Inaccurate/skewed stitching (2 Major), AD Fabric stains (1 Major), DC Join stitching (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: DI High-low/uneven (3), DB Run-off stitching (3), CC Skip stitch (2), CB Broken stitch (2), CE Broken seam (1); Both: BA Thread ends (7/11), EC Asymmetry (1/7), DE Cut to broken (6/1), DJ Pleat (2/5), DA Exceed seam allowance (3/3), CG Grinning (2/3); DHU QC 1st Bundle 61.5% / QA 1st Bundle 76.7%

Caught in earlier stages

CC Skip stitch (167), ED Gathering crease (134), EC Asymmetry (33), EB Measurement issue (25), DE Cut to broken (15) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—61.5%
QA 1st Bundle3 reports—76.7%
QC Inline3 reports
required on prod. days 3/68 (4%)
—31.7%
QC Endline25 days—6.8%
QA Inline1 reports115.6%
Final Random1 reports02.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP209.4%
3080 / 7 days
—PASS
08/10–09/03
BA Thread ends, CC Skip stitch, ED Gathering crease
CP1010.5%
3020 / 7 days
——
07/24–08/31
BA Thread ends, CC Skip stitch, ED Gathering crease
CP090.0%
2540 / 16 days
15.6%—
07/24–08/19
—
CP040.0%
100 / 1 days
——
07/24–07/24
—
CP114.0%
100 / 1 days
——
08/06–08/06
BA Thread ends
CP120.0%
100 / 1 days
——
08/03–08/03
—
CP190.0%
40 / 1 days
——
08/04–08/04
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0916320 (0%)161608/06, 08/07, 08/08, 08/10, 08/19
CP107141 (7%)7608/25, 08/26, 08/28, 08/29, 08/31
CP207142 (14%)7508/29, 08/31, 09/01, 09/02, 09/03
CP04120 (0%)1107/24
CP11120 (0%)1108/06
CP12120 (0%)1108/03
CP19120 (0%)1108/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends7113025235
CC Skip stitch2165
ED Gathering crease2132
EC Asymmetry174201
EB Measurement issue25
DE Cut to broken618
DJ Pleat255
EA Uneven seam allowance12
261142 OSIT · CP07/CP08/CP13 · Due 09/09Final Random PASS Not fixed: CB Broken stitch
No reportPP Sample
No reportPilot Run
08/12QC 1st Bundle1 reports
08/12QA 1st Bundle1 reports
13/38QC Inlineactual/required · 34%
DHU 10.8%QC Endline17 days
All FAILQA Inline4 reports
No reportShipment Sample
All FAILPre-final3 reports
All PASSFinal Random1 reports
Order/Ship qty20,000 / 20,000
PDF reports23
Last report08/31

Cross-stage findings

Not fixed: CB Broken stitch

Found 13 times (23 pcs, 08/12–08/28) in earlier stages; latest Final Random (08/31) still has 3 major

Missed in earlier stages: 1

BB Missing cut seam allowance (Pre-final 08/25): first found in later stages, never recorded before

QA Inline DHU is 6.8× QC Inline

QA Inline DHU 43.0% vs QC Inline 6.3%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (08/31): AD Fabric stains 1 (earlier 27 times), EC Asymmetry 1 (earlier 30 times)

Found earlier but still reached later stages: 4

GA Missing bartack/button 1, DE Cut to broken 6, AC Fabric hole 1, CC Skip stitch 1 pcs (later stages total)

46 defects recorded as 'Others' without detail

QC 1st Bundle 3, QC Inline 28, Pre-final 9, Final Random 6; cannot compare across stages

QC Endline data errors: 16

08/12 CP08 261142 (defective pcs 70 > defects 65), 08/13 CP08 261142 (defective pcs 139 > defects 82), 08/14 CP08 261142 (defective pcs 283 > defects 179), 08/15 CP08 261142 (defective pcs 225 > defects 107)…

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (8 Major), CE Broken seam (3 Major), GA Missing bartack/button (2 Major); Only QC 1st Bundle: DI High-low/uneven (4), EI Inaccurate/skewed stitching (1), CB Broken stitch (1); Both: BA Thread ends (5/2), DJ Pleat (3/3), AD Fabric stains (2/1), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (241), EA Uneven seam allowance (231), EA Unsmooth/puckering/bubbling (197), DI High-low/uneven (58), CE Broken seam (27) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—100.0%
QC Inline13 reports
required on prod. days 13/38 (34%)
—6.3%
QC Endline17 days—10.8%
QA Inline4 reports443.0%
Pre-final3 reports36.5%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0810.8%
20440 / 17 days
43.0%PASS
08/12–09/01
BA Thread ends, AD Fabric stains, ED Gathering crease
CP130.0%
60 / 1 days
——
08/19–08/19
—
CP070.0%
40 / 1 days
——
08/24–08/24
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP08173413 (38%)17408/26, 08/28, 08/29, 08/31, 09/01
CP07120 (0%)1108/24
CP13120 (0%)1108/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends5258680123711
AD Fabric stains21153031121
ED Gathering crease241
EA Uneven seam allowance231
CC Skip stitch12261
EA Unsmooth/puckering/bubbling112193
EC Asymmetry8181381851
Others (no detail)32812096
261143 OSIT · CP05/CP07 · Due 09/09Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/01QA 1st Bundle1 reports
5/36QC Inlineactual/required · 14%
DHU 10.8%QC Endline17 days
All FAILQA Inline2 reports
All FAILShipment Sample4 reports
4/5 FAILPre-final5 reports
All PASSFinal Random1 reports
Order/Ship qty15,000 / 15,000
PDF reports18
Last report08/18

Cross-stage findings

Not fixed: ED Gathering crease

Found 13 times (305 pcs, 08/01–08/14) in earlier stages; latest Final Random (08/18) still has 3 major

Missed in earlier stages: 8

CB Broken stitch (Pre-final 08/04), DF Twisted seam/skewing (Shipment Sample 08/06), BB Missing cut seam allowance (Shipment Sample 08/07), EE Raw edge (Shipment Sample 08/07), EI Inaccurate/skewed stitching (Shipment Sample 08/07), BD Snagging (Pre-final 08/10), BC Sticker left (Pre-final 08/10), CD Needle hole (Pre-final 08/14): first found in later stages, never recorded before

Pre-final DHU is 1.0× QC Endline

Pre-final DHU 11.2% vs QC Endline 10.8% (08/01–08/21, 17 days, 14900 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (08/18): DJ Pleat 1 (earlier 5 times), AD Fabric stains 2 (earlier 12 times), EA Unsmooth/puckering/bubbling 1 (earlier 4 times)

Found earlier but still reached later stages: 6

DE Cut to broken 5, EC Asymmetry 8, CG Grinning 7, GA Missing bartack/button 1, CC Skip stitch 1, GB Missing sewing operation 1 pcs (later stages total)

31 defects recorded as 'Others' without detail

Pre-final 25, Final Random 6; cannot compare across stages

QC Endline data errors: 12

08/01 CP07 261143 (defective pcs 65 > defects 27), 08/03 CP07 261143 (defective pcs 142 > defects 78), 08/04 CP07 261143 (defective pcs 252 > defects 98), 08/05 CP07 261143 (defective pcs 571 > defects 176)…

Caught in earlier stages

EA Uneven seam allowance (115), CE Broken seam (85), DI High-low/uneven (24), DB Run-off stitching (20), EB Measurement issue (16) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—95.0%
QC Inline5 reports
required on prod. days 5/36 (14%)
—24.5%
QC Endline17 days—10.8%
QA Inline2 reports235.9%
Shipment Sample4 reports4—
Pre-final5 reports411.2%
Final Random1 reports04.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0710.8%
14880 / 17 days
35.9%PASS
08/01–08/21
BA Thread ends, ED Gathering crease, CC Skip stitch
CP050.0%
20 / 1 days
——
08/10–08/10
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0717345 (15%)171208/15, 08/17, 08/18, 08/19, 08/21
CP05120 (0%)1108/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends75693610
ED Gathering crease13046133
CC Skip stitch12491
EC Asymmetry5814368
EA Uneven seam allowance115
AD Fabric stains25742492
CE Broken seam13711
Others (no detail)5256
261478 OSIT · CS25 · Due 09/09Final Random PASS Not fixed: EC Asymmetry
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/14QA 1st Bundle1 reports
8/22QC Inlineactual/required · 36%
DHU 8.4%QC Endline11 days
All FAILQA Inline3 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty13,000 / 13,000
PDF reports14
Last report08/29

Cross-stage findings

Not fixed: EC Asymmetry

Found 23 times (170 pcs, 08/14–08/24) in earlier stages; latest Final Random (08/29) still has 6 major

Missed in earlier stages: 1

IA 2nd operation issue (Pre-final 08/21): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (08/29): ED Gathering crease 1 (earlier 31 times), BA Thread ends 2 (earlier 11 times), CB Broken stitch 2 (earlier 4 times)

Found earlier but still reached later stages: 2

BB Missing cut seam allowance 3, CC Skip stitch 2 pcs (later stages total)

QC Endline data errors: 9

08/14 CS25 261478 (defective pcs 165 > defects 108), 08/15 CS25 261478 (defective pcs 161 > defects 128), 08/17 CS25 261478 (defective pcs 212 > defects 142), 08/18 CS25 261478 (defective pcs 216 > defects 128)…

Caught in earlier stages

EA Uneven seam allowance (145), DB Run-off stitching (67), AD Fabric stains (60), Q95 HTL position incorrect (39), DI High-low/uneven (19) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—45.0%
QC Inline8 reports
required on prod. days 8/22 (36%)
—24.5%
QC Endline11 days—8.4%
QA Inline3 reports321.9%
Pre-final1 reports16.3%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS258.4%
13092 / 11 days
21.9%PASS
08/14–08/28
BA Thread ends, CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2511228 (36%)11308/21, 08/22, 08/24, 08/25, 08/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends53812129
CC Skip stitch41872
EC Asymmetry132130756
ED Gathering crease36478241
EA Uneven seam allowance145
DB Run-off stitching8581
AD Fabric stains357
Q95 HTL position incorrect39
261691 OSIT · CS06/CS07 · Due 09/09Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
08/17QC 1st Bundle1 reports
08/17QA 1st Bundle1 reports
2/16QC Inlineactual/required · 12%
DHU 8.6%QC Endline8 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports9
Last report08/31

Cross-stage findings

Not fixed: ED Gathering crease

Found 8 times (26 pcs, 08/17–09/02) in earlier stages; latest Final Random (08/31) still has 3 major

Missed in earlier stages: 1

DJ Pleat (Final Random 08/31): first found in later stages, never recorded before

QA Inline DHU is 2.6× QC Inline

QA Inline DHU 35.9% vs QC Inline 13.8%; QC Inline may be missing defects

Pre-final DHU is 1.7× QC Endline

Pre-final DHU 14.4% vs QC Endline 8.6% (08/15–09/05, 8 days, 1974 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/31): AD Fabric stains 2 (earlier 14 times)

Found earlier but still reached later stages: 1

DF Twisted seam/skewing 5 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA Inline 3, Pre-final 2; cannot compare across stages

QC Endline data errors: 4

08/19 CS07 261691 (defective pcs 18 > defects 12), 09/02 CS06 261691 (defective pcs 30 > defects 26), 09/03 CS06 261691 (defective pcs 6 > defects 4), 09/05 CS06 261691 (defective pcs 3 > defects 2)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (2 Major), CC Skip stitch (1 Major), AC Fabric hole (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (2), DF Twisted seam/skewing (1); Both: AD Fabric stains (7/4), ED Gathering crease (2/4), BA Thread ends (1/3); DHU QC 1st Bundle 100.0% / QA 1st Bundle 80.0%

Caught in earlier stages

CC Skip stitch (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—80.0%
QC Inline2 reports
required on prod. days 2/16 (12%)
—13.8%
QC Endline8 days—8.6%
QA Inline2 reports235.9%
Shipment Sample1 reports1—
Pre-final1 reports114.4%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS079.1%
1511 / 5 days
35.9%PASS
08/15–08/20
AD Fabric stains, BA Thread ends, ED Gathering crease
CS066.9%
463 / 3 days
——
09/02–09/05
AD Fabric stains, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS075102 (20%)5308/15, 08/17, 08/18, 08/19, 08/20
CS06360 (0%)3309/02, 09/03, 09/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
AD Fabric stains7491104232
BA Thread ends1323754
ED Gathering crease244106123
DF Twisted seam/skewing14123
EC Asymmetry23221
CC Skip stitch17
Others (no detail)32
CB Broken stitch13
261969 OSIT · CS04 · Due 09/09Final Random PASS Not fixed: ED Gathering crease
No resultPP Sample1 reports
No reportPilot Run
08/12QC 1st Bundle1 reports
08/11–08/12QA 1st Bundle2 reports
10/26QC Inlineactual/required · 38%
DHU 12.4%QC Endline13 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty6,000 / 6,000
PDF reports20
Last report08/28

Cross-stage findings

Not fixed: ED Gathering crease

Found 20 times (97 pcs, 08/12–08/26) in earlier stages; latest Final Random (08/28) still has 3 major

Not fixed: AD Fabric stains

Found 24 times (223 pcs, 08/12–08/26) in earlier stages; latest Final Random (08/28) still has 4 major

Missed in earlier stages: 4

EI Inaccurate/skewed stitching (Shipment Sample 08/13), DF Twisted seam/skewing (Pre-final 08/14), IA 2nd operation issue (Pre-final 08/14), IC Broken needle/metal contamination (Pre-final 08/14): first found in later stages, never recorded before

QA Inline DHU is 2.1× QC Inline

QA Inline DHU 27.1% vs QC Inline 13.1%; QC Inline may be missing defects

Pre-final DHU is 1.1× QC Endline

Pre-final DHU 13.5% vs QC Endline 12.4% (08/12–08/26, 13 days, 5777 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/28): EC Asymmetry 1 (earlier 19 times)

Found earlier but still reached later stages: 3

CB Broken stitch 1, CG Grinning 1, EA Unsmooth/puckering/bubbling 2 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA 1st Bundle 3, Shipment Sample 1, QA Inline 1; cannot compare across stages

Duplicate report numbers

QGR2634853 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (3 Major), EC Asymmetry (3 Major), EA Unsmooth/puckering/bubbling (1 Major), CG Grinning (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: ED Gathering crease (2); Both: AD Fabric stains (2/3), AC Fabric hole (3/1), CB Broken stitch (1/1); DHU QC 1st Bundle 25.0% / QA 1st Bundle 42.5%

Caught in earlier stages

DB Run-off stitching (136), AC Fabric hole (61), CE Broken seam (11), CC Skip stitch (10) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—25.0%
QA 1st Bundle2 reports—42.5%
QC Inline10 reports
required on prod. days 10/26 (38%)
—13.1%
QC Endline13 days—12.4%
QA Inline3 reports327.1%
Shipment Sample1 reports1—
Pre-final1 reports113.5%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0412.4%
5777 / 13 days
27.1%PASS
08/12–08/26
AD Fabric stains, DB Run-off stitching, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS04132610 (38%)12408/21, 08/22, 08/24, 08/25, 08/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
AD Fabric stains2323190524
BA Thread ends101236128
EC Asymmetry3612361
DB Run-off stitching14131
ED Gathering crease298421143
AC Fabric hole318463
CE Broken seam38
CC Skip stitch91
261654 CIWH · CS08 · Due 09/14Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
08/14QC 1st Bundle1 reports
08/13QA 1st Bundle1 reports
2/14QC Inlineactual/required · 14%
DHU 16.3%QC Endline7 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,000 / 3,000
PDF reports7
Last report08/26

Cross-stage findings

Not fixed: AD Fabric stains

Found 9 times (163 pcs, 08/12–08/17) in earlier stages; latest Final Random (08/26) still has 3 major

Missed in earlier stages: 2

EG Wrong panel assembly (Final Random 08/26), BB Missing cut seam allowance (Final Random 08/26): first found in later stages, never recorded before

QA Inline DHU is 6.1× QC Inline

QA Inline DHU 51.6% vs QC Inline 8.5%; QC Inline may be missing defects

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

7 defects recorded as 'Others' without detail

QA Inline 2, QC Inline 5; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

AC Fabric hole (QA 19); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (5 Major), BA Thread ends (2 Major), CC Skip stitch (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: CB Broken stitch (5), GB Missing sewing operation (1); Both: AD Fabric stains (4/2); DHU QC 1st Bundle 76.9% / QA 1st Bundle 55.0%

Caught in earlier stages

CE Broken seam (213), CC Skip stitch (55), AC Fabric hole (22), CB Broken stitch (17), DB Run-off stitching (16) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—55.0%
QC Inline2 reports
required on prod. days 2/14 (14%)
—8.5%
QC Endline7 days—16.3%
QA Inline2 reports251.6%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0816.3%
2989 / 7 days
51.6%PASS
08/12–08/21
CE Broken seam, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS087142 (14%)7508/14, 08/15, 08/17, 08/19, 08/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
CE Broken seam213
AD Fabric stains4215433
BA Thread ends244532
CC Skip stitch154
AC Fabric hole319
CB Broken stitch5102
DB Run-off stitching16
Others (no detail)52
261137 LOGE · CS24 · Due 09/16Final Random PASS Not fixed: CB Broken stitch
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/24QA 1st Bundle1 reports
3/22QC Inlineactual/required · 14%
DHU 10.6%QC Endline11 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty4,015 / 4,015
PDF reports6
Last report08/21

Cross-stage findings

Not fixed: CB Broken stitch

Found 7 times (26 pcs, 07/24–07/27) in earlier stages; latest Final Random (08/21) still has 3 major

Missed in earlier stages: 1

EA Unsmooth/puckering/bubbling (Final Random 08/21): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/21): DJ Pleat 1 (earlier 4 times), AD Fabric stains 2 (earlier 4 times)

Found earlier but still reached later stages: 1

BD Snagging 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

DF Twisted seam/skewing (QA 4); zero in QC Endline records

Caught in earlier stages

CC Skip stitch (110), DB Run-off stitching (42), DI High-low/uneven (14), EC Asymmetry (12), CE Broken seam (7) did not reach later stages

Report line differs from production line

QGR2635452 Final Random (08/21) CS16; actual production line(s) CS24 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline3 reports
required on prod. days 3/22 (14%)
—46.5%
QC Endline11 days—10.6%
QA Inline1 reports137.5%
Final Random1 reports04.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2410.6%
4015 / 11 days
37.5%—
07/23–08/13
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2411223 (14%)11807/30, 07/31, 08/03, 08/05, 08/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends225723
CC Skip stitch110
DB Run-off stitching735
CB Broken stitch1253
AD Fabric stains1412
DI High-low/uneven14
EC Asymmetry1101
DJ Pleat1511
261144 LOGE · CB19/CB21/CB26… · Due 09/16Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
07/27QC 1st Bundle1 reports
07/27QA 1st Bundle1 reports
3/36QC Inlineactual/required · 8%
DHU 7.5%QC Endline11 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty5,005 / 5,005
PDF reports11
Last report08/21

Cross-stage findings

Not fixed: AD Fabric stains

Found 7 times (17 pcs, 07/27–08/03) in earlier stages; latest Final Random (08/21) still has 4 major

QA Inline DHU is 6.5× QC Endline

QA Inline DHU 48.4% vs QC Endline 7.5% (07/28–08/12, 11 days, 4306 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/21): CB Broken stitch 2 (earlier 3 times)

Main QA defects never recorded by QC Endline: 2

EA Unsmooth/puckering/bubbling (QA 9), AD Fabric stains (QA 6); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (2 Major), EA Unsmooth/puckering/bubbling (2 Major), CC Skip stitch (1 Major), DE Cut to broken (1 Major), FB Material defect (1 Major); Only QC 1st Bundle: EI Inaccurate/skewed stitching (2), DB Run-off stitching (2), DA Exceed seam allowance (1), BA Thread ends (1); Both: EC Asymmetry (1/4), AD Fabric stains (2/2); DHU QC 1st Bundle 69.2% / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (108), DF Twisted seam/skewing (31), EC Asymmetry (28), EA Unsmooth/puckering/bubbling (27), DB Run-off stitching (15) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—100.0%
QC Inline6 reports
required on prod. days 3/36 (8%)
—37.0%
QC Endline11 days—7.5%
QA Inline2 reports248.4%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB266.3%
3214 / 9 days
48.4%PASS
07/28–08/07
BA Thread ends, CC Skip stitch
CB1911.5%
1051 / 5 days
——
08/01–08/08
BA Thread ends, DF Twisted seam/skewing, ED Gathering crease
CB300.0%
31 / 3 days
——
08/03–08/05
—
CB290.0%
10 / 1 days
——
08/12–08/12
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB269182 (11%)9708/03, 08/04, 08/05, 08/06, 08/07
CB195101 (10%)5408/01, 08/03, 08/05, 08/06, 08/08
CB30360 (0%)3308/03, 08/04, 08/05
CB29120 (0%)1108/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends1216147
CC Skip stitch151002
DF Twisted seam/skewing31
EC Asymmetry148105
EA Unsmooth/puckering/bubbling2169
AD Fabric stains221124
DB Run-off stitching2310
DD Thread not straight/waving265
261145 LOGE · CS22 · Due 09/16Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
08/14QC 1st Bundle1 reports
08/14QA 1st Bundle1 reports
10/28QC Inlineactual/required · 36%
DHU 12.4%QC Endline14 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty8,000 / 8,000
PDF reports16
Last report09/05

Cross-stage findings

Not fixed: AD Fabric stains

Found 25 times (178 pcs, 08/14–08/28) in earlier stages; latest Final Random (09/05) still has 3 major

Recurring in small numbers: 1

Latest Final Random (09/05): DJ Pleat 1 (earlier 4 times)

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

9 defects recorded as 'Others' without detail

QC Inline 8, Final Random 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (3 Major), DA Exceed seam allowance (2 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CA Thread tension (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: BA Thread ends (6), DD Thread not straight/waving (3), DB Run-off stitching (2), CB Broken stitch (2); Both: AD Fabric stains (3/1), CC Skip stitch (3/1); DHU QC 1st Bundle 95.0% / QA 1st Bundle 84.6%

Caught in earlier stages

CC Skip stitch (238), DB Run-off stitching (185), ED Gathering crease (69), CB Broken stitch (38), DD Thread not straight/waving (21) did not reach later stages

Report line differs from production line

QGR2638264 Final Random (09/05) CS04; actual production line(s) CS22 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—95.0%
QA 1st Bundle1 reports—84.6%
QC Inline10 reports
required on prod. days 10/28 (36%)
—32.8%
QC Endline14 days—12.4%
QA Inline3 reports339.6%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2212.4%
8000 / 14 days
39.6%—
08/14–09/07
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS22142810 (36%)14408/25, 08/26, 08/28, 08/29, 09/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends64439828
CC Skip stitch31222093
DB Run-off stitching227156
AD Fabric stains312514633
ED Gathering crease13605
CB Broken stitch2342
DD Thread not straight/waving318
DE Cut to broken16
261148 LOGE · CS17/CS27 · Due 09/16Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
08/11QC 1st Bundle1 reports
08/11QA 1st Bundle1 reports
9/30QC Inlineactual/required · 30%
DHU 10.2%QC Endline15 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty5,003 / 5,003
PDF reports14
Last report09/10

Cross-stage findings

Not fixed: AD Fabric stains

Found 14 times (40 pcs, 08/11–09/07) in earlier stages; latest Final Random (09/10) still has 3 major

QA Inline DHU is 2.0× QC Inline

QA Inline DHU 42.2% vs QC Inline 21.1%; QC Inline may be missing defects

Recurring in small numbers: 4

Latest Final Random (09/10): EI Inaccurate/skewed stitching 1 (earlier 3 times), DJ Pleat 1 (earlier 8 times), EA Unsmooth/puckering/bubbling 1 (earlier 6 times), ED Gathering crease 1 (earlier 9 times)

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

QC Endline data errors: 4

08/25 CS27 261148-S (defective pcs 10 > defects 9), 08/28 CS27 261148-S (defective pcs 86 > defects 40), 08/29 CS27 261148-S (defective pcs 52 > defects 13), 09/08 CS27 261148-S (defective pcs 14 > defects 12)

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), DD Thread not straight/waving (2 Major), DA Exceed seam allowance (2 Major), DJ Pleat (2 Major), CC Skip stitch (1 Major), EI Inaccurate/skewed stitching (1 Major), AC Fabric hole (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: DB Run-off stitching (3), CA Thread tension (2), DI High-low/uneven (1); Both: AD Fabric stains (3/1), CE Broken seam (3/1), BB Missing cut seam allowance (1/2), EC Asymmetry (2/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 85.0%

Caught in earlier stages

CC Skip stitch (127), DB Run-off stitching (69), EC Asymmetry (63), EB Measurement issue (14), CE Broken seam (13) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—85.0%
QC Inline9 reports
required on prod. days 9/30 (30%)
—21.1%
QC Endline15 days—10.2%
QA Inline2 reports242.2%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2710.3%
4783 / 13 days
42.2%PASS
08/11–09/08
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS177.2%
180 / 2 days
——
08/12–08/13
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2713269 (35%)13409/03, 09/04, 09/05, 09/07, 09/08
CS17240 (0%)2208/12, 08/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends227146
CC Skip stitch131221
DB Run-off stitching31155
EC Asymmetry21573
AD Fabric stains3172723
ED Gathering crease1721
BB Missing cut seam allowance12122
DJ Pleat21311
261283 OSIT · CS06 · Due 09/16Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
08/11QC 1st Bundle1 reports
08/11QA 1st Bundle1 reports
8/18QC Inlineactual/required · 44%
DHU 12.4%QC Endline9 days
All FAILQA Inline4 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty13,000 / 13,000
PDF reports16
Last report08/22

Cross-stage findings

Not fixed: ED Gathering crease

Found 21 times (237 pcs, 08/11–08/20) in earlier stages; latest Final Random (08/22) still has 4 major

QA Inline DHU is 2.1× QC Inline

QA Inline DHU 29.7% vs QC Inline 13.9%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (08/22): AD Fabric stains 2 (earlier 10 times), CC Skip stitch 2 (earlier 9 times)

Found earlier but still reached later stages: 1

EC Asymmetry 9 pcs (later stages total)

22 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 3, QC Inline 16; cannot compare across stages

QC Endline data errors: 3

08/11 CS06 261283 (defective pcs 110 > defects 105), 08/18 CS06 261283 (defective pcs 255 > defects 240), 08/19 CS06 261283 (defective pcs 228 > defects 213)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (2 Major), BA Thread ends (2 Major), EH Poor lamination/bonding (1 Major); Only QC 1st Bundle: AD Fabric stains (4); Both: EC Asymmetry (3/2), ED Gathering crease (2/2); DHU QC 1st Bundle 69.2% / QA 1st Bundle 60.0%

Caught in earlier stages

DB Run-off stitching (163), AB Shading (78), DF Twisted seam/skewing (61), EA Unsmooth/puckering/bubbling (53), Q93 Heat seal logo peeling off (41) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—60.0%
QC Inline8 reports
required on prod. days 8/18 (44%)
—13.9%
QC Endline9 days—12.4%
QA Inline4 reports429.7%
Pre-final1 reports15.7%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0612.4%
12933 / 9 days
29.7%PASS
08/11–08/20
CC Skip stitch, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS069188 (44%)9108/15, 08/17, 08/18, 08/19, 08/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
CC Skip stitch4482
BA Thread ends253892155
ED Gathering crease2225202694
DB Run-off stitching163
EC Asymmetry322536119
AB Shading573
DF Twisted seam/skewing61
EA Unsmooth/puckering/bubbling8396
261290 LOGE · CP12/CP13 · Due 09/16Shipment Sample FAIL Latest Shipment Sample (09/11) FAILED
No resultPP Sample1 reports
No reportPilot Run
08/31QC 1st Bundle1 reports
09/01QA 1st Bundle1 reports
4/36QC Inlineactual/required · 11%
DHU 18.4%QC Endline16 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty5,000 / 5,000
PDF reports9
Last report09/11

Cross-stage findings

Latest Shipment Sample (09/11) FAILED

8 major: EI Inaccurate/skewed stitching 1, CA Thread tension 1, DF Twisted seam/skewing 1, EC Asymmetry 1, GA Missing bartack/button 1, EI Inaccurate/skewed stitching 1, EI Inaccurate/skewed stitching 1, EI Inaccurate/skewed stitching 1

Not fixed: EC Asymmetry

Found 24 times (111 pcs, 08/28–09/14) in earlier stages; latest Shipment Sample (09/11) still has 1 major

Not fixed: EI Inaccurate/skewed stitching

Found 4 times (4 pcs, 08/29–09/05) in earlier stages; latest Shipment Sample (09/11) still has 4 major

Missed in earlier stages: 3

CA Thread tension (Shipment Sample 09/11), DF Twisted seam/skewing (Shipment Sample 09/11), GA Missing bartack/button (Shipment Sample 09/11): first found in later stages, never recorded before

QC Endline data errors: 3

08/28 CP13 261290 (defective pcs 5 > defects 3), 08/29 CP13 261290 (defective pcs 15 > defects 12), 08/31 CP13 261290 (defective pcs 36 > defects 18)

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (7 Major), EI Inaccurate/skewed stitching (2 Major), BB Missing cut seam allowance (2 Major), BA Thread ends (1 Major), ED Gathering crease (1 Major), GB Missing sewing operation (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (3), CC Skip stitch (2), DE Cut to broken (1); Both: DJ Pleat (4/3), EA Unsmooth/puckering/bubbling (3/1), CE Broken seam (2/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 100.0%

Caught in earlier stages

BA Thread ends (458), ED Gathering crease (149), EA Unsmooth/puckering/bubbling (127), CC Skip stitch (116), EB Measurement issue (30) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—100.0%
QC Inline4 reports
required on prod. days 4/36 (11%)
—68.8%
QC Endline16 days—18.4%
QA Inline1 reports146.9%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1318.5%
4940 / 16 days
46.9%—
08/28–09/15
BA Thread ends, ED Gathering crease, EA Unsmooth/puckering/bubbling
CP1210.0%
60 / 2 days
——
09/07–09/08
EA Unsmooth/puckering/bubbling, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1316324 (12%)161209/10, 09/11, 09/12, 09/14, 09/15
CP12240 (0%)2209/07, 09/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends21284243
ED Gathering crease1148
EA Unsmooth/puckering/bubbling2311174
CC Skip stitch210104
EC Asymmetry37247251
EB Measurement issue30
DB Run-off stitching20
CE Broken seam12112
261293 LOGE · CP07 · Due 09/16Final Random FAIL Latest Final Random (09/04) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/29QA 1st Bundle1 reports
6/24QC Inlineactual/required · 25%
DHU 14.2%QC Endline12 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All FAILFinal Random1 reports
Order/Ship qty4,000 / 4,000
PDF reports10
Last report09/08

Cross-stage findings

Latest Final Random (09/04) FAILED

17 major: DJ Pleat 1, ED Gathering crease 7, EA Unsmooth/puckering/bubbling 6, Others (no detail) 2, DE Cut to broken 1

Not fixed: EA Unsmooth/puckering/bubbling

Found 8 times (29 pcs, 08/29–09/07) in earlier stages; latest Shipment Sample (09/05) still has 1 major

Not fixed: DE Cut to broken

Found 6 times (6 pcs, 08/29–09/08) in earlier stages; latest Shipment Sample (09/05) still has 1 major

Not fixed: EC Asymmetry

Found 4 times (10 pcs, 08/28–09/07) in earlier stages; latest Shipment Sample (09/05) still has 4 major

Missed in earlier stages: 4

DJ Pleat (Final Random 09/04), CB Broken stitch (Shipment Sample 09/05), CG Grinning (Shipment Sample 09/05), EI Inaccurate/skewed stitching (Shipment Sample 09/05): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

BA Thread ends 2, ED Gathering crease 7 pcs (later stages total)

5 defects recorded as 'Others' without detail

Final Random 2, Shipment Sample 3; cannot compare across stages

QC Endline data errors: 3

08/28 CP07 261293 (defective pcs 30 > defects 27), 09/01 CP07 261293 (defective pcs 51 > defects 48), 09/09 CP07 261293 (defective pcs 7 > defects 6)

Caught in earlier stages

EA Uneven seam allowance (66), DI High-low/uneven (43), EB Measurement issue (36), DB Run-off stitching (26), CC Skip stitch (25) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—85.0%
QC Inline6 reports
required on prod. days 6/24 (25%)
—31.7%
QC Endline12 days—14.2%
QA Inline1 reports140.6%
Shipment Sample1 reports1—
Final Random1 reports18.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0714.2%
4000 / 12 days
40.6%FAIL
08/28–09/10
BA Thread ends, ED Gathering crease, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0712246 (25%)12609/05, 09/07, 09/08, 09/09, 09/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends221112
ED Gathering crease16417
EA Uneven seam allowance66
DI High-low/uneven43
EA Unsmooth/puckering/bubbling819216
EB Measurement issue36
DB Run-off stitching1412
CC Skip stitch15181
261295 LOGE · CP01 · Due 09/16Final Random PASS Not fixed: ED Gathering crease
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
08/29QA 1st Bundle1 reports
1/34QC Inlineactual/required · 3%
DHU 18.8%QC Endline17 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty10,000 / 10,000
PDF reports6
Last report09/10

Cross-stage findings

Not fixed: ED Gathering crease

Found 16 times (163 pcs, 08/28–09/15) in earlier stages; latest Final Random (09/09) still has 3 major

Missed in earlier stages: 1

CA Thread tension (Shipment Sample 09/08): first found in later stages, never recorded before

QA Inline DHU is 8.6× QC Inline

QA Inline DHU 34.4% vs QC Inline 4.0%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (09/09): CE Broken seam 2 (earlier 22 times)

Found earlier but still reached later stages: 6

EA Unsmooth/puckering/bubbling 1, EC Asymmetry 4, CG Grinning 1, DE Cut to broken 1, CC Skip stitch 1, BB Missing cut seam allowance 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

Shipment Sample 2; cannot compare across stages

QC Endline data errors: 3

08/28 CP01 261295 (defective pcs 65 > defects 64), 08/29 CP01 261295 (defective pcs 88 > defects 51), 08/31 CP01 261295 (defective pcs 90 > defects 37)

Caught in earlier stages

EB Measurement issue (205), DB Run-off stitching (48), DK Twisted shoulder strap (36), CD Needle hole (36) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA 1st Bundle1 reports—90.0%
QC Inline1 reports
required on prod. days 1/34 (3%)
—4.0%
QC Endline17 days—18.8%
QA Inline1 reports134.4%
Shipment Sample1 reports1—
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0118.8%
9860 / 17 days
34.4%PASS
08/28–09/16
BA Thread ends, EA Unsmooth/puckering/bubbling, CE Broken seam

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0117341 (3%)171609/11, 09/12, 09/14, 09/15, 09/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends247719
EA Unsmooth/puckering/bubbling244461
CE Broken seam14208212
EB Measurement issue205
CC Skip stitch21811
ED Gathering crease162123
EC Asymmetry21584
DB Run-off stitching1461
261299 LOGE · CP03/CP07/CP08… · Due 09/16Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
08/17QC 1st Bundle1 reports
08/18–08/28QA 1st Bundle2 reports
6/168QC Inlineactual/required · 4%
DHU 3.5%QC Endline33 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty12,000 / 12,000
PDF reports12
Last report08/29

Cross-stage findings

Not fixed: ED Gathering crease

Found 14 times (72 pcs, 08/12–08/25) in earlier stages; latest Final Random (08/29) still has 3 major

Missed in earlier stages: 3

FC Wrong label (Shipment Sample 08/26), CG Grinning (Shipment Sample 08/26), BB Missing cut seam allowance (Final Random 08/29): first found in later stages, never recorded before

QA Inline DHU is 10.7× QC Endline

QA Inline DHU 37.5% vs QC Endline 3.5% (08/11–09/21, 33 days, 11940 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/29): CE Broken seam 1 (earlier 7 times)

Found earlier but still reached later stages: 3

EC Asymmetry 4, EA Unsmooth/puckering/bubbling 1, DJ Pleat 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

Shipment Sample 2; cannot compare across stages

QC Endline data errors: 14

08/17 CP17 261299-1 (defective pcs 26 > defects 8), 08/18 CP17 261299-1 (defective pcs 93 > defects 40), 08/19 CP17 261299-1 (defective pcs 139 > defects 35), 08/19 CP18 261299-2 (defective pcs 22 > defects 10)…

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (11 Major), EI Inaccurate/skewed stitching (3 Major), ED Gathering crease (2 Major), EA Unsmooth/puckering/bubbling (2 Major), CE Broken seam (2 Major), BD Snagging (1 Major), DA Exceed seam allowance (1 Major), DJ Pleat (1 Major); Only QC 1st Bundle: DE Cut to broken (3), FB Material defect (2), DI High-low/uneven (2), AD Fabric stains (1); Both: BA Thread ends (5/5); DHU QC 1st Bundle 65.0% / QA 1st Bundle 70.0%

Caught in earlier stages

AD Fabric stains (47), CC Skip stitch (46), EB Measurement issue (21), DE Cut to broken (18), DI High-low/uneven (12) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—65.0%
QA 1st Bundle2 reports—70.0%
QC Inline6 reports
required on prod. days 6/168 (4%)
—25.0%
QC Endline33 days—3.5%
QA Inline1 reports137.5%
Shipment Sample1 reports1—
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP175.9%
5940 / 15 days
37.5%—
08/17–09/04
BA Thread ends, ED Gathering crease, AD Fabric stains
CP190.1%
2580 / 23 days
—PASS
08/11–09/18
BA Thread ends
CP200.7%
900 / 11 days
——
08/11–09/11
BA Thread ends, CC Skip stitch, ED Gathering crease
CP181.5%
660 / 7 days
——
08/18–09/21
BA Thread ends, CC Skip stitch
CP131.6%
620 / 6 days
——
08/14–09/10
BA Thread ends, EC Asymmetry, DK Twisted shoulder strap
CP167.8%
360 / 8 days
——
08/20–09/12
BA Thread ends, EB Measurement issue
CP140.0%
300 / 3 days
——
09/11–09/15
—
CP125.6%
180 / 1 days
——
08/25–08/25
BA Thread ends, DF Twisted seam/skewing, CC Skip stitch
CP103.3%
120 / 3 days
——
08/26–08/29
BA Thread ends
CP030.0%
80 / 1 days
——
08/26–08/26
—
CP080.0%
80 / 3 days
——
09/05–09/08
—
CP110.0%
60 / 1 days
——
08/25–08/25
—
CP090.0%
40 / 1 days
——
09/11–09/11
—
CP070.0%
20 / 1 days
——
08/25–08/25
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1923460 (0%)232309/11, 09/15, 09/16, 09/17, 09/18
CP1715306 (20%)15908/29, 08/31, 09/01, 09/02, 09/04
CP2011220 (0%)111108/26, 08/28, 09/03, 09/04, 09/11
CP168160 (0%)8809/02, 09/03, 09/07, 09/10, 09/12
CP187140 (0%)7708/20, 08/24, 09/04, 09/08, 09/21
CP136120 (0%)6608/28, 08/31, 09/01, 09/02, 09/10
CP08360 (0%)3309/05, 09/07, 09/08
CP10360 (0%)3308/26, 08/28, 08/29
CP14360 (0%)3309/11, 09/12, 09/15
CP03120 (0%)1108/26
CP07120 (0%)1108/25
CP09120 (0%)1109/11
CP11120 (0%)1108/25
CP12120 (0%)1108/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends55271975
ED Gathering crease246243
EC Asymmetry11212654
AD Fabric stains11135
CC Skip stitch244
EA Unsmooth/puckering/bubbling222011
EB Measurement issue21
DE Cut to broken3141
261302 LOGE · CB36 · Due 09/16Shipment Sample FAIL Latest Shipment Sample (09/08) FAILED
No resultPP Sample1 reports
No reportPilot Run
08/20QC 1st Bundle1 reports
08/19QA 1st Bundle1 reports
5/36QC Inlineactual/required · 14%
DHU 11.8%QC Endline18 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty4,000 / 4,000
PDF reports11
Last report09/08

Cross-stage findings

Latest Shipment Sample (09/08) FAILED

13 major: EI Inaccurate/skewed stitching 1, Others (no detail) 1, Others (no detail) 1, DF Twisted seam/skewing 1, Others (no detail) 1, EC Asymmetry 1, CC Skip stitch 1, EC Asymmetry 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, EB Measurement issue 1, AA Fabric defect 1, Others (no detail) 1

Not fixed: EB Measurement issue

Found 10 times (11 pcs, 08/15–09/08) in earlier stages; latest Shipment Sample (09/08) still has 1 major

Not fixed: CC Skip stitch

Found 32 times (100 pcs, 08/15–09/08) in earlier stages; latest Shipment Sample (09/08) still has 1 major

Not fixed: DF Twisted seam/skewing

Found 6 times (7 pcs, 08/15–08/31) in earlier stages; latest Shipment Sample (09/08) still has 1 major

Not fixed: EC Asymmetry

Found 33 times (82 pcs, 08/15–09/08) in earlier stages; latest Shipment Sample (09/08) still has 3 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 6 times (9 pcs, 08/19–09/08) in earlier stages; latest Shipment Sample (09/08) still has 1 major

Missed in earlier stages: 1

AA Fabric defect (Shipment Sample 09/08): first found in later stages, never recorded before

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 35.9% vs QC Inline 20.4%; QC Inline may be missing defects

Found earlier but still reached later stages: 1

EI Inaccurate/skewed stitching 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

Shipment Sample 4; cannot compare across stages

Duplicate report numbers

QGR2637004 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (4 Major), DA Exceed seam allowance (1 Major), DF Twisted seam/skewing (1 Major), DE Cut to broken (1 Major); Only QC 1st Bundle: CG Grinning (1), EI Inaccurate/skewed stitching (1), CB Broken stitch (1), BA Thread ends (1); Both: EC Asymmetry (4/3), DJ Pleat (2/1), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 84.6% / QA 1st Bundle 92.3%

Caught in earlier stages

BA Thread ends (177), ED Gathering crease (72), DB Run-off stitching (36), CE Broken seam (28), CD Needle hole (15) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—84.6%
QA 1st Bundle1 reports—92.3%
QC Inline5 reports
required on prod. days 5/36 (14%)
—20.4%
QC Endline18 days—11.8%
QA Inline2 reports235.9%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3611.8%
4000 / 18 days
35.9%—
08/18–09/08
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3618365 (14%)181309/03, 09/04, 09/05, 09/07, 09/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends171654
CC Skip stitch12971
EC Asymmetry143234563
ED Gathering crease1701
DB Run-off stitching234
CE Broken seam2233
CD Needle hole15
EB Measurement issue3441
261303 LOGE · CP17 · Due 09/16Final Random PASS Not fixed: CE Broken seam
No resultPP Sample1 reports
No reportPilot Run
08/26QC 1st Bundle1 reports
08/26QA 1st Bundle1 reports
2/12QC Inlineactual/required · 17%
DHU 5.3%QC Endline6 days
No reportQA Inline
All FAILShipment Sample3 reports2 no result
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty4,000 / 4,000
PDF reports9
Last report09/08

Cross-stage findings

Not fixed: CE Broken seam

Found 8 times (13 pcs, 08/24–08/31) in earlier stages; latest Shipment Sample (09/08) still has 1 major

Not fixed: CG Grinning

Found 3 times (6 pcs, 08/24–08/31) in earlier stages; latest Shipment Sample (09/08) still has 1 major

Not fixed: EC Asymmetry

Found 10 times (20 pcs, 08/26–08/31) in earlier stages; latest Shipment Sample (09/08) still has 3 major

Not fixed: CC Skip stitch

Found 6 times (20 pcs, 08/25–08/31) in earlier stages; latest Shipment Sample (09/08) still has 1 major

Missed in earlier stages: 2

CB Broken stitch (Final Random 09/04), BB Missing cut seam allowance (Final Random 09/04): first found in later stages, never recorded before

Found earlier but still reached later stages: 4

EI Inaccurate/skewed stitching 8, ED Gathering crease 6, BA Thread ends 10, DB Run-off stitching 2 pcs (later stages total)

QC Endline data errors: 5

08/25 CP17 261303 (defective pcs 29 > defects 13), 08/26 CP17 261303 (defective pcs 103 > defects 63), 08/28 CP17 261303 (defective pcs 153 > defects 53), 08/29 CP17 261303 (defective pcs 115 > defects 40)…

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), CC Skip stitch (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: CG Grinning (2), DE Cut to broken (2), BD Snagging (1); Both: ED Gathering crease (7/3), EC Asymmetry (3/5), CE Broken seam (2/1); DHU QC 1st Bundle 85.0% / QA 1st Bundle 65.0%

Caught in earlier stages

AD Fabric stains (38), EB Measurement issue (16), EA Unsmooth/puckering/bubbling (13), DJ Pleat (6) did not reach later stages

Report line differs from production line

QGR2638388 Final Random (09/04) CP07; actual production line(s) CP17 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—85.0%
QA 1st Bundle1 reports—65.0%
QC Inline2 reports
required on prod. days 2/12 (17%)
—25.4%
QC Endline6 days—5.3%
Shipment Sample3 reports1—
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP175.3%
4000 / 6 days
——
08/25–09/01
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP176122 (17%)6408/26, 08/28, 08/29, 08/31, 09/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SampleFinal Random
BA Thread ends249310
ED Gathering crease733042
AD Fabric stains533
EC Asymmetry35757
CC Skip stitch1191
CE Broken seam221445
EB Measurement issue16
EA Unsmooth/puckering/bubbling2110
261304 LOGE · CP13/CP14 · Due 09/16Shipment Sample FAIL Latest Shipment Sample (09/09) FAILED
No reportPP Sample
No reportPilot Run
08/28QC 1st Bundle1 reports
08/28QA 1st Bundle1 reports
4/34QC Inlineactual/required · 12%
DHU 11.6%QC Endline15 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty5,000 / 5,000
PDF reports8
Last report09/09

Cross-stage findings

Latest Shipment Sample (09/09) FAILED

12 major: Others (no detail) 1, EC Asymmetry 1, DB Run-off stitching 1, Others (no detail) 1, EC Asymmetry 1, GA Missing bartack/button 1, Others (no detail) 1, CF Pulling yarn 1, EC Asymmetry 1, DJ Pleat 1, EC Asymmetry 1, EC Asymmetry 1

Not fixed: DJ Pleat

Found 3 times (5 pcs, 08/28–08/28) in earlier stages; latest Shipment Sample (09/09) still has 1 major

Not fixed: EC Asymmetry

Found 18 times (68 pcs, 08/26–09/09) in earlier stages; latest Shipment Sample (09/09) still has 5 major

Not fixed: DB Run-off stitching

Found 12 times (31 pcs, 08/26–09/10) in earlier stages; latest Shipment Sample (09/09) still has 1 major

Missed in earlier stages: 2

GA Missing bartack/button (Shipment Sample 09/09), CF Pulling yarn (Shipment Sample 09/09): first found in later stages, never recorded before

3 defects recorded as 'Others' without detail

Shipment Sample 3; cannot compare across stages

QC Endline data errors: 4

08/26 CP14 261304 (defective pcs 19 > defects 13), 08/28 CP14 261304 (defective pcs 22 > defects 14), 08/29 CP14 261304 (defective pcs 34 > defects 23), 08/31 CP14 261304 (defective pcs 39 > defects 24)

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (3 Major), EI Inaccurate/skewed stitching (3 Major), BA Thread ends (2 Major), DD Thread not straight/waving (2 Major), DA Exceed seam allowance (1 Major), EA Unsmooth/puckering/bubbling (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: DJ Pleat (5), DC Join stitching (2); Both: EC Asymmetry (4/3), CE Broken seam (3/1); DHU QC 1st Bundle 70.0% / QA 1st Bundle 85.0%

Caught in earlier stages

BA Thread ends (335), CC Skip stitch (69), EA Unsmooth/puckering/bubbling (61), ED Gathering crease (33), DK Twisted shoulder strap (19) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—70.0%
QA 1st Bundle1 reports—85.0%
QC Inline4 reports
required on prod. days 4/34 (12%)
—39.8%
QC Endline15 days—11.6%
QA Inline1 reports131.2%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1411.7%
4960 / 15 days
31.2%—
08/26–09/12
BA Thread ends, EA Unsmooth/puckering/bubbling, CC Skip stitch
CP130.0%
40 / 2 days
——
09/02–09/09
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1415304 (13%)151109/08, 09/09, 09/10, 09/11, 09/12
CP13240 (0%)2209/02, 09/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends2333
EC Asymmetry4385215
CC Skip stitch1257
EA Unsmooth/puckering/bubbling1582
ED Gathering crease330
DB Run-off stitching12191
DK Twisted shoulder strap19
CE Broken seam31121
261645 OSIT · CP06 · Due 09/16Final Random PASS Not fixed: AD Fabric stains
No resultPP Sample1 reports
No reportPilot Run
09/03QC 1st Bundle1 reports
09/03QA 1st Bundle1 reports
1/8QC Inlineactual/required · 12%
DHU 15.9%QC Endline4 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports8
Last report09/09

Cross-stage findings

Not fixed: AD Fabric stains

Found 7 times (22 pcs, 09/03–09/07) in earlier stages; latest Final Random (09/09) still has 3 major

Found earlier but still reached later stages: 3

ED Gathering crease 2, EA Unsmooth/puckering/bubbling 2, CB Broken stitch 2 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BD Snagging (2 Major), BA Thread ends (2 Major), CC Skip stitch (1 Major), DC Join stitching (1 Major), CA Thread tension (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DI High-low/uneven (2), CG Grinning (1), DB Run-off stitching (1); Both: EA Unsmooth/puckering/bubbling (7/8), ED Gathering crease (7/2), AD Fabric stains (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 95.0%

Caught in earlier stages

CC Skip stitch (32), DB Run-off stitching (12), EC Asymmetry (7), AC Fabric hole (7), BD Snagging (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—95.0%
QC Inline1 reports
required on prod. days 1/8 (12%)
—26.0%
QC Endline4 days—15.9%
QA Inline1 reports131.2%
Shipment Sample1 reports1—
Pre-final1 reports18.8%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0615.9%
980 / 4 days
31.2%PASS
09/03–09/07
ED Gathering crease, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP06481 (12%)4309/03, 09/04, 09/05, 09/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
ED Gathering crease72302
BA Thread ends227344
EA Unsmooth/puckering/bubbling781152
CC Skip stitch14261
AD Fabric stains2131653
DB Run-off stitching111
CB Broken stitch1312
EC Asymmetry61
260720 DJLF · CS07/CS08 · Due 09/21Final Random PASS Not fixed: CB Broken stitch
No reportPP Sample
No reportPilot Run
08/31QC 1st Bundle1 reports
09/01QA 1st Bundle1 reports
6/20QC Inlineactual/required · 30%
DHU 9.6%QC Endline10 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,900 / 3,900
PDF reports14
Last report09/18

Cross-stage findings

Not fixed: CB Broken stitch

Found 13 times (31 pcs, 08/31–09/08) in earlier stages; latest Final Random (09/18) still has 3 major

Missed in earlier stages: 2

AD Fabric stains (Shipment Sample 09/05), DH Pressing mark (Final Random 09/18): first found in later stages, never recorded before

QA Inline DHU is 4.3× QC Inline

QA Inline DHU 41.7% vs QC Inline 9.8%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (09/18): ED Gathering crease 2 (earlier 8 times), CC Skip stitch 1 (earlier 10 times)

Found earlier but still reached later stages: 3

EA Unsmooth/puckering/bubbling 3, DJ Pleat 1, CF Pulling yarn 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 9); zero in QC Endline records

QC Endline data errors: 2

09/02 CS07 260720 (defective pcs 64 > defects 60), 09/07 CS07 260720 (defective pcs 51 > defects 48)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), CC Skip stitch (2 Major), EC Asymmetry (2 Major), EE Raw edge (1 Major), ED Gathering crease (1 Major), DJ Pleat (1 Major); Only QC 1st Bundle: DF Twisted seam/skewing (4); Both: CB Broken stitch (5/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 65.0%

Caught in earlier stages

EB Measurement issue (26), FC Wrong label (20), EC Asymmetry (18), DF Twisted seam/skewing (16) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—65.0%
QC Inline6 reports
required on prod. days 6/20 (30%)
—9.8%
QC Endline10 days—9.6%
QA Inline3 reports341.7%
Shipment Sample2 reports1—
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS079.6%
3888 / 10 days
41.7%PASS
09/01–09/11
BA Thread ends, CC Skip stitch, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0710206 (30%)10409/07, 09/08, 09/09, 09/10, 09/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends20615
CC Skip stitch231071
CB Broken stitch5111143
ED Gathering crease142012
EB Measurement issue251
EA Unsmooth/puckering/bubbling3863
FC Wrong label20
EC Asymmetry2646
260884 LOGE · CS09/CS12 · Due 09/21Final Random PASS Not fixed: CB Broken stitch
No reportPP Sample
No reportPilot Run
08/05QC 1st Bundle1 reports
08/05QA 1st Bundle1 reports
35/90QC Inlineactual/required · 39%
DHU 6.7%QC Endline26 days
All FAILQA Inline8 reports
All FAILShipment Sample1 reports
1/2 FAILPre-final2 reports
All PASSFinal Random1 reports
Order/Ship qty50,000 / 50,000
PDF reports49
Last report09/07

Cross-stage findings

Not fixed: CB Broken stitch

Found 21 times (71 pcs, 08/05–08/28) in earlier stages; latest Final Random (09/07) still has 3 major

Found earlier but still reached later stages: 2

DJ Pleat 2, BB Missing cut seam allowance 2 pcs (later stages total)

128 defects recorded as 'Others' without detail

QC 1st Bundle 9, QC Inline 119; cannot compare across stages

QC Endline data errors: 19

08/06 CS12 260884 (defective pcs 38 > defects 15), 08/07 CS12 260884 (defective pcs 43 > defects 23), 08/08 CS12 260884 (defective pcs 31 > defects 18), 08/10 CS12 260884 (defective pcs 27 > defects 12)…

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), DD Thread not straight/waving (1 Major), EA Unsmooth/puckering/bubbling (1 Major), EI Inaccurate/skewed stitching (1 Major), CE Broken seam (1 Major), GA Missing bartack/button (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: ED Gathering crease (5); Both: CB Broken stitch (5/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 45.0%

Caught in earlier stages

CC Skip stitch (502), DB Run-off stitching (84), EB Measurement issue (52), DF Twisted seam/skewing (18), CE Broken seam (12) did not reach later stages

Found before bulk production (Shipment Sample): 6

EA Unsmooth/puckering/bubbling, EC Asymmetry, ED Gathering crease, AD Fabric stains, AC Fabric hole, EI Inaccurate/skewed stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—45.0%
QC Inline35 reports
required on prod. days 35/90 (39%)
—36.4%
QC Endline26 days—6.7%
QA Inline8 reports830.5%
Shipment Sample1 reports1—
Pre-final2 reports12.9%
Final Random1 reports02.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS099.4%
30079 / 25 days
30.4%—
08/06–09/07
BA Thread ends, CC Skip stitch, ED Gathering crease
CS122.7%
20050 / 20 days
31.2%PASS
08/05–09/07
BA Thread ends, CC Skip stitch, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS09255021 (42%)25408/31, 09/01, 09/02, 09/05, 09/07
CS12204014 (35%)20608/22, 08/24, 08/26, 09/02, 09/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends22342520181415
CC Skip stitch502
ED Gathering crease56212482
Others (no detail)911922
EA Unsmooth/puckering/bubbling188324421
EI Inaccurate/skewed stitching11032531
EC Asymmetry15926671
AC Fabric hole54271212
260915 SAIN · CB21/CB30 · Due 09/21Final Random PASS Not fixed: AD Fabric stains
No resultPP Sample1 reports
No reportPilot Run
08/03QC 1st Bundle1 reports
08/03QA 1st Bundle1 reports
8/42QC Inlineactual/required · 19%
DHU 10.1%QC Endline20 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty4,870 / 1,760
PDF reports16
Last report08/26

Cross-stage findings

Not fixed: AD Fabric stains

Found 16 times (40 pcs, 08/01–08/20) in earlier stages; latest Final Random (08/26) still has 3 major

Missed in earlier stages: 1

GB Missing sewing operation (Final Random 08/20): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/26): CB Broken stitch 1 (earlier 6 times), CC Skip stitch 1 (earlier 12 times)

Found earlier but still reached later stages: 2

AC Fabric hole 1, BA Thread ends 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA 1st Bundle 2; cannot compare across stages

QC Endline data errors: 1

08/05 CB21 260915 (defective pcs 26 > defects 25)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), EA Unsmooth/puckering/bubbling (2 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: CB Broken stitch (1), DH Pressing mark (1); Both: AD Fabric stains (3/3), AC Fabric hole (3/1), EC Asymmetry (2/2); DHU QC 1st Bundle 76.9% / QA 1st Bundle 100.0%

Caught in earlier stages

CD Needle hole (131), Q94 Glue marks (27), EC Asymmetry (25), EB Measurement issue (23), DB Run-off stitching (22) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—100.0%
QC Inline8 reports
required on prod. days 8/42 (19%)
—38.3%
QC Endline20 days—10.1%
QA Inline3 reports340.6%
Final Random2 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2110.1%
5000 / 20 days
40.6%PASS
08/03–09/05
BA Thread ends, CD Needle hole, Q94 Glue marks
CB300.0%
10 / 1 days
——
08/14–08/14
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2120408 (20%)201208/20, 08/21, 08/22, 09/04, 09/05
CB30120 (0%)1108/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends22561
CD Needle hole131
AD Fabric stains13325265
AC Fabric hole312121
CC Skip stitch2241
Q94 Glue marks27
EC Asymmetry422161
EB Measurement issue1211
260944 LOGE · CP01/CP02/CP03… · Due 09/21Final Random PASS Not fixed: EA Unsmooth/puckering/bubbling
No resultPP Sample1 reports
No reportPilot Run
08/28QC 1st Bundle1 reports
08/14–09/09QA 1st Bundle3 reports
6/100QC Inlineactual/required · 6%
DHU 10.3%QC Endline23 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,000 / 3,000
PDF reports15
Last report09/09

Cross-stage findings

Not fixed: EA Unsmooth/puckering/bubbling

Found 11 times (109 pcs, 08/13–09/04) in earlier stages; latest Final Random (09/03) still has 3 major

Missed in earlier stages: 1

BD Snagging (Final Random 09/03): first found in later stages, never recorded before

QA Inline DHU is 5.2× QC Endline

QA Inline DHU 53.1% vs QC Endline 10.3% (08/12–09/08, 23 days, 9000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

1 defects recorded as 'Others' without detail

QC Inline 1; cannot compare across stages

QC Endline data errors: 13

08/12 CP02 260944-2 (defective pcs 78 > defects 16), 08/12 CP06 260944-3 (defective pcs 22 > defects 7), 08/13 CP15 260944-3 (defective pcs 7 > defects 2), 08/14 CP15 260944-3 (defective pcs 8 > defects 3)…

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (3 Major), EA Unsmooth/puckering/bubbling (2 Major), DE Cut to broken (2 Major), ED Gathering crease (1 Major), EI Inaccurate/skewed stitching (1 Major), CG Grinning (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: CC Skip stitch (4), DD Thread not straight/waving (1), GB Missing sewing operation (1); Both: EC Asymmetry (1/17), BA Thread ends (4/5), DI High-low/uneven (4/2), DA Exceed seam allowance (1/4), CB Broken stitch (2/2), AD Fabric stains (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 70.0%

Caught in earlier stages

EC Asymmetry (124), CC Skip stitch (121), ED Gathering crease (67), DB Run-off stitching (64), EB Measurement issue (52) did not reach later stages

Report line differs from production line

QGR2638107 Final Random (09/03) CP11; actual production line(s) CP01/CP02/CP03/CP04/CP05/CP06/CP07/CP09/CP15/CP18/CP20 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle3 reports—70.0%
QC Inline7 reports
required on prod. days 6/100 (6%)
—37.1%
QC Endline23 days—10.3%
QA Inline2 reports253.1%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0214.9%
3700 / 17 days
53.1%—
08/12–09/07
BA Thread ends, EA Unsmooth/puckering/bubbling, EB Measurement issue
CP0911.6%
3000 / 8 days
53.1%—
08/28–09/05
BA Thread ends, CC Skip stitch, DB Run-off stitching
CP061.5%
660 / 8 days
——
08/12–09/08
BA Thread ends, DB Run-off stitching, CC Skip stitch
CP040.0%
580 / 7 days
——
08/15–08/26
—
CP013.5%
340 / 2 days
——
08/17–08/18
BA Thread ends, DK Twisted shoulder strap
CP050.0%
320 / 3 days
——
08/15–08/19
—
CP151.7%
300 / 2 days
——
08/13–08/14
BA Thread ends, EC Asymmetry
CP030.0%
40 / 1 days
——
08/26–08/26
—
CP070.0%
40 / 1 days
——
08/22–08/22
—
CP180.0%
20 / 1 days
——
08/24–08/24
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0217340 (0%)171708/28, 08/29, 08/31, 09/02, 09/07
CP068160 (0%)8808/19, 08/20, 08/22, 09/07, 09/08
CP098166 (38%)8209/01, 09/02, 09/03, 09/04, 09/05
CP047140 (0%)7708/18, 08/19, 08/20, 08/21, 08/26
CP05360 (0%)3308/15, 08/17, 08/19
CP01240 (0%)2208/17, 08/18
CP15240 (0%)2208/13, 08/14
CP03120 (0%)1108/26
CP07120 (0%)1108/22
CP18120 (0%)1108/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends453841139
EC Asymmetry4117127911
CC Skip stitch411106
EA Unsmooth/puckering/bubbling2210233
ED Gathering crease1165
DB Run-off stitching64
EB Measurement issue52
AD Fabric stains2113291
261544 OSIT · CS06 · Due 09/23Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
09/07QC 1st Bundle1 reports
09/07QA 1st Bundle1 reports
9/26QC Inlineactual/required · 35%
DHU 15.1%QC Endline13 days
All FAILQA Inline4 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty6,000 / 0
PDF reports19
Last report09/18

Cross-stage findings

Not fixed: ED Gathering crease

Found 17 times (101 pcs, 09/07–09/19) in earlier stages; latest Final Random (09/17) still has 4 major

QA Inline DHU is 2.8× QC Inline

QA Inline DHU 35.9% vs QC Inline 12.6%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (09/17): EC Asymmetry 2 (earlier 18 times), CB Broken stitch 1 (earlier 6 times)

Found earlier but still reached later stages: 4

DF Twisted seam/skewing 1, CF Pulling yarn 1, EA Unsmooth/puckering/bubbling 1, DI High-low/uneven 1 pcs (later stages total)

8 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 6; cannot compare across stages

QC Endline data errors: 2

09/05 CS06 261544 (defective pcs 5 > defects 3), 09/08 CS06 261544 (defective pcs 52 > defects 50)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (3 Major), BA Thread ends (2 Major), EA Unsmooth/puckering/bubbling (1 Major), CF Pulling yarn (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (2), GB Missing sewing operation (2), EC Asymmetry (2), DF Twisted seam/skewing (1); Both: DJ Pleat (2/2), DB Run-off stitching (2/2), AD Fabric stains (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 75.0%

Caught in earlier stages

CC Skip stitch (107), DB Run-off stitching (83), AB Shading (54), AC Fabric hole (42), CD Needle hole (32) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—75.0%
QC Inline9 reports
required on prod. days 9/26 (35%)
—12.6%
QC Endline13 days—15.1%
QA Inline4 reports435.9%
Shipment Sample2 reports1—
Pre-final1 reports111.0%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0615.1%
5857 / 13 days
35.9%PASS
09/05–09/19
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0613269 (35%)13409/15, 09/16, 09/17, 09/18, 09/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends2247555
ED Gathering crease3926114
CC Skip stitch61001
AD Fabric stains211180632
DB Run-off stitching221762
EC Asymmetry217273272
AB Shading1044
DF Twisted seam/skewing124311
261286 LOGE · CP01/CP02/CP03… · Due 09/25Shipment Sample PASS Not fixed: EC Asymmetry
No resultPP Sample2 reports
No reportPilot Run
08/26–08/31QC 1st Bundle2 reports
08/26–09/01QA 1st Bundle3 reports
20/270QC Inlineactual/required · 7%
DHU 9.5%QC Endline24 days
All FAILQA Inline5 reports
1/3 FAILShipment Sample4 reports1 no result
No reportPre-final
No reportFinal Random
Order/Ship qty10,000 / 10,000
PDF reports36
Last report09/15

Cross-stage findings

Not fixed: EC Asymmetry

Found 67 times (206 pcs, 07/23–09/18) in earlier stages; latest Shipment Sample (09/10) still has 6 major

2 later-stage PDF report(s) blank

Shipment Sample 09/02 QGR2638411 (FAIL), Shipment Sample 09/10 QGR2640192 (FAIL); please check if the report was completed

Found earlier but still reached later stages: 6

EA Unsmooth/puckering/bubbling 1, GA Missing bartack/button 1, EI Inaccurate/skewed stitching 1, CG Grinning 2, ED Gathering crease 2, CB Broken stitch 1 pcs (later stages total)

QC Endline data errors: 14

08/25 CP05 261286-1 (defective pcs 40 > defects 33), 08/26 CP05 261286-1 (defective pcs 20 > defects 15), 08/28 CP05 261286-1 (defective pcs 20 > defects 8), 08/29 CP05 261286-1 (defective pcs 56 > defects 22)…

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DE Cut to broken (4 Major), CC Skip stitch (2 Major), EI Inaccurate/skewed stitching (2 Major), EG Wrong panel assembly (2 Major), BD Snagging (1 Major), GB Missing sewing operation (1 Major), GA Missing bartack/button (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DI High-low/uneven (2), BB Missing cut seam allowance (2), FA Wrong material (1); Both: BA Thread ends (6/7), ED Gathering crease (8/4), EC Asymmetry (6/4), EA Unsmooth/puckering/bubbling (4/5), DA Exceed seam allowance (3/2), DJ Pleat (4/1), CE Broken seam (2/1), CG Grinning (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 65.0%

Caught in earlier stages

BA Thread ends (1295), CC Skip stitch (664), CE Broken seam (207), EB Measurement issue (185), DB Run-off stitching (105) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample2 reports0—
QC 1st Bundle2 reports—100.0%
QA 1st Bundle3 reports—65.0%
QC Inline20 reports
required on prod. days 20/270 (7%)
—41.7%
QC Endline24 days—9.5%
QA Inline5 reports533.1%
Shipment Sample4 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP119.7%
8647 / 16 days
31.2%—
08/29–09/16
BA Thread ends, CC Skip stitch, ED Gathering crease
CP0512.0%
6970 / 21 days
62.5%—
08/25–09/18
BA Thread ends, CC Skip stitch, EB Measurement issue
CP0313.8%
5090 / 17 days
21.9%—
08/31–09/22
BA Thread ends, CC Skip stitch, ED Gathering crease
CP071.6%
1600 / 12 days
——
08/29–09/16
BA Thread ends
CP188.7%
1353 / 3 days
——
09/12–09/15
BA Thread ends, CC Skip stitch, CE Broken seam
CP159.9%
1260 / 9 days
——
09/04–09/14
BA Thread ends, DK Twisted shoulder strap, ED Gathering crease
CP161.1%
1140 / 13 days
——
09/01–09/21
BA Thread ends
CP020.0%
880 / 11 days
——
09/01–09/19
—
CP060.0%
880 / 9 days
——
09/03–09/17
—
CP019.7%
680 / 8 days
18.8%—
08/29–09/18
BA Thread ends, EC Asymmetry, DK Twisted shoulder strap
CP1713.0%
460 / 7 days
——
09/01–09/21
BA Thread ends, EC Asymmetry, ED Gathering crease
CP047.1%
280 / 5 days
——
08/28–09/12
EB Measurement issue, BA Thread ends, ED Gathering crease
CP140.0%
120 / 1 days
——
09/12–09/12
—
CP190.0%
100 / 2 days
——
09/07–09/18
—
CP090.0%
40 / 1 days
——
09/11–09/11
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP05214210 (24%)201209/14, 09/15, 09/16, 09/17, 09/18
CP0317345 (15%)171209/14, 09/15, 09/16, 09/17, 09/22
CP1116325 (16%)161109/11, 09/12, 09/14, 09/15, 09/16
CP1613260 (0%)131309/11, 09/12, 09/14, 09/18, 09/21
CP0712240 (0%)121209/09, 09/10, 09/12, 09/14, 09/16
CP0211220 (0%)111109/11, 09/14, 09/15, 09/16, 09/19
CP069180 (0%)9909/11, 09/12, 09/14, 09/16, 09/17
CP159180 (0%)9909/09, 09/10, 09/11, 09/12, 09/14
CP018160 (0%)8809/03, 09/04, 09/07, 09/16, 09/18
CP177140 (0%)7709/11, 09/12, 09/14, 09/19, 09/21
CP045100 (0%)5508/28, 09/01, 09/02, 09/11, 09/12
CP18360 (0%)3309/12, 09/14, 09/15
CP19240 (0%)2209/07, 09/18
CP09120 (0%)1109/11
CP14120 (0%)1109/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends67146112412
CC Skip stitch232630
ED Gathering crease8422572
EC Asymmetry464611151610
CE Broken seam2166138
EB Measurement issue185
EA Unsmooth/puckering/bubbling4452655101
DB Run-off stitching1995
261287 LOGE · CB10/CB30 · Due 09/25Final Random PASS Not fixed: ED Gathering crease
No resultPP Sample1 reports
No reportPilot Run
09/03QC 1st Bundle1 reports
09/04QA 1st Bundle1 reports
14/52QC Inlineactual/required · 27%
DHU 14.5%QC Endline22 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,000 / 3,000
PDF reports20
Last report09/19

Cross-stage findings

Not fixed: ED Gathering crease

Found 28 times (116 pcs, 09/03–09/29) in earlier stages; latest Final Random (09/18) still has 3 major

Missed in earlier stages: 4

AB Shading (Shipment Sample 09/15), FB Material defect (Shipment Sample 09/15), GA Missing bartack/button (Shipment Sample 09/15), BB Missing cut seam allowance (Final Random 09/18): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/18): CE Broken seam 1 (earlier 24 times), CC Skip stitch 1 (earlier 34 times)

Found earlier but still reached later stages: 5

EC Asymmetry 6, EB Measurement issue 1, EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 2, DE Cut to broken 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

Shipment Sample 4; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (3 Major), EI Inaccurate/skewed stitching (2 Major), EB Measurement issue (1 Major), EE Raw edge (1 Major), DD Thread not straight/waving (1 Major), EA Unsmooth/puckering/bubbling (1 Major), AC Fabric hole (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: ED Gathering crease (2), CB Broken stitch (2); Both: DA Exceed seam allowance (4/1), EC Asymmetry (2/2), DJ Pleat (2/1); DHU QC 1st Bundle 92.3% / QA 1st Bundle 75.0%

Caught in earlier stages

DA Exceed seam allowance (76), DJ Pleat (59), AC Fabric hole (46), CB Broken stitch (9), DB Run-off stitching (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—75.0%
QC Inline14 reports
required on prod. days 14/52 (27%)
—37.7%
QC Endline22 days—14.5%
QA Inline1 reports140.6%
Shipment Sample1 reports1—
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1014.7%
2950 / 22 days
40.6%PASS
09/03–09/29
BA Thread ends, CC Skip stitch, ED Gathering crease
CB300.0%
40 / 4 days
——
09/16–09/23
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB10224414 (32%)22809/23, 09/25, 09/26, 09/28, 09/29
CB30480 (0%)4409/16, 09/19, 09/21, 09/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends171266
CC Skip stitch251091
ED Gathering crease29103213
DA Exceed seam allowance14170
EC Asymmetry122311626
DJ Pleat2156
CE Broken seam1322261
AC Fabric hole1441
261294 LOGE · CB26/CB28/CB29… · Due 09/25Final Random PASS Not fixed: EA Unsmooth/puckering/bubbling
No resultPP Sample1 reports
No reportPilot Run
08/31–09/03QC 1st Bundle2 reports
08/31QA 1st Bundle1 reports
27/96QC Inlineactual/required · 28%
DHU 9.2%QC Endline26 days
All FAILQA Inline6 reports
1/2 FAILShipment Sample2 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty10,000 / 10,000
PDF reports43
Last report09/23

Cross-stage findings

Not fixed: EA Unsmooth/puckering/bubbling

Found 24 times (58 pcs, 08/29–09/19) in earlier stages; latest Final Random (09/18) still has 3 major

Missed in earlier stages: 1

GA Missing bartack/button (Shipment Sample 09/08): first found in later stages, never recorded before

1 later-stage PDF report(s) blank

Shipment Sample 09/08 QGR2639425 (FAIL); please check if the report was completed

QA Inline DHU is 5.3× QC Endline

QA Inline DHU 48.4% vs QC Endline 9.2% (09/01–10/03, 26 days, 8880 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 4

Latest Final Random (09/18): EC Asymmetry 2 (earlier 36 times), DJ Pleat 2 (earlier 23 times), CB Broken stitch 1 (earlier 10 times), DE Cut to broken 1 (earlier 7 times)

Found earlier but still reached later stages: 3

EI Inaccurate/skewed stitching 3, CG Grinning 1, ED Gathering crease 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA Inline 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EA Unsmooth/puckering/bubbling (QA 23), EC Asymmetry (QA 19); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (4 Major), BA Thread ends (2), DD Thread not straight/waving (1 Major), EG Wrong panel assembly (1 Major), BB Missing cut seam allowance (1); Only QC 1st Bundle: DJ Pleat (3), EI Inaccurate/skewed stitching (3), DA Exceed seam allowance (2), DB Run-off stitching (2), EC Asymmetry (2), CC Skip stitch (1); Both: CE Broken seam (2/3), EA Unsmooth/puckering/bubbling (1/2); DHU QC 1st Bundle 76.2% / QA 1st Bundle 55.0%

Caught in earlier stages

CC Skip stitch (300), DA Exceed seam allowance (80), EB Measurement issue (72), AC Fabric hole (71), DB Run-off stitching (60) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—76.2%
QA 1st Bundle1 reports—55.0%
QC Inline30 reports
required on prod. days 27/96 (28%)
—32.4%
QC Endline26 days—9.2%
QA Inline6 reports648.4%
Shipment Sample2 reports1—
Final Random1 reports04.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB288.5%
5214 / 24 days
51.6%PASS
09/01–10/03
BA Thread ends, CC Skip stitch, EB Measurement issue
CB2610.4%
3586 / 16 days
46.9%PASS
09/04–09/25
BA Thread ends, CC Skip stitch, EB Measurement issue
CB300.0%
70 / 7 days
——
09/15–09/23
—
CB290.0%
10 / 1 days
——
09/28–09/28
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB28244811 (23%)241309/25, 09/26, 09/29, 09/30, 10/03
CB26163216 (50%)13309/16, 09/17, 09/21, 09/22, 09/25
CB307140 (0%)7709/18, 09/19, 09/21, 09/22, 09/23
CB29120 (0%)1109/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends2940857
CC Skip stitch1192791
EC Asymmetry42731612
DA Exceed seam allowance278
EB Measurement issue72
AC Fabric hole2546
EA Unsmooth/puckering/bubbling312351733
DB Run-off stitching24891
261296 LOGE · CB05/CB07/CB29… · Due 09/25Final Random PASS Not fixed: ED Gathering crease
No resultPP Sample1 reports
No reportPilot Run
08/24QC 1st Bundle1 reports
08/24QA 1st Bundle1 reports
34/98QC Inlineactual/required · 35%
DHU 21.3%QC Endline30 days
All FAILQA Inline9 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty10,000 / 10,000
PDF reports49
Last report09/22

Cross-stage findings

Not fixed: ED Gathering crease

Found 67 times (239 pcs, 08/24–09/28) in earlier stages; latest Final Random (09/17) still has 3 major

Missed in earlier stages: 1

FA Wrong material (Shipment Sample 09/05): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/17): DJ Pleat 1 (earlier 24 times), EI Inaccurate/skewed stitching 1 (earlier 9 times), CB Broken stitch 2 (earlier 29 times)

Found earlier but still reached later stages: 4

EA Unsmooth/puckering/bubbling 1, EC Asymmetry 4, DE Cut to broken 1, CG Grinning 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

QC Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 13); zero in QC Endline records

QC Endline data errors: 2

09/16 CB07 261296-S (defective pcs 25 > defects 24), 09/21 CB07 261296-S (defective pcs 29 > defects 28)

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (3 Major), ED Gathering crease (2 Major), EI Inaccurate/skewed stitching (2 Major), EE Raw edge (1 Major), DD Thread not straight/waving (1 Major), DE Cut to broken (1 Major), DJ Pleat (1 Major); Only QC 1st Bundle: EC Asymmetry (3); Both: CC Skip stitch (4/1), EA Unsmooth/puckering/bubbling (3/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 100.0%

Caught in earlier stages

EB Measurement issue (353), CC Skip stitch (295), AC Fabric hole (221), CE Broken seam (169), Q61 Lace raw edge or broken lace (162) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—100.0%
QC Inline35 reports
required on prod. days 34/98 (35%)
—40.7%
QC Endline30 days—21.3%
QA Inline9 reports940.3%
Shipment Sample1 reports1—
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0712.1%
6308 / 28 days
42.2%PASS
08/24–10/01
BA Thread ends, EB Measurement issue, ED Gathering crease
CB0537.8%
3396 / 19 days
36.5%PASS
09/07–09/30
EB Measurement issue, BA Thread ends, CC Skip stitch
CB290.0%
20 / 1 days
——
09/16–09/16
—
CB30150.0%
20 / 1 days
——
09/21–09/21
EB Measurement issue, BA Thread ends, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB07285626 (46%)24609/23, 09/25, 09/26, 09/28, 10/01
CB0519388 (21%)181209/23, 09/25, 09/28, 09/29, 09/30
CB29120 (0%)1109/16
CB30120 (0%)1109/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
EB Measurement issue3173312
BA Thread ends313125
CC Skip stitch413824210
ED Gathering crease29226213
AC Fabric hole1181939
EC Asymmetry338122204
CE Broken seam181798
Q61 Lace raw edge or broken lace162
261484 CHTE · CS23 · Due 09/28Final Random FAIL Latest Final Random (09/16) FAILED
No reportPP Sample
No reportPilot Run
08/20QC 1st Bundle1 reports
08/20QA 1st Bundle1 reports
4/22QC Inlineactual/required · 18%
DHU 15.3%QC Endline11 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
1/2 FAILFinal Random2 reports
Order/Ship qty1,249 / 1,249
PDF reports12
Last report09/16

Cross-stage findings

Latest Final Random (09/16) FAILED

3 major: ED Gathering crease 2, AD Fabric stains 1

Not fixed: AD Fabric stains

Found 13 times (46 pcs, 08/20–08/29) in earlier stages; latest Final Random (09/16) still has 3 major

Not fixed: ED Gathering crease

Found 9 times (40 pcs, 08/20–08/29) in earlier stages; latest Final Random (09/16) still has 4 major

Not fixed: BA Thread ends

Found 15 times (61 pcs, 08/20–08/31) in earlier stages; latest Final Random (09/16) still has 1 major

Missed in earlier stages: 3

CG Grinning (Shipment Sample 09/11), EE Raw edge (Shipment Sample 09/11), CF Pulling yarn (Shipment Sample 09/11): first found in later stages, never recorded before

Found earlier but still reached later stages: 4

EC Asymmetry 3, CC Skip stitch 1, DF Twisted seam/skewing 1, AC Fabric hole 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

QC Inline 2; cannot compare across stages

QC Endline data errors: 8

08/20 CS23 261484 (defective pcs 7 > defects 4), 08/21 CS23 261484 (defective pcs 55 > defects 48), 08/22 CS23 261484 (defective pcs 45 > defects 36), 08/24 CS23 261484 (defective pcs 55 > defects 43)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (3 Major), EI Inaccurate/skewed stitching (2 Major); Only QC 1st Bundle: ED Gathering crease (3), DB Run-off stitching (2); Both: AD Fabric stains (3/2), DI High-low/uneven (3/1), BA Thread ends (2/2); DHU QC 1st Bundle 65.0% / QA 1st Bundle 50.0%

Caught in earlier stages

DI High-low/uneven (13), DD Thread not straight/waving (12), CB Broken stitch (9), EB Measurement issue (9), CE Broken seam (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—65.0%
QA 1st Bundle1 reports—50.0%
QC Inline4 reports
required on prod. days 4/22 (18%)
—26.2%
QC Endline11 days—15.3%
QA Inline1 reports134.4%
Shipment Sample2 reports1—
Pre-final1 reports112.0%
Final Random2 reports13.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2315.3%
1249 / 11 days
34.4%FAIL
08/20–09/02
ED Gathering crease, BA Thread ends, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2311224 (18%)11708/28, 08/29, 08/31, 09/01, 09/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends2224321323
AD Fabric stains32931123
ED Gathering crease336154
CC Skip stitch92811
Others (no detail)226
DF Twisted seam/skewing2111
DI High-low/uneven319
DD Thread not straight/waving12
261486 CHTE · CS15 · Due 09/28Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
08/31QC 1st Bundle1 reports
08/29QA 1st Bundle1 reports
9/28QC Inlineactual/required · 32%
DHU 18.5%QC Endline14 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
1/2 FAILFinal Random2 reports
Order/Ship qty1,983 / 1,983
PDF reports18
Last report09/28

Cross-stage findings

Not fixed: AD Fabric stains

Found 24 times (136 pcs, 08/29–09/11) in earlier stages; latest Final Random (09/28) still has 6 major

Not fixed: ED Gathering crease

Found 17 times (76 pcs, 08/31–09/11) in earlier stages; latest Final Random (09/28) still has 20 major

Missed in earlier stages: 3

IA 2nd operation issue (Pre-final 09/05), EI Inaccurate/skewed stitching (Pre-final 09/05), CG Grinning (Shipment Sample 09/09): first found in later stages, never recorded before

QA Inline DHU is 3.4× QC Inline

QA Inline DHU 64.1% vs QC Inline 18.8%; QC Inline may be missing defects

Found earlier but still reached later stages: 5

EC Asymmetry 2, EA Unsmooth/puckering/bubbling 2, CB Broken stitch 2, DB Run-off stitching 4, CF Pulling yarn 3 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: DB Run-off stitching (3), ED Gathering crease (1), BC Sticker left (1); Both: EC Asymmetry (4/2), AD Fabric stains (2/2), DJ Pleat (2/1), DI High-low/uneven (1/2), CB Broken stitch (2/1), DF Twisted seam/skewing (1/1); DHU QC 1st Bundle 85.0% / QA 1st Bundle 50.0%

Caught in earlier stages

CC Skip stitch (72), DJ Pleat (19), DI High-low/uneven (12), CE Broken seam (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—85.0%
QA 1st Bundle1 reports—50.0%
QC Inline9 reports
required on prod. days 9/28 (32%)
—18.8%
QC Endline14 days—18.5%
QA Inline2 reports264.1%
Shipment Sample2 reports1—
Pre-final1 reports110.4%
Final Random2 reports111.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1518.5%
1983 / 14 days
64.1%PASS
08/29–09/19
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1514289 (32%)14509/09, 09/10, 09/11, 09/15, 09/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends12312929
AD Fabric stains22171123126
ED Gathering crease13648220
CC Skip stitch13581
CB Broken stitch213742
EC Asymmetry421432
DJ Pleat21151
DB Run-off stitching3834
261172 MKSC · CS01/CS16/CS19 · Due 09/29Final Random PASS Not fixed: EA Unsmooth/puckering/bubbling
No reportPP Sample
No resultPilot Run5 reports
08/24QC 1st Bundle1 reports
08/24QA 1st Bundle1 reports
3/14QC Inlineactual/required · 21%
DHU 17.7%QC Endline7 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,104 / 0
PDF reports14
Last report09/15

Cross-stage findings

Not fixed: EA Unsmooth/puckering/bubbling

Found 4 times (6 pcs, 08/24–09/04) in earlier stages; latest Final Random (09/05) still has 4 major

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 45.3% vs QC Inline 24.6%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (09/05): AD Fabric stains 2 (earlier 9 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

8 defects recorded as 'Others' without detail

QC 1st Bundle 3, QA 1st Bundle 2, QA Inline 1, QC Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 7); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: HA Poor pressing (2 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: DI High-low/uneven (2), EI Inaccurate/skewed stitching (1), DJ Pleat (1); Both: BA Thread ends (4/2), AD Fabric stains (3/1), CG Grinning (1/2), EC Asymmetry (1/2); DHU QC 1st Bundle 80.0% / QA 1st Bundle 60.0%

Caught in earlier stages

CC Skip stitch (46), ED Gathering crease (32), EC Asymmetry (24), EB Measurement issue (18), EI Inaccurate/skewed stitching (10) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run5 reports0—
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—60.0%
QC Inline3 reports
required on prod. days 3/14 (21%)
—24.6%
QC Endline7 days—17.7%
QA Inline2 reports245.3%
Final Random2 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1917.7%
1104 / 7 days
45.3%PASS
08/25–09/04
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS197143 (21%)7408/28, 08/29, 08/31, 09/02, 09/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends421710214
CC Skip stitch5401
ED Gathering crease7232
EC Asymmetry81213
AD Fabric stains312782
EB Measurement issue18
EI Inaccurate/skewed stitching5122
EA Unsmooth/puckering/bubbling2134
260949 LOGE · CS27 · Due 09/30Final Random PASS Not fixed: DJ Pleat
No reportPP Sample
No reportPilot Run
07/23QC 1st Bundle2 reports
07/23QA 1st Bundle1 reports
8/24QC Inlineactual/required · 33%
DHU 7.7%QC Endline12 days
All FAILQA Inline2 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty4,000 / 4,000
PDF reports15
Last report08/10

Cross-stage findings

Not fixed: DJ Pleat

Found 4 times (8 pcs, 07/23–08/04) in earlier stages; latest Final Random (08/10) still has 3 major

QA Inline DHU is 1.6× QC Inline

QA Inline DHU 39.1% vs QC Inline 24.0%; QC Inline may be missing defects

QA Inline DHU is 5.1× QC Endline

QA Inline DHU 39.1% vs QC Endline 7.7% (07/23–08/05, 12 days, 4000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/10): EI Inaccurate/skewed stitching 1 (earlier 3 times)

Found earlier but still reached later stages: 3

CE Broken seam 1, BB Missing cut seam allowance 8, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

QC Endline data errors: 4

07/24 CS27 260949-S1 (defective pcs 32 > defects 31), 07/30 CS27 260949-S1 (defective pcs 32 > defects 31), 08/01 CS27 260949-S1 (defective pcs 16 > defects 15), 08/05 CS27 260949-S1 (defective pcs 7 > defects 6)

QC 1st Bundle vs QA 1st Bundle: 10 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DE Cut to broken (2 Major), EI Inaccurate/skewed stitching (2 Major), DD Thread not straight/waving (1 Major), AC Fabric hole (1 Major), GB Missing sewing operation (1 Major), DJ Pleat (1 Major), CE Broken seam (1 Major), EG Wrong panel assembly (1 Major), CG Grinning (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: BA Thread ends (5), DF Twisted seam/skewing (2), DA Exceed seam allowance (2), DB Run-off stitching (2), CA Thread tension (1); Both: EC Asymmetry (4/1); DHU QC 1st Bundle 40.0% / QA 1st Bundle 65.0%

Caught in earlier stages

DB Run-off stitching (75), CC Skip stitch (50), EC Asymmetry (43), ED Gathering crease (18), DE Cut to broken (13) did not reach later stages

Report line differs from production line

QGR2633034 Final Random (08/10) CS20; actual production line(s) CS27 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—40.0%
QA 1st Bundle1 reports—65.0%
QC Inline8 reports
required on prod. days 8/24 (33%)
—24.0%
QC Endline12 days—7.7%
QA Inline2 reports239.1%
Pre-final1 reports15.5%
Final Random1 reports02.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS277.7%
4000 / 12 days
39.1%—
07/23–08/05
BA Thread ends, DB Run-off stitching, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2712248 (33%)12407/31, 08/01, 08/03, 08/04, 08/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends516173257
DB Run-off stitching214581
CC Skip stitch644
EC Asymmetry41326
BB Missing cut seam allowance1438
CE Broken seam1191
ED Gathering crease315
Others (no detail)16
260952 LOGE · CP01/CP02/CP03… · Due 09/30Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
09/01QC 1st Bundle1 reports
07/07–09/01QA 1st Bundle3 reports
9/124QC Inlineactual/required · 7%
DHU 10.8%QC Endline32 days
All FAILQA Inline4 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty12,000 / 12,000
PDF reports18
Last report09/14

Cross-stage findings

Not fixed: ED Gathering crease

Found 23 times (203 pcs, 08/15–09/08) in earlier stages; latest Final Random (09/14) still has 3 major

Recurring in small numbers: 2

Latest Final Random (09/14): CB Broken stitch 2 (earlier 7 times), AD Fabric stains 1 (earlier 16 times)

QC Endline data errors: 19

07/07 CP15 260952-3 (defective pcs 12 > defects 5), 07/08 CP15 260952-3 (defective pcs 5 > defects 2), 07/09 CP15 260952-3 (defective pcs 5 > defects 1), 07/10 CP15 260952-3 (defective pcs 10 > defects 3)…

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (8 Major), ED Gathering crease (6 Major), BB Missing cut seam allowance (3 Major); Only QC 1st Bundle: AD Fabric stains (2), DI High-low/uneven (2), DE Cut to broken (2); Both: EC Asymmetry (2/9), BA Thread ends (3/7), CE Broken seam (1/5), DJ Pleat (2/2); DHU QC 1st Bundle 70.0% / QA 1st Bundle 66.7%

Caught in earlier stages

CC Skip stitch (225), EA Unsmooth/puckering/bubbling (138), CE Broken seam (102), EC Asymmetry (87), DB Run-off stitching (54) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—70.0%
QA 1st Bundle3 reports—66.7%
QC Inline9 reports
required on prod. days 9/124 (7%)
—30.4%
QC Endline32 days—10.8%
QA Inline4 reports421.9%
Final Random1 reports01.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP079.3%
4520 / 14 days
34.4%PASS
07/10–09/02
BA Thread ends, ED Gathering crease, CC Skip stitch
CP1719.7%
4140 / 9 days
21.9%—
07/08–09/08
BA Thread ends, CC Skip stitch, ED Gathering crease
CP030.1%
1120 / 14 days
——
07/06–08/15
BA Thread ends
CP152.6%
660 / 8 days
17.1%—
07/06–07/16
BA Thread ends, EC Asymmetry
CP013.4%
580 / 8 days
——
07/10–07/31
BA Thread ends
CP022.1%
520 / 2 days
——
07/13–07/16
BA Thread ends
CP060.0%
440 / 6 days
——
07/09–07/20
—
CP1630.0%
20 / 1 days
——
09/07–09/07
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0314280 (0%)141407/16, 07/17, 07/18, 08/03, 08/15
CP0714283 (11%)141108/20, 08/21, 08/22, 08/24, 09/02
CP179186 (33%)9309/03, 09/04, 09/05, 09/07, 09/08
CP018160 (0%)8807/15, 07/16, 07/17, 07/18, 07/31
CP158160 (0%)8807/09, 07/10, 07/11, 07/14, 07/16
CP066120 (0%)6607/10, 07/11, 07/14, 07/15, 07/20
CP02240 (0%)2207/13, 07/16
CP16120 (0%)1109/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends372645558
CC Skip stitch14211
ED Gathering crease61018433
EA Unsmooth/puckering/bubbling861213
CE Broken seam1531641
EC Asymmetry296628
AD Fabric stains26561
DB Run-off stitching2034
260953 LOGE · CS26 · Due 09/30Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
07/28QC 1st Bundle1 reports
07/28QA 1st Bundle1 reports
7/26QC Inlineactual/required · 27%
DHU 14.1%QC Endline13 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports13
Last report08/18

Cross-stage findings

Not fixed: ED Gathering crease

Found 5 times (30 pcs, 07/28–08/04) in earlier stages; latest Final Random (08/18) still has 4 major

Recurring in small numbers: 1

Latest Final Random (08/18): DF Twisted seam/skewing 1 (earlier 4 times)

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), CE Broken seam (2 Major), DA Exceed seam allowance (1 Major), DJ Pleat (1 Major), GA Missing bartack/button (1 Major), EH Poor lamination/bonding (1 Major); Only QC 1st Bundle: EC Asymmetry (2), CG Grinning (1), DF Twisted seam/skewing (1); Both: EI Inaccurate/skewed stitching (3/2), AD Fabric stains (3/1), DI High-low/uneven (2/1), BB Missing cut seam allowance (2/1); DHU QC 1st Bundle 107.7% / QA 1st Bundle 100.0%

Caught in earlier stages

AD Fabric stains (117), EC Asymmetry (42), CC Skip stitch (41), GB Missing sewing operation (20), EI Inaccurate/skewed stitching (11) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—107.7%
QA 1st Bundle1 reports—100.0%
QC Inline7 reports
required on prod. days 7/26 (27%)
—24.8%
QC Endline13 days—14.1%
QA Inline3 reports333.3%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2614.1%
2000 / 13 days
33.3%PASS
07/28–08/12
BA Thread ends, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2613267 (27%)13608/06, 08/07, 08/10, 08/11, 08/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends2011534
AD Fabric stains3123891
EC Asymmetry226104
CC Skip stitch3353
ED Gathering crease262114
GB Missing sewing operation1010
EI Inaccurate/skewed stitching3251
BB Missing cut seam allowance2152
260954 LOGE · CP12 · Due 09/30Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
09/02QC 1st Bundle1 reports
09/02QA 1st Bundle1 reports
0/14QC Inlineactual/required · 0%
DHU 12.5%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,001
PDF reports4
Last report09/14

Cross-stage findings

Not fixed: ED Gathering crease

Found 9 times (46 pcs, 09/02–09/07) in earlier stages; latest Final Random (09/14) still has 3 major

Recurring in small numbers: 1

Latest Final Random (09/14): AD Fabric stains 2 (earlier 8 times)

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (7 Major); Only QC 1st Bundle: GA Missing bartack/button (2), DB Run-off stitching (2), CC Skip stitch (1), GC Missing pocket/label (1), CB Broken stitch (1); Both: BA Thread ends (6/3), AD Fabric stains (4/1), ED Gathering crease (3/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 60.0%

Caught in earlier stages

CC Skip stitch (17), EC Asymmetry (15), EA Unsmooth/puckering/bubbling (11) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—60.0%
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—12.5%
QA Inline1 reports121.9%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1212.5%
2000 / 7 days
21.9%PASS
09/01–09/16
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP127140 (0%)7709/03, 09/04, 09/05, 09/07, 09/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends631297
ED Gathering crease313843
AD Fabric stains41392
CC Skip stitch116
EC Asymmetry762
EA Unsmooth/puckering/bubbling11
HA Poor pressing4
EA Uneven seam allowance4
261127 MKSC · CB05/CB08/CB16… · Due 09/30Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No resultPilot Run5 reports
09/11QC 1st Bundle1 reports
09/11QA 1st Bundle1 reports
4/10QC Inlineactual/required · 40%
DHU 18.0%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,000 / 0
PDF reports14
Last report10/08

Cross-stage findings

Not fixed: ED Gathering crease

Found 11 times (65 pcs, 09/11–09/16) in earlier stages; latest Final Random (09/30) still has 3 major

Found earlier but still reached later stages: 2

DJ Pleat 1, BA Thread ends 2 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), CG Grinning (1 Major), FC Wrong label (1 Major); Only QC 1st Bundle: AD Fabric stains (4), DB Run-off stitching (2), ED Gathering crease (1), CB Broken stitch (1); Both: EC Asymmetry (3/7); DHU QC 1st Bundle 84.6% / QA 1st Bundle 92.3%

Caught in earlier stages

EC Asymmetry (81), AD Fabric stains (39), EB Measurement issue (33), CE Broken seam (29), DA Exceed seam allowance (16) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run5 reports0—
QC 1st Bundle1 reports—84.6%
QA 1st Bundle1 reports—92.3%
QC Inline5 reports
required on prod. days 4/10 (40%)
—39.2%
QC Endline5 days—18.0%
QA Inline1 reports137.5%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1718.0%
943 / 5 days
37.5%PASS
09/12–09/17
ED Gathering crease, EB Measurement issue, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB175104 (40%)5109/12, 09/14, 09/15, 09/16, 09/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
EC Asymmetry43731297
ED Gathering crease124403
AD Fabric stains141420
EB Measurement issue33
CE Broken seam227
DA Exceed seam allowance16
BA Thread ends142
CC Skip stitch137
260245 MKSC · CB17 · Due 09/02Final Random PASS Missed in earlier stages: 2
No resultPP Sample1 reports
No reportPilot Run
07/13QC 1st Bundle1 reports
07/13QA 1st Bundle1 reports
5/28QC Inlineactual/required · 18%
DHU 52.1%QC Endline14 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,450 / 1,000
PDF reports13
Last report08/21

Cross-stage findings

Missed in earlier stages: 2

BA Thread ends (Final Random 08/04), DF Twisted seam/skewing (Final Random 08/21): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/21): CE Broken seam 1 (earlier 6 times)

Found earlier but still reached later stages: 2

BB Missing cut seam allowance 1, AD Fabric stains 1 pcs (later stages total)

10 defects recorded as 'Others' without detail

PP Sample 3, QA 1st Bundle 3, QA Inline 3, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 3

CE Broken seam (QA 9), BA Thread ends (QA 6), EC Asymmetry (QA 4); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DJ Pleat (2 Major), CG Grinning (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (3), CF Pulling yarn (1), AC Fabric hole (1); Both: EC Asymmetry (4/2), CE Broken seam (1/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 76.9%

Caught in earlier stages

ED Gathering crease (532), AC Fabric hole (416), EB Measurement issue (180), EC Asymmetry (36), DA Exceed seam allowance (18) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—76.9%
QC Inline5 reports
required on prod. days 5/28 (18%)
—40.8%
QC Endline14 days—52.1%
QA Inline3 reports316.7%
Final Random2 reports03.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1752.1%
2111 / 14 days
16.7%PASS
07/13–08/11
ED Gathering crease, AC Fabric hole, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1714285 (18%)14907/31, 08/01, 08/03, 08/04, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease12520
AC Fabric hole15410
EB Measurement issue10170
EC Asymmetry442224
DA Exceed seam allowance315
CE Broken seam1181
Others (no detail)3331
AD Fabric stains81
260250 MKSC · CP01 · Due 09/02Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/07QA 1st Bundle1 reports
0/16QC Inlineactual/required · 0%
DHU 5.7%QC Endline8 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty2,150 / 950
PDF reports7
Last report08/26

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 08/26): first found in later stages, never recorded before

QA Inline DHU is 6.9× QC Endline

QA Inline DHU 39.1% vs QC Endline 5.7% (07/07–07/18, 8 days, 2610 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/26): BA Thread ends 1 (earlier 16 times)

Found earlier but still reached later stages: 2

CC Skip stitch 1, ED Gathering crease 1 pcs (later stages total)

QC Endline data errors: 14

07/07 CP01 260250A (defective pcs 28 > defects 4), 07/08 CP01 260250B (defective pcs 64 > defects 19), 07/08 CP01 260250A (defective pcs 41 > defects 11), 07/09 CP01 260250B (defective pcs 74 > defects 22)…

Caught in earlier stages

EC Asymmetry (9), CG Grinning (8) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—60.0%
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline8 days—5.7%
QA Inline2 reports239.1%
Final Random4 reports02.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP015.7%
2610 / 8 days
39.1%PASS
07/07–07/18
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP018160 (0%)8807/10, 07/11, 07/13, 07/16, 07/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends764914
ED Gathering crease5151
CC Skip stitch11611
EC Asymmetry9
CG Grinning26
AD Fabric stains21
DJ Pleat2
EA Uneven seam allowance2
260251 MKSC · CP04 · Due 09/02Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
07/06QC 1st Bundle1 reports
07/06QA 1st Bundle1 reports
1/10QC Inlineactual/required · 10%
DHU 16.2%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,200 / 600
PDF reports7
Last report08/25

Cross-stage findings

Missed in earlier stages: 2

CB Broken stitch (Final Random 07/11), CD Needle hole (Final Random 08/25): first found in later stages, never recorded before

Found earlier but still reached later stages: 3

BB Missing cut seam allowance 1, ED Gathering crease 1, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

6 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 2, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 7); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), CF Pulling yarn (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: EC Asymmetry (4), CC Skip stitch (3), DD Thread not straight/waving (1); Both: BA Thread ends (10/5), BB Missing cut seam allowance (2/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 70.0%

Caught in earlier stages

CC Skip stitch (103), EC Asymmetry (33), AD Fabric stains (15), DE Cut to broken (6), GB Missing sewing operation (6) did not reach later stages

Report line differs from production line

QGR2628837 Final Random (07/21) CP05; actual production line(s) CP04 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—70.0%
QC Inline1 reports
required on prod. days 1/10 (10%)
—75.0%
QC Endline5 days—16.2%
QA Inline1 reports137.5%
Final Random3 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0416.2%
1680 / 5 days
37.5%PASS
07/04–07/15
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP045101 (10%)5407/04, 07/06, 07/07, 07/14, 07/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends10510824
CC Skip stitch31486
ED Gathering crease2311
EC Asymmetry4425
AD Fabric stains15
EA Unsmooth/puckering/bubbling161
Others (no detail)3121
DE Cut to broken6
260253 MKSC · CB05/CB06/CB10… · Due 09/02Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run4 reports
07/15QC 1st Bundle1 reports
07/17QA 1st Bundle1 reports
4/20QC Inlineactual/required · 20%
DHU 24.1%QC Endline10 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,600 / 850
PDF reports16
Last report08/25

Cross-stage findings

Missed in earlier stages: 1

DF Twisted seam/skewing (Final Random 08/17): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/25): EC Asymmetry 1 (earlier 23 times)

Found earlier but still reached later stages: 4

CB Broken stitch 2, DJ Pleat 1, AD Fabric stains 1, BA Thread ends 7 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 1, Pilot Run 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), DJ Pleat (1 Major), CE Broken seam (1 Major); Only QC 1st Bundle: ED Gathering crease (3), CB Broken stitch (1), EB Measurement issue (1); Both: EC Asymmetry (3/3); DHU QC 1st Bundle 61.5% / QA 1st Bundle 69.2%

Caught in earlier stages

AC Fabric hole (187), ED Gathering crease (172), EB Measurement issue (96), EA Unsmooth/puckering/bubbling (23), DA Exceed seam allowance (14) did not reach later stages

Report line differs from production line

QGR2630447 Final Random (07/22) CB03; actual production line(s) CB05/CB06/CB10/CB16/CB17 (cards show production lines only)

Stage summary

StageCountFAILDHU
Pilot Run4 reports0—
QC 1st Bundle1 reports—61.5%
QA 1st Bundle1 reports—69.2%
QC Inline6 reports
required on prod. days 4/20 (20%)
—37.7%
QC Endline10 days—24.1%
QA Inline1 reports118.8%
Final Random3 reports04.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1724.1%
1859 / 10 days
18.8%PASS
07/17–08/10
AC Fabric hole, ED Gathering crease, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1710204 (20%)10608/01, 08/03, 08/04, 08/05, 08/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
AC Fabric hole17179
ED Gathering crease3310156
EB Measurement issue1689
EC Asymmetry53326613
EA Unsmooth/puckering/bubbling53132
BA Thread ends1037
DA Exceed seam allowance113
CC Skip stitch86
260254 MKSC · CP01 · Due 09/02Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/14QA 1st Bundle1 reports
0/22QC Inlineactual/required · 0%
DHU 10.8%QC Endline11 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
1/5 FAILFinal Random5 reports
Order/Ship qty2,600 / 1,400
PDF reports8
Last report08/24

Cross-stage findings

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 07/21): first found in later stages, never recorded before

1 later-stage PDF report(s) blank

Final Random 07/22 QGR2629209 (FAIL); please check if the report was completed

Found earlier but still reached later stages: 4

DB Run-off stitching 1, CE Broken seam 1, CB Broken stitch 2, AD Fabric stains 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA Inline 2; cannot compare across stages

QC Endline data errors: 12

07/13 CP01 260254A (defective pcs 9 > defects 2), 07/14 CP01 260254A (defective pcs 65 > defects 21), 07/14 CP01 260254B (defective pcs 27 > defects 10), 07/15 CP01 260254A (defective pcs 23 > defects 10)…

Duplicate report numbers

QGR2636211 have multiple reports with different content

Caught in earlier stages

ED Gathering crease (100), CC Skip stitch (57), EC Asymmetry (25), AC Fabric hole (8), CG Grinning (5) did not reach later stages

Report line differs from production line

QGR2628800 Final Random (07/21) CP07, QGR2629209 Final Random (07/22) CP03; actual production line(s) CP01 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—70.0%
QC Inline0 reports
required on prod. days 0/22 (0%)
——
QC Endline11 days—10.8%
QA Inline2 reports232.8%
Final Random5 reports12.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0110.8%
3575 / 11 days
32.8%PASS
07/13–08/11
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0111220 (0%)111108/06, 08/07, 08/08, 08/10, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends4114315
ED Gathering crease18811
AD Fabric stains891
CC Skip stitch57
EC Asymmetry25
AC Fabric hole8
CG Grinning32
BB Missing cut seam allowance5
260255 MKSC · CP04 · Due 09/02Final Random PASS Missed in earlier stages: 5
No reportPP Sample
No reportPilot Run
07/08QC 1st Bundle1 reports
07/08QA 1st Bundle1 reports
1/14QC Inlineactual/required · 7%
DHU 18.4%QC Endline7 days
All FAILQA Inline1 reports
No resultShipment Sample1 reports
No reportPre-final
All PASSFinal Random5 reports
Order/Ship qty2,200 / 700
PDF reports10
Last report08/25

Cross-stage findings

Missed in earlier stages: 5

DJ Pleat (Shipment Sample 07/09), CB Broken stitch (Shipment Sample 07/09), CE Broken seam (Shipment Sample 07/09), DD Thread not straight/waving (Shipment Sample 07/09), CF Pulling yarn (Final Random 07/20): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/25): BA Thread ends 1 (earlier 19 times), AD Fabric stains 1 (earlier 18 times)

Found earlier but still reached later stages: 4

EC Asymmetry 3, BB Missing cut seam allowance 2, ED Gathering crease 1, EA Unsmooth/puckering/bubbling 3 pcs (later stages total)

QC Endline data errors: 1

07/10 CP04 260255C (defective pcs 34 > defects 33)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (4 Major), ED Gathering crease (2 Major), CG Grinning (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: CC Skip stitch (5); Both: BA Thread ends (7/1), EC Asymmetry (5/1), BB Missing cut seam allowance (3/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 55.0%

Caught in earlier stages

CC Skip stitch (137), EB Measurement issue (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—55.0%
QC Inline1 reports
required on prod. days 1/14 (7%)
—68.8%
QC Endline7 days—18.4%
QA Inline1 reports146.9%
Shipment Sample1 reports0—
Final Random5 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0418.4%
2986 / 7 days
46.9%PASS
07/07–07/14
AD Fabric stains, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP047141 (7%)7607/09, 07/10, 07/11, 07/13, 07/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
AD Fabric stains4420824
BA Thread ends7111161611
CC Skip stitch521282
EC Asymmetry512123
ED Gathering crease2181
EB Measurement issue9
BB Missing cut seam allowance3122
EA Unsmooth/puckering/bubbling221
260294 MKSC · CB21/CB22/CB23… · Due 09/02Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
07/10QC 1st Bundle1 reports
07/10QA 1st Bundle1 reports
14/62QC Inlineactual/required · 23%
DHU 26.3%QC Endline27 days
All FAILQA Inline2 reports
No resultShipment Sample1 reports
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty7,968 / 500
PDF reports24
Last report08/21

Cross-stage findings

Missed in earlier stages: 3

DD Thread not straight/waving (Shipment Sample 07/15), BD Snagging (Final Random 07/27), AC Fabric hole (Final Random 08/17): first found in later stages, never recorded before

Found earlier but still reached later stages: 6

ED Gathering crease 1, DJ Pleat 1, EA Unsmooth/puckering/bubbling 2, CG Grinning 2, AD Fabric stains 1, CB Broken stitch 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 3, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), CE Broken seam (1 Major); Only QC 1st Bundle: BA Thread ends (3), ED Gathering crease (2), DJ Pleat (1); Both: EC Asymmetry (2/2), BB Missing cut seam allowance (2/1), EA Unsmooth/puckering/bubbling (2/1); DHU QC 1st Bundle 92.3% / QA 1st Bundle 76.9%

Caught in earlier stages

EC Asymmetry (598), CC Skip stitch (95), DB Run-off stitching (51), BB Missing cut seam allowance (41), CE Broken seam (11) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—76.9%
QC Inline15 reports
required on prod. days 14/62 (23%)
—44.2%
QC Endline27 days—26.3%
QA Inline2 reports220.3%
Shipment Sample1 reports0—
Final Random4 reports02.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2226.6%
6835 / 26 days
20.3%PASS
07/09–08/11
BA Thread ends, EC Asymmetry, Others (no detail)
CB260.0%
30 / 1 days
——
07/23–07/23
—
CB210.0%
10 / 1 days
——
07/27–07/27
—
CB230.0%
10 / 1 days
——
07/28–07/28
—
CB240.0%
10 / 1 days
——
07/24–07/24
—
CB300.0%
10 / 1 days
——
08/06–08/06
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB22265214 (27%)261208/05, 08/06, 08/07, 08/10, 08/11
CB21120 (0%)1107/27
CB23120 (0%)1107/28
CB24120 (0%)1107/24
CB26120 (0%)1107/23
CB30120 (0%)1108/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends3277398
EC Asymmetry22265662
Others (no detail)32801
ED Gathering crease220801
CC Skip stitch1184
DB Run-off stitching1140
BB Missing cut seam allowance21362
AD Fabric stains9301
260297 MKSC · CP03/CP07/CP12 · Due 09/02Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run1 reports
07/11QC 1st Bundle1 reports
07/13QA 1st Bundle1 reports
5/34QC Inlineactual/required · 15%
DHU 12.1%QC Endline16 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty6,232 / 1,000
PDF reports14
Last report08/21

Cross-stage findings

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 07/21): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/21): ED Gathering crease 1 (earlier 28 times), BA Thread ends 1 (earlier 29 times)

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 2 pcs (later stages total)

11 defects recorded as 'Others' without detail

Pilot Run 3, QA 1st Bundle 2, QA Inline 6; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 8); zero in QC Endline records

QC Endline data errors: 10

07/14 CP03 260297A (defective pcs 89 > defects 81), 07/15 CP03 260297A (defective pcs 61 > defects 49), 07/16 CP03 260297A (defective pcs 85 > defects 78), 07/18 CP03 260297A (defective pcs 72 > defects 65)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (4 Major), EI Inaccurate/skewed stitching (2 Major); Only QC 1st Bundle: CB Broken stitch (4), BA Thread ends (4), DJ Pleat (3), ED Gathering crease (2); Both: EC Asymmetry (4/1), AD Fabric stains (3/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 50.0%

Caught in earlier stages

CC Skip stitch (235), EC Asymmetry (168), AD Fabric stains (47), DJ Pleat (31), EA Uneven seam allowance (14) did not reach later stages

Report line differs from production line

QGR2629537 Final Random (07/21) CP17; actual production line(s) CP03/CP07/CP12 (cards show production lines only)

Stage summary

StageCountFAILDHU
Pilot Run1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—50.0%
QC Inline6 reports
required on prod. days 5/34 (15%)
—74.0%
QC Endline16 days—12.1%
QA Inline2 reports257.8%
Final Random3 reports02.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0312.2%
6112 / 16 days
57.8%PASS
07/11–08/12
CC Skip stitch, ED Gathering crease, BA Thread ends
CP120.0%
20 / 1 days
——
07/23–07/23
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0316325 (16%)151207/24, 08/04, 08/10, 08/11, 08/12
CP12120 (0%)1107/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
CC Skip stitch2341
ED Gathering crease121620023
BA Thread ends43513945
EC Asymmetry141241344
AD Fabric stains3123146
DJ Pleat328
EA Unsmooth/puckering/bubbling14462
EA Uneven seam allowance14
260740 GECL · CS14/CS22 · Due 09/02Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
2/40QC Inlineactual/required · 5%
DHU 21.4%QC Endline18 days
All FAILQA Inline1 reports
No resultShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random3 reports
Order/Ship qty2,000 / 320
PDF reports8
Last report08/11

Cross-stage findings

Missed in earlier stages: 3

AD Fabric stains (Final Random 07/24), DE Cut to broken (Final Random 08/11), CE Broken seam (Final Random 08/11): first found in later stages, never recorded before

Pre-final DHU is 1.3× QC Endline

Pre-final DHU 28.0% vs QC Endline 21.4% (06/20–07/23, 18 days, 3999 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 3

CC Skip stitch 9, CB Broken stitch 3, DB Run-off stitching 2 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA Inline 1; cannot compare across stages

QC Endline data errors: 8

06/20 CS14 260740A-2 (defective pcs 10 > defects 9), 06/23 CS14 260740A-2 (defective pcs 78 > defects 77), 06/25 CS14 260740A-2 (defective pcs 72 > defects 70), 06/26 CS14 260740A-2 (defective pcs 43 > defects 39)…

Caught in earlier stages

ED Gathering crease (45), EC Asymmetry (16), EB Measurement issue (8), CG Grinning (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline2 reports
required on prod. days 2/40 (5%)
—54.7%
QC Endline18 days—21.4%
QA Inline1 reports156.2%
Shipment Sample1 reports0—
Pre-final1 reports128.0%
Final Random3 reports03.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2218.8%
2000 / 9 days
56.2%PASS
07/02–07/23
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS1424.0%
1999 / 11 days
——
06/20–07/03
BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1411220 (0%)111106/27, 06/29, 06/30, 07/02, 07/03
CS229182 (11%)9707/07, 07/08, 07/10, 07/11, 07/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends12417357
CC Skip stitch307263
DB Run-off stitching652
ED Gathering crease45
EC Asymmetry925
EB Measurement issue8
Others (no detail)61
CG Grinning7
260745 GECL · CS03/CS17 · Due 09/02Final Random PASS Missed in earlier stages: 4
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/17QA 1st Bundle1 reports
5/40QC Inlineactual/required · 12%
DHU 15.1%QC Endline20 days
No reportQA Inline
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random3 reports
Order/Ship qty6,980 / 750
PDF reports12
Last report08/12

Cross-stage findings

Missed in earlier stages: 4

DL Wrong trim position (Shipment Sample 07/20), DH Pressing mark (Shipment Sample 07/20), EA Unsmooth/puckering/bubbling (Shipment Sample 07/20), EI Inaccurate/skewed stitching (Shipment Sample 07/20): first found in later stages, never recorded before

Pre-final DHU is 1.0× QC Endline

Pre-final DHU 15.2% vs QC Endline 15.1% (06/22–07/30, 20 days, 6889 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/12): AD Fabric stains 2 (earlier 23 times), ED Gathering crease 1 (earlier 19 times)

Found earlier but still reached later stages: 2

EC Asymmetry 2, DJ Pleat 1 pcs (later stages total)

5 defects recorded as 'Others' without detail

Pre-final 3, QA 1st Bundle 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

CE Broken seam (QA 3); zero in QC Endline records

QC Endline data errors: 2

06/25 CS03 260745A-2 (defective pcs 47 > defects 20), 06/25 CS03 260745B-2 (defective pcs 24 > defects 8)

Caught in earlier stages

CC Skip stitch (172), GA Missing bartack/button (7), CA Thread tension (5) did not reach later stages

Found before bulk production (Shipment Sample, Pre-final): 5

CE Broken seam, CF Pulling yarn, DB Run-off stitching, CB Broken stitch, AA Fabric defect: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—65.0%
QC Inline5 reports
required on prod. days 5/40 (12%)
—22.8%
QC Endline20 days—15.1%
Shipment Sample2 reports1—
Pre-final1 reports115.2%
Final Random3 reports03.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0321.5%
3480 / 8 days
—PASS
06/22–07/02
AD Fabric stains, BA Thread ends, CC Skip stitch
CS178.6%
3409 / 12 days
—PASS
07/16–07/30
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1712245 (21%)12707/24, 07/25, 07/27, 07/28, 07/30
CS038160 (0%)8806/25, 06/26, 06/27, 06/29, 07/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineShipment SamplePre-finalFinal Random
AD Fabric stains8444126
BA Thread ends42933458
CC Skip stitch3169
ED Gathering crease13603
DB Run-off stitching212
EC Asymmetry37511
CE Broken seam83
CB Broken stitch73
260790 LOGE · CS11/CS12 · Due 09/02Final Random PASS QA Inline DHU is 13.7× QC Endline
No reportPP Sample
No reportPilot Run
07/23QC 1st Bundle1 reports
07/23QA 1st Bundle1 reports
10/28QC Inlineactual/required · 36%
DHU 2.2%QC Endline14 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty10,000 / 10,016
PDF reports19
Last report08/31

Cross-stage findings

QA Inline DHU is 13.7× QC Endline

QA Inline DHU 30.2% vs QC Endline 2.2% (07/23–08/07, 14 days, 10020 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/31): CB Broken stitch 2 (earlier 4 times)

Found earlier but still reached later stages: 3

EA Unsmooth/puckering/bubbling 3, EI Inaccurate/skewed stitching 2, BB Missing cut seam allowance 2 pcs (later stages total)

104 defects recorded as 'Others' without detail

Shipment Sample 2, QC 1st Bundle 9, QC Inline 93; cannot compare across stages

QC Endline data errors: 12

07/23 CS12 260790 (defective pcs 17 > defects 7), 07/24 CS12 260790 (defective pcs 30 > defects 11), 07/25 CS12 260790 (defective pcs 23 > defects 9), 07/27 CS12 260790 (defective pcs 43 > defects 20)…

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (3 Major), ED Gathering crease (3 Major), CC Skip stitch (1 Major), AD Fabric stains (1 Major), CE Broken seam (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: CB Broken stitch (6), EC Asymmetry (3); DHU QC 1st Bundle 0.0% / QA 1st Bundle 50.0%

Caught in earlier stages

CC Skip stitch (26), EB Measurement issue (7), CE Broken seam (5) did not reach later stages

Found before bulk production (Shipment Sample): 2

EC Asymmetry, ED Gathering crease: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—50.0%
QC Inline11 reports
required on prod. days 10/28 (36%)
—0.0%
QC Endline14 days—2.2%
QA Inline3 reports330.2%
Shipment Sample1 reports1—
Final Random2 reports01.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS122.2%
10020 / 14 days
30.2%PASS
07/23–08/07
BA Thread ends, Others (no detail), EA Unsmooth/puckering/bubbling

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS12142810 (36%)14408/03, 08/04, 08/05, 08/06, 08/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends33787613
Others (no detail)993392
EA Unsmooth/puckering/bubbling173943
EC Asymmetry321422
CC Skip stitch1241
ED Gathering crease3151
CB Broken stitch683
EB Measurement issue7
260895 LOGE · CS10 · Due 09/02Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
08/11QC 1st Bundle1 reports
08/11QA 1st Bundle1 reports
13/34QC Inlineactual/required · 38%
DHU 13.8%QC Endline17 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty12,000 / 12,000
PDF reports19
Last report09/02

Cross-stage findings

Missed in earlier stages: 2

EI Inaccurate/skewed stitching (Shipment Sample 08/11), CC Skip stitch (Shipment Sample 08/11): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/02): CB Broken stitch 2 (earlier 3 times), DJ Pleat 1 (earlier 4 times)

Found earlier but still reached later stages: 5

EC Asymmetry 1, DE Cut to broken 1, EA Unsmooth/puckering/bubbling 2, CG Grinning 1, CE Broken seam 2 pcs (later stages total)

3 defects recorded as 'Others' without detail

Shipment Sample 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 7); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (3 Major), EA Unsmooth/puckering/bubbling (2 Major), DE Cut to broken (1 Major), AC Fabric hole (1 Major), CG Grinning (1 Major), CB Broken stitch (1 Major); Both: BA Thread ends (5/2), ED Gathering crease (5/1), BB Missing cut seam allowance (4/1); DHU QC 1st Bundle 107.7% / QA 1st Bundle 65.0%

Caught in earlier stages

ED Gathering crease (177), BB Missing cut seam allowance (30), EB Measurement issue (25), CH Incorrect stitch density (24), DB Run-off stitching (21) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—107.7%
QA 1st Bundle1 reports—65.0%
QC Inline13 reports
required on prod. days 13/34 (38%)
—67.6%
QC Endline17 days—13.8%
QA Inline2 reports237.5%
Shipment Sample1 reports1—
Final Random1 reports01.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1013.8%
11980 / 17 days
37.5%PASS
08/11–09/03
BA Thread ends, ED Gathering crease, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS10173413 (38%)17408/25, 08/26, 08/28, 08/29, 09/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends52140129026
ED Gathering crease5133138
Others (no detail)1273
CC Skip stitch76111
EI Inaccurate/skewed stitching593
EA Unsmooth/puckering/bubbling23952
BB Missing cut seam allowance41178
EC Asymmetry32221
260940 LOGE · CP01/CP02/CP03… · Due 09/02No final QA Inline DHU is 3.8× QC Inline
No reportPP Sample
No reportPilot Run
08/01–08/03QC 1st Bundle2 reports
07/15–08/03QA 1st Bundle3 reports
8/90QC Inlineactual/required · 9%
DHU 8.7%QC Endline23 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty3,000 / 3,000
PDF reports15
Last report08/11

Cross-stage findings

QA Inline DHU is 3.8× QC Inline

QA Inline DHU 64.1% vs QC Inline 16.7%; QC Inline may be missing defects

QA Inline DHU is 7.4× QC Endline

QA Inline DHU 64.1% vs QC Endline 8.7% (07/16–08/14, 23 days, 8920 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

3 defects recorded as 'Others' without detail

QC 1st Bundle 3; cannot compare across stages

QC Endline data errors: 29

07/17 CP01 260940-3 (defective pcs 18 > defects 3), 07/18 CP01 260940-3 (defective pcs 9 > defects 2), 07/20 CP06 260940-3 (defective pcs 32 > defects 9), 07/21 CP01 260940-3 (defective pcs 27 > defects 9)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (5 Major), ED Gathering crease (4 Major), EA Unsmooth/puckering/bubbling (4 Major), DE Cut to broken (1 Major), AD Fabric stains (1 Major); Only QC 1st Bundle: CC Skip stitch (5), DD Thread not straight/waving (5), DB Run-off stitching (3), DC Join stitching (2), DI High-low/uneven (2), DA Exceed seam allowance (1), GB Missing sewing operation (1), CB Broken stitch (1); Both: BA Thread ends (8/9), CE Broken seam (4/7), EC Asymmetry (1/10), CG Grinning (2/5); DHU QC 1st Bundle 95.0% / QA 1st Bundle 76.7%

Caught in earlier stages

BA Thread ends (367), EC Asymmetry (167), ED Gathering crease (80), EB Measurement issue (74), CC Skip stitch (69) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—95.0%
QA 1st Bundle3 reports—76.7%
QC Inline8 reports
required on prod. days 8/90 (9%)
—16.7%
QC Endline23 days—8.7%
QA Inline2 reports264.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP179.8%
3060 / 10 days
71.9%—
07/23–08/08
BA Thread ends, EC Asymmetry, EA Uneven seam allowance
CP0813.8%
2900 / 9 days
56.2%—
08/03–08/12
BA Thread ends, EC Asymmetry, EB Measurement issue
CP032.7%
940 / 10 days
——
07/18–08/14
ED Gathering crease, BA Thread ends, CC Skip stitch
CP013.6%
900 / 6 days
——
07/17–07/24
BA Thread ends
CP061.8%
600 / 4 days
——
07/20–07/23
BA Thread ends, DK Twisted shoulder strap
CP151.6%
320 / 2 days
——
07/22–07/23
BA Thread ends, EC Asymmetry
CP021.2%
160 / 2 days
——
07/16–07/22
BA Thread ends
CP120.0%
40 / 2 days
——
07/20–07/21
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0310200 (0%)101007/24, 07/29, 07/30, 07/31, 08/14
CP1710201 (5%)10908/04, 08/05, 08/06, 08/07, 08/08
CP089187 (39%)9208/07, 08/08, 08/10, 08/11, 08/12
CP016120 (0%)6607/18, 07/21, 07/22, 07/23, 07/24
CP06480 (0%)4407/20, 07/21, 07/22, 07/23
CP02240 (0%)2207/16, 07/22
CP12240 (0%)2207/20, 07/21
CP15240 (0%)2207/22, 07/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends89403073
EC Asymmetry110813315
ED Gathering crease4724
EB Measurement issue74
CC Skip stitch51153
CE Broken seam4717274
EA Uneven seam allowance56
DB Run-off stitching3816
261588 LOGE · CB23 · Due 09/02Final Random PASS Missed in earlier stages: 2
No resultPP Sample1 reports
No reportPilot Run
08/19QC 1st Bundle1 reports
08/19QA 1st Bundle1 reports
4/16QC Inlineactual/required · 25%
DHU 8.0%QC Endline8 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports11
Last report08/29

Cross-stage findings

Missed in earlier stages: 2

AB Shading (Shipment Sample 08/25), GA Missing bartack/button (Final Random 08/29): first found in later stages, never recorded before

QA Inline DHU is 2.4× QC Inline

QA Inline DHU 57.8% vs QC Inline 24.4%; QC Inline may be missing defects

QA Inline DHU is 7.2× QC Endline

QA Inline DHU 57.8% vs QC Endline 8.0% (08/19–08/28, 8 days, 1922 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/29): BB Missing cut seam allowance 1 (earlier 4 times), AC Fabric hole 1 (earlier 8 times)

Found earlier but still reached later stages: 5

EB Measurement issue 1, CB Broken stitch 1, EA Unsmooth/puckering/bubbling 7, EC Asymmetry 1, DJ Pleat 2 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA 1st Bundle 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 10); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (3 Major), CE Broken seam (3 Major), BA Thread ends (2 Major), CH Incorrect stitch density (1 Major), CC Skip stitch (1 Major), AC Fabric hole (1 Major), BB Missing cut seam allowance (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: EC Asymmetry (5), EB Measurement issue (3), CG Grinning (2), EH Poor lamination/bonding (2); Both: EA Unsmooth/puckering/bubbling (3/2); DHU QC 1st Bundle 75.0% / QA 1st Bundle 85.0%

Caught in earlier stages

CC Skip stitch (24), EI Inaccurate/skewed stitching (18), DB Run-off stitching (9), CE Broken seam (5) did not reach later stages

Report line differs from production line

QGR2637113 Final Random (08/29) CB30; actual production line(s) CB23 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—85.0%
QC Inline4 reports
required on prod. days 4/16 (25%)
—24.4%
QC Endline8 days—8.0%
QA Inline2 reports257.8%
Shipment Sample1 reports1—
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB238.0%
1922 / 8 days
57.8%—
08/19–08/28
BA Thread ends, AC Fabric hole, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB238164 (25%)8408/22, 08/24, 08/25, 08/26, 08/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends226737
AC Fabric hole14511
EC Asymmetry2561881
CC Skip stitch15171
EA Unsmooth/puckering/bubbling132737
EI Inaccurate/skewed stitching2349
EB Measurement issue2331
BB Missing cut seam allowance171
261690 OSIT · CB07/CS07 · Due 09/02Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
08/08QC 1st Bundle1 reports
08/07QA 1st Bundle1 reports
6/24QC Inlineactual/required · 25%
DHU 5.9%QC Endline12 days
All FAILQA Inline3 reports2 no result
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty5,000 / 5,000
PDF reports14
Last report08/19

Cross-stage findings

Missed in earlier stages: 2

EI Inaccurate/skewed stitching (Shipment Sample 08/10), IA 2nd operation issue (Pre-final 08/11): first found in later stages, never recorded before

QA Inline DHU is 6.3× QC Inline

QA Inline DHU 78.1% vs QC Inline 12.3%; QC Inline may be missing defects

QA Inline DHU is 13.2× QC Endline

QA Inline DHU 78.1% vs QC Endline 5.9% (08/07–08/20, 12 days, 4782 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (08/19): CB Broken stitch 1 (earlier 8 times), DB Run-off stitching 2 (earlier 5 times), DF Twisted seam/skewing 2 (earlier 4 times)

Found earlier but still reached later stages: 5

EC Asymmetry 1, AB Shading 2, CC Skip stitch 2, ED Gathering crease 1, AC Fabric hole 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

Pre-final 2, QA Inline 2; cannot compare across stages

QC Endline data errors: 4

08/10 CS07 261690 (defective pcs 15 > defects 12), 08/11 CS07 261690 (defective pcs 33 > defects 26), 08/12 CS07 261690 (defective pcs 48 > defects 42), 08/13 CS07 261690 (defective pcs 44 > defects 42)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (2 Major), DJ Pleat (1 Major), EH Poor lamination/bonding (1 Major), BB Missing cut seam allowance (1 Major), DB Run-off stitching (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: ED Gathering crease (6), EA Unsmooth/puckering/bubbling (3); Both: BA Thread ends (3/2); DHU QC 1st Bundle 92.3% / QA 1st Bundle 45.0%

Caught in earlier stages

DJ Pleat (12), EA Unsmooth/puckering/bubbling (12), DI High-low/uneven (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—45.0%
QC Inline6 reports
required on prod. days 6/24 (25%)
—12.3%
QC Endline12 days—5.9%
QA Inline3 reports178.1%
Shipment Sample1 reports1—
Pre-final1 reports14.0%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS075.9%
4782 / 12 days
65.6%PASS
08/07–08/20
BA Thread ends, ED Gathering crease, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0712246 (25%)12608/15, 08/17, 08/18, 08/19, 08/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends3272344208
ED Gathering crease682231
DF Twisted seam/skewing1142
DJ Pleat192
EA Unsmooth/puckering/bubbling39
CB Broken stitch22511
EC Asymmetry1631
DB Run-off stitching182
260120 SAIN · CS03/CS04/CS08… · Due 09/07Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/28QC Inlineactual/required · 4%
DHU 12.3%QC Endline14 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,106 / 1,098
PDF reports4
Last report09/02

Cross-stage findings

Missed in earlier stages: 2

DJ Pleat (Final Random 09/02), HA Poor pressing (Final Random 09/02): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

ED Gathering crease 2, CC Skip stitch 1 pcs (later stages total)

QC Endline data errors: 3

08/22 CS08 260120 (defective pcs 23 > defects 13), 08/24 CS08 260120 (defective pcs 73 > defects 24), 08/25 CS08 260120 (defective pcs 10 > defects 4)

Caught in earlier stages

DB Run-off stitching (14), EC Asymmetry (7), CF Pulling yarn (6) did not reach later stages

Report line differs from production line

QGR2626808 Final Random (07/09) CS07, QGR2628103 Final Random (07/18) CS07, QGR2637758 Final Random (09/02) CS07; actual production line(s) CS03/CS04/CS08/CS10 (cards show production lines only)

Found before bulk production (Final Random): 4

EI Inaccurate/skewed stitching, AB Shading, AC Fabric hole, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/28 (4%)
—20.0%
QC Endline14 days—12.3%
Final Random3 reports04.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0318.5%
2382 / 4 days
——
06/13–06/19
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS049.4%
1416 / 5 days
——
06/06–06/11
CC Skip stitch, ED Gathering crease, BA Thread ends
CS083.5%
1164 / 4 days
——
08/22–08/26
BA Thread ends, CC Skip stitch
CS100.0%
20 / 1 days
——
06/20–06/20
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS045100 (0%)5506/06, 06/08, 06/09, 06/10, 06/11
CS03480 (0%)4406/13, 06/16, 06/17, 06/19
CS08481 (12%)4308/22, 08/24, 08/25, 08/26
CS10120 (0%)1106/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
BA Thread ends41811
CC Skip stitch1331
ED Gathering crease5362
DB Run-off stitching14
EC Asymmetry34
CF Pulling yarn6
EI Inaccurate/skewed stitching5
Others (no detail)4
260123 SAIN · CS03/CS08 · Due 09/07Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/10QC Inlineactual/required · 10%
DHU 13.1%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty4,460 / 990
PDF reports4
Last report09/02

Cross-stage findings

Missed in earlier stages: 3

EC Asymmetry (Final Random 09/01), AB Shading (Final Random 09/02), AD Fabric stains (Final Random 09/02): first found in later stages, never recorded before

Found earlier but still reached later stages: 1

BA Thread ends 16 pcs (later stages total)

QC Endline data errors: 2

08/21 CS08 260123 (defective pcs 10 > defects 8), 08/22 CS08 260123 (defective pcs 4 > defects 2)

Caught in earlier stages

CC Skip stitch (86) did not reach later stages

Report line differs from production line

QGR2631909 Final Random (08/03) CS04;CS10, QGR2637550 Final Random (09/01) CS04;CS10, QGR2637859 Final Random (09/02) CS04;CS10; actual production line(s) CS03/CS08 (cards show production lines only)

Found before bulk production (Final Random): 3

BD Snagging, ED Gathering crease, EI Inaccurate/skewed stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/10 (10%)
—50.0%
QC Endline5 days—13.1%
Final Random3 reports03.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0321.7%
935 / 2 days
——
06/17–06/19
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS081.5%
686 / 3 days
——
08/21–09/02
CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS08361 (17%)3208/21, 08/22, 09/02
CS03240 (0%)2206/17, 06/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
BA Thread ends12016
CC Skip stitch86
ED Gathering crease31
CA Thread tension4
FC Wrong label4
DB Run-off stitching4
EI Inaccurate/skewed stitching3
EA Unsmooth/puckering/bubbling3
253613 MKSC · CB04 · Due 09/09Final Random PASS Missed in earlier stages: 4
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/10QC Inlineactual/required · 10%
DHU 17.8%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty2,300 / 500
PDF reports4
Last report09/02

Cross-stage findings

Missed in earlier stages: 4

CC Skip stitch (Final Random 07/09), BB Missing cut seam allowance (Final Random 07/09), CG Grinning (Final Random 07/13), CB Broken stitch (Final Random 09/02): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Final Random 1; cannot compare across stages

Caught in earlier stages

EB Measurement issue (73), DB Run-off stitching (26), AC Fabric hole (8), CE Broken seam (6) did not reach later stages

Report line differs from production line

QGR2637872 Final Random (09/02) CB07; actual production line(s) CB04 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/10 (10%)
—50.0%
QC Endline5 days—17.8%
Final Random3 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0417.8%
2300 / 5 days
—PASS
07/02–07/07
BA Thread ends, EB Measurement issue, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB045101 (10%)5407/02, 07/03, 07/04, 07/06, 07/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
BA Thread ends2336
EB Measurement issue73
EC Asymmetry3641
DB Run-off stitching323
EA Unsmooth/puckering/bubbling81
AC Fabric hole8
CE Broken seam6
DA Exceed seam allowance4
253716 MKSC · CP03 · Due 09/09Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
2/26QC Inlineactual/required · 8%
DHU 9.4%QC Endline13 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty3,716 / 1,500
PDF reports6
Last report07/28

Cross-stage findings

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 07/20): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/28): EC Asymmetry 1 (earlier 19 times)

Found earlier but still reached later stages: 5

DJ Pleat 1, ED Gathering crease 1, CE Broken seam 3, CB Broken stitch 1, BD Snagging 1 pcs (later stages total)

7 defects recorded as 'Others' without detail

QA Inline 7; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

CE Broken seam (QA 4); zero in QC Endline records

QC Endline data errors: 19

07/04 CP03 253716A (defective pcs 97 > defects 19), 07/04 CP03 253716B (defective pcs 33 > defects 12), 07/06 CP03 253716B (defective pcs 78 > defects 61), 07/06 CP03 253716A (defective pcs 7 > defects 6)…

Caught in earlier stages

CC Skip stitch (87), CA Thread tension (20), DF Twisted seam/skewing (19), EA Uneven seam allowance (15), DE Cut to broken (5) did not reach later stages

Report line differs from production line

QGR2630430 Final Random (07/28) CP05; actual production line(s) CP03 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline2 reports
required on prod. days 2/26 (8%)
—81.2%
QC Endline13 days—9.4%
QA Inline1 reports134.4%
Final Random3 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP039.4%
3676 / 13 days
34.4%PASS
07/03–07/21
CC Skip stitch, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0313262 (8%)131107/13, 07/14, 07/15, 07/17, 07/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends11827
CC Skip stitch285
EC Asymmetry14591
ED Gathering crease16121
CA Thread tension20
DF Twisted seam/skewing217
EA Uneven seam allowance15
DJ Pleat81
253717 MKSC · CP17 · Due 09/09Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/14QA 1st Bundle1 reports
1/8QC Inlineactual/required · 12%
DHU 12.3%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,481 / 1,000
PDF reports5
Last report08/01

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 07/20): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/01): BA Thread ends 2 (earlier 8 times)

Found earlier but still reached later stages: 2

DJ Pleat 1, CE Broken seam 2 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 3; cannot compare across stages

QC Endline data errors: 1

07/16 CP17 253717A (defective pcs 5 > defects 4)

Caught in earlier stages

EA Uneven seam allowance (44), DK Twisted shoulder strap (17), ED Gathering crease (15), EB Measurement issue (13), CC Skip stitch (12) did not reach later stages

Report line differs from production line

QGR2628637 Final Random (07/20) CB17, QGR2631507 Final Random (08/01) CP05; actual production line(s) CP17 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline1 reports
required on prod. days 1/8 (12%)
—0.0%
QC Endline4 days—12.3%
QA Inline1 reports134.4%
Final Random2 reports05.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1712.3%
1481 / 4 days
34.4%—
07/14–07/21
BA Thread ends, EA Uneven seam allowance, DK Twisted shoulder strap

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP17481 (12%)4307/14, 07/15, 07/16, 07/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends38112
EA Uneven seam allowance44
DK Twisted shoulder strap17
ED Gathering crease1104
EB Measurement issue13
CC Skip stitch12
CE Broken seam42
CA Thread tension41
254225 MKSC · CS19 · Due 09/09Final Random PASS Final Random DHU is 50.0× QC Endline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/4QC Inlineactual/required · 0%
DHU 0.0%QC Endline2 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,500 / 750
PDF reports1
Last report08/06

Cross-stage findings

Final Random DHU is 50.0× QC Endline

Final Random DHU 5.0% vs QC Endline 0.0% (06/01–06/11, 2 days, 22 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Main QA defects never recorded by QC Endline: 1

BA Thread ends (QA 3); zero in QC Endline records

Found before bulk production (Final Random): 4

EA Unsmooth/puckering/bubbling, BA Thread ends, AC Fabric hole, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/4 (0%)
——
QC Endline2 days—0.0%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS190.0%
22 / 2 days
—PASS
06/01–06/11
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS19240 (0%)2206/01, 06/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends3
CB Broken stitch2
EA Unsmooth/puckering/bubbling1
AC Fabric hole1
260248 MKSC · CB01 · Due 09/09Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/12QC Inlineactual/required · 8%
DHU 5.0%QC Endline6 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,900 / 900
PDF reports4
Last report07/16

Cross-stage findings

Missed in earlier stages: 2

BB Missing cut seam allowance (Final Random 07/09), ED Gathering crease (Final Random 07/16): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/16): BA Thread ends 1 (earlier 5 times)

Caught in earlier stages

DB Run-off stitching (24), CC Skip stitch (8), EA Unsmooth/puckering/bubbling (8), CA Thread tension (8), AD Fabric stains (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline2 reports
required on prod. days 1/12 (8%)
—38.0%
QC Endline6 days—5.0%
Final Random2 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB015.0%
1574 / 6 days
—PASS
07/02–07/09
BA Thread ends, DB Run-off stitching, CA Thread tension

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB016121 (8%)6507/03, 07/04, 07/07, 07/08, 07/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
BA Thread ends465
DB Run-off stitching717
CC Skip stitch8
EA Unsmooth/puckering/bubbling8
CA Thread tension8
AD Fabric stains7
CE Broken seam6
CB Broken stitch5
260271 MKSC · CB08/CB22/CB30 · Due 09/09Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No resultPilot Run2 reports
07/17QC 1st Bundle1 reports
07/18QA 1st Bundle1 reports
11/38QC Inlineactual/required · 29%
DHU 14.7%QC Endline18 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty3,000 / 1,000
PDF reports22
Last report09/01

Cross-stage findings

Missed in earlier stages: 2

DB Run-off stitching (Final Random 07/21), DF Twisted seam/skewing (Final Random 08/03): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/01): BA Thread ends 1 (earlier 18 times), ED Gathering crease 1 (earlier 16 times), EA Unsmooth/puckering/bubbling 1 (earlier 7 times)

Found earlier but still reached later stages: 3

CG Grinning 1, AD Fabric stains 1, CB Broken stitch 1 pcs (later stages total)

7 defects recorded as 'Others' without detail

QA 1st Bundle 1, Final Random 3, QA Inline 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC Endline data errors: 1

07/20 CB08 260271A-L (defective pcs 14 > defects 12)

Caught in earlier stages

EC Asymmetry (149), EB Measurement issue (44), CD Needle hole (23), DD Thread not straight/waving (21), DI High-low/uneven (14) did not reach later stages

QC 1st Bundle vs QA 1st Bundle

Only QC 1st Bundle: CG Grinning (5), BA Thread ends (3), DJ Pleat (2), ED Gathering crease (2); Both: EC Asymmetry (5/2), EA Unsmooth/puckering/bubbling (2/4); DHU QC 1st Bundle 146.2% / QA 1st Bundle 53.8%

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—146.2%
QA 1st Bundle1 reports—53.8%
QC Inline12 reports
required on prod. days 11/38 (29%)
—47.1%
QC Endline18 days—14.7%
QA Inline2 reports218.8%
Final Random4 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0817.8%
1613 / 11 days
18.8%PASS
07/20–08/12
ED Gathering crease, BA Thread ends, EB Measurement issue
CB2211.3%
1499 / 7 days
18.8%—
08/06–08/14
BA Thread ends, EC Asymmetry, AD Fabric stains
CB300.0%
2 / 1 days
——
07/21–07/21
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0811228 (36%)11307/27, 07/28, 07/29, 07/30, 08/12
CB227143 (21%)7408/08, 08/10, 08/11, 08/13, 08/14
CB30120 (0%)1107/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends3121374
EC Asymmetry152281085
ED Gathering crease21711211
EB Measurement issue539
AD Fabric stains43311
CG Grinning5211
CD Needle hole23
DD Thread not straight/waving21
260276 MKSC · CS19 · Due 09/09Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/28QC 1st Bundle1 reports
07/28QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 6.5%QC Endline6 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports4
Last report08/07

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 08/07): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/07): AD Fabric stains 1 (earlier 6 times)

Found earlier but still reached later stages: 1

HA Poor pressing 1 pcs (later stages total)

QC Endline data errors: 1

07/29 CS19 260276AU (defective pcs 16 > defects 15)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (1 Major), ED Gathering crease (1 Major); Only QC 1st Bundle: DI High-low/uneven (4), CC Skip stitch (2), AD Fabric stains (2), CA Thread tension (1), HA Poor pressing (1), CG Grinning (1); Both: EC Asymmetry (2/4), BA Thread ends (3/3), DJ Pleat (1/1); DHU QC 1st Bundle 85.0% / QA 1st Bundle 50.0%

Caught in earlier stages

CC Skip stitch (9), DI High-low/uneven (9), EC Asymmetry (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—85.0%
QA 1st Bundle1 reports—50.0%
QC Inline1 reports
required on prod. days 1/12 (8%)
—25.0%
QC Endline6 days—6.5%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS196.5%
1000 / 6 days
—PASS
07/27–08/06
BA Thread ends, AD Fabric stains, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS196121 (8%)6507/28, 07/29, 07/30, 08/05, 08/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineFinal Random
BA Thread ends338312
AD Fabric stains22141
CC Skip stitch27
DI High-low/uneven45
Others (no detail)9
EC Asymmetry242
DJ Pleat111
CG Grinning12
260278 MKSC · CB06/CB16/CB17… · Due 09/09Final Random PASS Missed in earlier stages: 3
No resultPP Sample1 reports
No reportPilot Run
07/07QC 1st Bundle1 reports
07/07QA 1st Bundle1 reports
17/58QC Inlineactual/required · 29%
DHU 11.5%QC Endline25 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random5 reports
Order/Ship qty8,500 / 2,000
PDF reports29
Last report08/22

Cross-stage findings

Missed in earlier stages: 3

DH Pressing mark (Final Random 07/13), DE Cut to broken (Final Random 07/13), BB Missing cut seam allowance (Final Random 08/22): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (08/22): ED Gathering crease 1 (earlier 52 times), AD Fabric stains 2 (earlier 54 times), BA Thread ends 2 (earlier 23 times)

Found earlier but still reached later stages: 1

CG Grinning 1 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA Inline 2, Final Random 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), DF Twisted seam/skewing (1 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (3), ED Gathering crease (2), EB Measurement issue (2); Both: EC Asymmetry (1/3); DHU QC 1st Bundle 61.5% / QA 1st Bundle 53.8%

Caught in earlier stages

CE Broken seam (142), CC Skip stitch (97), DB Run-off stitching (80), CD Needle hole (37), EC Asymmetry (27) did not reach later stages

Report line differs from production line

QGR2632545 Final Random (08/03) CB13, QGR2633618 Final Random (08/13) CB13, QGR2635861 Final Random (08/22) CB13; actual production line(s) CB06/CB16/CB17/CB30 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—61.5%
QA 1st Bundle1 reports—53.8%
QC Inline18 reports
required on prod. days 17/58 (29%)
—36.0%
QC Endline25 days—11.5%
QA Inline3 reports319.8%
Final Random5 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1611.6%
9519 / 25 days
19.8%PASS
07/06–08/20
Others (no detail), AD Fabric stains, BA Thread ends
CB300.0%
30 / 3 days
——
07/31–08/15
—
CB060.0%
10 / 1 days
——
07/09–07/09
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB16255017 (34%)25808/15, 08/17, 08/18, 08/19, 08/20
CB30360 (0%)3307/31, 08/12, 08/15
CB06120 (0%)1107/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
AD Fabric stains19021415
ED Gathering crease2991552
Others (no detail)22623
BA Thread ends316512
CE Broken seam151252
CC Skip stitch9871
DB Run-off stitching575
CD Needle hole37
260281 MKSC · CB17 · Due 09/09Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
08/04QC 1st Bundle1 reports
08/05QA 1st Bundle1 reports
5/14QC Inlineactual/required · 36%
DHU 97.2%QC Endline7 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,350 / 700
PDF reports11
Last report09/04

Cross-stage findings

Missed in earlier stages: 2

BB Missing cut seam allowance (Final Random 08/11), CH Incorrect stitch density (Final Random 09/04): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

CB Broken stitch 2, DJ Pleat 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA 1st Bundle 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 7); zero in QC Endline records

QC Endline data errors: 1

08/22 CB17 260281B-L (defective pcs 13 > defects 10)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (3 Major), EA Unsmooth/puckering/bubbling (2 Major); Only QC 1st Bundle: ED Gathering crease (5), BA Thread ends (2); Both: EC Asymmetry (2/2); DHU QC 1st Bundle 69.2% / QA 1st Bundle 61.5%

Caught in earlier stages

ED Gathering crease (464), AC Fabric hole (450), EB Measurement issue (100), DB Run-off stitching (60), CE Broken seam (42) did not reach later stages

Report line differs from production line

QGR2633507 Final Random (08/11) CB15; actual production line(s) CB17 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—61.5%
QC Inline5 reports
required on prod. days 5/14 (36%)
—37.2%
QC Endline7 days—97.2%
QA Inline2 reports221.9%
Final Random2 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1797.2%
1244 / 7 days
21.9%PASS
08/05–08/31
AC Fabric hole, ED Gathering crease, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB177145 (36%)7208/07, 08/19, 08/20, 08/22, 08/31

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease518441
AC Fabric hole450
EB Measurement issue100
BA Thread ends23904
DB Run-off stitching60
CE Broken seam42
EC Asymmetry222723
CC Skip stitch231
260288 MKSC · CB08/CB09 · Due 09/09Final Random PASS Missed in earlier stages: 4
No reportPP Sample
No resultPilot Run3 reports
No reportQC 1st Bundle
No reportQA 1st Bundle
2/18QC Inlineactual/required · 11%
DHU 8.5%QC Endline9 days
No reportQA Inline
No resultShipment Sample1 reports
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,926 / 930
PDF reports9
Last report07/28

Cross-stage findings

Missed in earlier stages: 4

BB Missing cut seam allowance (Final Random 07/16), DJ Pleat (Final Random 07/16), BD Snagging (Final Random 07/28), EE Raw edge (Final Random 07/28): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/28): CB Broken stitch 2 (earlier 4 times)

Found earlier but still reached later stages: 2

CE Broken seam 1, CC Skip stitch 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

CB Broken stitch (QA 3); zero in QC Endline records

QC Endline data errors: 2

07/02 CB08 260288C (defective pcs 10 > defects 9), 07/06 CB08 260288A (defective pcs 15 > defects 14)

Caught in earlier stages

ED Gathering crease (47), EB Measurement issue (25), EC Asymmetry (12), AC Fabric hole (10), CD Needle hole (10) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run3 reports0—
QC Inline2 reports
required on prod. days 2/18 (11%)
—45.3%
QC Endline9 days—8.5%
Shipment Sample1 reports0—
Final Random3 reports04.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB088.5%
1823 / 9 days
—PASS
07/02–07/13
BA Thread ends, ED Gathering crease, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB089182 (11%)9707/07, 07/08, 07/09, 07/10, 07/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC InlineQC EndlineFinal Random
BA Thread ends534
ED Gathering crease47
EB Measurement issue25
CB Broken stitch93
EC Asymmetry210
AC Fabric hole10
CD Needle hole10
CE Broken seam81
260295 MKSC · CB07/CB22 · Due 09/09Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No resultPilot Run3 reports
No reportQC 1st Bundle
07/06QA 1st Bundle1 reports
3/12QC Inlineactual/required · 25%
DHU 19.2%QC Endline6 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,000 / 380
PDF reports10
Last report07/27

Cross-stage findings

Missed in earlier stages: 2

DF Twisted seam/skewing (Final Random 07/27), AD Fabric stains (Final Random 07/27): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/27): CB Broken stitch 1 (earlier 4 times)

Found earlier but still reached later stages: 3

DB Run-off stitching 1, DJ Pleat 1, CG Grinning 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 3, Pilot Run 1; cannot compare across stages

Caught in earlier stages

CE Broken seam (40), CC Skip stitch (21), EC Asymmetry (15), ED Gathering crease (15), EA Unsmooth/puckering/bubbling (8) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run3 reports0—
QA 1st Bundle1 reports—69.2%
QC Inline3 reports
required on prod. days 3/12 (25%)
—42.7%
QC Endline6 days—19.2%
QA Inline1 reports121.9%
Final Random2 reports04.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2219.2%
1000 / 6 days
21.9%PASS
07/06–07/17
BA Thread ends, Others (no detail), CE Broken seam

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB226123 (25%)6307/07, 07/08, 07/09, 07/13, 07/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends13702
Others (no detail)1356
CE Broken seam27301
CC Skip stitch4161
EC Asymmetry9141
ED Gathering crease2121
DB Run-off stitching1541
EA Unsmooth/puckering/bubbling26
260314 MKSC · CP01 · Due 09/09Final Random PASS QA Inline DHU is 5.1× QC Endline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/27QA 1st Bundle1 reports
0/14QC Inlineactual/required · 0%
DHU 6.7%QC Endline7 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty800 / 800
PDF reports5
Last report09/01

Cross-stage findings

QA Inline DHU is 5.1× QC Endline

QA Inline DHU 34.4% vs QC Endline 6.7% (07/27–08/20, 7 days, 2520 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 3

DE Cut to broken 1, CB Broken stitch 1, BB Missing cut seam allowance 1 pcs (later stages total)

8 defects recorded as 'Others' without detail

QA Inline 5, Final Random 3; cannot compare across stages

QC Endline data errors: 6

07/27 CP01 260314A (defective pcs 55 > defects 13), 07/28 CP01 260314A (defective pcs 95 > defects 52), 07/29 CP01 260314A (defective pcs 71 > defects 27), 07/29 CP01 260314B (defective pcs 18 > defects 5)…

Caught in earlier stages

EB Measurement issue (11), CC Skip stitch (10), ED Gathering crease (9), DB Run-off stitching (6), DK Twisted shoulder strap (5) did not reach later stages

Found before bulk production (Shipment Sample): 3

EC Asymmetry, EA Unsmooth/puckering/bubbling, CE Broken seam: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—45.0%
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—6.7%
QA Inline1 reports134.4%
Shipment Sample1 reports1—
Final Random2 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP016.7%
2520 / 7 days
34.4%PASS
07/27–08/20
BA Thread ends, EC Asymmetry, EA Unsmooth/puckering/bubbling

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP017140 (0%)7707/29, 07/30, 08/05, 08/06, 08/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends38342
EC Asymmetry2913
EA Unsmooth/puckering/bubbling2161
EB Measurement issue11
CC Skip stitch10
ED Gathering crease9
Others (no detail)53
DB Run-off stitching6
260318 MKSC · CP08/CP17 · Due 09/09Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run4 reports
07/27QC 1st Bundle1 reports
07/25QA 1st Bundle1 reports
2/14QC Inlineactual/required · 14%
DHU 15.9%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty2,643 / 600
PDF reports12
Last report08/28

Cross-stage findings

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 07/29): first found in later stages, never recorded before

QA Inline DHU is 1.9× QC Inline

QA Inline DHU 50.0% vs QC Inline 26.6%; QC Inline may be missing defects

Found earlier but still reached later stages: 3

EA Unsmooth/puckering/bubbling 3, CB Broken stitch 2, AD Fabric stains 1 pcs (later stages total)

13 defects recorded as 'Others' without detail

Pilot Run 2, QA 1st Bundle 3, QA Inline 8; cannot compare across stages

QC Endline data errors: 2

07/25 CP17 260318A (defective pcs 26 > defects 22), 07/30 CP17 260318B (defective pcs 45 > defects 44)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (3 Major), CE Broken seam (2 Major), DC Join stitching (1 Major), AD Fabric stains (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DL Wrong trim position (1); Both: EC Asymmetry (8/2), EA Unsmooth/puckering/bubbling (3/3), DF Twisted seam/skewing (4/1), BA Thread ends (3/1), CG Grinning (2/2); DHU QC 1st Bundle 105.0% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (93), EA Uneven seam allowance (58), DF Twisted seam/skewing (46), EC Asymmetry (31), CC Skip stitch (27) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run4 reports0—
QC 1st Bundle1 reports—105.0%
QA 1st Bundle1 reports—100.0%
QC Inline2 reports
required on prod. days 2/14 (14%)
—26.6%
QC Endline7 days—15.9%
QA Inline1 reports150.0%
Final Random3 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1715.9%
2643 / 7 days
50.0%PASS
07/25–08/12
BA Thread ends, ED Gathering crease, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP177142 (14%)6607/27, 07/28, 07/29, 07/31, 08/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends131514435
ED Gathering crease93
EA Uneven seam allowance58
DF Twisted seam/skewing41140
EC Asymmetry1182532
CC Skip stitch324
EA Unsmooth/puckering/bubbling133143
CE Broken seam1215
260342 MKSC · CS07/CS17 · Due 09/09Final Random PASS QA Inline DHU is 1.8× QC Inline
No reportPP Sample
No resultPilot Run2 reports
No reportQC 1st Bundle
07/04QA 1st Bundle1 reports
3/8QC Inlineactual/required · 38%
DHU 7.1%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,019 / 400
PDF reports9
Last report08/13

Cross-stage findings

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 28.1% vs QC Inline 15.9%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (08/13): EA Unsmooth/puckering/bubbling 1 (earlier 3 times), EC Asymmetry 1 (earlier 3 times)

Found earlier but still reached later stages: 3

AD Fabric stains 2, CB Broken stitch 1, BD Snagging 2 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA Inline 1; cannot compare across stages

QC Endline data errors: 5

07/04 CS07 260342A (defective pcs 18 > defects 12), 07/07 CS07 260342A (defective pcs 8 > defects 6), 07/07 CS07 260342B (defective pcs 16 > defects 12), 07/08 CS07 260342A (defective pcs 6 > defects 4)…

Caught in earlier stages

ED Gathering crease (28), CC Skip stitch (14) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QA 1st Bundle1 reports—60.0%
QC Inline3 reports
required on prod. days 3/8 (38%)
—15.9%
QC Endline4 days—7.1%
QA Inline1 reports128.1%
Final Random2 reports05.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS077.1%
1019 / 4 days
28.1%PASS
07/04–07/08
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS07483 (38%)4107/04, 07/06, 07/07, 07/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends23033
ED Gathering crease2422
CC Skip stitch14
EA Unsmooth/puckering/bubbling81
AD Fabric stains1122
EC Asymmetry1221
CB Broken stitch131
CG Grinning12
260892 LOGE · CB17 · Due 09/09Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/22QC 1st Bundle1 reports
08/22QA 1st Bundle1 reports
11/30QC Inlineactual/required · 37%
DHU 5.8%QC Endline15 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty6,000 / 6,000
PDF reports18
Last report09/07

Cross-stage findings

Missed in earlier stages: 1

ED Gathering crease (Shipment Sample 08/25): first found in later stages, never recorded before

QA Inline DHU is 5.7× QC Endline

QA Inline DHU 32.8% vs QC Endline 5.8% (08/22–09/09, 15 days, 5746 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (09/05): AD Fabric stains 2 (earlier 24 times), CB Broken stitch 2 (earlier 14 times), CC Skip stitch 1 (earlier 13 times)

Found earlier but still reached later stages: 2

EC Asymmetry 8, EA Unsmooth/puckering/bubbling 2 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (3 Major), BB Missing cut seam allowance (2), EI Inaccurate/skewed stitching (1 Major), DE Cut to broken (1 Major); Only QC 1st Bundle: AC Fabric hole (1), CB Broken stitch (1); Both: AD Fabric stains (5/3), BA Thread ends (2/2); DHU QC 1st Bundle 69.2% / QA 1st Bundle 40.0%

Caught in earlier stages

EB Measurement issue (112), CE Broken seam (46), DA Exceed seam allowance (29), AC Fabric hole (12), CG Grinning (11) did not reach later stages

Report line differs from production line

QGR2638560 Final Random (09/05) CB30; actual production line(s) CB17 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—40.0%
QC Inline11 reports
required on prod. days 11/30 (37%)
—40.5%
QC Endline15 days—5.8%
QA Inline2 reports232.8%
Shipment Sample2 reports2—
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB175.8%
5746 / 15 days
32.8%—
08/22–09/09
EB Measurement issue, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB17153011 (37%)15409/04, 09/05, 09/07, 09/08, 09/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
AD Fabric stains533773222
EB Measurement issue81022
EC Asymmetry368658
BA Thread ends2236026
CC Skip stitch46711
CE Broken seam20251
DA Exceed seam allowance29
CB Broken stitch12012
260907 LOGE · CP18 · Due 09/09No final QA Inline DHU is 1.8× QC Inline
No reportPP Sample
No reportPilot Run
08/08QC 1st Bundle1 reports
08/07QA 1st Bundle1 reports
1/8QC Inlineactual/required · 12%
DHU 6.8%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,196 / 2,196
PDF reports4
Last report08/10

Cross-stage findings

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 43.8% vs QC Inline 23.8%; QC Inline may be missing defects

QA Inline DHU is 6.4× QC Endline

QA Inline DHU 43.8% vs QC Endline 6.8% (08/07–08/11, 4 days, 2196 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 12); zero in QC Endline records

QC Endline data errors: 4

08/07 CP18 260907 (defective pcs 36 > defects 23), 08/08 CP18 260907 (defective pcs 80 > defects 45), 08/10 CP18 260907 (defective pcs 79 > defects 62), 08/11 CP18 260907 (defective pcs 33 > defects 20)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (3 Major), CB Broken stitch (3 Major); Only QC 1st Bundle: DI High-low/uneven (2), ED Gathering crease (2); Both: EC Asymmetry (4/5), BA Thread ends (5/2), CE Broken seam (2/2), AD Fabric stains (1/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 80.0%

Caught in earlier stages

BA Thread ends (67), CC Skip stitch (39), ED Gathering crease (36), EC Asymmetry (21), EA Uneven seam allowance (13) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—80.0%
QC Inline1 reports
required on prod. days 1/8 (12%)
—23.8%
QC Endline4 days—6.8%
QA Inline1 reports143.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP186.8%
2196 / 4 days
43.8%—
08/07–08/11
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP18481 (12%)4308/07, 08/08, 08/10, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends524551
CC Skip stitch39
ED Gathering crease234
EC Asymmetry4512
EA Uneven seam allowance13
DJ Pleat7
EA Unsmooth/puckering/bubbling7
CE Broken seam222
260908 LOGE · CB26/CB27/CB28… · Due 09/09Final Random PASS QA Inline DHU is 8.6× QC Endline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
15/96QC Inlineactual/required · 16%
DHU 4.6%QC Endline39 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,296 / 2,296
PDF reports19
Last report09/01

Cross-stage findings

QA Inline DHU is 8.6× QC Endline

QA Inline DHU 39.6% vs QC Endline 4.6% (07/02–08/29, 39 days, 22593 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (09/01): CE Broken seam 2 (earlier 13 times), EA Unsmooth/puckering/bubbling 2 (earlier 15 times)

2 defects recorded as 'Others' without detail

QA Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 12); zero in QC Endline records

Caught in earlier stages

CC Skip stitch (289), DB Run-off stitching (93), EC Asymmetry (90), AC Fabric hole (75), AD Fabric stains (40) did not reach later stages

Report line differs from production line

QGR2637478 Final Random (09/01) CB06; actual production line(s) CB26/CB27/CB28/CB29/CB30 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline15 reports
required on prod. days 15/96 (16%)
—34.0%
QC Endline39 days—4.6%
QA Inline3 reports339.6%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB284.6%
22380 / 39 days
39.6%—
07/02–08/29
BA Thread ends, CC Skip stitch, AC Fabric hole
CB300.0%
140 / 6 days
——
07/08–08/28
—
CB2720.0%
40 / 1 days
——
07/04–07/04
EC Asymmetry, CC Skip stitch, EB Measurement issue
CB260.0%
20 / 1 days
——
07/07–07/07
—
CB290.0%
13 / 1 days
——
07/02–07/02
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB28397815 (19%)392408/24, 08/25, 08/26, 08/28, 08/29
CB306120 (0%)6607/29, 08/05, 08/20, 08/24, 08/28
CB26120 (0%)1107/07
CB27120 (0%)1107/04
CB29120 (0%)1107/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends51038
CC Skip stitch172702
DB Run-off stitching28641
EC Asymmetry54342
AC Fabric hole867
EA Unsmooth/puckering/bubbling36102
CE Broken seam3192
AD Fabric stains8311
260909 LOGE · CS13 · Due 09/09Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/30QC 1st Bundle1 reports
07/30QA 1st Bundle1 reports
21/44QC Inlineactual/required · 48%
DHU 7.7%QC Endline22 days
All FAILQA Inline8 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty9,366 / 9,147
PDF reports33
Last report08/28

Cross-stage findings

Missed in earlier stages: 1

GA Missing bartack/button (Final Random 08/21): first found in later stages, never recorded before

Recurring in small numbers: 4

Latest Final Random (08/28): EA Unsmooth/puckering/bubbling 2 (earlier 21 times), AD Fabric stains 2 (earlier 11 times), CB Broken stitch 1 (earlier 5 times), DJ Pleat 1 (earlier 14 times)

Found earlier but still reached later stages: 1

CG Grinning 2 pcs (later stages total)

172 defects recorded as 'Others' without detail

QC 1st Bundle 8, QC Inline 164; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 18); zero in QC Endline records

QC Endline data errors: 1

07/30 CS13 260909 (defective pcs 40 > defects 25)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (4 Major), EA Unsmooth/puckering/bubbling (3 Major), BA Thread ends (1 Major), AD Fabric stains (1 Major), CE Broken seam (1 Major), CB Broken stitch (1 Major); Both: ED Gathering crease (4/2), BB Missing cut seam allowance (3/2); DHU QC 1st Bundle 0.0% / QA 1st Bundle 75.0%

Caught in earlier stages

ED Gathering crease (409), CC Skip stitch (214), AC Fabric hole (143), DB Run-off stitching (114), EC Asymmetry (35) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—75.0%
QC Inline21 reports
required on prod. days 21/44 (48%)
—0.0%
QC Endline22 days—7.7%
QA Inline8 reports834.0%
Final Random2 reports03.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS137.7%
32626 / 22 days
34.0%PASS
07/30–08/25
BA Thread ends, Others (no detail), ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS13224421 (48%)21208/19, 08/20, 08/21, 08/22, 08/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends11511891111
Others (no detail)8164401
ED Gathering crease42103867
CC Skip stitch151981
AC Fabric hole2141
DB Run-off stitching5109
AD Fabric stains155852
EA Unsmooth/puckering/bubbling31828165
260943 LOGE · CS20 · Due 09/09Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/11QC 1st Bundle1 reports
08/12QA 1st Bundle1 reports
8/20QC Inlineactual/required · 40%
DHU 8.6%QC Endline10 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
1/2 FAILFinal Random2 reports
Order/Ship qty3,000 / 3,000
PDF reports13
Last report08/31

Cross-stage findings

Missed in earlier stages: 1

DE Cut to broken (Final Random 08/28): first found in later stages, never recorded before

Final Random DHU is 1.6× QC Endline

Final Random DHU 13.6% vs QC Endline 8.6% (08/11–08/21, 10 days, 3000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 4

Latest Final Random (08/31): DJ Pleat 2 (earlier 14 times), CE Broken seam 2 (earlier 6 times), CC Skip stitch 1 (earlier 17 times), CB Broken stitch 2 (earlier 7 times)

Found earlier but still reached later stages: 2

DD Thread not straight/waving 1, AC Fabric hole 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QC 1st Bundle 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

CE Broken seam (QA 10); zero in QC Endline records

QC Endline data errors: 2

08/19 CS20 260943-L (defective pcs 15 > defects 14), 08/20 CS20 260943-S (defective pcs 34 > defects 30)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (3 Major), CG Grinning (2 Major), AD Fabric stains (1 Major); Only QC 1st Bundle: BA Thread ends (4), EA Unsmooth/puckering/bubbling (2), DA Exceed seam allowance (1), CE Broken seam (1), DB Run-off stitching (1); Both: DD Thread not straight/waving (4/2), CC Skip stitch (1/2), DJ Pleat (2/1); DHU QC 1st Bundle 85.0% / QA 1st Bundle 55.0%

Caught in earlier stages

EB Measurement issue (55), ED Gathering crease (25), EA Unsmooth/puckering/bubbling (15), DA Exceed seam allowance (14), CG Grinning (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—85.0%
QA 1st Bundle1 reports—55.0%
QC Inline8 reports
required on prod. days 8/20 (40%)
—25.7%
QC Endline10 days—8.6%
QA Inline1 reports128.1%
Final Random2 reports113.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS208.6%
3000 / 10 days
28.1%PASS
08/11–08/21
BA Thread ends, EB Measurement issue, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2010208 (40%)10208/17, 08/18, 08/19, 08/20, 08/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends44212922
CC Skip stitch1265414
EB Measurement issue55
DJ Pleat2118213
ED Gathering crease196
CB Broken stitch3105
CE Broken seam1619
EA Unsmooth/puckering/bubbling2112
260946 LOGE · CP01/CP03/CP06… · Due 09/09Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/03QC 1st Bundle1 reports
07/28–09/03QA 1st Bundle3 reports
0/56QC Inlineactual/required · 0%
DHU 8.1%QC Endline20 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty6,000 / 6,000
PDF reports7
Last report09/09

Cross-stage findings

Missed in earlier stages: 1

BD Snagging (Final Random 09/09): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/09): CC Skip stitch 2 (earlier 7 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

QC Endline data errors: 13

07/25 CP15 260946-3 (defective pcs 5 > defects 2), 07/27 CP01 260946-3 (defective pcs 6 > defects 3), 07/27 CP15 260946-3 (defective pcs 17 > defects 6), 07/28 CP15 260946-3 (defective pcs 8 > defects 4)…

QC 1st Bundle vs QA 1st Bundle: 9 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (5 Major), BB Missing cut seam allowance (5 Major), DA Exceed seam allowance (3 Major), EI Inaccurate/skewed stitching (3 Major), CG Grinning (2 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major), GA Missing bartack/button (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DE Cut to broken (3), AC Fabric hole (2); Both: BA Thread ends (6/11), EC Asymmetry (5/8); DHU QC 1st Bundle 80.0% / QA 1st Bundle 68.3%

Caught in earlier stages

ED Gathering crease (82), EC Asymmetry (29), EA Uneven seam allowance (17), BB Missing cut seam allowance (10), EB Measurement issue (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle3 reports—68.3%
QC Inline0 reports
required on prod. days 0/56 (0%)
——
QC Endline20 days—8.1%
QA Inline2 reports229.7%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP208.1%
2000 / 5 days
28.1%—
09/02–09/07
BA Thread ends, CC Skip stitch, ED Gathering crease
CP1014.2%
1980 / 3 days
—PASS
08/31–09/02
BA Thread ends, CC Skip stitch, ED Gathering crease
CP151.5%
980 / 7 days
31.2%—
07/25–08/04
BA Thread ends, EC Asymmetry
CP172.0%
500 / 5 days
——
07/28–08/14
BA Thread ends
CP017.1%
240 / 3 days
——
07/27–08/08
BA Thread ends
CP030.0%
180 / 2 days
——
08/06–08/10
—
CP060.0%
100 / 2 days
——
07/29–08/01
—
CP130.0%
20 / 1 days
——
09/01–09/01
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP157140 (0%)7707/28, 07/29, 07/30, 08/03, 08/04
CP175100 (0%)5507/28, 08/03, 08/04, 08/05, 08/14
CP205100 (0%)5509/02, 09/03, 09/04, 09/05, 09/07
CP01360 (0%)3307/27, 08/04, 08/08
CP10360 (0%)3308/31, 09/01, 09/02
CP03240 (0%)2208/06, 08/10
CP06240 (0%)2207/29, 08/01
CP13120 (0%)1109/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends61124068
CC Skip stitch1212
ED Gathering crease181
EC Asymmetry58133
EA Uneven seam allowance17
BB Missing cut seam allowance55
EB Measurement issue10
CE Broken seam51
260947 LOGE · CS20 · Due 09/09Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
08/21QC 1st Bundle1 reports
08/21QA 1st Bundle1 reports
5/14QC Inlineactual/required · 36%
DHU 9.1%QC Endline7 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports10
Last report09/08

Cross-stage findings

Missed in earlier stages: 2

BB Missing cut seam allowance (Final Random 09/08), DF Twisted seam/skewing (Final Random 09/08): first found in later stages, never recorded before

QA Inline DHU is 2.0× QC Inline

QA Inline DHU 50.0% vs QC Inline 25.2%; QC Inline may be missing defects

QA Inline DHU is 5.5× QC Endline

QA Inline DHU 50.0% vs QC Endline 9.1% (08/21–09/02, 7 days, 1986 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (09/08): CB Broken stitch 1 (earlier 7 times), DJ Pleat 1 (earlier 10 times), ED Gathering crease 1 (earlier 10 times)

Found earlier but still reached later stages: 1

EI Inaccurate/skewed stitching 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), ED Gathering crease (1 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), DJ Pleat (3), CB Broken stitch (2), DB Run-off stitching (1), BC Sticker left (1); Both: BA Thread ends (4/1), EC Asymmetry (1/2), DA Exceed seam allowance (1/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 40.0%

Caught in earlier stages

EB Measurement issue (43), CC Skip stitch (42), CE Broken seam (16), DA Exceed seam allowance (10), FA Wrong material (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—40.0%
QC Inline5 reports
required on prod. days 5/14 (36%)
—25.2%
QC Endline7 days—9.1%
QA Inline2 reports250.0%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS209.1%
1986 / 7 days
50.0%PASS
08/21–09/02
BA Thread ends, EB Measurement issue, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS207145 (36%)7208/24, 08/25, 08/26, 08/28, 09/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends41327834
EB Measurement issue403
CC Skip stitch5343
ED Gathering crease19161
DJ Pleat31081
CE Broken seam1141
DA Exceed seam allowance118
CB Broken stitch2421
260948 LOGE · CP02/CP09/CP11… · Due 09/09No final QA Inline DHU is 1.5× QC Inline
No reportPP Sample
No resultPilot Run1 reports
No reportQC 1st Bundle
08/11–09/07QA 1st Bundle3 reports
2/50QC Inlineactual/required · 4%
DHU 12.1%QC Endline19 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,000 / 2,000
PDF reports8
Last report09/09

Cross-stage findings

QA Inline DHU is 1.5× QC Inline

QA Inline DHU 48.4% vs QC Inline 32.0%; QC Inline may be missing defects

QC Endline data errors: 4

08/11 CP12 260948-3 (defective pcs 30 > defects 19), 08/13 CP12 260948-3 (defective pcs 15 > defects 4), 08/14 CP12 260948-3 (defective pcs 15 > defects 5), 08/24 CP12 260948-3 (defective pcs 21 > defects 20)

Caught in earlier stages

BA Thread ends (366), EA Unsmooth/puckering/bubbling (105), CC Skip stitch (94), EC Asymmetry (84), ED Gathering crease (54) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run1 reports0—
QA 1st Bundle3 reports—81.7%
QC Inline2 reports
required on prod. days 2/50 (4%)
—32.0%
QC Endline19 days—12.1%
QA Inline2 reports248.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0218.8%
2000 / 5 days
50.0%—
08/19–08/24
BA Thread ends, EA Unsmooth/puckering/bubbling, EC Asymmetry
CP0914.8%
2000 / 5 days
46.9%—
09/05–09/10
BA Thread ends, CC Skip stitch, ED Gathering crease
CP122.8%
1880 / 13 days
——
08/10–09/01
BA Thread ends, DK Twisted shoulder strap, Others (no detail)
CP110.0%
60 / 1 days
——
08/11–08/11
—
CP130.0%
40 / 1 days
——
08/14–08/14
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1213260 (0%)131308/19, 08/21, 08/22, 08/24, 09/01
CP025100 (0%)5508/19, 08/20, 08/21, 08/22, 08/24
CP095102 (20%)5309/05, 09/07, 09/08, 09/09, 09/10
CP11120 (0%)1108/11
CP13120 (0%)1108/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends9103425
EA Unsmooth/puckering/bubbling7926
CC Skip stitch2902
EC Asymmetry141645
ED Gathering crease54
DB Run-off stitching130
AD Fabric stains1414
EI Inaccurate/skewed stitching716
261479 OSIT · CS25 · Due 09/09Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
08/13QC 1st Bundle1 reports
08/13QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 10.2%QC Endline4 days
No reportQA Inline
All FAILShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports5
Last report09/01

Cross-stage findings

Missed in earlier stages: 2

DH Pressing mark (Shipment Sample 08/17), AB Shading (Pre-final 08/22): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/01): EC Asymmetry 1 (earlier 6 times), ED Gathering crease 2 (earlier 6 times)

Found earlier but still reached later stages: 3

CB Broken stitch 2, EI Inaccurate/skewed stitching 2, BA Thread ends 8 pcs (later stages total)

QC Endline data errors: 1

08/14 CS25 261479 (defective pcs 70 > defects 59)

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major); Both: ED Gathering crease (10/2), EC Asymmetry (6/3), CB Broken stitch (3/1); DHU QC 1st Bundle 95.0% / QA 1st Bundle 40.0%

Caught in earlier stages

EA Uneven seam allowance (35), Q95 HTL position incorrect (15), EA Unsmooth/puckering/bubbling (6), CC Skip stitch (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—95.0%
QA 1st Bundle1 reports—40.0%
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—10.2%
Shipment Sample1 reports1—
Pre-final1 reports05.0%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2510.2%
1001 / 4 days
—PASS
08/13–08/21
EA Uneven seam allowance, BA Thread ends, Q95 HTL position incorrect

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS25480 (0%)4408/13, 08/14, 08/19, 08/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineShipment SamplePre-finalFinal Random
BA Thread ends3253
EA Uneven seam allowance35
EC Asymmetry635121
ED Gathering crease10212
Q95 HTL position incorrect15
CB Broken stitch3111
EA Unsmooth/puckering/bubbling6
CC Skip stitch5
261657 OSIT · CS01 · Due 09/09Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
08/20QC 1st Bundle1 reports
08/20QA 1st Bundle1 reports
1/6QC Inlineactual/required · 17%
DHU 16.3%QC Endline3 days
No reportQA Inline
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty600 / 600
PDF reports6
Last report08/29

Cross-stage findings

Missed in earlier stages: 1

IA 2nd operation issue (Pre-final 08/22): first found in later stages, never recorded before

Found earlier but still reached later stages: 5

DJ Pleat 1, AD Fabric stains 1, EH Poor lamination/bonding 2, CB Broken stitch 4, ED Gathering crease 3 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (2 Major), EC Asymmetry (2 Major), BA Thread ends (1 Major), DD Thread not straight/waving (1 Major), EA Unsmooth/puckering/bubbling (1 Major), AD Fabric stains (1 Major), EH Poor lamination/bonding (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: AC Fabric hole (5); Both: DI High-low/uneven (3/1), DJ Pleat (2/1); DHU QC 1st Bundle 31.2% / QA 1st Bundle 60.0%

Caught in earlier stages

CC Skip stitch (18), AC Fabric hole (5) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—31.2%
QA 1st Bundle1 reports—60.0%
QC Inline1 reports
required on prod. days 1/6 (17%)
—10.0%
QC Endline3 days—16.3%
Pre-final1 reports111.2%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0116.3%
449 / 3 days
—PASS
08/19–08/21
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS01361 (17%)3208/19, 08/20, 08/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlinePre-finalFinal Random
BA Thread ends13663
CC Skip stitch216
ED Gathering crease1121
EC Asymmetry23611
CB Broken stitch322
AC Fabric hole5
EH Poor lamination/bonding122
DJ Pleat211
260890 LOGE · CS17/CS21 · Due 09/10Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/13QC 1st Bundle1 reports
08/13QA 1st Bundle1 reports
17/54QC Inlineactual/required · 31%
DHU 12.1%QC Endline21 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty7,000 / 7,000
PDF reports25
Last report09/08

Cross-stage findings

Missed in earlier stages: 1

GB Missing sewing operation (Shipment Sample 08/24): first found in later stages, never recorded before

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 44.5% vs QC Inline 24.4%; QC Inline may be missing defects

Recurring in small numbers: 5

Latest Final Random (09/08): CB Broken stitch 2 (earlier 21 times), DE Cut to broken 1 (earlier 11 times), DJ Pleat 1 (earlier 11 times), EI Inaccurate/skewed stitching 1 (earlier 8 times), ED Gathering crease 1 (earlier 17 times)

Found earlier but still reached later stages: 4

EC Asymmetry 3, GA Missing bartack/button 1, AD Fabric stains 1, BB Missing cut seam allowance 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA Inline 1, QC Inline 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (2 Major), AH Sharp edge (2 Major), CC Skip stitch (1 Major), AD Fabric stains (1 Major), CE Broken seam (1 Major), GA Missing bartack/button (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: BA Thread ends (5), CG Grinning (4); Both: DB Run-off stitching (2/3), EA Unsmooth/puckering/bubbling (4/1), CB Broken stitch (3/1), EC Asymmetry (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 75.0%

Caught in earlier stages

DB Run-off stitching (149), CC Skip stitch (89), EB Measurement issue (75), EA Unsmooth/puckering/bubbling (70), CG Grinning (21) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—75.0%
QC Inline17 reports
required on prod. days 17/54 (31%)
—24.4%
QC Endline21 days—12.1%
QA Inline4 reports444.5%
Shipment Sample1 reports1—
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1710.7%
5175 / 20 days
49.0%PASS
08/13–09/07
BA Thread ends, DB Run-off stitching, EB Measurement issue
CS2116.2%
1798 / 7 days
31.2%—
08/24–09/05
BA Thread ends, EA Unsmooth/puckering/bubbling, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS17204013 (32%)20709/01, 09/02, 09/03, 09/04, 09/07
CS217144 (29%)7308/26, 08/28, 08/29, 08/31, 09/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends56542646
DB Run-off stitching23361044
CC Skip stitch17765
EB Measurement issue75
ED Gathering crease862111
EA Unsmooth/puckering/bubbling4112449
EC Asymmetry21272273
CB Broken stitch313542
260894 LOGE · CB20 · Due 09/10Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
08/10QC 1st Bundle1 reports
08/08QA 1st Bundle1 reports
18/52QC Inlineactual/required · 35%
DHU 12.2%QC Endline26 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty9,000 / 9,000
PDF reports24
Last report09/05

Cross-stage findings

Missed in earlier stages: 2

DH Pressing mark (Shipment Sample 08/24), AC Fabric hole (Shipment Sample 08/24): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/05): DJ Pleat 2 (earlier 9 times), CE Broken seam 1 (earlier 12 times), CB Broken stitch 2 (earlier 4 times)

Found earlier but still reached later stages: 5

ED Gathering crease 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 2, CG Grinning 1, DE Cut to broken 3 pcs (later stages total)

3 defects recorded as 'Others' without detail

Shipment Sample 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 4); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (2 Major), ED Gathering crease (2 Major), EF Cup/pocket issue (2 Major), DC Join stitching (1 Major), AD Fabric stains (1 Major); Only QC 1st Bundle: EC Asymmetry (2), DD Thread not straight/waving (1); Both: BB Missing cut seam allowance (1/2), EA Unsmooth/puckering/bubbling (2/1), BA Thread ends (1/2); DHU QC 1st Bundle 21.9% / QA 1st Bundle 100.0%

Caught in earlier stages

DB Run-off stitching (327), Q61 Lace raw edge or broken lace (320), EA Uneven seam allowance (205), CC Skip stitch (74), BB Missing cut seam allowance (38) did not reach later stages

Report line differs from production line

QGR2640106 Final Random (09/05) CB14; actual production line(s) CB20 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—21.9%
QA 1st Bundle1 reports—100.0%
QC Inline18 reports
required on prod. days 18/52 (35%)
—40.9%
QC Endline26 days—12.2%
QA Inline2 reports235.9%
Shipment Sample1 reports1—
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2012.2%
8980 / 26 days
35.9%—
08/08–09/09
Q61 Lace raw edge or broken lace, DB Run-off stitching, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB20265218 (35%)26809/03, 09/04, 09/05, 09/07, 09/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
DB Run-off stitching25302
Q61 Lace raw edge or broken lace320
EA Uneven seam allowance205
ED Gathering crease21411
CC Skip stitch74
BA Thread ends12202147
EA Unsmooth/puckering/bubbling2144221
EC Asymmetry24622
261612 RGOR · CB35 · Due 09/11Final Random PASS 1 later-stage PDF report(s) blank
No reportPP Sample
No reportPilot Run
08/07QC 1st Bundle1 reports
08/07QA 1st Bundle1 reports
4/12QC Inlineactual/required · 33%
DHU 16.3%QC Endline6 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,340 / 1,340
PDF reports9
Last report09/12

Cross-stage findings

1 later-stage PDF report(s) blank

Final Random 09/11 QGR2639941 (FAIL); please check if the report was completed

Recurring in small numbers: 1

Latest Final Random (09/12): AD Fabric stains 1 (earlier 8 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA Inline 2; cannot compare across stages

QC Endline data errors: 1

08/08 CB35 261612 (defective pcs 32 > defects 30)

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), EE Raw edge (1 Major), DD Thread not straight/waving (1 Major), DE Cut to broken (1 Major), AD Fabric stains (1 Major), AC Fabric hole (1 Major), CE Broken seam (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: EC Asymmetry (3), EB Measurement issue (1); Both: ED Gathering crease (2/1), DJ Pleat (1/1), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 61.5% / QA 1st Bundle 92.3%

Caught in earlier stages

ED Gathering crease (93), CC Skip stitch (29), EC Asymmetry (24), EA Unsmooth/puckering/bubbling (15), DB Run-off stitching (9) did not reach later stages

Report line differs from production line

QGR2639941 Final Random (09/11) CB04, QGR2640110 Final Random (09/12) CB04; actual production line(s) CB35 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—61.5%
QA 1st Bundle1 reports—92.3%
QC Inline4 reports
required on prod. days 4/12 (33%)
—30.5%
QC Endline6 days—16.3%
QA Inline1 reports118.8%
Final Random2 reports01.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3516.3%
1359 / 6 days
18.8%—
08/07–08/13
ED Gathering crease, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB356124 (33%)6208/08, 08/10, 08/11, 08/12, 08/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease211278
BA Thread ends26426
AD Fabric stains15241
CC Skip stitch29
EC Asymmetry36132
EA Unsmooth/puckering/bubbling1113
DB Run-off stitching18
DJ Pleat116
261613 RGOR · CB17/CB24/CB27 · Due 09/11Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
08/22QA 1st Bundle1 reports
0/14QC Inlineactual/required · 0%
DHU 55.7%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,035 / 1,035
PDF reports4
Last report09/12

Cross-stage findings

Missed in earlier stages: 1

DJ Pleat (Final Random 09/12): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/12): AD Fabric stains 1 (earlier 8 times)

Main QA defects never recorded by QC Endline: 1

CA Thread tension (QA 5); zero in QC Endline records

Caught in earlier stages

ED Gathering crease (170), CC Skip stitch (17), EC Asymmetry (14), AC Fabric hole (12), CE Broken seam (7) did not reach later stages

Report line differs from production line

QGR2640123 Final Random (09/12) CB03; actual production line(s) CB17/CB24/CB27 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA 1st Bundle1 reports—80.0%
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—55.7%
QA Inline1 reports165.6%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2456.5%
981 / 5 days
——
08/22–08/28
AD Fabric stains, ED Gathering crease, BA Thread ends
CB170.0%
13 / 2 days
——
09/07–09/09
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB245100 (0%)5508/22, 08/24, 08/25, 08/26, 08/28
CB17240 (0%)2209/07, 09/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQA 1st BundleQC EndlineQA InlineFinal Random
AD Fabric stains1323121
ED Gathering crease111662
BA Thread ends211125
CC Skip stitch116
EC Asymmetry131
AC Fabric hole1101
CE Broken seam16
EA Unsmooth/puckering/bubbling231
261615 RGOR · CP15 · Due 09/11Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/26QA 1st Bundle1 reports
0/10QC Inlineactual/required · 0%
DHU 14.7%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,560 / 1,560
PDF reports3
Last report09/07

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 09/02): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/07): ED Gathering crease 2 (earlier 5 times), AD Fabric stains 2 (earlier 5 times)

QC Endline data errors: 2

08/26 CP15 261615 (defective pcs 136 > defects 85), 08/28 CP15 261615 (defective pcs 303 > defects 273)

Caught in earlier stages

EB Measurement issue (42), CC Skip stitch (34), EA Unsmooth/puckering/bubbling (30), EA Uneven seam allowance (11), EC Asymmetry (6) did not reach later stages

Report line differs from production line

QGR2637910 Final Random (09/02) CP07, QGR2638589 Final Random (09/07) CP07; actual production line(s) CP15 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—85.0%
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—14.7%
Final Random2 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1514.7%
2647 / 5 days
——
08/26–09/01
ED Gathering crease, BA Thread ends, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP155100 (0%)5508/26, 08/28, 08/29, 08/31, 09/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineFinal Random
ED Gathering crease31273
BA Thread ends28411
AD Fabric stains1452
EB Measurement issue42
CC Skip stitch34
EA Unsmooth/puckering/bubbling327
EA Uneven seam allowance11
EC Asymmetry24
261616 RGOR · CP15 · Due 09/11Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/31QA 1st Bundle1 reports
0/4QC Inlineactual/required · 0%
DHU 12.3%QC Endline2 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,300 / 1,300
PDF reports3
Last report09/12

Cross-stage findings

Missed in earlier stages: 1

DJ Pleat (Final Random 09/12): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/12): AD Fabric stains 1 (earlier 3 times)

Found earlier but still reached later stages: 1

CB Broken stitch 3 pcs (later stages total)

QC Endline data errors: 1

08/31 CP15 261616 (defective pcs 355 > defects 205)

Caught in earlier stages

EA Unsmooth/puckering/bubbling (49), ED Gathering crease (46), CC Skip stitch (27), AB Shading (18), EC Asymmetry (17) did not reach later stages

Report line differs from production line

QGR2640148 Final Random (09/12) CP02, QGR2640171 Final Random (09/12) CP02; actual production line(s) CP15 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—55.0%
QC Inline0 reports
required on prod. days 0/4 (0%)
——
QC Endline2 days—12.3%
Final Random2 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1512.3%
2488 / 2 days
——
08/29–08/31
BA Thread ends, EA Unsmooth/puckering/bubbling, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP15240 (0%)2208/29, 08/31

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineFinal Random
BA Thread ends310411
EA Unsmooth/puckering/bubbling148
ED Gathering crease46
AD Fabric stains1341
CC Skip stitch27
AB Shading18
EC Asymmetry17
CB Broken stitch23
261617 RGOR · CP15 · Due 09/11Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/01QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 17.9%QC Endline4 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,070 / 1,070
PDF reports2
Last report09/12

Cross-stage findings

Missed in earlier stages: 1

EE Raw edge (Final Random 09/12): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/12): AD Fabric stains 1 (earlier 4 times)

Found earlier but still reached later stages: 2

BB Missing cut seam allowance 1, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

QC Endline data errors: 1

08/31 CP15 261617 (defective pcs 33 > defects 31)

Caught in earlier stages

ED Gathering crease (20) did not reach later stages

Report line differs from production line

QGR2640197 Final Random (09/12) CP04; actual production line(s) CP15 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—60.0%
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—17.9%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1517.9%
1103 / 4 days
——
08/31–09/03
AD Fabric stains, BA Thread ends, EA Unsmooth/puckering/bubbling

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP15480 (0%)4408/31, 09/01, 09/02, 09/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineFinal Random
BA Thread ends3604
AD Fabric stains3611
EA Unsmooth/puckering/bubbling531
ED Gathering crease20
BB Missing cut seam allowance11
DA Exceed seam allowance2
EB Measurement issue2
DE Cut to broken1
261655 CIWH · CS08 · Due 09/14Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
08/17QC 1st Bundle1 reports
08/17QA 1st Bundle1 reports
3/12QC Inlineactual/required · 25%
DHU 11.8%QC Endline6 days
All FAILQA Inline2 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,750 / 2,750
PDF reports9
Last report08/28

Cross-stage findings

Missed in earlier stages: 3

BD Snagging (Pre-final 08/18), EC Asymmetry (Pre-final 08/18), CB Broken stitch (Pre-final 08/18): first found in later stages, never recorded before

QA Inline DHU is 2.3× QC Inline

QA Inline DHU 32.8% vs QC Inline 14.3%; QC Inline may be missing defects

Pre-final DHU is 1.2× QC Endline

Pre-final DHU 13.8% vs QC Endline 11.8% (08/17–08/26, 6 days, 2708 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (08/28): ED Gathering crease 1 (earlier 6 times), EA Unsmooth/puckering/bubbling 2 (earlier 5 times), AD Fabric stains 2 (earlier 8 times)

Found earlier but still reached later stages: 1

BA Thread ends 5 pcs (later stages total)

6 defects recorded as 'Others' without detail

QC 1st Bundle 5, Pre-final 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EA Unsmooth/puckering/bubbling (QA 9), ED Gathering crease (QA 7); zero in QC Endline records

QC Endline data errors: 3

08/17 CS08 261655 (defective pcs 63 > defects 61), 08/18 CS08 261655 (defective pcs 93 > defects 47), 08/19 CS08 261655 (defective pcs 86 > defects 63)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (4 Major), DI High-low/uneven (1 Major), DD Thread not straight/waving (1 Major), BA Thread ends (1 Major); Both: ED Gathering crease (5/3), BB Missing cut seam allowance (4/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 55.0%

Caught in earlier stages

CC Skip stitch (102), CE Broken seam (42), DF Twisted seam/skewing (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—55.0%
QC Inline3 reports
required on prod. days 3/12 (25%)
—14.3%
QC Endline6 days—11.8%
QA Inline2 reports232.8%
Pre-final1 reports113.8%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0811.8%
2708 / 6 days
32.8%PASS
08/17–08/26
AD Fabric stains, CC Skip stitch, CE Broken seam

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS086123 (25%)6308/18, 08/19, 08/20, 08/21, 08/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
AD Fabric stains1115422
CC Skip stitch1011
CE Broken seam42
BA Thread ends11915
ED Gathering crease53661
EA Unsmooth/puckering/bubbling43252
BB Missing cut seam allowance41211
CB Broken stitch5211
253703 MKSC · CB03/CB04/CB07… · Due 09/16Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No resultPilot Run2 reports
08/04QC 1st Bundle1 reports
08/04QA 1st Bundle1 reports
12/50QC Inlineactual/required · 24%
DHU 8.2%QC Endline21 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty2,250 / 750
PDF reports23
Last report09/15

Cross-stage findings

Missed in earlier stages: 2

DE Cut to broken (Final Random 08/11), AD Fabric stains (Final Random 09/02): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/15): CB Broken stitch 1 (earlier 27 times), DB Run-off stitching 1 (earlier 5 times)

Found earlier but still reached later stages: 2

ED Gathering crease 1, DJ Pleat 1 pcs (later stages total)

6 defects recorded as 'Others' without detail

Pilot Run 1, QA 1st Bundle 3, QA Inline 1, Final Random 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (1 Major), EA Unsmooth/puckering/bubbling (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: CC Skip stitch (3); Both: EC Asymmetry (6/4), CB Broken stitch (7/2); DHU QC 1st Bundle 123.1% / QA 1st Bundle 92.3%

Caught in earlier stages

EC Asymmetry (72), CC Skip stitch (71), EB Measurement issue (57), CE Broken seam (36), BB Missing cut seam allowance (15) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—123.1%
QA 1st Bundle1 reports—92.3%
QC Inline12 reports
required on prod. days 12/50 (24%)
—63.2%
QC Endline21 days—8.2%
QA Inline3 reports322.9%
Final Random4 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB038.6%
3277 / 14 days
23.4%PASS
08/05–08/20
BA Thread ends, EB Measurement issue, CC Skip stitch
CB047.1%
742 / 8 days
21.9%PASS
08/15–09/15
BA Thread ends, AC Fabric hole, EB Measurement issue
CB300.0%
20 / 2 days
——
08/12–08/13
—
CB290.0%
10 / 1 days
——
08/12–08/12
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB03142811 (39%)14308/15, 08/17, 08/18, 08/19, 08/20
CB048161 (6%)8709/09, 09/10, 09/11, 09/14, 09/15
CB30240 (0%)2208/12, 08/13
CB29120 (0%)1108/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends31799
CB Broken stitch1727632
EC Asymmetry9644238
CC Skip stitch31850
EB Measurement issue1542
CE Broken seam135
ED Gathering crease42421
Others (no detail)13911
253704 MKSC · CB05/CB13 · Due 09/16Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No resultPilot Run2 reports
07/22QC 1st Bundle1 reports
07/23QA 1st Bundle1 reports
11/34QC Inlineactual/required · 32%
DHU 14.3%QC Endline17 days
All FAILQA Inline3 reports
No resultShipment Sample2 reports
All FAILPre-final1 reports
1/5 FAILFinal Random5 reports
Order/Ship qty4,700 / 1,000
PDF reports30
Last report09/11

Cross-stage findings

Missed in earlier stages: 1

DJ Pleat (Final Random 08/10): first found in later stages, never recorded before

Pre-final DHU is 1.3× QC Endline

Pre-final DHU 18.8% vs QC Endline 14.3% (07/23–08/25, 17 days, 4079 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (09/11): CG Grinning 2 (earlier 15 times)

Found earlier but still reached later stages: 9

EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 4, EC Asymmetry 3, FC Wrong label 1, CE Broken seam 1, DB Run-off stitching 1, CB Broken stitch 2, DE Cut to broken 1, BB Missing cut seam allowance 1 pcs (later stages total)

27 defects recorded as 'Others' without detail

PP Sample 3, QA 1st Bundle 3, QC Inline 7, QA Inline 7, Final Random 7; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 8); zero in QC Endline records

QC Endline data errors: 7

07/27 CB13 253704A-L (defective pcs 20 > defects 17), 07/29 CB13 253704A-S (defective pcs 40 > defects 39), 07/29 CB13 253704A-L (defective pcs 20 > defects 16), 07/30 CB13 253704A-S (defective pcs 20 > defects 16)…

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (1 Major), ED Gathering crease (1 Major), EB Measurement issue (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: CG Grinning (1), CC Skip stitch (1), DI High-low/uneven (1); Both: EC Asymmetry (8/3), EA Unsmooth/puckering/bubbling (1/2); DHU QC 1st Bundle 92.3% / QA 1st Bundle 92.3%

Caught in earlier stages

CC Skip stitch (108), AA Fabric defect (92), ED Gathering crease (67), EB Measurement issue (52), DD Thread not straight/waving (12) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run2 reports0—
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—92.3%
QC Inline14 reports
required on prod. days 11/34 (32%)
—42.4%
QC Endline17 days—14.3%
QA Inline3 reports324.0%
Shipment Sample2 reports0—
Pre-final1 reports118.8%
Final Random5 reports14.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1314.3%
4079 / 17 days
24.0%PASS
07/23–08/25
BA Thread ends, CC Skip stitch, AA Fabric defect

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB13173411 (32%)17608/20, 08/21, 08/22, 08/24, 08/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
EC Asymmetry3831205723
BA Thread ends1101531155
CC Skip stitch12105
AA Fabric defect92
CE Broken seam156011
ED Gathering crease11353
EB Measurement issue112381
CG Grinning1136114
253705 MKSC · CP05/CP06/CP12 · Due 09/16Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run3 reports
No reportQC 1st Bundle
07/30QA 1st Bundle1 reports
3/24QC Inlineactual/required · 12%
DHU 8.1%QC Endline12 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random5 reports
Order/Ship qty3,500 / 1,000
PDF reports15
Last report08/28

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 08/07): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/28): BB Missing cut seam allowance 2 (earlier 7 times), BA Thread ends 1 (earlier 13 times)

Found earlier but still reached later stages: 5

CE Broken seam 2, EA Unsmooth/puckering/bubbling 3, EC Asymmetry 2, CD Needle hole 1, CC Skip stitch 2 pcs (later stages total)

13 defects recorded as 'Others' without detail

Pilot Run 1, QA 1st Bundle 8, QA Inline 1, Final Random 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

CE Broken seam (QA 4); zero in QC Endline records

QC Endline data errors: 9

07/30 CP06 253705A (defective pcs 40 > defects 18), 08/01 CP06 253705A (defective pcs 49 > defects 26), 08/03 CP06 253705A (defective pcs 49 > defects 24), 08/10 CP06 253705B (defective pcs 6 > defects 1)…

Duplicate report numbers

QGR2635256 have multiple reports with different content

Caught in earlier stages

ED Gathering crease (62), CG Grinning (34), EB Measurement issue (11), DB Run-off stitching (9) did not reach later stages

Report line differs from production line

QGR2632528 Final Random (08/07) CP02; actual production line(s) CP05/CP06/CP12 (cards show production lines only)

Stage summary

StageCountFAILDHU
Pilot Run3 reports0—
QA 1st Bundle1 reports—100.0%
QC Inline3 reports
required on prod. days 3/24 (12%)
—27.1%
QC Endline12 days—8.1%
QA Inline3 reports322.9%
Final Random5 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP068.1%
3500 / 12 days
21.9%PASS
07/30–08/26
BA Thread ends, ED Gathering crease, EA Unsmooth/puckering/bubbling

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0612243 (12%)12908/12, 08/13, 08/15, 08/19, 08/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends187147
EA Unsmooth/puckering/bubbling425813
ED Gathering crease161
EC Asymmetry35012
CG Grinning133
CC Skip stitch2512
Others (no detail)18713
BB Missing cut seam allowance1363
253706 MKSC · CP02/CP07 · Due 09/16Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No resultPilot Run4 reports
No reportQC 1st Bundle
07/28QA 1st Bundle1 reports
0/20QC Inlineactual/required · 0%
DHU 15.9%QC Endline9 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
1/5 FAILFinal Random5 reports
Order/Ship qty2,799 / 500
PDF reports12
Last report09/11

Cross-stage findings

Missed in earlier stages: 2

DE Cut to broken (Final Random 09/10), BC Sticker left (Final Random 09/10): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/11): ED Gathering crease 1 (earlier 15 times), CE Broken seam 1 (earlier 7 times)

Found earlier but still reached later stages: 7

EA Unsmooth/puckering/bubbling 1, DJ Pleat 4, EC Asymmetry 1, CB Broken stitch 4, BA Thread ends 9, AD Fabric stains 2, CC Skip stitch 1 pcs (later stages total)

22 defects recorded as 'Others' without detail

QA 1st Bundle 10, Pilot Run 2, QA Inline 8, Final Random 2; cannot compare across stages

QC Endline data errors: 1

07/28 CP02 253706A (defective pcs 70 > defects 13)

Caught in earlier stages

DB Run-off stitching (96), DF Twisted seam/skewing (11), EA Uneven seam allowance (9), GB Missing sewing operation (9), EB Measurement issue (7) did not reach later stages

Report line differs from production line

QGR2634480 Final Random (08/17) CP04; actual production line(s) CP02/CP07 (cards show production lines only)

Stage summary

StageCountFAILDHU
Pilot Run4 reports0—
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/20 (0%)
——
QC Endline9 days—15.9%
QA Inline2 reports254.7%
Final Random5 reports16.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0215.3%
2659 / 9 days
54.7%PASS
07/28–08/13
BA Thread ends, CC Skip stitch, DB Run-off stitching
CP0726.4%
140 / 1 days
——
07/29–07/29
DB Run-off stitching, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP029180 (0%)9908/01, 08/06, 08/07, 08/08, 08/13
CP07120 (0%)1107/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends11639
CC Skip stitch10911
DB Run-off stitching195
ED Gathering crease253923
Others (no detail)2102282
EA Unsmooth/puckering/bubbling113111
EC Asymmetry71011
DF Twisted seam/skewing191
253707 MKSC · CB04/CB30 · Due 09/16Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
08/04QC 1st Bundle1 reports
08/04QA 1st Bundle1 reports
12/38QC Inlineactual/required · 32%
DHU 15.5%QC Endline17 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty1,550 / 550
PDF reports24
Last report09/14

Cross-stage findings

Missed in earlier stages: 1

AC Fabric hole (Final Random 08/10): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/14): BB Missing cut seam allowance 1 (earlier 4 times), BA Thread ends 2 (earlier 29 times)

Found earlier but still reached later stages: 3

CB Broken stitch 1, DJ Pleat 1, CC Skip stitch 2 pcs (later stages total)

6 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 5; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (3 Major), EC Asymmetry (2 Major), DC Join stitching (1 Major), CE Broken seam (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: BB Missing cut seam allowance (3), DJ Pleat (3); Both: EA Unsmooth/puckering/bubbling (4/1), CB Broken stitch (4/1), AD Fabric stains (3/1); DHU QC 1st Bundle 130.8% / QA 1st Bundle 92.3%

Caught in earlier stages

EB Measurement issue (100), EA Unsmooth/puckering/bubbling (63), DB Run-off stitching (54), CG Grinning (34), CE Broken seam (5) did not reach later stages

Found before bulk production (Shipment Sample): 4

AD Fabric stains, EC Asymmetry, DI High-low/uneven, EI Inaccurate/skewed stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—130.8%
QA 1st Bundle1 reports—92.3%
QC Inline12 reports
required on prod. days 12/38 (32%)
—56.5%
QC Endline17 days—15.5%
QA Inline4 reports427.3%
Shipment Sample1 reports1—
Final Random4 reports04.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0415.6%
4049 / 17 days
27.3%PASS
08/04–09/15
BA Thread ends, EB Measurement issue, EC Asymmetry
CB300.0%
30 / 2 days
——
08/11–08/12
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB04173412 (35%)17509/04, 09/05, 09/07, 09/08, 09/15
CB30240 (0%)2208/11, 08/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends1135857
EC Asymmetry23956611
EB Measurement issue982
AD Fabric stains1312430112
EA Unsmooth/puckering/bubbling14114403
CB Broken stitch415111
DB Run-off stitching846
CG Grinning1285
253708 MKSC · CB08/CB13/CB30 · Due 09/16Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run2 reports
08/03QC 1st Bundle1 reports
08/03QA 1st Bundle1 reports
8/36QC Inlineactual/required · 22%
DHU 14.7%QC Endline18 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty2,250 / 1,000
PDF reports19
Last report09/12

Cross-stage findings

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 08/11): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/12): DJ Pleat 1 (earlier 5 times), BA Thread ends 1 (earlier 18 times), ED Gathering crease 1 (earlier 3 times)

Found earlier but still reached later stages: 3

EC Asymmetry 1, CB Broken stitch 1, DF Twisted seam/skewing 1 pcs (later stages total)

11 defects recorded as 'Others' without detail

Pilot Run 1, QA Inline 4, QC Inline 3, Final Random 3; cannot compare across stages

QC Endline data errors: 3

08/04 CB13 253708A-L (defective pcs 10 > defects 7), 08/06 CB13 253708A-S (defective pcs 32 > defects 28), 08/12 CB13 253708A-L (defective pcs 10 > defects 8)

Caught in earlier stages

EB Measurement issue (145), AA Fabric defect (121), CC Skip stitch (115), CE Broken seam (45), EA Unsmooth/puckering/bubbling (29) did not reach later stages

QC 1st Bundle vs QA 1st Bundle

Only QC 1st Bundle: DB Run-off stitching (2), CG Grinning (1), CE Broken seam (1), CB Broken stitch (1); Both: EA Unsmooth/puckering/bubbling (1/9), EC Asymmetry (5/3); DHU QC 1st Bundle 84.6% / QA 1st Bundle 92.3%

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—84.6%
QA 1st Bundle1 reports—92.3%
QC Inline9 reports
required on prod. days 8/36 (22%)
—39.6%
QC Endline18 days—14.7%
QA Inline2 reports223.4%
Final Random4 reports03.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1314.7%
4575 / 17 days
23.4%PASS
08/03–08/25
BA Thread ends, EB Measurement issue, AA Fabric defect
CB300.0%
10 / 1 days
——
09/10–09/10
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1317348 (24%)161008/18, 08/19, 08/20, 08/21, 08/25
CB30120 (0%)1109/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends315117
EC Asymmetry553766051
EB Measurement issue145
AA Fabric defect121
CC Skip stitch115
CE Broken seam112815
ED Gathering crease321
EA Unsmooth/puckering/bubbling419132
253709 MKSC · CP04/CP06 · Due 09/16Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run2 reports
No reportQC 1st Bundle
08/03QA 1st Bundle1 reports
3/16QC Inlineactual/required · 19%
DHU 5.6%QC Endline8 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty3,757 / 1,000
PDF reports11
Last report09/10

Cross-stage findings

Missed in earlier stages: 1

CE Broken seam (Final Random 08/07): first found in later stages, never recorded before

QA Inline DHU is 6.7× QC Endline

QA Inline DHU 37.5% vs QC Endline 5.6% (08/03–08/11, 8 days, 3723 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (09/10): CB Broken stitch 1 (earlier 3 times), BA Thread ends 1 (earlier 18 times), DJ Pleat 1 (earlier 6 times)

Found earlier but still reached later stages: 3

AD Fabric stains 2, DB Run-off stitching 1, BB Missing cut seam allowance 1 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 3; cannot compare across stages

QC Endline data errors: 14

08/03 CP06 253709A (defective pcs 26 > defects 10), 08/04 CP06 253709A (defective pcs 109 > defects 41), 08/05 CP06 253709A (defective pcs 80 > defects 34), 08/05 CP06 253709B (defective pcs 6 > defects 2)…

Caught in earlier stages

ED Gathering crease (50), EC Asymmetry (28), CC Skip stitch (28), EA Unsmooth/puckering/bubbling (19), DI High-low/uneven (6) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QA 1st Bundle1 reports—85.0%
QC Inline3 reports
required on prod. days 3/16 (19%)
—26.7%
QC Endline8 days—5.6%
QA Inline1 reports137.5%
Final Random4 reports03.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP065.6%
3723 / 8 days
37.5%PASS
08/03–08/11
BA Thread ends, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP068163 (19%)8508/06, 08/07, 08/08, 08/10, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends2186014
ED Gathering crease347
AD Fabric stains11123122
EC Asymmetry3223
CC Skip stitch28
EA Unsmooth/puckering/bubbling133111
DJ Pleat173
DB Run-off stitching1351
261134 MKSC · CB06/CB08/CB30 · Due 09/16Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/25QC 1st Bundle1 reports
08/25QA 1st Bundle1 reports
10/30QC Inlineactual/required · 33%
DHU 10.2%QC Endline14 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,089 / 3,089
PDF reports16
Last report09/16

Cross-stage findings

Missed in earlier stages: 1

CF Pulling yarn (Final Random 09/16): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/16): EA Unsmooth/puckering/bubbling 1 (earlier 8 times), BA Thread ends 1 (earlier 19 times), CB Broken stitch 1 (earlier 4 times)

10 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 6, QC Inline 2, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major); Only QC 1st Bundle: CG Grinning (2), CE Broken seam (2); Both: EA Unsmooth/puckering/bubbling (4/4), EC Asymmetry (4/1); DHU QC 1st Bundle 92.3% / QA 1st Bundle 61.5%

Caught in earlier stages

EC Asymmetry (115), ED Gathering crease (81), CE Broken seam (33), Q61 Lace raw edge or broken lace (32), DJ Pleat (26) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—61.5%
QC Inline10 reports
required on prod. days 10/30 (33%)
—44.1%
QC Endline14 days—10.2%
QA Inline3 reports331.2%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0810.3%
2963 / 13 days
31.2%PASS
08/25–09/10
ED Gathering crease, BA Thread ends, EC Asymmetry
CB060.0%
20 / 1 days
——
08/29–08/29
—
CB300.0%
7 / 1 days
——
09/11–09/11
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB08132610 (38%)13309/04, 09/05, 09/07, 09/08, 09/10
CB06120 (0%)1108/29
CB30120 (0%)1109/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
EC Asymmetry4141627
ED Gathering crease25668
BA Thread ends2641
CE Broken seam2229
Q61 Lace raw edge or broken lace32
DJ Pleat26
DB Run-off stitching251
EB Measurement issue25
261138 LOGE · CS22 · Due 09/16Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/24QA 1st Bundle1 reports
3/28QC Inlineactual/required · 11%
DHU 8.5%QC Endline14 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,390 / 2,390
PDF reports5
Last report08/21

Cross-stage findings

Missed in earlier stages: 1

CE Broken seam (Final Random 08/21): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

CB Broken stitch 4, AD Fabric stains 2 pcs (later stages total)

QC Endline data errors: 1

07/23 CS22 261138 (defective pcs 4 > defects 3)

Caught in earlier stages

CC Skip stitch (55), DB Run-off stitching (51), EC Asymmetry (9), ED Gathering crease (9), GB Missing sewing operation (5) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—76.9%
QC Inline3 reports
required on prod. days 3/28 (11%)
—57.3%
QC Endline14 days—8.5%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS228.5%
2390 / 14 days
—PASS
07/23–08/14
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2214283 (11%)141108/04, 08/06, 08/10, 08/11, 08/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineFinal Random
BA Thread ends219925
CC Skip stitch2350
DB Run-off stitching31335
CB Broken stitch74
AD Fabric stains92
EC Asymmetry36
ED Gathering crease36
GB Missing sewing operation5
261149 LOGE · CS25 · Due 09/16Final Random PASS QA Inline DHU is 6.9× QC Endline
No reportPP Sample
No reportPilot Run
08/24QC 1st Bundle1 reports
08/24QA 1st Bundle1 reports
8/24QC Inlineactual/required · 33%
DHU 4.4%QC Endline12 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty8,000 / 8,000
PDF reports14
Last report09/09

Cross-stage findings

QA Inline DHU is 6.9× QC Endline

QA Inline DHU 30.2% vs QC Endline 4.4% (08/24–09/12, 12 days, 8000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 1

AC Fabric hole 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Final Random 1; cannot compare across stages

QC Endline data errors: 11

08/24 CS25 261149 (defective pcs 102 > defects 65), 08/25 CS25 261149 (defective pcs 93 > defects 30), 08/26 CS25 261149 (defective pcs 162 > defects 63), 08/28 CS25 261149 (defective pcs 163 > defects 44)…

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (5 Major), BA Thread ends (1 Major), DA Exceed seam allowance (1 Major), CA Thread tension (1 Major), DJ Pleat (1 Major), CG Grinning (1 Major); Both: AD Fabric stains (5/4), ED Gathering crease (5/1), EC Asymmetry (3/1); DHU QC 1st Bundle 65.0% / QA 1st Bundle 80.0%

Caught in earlier stages

AD Fabric stains (89), CC Skip stitch (86), ED Gathering crease (77), EC Asymmetry (55), EA Unsmooth/puckering/bubbling (33) did not reach later stages

Report line differs from production line

QGR2639518 Final Random (09/09) CS02; actual production line(s) CS25 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—65.0%
QA 1st Bundle1 reports—80.0%
QC Inline8 reports
required on prod. days 8/24 (33%)
—37.5%
QC Endline12 days—4.4%
QA Inline3 reports330.2%
Final Random1 reports00.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS254.4%
8000 / 12 days
30.2%—
08/24–09/12
BA Thread ends, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2512248 (33%)12409/02, 09/03, 09/04, 09/05, 09/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends1513221
AD Fabric stains549692
CC Skip stitch44411
ED Gathering crease5134316
EC Asymmetry3126232
EA Unsmooth/puckering/bubbling2211
CB Broken stitch271
DB Run-off stitching10101
261165 LOGE · CP01/CP02/CP03… · Due 09/16No final QA Inline DHU is 1.7× QC Inline
No reportPP Sample
No reportPilot Run
09/03–09/08QC 1st Bundle2 reports
07/29–09/08QA 1st Bundle3 reports
1/78QC Inlineactual/required · 1%
DHU 8.3%QC Endline23 days
3/4 FAILQA Inline4 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,503 / 2,503
PDF reports10
Last report09/10

Cross-stage findings

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 41.4% vs QC Inline 23.8%; QC Inline may be missing defects

QC Endline data errors: 8

07/30 CP01 261165-3 (defective pcs 15 > defects 5), 07/30 CP03 261165-3 (defective pcs 15 > defects 4), 07/30 CP15 261165-3 (defective pcs 7 > defects 3), 07/31 CP01 261165-3 (defective pcs 17 > defects 5)…

Duplicate report numbers

QGR2638460 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (6 Major), BB Missing cut seam allowance (3 Major), EI Inaccurate/skewed stitching (2 Major), AD Fabric stains (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: DL Wrong trim position (5), DE Cut to broken (4), DB Run-off stitching (3), CB Broken stitch (3); Both: BA Thread ends (13/8), DA Exceed seam allowance (4/4), EC Asymmetry (2/6), DF Twisted seam/skewing (2/4), DJ Pleat (2/1), BD Snagging (1/1), CE Broken seam (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 63.3%

Caught in earlier stages

BA Thread ends (353), CC Skip stitch (137), ED Gathering crease (86), EA Uneven seam allowance (59), EC Asymmetry (25) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—100.0%
QA 1st Bundle3 reports—63.3%
QC Inline1 reports
required on prod. days 1/78 (1%)
—23.8%
QC Endline23 days—8.3%
QA Inline4 reports341.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1011.0%
5006 / 8 days
49.0%—
09/03–09/11
BA Thread ends, CC Skip stitch, ED Gathering crease
CP017.3%
783 / 9 days
18.8%—
07/30–09/02
BA Thread ends, DK Twisted shoulder strap
CP062.2%
500 / 6 days
——
08/01–09/12
BA Thread ends, ED Gathering crease
CP020.0%
380 / 6 days
——
07/30–08/12
—
CP031.2%
340 / 5 days
——
07/30–08/10
BA Thread ends
CP151.4%
220 / 2 days
——
07/30–08/01
BA Thread ends, EC Asymmetry
CP070.0%
120 / 1 days
——
07/29–07/29
—
CP120.0%
100 / 1 days
——
08/04–08/04
—
CP170.0%
60 / 1 days
——
07/31–07/31
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP019180 (0%)9908/10, 08/11, 08/12, 08/14, 09/02
CP108161 (6%)8709/07, 09/08, 09/09, 09/10, 09/11
CP026120 (0%)6608/01, 08/04, 08/06, 08/11, 08/12
CP066120 (0%)6608/03, 08/04, 08/07, 08/10, 09/12
CP035100 (0%)5507/30, 08/04, 08/06, 08/08, 08/10
CP15240 (0%)2207/30, 08/01
CP07120 (0%)1107/29
CP12120 (0%)1108/04
CP17120 (0%)1107/31

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends13863197
CC Skip stitch1361
ED Gathering crease86
EA Uneven seam allowance59
EC Asymmetry263113
EA Unsmooth/puckering/bubbling6510
EB Measurement issue19
DA Exceed seam allowance444
261190 LOGE · CP04/CP05/CP11… · Due 09/16Final Random PASS QA Inline DHU is 1.6× QC Inline
No reportPP Sample
No reportPilot Run
08/19–08/25QC 1st Bundle2 reports
08/19–09/05QA 1st Bundle3 reports
1/68QC Inlineactual/required · 1%
DHU 7.4%QC Endline19 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,206 / 2,206
PDF reports9
Last report09/05

Cross-stage findings

QA Inline DHU is 1.6× QC Inline

QA Inline DHU 43.8% vs QC Inline 27.5%; QC Inline may be missing defects

QA Inline DHU is 5.9× QC Endline

QA Inline DHU 43.8% vs QC Endline 7.4% (08/01–08/31, 19 days, 6578 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/28): CB Broken stitch 2 (earlier 5 times), EA Unsmooth/puckering/bubbling 1 (earlier 6 times)

1 defects recorded as 'Others' without detail

Final Random 1; cannot compare across stages

QC Endline data errors: 9

08/06 CP12 261190-3 (defective pcs 11 > defects 5), 08/07 CP12 261190-3 (defective pcs 10 > defects 9), 08/10 CP12 261190-3 (defective pcs 15 > defects 5), 08/20 CP12 261190-1 (defective pcs 95 > defects 90)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (7 Major), GA Missing bartack/button (3 Major), ED Gathering crease (2 Major), BD Snagging (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: CB Broken stitch (4), CG Grinning (3), DD Thread not straight/waving (2), DB Run-off stitching (2), DA Exceed seam allowance (1), DE Cut to broken (1), DI High-low/uneven (1); Both: BA Thread ends (12/8), CE Broken seam (1/10), DJ Pleat (4/2), DF Twisted seam/skewing (5/1), EI Inaccurate/skewed stitching (2/3), EC Asymmetry (2/3); DHU QC 1st Bundle 100.0% / QA 1st Bundle 68.3%

Caught in earlier stages

CC Skip stitch (90), EB Measurement issue (63), DF Twisted seam/skewing (61), AD Fabric stains (35), CE Broken seam (23) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—100.0%
QA 1st Bundle3 reports—68.3%
QC Inline1 reports
required on prod. days 1/68 (1%)
—27.5%
QC Endline19 days—7.4%
QA Inline2 reports243.8%
Final Random1 reports02.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP129.6%
5092 / 15 days
43.8%PASS
08/05–08/31
BA Thread ends, CC Skip stitch, EB Measurement issue
CP050.0%
840 / 8 days
——
08/03–08/14
—
CP040.0%
400 / 5 days
——
08/05–08/10
—
CP200.0%
120 / 2 days
——
08/03–08/04
—
CP110.0%
106 / 3 days
——
08/01–08/06
—
CP140.0%
20 / 1 days
——
08/07–08/07
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1215301 (3%)151408/25, 08/26, 08/28, 08/29, 08/31
CP058160 (0%)8808/06, 08/07, 08/08, 08/10, 08/14
CP045100 (0%)5508/05, 08/06, 08/07, 08/08, 08/10
CP11360 (0%)3308/01, 08/05, 08/06
CP20240 (0%)2208/03, 08/04
CP14120 (0%)1108/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends128716098
CC Skip stitch90
EB Measurement issue63
DF Twisted seam/skewing51253
Others (no detail)581
AD Fabric stains233
CE Broken seam110237
EC Asymmetry23291
261284 OSIT · CS06 · Due 09/16Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/10QC 1st Bundle1 reports
08/10QA 1st Bundle1 reports
0/4QC Inlineactual/required · 0%
DHU 6.0%QC Endline2 days
No reportQA Inline
All FAILShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports5
Last report09/08

Cross-stage findings

Missed in earlier stages: 1

IA 2nd operation issue (Pre-final 08/12): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/08): ED Gathering crease 2 (earlier 5 times)

Found earlier but still reached later stages: 5

EC Asymmetry 1, DJ Pleat 1, CB Broken stitch 5, CC Skip stitch 1, DF Twisted seam/skewing 1 pcs (later stages total)

QC Endline data errors: 1

08/10 CS06 261284 (defective pcs 67 > defects 57)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (2 Major), BA Thread ends (2 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3); Both: ED Gathering crease (5/2), EC Asymmetry (3/1), DJ Pleat (1/2); DHU QC 1st Bundle 60.0% / QA 1st Bundle 50.0%

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—60.0%
QA 1st Bundle1 reports—50.0%
QC Inline0 reports
required on prod. days 0/4 (0%)
——
QC Endline2 days—6.0%
Shipment Sample1 reports1—
Pre-final1 reports05.0%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS066.0%
1013 / 2 days
—PASS
08/10–08/11
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS06240 (0%)2208/10, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineShipment SamplePre-finalFinal Random
BA Thread ends23144
ED Gathering crease52112
CC Skip stitch121
CB Broken stitch2311
EC Asymmetry311
EA Unsmooth/puckering/bubbling31
DJ Pleat121
DF Twisted seam/skewing11
261637 OSIT · CS25 · Due 09/16Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/11QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 6.6%QC Endline6 days
All FAILQA Inline1 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,650 / 2,650
PDF reports5
Last report08/19

Cross-stage findings

Missed in earlier stages: 3

EH Poor lamination/bonding (Pre-final 08/14), IA 2nd operation issue (Pre-final 08/14), DE Cut to broken (Final Random 08/19): first found in later stages, never recorded before

Pre-final DHU is 1.7× QC Endline

Pre-final DHU 11.2% vs QC Endline 6.6% (08/11–08/17, 6 days, 2328 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/19): EC Asymmetry 1 (earlier 9 times), ED Gathering crease 1 (earlier 6 times)

Found earlier but still reached later stages: 2

CB Broken stitch 1, DB Run-off stitching 2 pcs (later stages total)

QC Endline data errors: 2

08/12 CS25 261637 (defective pcs 100 > defects 61), 08/13 CS25 261637 (defective pcs 46 > defects 39)

Caught in earlier stages

Q94 Glue marks (49), CC Skip stitch (12) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—45.0%
QC Inline1 reports
required on prod. days 1/12 (8%)
—16.2%
QC Endline6 days—6.6%
QA Inline1 reports118.8%
Pre-final1 reports111.2%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS256.6%
2328 / 6 days
18.8%PASS
08/11–08/17
Q94 Glue marks, BA Thread ends, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS256121 (8%)6508/12, 08/13, 08/14, 08/15, 08/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends14943
Q94 Glue marks49
EC Asymmetry4621521
ED Gathering crease271421
CC Skip stitch12
AD Fabric stains1222
IA 2nd operation issue41
DB Run-off stitching32
261644 OSIT · CS04 · Due 09/16Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
08/28QC 1st Bundle1 reports
08/29QA 1st Bundle1 reports
4/18QC Inlineactual/required · 22%
DHU 15.0%QC Endline9 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,500 / 1,500
PDF reports12
Last report09/09

Cross-stage findings

Missed in earlier stages: 2

CF Pulling yarn (Pre-final 09/03), EA Unsmooth/puckering/bubbling (Shipment Sample 09/04): first found in later stages, never recorded before

QA Inline DHU is 2.2× QC Inline

QA Inline DHU 29.7% vs QC Inline 13.4%; QC Inline may be missing defects

Recurring in small numbers: 4

Latest Final Random (09/09): DF Twisted seam/skewing 2 (earlier 5 times), AD Fabric stains 1 (earlier 14 times), EC Asymmetry 1 (earlier 8 times), ED Gathering crease 2 (earlier 9 times)

Found earlier but still reached later stages: 1

CG Grinning 1 pcs (later stages total)

10 defects recorded as 'Others' without detail

QA 1st Bundle 4, QA Inline 2, Pre-final 4; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AC Fabric hole (2 Major), ED Gathering crease (2 Major), EC Asymmetry (2 Major); Only QC 1st Bundle: BA Thread ends (2), FA Wrong material (2), BB Missing cut seam allowance (2), DF Twisted seam/skewing (2), GB Missing sewing operation (1), GA Missing bartack/button (1); Both: AD Fabric stains (2/2), BD Snagging (1/3), CG Grinning (1/2); DHU QC 1st Bundle 43.8% / QA 1st Bundle 85.0%

Caught in earlier stages

AC Fabric hole (30), DB Run-off stitching (24), CC Skip stitch (10), DJ Pleat (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—43.8%
QA 1st Bundle1 reports—85.0%
QC Inline4 reports
required on prod. days 4/18 (22%)
—13.4%
QC Endline9 days—15.0%
QA Inline2 reports229.7%
Shipment Sample2 reports1—
Pre-final1 reports111.2%
Final Random1 reports05.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0415.0%
1531 / 9 days
29.7%PASS
08/28–09/09
BA Thread ends, AD Fabric stains, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS049184 (22%)9509/02, 09/03, 09/05, 09/07, 09/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends287457
AD Fabric stains2212441
EC Asymmetry2237241
AC Fabric hole23232
DB Run-off stitching24
ED Gathering crease235422
DF Twisted seam/skewing2622
Others (no detail)424
261646 OSIT · CS08 · Due 09/16Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/26QC 1st Bundle1 reports
08/28QA 1st Bundle1 reports
8/22QC Inlineactual/required · 36%
DHU 8.9%QC Endline11 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports15
Last report09/09

Cross-stage findings

Missed in earlier stages: 1

CF Pulling yarn (Shipment Sample 09/02): first found in later stages, never recorded before

QA Inline DHU is 4.1× QC Inline

QA Inline DHU 40.6% vs QC Inline 10.0%; QC Inline may be missing defects

Pre-final DHU is 1.4× QC Endline

Pre-final DHU 12.8% vs QC Endline 8.9% (08/26–09/09, 11 days, 2006 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (09/09): ED Gathering crease 2 (earlier 13 times), DB Run-off stitching 1 (earlier 5 times), CC Skip stitch 2 (earlier 9 times)

Found earlier but still reached later stages: 7

DD Thread not straight/waving 1, EC Asymmetry 6, AC Fabric hole 2, AD Fabric stains 1, DJ Pleat 2, CG Grinning 2, EA Unsmooth/puckering/bubbling 4 pcs (later stages total)

9 defects recorded as 'Others' without detail

QA 1st Bundle 6, QA Inline 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

QC Endline data errors: 10

08/26 CS08 261646 (defective pcs 2 > defects 1), 08/28 CS08 261646 (defective pcs 19 > defects 8), 08/29 CS08 261646 (defective pcs 25 > defects 9), 08/31 CS08 261646 (defective pcs 57 > defects 23)…

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AH Sharp edge (2 Major), CA Thread tension (1 Major), AD Fabric stains (1 Major), DJ Pleat (1 Major), AC Fabric hole (1 Major), CE Broken seam (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (1), EC Asymmetry (1); Both: ED Gathering crease (5/5); DHU QC 1st Bundle 14.0% / QA 1st Bundle 95.0%

Caught in earlier stages

DF Twisted seam/skewing (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—14.0%
QA 1st Bundle1 reports—95.0%
QC Inline8 reports
required on prod. days 8/22 (36%)
—10.0%
QC Endline11 days—8.9%
QA Inline1 reports140.6%
Shipment Sample2 reports1—
Pre-final1 reports112.8%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS088.9%
2006 / 11 days
40.6%PASS
08/26–09/09
CC Skip stitch, AD Fabric stains, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0811228 (36%)11309/03, 09/05, 09/07, 09/08, 09/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
CC Skip stitch6112
BA Thread ends446253
AD Fabric stains164811
ED Gathering crease551212172
EA Unsmooth/puckering/bubbling194
DB Run-off stitching11111
EC Asymmetry136
Others (no detail)63
261652 RTMS · CS01 · Due 09/16Final Random PASS Missed in earlier stages: 2
All PASSPP Sample1 reports
No reportPilot Run
08/25QC 1st Bundle1 reports
08/25QA 1st Bundle1 reports
7/16QC Inlineactual/required · 44%
DHU 11.1%QC Endline8 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports16
Last report09/08

Cross-stage findings

Missed in earlier stages: 2

EE Raw edge (Shipment Sample 09/03), DD Thread not straight/waving (Shipment Sample 09/03): first found in later stages, never recorded before

QA Inline DHU is 2.5× QC Inline

QA Inline DHU 33.3% vs QC Inline 13.4%; QC Inline may be missing defects

Recurring in small numbers: 3

Latest Final Random (09/08): CB Broken stitch 1 (earlier 8 times), CF Pulling yarn 2 (earlier 8 times), CC Skip stitch 2 (earlier 8 times)

Found earlier but still reached later stages: 1

CE Broken seam 1 pcs (later stages total)

12 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 6, Pre-final 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (3 Major), DI High-low/uneven (2 Major), BA Thread ends (2 Major), CG Grinning (1 Major); Both: EI Inaccurate/skewed stitching (4/1), AC Fabric hole (2/1), CE Broken seam (2/1); DHU QC 1st Bundle — / QA 1st Bundle 70.0%

Caught in earlier stages

EC Asymmetry (45), DB Run-off stitching (25), DI High-low/uneven (23), ED Gathering crease (15), EI Inaccurate/skewed stitching (12) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—70.0%
QC Inline7 reports
required on prod. days 7/16 (44%)
—13.4%
QC Endline8 days—11.1%
QA Inline3 reports333.3%
Shipment Sample1 reports1—
Pre-final1 reports04.0%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0111.1%
1837 / 8 days
33.3%PASS
08/25–09/03
CC Skip stitch, BA Thread ends, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS018167 (44%)8108/29, 08/31, 09/01, 09/02, 09/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends25864
CC Skip stitch642
EC Asymmetry12294
DB Run-off stitching25
DI High-low/uneven2174
Others (no detail)31063
CB Broken stitch312111
CF Pulling yarn10312
261681 RTMS · CS01 · Due 09/16Final Random PASS Missed in earlier stages: 3
No resultPP Sample1 reports
No reportPilot Run
08/21QC 1st Bundle1 reports
08/21QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 15.4%QC Endline6 days
All FAILQA Inline1 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty800 / 800
PDF reports7
Last report09/08

Cross-stage findings

Missed in earlier stages: 3

IA 2nd operation issue (Pre-final 08/25), AD Fabric stains (Final Random 09/08), DD Thread not straight/waving (Final Random 09/08): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

CB Broken stitch 1, CF Pulling yarn 5 pcs (later stages total)

15 defects recorded as 'Others' without detail

QA 1st Bundle 9, QA Inline 2, Pre-final 4; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (4 Major), AC Fabric hole (2 Major), CC Skip stitch (1 Major), BA Thread ends (1 Major), EH Poor lamination/bonding (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DI High-low/uneven (2), DF Twisted seam/skewing (2), EC Asymmetry (2); Both: CG Grinning (2/1); DHU QC 1st Bundle 25.0% / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (28), EC Asymmetry (23), DB Run-off stitching (11), DI High-low/uneven (6), ED Gathering crease (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—25.0%
QA 1st Bundle1 reports—100.0%
QC Inline1 reports
required on prod. days 1/12 (8%)
——
QC Endline6 days—15.4%
QA Inline1 reports143.8%
Pre-final1 reports112.5%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0115.4%
787 / 6 days
43.8%PASS
08/21–09/01
BA Thread ends, CC Skip stitch, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS016121 (8%)6508/22, 08/24, 08/25, 08/31, 09/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends154154
CC Skip stitch127
EC Asymmetry23162
Others (no detail)9624
DB Run-off stitching11
CF Pulling yarn2132
DI High-low/uneven231
ED Gathering crease51
261745 OSIT · CS02 · Due 09/16Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
08/24QC 1st Bundle1 reports
08/24QA 1st Bundle1 reports
3/18QC Inlineactual/required · 17%
DHU 21.0%QC Endline9 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,300 / 1,300
PDF reports11
Last report09/08

Cross-stage findings

Missed in earlier stages: 1

IA 2nd operation issue (Pre-final 08/26): first found in later stages, never recorded before

QA Inline DHU is 2.0× QC Inline

QA Inline DHU 25.0% vs QC Inline 12.5%; QC Inline may be missing defects

Recurring in small numbers: 3

Latest Final Random (09/08): EC Asymmetry 1 (earlier 4 times), ED Gathering crease 2 (earlier 11 times), CB Broken stitch 1 (earlier 7 times)

Found earlier but still reached later stages: 5

DF Twisted seam/skewing 2, CE Broken seam 2, CC Skip stitch 1, EA Unsmooth/puckering/bubbling 2, CG Grinning 3 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (3 Major), EA Unsmooth/puckering/bubbling (1 Major), AD Fabric stains (1 Major), DJ Pleat (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: DF Twisted seam/skewing (2), EC Asymmetry (2); Both: CB Broken stitch (3/4), ED Gathering crease (2/1), CE Broken seam (2/1); DHU QC 1st Bundle 34.4% / QA 1st Bundle 65.0%

Caught in earlier stages

DB Run-off stitching (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—34.4%
QA 1st Bundle1 reports—65.0%
QC Inline3 reports
required on prod. days 3/18 (17%)
—12.5%
QC Endline9 days—21.0%
QA Inline1 reports125.0%
Shipment Sample2 reports1—
Pre-final1 reports115.2%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0221.0%
1112 / 9 days
25.0%PASS
08/22–09/07
ED Gathering crease, CC Skip stitch, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS029183 (17%)9608/28, 08/29, 08/31, 09/02, 09/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
ED Gathering crease219122172
BA Thread ends4475
CC Skip stitch3511
CB Broken stitch3472331
EC Asymmetry22141
EA Unsmooth/puckering/bubbling132
DB Run-off stitching33
DF Twisted seam/skewing212
261641 RGOR · CP19 · Due 09/18Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/26QA 1st Bundle1 reports
0/6QC Inlineactual/required · 0%
DHU 4.2%QC Endline3 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,860 / 1,860
PDF reports2
Last report09/01

Cross-stage findings

Missed in earlier stages: 2

DJ Pleat (Final Random 09/01), CE Broken seam (Final Random 09/01): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/01): CC Skip stitch 2 (earlier 5 times)

QC Endline data errors: 6

08/26 CP19 261641-S (defective pcs 67 > defects 13), 08/26 CP19 261641-L (defective pcs 13 > defects 8), 08/28 CP19 261641-S (defective pcs 122 > defects 41), 08/28 CP19 261641-L (defective pcs 40 > defects 13)…

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—50.0%
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—4.2%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP194.2%
1916 / 3 days
—PASS
08/26–08/29
BA Thread ends, CC Skip stitch, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP19360 (0%)3308/26, 08/28, 08/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineFinal Random
BA Thread ends5523
CC Skip stitch162
Others (no detail)5
EB Measurement issue4
ED Gathering crease21
BB Missing cut seam allowance2
DE Cut to broken1
DJ Pleat1
261642 RGOR · CP19 · Due 09/18Final Random PASS QA Inline DHU is 9.6× QC Endline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/29QA 1st Bundle1 reports
2/6QC Inlineactual/required · 33%
DHU 3.9%QC Endline3 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,730 / 1,730
PDF reports5
Last report09/02

Cross-stage findings

QA Inline DHU is 9.6× QC Endline

QA Inline DHU 37.5% vs QC Endline 3.9% (08/29–09/01, 3 days, 1781 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 1

CC Skip stitch 2 pcs (later stages total)

QC Endline data errors: 2

08/29 CP19 261642 (defective pcs 75 > defects 36), 08/31 CP19 261642 (defective pcs 70 > defects 34)

Caught in earlier stages

CG Grinning (9), CB Broken stitch (7), EC Asymmetry (6), EB Measurement issue (6) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—65.0%
QC Inline2 reports
required on prod. days 2/6 (33%)
—40.0%
QC Endline3 days—3.9%
QA Inline1 reports137.5%
Final Random1 reports01.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP193.9%
1781 / 3 days
37.5%PASS
08/29–09/01
BA Thread ends, CC Skip stitch, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP19362 (33%)3108/29, 08/31, 09/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends3213734
CC Skip stitch222
CG Grinning153
CB Broken stitch7
EC Asymmetry411
EB Measurement issue6
EA Unsmooth/puckering/bubbling21
ED Gathering crease12
261669 RGOR · CB30 · Due 09/18Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/17QC 1st Bundle1 reports
08/17QA 1st Bundle1 reports
0/6QC Inlineactual/required · 0%
DHU 13.6%QC Endline3 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty390 / 356
PDF reports5
Last report09/18

Cross-stage findings

Missed in earlier stages: 1

DE Cut to broken (Final Random 09/16): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

CB Broken stitch 2, AD Fabric stains 1 pcs (later stages total)

QC Endline data errors: 5

08/17 CB30 261669-S (defective pcs 38 > defects 32), 08/17 CB30 261669-L1 (defective pcs 10 > defects 7), 08/18 CB30 261669-S (defective pcs 12 > defects 10), 08/18 CB30 261669-L1 (defective pcs 9 > defects 4)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), EI Inaccurate/skewed stitching (2 Major), CC Skip stitch (1 Major), DD Thread not straight/waving (1 Major), AH Sharp edge (1 Major); Only QC 1st Bundle: DI High-low/uneven (2), EA Unsmooth/puckering/bubbling (2), EC Asymmetry (2); Both: DJ Pleat (1/1); DHU QC 1st Bundle 87.5% / QA 1st Bundle 61.5%

Caught in earlier stages

CD Needle hole (13), CC Skip stitch (8) did not reach later stages

Report line differs from production line

QGR2641526 Final Random (09/18) CB29; actual production line(s) CB30 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—87.5%
QA 1st Bundle1 reports—61.5%
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—13.6%
QA Inline1 reports128.1%
Final Random2 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3013.6%
808 / 3 days
28.1%PASS
08/17–08/19
BA Thread ends, CD Needle hole, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB30360 (0%)3308/17, 08/18, 08/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends828
CD Needle hole13
AD Fabric stains811
CC Skip stitch17
EA Unsmooth/puckering/bubbling22
CB Broken stitch22
EC Asymmetry21
DI High-low/uneven2
260719 DJLF · CS07 · Due 09/21Final Random PASS Missed in earlier stages: 6
No reportPP Sample
No reportPilot Run
08/21QC 1st Bundle1 reports
08/21QA 1st Bundle1 reports
6/22QC Inlineactual/required · 27%
DHU 8.2%QC Endline11 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final2 reports
All PASSFinal Random1 reports
Order/Ship qty3,050 / 3,050
PDF reports15
Last report09/05

Cross-stage findings

Missed in earlier stages: 6

IA 2nd operation issue (Pre-final 08/25), EA Unsmooth/puckering/bubbling (Pre-final 08/25), DJ Pleat (Pre-final 08/25), EI Inaccurate/skewed stitching (Shipment Sample 08/26), BB Missing cut seam allowance (Pre-final 08/31), IC Broken needle/metal contamination (Final Random 09/05): first found in later stages, never recorded before

QA Inline DHU is 4.0× QC Inline

QA Inline DHU 36.5% vs QC Inline 9.1%; QC Inline may be missing defects

Pre-final DHU is 1.9× QC Endline

Pre-final DHU 15.6% vs QC Endline 8.2% (08/20–09/05, 11 days, 3050 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (09/05): CB Broken stitch 2 (earlier 9 times), CC Skip stitch 2 (earlier 11 times)

Found earlier but still reached later stages: 4

BD Snagging 1, AD Fabric stains 2, EC Asymmetry 3, ED Gathering crease 12 pcs (later stages total)

33 defects recorded as 'Others' without detail

QC 1st Bundle 11, QA 1st Bundle 8, QC Inline 14; cannot compare across stages

QC Endline data errors: 5

08/21 CS07 260719 (defective pcs 40 > defects 33), 08/22 CS07 260719 (defective pcs 23 > defects 20), 08/24 CS07 260719 (defective pcs 50 > defects 44), 08/29 CS07 260719 (defective pcs 33 > defects 32)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (2 Major), EE Raw edge (1 Major), ED Gathering crease (1 Major), AD Fabric stains (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: BD Snagging (3), BA Thread ends (2); Both: CB Broken stitch (5/3), AC Fabric hole (3/2); DHU QC 1st Bundle 0.0% / QA 1st Bundle 95.0%

Caught in earlier stages

DF Twisted seam/skewing (22), DB Run-off stitching (12), AB Shading (10), GB Missing sewing operation (9), AC Fabric hole (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—95.0%
QC Inline6 reports
required on prod. days 6/22 (27%)
—9.1%
QC Endline11 days—8.2%
QA Inline2 reports236.5%
Shipment Sample2 reports1—
Pre-final2 reports215.6%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS078.2%
3050 / 11 days
36.5%PASS
08/20–09/05
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0711226 (27%)11508/28, 08/29, 08/31, 09/01, 09/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends212834196
ED Gathering crease1872212
CC Skip stitch361272
Others (no detail)11814
CB Broken stitch53104122
DF Twisted seam/skewing2182
DB Run-off stitching12
AB Shading10
260721 DJLF · CS06 · Due 09/21Final Random PASS QA Inline DHU is 2.1× QC Inline
No reportPP Sample
No reportPilot Run
08/21QC 1st Bundle1 reports
08/20QA 1st Bundle1 reports
2/14QC Inlineactual/required · 14%
DHU 13.0%QC Endline7 days
3/4 FAILQA Inline4 reports
All FAILShipment Sample2 reports1 no result
1/2 FAILPre-final2 reports
All PASSFinal Random1 reports
Order/Ship qty2,400 / 2,400
PDF reports13
Last report09/17

Cross-stage findings

QA Inline DHU is 2.1× QC Inline

QA Inline DHU 25.9% vs QC Inline 12.3%; QC Inline may be missing defects

Recurring in small numbers: 3

Latest Final Random (09/17): ED Gathering crease 2 (earlier 13 times), AD Fabric stains 2 (earlier 6 times), CF Pulling yarn 1 (earlier 5 times)

Found earlier but still reached later stages: 3

CB Broken stitch 2, EA Unsmooth/puckering/bubbling 1, CC Skip stitch 2 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA Inline 2; cannot compare across stages

QC Endline data errors: 1

08/26 CS06 260721 (defective pcs 57 > defects 56)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (2 Major), BA Thread ends (2 Major), DI High-low/uneven (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: EC Asymmetry (5), EI Inaccurate/skewed stitching (2), DJ Pleat (2); Both: ED Gathering crease (6/2), AD Fabric stains (1/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 45.0%

Caught in earlier stages

EC Asymmetry (43), AC Fabric hole (27), AB Shading (16), CD Needle hole (13), DF Twisted seam/skewing (12) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—45.0%
QC Inline2 reports
required on prod. days 2/14 (14%)
—12.3%
QC Endline7 days—13.0%
QA Inline4 reports325.9%
Shipment Sample2 reports1—
Pre-final2 reports16.2%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0613.0%
2400 / 7 days
25.9%PASS
08/20–08/28
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS067142 (14%)7508/22, 08/24, 08/25, 08/26, 08/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends2636204
ED Gathering crease6262722
EC Asymmetry56311
CF Pulling yarn2431
AC Fabric hole1242
AD Fabric stains1151622
CC Skip stitch2311
AB Shading16
260916 SAIN · CP07/CP13/CP17… · Due 09/21Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/31QC 1st Bundle1 reports
07/31QA 1st Bundle1 reports
2/28QC Inlineactual/required · 7%
DHU 9.1%QC Endline10 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,708 / 1,680
PDF reports8
Last report08/19

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 08/18): first found in later stages, never recorded before

QA Inline DHU is 5.8× QC Endline

QA Inline DHU 53.1% vs QC Endline 9.1% (07/30–08/11, 10 days, 4693 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/19): AD Fabric stains 1 (earlier 4 times), CE Broken seam 1 (earlier 8 times)

Found earlier but still reached later stages: 3

BD Snagging 3, CG Grinning 1, CF Pulling yarn 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

AD Fabric stains (QA 8); zero in QC Endline records

QC Endline data errors: 10

07/30 CP13 260916 (defective pcs 85 > defects 52), 07/31 CP13 260916 (defective pcs 47 > defects 22), 08/01 CP13 260916 (defective pcs 87 > defects 57), 08/03 CP13 260916 (defective pcs 84 > defects 58)…

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (3 Major), HA Poor pressing (2 Major), CE Broken seam (2 Major), BA Thread ends (1 Major); Only QC 1st Bundle: EC Asymmetry (4), CC Skip stitch (2), CA Thread tension (2); Both: EI Inaccurate/skewed stitching (3/2), DI High-low/uneven (3/1), EA Unsmooth/puckering/bubbling (2/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 60.0%

Caught in earlier stages

EH Poor lamination/bonding (140), Q94 Glue marks (101), Q95 HTL position incorrect (92), EC Asymmetry (27), CC Skip stitch (16) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—60.0%
QC Inline2 reports
required on prod. days 2/28 (7%)
—71.9%
QC Endline10 days—9.1%
QA Inline1 reports153.1%
Final Random3 reports04.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP139.2%
4533 / 10 days
53.1%PASS
07/30–08/11
EH Poor lamination/bonding, Q94 Glue marks, Q95 HTL position incorrect
CP077.5%
120 / 2 days
——
08/06–08/08
EH Poor lamination/bonding, CE Broken seam, Q94 Glue marks
CP170.0%
20 / 1 days
——
08/04–08/04
—
CP200.0%
20 / 1 days
——
08/04–08/04
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1310202 (10%)10808/05, 08/06, 08/07, 08/08, 08/11
CP07240 (0%)2208/06, 08/08
CP17120 (0%)1108/04
CP20120 (0%)1108/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
EH Poor lamination/bonding140
Q94 Glue marks101
Q95 HTL position incorrect92
BA Thread ends1105014
EC Asymmetry41283
CE Broken seam2862
AD Fabric stains3635
CC Skip stitch214
260269 MKSC · CB16/CB19/CB29… · Due 09/23Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
07/18QC 1st Bundle1 reports
07/18QA 1st Bundle1 reports
6/42QC Inlineactual/required · 14%
DHU 11.4%QC Endline16 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty4,287 / 1,000
PDF reports15
Last report08/26

Cross-stage findings

Missed in earlier stages: 1

DJ Pleat (Final Random 08/20): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/26): ED Gathering crease 2 (earlier 27 times), EA Unsmooth/puckering/bubbling 1 (earlier 4 times)

Found earlier but still reached later stages: 4

EC Asymmetry 1, AD Fabric stains 3, BA Thread ends 4, DF Twisted seam/skewing 1 pcs (later stages total)

11 defects recorded as 'Others' without detail

PP Sample 2, QA 1st Bundle 4, QA Inline 3, Final Random 2; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), CE Broken seam (1 Major), EA Unsmooth/puckering/bubbling (1 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: ED Gathering crease (4), EC Asymmetry (1), DB Run-off stitching (1), EB Measurement issue (1); Both: AD Fabric stains (2/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 76.9%

Caught in earlier stages

DB Run-off stitching (37), CE Broken seam (32), CC Skip stitch (18), CD Needle hole (13), CG Grinning (5) did not reach later stages

Report line differs from production line

QGR2629378 Final Random (07/25) CB04; actual production line(s) CB16/CB19/CB29/CB30 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—76.9%
QC Inline6 reports
required on prod. days 6/42 (14%)
—36.0%
QC Endline16 days—11.4%
QA Inline2 reports217.2%
Final Random4 reports03.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1611.6%
4213 / 16 days
17.2%PASS
07/18–08/24
BA Thread ends, ED Gathering crease, Others (no detail)
CB300.0%
30 / 3 days
——
07/22–07/27
—
CB190.0%
24 / 1 days
——
07/22–07/22
—
CB290.0%
20 / 1 days
——
07/24–07/24
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1616326 (19%)161008/19, 08/20, 08/21, 08/22, 08/24
CB30360 (0%)3307/22, 07/23, 07/27
CB19120 (0%)1107/22
CB29120 (0%)1107/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease4459314
BA Thread ends31264
AD Fabric stains21358013
Others (no detail)249132
DB Run-off stitching1234
CE Broken seam1328
CC Skip stitch18
EC Asymmetry116431
260286 MKSC · CB02/CB08/CB30 · Due 09/23Final Random PASS Missed in earlier stages: 2
All FAILPP Sample1 reports
No resultPilot Run3 reports
08/10QC 1st Bundle1 reports
08/10QA 1st Bundle1 reports
6/26QC Inlineactual/required · 23%
DHU 10.2%QC Endline12 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
1/4 FAILFinal Random4 reports
Order/Ship qty3,168 / 750
PDF reports18
Last report09/03

Cross-stage findings

Missed in earlier stages: 2

CB Broken stitch (Final Random 08/14), HA Poor pressing (Final Random 08/24): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/03): EC Asymmetry 1 (earlier 20 times), EA Unsmooth/puckering/bubbling 1 (earlier 14 times), ED Gathering crease 2 (earlier 29 times)

Found earlier but still reached later stages: 3

AD Fabric stains 1, DJ Pleat 1, CF Pulling yarn 1 pcs (later stages total)

7 defects recorded as 'Others' without detail

PP Sample 3, Pilot Run 1, QA 1st Bundle 2, QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 12); zero in QC Endline records

QC Endline data errors: 1

08/14 CB02 260286A (defective pcs 18 > defects 17)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (5 Major), ED Gathering crease (4 Major), EC Asymmetry (2 Major); DHU QC 1st Bundle 0.0% / QA 1st Bundle 40.6%

Caught in earlier stages

DB Run-off stitching (30), Q61 Lace raw edge or broken lace (27), CC Skip stitch (17), AC Fabric hole (12), EE Raw edge (12) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports1—
Pilot Run3 reports0—
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—40.6%
QC Inline6 reports
required on prod. days 6/26 (23%)
—65.1%
QC Endline12 days—10.2%
QA Inline2 reports240.6%
Final Random4 reports110.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0210.2%
3074 / 12 days
40.6%PASS
08/10–09/01
Others (no detail), ED Gathering crease, BA Thread ends
CB300.0%
10 / 1 days
——
08/17–08/17
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0212246 (25%)12608/18, 08/19, 08/20, 08/21, 09/01
CB30120 (0%)1108/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease6429741013
Others (no detail)312781
BA Thread ends5316
AD Fabric stains126331
EA Unsmooth/puckering/bubbling152348
EC Asymmetry352131231
DB Run-off stitching219
Q61 Lace raw edge or broken lace27
261692 OSIT · CS06 · Due 09/23Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
08/29QC 1st Bundle1 reports
08/29QA 1st Bundle1 reports
3/16QC Inlineactual/required · 19%
DHU 11.1%QC Endline8 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports1 no result
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,500 / 2,500
PDF reports11
Last report09/11

Cross-stage findings

Missed in earlier stages: 3

EI Inaccurate/skewed stitching (Shipment Sample 09/02), BD Snagging (Final Random 09/11), IA 2nd operation issue (Final Random 09/11): first found in later stages, never recorded before

QA Inline DHU is 6.2× QC Inline

QA Inline DHU 28.1% vs QC Inline 4.5%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (09/11): EC Asymmetry 1 (earlier 8 times), CB Broken stitch 1 (earlier 5 times)

Found earlier but still reached later stages: 7

CC Skip stitch 1, ED Gathering crease 3, AD Fabric stains 1, EA Unsmooth/puckering/bubbling 1, DJ Pleat 1, AC Fabric hole 1, DF Twisted seam/skewing 1 pcs (later stages total)

18 defects recorded as 'Others' without detail

QC 1st Bundle 9, QC Inline 8, QA Inline 1; cannot compare across stages

QC Endline data errors: 4

08/28 CS06 261692 (defective pcs 4 > defects 2), 08/29 CS06 261692 (defective pcs 51 > defects 49), 09/02 CS06 261692 (defective pcs 20 > defects 13), 09/05 CS06 261692 (defective pcs 15 > defects 13)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (3 Major), BA Thread ends (2 Major), ED Gathering crease (1 Major), AD Fabric stains (1 Major), EH Poor lamination/bonding (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: EC Asymmetry (4), DI High-low/uneven (4), CB Broken stitch (3); DHU QC 1st Bundle 0.0% / QA 1st Bundle 45.0%

Caught in earlier stages

DB Run-off stitching (19), EH Poor lamination/bonding (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—45.0%
QC Inline3 reports
required on prod. days 3/16 (19%)
—4.5%
QC Endline8 days—11.1%
QA Inline2 reports228.1%
Shipment Sample2 reports1—
Pre-final1 reports04.8%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0611.1%
2556 / 8 days
28.1%PASS
08/28–09/07
DF Twisted seam/skewing, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS068163 (19%)8509/01, 09/02, 09/03, 09/05, 09/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends259455
DF Twisted seam/skewing671
ED Gathering crease1444112
CC Skip stitch33321
EC Asymmetry4147211
AD Fabric stains1221
DB Run-off stitching19
Others (no detail)981
261150 LOGE · CS20 · Due 09/25Final Random PASS QA Inline DHU is 2.0× QC Inline
No reportPP Sample
No reportPilot Run
08/29QC 1st Bundle1 reports
08/29QA 1st Bundle1 reports
6/20QC Inlineactual/required · 30%
DHU 22.2%QC Endline10 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,261 / 2,261
PDF reports11
Last report09/15

Cross-stage findings

QA Inline DHU is 2.0× QC Inline

QA Inline DHU 35.9% vs QC Inline 18.2%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (09/15): AD Fabric stains 2 (earlier 15 times), CB Broken stitch 2 (earlier 3 times)

Found earlier but still reached later stages: 1

DE Cut to broken 1 pcs (later stages total)

QC Endline data errors: 3

08/31 CS20 261150-L (defective pcs 6 > defects 1), 08/31 CS20 261150-S (defective pcs 71 > defects 59), 09/03 CS20 261150-S (defective pcs 41 > defects 40)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (2 Major), GB Missing sewing operation (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), FA Wrong material (1), DA Exceed seam allowance (1), CG Grinning (1), DI High-low/uneven (1); Both: EI Inaccurate/skewed stitching (4/1), DJ Pleat (2/2), CE Broken seam (2/1), EC Asymmetry (1/2); DHU QC 1st Bundle 80.0% / QA 1st Bundle 76.9%

Caught in earlier stages

EB Measurement issue (126), CC Skip stitch (105), EA Unsmooth/puckering/bubbling (63), ED Gathering crease (23), CE Broken seam (22) did not reach later stages

Report line differs from production line

QGR2640969 Final Random (09/15) CS21; actual production line(s) CS20 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—76.9%
QC Inline6 reports
required on prod. days 6/20 (30%)
—18.2%
QC Endline10 days—22.2%
QA Inline2 reports235.9%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2022.2%
2261 / 10 days
35.9%—
08/28–09/12
BA Thread ends, EB Measurement issue, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2010206 (30%)10409/03, 09/04, 09/05, 09/07, 09/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends3414714
EB Measurement issue126
CC Skip stitch9951
EA Unsmooth/puckering/bubbling35532
AD Fabric stains262322
ED Gathering crease617
CE Broken seam21712
DB Run-off stitching1191
261288 LOGE · CB30/CB32/CB34… · Due 09/25Final Random PASS Missed in earlier stages: 3
No resultPP Sample1 reports
No reportPilot Run
08/26QC 1st Bundle1 reports
08/28QA 1st Bundle1 reports
29/80QC Inlineactual/required · 36%
DHU 19.8%QC Endline25 days
All FAILQA Inline4 reports
All PASSShipment Sample2 reports1 no result
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty10,000 / 10,000
PDF reports39
Last report09/23

Cross-stage findings

Missed in earlier stages: 3

GA Missing bartack/button (Shipment Sample 09/09), CF Pulling yarn (Shipment Sample 09/09), BD Snagging (Final Random 09/15): first found in later stages, never recorded before

1 later-stage PDF report(s) blank

Shipment Sample 09/09 QGR2640120 (FAIL); please check if the report was completed

Recurring in small numbers: 2

Latest Final Random (09/15): CE Broken seam 1 (earlier 28 times), CC Skip stitch 2 (earlier 69 times)

Found earlier but still reached later stages: 6

DJ Pleat 1, EC Asymmetry 3, ED Gathering crease 4, CG Grinning 1, CA Thread tension 1, EI Inaccurate/skewed stitching 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

PP Sample 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (3 Major), EE Raw edge (2 Major), CB Broken stitch (2 Major), DA Exceed seam allowance (1 Major), AC Fabric hole (1 Major), CE Broken seam (1 Major); Only QC 1st Bundle: CG Grinning (1), AF Crushed foam cup (1), DJ Pleat (1), EA Unsmooth/puckering/bubbling (1); Both: EC Asymmetry (4/2), ED Gathering crease (1/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 100.0%

Caught in earlier stages

DB Run-off stitching (204), EB Measurement issue (178), EA Unsmooth/puckering/bubbling (55), EA Uneven seam allowance (22), AF Crushed foam cup (21) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—100.0%
QC Inline29 reports
required on prod. days 29/80 (36%)
—32.6%
QC Endline25 days—19.8%
QA Inline4 reports435.2%
Shipment Sample2 reports0—
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3524.7%
6323 / 25 days
35.2%PASS
08/26–09/25
EC Asymmetry, ED Gathering crease, CC Skip stitch
CB3610.9%
3353 / 11 days
——
09/10–09/22
BA Thread ends, ED Gathering crease, CC Skip stitch
CB3216.4%
73 / 1 days
——
09/25–09/25
EC Asymmetry, CC Skip stitch, ED Gathering crease
CB3422.0%
50 / 1 days
——
09/01–09/01
EC Asymmetry, ED Gathering crease
CB300.0%
40 / 2 days
——
09/18–09/19
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB35255024 (48%)21509/15, 09/16, 09/17, 09/23, 09/25
CB3611225 (23%)11609/17, 09/18, 09/19, 09/21, 09/22
CB30240 (0%)2209/18, 09/19
CB32120 (0%)1109/25
CB34120 (0%)1109/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
EC Asymmetry54210640353
ED Gathering crease113838424
BA Thread ends1436587
CC Skip stitch833152
DB Run-off stitching204
EB Measurement issue3321682
CG Grinning1651
CE Broken seam1183731
261289 LOGE · CS10/CS11/CS13 · Due 09/25Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
08/24QC 1st Bundle1 reports
08/25QA 1st Bundle1 reports
14/42QC Inlineactual/required · 33%
DHU 8.6%QC Endline20 days
All FAILQA Inline5 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty10,000 / 10,000
PDF reports24
Last report09/12

Cross-stage findings

Missed in earlier stages: 3

EI Inaccurate/skewed stitching (Shipment Sample 08/31), FB Material defect (Shipment Sample 08/31), HB Missing/wrong trims (Final Random 09/11): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/11): CB Broken stitch 2 (earlier 5 times)

Found earlier but still reached later stages: 5

EA Unsmooth/puckering/bubbling 1, EC Asymmetry 3, ED Gathering crease 1, DJ Pleat 2, DE Cut to broken 1 pcs (later stages total)

128 defects recorded as 'Others' without detail

QC 1st Bundle 4, QC Inline 122, Shipment Sample 2; cannot compare across stages

QC Endline data errors: 3

09/07 CS13 261289 (defective pcs 91 > defects 90), 09/10 CS13 261289 (defective pcs 51 > defects 49), 09/11 CS13 261289 (defective pcs 63 > defects 58)

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), CG Grinning (2 Major), EC Asymmetry (2 Major), EB Measurement issue (1 Major), BA Thread ends (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CA Thread tension (1 Major), GA Missing bartack/button (1 Major); Both: DB Run-off stitching (10/2); DHU QC 1st Bundle 0.0% / QA 1st Bundle 65.0%

Caught in earlier stages

DB Run-off stitching (122), CC Skip stitch (87), AC Fabric hole (67), CE Broken seam (32), BB Missing cut seam allowance (14) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—65.0%
QC Inline15 reports
required on prod. days 14/42 (33%)
—0.0%
QC Endline20 days—8.6%
QA Inline5 reports526.9%
Shipment Sample1 reports1—
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS138.6%
9980 / 20 days
26.9%PASS
08/24–09/17
BA Thread ends, DB Run-off stitching, CC Skip stitch
CS100.0%
20 / 1 days
——
09/07–09/07
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS13204014 (35%)20609/11, 09/12, 09/14, 09/15, 09/17
CS10120 (0%)1109/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends1947777
Others (no detail)4122752
DB Run-off stitching10220891
CC Skip stitch5793
ED Gathering crease27821
AC Fabric hole18463
CE Broken seam284
EA Unsmooth/puckering/bubbling11451
261297 LOGE · CP03/CP04/CP05… · Due 09/25Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
08/19–08/26QC 1st Bundle2 reports
08/11–08/28QA 1st Bundle3 reports
29/280QC Inlineactual/required · 10%
DHU 10.9%QC Endline31 days
All FAILQA Inline4 reports
All FAILShipment Sample4 reports2 no result
No reportPre-final
2/3 FAILFinal Random3 reports
Order/Ship qty30,000 / 30,000
PDF reports46
Last report09/22

Cross-stage findings

Missed in earlier stages: 1

CF Pulling yarn (Shipment Sample 09/05): first found in later stages, never recorded before

Recurring in small numbers: 9

Latest Final Random (09/22): CE Broken seam 2 (earlier 49 times), BB Missing cut seam allowance 1 (earlier 6 times), DB Run-off stitching 1 (earlier 37 times), DJ Pleat 1 (earlier 28 times), EA Unsmooth/puckering/bubbling 1 (earlier 29 times), AD Fabric stains 1 (earlier 16 times), CC Skip stitch 1 (earlier 73 times), GA Missing bartack/button 1 (earlier 11 times), CB Broken stitch 1 (earlier 3 times)

Found earlier but still reached later stages: 4

CG Grinning 1, EC Asymmetry 4, EI Inaccurate/skewed stitching 4, ED Gathering crease 1 pcs (later stages total)

QC Endline data errors: 48

08/12 CP10 261297-3 (defective pcs 25 > defects 4), 08/13 CP11 261297-3 (defective pcs 15 > defects 6), 08/15 CP11 261297-3 (defective pcs 8 > defects 4), 08/18 CP18 261297-2 (defective pcs 6 > defects 4)…

Duplicate report numbers

QGR2640798 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (8 Major), EA Unsmooth/puckering/bubbling (4 Major), ED Gathering crease (2 Major), DE Cut to broken (1 Major), EG Wrong panel assembly (1 Major); Only QC 1st Bundle: DI High-low/uneven (7), DB Run-off stitching (4), AD Fabric stains (2); Both: EC Asymmetry (3/8), BA Thread ends (3/7), CE Broken seam (6/4), CG Grinning (2/6), DJ Pleat (4/2), EI Inaccurate/skewed stitching (2/4), CC Skip stitch (2/1), DF Twisted seam/skewing (2/1); DHU QC 1st Bundle 92.5% / QA 1st Bundle 81.7%

Caught in earlier stages

EB Measurement issue (197), GB Missing sewing operation (83), EA Uneven seam allowance (62), DF Twisted seam/skewing (53), DK Twisted shoulder strap (46) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—92.5%
QA 1st Bundle3 reports—81.7%
QC Inline29 reports
required on prod. days 29/280 (10%)
—33.4%
QC Endline31 days—10.9%
QA Inline4 reports439.8%
Shipment Sample4 reports2—
Final Random3 reports27.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1810.5%
10440 / 22 days
48.4%PASS
08/18–09/12
BA Thread ends, CC Skip stitch, ED Gathering crease
CP1620.8%
6664 / 18 days
31.2%PASS
08/26–09/16
BA Thread ends, CC Skip stitch, ED Gathering crease
CP1714.7%
3216 / 8 days
31.2%—
09/08–09/16
BA Thread ends, EB Measurement issue, ED Gathering crease
CP124.2%
2380 / 14 days
——
08/14–09/08
BA Thread ends, DF Twisted seam/skewing, CC Skip stitch
CP114.0%
1680 / 16 days
——
08/13–09/07
BA Thread ends
CP092.5%
1440 / 15 days
——
08/14–09/10
BA Thread ends, CC Skip stitch
CP082.3%
980 / 10 days
——
08/26–09/10
BA Thread ends, DB Run-off stitching, EA Uneven seam allowance
CP133.5%
600 / 8 days
——
08/26–09/05
BA Thread ends, EC Asymmetry, DK Twisted shoulder strap
CP190.0%
560 / 6 days
——
08/22–09/05
—
CP040.0%
500 / 5 days
——
08/26–09/17
—
CP145.2%
480 / 3 days
——
08/25–08/28
BA Thread ends, EC Asymmetry, Others (no detail)
CP101.8%
380 / 5 days
——
08/12–09/03
BA Thread ends
CP200.0%
180 / 3 days
——
08/21–08/26
—
CP050.0%
140 / 3 days
——
08/26–09/02
—
CP070.0%
140 / 2 days
——
08/24–09/10
—
CP030.0%
40 / 1 days
——
08/26–08/26
—
CP060.0%
20 / 1 days
——
09/11–09/11
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1822449 (20%)221309/08, 09/09, 09/10, 09/11, 09/12
CP16183615 (42%)18309/11, 09/12, 09/14, 09/15, 09/16
CP1116320 (0%)161608/31, 09/01, 09/02, 09/05, 09/07
CP0915300 (0%)151509/02, 09/04, 09/05, 09/07, 09/10
CP1214280 (0%)141408/29, 08/31, 09/01, 09/07, 09/08
CP0810200 (0%)101009/05, 09/07, 09/08, 09/09, 09/10
CP138160 (0%)8808/31, 09/01, 09/03, 09/04, 09/05
CP178165 (31%)8309/11, 09/12, 09/14, 09/15, 09/16
CP196120 (0%)6608/25, 08/26, 08/28, 08/29, 09/05
CP045100 (0%)5508/26, 08/28, 08/29, 09/01, 09/17
CP105100 (0%)5508/12, 08/17, 08/18, 08/25, 09/03
CP05360 (0%)3308/26, 08/28, 09/02
CP14360 (0%)3308/25, 08/26, 08/28
CP20360 (0%)3308/21, 08/24, 08/26
CP07240 (0%)2208/24, 09/10
CP03120 (0%)1108/26
CP06120 (0%)1109/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends13711212001136
CC Skip stitch2122682417
ED Gathering crease24841
EC Asymmetry381078854
EB Measurement issue197
DB Run-off stitching43811013
EA Unsmooth/puckering/bubbling248118639
CE Broken seam2646835210
261298 LOGE · CB09/CB24 · Due 09/25Final Random PASS Missed in earlier stages: 3
No resultPP Sample1 reports
No reportPilot Run
09/01QC 1st Bundle1 reports
08/31QA 1st Bundle1 reports
17/52QC Inlineactual/required · 33%
DHU 28.5%QC Endline25 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports
No reportPre-final
1/2 FAILFinal Random2 reports
Order/Ship qty6,000 / 6,000
PDF reports27
Last report09/22

Cross-stage findings

Missed in earlier stages: 3

AB Shading (Shipment Sample 09/10), EB Measurement issue (Shipment Sample 09/10), CH Incorrect stitch density (Final Random 09/16): first found in later stages, never recorded before

Recurring in small numbers: 8

Latest Final Random (09/21): EA Unsmooth/puckering/bubbling 1 (earlier 5 times), CB Broken stitch 1 (earlier 13 times), EC Asymmetry 1 (earlier 27 times), DE Cut to broken 1 (earlier 7 times), CC Skip stitch 1 (earlier 34 times), DJ Pleat 1 (earlier 22 times), DB Run-off stitching 1 (earlier 6 times), CE Broken seam 1 (earlier 21 times)

Found earlier but still reached later stages: 2

AD Fabric stains 2, FA Wrong material 4 pcs (later stages total)

4 defects recorded as 'Others' without detail

Shipment Sample 4; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 28); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EG Wrong panel assembly (2 Major), CC Skip stitch (2 Major), EA Unsmooth/puckering/bubbling (2 Major), DE Cut to broken (2 Major); Only QC 1st Bundle: DA Exceed seam allowance (2), AD Fabric stains (1), CE Broken seam (1), DF Twisted seam/skewing (1), CB Broken stitch (1); Both: EC Asymmetry (2/2), DJ Pleat (1/1), DB Run-off stitching (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 92.3%

Caught in earlier stages

ED Gathering crease (410), CG Grinning (24), DA Exceed seam allowance (16), AC Fabric hole (9), EI Inaccurate/skewed stitching (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—92.3%
QC Inline17 reports
required on prod. days 17/52 (33%)
—48.7%
QC Endline25 days—28.5%
QA Inline3 reports334.4%
Shipment Sample2 reports2—
Final Random2 reports18.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2428.6%
5980 / 25 days
34.4%PASS
09/01–09/30
BA Thread ends, ED Gathering crease, CC Skip stitch
CB090.0%
20 / 1 days
——
09/28–09/28
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB24255017 (34%)231009/25, 09/26, 09/28, 09/29, 09/30
CB09120 (0%)1109/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends713719
ED Gathering crease8402
CC Skip stitch2273662
CE Broken seam131198144
EC Asymmetry122489127
DJ Pleat114844
CB Broken stitch112034
EB Measurement issue241
261300 LOGE · CB11/CB13/CB15 · Due 09/25Final Random PASS 1 later-stage PDF report(s) blank
No resultPP Sample1 reports
No reportPilot Run
08/31QC 1st Bundle1 reports
08/31QA 1st Bundle1 reports
26/96QC Inlineactual/required · 27%
DHU 21.4%QC Endline25 days
All FAILQA Inline6 reports
1/2 FAILShipment Sample2 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty10,000 / 10,000
PDF reports40
Last report09/30

Cross-stage findings

1 later-stage PDF report(s) blank

Shipment Sample 09/15 QGR2641023 (FAIL); please check if the report was completed

Recurring in small numbers: 3

Latest Final Random (09/17): EA Unsmooth/puckering/bubbling 2 (earlier 20 times), BB Missing cut seam allowance 1 (earlier 3 times), CB Broken stitch 2 (earlier 13 times)

Found earlier but still reached later stages: 3

EI Inaccurate/skewed stitching 1, EC Asymmetry 3, AD Fabric stains 2 pcs (later stages total)

17 defects recorded as 'Others' without detail

QA 1st Bundle 1, QC Inline 13, QA Inline 3; cannot compare across stages

QC Endline data errors: 5

09/03 CB15 261300-S (defective pcs 118 > defects 87), 09/04 CB15 261300-L (defective pcs 61 > defects 58), 09/05 CB15 261300-S (defective pcs 83 > defects 65), 09/05 CB15 261300-L (defective pcs 13 > defects 12)…

Duplicate report numbers

QGR2642925 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (3 Major), EB Measurement issue (2 Major), DJ Pleat (1 Major), CE Broken seam (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: CG Grinning (2), AC Fabric hole (2), EA Unsmooth/puckering/bubbling (1); Both: EC Asymmetry (2/4), CC Skip stitch (1/2), BA Thread ends (1/2), EI Inaccurate/skewed stitching (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 90.0%

Caught in earlier stages

EB Measurement issue (305), CE Broken seam (229), CC Skip stitch (152), Q61 Lace raw edge or broken lace (139), DK Twisted shoulder strap (135) did not reach later stages

Report line differs from production line

QGR2641171 Final Random (09/17) CB12; actual production line(s) CB11/CB13/CB15 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—90.0%
QC Inline28 reports
required on prod. days 26/96 (27%)
—34.2%
QC Endline25 days—21.4%
QA Inline6 reports633.8%
Shipment Sample2 reports1—
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1518.3%
5573 / 25 days
30.6%—
08/29–09/30
BA Thread ends, CE Broken seam, DK Twisted shoulder strap
CB1326.3%
3575 / 22 days
32.9%—
09/02–09/30
BA Thread ends, EC Asymmetry, EB Measurement issue
CB110.0%
20 / 1 days
——
09/21–09/21
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB15255011 (22%)251409/25, 09/26, 09/28, 09/29, 09/30
CB13224415 (34%)20909/22, 09/23, 09/25, 09/26, 09/30
CB11120 (0%)1109/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
EC Asymmetry24135325243
BA Thread ends121545929
EB Measurement issue272924
CE Broken seam148180
CC Skip stitch12201227
Q61 Lace raw edge or broken lace139
DK Twisted shoulder strap21321
AC Fabric hole24105
261301 LOGE · CS09/CS10/CS12 · Due 09/25Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/25QA 1st Bundle1 reports
17/50QC Inlineactual/required · 34%
DHU 14.5%QC Endline18 days
All FAILQA Inline4 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty10,000 / 10,000
PDF reports25
Last report09/10

Cross-stage findings

Missed in earlier stages: 1

DJ Pleat (Final Random 09/10): first found in later stages, never recorded before

Recurring in small numbers: 4

Latest Final Random (09/10): CE Broken seam 1 (earlier 4 times), EI Inaccurate/skewed stitching 1 (earlier 12 times), ED Gathering crease 1 (earlier 17 times), BB Missing cut seam allowance 1 (earlier 5 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

66 defects recorded as 'Others' without detail

QC Inline 66; cannot compare across stages

QC Endline data errors: 11

08/25 CS12 261301 (defective pcs 23 > defects 6), 08/26 CS12 261301 (defective pcs 17 > defects 6), 08/28 CS12 261301 (defective pcs 21 > defects 8), 08/29 CS12 261301 (defective pcs 37 > defects 13)…

Caught in earlier stages

CC Skip stitch (184), EC Asymmetry (48), EA Unsmooth/puckering/bubbling (45), DF Twisted seam/skewing (33), DB Run-off stitching (30) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—70.0%
QC Inline18 reports
required on prod. days 17/50 (34%)
—27.8%
QC Endline18 days—14.5%
QA Inline4 reports435.9%
Pre-final1 reports12.5%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1023.7%
5439 / 14 days
35.9%—
08/29–09/15
BA Thread ends, CC Skip stitch, ED Gathering crease
CS123.5%
4501 / 11 days
——
08/24–09/07
BA Thread ends, CC Skip stitch, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1014288 (29%)14609/10, 09/11, 09/12, 09/14, 09/15
CS1211229 (41%)11209/01, 09/02, 09/03, 09/05, 09/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends11711247226
CC Skip stitch401404
ED Gathering crease3281131
Others (no detail)6628
AD Fabric stains124111
EC Asymmetry423129
EA Unsmooth/puckering/bubbling45
EI Inaccurate/skewed stitching23072
261305 LOGE · CP10/CP11/CP12… · Due 09/25Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/31QC 1st Bundle1 reports
08/31–09/03QA 1st Bundle2 reports
1/28QC Inlineactual/required · 4%
DHU 23.4%QC Endline10 days
All FAILQA Inline1 reports
All FAILShipment Sample3 reports1 no result
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty4,000 / 4,000
PDF reports9
Last report09/18

Cross-stage findings

Missed in earlier stages: 1

BD Snagging (Final Random 09/18): first found in later stages, never recorded before

QC Endline data errors: 1

08/31 CP12 261305-1 (defective pcs 76 > defects 66)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DJ Pleat (6 Major), HA Poor pressing (1 Major), GA Missing bartack/button (1 Major); Only QC 1st Bundle: DI High-low/uneven (2), CC Skip stitch (1), DB Run-off stitching (1); Both: CG Grinning (4/8), EC Asymmetry (1/8), BA Thread ends (4/4), DE Cut to broken (3/3), CB Broken stitch (4/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 82.5%

Caught in earlier stages

ED Gathering crease (160), HA Poor pressing (143), CC Skip stitch (40), CB Broken stitch (8), DE Cut to broken (7) did not reach later stages

Report line differs from production line

QGR2640438 Final Random (09/18) CP04; actual production line(s) CP10/CP11/CP12/CP13/CS03 (cards show production lines only)

Found before bulk production (Shipment Sample): 7

EI Inaccurate/skewed stitching, EC Asymmetry, DH Pressing mark, EA Unsmooth/puckering/bubbling, CG Grinning, CF Pulling yarn, AD Fabric stains: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle2 reports—82.5%
QC Inline1 reports
required on prod. days 1/28 (4%)
—28.7%
QC Endline10 days—23.4%
QA Inline1 reports131.2%
Shipment Sample3 reports2—
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1223.9%
3900 / 10 days
31.2%—
08/29–09/09
BA Thread ends, AD Fabric stains, ED Gathering crease
CP100.0%
20 / 1 days
——
09/02–09/02
—
CP110.0%
20 / 1 days
——
09/08–09/08
—
CP130.0%
20 / 1 days
——
09/04–09/04
—
CS030.0%
20 / 1 days
——
09/08–09/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1210201 (5%)10909/04, 09/05, 09/07, 09/08, 09/09
CP10120 (0%)1109/02
CP11120 (0%)1109/08
CP13120 (0%)1109/04
CS03120 (0%)1109/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends44632627
AD Fabric stains24213
ED Gathering crease160
HA Poor pressing11411
CC Skip stitch139
EC Asymmetry1831322
CG Grinning4832
CB Broken stitch422
261483 CHTE · CS01/CS12 · Due 09/28Final Random PASS Missed in earlier stages: 4
No resultPP Sample1 reports
No reportPilot Run
09/05QC 1st Bundle1 reports
09/07QA 1st Bundle1 reports
11/30QC Inlineactual/required · 37%
DHU 17.9%QC Endline14 days
All FAILQA Inline5 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final2 reports
All PASSFinal Random1 reports
Order/Ship qty2,549 / 2,549
PDF reports24
Last report10/03

Cross-stage findings

Missed in earlier stages: 4

EA Unsmooth/puckering/bubbling (Shipment Sample 09/14), CG Grinning (Shipment Sample 09/14), DD Thread not straight/waving (Shipment Sample 09/14), BD Snagging (Pre-final 09/18): first found in later stages, never recorded before

QA Inline DHU is 3.1× QC Inline

QA Inline DHU 37.8% vs QC Inline 12.3%; QC Inline may be missing defects

Recurring in small numbers: 4

Latest Final Random (10/03): AD Fabric stains 2 (earlier 22 times), CB Broken stitch 1 (earlier 9 times), EC Asymmetry 2 (earlier 19 times), ED Gathering crease 1 (earlier 12 times)

Found earlier but still reached later stages: 2

DF Twisted seam/skewing 2, AC Fabric hole 1 pcs (later stages total)

15 defects recorded as 'Others' without detail

QC 1st Bundle 3, QA 1st Bundle 2, QA Inline 7, QC Inline 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 9 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (3 Major), DF Twisted seam/skewing (2 Major), BA Thread ends (2 Major), CC Skip stitch (1 Major), DI High-low/uneven (1 Major), BB Missing cut seam allowance (1 Major), DB Run-off stitching (1 Major), CB Broken stitch (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: EG Wrong panel assembly (2), CH Incorrect stitch density (2), FC Wrong label (1); DHU QC 1st Bundle 8.8% / QA 1st Bundle 75.0%

Caught in earlier stages

CC Skip stitch (106), DB Run-off stitching (35), DJ Pleat (10), CE Broken seam (9), BB Missing cut seam allowance (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—8.8%
QA 1st Bundle1 reports—75.0%
QC Inline11 reports
required on prod. days 11/30 (37%)
—12.3%
QC Endline14 days—17.9%
QA Inline5 reports537.8%
Shipment Sample2 reports1—
Pre-final2 reports27.3%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0117.9%
2539 / 14 days
37.8%PASS
09/05–09/22
AD Fabric stains, BA Thread ends, CC Skip stitch
CS120.0%
10 / 1 days
——
09/07–09/07
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS01142811 (39%)14309/16, 09/17, 09/18, 09/19, 09/22
CS12120 (0%)1109/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
AD Fabric stains3111477282
BA Thread ends220873128
CC Skip stitch116863
ED Gathering crease8031
EC Asymmetry11521112
DB Run-off stitching134
CB Broken stitch1861
Others (no detail)3237
261485 CHTE · CS23 · Due 09/28Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/26QA 1st Bundle1 reports
3/16QC Inlineactual/required · 19%
DHU 13.3%QC Endline8 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty982 / 982
PDF reports9
Last report09/29

Cross-stage findings

Missed in earlier stages: 1

FC Wrong label (Shipment Sample 09/02): first found in later stages, never recorded before

Pre-final DHU is 1.1× QC Endline

Pre-final DHU 15.0% vs QC Endline 13.3% (08/26–09/21, 8 days, 982 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (09/29): ED Gathering crease 1 (earlier 6 times), AD Fabric stains 2 (earlier 6 times)

Found earlier but still reached later stages: 1

EC Asymmetry 4 pcs (later stages total)

QC Endline data errors: 4

08/26 CS23 261485 (defective pcs 35 > defects 22), 08/28 CS23 261485 (defective pcs 60 > defects 49), 08/29 CS23 261485 (defective pcs 44 > defects 33), 08/31 CS23 261485 (defective pcs 34 > defects 27)

Caught in earlier stages

CC Skip stitch (23), CB Broken stitch (14), DD Thread not straight/waving (14), DF Twisted seam/skewing (12), DI High-low/uneven (9) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—40.0%
QC Inline3 reports
required on prod. days 3/16 (19%)
—31.8%
QC Endline8 days—13.3%
QA Inline1 reports118.8%
Shipment Sample2 reports1—
Pre-final1 reports115.0%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2313.3%
982 / 8 days
18.8%PASS
08/26–09/21
AD Fabric stains, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS238163 (19%)8508/31, 09/01, 09/04, 09/07, 09/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends119251225
AD Fabric stains327122
ED Gathering crease1133171
CC Skip stitch23
Others (no detail)17
CB Broken stitch1121
DD Thread not straight/waving14
DF Twisted seam/skewing12
261490 CHTE · CS08/CS09 · Due 09/28Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/09QC 1st Bundle1 reports
09/09QA 1st Bundle1 reports
6/16QC Inlineactual/required · 38%
DHU 5.4%QC Endline8 days
All FAILQA Inline4 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,331 / 2,331
PDF reports16
Last report09/25

Cross-stage findings

Missed in earlier stages: 1

EI Inaccurate/skewed stitching (Shipment Sample 09/12): first found in later stages, never recorded before

QA Inline DHU is 5.0× QC Inline

QA Inline DHU 56.2% vs QC Inline 11.2%; QC Inline may be missing defects

QA Inline DHU is 10.4× QC Endline

QA Inline DHU 56.2% vs QC Endline 5.4% (09/09–09/17, 8 days, 2184 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects; Pre-final 11.2%

Recurring in small numbers: 4

Latest Final Random (09/25): AD Fabric stains 1 (earlier 12 times), DF Twisted seam/skewing 1 (earlier 17 times), EC Asymmetry 2 (earlier 12 times), ED Gathering crease 1 (earlier 6 times)

Found earlier but still reached later stages: 4

DD Thread not straight/waving 2, CB Broken stitch 1, BD Snagging 3, DJ Pleat 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Pre-final 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 20); zero in QC Endline records

QC Endline data errors: 8

09/09 CS08 261490 (defective pcs 19 > defects 8), 09/10 CS08 261490 (defective pcs 57 > defects 23), 09/11 CS08 261490 (defective pcs 35 > defects 14), 09/12 CS08 261490 (defective pcs 25 > defects 11)…

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (4 Major), DI High-low/uneven (3 Major), CF Pulling yarn (2 Major), DD Thread not straight/waving (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: AD Fabric stains (2), CA Thread tension (2), BB Missing cut seam allowance (1), BA Thread ends (1); Both: DF Twisted seam/skewing (5/3), EC Asymmetry (2/3); DHU QC 1st Bundle 100.0% / QA 1st Bundle 90.0%

Caught in earlier stages

CG Grinning (27), CC Skip stitch (15), DI High-low/uneven (9), CF Pulling yarn (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—90.0%
QC Inline6 reports
required on prod. days 6/16 (38%)
—11.2%
QC Endline8 days—5.4%
QA Inline4 reports456.2%
Shipment Sample2 reports1—
Pre-final1 reports111.2%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS085.4%
2184 / 8 days
56.2%PASS
09/09–09/17
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS088166 (38%)8209/12, 09/14, 09/15, 09/16, 09/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends1267158
DF Twisted seam/skewing5338461
AD Fabric stains2615311
EC Asymmetry2331712
CG Grinning423
ED Gathering crease315141
DD Thread not straight/waving1572
CC Skip stitch141
261491 CHTE · CS23 · Due 09/28Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/31QA 1st Bundle1 reports
4/14QC Inlineactual/required · 29%
DHU 29.9%QC Endline7 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,125 / 1,125
PDF reports9
Last report10/03

Cross-stage findings

Missed in earlier stages: 2

BD Snagging (Final Random 10/03), DH Pressing mark (Final Random 10/03): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (10/03): DJ Pleat 1 (earlier 3 times), CB Broken stitch 1 (earlier 6 times)

Found earlier but still reached later stages: 4

CG Grinning 1, EA Unsmooth/puckering/bubbling 2, EC Asymmetry 1, AD Fabric stains 3 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC Endline data errors: 4

09/01 CS23 261491 (defective pcs 61 > defects 40), 09/02 CS23 261491 (defective pcs 78 > defects 54), 09/04 CS23 261491 (defective pcs 72 > defects 46), 09/05 CS23 261491 (defective pcs 60 > defects 51)

Caught in earlier stages

CC Skip stitch (41), DI High-low/uneven (22), DB Run-off stitching (14), AC Fabric hole (11), DF Twisted seam/skewing (9) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—45.0%
QC Inline4 reports
required on prod. days 4/14 (29%)
—28.4%
QC Endline7 days—29.9%
QA Inline1 reports128.1%
Shipment Sample1 reports1—
Pre-final1 reports15.0%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2329.9%
1074 / 7 days
28.1%PASS
08/31–09/08
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS237144 (29%)7309/02, 09/03, 09/04, 09/05, 09/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends2219195
CC Skip stitch635
ED Gathering crease252
AD Fabric stains2013
DI High-low/uneven121
Others (no detail)20
CB Broken stitch15111
DB Run-off stitching392
261492 CHTE · CS04 · Due 09/28Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/07QC 1st Bundle1 reports
09/08QA 1st Bundle1 reports
6/18QC Inlineactual/required · 33%
DHU 19.0%QC Endline9 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final2 reports
All PASSFinal Random1 reports
Order/Ship qty1,124 / 1,124
PDF reports15
Last report09/21

Cross-stage findings

Missed in earlier stages: 1

CF Pulling yarn (Pre-final 09/11): first found in later stages, never recorded before

QA Inline DHU is 3.7× QC Inline

QA Inline DHU 42.2% vs QC Inline 11.4%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (09/21): CB Broken stitch 1 (earlier 6 times), DJ Pleat 1 (earlier 5 times)

Found earlier but still reached later stages: 5

EC Asymmetry 2, DD Thread not straight/waving 1, EA Unsmooth/puckering/bubbling 1, CC Skip stitch 1, ED Gathering crease 5 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

CF Pulling yarn (QA 6); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (2 Major), CB Broken stitch (2 Major), EA Unsmooth/puckering/bubbling (1 Major), AC Fabric hole (1 Major), DI High-low/uneven (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: AD Fabric stains (4), DF Twisted seam/skewing (1), EC Asymmetry (1), CA Thread tension (1); Both: BA Thread ends (1/2); DHU QC 1st Bundle 10.0% / QA 1st Bundle 55.0%

Caught in earlier stages

DB Run-off stitching (28), DI High-low/uneven (13), AD Fabric stains (6), CE Broken seam (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—10.0%
QA 1st Bundle1 reports—55.0%
QC Inline6 reports
required on prod. days 6/18 (33%)
—11.4%
QC Endline9 days—19.0%
QA Inline2 reports242.2%
Shipment Sample2 reports1—
Pre-final2 reports28.8%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0419.0%
1124 / 9 days
42.2%PASS
09/07–09/16
BA Thread ends, ED Gathering crease, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS049186 (33%)9309/11, 09/12, 09/14, 09/15, 09/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends1291196266
ED Gathering crease4714
DB Run-off stitching14221
EC Asymmetry1111012
CC Skip stitch51331
CB Broken stitch26141
DI High-low/uneven1111
DJ Pleat711
261494 CHTE · CS16/CS22 · Due 09/28Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
09/10QC 1st Bundle1 reports
09/10QA 1st Bundle1 reports
4/16QC Inlineactual/required · 25%
DHU 17.7%QC Endline7 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,567 / 1,567
PDF reports12
Last report09/23

Cross-stage findings

Missed in earlier stages: 2

EE Raw edge (Shipment Sample 09/15), BB Missing cut seam allowance (Pre-final 09/16): first found in later stages, never recorded before

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 48.4% vs QC Inline 29.1%; QC Inline may be missing defects

Recurring in small numbers: 3

Latest Final Random (09/23): DF Twisted seam/skewing 2 (earlier 4 times), AD Fabric stains 2 (earlier 11 times), DJ Pleat 1 (earlier 7 times)

Found earlier but still reached later stages: 2

EA Unsmooth/puckering/bubbling 3, ED Gathering crease 3 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 13); zero in QC Endline records

QC Endline data errors: 1

09/11 CS22 261494 (defective pcs 15 > defects 9)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), EA Unsmooth/puckering/bubbling (2 Major), AD Fabric stains (2 Major), AC Fabric hole (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: BA Thread ends (4), CC Skip stitch (2), GB Missing sewing operation (2), DB Run-off stitching (2); Both: DD Thread not straight/waving (4/1), EI Inaccurate/skewed stitching (3/1), CB Broken stitch (3/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 55.0%

Caught in earlier stages

CC Skip stitch (52), DB Run-off stitching (46), EA Uneven seam allowance (27), EC Asymmetry (24), CB Broken stitch (19) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—55.0%
QC Inline4 reports
required on prod. days 4/16 (25%)
—29.1%
QC Endline7 days—17.7%
QA Inline2 reports248.4%
Shipment Sample2 reports1—
Pre-final1 reports112.8%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2217.8%
1557 / 7 days
48.4%PASS
09/09–09/16
BA Thread ends, AD Fabric stains, CC Skip stitch
CS160.0%
10 / 1 days
——
09/10–09/10
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS227144 (29%)7309/11, 09/12, 09/14, 09/15, 09/16
CS16120 (0%)1109/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends41877175
AD Fabric stains25695232
CC Skip stitch26413
DB Run-off stitching2737
ED Gathering crease2223
EA Uneven seam allowance27
EC Asymmetry1113
CB Broken stitch31141
253712 MKSC · CB02/CB06/CB30 · Due 09/30Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/21QA 1st Bundle1 reports
12/102QC Inlineactual/required · 12%
DHU 11.1%QC Endline44 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
1/5 FAILFinal Random5 reports
Order/Ship qty6,000 / 2,000
PDF reports19
Last report09/26

Cross-stage findings

Missed in earlier stages: 1

AF Crushed foam cup (Final Random 08/05): first found in later stages, never recorded before

Found earlier but still reached later stages: 3

ED Gathering crease 5, AD Fabric stains 1, BA Thread ends 3 pcs (later stages total)

15 defects recorded as 'Others' without detail

Final Random 12, QC Inline 3; cannot compare across stages

QC Endline data errors: 6

07/02 CB06 253712A-S (defective pcs 28 > defects 27), 07/06 CB06 253712B-S (defective pcs 18 > defects 16), 07/07 CB06 253712A-S (defective pcs 9 > defects 8), 07/28 CB06 253712C-S (defective pcs 68 > defects 67)…

Caught in earlier stages

CC Skip stitch (133), EC Asymmetry (132), EA Unsmooth/puckering/bubbling (46), DB Run-off stitching (38), DD Thread not straight/waving (29) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline12 reports
required on prod. days 12/102 (12%)
—50.3%
QC Endline44 days—11.1%
QA Inline1 reports121.9%
Final Random5 reports13.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0612.5%
5468 / 40 days
21.9%PASS
06/30–09/18
ED Gathering crease, BA Thread ends, CC Skip stitch
CB027.4%
1958 / 9 days
——
08/03–08/20
CC Skip stitch, Others (no detail), EC Asymmetry
CB300.0%
42 / 2 days
——
08/06–08/10
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0640809 (11%)403108/29, 08/31, 09/05, 09/09, 09/18
CB029183 (17%)9608/07, 08/08, 08/10, 08/11, 08/20
CB30240 (0%)2208/06, 08/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease32733615
BA Thread ends1493
CC Skip stitch16117
EC Asymmetry530943
Others (no detail)33512
EA Unsmooth/puckering/bubbling3493
DB Run-off stitching434
DD Thread not straight/waving2234
253714 MKSC · CB08/CB10/CB30 · Due 09/30Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run2 reports
07/29QC 1st Bundle1 reports
07/29QA 1st Bundle1 reports
12/56QC Inlineactual/required · 21%
DHU 25.2%QC Endline27 days
All FAILQA Inline4 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty3,700 / 1,000
PDF reports24
Last report09/09

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 09/09): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/09): EC Asymmetry 1 (earlier 55 times), DJ Pleat 2 (earlier 3 times), CE Broken seam 1 (earlier 6 times)

Found earlier but still reached later stages: 3

ED Gathering crease 1, EA Unsmooth/puckering/bubbling 2, DB Run-off stitching 1 pcs (later stages total)

6 defects recorded as 'Others' without detail

Pilot Run 1, QA Inline 3, Final Random 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

QC Endline data errors: 1

07/30 CB08 253714A-S (defective pcs 19 > defects 18)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: EE Raw edge (2); Both: ED Gathering crease (4/3), EA Unsmooth/puckering/bubbling (2/1), EC Asymmetry (2/1), DE Cut to broken (2/1); DHU QC 1st Bundle 92.3% / QA 1st Bundle 69.2%

Caught in earlier stages

EB Measurement issue (193), EA Uneven seam allowance (98), CD Needle hole (64), CG Grinning (24), DE Cut to broken (20) did not reach later stages

Report line differs from production line

QGR2632029 Final Random (08/06) CB05; actual production line(s) CB08/CB10/CB30 (cards show production lines only)

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—69.2%
QC Inline12 reports
required on prod. days 12/56 (21%)
—50.3%
QC Endline27 days—25.2%
QA Inline4 reports418.8%
Final Random4 reports04.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0825.2%
4630 / 27 days
18.8%PASS
07/29–09/02
BA Thread ends, ED Gathering crease, EC Asymmetry
CB300.0%
10 / 1 days
——
08/10–08/10
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB08275412 (22%)271508/25, 08/26, 08/28, 08/29, 09/02
CB30120 (0%)1108/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends135323
ED Gathering crease1432724511
EC Asymmetry52156201101
EB Measurement issue251851
EA Uneven seam allowance98
CD Needle hole64
EA Unsmooth/puckering/bubbling1212132
CE Broken seam3221
260268 MKSC · CB13/CB30 · Due 09/30Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
2/24QC Inlineactual/required · 8%
DHU 10.5%QC Endline12 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
1/3 FAILFinal Random3 reports
Order/Ship qty1,993 / 1,000
PDF reports5
Last report08/11

Cross-stage findings

Missed in earlier stages: 3

ED Gathering crease (Final Random 08/06), EA Unsmooth/puckering/bubbling (Final Random 08/11), CG Grinning (Final Random 08/11): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/11): AD Fabric stains 2 (earlier 5 times), AC Fabric hole 1 (earlier 3 times)

Found earlier but still reached later stages: 3

DJ Pleat 1, EC Asymmetry 4, BA Thread ends 1 pcs (later stages total)

6 defects recorded as 'Others' without detail

Final Random 6; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 4), ED Gathering crease (QA 4); zero in QC Endline records

QC Endline data errors: 5

07/06 CB13 260268C-L (defective pcs 20 > defects 16), 07/06 CB13 260268B-L (defective pcs 10 > defects 7), 07/07 CB13 260268C-L (defective pcs 35 > defects 31), 07/08 CB13 260268C-L (defective pcs 20 > defects 15)…

Caught in earlier stages

CC Skip stitch (125), AA Fabric defect (25), DA Exceed seam allowance (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline2 reports
required on prod. days 2/24 (8%)
—33.0%
QC Endline12 days—10.5%
Final Random3 reports110.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1310.6%
1943 / 11 days
—PASS
06/30–08/06
CC Skip stitch, AD Fabric stains, AC Fabric hole
CB300.0%
10 / 1 days
——
08/04–08/04
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1311222 (9%)11907/08, 07/18, 07/21, 07/27, 08/06
CB30120 (0%)1108/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
CC Skip stitch2123
AD Fabric stains3303
AC Fabric hole291
AA Fabric defect124
DA Exceed seam allowance8
EC Asymmetry24
BA Thread ends51
Others (no detail)6
260274 MKSC · CP03 · Due 09/30Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/14QC Inlineactual/required · 7%
DHU 11.1%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty2,250 / 1,250
PDF reports5
Last report09/04

Cross-stage findings

Missed in earlier stages: 3

CE Broken seam (Final Random 08/20), BD Snagging (Final Random 09/04), BB Missing cut seam allowance (Final Random 09/04): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/04): ED Gathering crease 1 (earlier 10 times), CB Broken stitch 1 (earlier 3 times)

Found earlier but still reached later stages: 1

EC Asymmetry 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC Endline data errors: 7

06/24 CP03 260274AP (defective pcs 28 > defects 17), 06/25 CP03 260274AP (defective pcs 92 > defects 73), 06/25 CP03 260274AM (defective pcs 9 > defects 3), 08/13 CP03 260274CU (defective pcs 28 > defects 26)…

Caught in earlier stages

AD Fabric stains (82), CC Skip stitch (65), EA Uneven seam allowance (23), DF Twisted seam/skewing (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/14 (7%)
—105.0%
QC Endline7 days—11.1%
QA Inline1 reports131.2%
Final Random3 reports03.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0311.1%
2965 / 7 days
31.2%PASS
06/24–08/17
AD Fabric stains, CC Skip stitch, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP037141 (7%)7608/12, 08/13, 08/14, 08/15, 08/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
AD Fabric stains379
BA Thread ends56225
EC Asymmetry8571
CC Skip stitch65
ED Gathering crease372
EA Uneven seam allowance23
CB Broken stitch311
DF Twisted seam/skewing5
260275 MKSC · CP17 · Due 09/30Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/16QA 1st Bundle1 reports
0/14QC Inlineactual/required · 0%
DHU 14.3%QC Endline7 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty1,860 / 1,060
PDF reports5
Last report09/18

Cross-stage findings

Missed in earlier stages: 2

DJ Pleat (Final Random 09/18), BD Snagging (Final Random 09/18): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (09/18): BA Thread ends 1 (earlier 14 times)

Found earlier but still reached later stages: 5

CC Skip stitch 1, AC Fabric hole 1, CB Broken stitch 1, CE Broken seam 1, AD Fabric stains 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Final Random 1; cannot compare across stages

QC Endline data errors: 3

07/16 CP17 260275A (defective pcs 16 > defects 15), 07/21 CP17 260275B (defective pcs 6 > defects 5), 07/25 CP17 260275C (defective pcs 16 > defects 13)

Caught in earlier stages

ED Gathering crease (55), EA Uneven seam allowance (37), EB Measurement issue (12), DB Run-off stitching (12), DK Twisted shoulder strap (8) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—90.0%
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—14.3%
Final Random4 reports03.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1714.3%
2000 / 7 days
—PASS
07/16–07/28
BA Thread ends, ED Gathering crease, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP177140 (0%)7707/18, 07/20, 07/21, 07/25, 07/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineFinal Random
BA Thread ends31056
ED Gathering crease352
EA Uneven seam allowance37
CC Skip stitch1291
AD Fabric stains251
EB Measurement issue12
DB Run-off stitching12
DK Twisted shoulder strap8
260279 MKSC · CB01/CB04/CB07… · Due 09/30Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No resultPilot Run2 reports
07/11QC 1st Bundle1 reports
07/13QA 1st Bundle1 reports
12/46QC Inlineactual/required · 26%
DHU 5.3%QC Endline20 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
1/7 FAILFinal Random7 reports
Order/Ship qty2,000 / 1,000
PDF reports32
Last report09/23

Cross-stage findings

Missed in earlier stages: 3

DA Exceed seam allowance (Shipment Sample 07/18), DC Join stitching (Final Random 07/29), CD Needle hole (Final Random 08/04): first found in later stages, never recorded before

QA Inline DHU is 5.6× QC Endline

QA Inline DHU 29.7% vs QC Endline 5.3% (07/13–08/08, 20 days, 5204 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (09/23): ED Gathering crease 1 (earlier 8 times)

Found earlier but still reached later stages: 7

EC Asymmetry 2, CG Grinning 1, DJ Pleat 2, AD Fabric stains 3, EA Unsmooth/puckering/bubbling 5, CC Skip stitch 2, CB Broken stitch 4 pcs (later stages total)

17 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 9, Final Random 7; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

ED Gathering crease (QA 8), EA Unsmooth/puckering/bubbling (QA 6); zero in QC Endline records

QC Endline data errors: 8

07/14 CB01 260279A-S (defective pcs 6 > defects 5), 07/15 CB01 260279A-S (defective pcs 6 > defects 5), 07/17 CB01 260279A-L (defective pcs 6 > defects 4), 07/27 CB01 260279B-S (defective pcs 18 > defects 16)…

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DI High-low/uneven (1 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: AD Fabric stains (3), DJ Pleat (2), AC Fabric hole (2); Both: EC Asymmetry (3/5), CG Grinning (3/2), CE Broken seam (3/1); DHU QC 1st Bundle 123.1% / QA 1st Bundle 92.3%

Caught in earlier stages

DB Run-off stitching (133), CE Broken seam (26), AC Fabric hole (16), EH Poor lamination/bonding (7) did not reach later stages

Report line differs from production line

QGR2634098 Final Random (08/13) CB26; actual production line(s) CB01/CB04/CB07/CB28/CB30 (cards show production lines only)

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—123.1%
QA 1st Bundle1 reports—92.3%
QC Inline18 reports
required on prod. days 12/46 (26%)
—43.8%
QC Endline20 days—5.3%
QA Inline2 reports229.7%
Shipment Sample1 reports1—
Final Random7 reports15.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB015.3%
5143 / 18 days
29.7%PASS
07/13–08/08
BA Thread ends, DB Run-off stitching, AD Fabric stains
CB300.0%
41 / 3 days
——
07/20–07/23
—
CB040.0%
10 / 1 days
—PASS
08/03–08/03
—
CB280.0%
10 / 1 days
——
08/08–08/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB01183612 (33%)18608/04, 08/05, 08/06, 08/07, 08/08
CB30360 (0%)3307/20, 07/22, 07/23
CB04120 (0%)1108/03
CB28120 (0%)1108/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends1212311
DB Run-off stitching18115
AD Fabric stains3393513
EC Asymmetry354312
CB Broken stitch444
DJ Pleat2392
EA Unsmooth/puckering/bubbling133123
ED Gathering crease12426
260282 MKSC · CP06 · Due 09/30Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/36QC Inlineactual/required · 0%
DHU 8.4%QC Endline18 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty4,000 / 1,700
PDF reports5
Last report09/05

Cross-stage findings

Missed in earlier stages: 1

DJ Pleat (Final Random 08/14): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

DB Run-off stitching 1, CE Broken seam 2 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA Inline 1, Final Random 1; cannot compare across stages

QC Endline data errors: 9

06/13 CP06 260282B (defective pcs 10 > defects 2), 06/13 CP06 260282A (defective pcs 45 > defects 22), 06/17 CP06 260282A (defective pcs 25 > defects 9), 06/24 CP06 260282C (defective pcs 30 > defects 3)…

Caught in earlier stages

ED Gathering crease (114), EA Unsmooth/puckering/bubbling (76), AD Fabric stains (27), EC Asymmetry (27), EB Measurement issue (5) did not reach later stages

Report line differs from production line

QGR2635135 Final Random (08/14) CP03; actual production line(s) CP06 (cards show production lines only)

Found before bulk production (Final Random): 3

CD Needle hole, CB Broken stitch, CC Skip stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/36 (0%)
——
QC Endline18 days—8.4%
QA Inline1 reports131.2%
Final Random4 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP068.4%
5021 / 18 days
31.2%PASS
06/12–08/21
BA Thread ends, ED Gathering crease, EA Unsmooth/puckering/bubbling

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0618360 (0%)181807/01, 07/02, 08/14, 08/19, 08/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineQA InlineFinal Random
BA Thread ends13537
ED Gathering crease114
EA Unsmooth/puckering/bubbling733
DB Run-off stitching261
AD Fabric stains27
EC Asymmetry27
CC Skip stitch811
EB Measurement issue5
260283 MKSC · CP03 · Due 09/30Final Random PASS QA Inline DHU is 5.3× QC Endline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
3/28QC Inlineactual/required · 11%
DHU 9.8%QC Endline14 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random5 reports
Order/Ship qty4,750 / 2,000
PDF reports11
Last report09/19

Cross-stage findings

QA Inline DHU is 5.3× QC Endline

QA Inline DHU 52.1% vs QC Endline 9.8% (06/25–09/03, 14 days, 5749 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (09/19): CC Skip stitch 1 (earlier 19 times)

Found earlier but still reached later stages: 2

AD Fabric stains 5, DJ Pleat 2 pcs (later stages total)

4 defects recorded as 'Others' without detail

Final Random 1, QA Inline 3; cannot compare across stages

QC Endline data errors: 15

06/25 CP03 260283A (defective pcs 40 > defects 17), 06/26 CP03 260283A (defective pcs 96 > defects 74), 06/27 CP03 260283A (defective pcs 97 > defects 66), 08/17 CP03 260283B (defective pcs 26 > defects 21)…

Caught in earlier stages

EC Asymmetry (70), ED Gathering crease (69), EA Uneven seam allowance (50), EA Unsmooth/puckering/bubbling (24), AC Fabric hole (6) did not reach later stages

Report line differs from production line

QGR2641776 Final Random (09/19) CP01; actual production line(s) CP03 (cards show production lines only)

Found before bulk production (Final Random): 2

CB Broken stitch, DE Cut to broken: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline3 reports
required on prod. days 3/28 (11%)
—74.0%
QC Endline14 days—9.8%
QA Inline3 reports352.1%
Final Random5 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP039.8%
5749 / 14 days
52.1%PASS
06/25–09/03
AD Fabric stains, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0314283 (11%)141108/24, 08/25, 08/26, 08/28, 09/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
AD Fabric stains616725
BA Thread ends33115511
CC Skip stitch10211
EC Asymmetry223810
ED Gathering crease681
EA Uneven seam allowance50
EA Unsmooth/puckering/bubbling2139
CB Broken stitch243
260285 MKSC · CS13/CS19 · Due 09/30Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No resultPilot Run2 reports
No reportQC 1st Bundle
No reportQA 1st Bundle
7/42QC Inlineactual/required · 17%
DHU 10.9%QC Endline21 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty5,643 / 1,500
PDF reports13
Last report08/08

Cross-stage findings

Missed in earlier stages: 2

HA Poor pressing (Final Random 07/15), CB Broken stitch (Final Random 07/31): first found in later stages, never recorded before

QA Inline DHU is 1.6× QC Inline

QA Inline DHU 43.8% vs QC Inline 26.6%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (08/08): AD Fabric stains 2 (earlier 63 times)

6 defects recorded as 'Others' without detail

QC Inline 1, QA Inline 5; cannot compare across stages

Caught in earlier stages

CC Skip stitch (44), EB Measurement issue (41), EC Asymmetry (29), DI High-low/uneven (25), ED Gathering crease (24) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC Inline7 reports
required on prod. days 7/42 (17%)
—26.6%
QC Endline21 days—10.9%
QA Inline1 reports143.8%
Final Random3 reports02.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1910.9%
5643 / 21 days
43.8%PASS
06/30–08/03
BA Thread ends, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1921427 (17%)211407/25, 07/27, 07/28, 08/01, 08/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC InlineQC EndlineQA InlineFinal Random
BA Thread ends4922828
AD Fabric stains2022246
Others (no detail)1395
CC Skip stitch44
EB Measurement issue41
EC Asymmetry5231
DI High-low/uneven241
ED Gathering crease519
260379 MKSC · CP05 · Due 09/30Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
3/52QC Inlineactual/required · 6%
DHU 10.0%QC Endline26 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
1/5 FAILFinal Random5 reports
Order/Ship qty2,550 / 748
PDF reports9
Last report09/14

Cross-stage findings

Missed in earlier stages: 2

CB Broken stitch (Final Random 07/07), BD Snagging (Final Random 09/12): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/14): EA Unsmooth/puckering/bubbling 1 (earlier 5 times), BA Thread ends 1 (earlier 34 times)

Found earlier but still reached later stages: 5

AD Fabric stains 3, DJ Pleat 1, AC Fabric hole 2, CC Skip stitch 1, ED Gathering crease 1 pcs (later stages total)

13 defects recorded as 'Others' without detail

Final Random 13; cannot compare across stages

QC Endline data errors: 27

06/26 CP05 260379A (defective pcs 20 > defects 12), 06/27 CP05 260379A (defective pcs 45 > defects 31), 06/29 CP05 260379A (defective pcs 23 > defects 19), 06/30 CP05 260379A (defective pcs 27 > defects 11)…

Caught in earlier stages

DF Twisted seam/skewing (37), AB Shading (32), EC Asymmetry (27), DB Run-off stitching (25), EB Measurement issue (16) did not reach later stages

Report line differs from production line

QGR2626434 Final Random (07/07) CP04, QGR2634137 Final Random (08/14) CP04, QGR2637817 Final Random (09/02) CP07; actual production line(s) CP05 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline3 reports
required on prod. days 3/52 (6%)
—62.5%
QC Endline26 days—10.0%
QA Inline1 reports128.1%
Final Random5 reports16.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0510.0%
5118 / 26 days
28.1%PASS
06/26–08/12
AD Fabric stains, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0526523 (6%)262308/04, 08/05, 08/06, 08/07, 08/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
AD Fabric stains512543
BA Thread ends6817
ED Gathering crease4791
CC Skip stitch104911
DF Twisted seam/skewing235
AC Fabric hole342
AB Shading32
EC Asymmetry621
260951 LOGE · CB24/CB30 · Due 09/30Final Random PASS QA Inline DHU is 2.3× QC Inline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/20QA 1st Bundle1 reports
5/34QC Inlineactual/required · 15%
DHU 12.3%QC Endline16 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
1/2 FAILFinal Random2 reports
Order/Ship qty4,000 / 4,000
PDF reports10
Last report08/24

Cross-stage findings

QA Inline DHU is 2.3× QC Inline

QA Inline DHU 64.1% vs QC Inline 27.6%; QC Inline may be missing defects

QA Inline DHU is 5.2× QC Endline

QA Inline DHU 64.1% vs QC Endline 12.3% (07/20–08/07, 16 days, 3921 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (08/24): CE Broken seam 1 (earlier 7 times), DJ Pleat 1 (earlier 9 times), ED Gathering crease 2 (earlier 21 times)

Found earlier but still reached later stages: 2

EE Raw edge 3, DE Cut to broken 3 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 11); zero in QC Endline records

Duplicate report numbers

QGR2630146 have multiple reports with different content

Caught in earlier stages

CC Skip stitch (120), EC Asymmetry (28), EA Unsmooth/puckering/bubbling (20), CG Grinning (12), EI Inaccurate/skewed stitching (9) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline5 reports
required on prod. days 5/34 (15%)
—27.6%
QC Endline16 days—12.3%
QA Inline2 reports264.1%
Final Random2 reports15.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2412.3%
3901 / 16 days
64.1%PASS
07/20–08/07
BA Thread ends, CC Skip stitch, ED Gathering crease
CB300.0%
20 / 1 days
——
07/25–07/25
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2416325 (16%)161108/03, 08/04, 08/05, 08/06, 08/07
CB30120 (0%)1107/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends230026
CC Skip stitch120
ED Gathering crease65916
EC Asymmetry12124
DJ Pleat3785
EA Unsmooth/puckering/bubbling4511
CE Broken seam2723
CG Grinning12
261125 MKSC · CB01/CB02/CB04… · Due 09/30Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run6 reports
08/26QC 1st Bundle1 reports
08/26QA 1st Bundle1 reports
2/26QC Inlineactual/required · 8%
DHU 12.7%QC Endline13 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,658 / 0
PDF reports14
Last report09/19

Cross-stage findings

Missed in earlier stages: 1

DJ Pleat (Final Random 09/10): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

CB Broken stitch 1, AD Fabric stains 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (7 Major), DB Run-off stitching (2 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), EC Asymmetry (3), BA Thread ends (3); Both: ED Gathering crease (2/3), BB Missing cut seam allowance (3/1); DHU QC 1st Bundle 43.8% / QA 1st Bundle 65.0%

Caught in earlier stages

EC Asymmetry (144), ED Gathering crease (66), CG Grinning (23), DB Run-off stitching (17), EA Unsmooth/puckering/bubbling (13) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run6 reports0—
QC 1st Bundle1 reports—43.8%
QA 1st Bundle1 reports—65.0%
QC Inline2 reports
required on prod. days 2/26 (8%)
—31.7%
QC Endline13 days—12.7%
QA Inline3 reports331.2%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2212.7%
2658 / 13 days
31.2%PASS
08/25–09/22
BA Thread ends, EC Asymmetry, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2213262 (8%)131109/04, 09/05, 09/07, 09/11, 09/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends351353
EC Asymmetry5321304
ED Gathering crease2232489
CG Grinning17510
DB Run-off stitching2312
EA Unsmooth/puckering/bubbling2335
AD Fabric stains121
BB Missing cut seam allowance314
261168 MKSC · CB01/CB03/CB08… · Due 09/30Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run7 reports
09/17QC 1st Bundle1 reports
09/18QA 1st Bundle1 reports
12/26QC Inlineactual/required · 46%
DHU 10.2%QC Endline13 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty5,575 / 917
PDF reports27
Last report10/07

Cross-stage findings

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 10/07): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (10/07): ED Gathering crease 2 (earlier 14 times)

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 8); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (3 Major), AD Fabric stains (1 Major), CC Skip stitch (1 Major); Only QC 1st Bundle: ED Gathering crease (3), DE Cut to broken (3); Both: EA Unsmooth/puckering/bubbling (3/3), CB Broken stitch (2/2), EC Asymmetry (2/1); DHU QC 1st Bundle — / QA 1st Bundle 84.6%

Caught in earlier stages

EC Asymmetry (170), CC Skip stitch (75), CG Grinning (57), CB Broken stitch (38), DJ Pleat (24) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run7 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—84.6%
QC Inline13 reports
required on prod. days 12/26 (46%)
—81.3%
QC Endline13 days—10.2%
QA Inline3 reports328.1%
Final Random2 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2210.2%
4015 / 13 days
28.1%PASS
09/17–10/03
BA Thread ends, EC Asymmetry, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB22132612 (46%)9509/29, 09/30, 10/01, 10/02, 10/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends1746
EC Asymmetry721271276
CC Skip stitch17652
EA Unsmooth/puckering/bubbling8335171
CG Grinning3495
ED Gathering crease53112014
CB Broken stitch2234
DJ Pleat231
261169 MKSC · CB07/CB22 · Due 09/30Final Random PASS QA Inline DHU is 1.7× QC Inline
No reportPP Sample
No resultPilot Run3 reports
09/14QC 1st Bundle1 reports
09/16QA 1st Bundle1 reports
2/18QC Inlineactual/required · 11%
DHU 16.8%QC Endline9 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,661 / 161
PDF reports10
Last report10/02

Cross-stage findings

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 68.8% vs QC Inline 40.0%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (10/02): EA Unsmooth/puckering/bubbling 1 (earlier 4 times), BA Thread ends 1 (earlier 5 times)

Found earlier but still reached later stages: 1

ED Gathering crease 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (4 Major), DJ Pleat (1 Major), ED Gathering crease (1 Major); Only QC 1st Bundle: DB Run-off stitching (2), CE Broken seam (2), CB Broken stitch (2), CA Thread tension (2); Both: CG Grinning (3/2); DHU QC 1st Bundle 84.6% / QA 1st Bundle 61.5%

Caught in earlier stages

CC Skip stitch (36), DB Run-off stitching (28), EC Asymmetry (18), CG Grinning (13), CB Broken stitch (12) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run3 reports0—
QC 1st Bundle1 reports—84.6%
QA 1st Bundle1 reports—61.5%
QC Inline2 reports
required on prod. days 2/18 (11%)
—40.0%
QC Endline9 days—16.8%
QA Inline1 reports168.8%
Final Random2 reports03.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2216.8%
1141 / 9 days
68.8%PASS
09/12–09/23
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB229182 (11%)9709/17, 09/18, 09/21, 09/22, 09/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends842
ED Gathering crease2136151
CC Skip stitch36
DB Run-off stitching21412
EC Asymmetry14121
CG Grinning328
CB Broken stitch129
AD Fabric stains12
261170 MKSC · CP06 · Due 09/30Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/08QA 1st Bundle1 reports
3/10QC Inlineactual/required · 30%
DHU 9.2%QC Endline5 days
All FAILQA Inline1 reports
No resultShipment Sample3 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,204 / 704
PDF reports10
Last report09/23

Cross-stage findings

Missed in earlier stages: 3

EG Wrong panel assembly (Shipment Sample 09/10), CG Grinning (Shipment Sample 09/10), CD Needle hole (Final Random 09/23): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/23): CC Skip stitch 1 (earlier 11 times), EA Unsmooth/puckering/bubbling 1 (earlier 8 times)

Found earlier but still reached later stages: 3

EC Asymmetry 1, EB Measurement issue 1, CF Pulling yarn 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

Final Random 2; cannot compare across stages

Caught in earlier stages

AD Fabric stains (19), ED Gathering crease (18), DB Run-off stitching (17), DD Thread not straight/waving (7), CE Broken seam (7) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—55.0%
QC Inline3 reports
required on prod. days 3/10 (30%)
—38.0%
QC Endline5 days—9.2%
QA Inline1 reports140.0%
Shipment Sample3 reports0—
Final Random2 reports04.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP069.2%
2184 / 5 days
40.0%PASS
09/08–09/12
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP065103 (30%)5209/08, 09/09, 09/10, 09/11, 09/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends4205213
CC Skip stitch4183142
EA Unsmooth/puckering/bubbling2111323
AD Fabric stains4141
ED Gathering crease18
DB Run-off stitching116
EC Asymmetry1121
EB Measurement issue1111
261183 MKSC · CB02/CB08/CB16… · Due 09/30Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No resultPilot Run4 reports
08/21QC 1st Bundle1 reports
08/21QA 1st Bundle1 reports
12/48QC Inlineactual/required · 25%
DHU 11.7%QC Endline17 days
All FAILQA Inline4 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random5 reports
Order/Ship qty8,097 / 1,000
PDF reports29
Last report09/18

Cross-stage findings

Missed in earlier stages: 3

BB Missing cut seam allowance (Final Random 09/01), DF Twisted seam/skewing (Final Random 09/17), AF Crushed foam cup (Final Random 09/18): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/18): EA Unsmooth/puckering/bubbling 1 (earlier 8 times), AD Fabric stains 2 (earlier 48 times), CB Broken stitch 1 (earlier 3 times)

Found earlier but still reached later stages: 5

ED Gathering crease 1, BA Thread ends 3, AC Fabric hole 1, DJ Pleat 2, CC Skip stitch 1 pcs (later stages total)

12 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 9; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 9); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (1 Major), CA Thread tension (1 Major); Only QC 1st Bundle: ED Gathering crease (4), CG Grinning (2), DA Exceed seam allowance (1); Both: AD Fabric stains (2/1), EC Asymmetry (1/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 53.8%

Caught in earlier stages

DB Run-off stitching (104), CE Broken seam (94), EC Asymmetry (31), CD Needle hole (27), EB Measurement issue (23) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run4 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—53.8%
QC Inline14 reports
required on prod. days 12/48 (25%)
—39.1%
QC Endline17 days—11.7%
QA Inline4 reports428.1%
Final Random5 reports04.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1611.5%
6762 / 16 days
30.2%PASS
08/21–09/16
BA Thread ends, ED Gathering crease, AD Fabric stains
CB0213.4%
1265 / 5 days
21.9%PASS
09/09–09/14
AD Fabric stains, BA Thread ends, CC Skip stitch
CB300.0%
30 / 2 days
——
09/11–09/15
—
CB170.0%
10 / 1 days
——
09/08–09/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB16163212 (38%)16409/11, 09/12, 09/14, 09/15, 09/16
CB025100 (0%)5509/09, 09/10, 09/11, 09/12, 09/14
CB30240 (0%)2209/11, 09/15
CB17120 (0%)1109/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease448615821
AD Fabric stains216316818
BA Thread ends251913
DB Run-off stitching2876
Others (no detail)3909
CE Broken seam6871
CC Skip stitch4861
EC Asymmetry2111476
261227 GECL · CS05/CS06/CS22… · Due 09/30Final Random PASS QA Inline DHU is 1.6× QC Inline
No reportPP Sample
No reportPilot Run
08/04QC 1st Bundle1 reports
07/27–08/04QA 1st Bundle2 reports
16/54QC Inlineactual/required · 30%
DHU 15.9%QC Endline23 days
All FAILQA Inline5 reports
No resultShipment Sample2 reports
All PASSPre-final2 reports
All PASSFinal Random2 reports
Order/Ship qty9,960 / 1,710
PDF reports31
Last report09/09

Cross-stage findings

QA Inline DHU is 1.6× QC Inline

QA Inline DHU 47.5% vs QC Inline 30.1%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (09/09): CB Broken stitch 2 (earlier 22 times)

Found earlier but still reached later stages: 3

BB Missing cut seam allowance 1, ED Gathering crease 2, DH Pressing mark 1 pcs (later stages total)

63 defects recorded as 'Others' without detail

QA 1st Bundle 9, QA Inline 11, QC Inline 38, Pre-final 3, Final Random 2; cannot compare across stages

QC Endline data errors: 1

07/29 CS05 261227A-1 (defective pcs 43 > defects 42)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DJ Pleat (4 Major), EC Asymmetry (4 Major), CC Skip stitch (1 Major), GB Missing sewing operation (1 Major), BB Missing cut seam allowance (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: ED Gathering crease (3), BC Sticker left (3); Both: CB Broken stitch (7/1), BA Thread ends (5/2), DI High-low/uneven (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 62.5%

Caught in earlier stages

CC Skip stitch (356), DB Run-off stitching (185), BC Sticker left (19), DE Cut to broken (18), DK Twisted shoulder strap (18) did not reach later stages

Found before bulk production (Shipment Sample): 7

EA Unsmooth/puckering/bubbling, DJ Pleat, CG Grinning, AD Fabric stains, EI Inaccurate/skewed stitching, EF Cup/pocket issue, EC Asymmetry: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle2 reports—62.5%
QC Inline17 reports
required on prod. days 16/54 (30%)
—30.1%
QC Endline23 days—15.9%
QA Inline5 reports547.5%
Shipment Sample2 reports0—
Pre-final2 reports03.1%
Final Random2 reports03.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2215.4%
4664 / 9 days
35.9%PASS
08/04–08/13
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS0521.0%
3258 / 12 days
56.2%PASS
07/25–08/07
BA Thread ends, CC Skip stitch, ED Gathering crease
CS248.5%
1950 / 6 days
54.7%PASS
08/29–09/05
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0512246 (25%)12608/03, 08/04, 08/05, 08/06, 08/07
CS229188 (44%)9108/08, 08/10, 08/11, 08/12, 08/13
CS246122 (17%)6408/31, 09/01, 09/02, 09/03, 09/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends5253942955
CC Skip stitch143492
DB Run-off stitching1101713
CB Broken stitch7149713
ED Gathering crease31052111
Others (no detail)93841132
EC Asymmetry43427123
BC Sticker left316
261228 GECL · CS03/CS24 · Due 09/30Final Random PASS QA Inline DHU is 2.0× QC Inline
No reportPP Sample
No reportPilot Run
07/25QC 1st Bundle1 reports
07/25–07/31QA 1st Bundle2 reports
36/98QC Inlineactual/required · 37%
DHU 10.7%QC Endline34 days
All FAILQA Inline8 reports
All FAILShipment Sample3 reports2 no result
All PASSPre-final1 reports
All PASSFinal Random3 reports
Order/Ship qty25,980 / 4,240
PDF reports54
Last report09/01

Cross-stage findings

QA Inline DHU is 2.0× QC Inline

QA Inline DHU 39.5% vs QC Inline 19.9%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (09/01): EC Asymmetry 1 (earlier 66 times), CB Broken stitch 2 (earlier 20 times)

Found earlier but still reached later stages: 4

DJ Pleat 1, EA Unsmooth/puckering/bubbling 4, CC Skip stitch 4, AC Fabric hole 1 pcs (later stages total)

18 defects recorded as 'Others' without detail

Shipment Sample 5, QA 1st Bundle 5, QA Inline 8; cannot compare across stages

QC Endline data errors: 7

07/24 CS03 261228A-2 (defective pcs 8 > defects 4), 08/11 CS24 261228A-1 (defective pcs 49 > defects 44), 08/18 CS24 261228A-1 (defective pcs 62 > defects 56), 08/25 CS24 261228B-1 (defective pcs 29 > defects 28)…

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (6 Major), BA Thread ends (5 Major), CC Skip stitch (3 Major), EI Inaccurate/skewed stitching (1 Major), BB Missing cut seam allowance (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DC Join stitching (2), CA Thread tension (2), DI High-low/uneven (1); Both: AD Fabric stains (2/4), DJ Pleat (1/2); DHU QC 1st Bundle 25.0% / QA 1st Bundle 70.0%

Caught in earlier stages

CD Needle hole (52), BB Missing cut seam allowance (23), EB Measurement issue (23), EA Uneven seam allowance (17), CE Broken seam (14) did not reach later stages

Found before bulk production (Shipment Sample): 5

ED Gathering crease, EG Wrong panel assembly, AD Fabric stains, EI Inaccurate/skewed stitching, DB Run-off stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—25.0%
QA 1st Bundle2 reports—70.0%
QC Inline36 reports
required on prod. days 36/98 (37%)
—19.9%
QC Endline34 days—10.7%
QA Inline8 reports839.5%
Shipment Sample3 reports1—
Pre-final1 reports02.5%
Final Random3 reports03.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2413.1%
12986 / 27 days
36.9%PASS
08/01–09/09
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS038.0%
11265 / 22 days
43.8%PASS
07/24–08/26
BA Thread ends, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS24275422 (41%)27508/28, 08/29, 08/31, 09/02, 09/09
CS03224414 (32%)22808/14, 08/15, 08/17, 08/18, 08/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends54016182049
CC Skip stitch3204116121
AD Fabric stains24263375223
EC Asymmetry174221316
ED Gathering crease8917411
DB Run-off stitching751
DJ Pleat125751
CB Broken stitch14553
261689 RTMS · CP15 · Due 09/30Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/04QA 1st Bundle1 reports
0/16QC Inlineactual/required · 0%
DHU 18.5%QC Endline8 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports1 no result
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,500 / 1,500
PDF reports6
Last report09/15

Cross-stage findings

Missed in earlier stages: 3

CB Broken stitch (Pre-final 09/09), EE Raw edge (Shipment Sample 09/14), AD Fabric stains (Shipment Sample 09/14): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

ED Gathering crease 2, EI Inaccurate/skewed stitching 1 pcs (later stages total)

Caught in earlier stages

EC Asymmetry (72), EA Unsmooth/puckering/bubbling (54), DF Twisted seam/skewing (41), AC Fabric hole (16), EB Measurement issue (14) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline8 days—18.5%
QA Inline1 reports143.8%
Shipment Sample2 reports1—
Pre-final1 reports02.4%
Final Random1 reports01.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1518.5%
1387 / 8 days
43.8%PASS
09/03–09/14
EC Asymmetry, EA Unsmooth/puckering/bubbling, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP158160 (0%)8809/07, 09/08, 09/09, 09/10, 09/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineShipment SamplePre-finalFinal Random
EC Asymmetry1701
ED Gathering crease74152
EA Unsmooth/puckering/bubbling54
DF Twisted seam/skewing140
BA Thread ends25387
AC Fabric hole16
EB Measurement issue14
DB Run-off stitching17
253616 MKSC · CB13 · Due 09/02Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,100 / 500
PDF reports1
Last report08/25

Cross-stage findings

Found before bulk production (Final Random): 2

BA Thread ends, ED Gathering crease: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random1 reports02.0%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends2
ED Gathering crease1
253626 MKSC · CP04 · Due 09/02Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,000 / 1,800
PDF reports1
Last report08/28

Cross-stage findings

Found before bulk production (Final Random): 2

BA Thread ends, EI Inaccurate/skewed stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random1 reports01.6%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends4
EI Inaccurate/skewed stitching1
253627 MKSC · CP15 · Due 09/02Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/16QC Inlineactual/required · 0%
DHU 10.4%QC Endline8 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,400 / 900
PDF reports1
Last report08/26

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/26): BA Thread ends 1 (earlier 15 times), EA Unsmooth/puckering/bubbling 1 (earlier 4 times)

QC Endline data errors: 4

06/12 CP15 253627D (defective pcs 50 > defects 24), 06/13 CP15 253627D (defective pcs 20 > defects 12), 06/13 CP15 253627E (defective pcs 10 > defects 6), 06/16 CP15 253627D (defective pcs 8 > defects 6)

Caught in earlier stages

CC Skip stitch (67), ED Gathering crease (65), EC Asymmetry (35), DB Run-off stitching (25), CD Needle hole (13) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline8 days—10.4%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1510.4%
3400 / 8 days
—PASS
06/12–08/07
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP158160 (0%)8806/17, 06/19, 06/20, 06/22, 08/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends903
CC Skip stitch67
ED Gathering crease65
EC Asymmetry35
Others (no detail)30
DB Run-off stitching25
CD Needle hole13
EA Unsmooth/puckering/bubbling91
260296 MKSC · CP03/CP04/CP06 · Due 09/02Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No resultPilot Run2 reports
No reportQC 1st Bundle
No reportQA 1st Bundle
3/24QC Inlineactual/required · 12%
DHU 5.2%QC Endline12 days
No reportQA Inline
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random2 reports
Order/Ship qty5,428 / 660
PDF reports8
Last report08/14

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (08/14): BA Thread ends 1 (earlier 21 times), EA Unsmooth/puckering/bubbling 1 (earlier 5 times), ED Gathering crease 1 (earlier 15 times)

Found earlier but still reached later stages: 2

DJ Pleat 1, CB Broken stitch 2 pcs (later stages total)

QC Endline data errors: 18

06/30 CP06 260296A (defective pcs 16 > defects 5), 07/01 CP06 260296A (defective pcs 124 > defects 27), 07/02 CP06 260296A (defective pcs 70 > defects 24), 07/04 CP06 260296A (defective pcs 72 > defects 50)…

Caught in earlier stages

EC Asymmetry (46), AD Fabric stains (44), CC Skip stitch (27), DB Run-off stitching (7) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC Inline3 reports
required on prod. days 3/24 (12%)
—26.2%
QC Endline12 days—5.2%
Pre-final1 reports02.5%
Final Random2 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP065.2%
5428 / 12 days
—PASS
06/30–07/15
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0612243 (12%)12907/08, 07/09, 07/10, 07/11, 07/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC InlineQC EndlinePre-finalFinal Random
BA Thread ends28105310
ED Gathering crease5711
EC Asymmetry442
AD Fabric stains935
CC Skip stitch621
Others (no detail)9
DB Run-off stitching34
DJ Pleat61
260744 GECL · CS15/CS25 · Due 09/02Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
07/20QC 1st Bundle1 reports
07/20QA 1st Bundle1 reports
5/30QC Inlineactual/required · 17%
DHU 11.4%QC Endline15 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty4,980 / 470
PDF reports9
Last report08/20

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/20): CB Broken stitch 1 (earlier 11 times), AD Fabric stains 2 (earlier 6 times)

Found earlier but still reached later stages: 1

ED Gathering crease 1 pcs (later stages total)

QC Endline data errors: 1

06/29 CS25 260744C-2 (defective pcs 34 > defects 25)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (4 Major), EA Unsmooth/puckering/bubbling (1 Major), DC Join stitching (1 Major), AD Fabric stains (1 Major), CA Thread tension (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: DJ Pleat (2), EC Asymmetry (2), GC Missing pocket/label (1), CE Broken seam (1); Both: ED Gathering crease (3/4), CG Grinning (2/4), CB Broken stitch (4/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 90.0%

Caught in earlier stages

CC Skip stitch (100), CE Broken seam (28), AC Fabric hole (12), EB Measurement issue (11), DJ Pleat (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—90.0%
QC Inline5 reports
required on prod. days 5/30 (17%)
—20.7%
QC Endline15 days—11.4%
Final Random2 reports05.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS159.0%
2480 / 8 days
—PASS
07/18–07/27
ED Gathering crease, BA Thread ends, CC Skip stitch
CS2513.8%
2468 / 7 days
—PASS
06/24–07/02
BA Thread ends, CC Skip stitch, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS158165 (31%)8307/22, 07/23, 07/24, 07/25, 07/27
CS257140 (0%)7706/26, 06/27, 06/29, 06/30, 07/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineFinal Random
BA Thread ends412714
ED Gathering crease347961
CC Skip stitch892
AD Fabric stains1244
CE Broken seam1225
Others (no detail)22
CB Broken stitch41132
AC Fabric hole39
260939 LOGE · CB34/CB35 · Due 09/02Final Random PASS No major issue (3 minor notes)
No resultPP Sample1 reports
No reportPilot Run
07/18QC 1st Bundle1 reports
07/18QA 1st Bundle1 reports
8/26QC Inlineactual/required · 31%
DHU 13.3%QC Endline13 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,000 / 3,000
PDF reports13
Last report08/21

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/21): EA Unsmooth/puckering/bubbling 2 (earlier 3 times), CB Broken stitch 2 (earlier 12 times)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DE Cut to broken (2 Major), AD Fabric stains (2), EI Inaccurate/skewed stitching (2 Major), CE Broken seam (2 Major), DA Exceed seam allowance (1), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: CG Grinning (2); Both: EC Asymmetry (4/3), CB Broken stitch (2/4), BA Thread ends (1/2); DHU QC 1st Bundle 69.2% / QA 1st Bundle 70.0%

Caught in earlier stages

EC Asymmetry (166), CC Skip stitch (57), EB Measurement issue (32), CG Grinning (21), CE Broken seam (21) did not reach later stages

Report line differs from production line

QGR2635773 Final Random (08/21) CB30; actual production line(s) CB34/CB35 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—70.0%
QC Inline8 reports
required on prod. days 8/26 (31%)
—33.8%
QC Endline13 days—13.3%
QA Inline1 reports140.6%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3513.4%
2980 / 12 days
40.6%—
07/18–07/31
BA Thread ends, EC Asymmetry, CC Skip stitch
CB340.0%
20 / 1 days
——
07/17–07/17
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3512248 (33%)12407/27, 07/28, 07/29, 07/30, 07/31
CB34120 (0%)1107/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends121316928
EC Asymmetry143311243
CC Skip stitch255
EB Measurement issue32
CB Broken stitch241912
CG Grinning219
CE Broken seam2181
DB Run-off stitching310
253719 MKSC · CS19 · Due 09/08Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/14QC Inlineactual/required · 0%
DHU 12.9%QC Endline7 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,900 / 1,050
PDF reports3
Last report07/18

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/18): DB Run-off stitching 2 (earlier 14 times)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

Caught in earlier stages

CC Skip stitch (33), ED Gathering crease (19), EB Measurement issue (13) did not reach later stages

Found before bulk production (Final Random): 3

AD Fabric stains, EA Unsmooth/puckering/bubbling, HA Poor pressing: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—12.9%
Final Random3 reports03.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1912.9%
1885 / 7 days
—PASS
06/23–06/30
BA Thread ends, Others (no detail), CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS197140 (0%)7706/25, 06/26, 06/27, 06/29, 06/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1173
Others (no detail)38
CC Skip stitch33
DB Run-off stitching212
ED Gathering crease19
EB Measurement issue13
EA Unsmooth/puckering/bubbling4
DK Twisted shoulder strap2
260272 MKSC · CB17 · Due 09/09Final Random PASS No major issue (5 minor notes)
No reportPP Sample
No reportPilot Run
08/08QC 1st Bundle1 reports
08/10QA 1st Bundle1 reports
4/12QC Inlineactual/required · 33%
DHU 148.0%QC Endline6 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,150 / 650
PDF reports10
Last report09/05

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (09/05): DJ Pleat 1 (earlier 6 times), EC Asymmetry 1 (earlier 17 times), AD Fabric stains 1 (earlier 7 times)

Found earlier but still reached later stages: 3

CB Broken stitch 1, BB Missing cut seam allowance 1, BA Thread ends 2 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 5), AD Fabric stains (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (2 Major), BB Missing cut seam allowance (1 Major), CB Broken stitch (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: CC Skip stitch (1), DJ Pleat (1); Both: EC Asymmetry (3/3), CG Grinning (2/2), ED Gathering crease (2/1); DHU QC 1st Bundle 18.0% / QA 1st Bundle 84.6%

Caught in earlier stages

ED Gathering crease (1352), EB Measurement issue (170), AC Fabric hole (40), DA Exceed seam allowance (14), CG Grinning (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—18.0%
QA 1st Bundle1 reports—84.6%
QC Inline4 reports
required on prod. days 4/12 (33%)
—41.0%
QC Endline6 days—148.0%
QA Inline2 reports218.8%
Final Random2 reports04.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB17148.0%
1054 / 6 days
18.8%PASS
08/10–08/19
ED Gathering crease, EB Measurement issue, AC Fabric hole

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB176124 (33%)6208/11, 08/12, 08/13, 08/17, 08/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease21101339
EB Measurement issue170
AC Fabric hole40
EC Asymmetry332141
AD Fabric stains1412
BA Thread ends3102
DA Exceed seam allowance14
DJ Pleat1721
260324 MKSC · CP01/CP03 · Due 09/09Final Random PASS No major issue (5 minor notes)
No reportPP Sample
No resultPilot Run2 reports
07/22QC 1st Bundle1 reports
07/22QA 1st Bundle1 reports
0/18QC Inlineactual/required · 0%
DHU 7.2%QC Endline9 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty400 / 400
PDF reports7
Last report09/01

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (09/01): AD Fabric stains 2 (earlier 4 times)

Found earlier but still reached later stages: 2

GA Missing bartack/button 2, CC Skip stitch 1 pcs (later stages total)

6 defects recorded as 'Others' without detail

Pilot Run 1, QA 1st Bundle 4, QA Inline 1; cannot compare across stages

QC Endline data errors: 7

07/22 CP01 260324A (defective pcs 11 > defects 4), 07/23 CP01 260324A (defective pcs 33 > defects 14), 07/24 CP01 260324A (defective pcs 121 > defects 29), 07/24 CP01 260324B (defective pcs 5 > defects 1)…

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (4 Major), EA Unsmooth/puckering/bubbling (2 Major), GA Missing bartack/button (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: ED Gathering crease (2), EC Asymmetry (1), DE Cut to broken (1); Both: BA Thread ends (2/1), DD Thread not straight/waving (1/1); DHU QC 1st Bundle 35.0% / QA 1st Bundle 70.0%

Caught in earlier stages

EA Unsmooth/puckering/bubbling (30), EC Asymmetry (24), ED Gathering crease (10), EB Measurement issue (7), AC Fabric hole (5) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—35.0%
QA 1st Bundle1 reports—70.0%
QC Inline0 reports
required on prod. days 0/18 (0%)
——
QC Endline9 days—7.2%
QA Inline1 reports128.1%
Final Random2 reports03.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP017.2%
2134 / 9 days
28.1%PASS
07/22–08/11
BA Thread ends, EA Unsmooth/puckering/bubbling, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP019180 (0%)9907/27, 07/28, 07/29, 08/07, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends216017
EA Unsmooth/puckering/bubbling22215
EC Asymmetry3120
CC Skip stitch111
AD Fabric stains92
ED Gathering crease271
EB Measurement issue7
Others (no detail)141
260332 MKSC · CS07/CS15 · Due 09/09Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No resultPilot Run2 reports
No reportQC 1st Bundle
No reportQA 1st Bundle
0/24QC Inlineactual/required · 0%
DHU 15.7%QC Endline12 days
No reportQA Inline
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random2 reports
Order/Ship qty2,080 / 500
PDF reports5
Last report08/08

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (08/08): ED Gathering crease 1 (earlier 13 times)

Found earlier but still reached later stages: 4

CC Skip stitch 2, CB Broken stitch 2, AD Fabric stains 1, HA Poor pressing 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

Pre-final 1, Final Random 1; cannot compare across stages

QC Endline data errors: 12

06/23 CS07 260332A (defective pcs 30 > defects 26), 06/24 CS07 260332A (defective pcs 31 > defects 22), 06/25 CS07 260332A (defective pcs 41 > defects 26), 06/26 CS07 260332A (defective pcs 42 > defects 27)…

Caught in earlier stages

EC Asymmetry (27), DD Thread not straight/waving (20), EB Measurement issue (13) did not reach later stages

Report line differs from production line

QGR2632966 Final Random (08/08) CS06; actual production line(s) CS07/CS15 (cards show production lines only)

Found before bulk production (Final Random, Pre-final): 1

EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC Inline0 reports
required on prod. days 0/24 (0%)
——
QC Endline12 days—15.7%
Pre-final1 reports01.6%
Final Random2 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0715.7%
2080 / 12 days
—PASS
06/22–07/04
ED Gathering crease, BA Thread ends, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0712240 (0%)121206/30, 07/01, 07/02, 07/03, 07/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC EndlinePre-finalFinal Random
ED Gathering crease1461
BA Thread ends9324
EC Asymmetry126
DD Thread not straight/waving20
CC Skip stitch162
EB Measurement issue13
HA Poor pressing61
CB Broken stitch12
260910 LOGE · CB34 · Due 09/09Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/6QC Inlineactual/required · 0%
DHU 4.2%QC Endline3 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,626 / 2,626
PDF reports1
Last report08/21

Cross-stage findings

Found earlier but still reached later stages: 2

BA Thread ends 7, CC Skip stitch 1 pcs (later stages total)

Caught in earlier stages

DB Run-off stitching (10), AC Fabric hole (5) did not reach later stages

Found before bulk production (Final Random): 3

ED Gathering crease, AD Fabric stains, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—4.2%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB344.2%
1665 / 3 days
—PASS
07/03–07/07
CC Skip stitch, BA Thread ends, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB34360 (0%)3307/03, 07/04, 07/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends277
CC Skip stitch281
DB Run-off stitching10
AC Fabric hole5
ED Gathering crease2
AD Fabric stains1
CB Broken stitch1
260912 LOGE · CS10 · Due 09/09Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
08/10QC 1st Bundle1 reports
08/10QA 1st Bundle1 reports
0/2QC Inlineactual/required · 0%
DHU 12.6%QC Endline1 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty238 / 238
PDF reports4
Last report09/08

Cross-stage findings

Found earlier but still reached later stages: 1

BA Thread ends 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (1 Major), BB Missing cut seam allowance (1 Major), EI Inaccurate/skewed stitching (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: EB Measurement issue (3); Both: AD Fabric stains (1/2), ED Gathering crease (2/1), EA Unsmooth/puckering/bubbling (1/2), EC Asymmetry (2/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 50.0%

Caught in earlier stages

EA Unsmooth/puckering/bubbling (7) did not reach later stages

Report line differs from production line

QGR2639049 Final Random (09/08) CS02; actual production line(s) CS10 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—50.0%
QC Inline0 reports
required on prod. days 0/2 (0%)
——
QC Endline1 days—12.6%
QA Inline1 reports130.0%
Final Random1 reports00.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1012.6%
238 / 1 days
30.0%—
08/10–08/10
BA Thread ends, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS10120 (0%)1108/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends1241
EA Unsmooth/puckering/bubbling124
Others (no detail)61
ED Gathering crease211
AD Fabric stains12
EB Measurement issue3
EC Asymmetry21
CC Skip stitch1
260941 LOGE · CB07/CB29 · Due 09/09Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
08/10QC 1st Bundle1 reports
08/08QA 1st Bundle1 reports
5/28QC Inlineactual/required · 18%
DHU 25.0%QC Endline13 days
All FAILQA Inline3 reports1 no result
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,000 / 3,000
PDF reports11
Last report09/01

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (09/01): CB Broken stitch 2 (earlier 14 times), EA Unsmooth/puckering/bubbling 1 (earlier 4 times)

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), EA Unsmooth/puckering/bubbling (2 Major), AC Fabric hole (2 Major), EE Raw edge (1 Major), DA Exceed seam allowance (1 Major), DK Twisted shoulder strap (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: CE Broken seam (5), ED Gathering crease (2), EB Measurement issue (2); Both: CB Broken stitch (4/2), DD Thread not straight/waving (2/2), DJ Pleat (2/2); DHU QC 1st Bundle 130.8% / QA 1st Bundle 80.0%

Caught in earlier stages

ED Gathering crease (169), CC Skip stitch (136), AC Fabric hole (40), CE Broken seam (36), EB Measurement issue (23) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—130.8%
QA 1st Bundle1 reports—80.0%
QC Inline5 reports
required on prod. days 5/28 (18%)
—56.2%
QC Endline13 days—25.0%
QA Inline3 reports259.4%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0725.2%
2937 / 13 days
59.4%—
08/08–09/08
BA Thread ends, ED Gathering crease, Others (no detail)
CB290.0%
20 / 1 days
—PASS
08/13–08/13
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0713265 (19%)13808/18, 08/19, 08/20, 08/21, 09/08
CB29120 (0%)1108/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends225046
ED Gathering crease21652
Others (no detail)144
CC Skip stitch1306
AC Fabric hole2353
CE Broken seam5301
CB Broken stitch422252
EB Measurement issue2615
260945 LOGE · CB07 · Due 09/09Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
07/28QC 1st Bundle1 reports
07/28QA 1st Bundle1 reports
1/36QC Inlineactual/required · 3%
DHU 14.0%QC Endline18 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports9
Last report09/01

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (09/01): CB Broken stitch 1 (earlier 5 times), DJ Pleat 2 (earlier 4 times)

QC Endline data errors: 2

08/03 CB07 260945-S (defective pcs 15 > defects 13), 08/05 CB07 260945-S (defective pcs 16 > defects 15)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (1 Major), DB Run-off stitching (1 Major), CA Thread tension (1 Major); Only QC 1st Bundle: DJ Pleat (3), CG Grinning (2), CH Incorrect stitch density (1), CC Skip stitch (1), ED Gathering crease (1); Both: CE Broken seam (3/2), EC Asymmetry (3/2), EI Inaccurate/skewed stitching (2/2), CB Broken stitch (2/2); DHU QC 1st Bundle 138.5% / QA 1st Bundle 55.0%

Caught in earlier stages

EB Measurement issue (59), ED Gathering crease (52), CC Skip stitch (36), CE Broken seam (28), EC Asymmetry (16) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—138.5%
QA 1st Bundle1 reports—55.0%
QC Inline3 reports
required on prod. days 1/36 (3%)
—56.2%
QC Endline18 days—14.0%
QA Inline3 reports332.3%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0714.0%
1942 / 18 days
32.3%PASS
07/28–09/07
BA Thread ends, EB Measurement issue, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0718361 (3%)181708/24, 08/26, 08/31, 09/04, 09/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends8065
EB Measurement issue554
ED Gathering crease1645
CC Skip stitch13302
Others (no detail)30
CE Broken seam3212101
EC Asymmetry32362
CB Broken stitch22611
261614 RGOR · CB35 · Due 09/11No final No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/13QA 1st Bundle1 reports
4/18QC Inlineactual/required · 22%
DHU 28.9%QC Endline9 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,110 / 2,110
PDF reports7
Last report08/22

Cross-stage findings

Caught in earlier stages

EC Asymmetry (209), BA Thread ends (135), ED Gathering crease (115), DB Run-off stitching (86), CC Skip stitch (83) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline4 reports
required on prod. days 4/18 (22%)
—30.0%
QC Endline9 days—28.9%
QA Inline2 reports235.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3528.9%
2147 / 9 days
35.9%—
08/13–08/25
EC Asymmetry, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB359184 (22%)9508/20, 08/21, 08/22, 08/24, 08/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA Inline
EC Asymmetry3161882
BA Thread ends281214
ED Gathering crease9106
DB Run-off stitching851
CC Skip stitch281
EB Measurement issue132
CG Grinning212
AD Fabric stains101
261618 RGOR · CP15 · Due 09/11No final No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/02QA 1st Bundle1 reports
0/6QC Inlineactual/required · 0%
DHU 18.5%QC Endline3 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,020 / 1,020
PDF reports2
Last report09/02

Cross-stage findings

Caught in earlier stages

BA Thread ends (245), AD Fabric stains (92), EA Unsmooth/puckering/bubbling (32), ED Gathering crease (27), CC Skip stitch (24) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—75.0%
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—18.5%
QA Inline1 reports140.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1518.5%
2401 / 3 days
40.6%—
09/01–09/03
BA Thread ends, AD Fabric stains, EA Unsmooth/puckering/bubbling

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP15360 (0%)3309/01, 09/02, 09/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA Inline
BA Thread ends1244
AD Fabric stains191
EA Unsmooth/puckering/bubbling329
ED Gathering crease225
CC Skip stitch24
EC Asymmetry193
Others (no detail)10
EB Measurement issue6
253710 MKSC · CP02/CP06/CP13 · Due 09/16Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No resultPilot Run2 reports
No reportQC 1st Bundle
08/01QA 1st Bundle1 reports
0/24QC Inlineactual/required · 0%
DHU 12.8%QC Endline12 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
1/5 FAILFinal Random5 reports
Order/Ship qty4,011 / 1,000
PDF reports10
Last report09/10

Cross-stage findings

Found earlier but still reached later stages: 6

CC Skip stitch 1, AD Fabric stains 3, ED Gathering crease 3, CB Broken stitch 1, BB Missing cut seam allowance 2, EA Unsmooth/puckering/bubbling 2 pcs (later stages total)

18 defects recorded as 'Others' without detail

Pilot Run 1, QA 1st Bundle 2, QA Inline 4, Final Random 11; cannot compare across stages

QC Endline data errors: 1

08/10 CP02 253710B (defective pcs 63 > defects 62)

Caught in earlier stages

DB Run-off stitching (94), EB Measurement issue (30), GB Missing sewing operation (26), CE Broken seam (13), EC Asymmetry (10) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QA 1st Bundle1 reports—85.0%
QC Inline0 reports
required on prod. days 0/24 (0%)
——
QC Endline12 days—12.8%
QA Inline2 reports245.3%
Final Random5 reports14.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0212.8%
3991 / 11 days
45.3%PASS
08/01–08/13
BA Thread ends, CC Skip stitch, DB Run-off stitching
CP060.0%
20 / 1 days
——
08/21–08/21
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0211220 (0%)111108/08, 08/10, 08/11, 08/12, 08/13
CP06120 (0%)1108/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends2125110
CC Skip stitch1110411
DB Run-off stitching94
AD Fabric stains23493
Others (no detail)1225411
ED Gathering crease42783
EB Measurement issue30
GB Missing sewing operation26
261139 LOGE · CS22 · Due 09/16No final No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/27QA 1st Bundle1 reports
5/22QC Inlineactual/required · 23%
DHU 10.4%QC Endline11 days
All FAILQA Inline2 reports
No reportShipment Sample
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty3,741 / 3,741
PDF reports9
Last report08/03

Cross-stage findings

Recurring in small numbers: 2

Latest Pre-final (08/03): CB Broken stitch 2 (earlier 4 times), BD Snagging 1 (earlier 4 times)

5 defects recorded as 'Others' without detail

QC Inline 5; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

DF Twisted seam/skewing (QA 10); zero in QC Endline records

Caught in earlier stages

CC Skip stitch (178), DB Run-off stitching (125), AD Fabric stains (75), ED Gathering crease (19), DF Twisted seam/skewing (12) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—76.9%
QC Inline5 reports
required on prod. days 5/22 (23%)
—58.1%
QC Endline11 days—10.4%
QA Inline2 reports240.6%
Pre-final1 reports01.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2210.4%
7066 / 11 days
40.6%—
07/27–08/22
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2211225 (23%)11608/03, 08/04, 08/05, 08/11, 08/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlinePre-final
BA Thread ends12834747
CC Skip stitch178
DB Run-off stitching112112
AD Fabric stains3666
ED Gathering crease181
BD Snagging931
DF Twisted seam/skewing210
CB Broken stitch1712
261151 LOGE · CP08/CP09/CP10… · Due 09/16Final Random PASS No major issue (3 minor notes)
No resultPP Sample1 reports
No reportPilot Run
08/29–09/03QC 1st Bundle2 reports
08/10–09/04QA 1st Bundle3 reports
5/60QC Inlineactual/required · 8%
DHU 8.8%QC Endline19 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty6,987 / 6,987
PDF reports13
Last report09/11

Cross-stage findings

Recurring in small numbers: 4

Latest Final Random (09/11): CE Broken seam 2 (earlier 16 times), ED Gathering crease 1 (earlier 15 times), DJ Pleat 1 (earlier 5 times), CB Broken stitch 2 (earlier 5 times)

QC Endline data errors: 8

08/12 CP08 261151-3 (defective pcs 11 > defects 7), 08/24 CP09 261151-3 (defective pcs 17 > defects 5), 08/25 CP09 261151-3 (defective pcs 30 > defects 8), 08/28 CP08 261151-1 (defective pcs 80 > defects 22)…

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (9 Major), GA Missing bartack/button (4 Major), EG Wrong panel assembly (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: DI High-low/uneven (7), DB Run-off stitching (1), CA Thread tension (1); Both: BA Thread ends (8/6), EC Asymmetry (4/9), DA Exceed seam allowance (2/7), EI Inaccurate/skewed stitching (5/3), EA Unsmooth/puckering/bubbling (2/5), CC Skip stitch (2/2), AD Fabric stains (3/1), ED Gathering crease (2/1), DJ Pleat (1/2), CB Broken stitch (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 86.7%

Caught in earlier stages

CC Skip stitch (103), EC Asymmetry (54), EB Measurement issue (38), EA Unsmooth/puckering/bubbling (37), EA Uneven seam allowance (32) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—100.0%
QA 1st Bundle3 reports—86.7%
QC Inline5 reports
required on prod. days 5/60 (8%)
—32.8%
QC Endline19 days—8.8%
QA Inline1 reports131.2%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0812.7%
4638 / 11 days
31.2%—
08/12–09/08
BA Thread ends, CC Skip stitch, ED Gathering crease
CP090.8%
1549 / 9 days
——
08/11–09/01
BA Thread ends, CC Skip stitch
CP101.3%
380 / 4 days
——
08/11–09/01
BA Thread ends
CP180.0%
120 / 1 days
——
08/11–08/11
—
CP110.0%
100 / 1 days
——
08/20–08/20
—
CP130.0%
40 / 1 days
—PASS
08/12–08/12
—
CP190.0%
40 / 1 days
——
08/22–08/22
—
CP140.0%
20 / 1 days
——
08/14–08/14
—
CP170.0%
20 / 1 days
——
08/13–08/13
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0811225 (23%)11609/03, 09/04, 09/05, 09/07, 09/08
CP099180 (0%)9908/21, 08/22, 08/24, 08/25, 09/01
CP10480 (0%)4408/11, 08/22, 08/29, 09/01
CP11120 (0%)1108/20
CP13120 (0%)1108/12
CP14120 (0%)1108/14
CP17120 (0%)1108/13
CP18120 (0%)1108/11
CP19120 (0%)1108/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends8627220211
CC Skip stitch223942
CE Broken seam195492
ED Gathering crease213581
EC Asymmetry249633
EB Measurement issue38
EA Unsmooth/puckering/bubbling2251252
EA Uneven seam allowance32
261159 LOGE · CS21 · Due 09/16Final Random PASS No major issue (6 minor notes)
No reportPP Sample
No reportPilot Run
07/21QC 1st Bundle1 reports
07/22QA 1st Bundle1 reports
11/32QC Inlineactual/required · 34%
DHU 11.9%QC Endline16 days
All FAILQA Inline4 reports
No reportShipment Sample
All FAILPre-final2 reports
All PASSFinal Random2 reports1 no result
Order/Ship qty2,033 / 2,033
PDF reports21
Last report08/11

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (08/11): EA Unsmooth/puckering/bubbling 2 (earlier 5 times), CB Broken stitch 1 (earlier 21 times), BB Missing cut seam allowance 2 (earlier 4 times)

Found earlier but still reached later stages: 4

CC Skip stitch 4, DJ Pleat 1, ED Gathering crease 1, BD Snagging 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

QC Inline 4; cannot compare across stages

QC Endline data errors: 2

08/05 CS21 261159-S (defective pcs 20 > defects 16), 08/05 CS21 261159-L (defective pcs 14 > defects 10)

Duplicate report numbers

QGR2633342 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (2 Major), EI Inaccurate/skewed stitching (2 Major), EC Asymmetry (2 Major), BA Thread ends (1 Major), IA 2nd operation issue (1 Major), EH Poor lamination/bonding (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: GA Missing bartack/button (2), CE Broken seam (2), DF Twisted seam/skewing (1), DE Cut to broken (1); Both: CB Broken stitch (3/3), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 50.0% / QA 1st Bundle 70.0%

Caught in earlier stages

DB Run-off stitching (72), DE Cut to broken (28), EC Asymmetry (26), DK Twisted shoulder strap (25), CE Broken seam (16) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—50.0%
QA 1st Bundle1 reports—70.0%
QC Inline11 reports
required on prod. days 11/32 (34%)
—25.8%
QC Endline16 days—11.9%
QA Inline4 reports433.6%
Pre-final2 reports27.4%
Final Random2 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2111.9%
5355 / 16 days
33.6%PASS
07/21–08/08
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS21163211 (34%)16508/03, 08/04, 08/05, 08/06, 08/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends1303572177
CC Skip stitch1114454
DB Run-off stitching864
ED Gathering crease6421
CB Broken stitch332951
DE Cut to broken1198
EC Asymmetry2177
DK Twisted shoulder strap25
261160 LOGE · CP03/CP04/CP05… · Due 09/16No final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
08/07–08/29QC 1st Bundle2 reports
07/25–08/31QA 1st Bundle3 reports
16/186QC Inlineactual/required · 9%
DHU 11.0%QC Endline44 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty3,946 / 3,946
PDF reports24
Last report09/08

Cross-stage findings

QC Endline data errors: 34

07/24 CP08 261160-3 (defective pcs 9 > defects 6), 07/24 CP12 261160-3 (defective pcs 10 > defects 2), 07/25 CP08 261160-3 (defective pcs 12 > defects 8), 07/27 CP08 261160-3 (defective pcs 6 > defects 4)…

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (2 Major), DA Exceed seam allowance (2 Major), CC Skip stitch (1 Major), CE Broken seam (1 Major), BB Missing cut seam allowance (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: ED Gathering crease (2), DE Cut to broken (1); Both: BA Thread ends (8/10), EA Unsmooth/puckering/bubbling (5/9), EC Asymmetry (6/8), DJ Pleat (8/2), EI Inaccurate/skewed stitching (2/3), DI High-low/uneven (4/1), CB Broken stitch (2/1), BD Snagging (1/1), CG Grinning (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 73.3%

Caught in earlier stages

BA Thread ends (1133), CC Skip stitch (363), ED Gathering crease (334), EB Measurement issue (279), EA Unsmooth/puckering/bubbling (263) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—100.0%
QA 1st Bundle3 reports—73.3%
QC Inline16 reports
required on prod. days 16/186 (9%)
—30.4%
QC Endline44 days—11.0%
QA Inline3 reports328.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0417.4%
8139 / 19 days
21.9%—
07/28–09/10
BA Thread ends, EB Measurement issue, EA Unsmooth/puckering/bubbling
CP1612.3%
7419 / 17 days
50.0%—
08/07–08/26
BA Thread ends, CC Skip stitch, ED Gathering crease
CP083.7%
2326 / 17 days
——
07/24–08/13
BA Thread ends, DB Run-off stitching, EA Uneven seam allowance
CP130.4%
1933 / 11 days
12.5%—
07/21–08/20
BA Thread ends, CC Skip stitch
CP050.0%
680 / 7 days
——
08/08–08/17
—
CP123.5%
520 / 5 days
——
07/24–08/21
BA Thread ends, DK Twisted shoulder strap, Others (no detail)
CP181.3%
520 / 8 days
——
07/28–08/29
CC Skip stitch, BA Thread ends, ED Gathering crease
CP112.6%
500 / 3 days
——
08/18–08/24
BA Thread ends
CP030.0%
100 / 1 days
——
08/13–08/13
—
CP090.0%
100 / 1 days
——
07/30–07/30
—
CP200.0%
80 / 1 days
——
08/10–08/10
—
CP170.0%
40 / 2 days
——
08/12–08/13
—
CP190.0%
40 / 1 days
——
08/22–08/22
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0419385 (13%)191409/05, 09/07, 09/08, 09/09, 09/10
CP0817340 (0%)171708/07, 08/08, 08/10, 08/11, 08/13
CP16173411 (32%)17608/21, 08/22, 08/24, 08/25, 08/26
CP1311220 (0%)111108/10, 08/11, 08/12, 08/14, 08/20
CP188160 (0%)8807/31, 08/06, 08/07, 08/18, 08/29
CP057140 (0%)7708/11, 08/12, 08/14, 08/15, 08/17
CP125100 (0%)5507/24, 08/17, 08/19, 08/20, 08/21
CP11360 (0%)3308/18, 08/19, 08/24
CP17240 (0%)2208/12, 08/13
CP03120 (0%)1108/13
CP09120 (0%)1107/30
CP19120 (0%)1108/22
CP20120 (0%)1108/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends8108210249
CC Skip stitch122340
ED Gathering crease263242
EB Measurement issue279
EA Unsmooth/puckering/bubbling5982401
EC Asymmetry68491462
CG Grinning11413
DB Run-off stitching11231
261164 LOGE · CB34 · Due 09/16Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
07/27QC 1st Bundle1 reports
07/30QA 1st Bundle1 reports
3/10QC Inlineactual/required · 30%
DHU 9.5%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,232 / 2,232
PDF reports8
Last report08/21

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/21): ED Gathering crease 2 (earlier 3 times), CB Broken stitch 2 (earlier 5 times)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DE Cut to broken (4 Major), EI Inaccurate/skewed stitching (2 Major), DA Exceed seam allowance (1 Major); Only QC 1st Bundle: ED Gathering crease (2), CG Grinning (1), BB Missing cut seam allowance (1); Both: EC Asymmetry (3/2), DJ Pleat (1/2), CB Broken stitch (1/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 92.3%

Caught in earlier stages

CC Skip stitch (83), AC Fabric hole (38), EC Asymmetry (35), DB Run-off stitching (8), EA Uneven seam allowance (8) did not reach later stages

Report line differs from production line

QGR2635725 Final Random (08/21) CB05; actual production line(s) CB34 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—92.3%
QC Inline4 reports
required on prod. days 3/10 (30%)
—30.5%
QC Endline5 days—9.5%
QA Inline1 reports140.6%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB349.5%
1924 / 5 days
40.6%—
07/29–08/03
CC Skip stitch, BA Thread ends, AC Fabric hole

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB345103 (30%)5207/29, 07/30, 07/31, 08/01, 08/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
CC Skip stitch83
BA Thread ends3477
AC Fabric hole371
EC Asymmetry32273
CB Broken stitch1182
ED Gathering crease252
DB Run-off stitching71
EA Uneven seam allowance8
261189 LOGE · CS27 · Due 09/16Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
08/06QC 1st Bundle1 reports
08/05QA 1st Bundle1 reports
3/10QC Inlineactual/required · 30%
DHU 7.7%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,872 / 1,872
PDF reports7
Last report08/15

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/15): CE Broken seam 2 (earlier 3 times), ED Gathering crease 1 (earlier 6 times)

Found earlier but still reached later stages: 4

CB Broken stitch 1, DD Thread not straight/waving 1, BB Missing cut seam allowance 1, DE Cut to broken 1 pcs (later stages total)

QC Endline data errors: 2

08/06 CS27 261189-S (defective pcs 14 > defects 13), 08/08 CS27 261189-L (defective pcs 11 > defects 8)

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (4 Major), EI Inaccurate/skewed stitching (2 Major), GA Missing bartack/button (2 Major), DD Thread not straight/waving (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CE Broken seam (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DB Run-off stitching (4), EB Measurement issue (2), CA Thread tension (2), DJ Pleat (2), CG Grinning (2), BB Missing cut seam allowance (2); DHU QC 1st Bundle 107.7% / QA 1st Bundle 60.0%

Caught in earlier stages

DB Run-off stitching (45), EC Asymmetry (26), CC Skip stitch (16), DJ Pleat (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—107.7%
QA 1st Bundle1 reports—60.0%
QC Inline3 reports
required on prod. days 3/10 (30%)
—21.7%
QC Endline5 days—7.7%
QA Inline1 reports128.1%
Final Random1 reports05.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS277.7%
1872 / 5 days
28.1%PASS
08/05–08/10
BA Thread ends, DB Run-off stitching, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS275103 (30%)5208/05, 08/06, 08/07, 08/08, 08/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends6866
DB Run-off stitching4932
EC Asymmetry4202
CC Skip stitch16
ED Gathering crease911
DJ Pleat27
CE Broken seam1112
BB Missing cut seam allowance221
261291 LOGE · CP19 · Due 09/16Shipment Sample No result No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
09/03–09/07QC 1st Bundle2 reports
09/02–09/07QA 1st Bundle2 reports
1/26QC Inlineactual/required · 4%
DHU 32.3%QC Endline13 days
All FAILQA Inline2 reports
All FAILShipment Sample3 reports1 no result
No reportPre-final
No reportFinal Random
Order/Ship qty2,000 / 2,000
PDF reports10
Last report09/08

Cross-stage findings

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (4 Major); Only QC 1st Bundle: CB Broken stitch (4), CF Pulling yarn (3), DD Thread not straight/waving (1), GB Missing sewing operation (1); Both: BA Thread ends (11/6), EC Asymmetry (2/7), EI Inaccurate/skewed stitching (3/5), HA Poor pressing (5/1), DE Cut to broken (2/2), DJ Pleat (3/1); DHU QC 1st Bundle 87.5% / QA 1st Bundle 65.0%

Caught in earlier stages

HA Poor pressing (360), BA Thread ends (272), EA Uneven seam allowance (235), CC Skip stitch (201), CF Pulling yarn (78) did not reach later stages

Found before bulk production (Shipment Sample): 5

CB Broken stitch, EI Inaccurate/skewed stitching, EC Asymmetry, ED Gathering crease, CG Grinning: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—87.5%
QA 1st Bundle2 reports—65.0%
QC Inline1 reports
required on prod. days 1/26 (4%)
—40.6%
QC Endline13 days—32.3%
QA Inline2 reports228.8%
Shipment Sample3 reports2—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1932.3%
3960 / 13 days
28.8%—
09/02–09/16
HA Poor pressing, BA Thread ends, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1913261 (4%)131209/11, 09/12, 09/14, 09/15, 09/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
HA Poor pressing51354
BA Thread ends11662463
EA Uneven seam allowance235
CC Skip stitch201
ED Gathering crease1541
CF Pulling yarn375
EC Asymmetry274926
CG Grinning443
261647 OSIT · CP06 · Due 09/16Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/04QA 1st Bundle1 reports
1/2QC Inlineactual/required · 50%
DHU 14.4%QC Endline1 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty500 / 500
PDF reports7
Last report09/10

Cross-stage findings

Found earlier but still reached later stages: 3

CB Broken stitch 3, BA Thread ends 4, AD Fabric stains 7 pcs (later stages total)

3 defects recorded as 'Others' without detail

Final Random 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

Caught in earlier stages

CC Skip stitch (22), EA Uneven seam allowance (11), ED Gathering crease (10), BD Snagging (5), EA Unsmooth/puckering/bubbling (5) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—65.0%
QC Inline1 reports
required on prod. days 1/2 (50%)
—24.0%
QC Endline1 days—14.4%
QA Inline1 reports131.2%
Shipment Sample2 reports1—
Pre-final1 reports110.0%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0614.4%
500 / 1 days
31.2%PASS
09/07–09/07
AD Fabric stains, CC Skip stitch, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP06121 (50%)1009/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
AD Fabric stains418331
CC Skip stitch13171
BA Thread ends31124
EA Uneven seam allowance11
ED Gathering crease271
Others (no detail)53
CB Broken stitch1221
BD Snagging32
261635 LOGE · CB12/CB14/CB29… · Due 09/18No final No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
08/06–08/10QC 1st Bundle2 reports
08/06QA 1st Bundle1 reports
64/220QC Inlineactual/required · 29%
DHU 11.0%QC Endline37 days
All FAILQA Inline12 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty13,179 / 13,179
PDF reports80
Last report09/16

Cross-stage findings

5 defects recorded as 'Others' without detail

QC Inline 5; cannot compare across stages

QC Endline data errors: 3

09/01 CB31 261635-WL (defective pcs 11 > defects 10), 09/03 CB31 261635-L (defective pcs 11 > defects 10), 09/14 CB12 261635-S (defective pcs 28 > defects 27)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), AH Sharp edge (2 Major), EE Raw edge (1 Major), DD Thread not straight/waving (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), EC Asymmetry (3), DI High-low/uneven (2), DE Cut to broken (1), DB Run-off stitching (1); Both: AD Fabric stains (2/2), DJ Pleat (1/2), ED Gathering crease (1/2); DHU QC 1st Bundle 66.7% / QA 1st Bundle 100.0%

Caught in earlier stages

AD Fabric stains (1235), BA Thread ends (978), ED Gathering crease (890), CC Skip stitch (478), CA Thread tension (332) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—66.7%
QA 1st Bundle1 reports—100.0%
QC Inline65 reports
required on prod. days 64/220 (29%)
—33.9%
QC Endline37 days—11.0%
QA Inline12 reports1240.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2910.1%
15108 / 35 days
40.1%—
08/06–09/16
ED Gathering crease, BA Thread ends, CC Skip stitch
CB3111.7%
14916 / 33 days
40.1%—
08/10–09/17
AD Fabric stains, BA Thread ends, CC Skip stitch
CB1214.1%
5521 / 16 days
——
09/01–09/18
CA Thread tension, AD Fabric stains, BA Thread ends
CB149.3%
5472 / 12 days
——
09/03–09/17
AC Fabric hole, BA Thread ends, ED Gathering crease
CB300.0%
226 / 14 days
——
08/17–09/17
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB29357018 (26%)351709/11, 09/12, 09/14, 09/15, 09/16
CB31336630 (45%)33309/12, 09/14, 09/15, 09/16, 09/17
CB12163212 (38%)16409/14, 09/15, 09/16, 09/17, 09/18
CB3014280 (0%)141409/11, 09/14, 09/15, 09/16, 09/17
CB1412244 (17%)12809/11, 09/12, 09/14, 09/15, 09/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
AD Fabric stains2288113310
BA Thread ends24591912
ED Gathering crease124083116
CC Skip stitch55423
CA Thread tension7325
EC Asymmetry314212824
DF Twisted seam/skewing1951583
AC Fabric hole92091
261636 LOGE · CB01/CB05/CB11… · Due 09/18No final No major issue (3 minor notes)
No resultPP Sample1 reports
No reportPilot Run
08/14–08/18QC 1st Bundle3 reports
08/13QA 1st Bundle1 reports
36/208QC Inlineactual/required · 17%
DHU 17.0%QC Endline29 days
All FAILQA Inline10 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty16,811 / 16,811
PDF reports52
Last report09/16

Cross-stage findings

8 defects recorded as 'Others' without detail

QC Inline 8; cannot compare across stages

QC Endline data errors: 4

08/15 CB01 261636-S1 (defective pcs 32 > defects 23), 08/17 CB01 261636-S1 (defective pcs 21 > defects 20), 08/20 CB01 261636-L (defective pcs 11 > defects 10), 08/26 CB12 261636-S2 (defective pcs 8 > defects 6)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AB Shading (3 Major), EF Cup/pocket issue (2 Major), EI Inaccurate/skewed stitching (2 Major), EB Measurement issue (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: CC Skip stitch (3), BA Thread ends (3), ED Gathering crease (3), EA Unsmooth/puckering/bubbling (2), DJ Pleat (2), BD Snagging (1), DE Cut to broken (1), AD Fabric stains (1), CG Grinning (1), CB Broken stitch (1); Both: EC Asymmetry (8/1), DF Twisted seam/skewing (2/2), CE Broken seam (2/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 100.0%

Caught in earlier stages

BA Thread ends (1827), AD Fabric stains (1627), ED Gathering crease (600), CC Skip stitch (411), DB Run-off stitching (309) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle3 reports—76.9%
QA 1st Bundle1 reports—100.0%
QC Inline37 reports
required on prod. days 36/208 (17%)
—35.7%
QC Endline29 days—17.0%
QA Inline10 reports1027.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0115.9%
12502 / 29 days
21.9%—
08/14–09/17
AD Fabric stains, BA Thread ends, DB Run-off stitching
CB1125.4%
6808 / 25 days
29.2%—
08/18–09/17
BA Thread ends, ED Gathering crease, AD Fabric stains
CB1216.3%
4885 / 19 days
30.7%—
08/15–09/14
AD Fabric stains, BA Thread ends, EC Asymmetry
CB148.8%
4504 / 15 days
28.1%—
08/18–09/05
BA Thread ends, AC Fabric hole, EC Asymmetry
CB303.9%
258 / 13 days
——
08/19–09/16
EA Uneven seam allowance, BA Thread ends
CB130.0%
20 / 1 days
——
08/21–08/21
—
CB050.0%
10 / 1 days
——
08/17–08/17
—
CB290.0%
10 / 1 days
——
08/22–08/22
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0129585 (9%)292409/12, 09/14, 09/15, 09/16, 09/17
CB11255019 (38%)25609/11, 09/14, 09/15, 09/16, 09/17
CB1219388 (21%)191109/03, 09/04, 09/05, 09/09, 09/14
CB1415304 (13%)151108/31, 09/01, 09/02, 09/03, 09/05
CB3013260 (0%)131309/09, 09/10, 09/11, 09/14, 09/16
CB05120 (0%)1108/17
CB13120 (0%)1108/21
CB29120 (0%)1108/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends325177920
AD Fabric stains116315602
ED Gathering crease3765174
CC Skip stitch3183837
DB Run-off stitching14295
EC Asymmetry1811118615
AC Fabric hole115155
DF Twisted seam/skewing2259164
261639 RGOR · CB23 · Due 09/18Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/13QA 1st Bundle1 reports
3/14QC Inlineactual/required · 21%
DHU 5.9%QC Endline7 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,745 / 1,745
PDF reports5
Last report09/16

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (09/16): CC Skip stitch 2 (earlier 3 times)

Found earlier but still reached later stages: 2

CB Broken stitch 2, AD Fabric stains 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 3; cannot compare across stages

Caught in earlier stages

EC Asymmetry (28), AC Fabric hole (24), DB Run-off stitching (17), DD Thread not straight/waving (5), EA Unsmooth/puckering/bubbling (5) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—85.0%
QC Inline3 reports
required on prod. days 3/14 (21%)
—43.8%
QC Endline7 days—5.9%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB235.9%
1705 / 7 days
—PASS
08/12–08/19
BA Thread ends, AC Fabric hole, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB237143 (21%)7408/14, 08/15, 08/17, 08/18, 08/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineFinal Random
BA Thread ends23374
EC Asymmetry4519
AC Fabric hole24
DB Run-off stitching287
CC Skip stitch2132
DD Thread not straight/waving5
EA Unsmooth/puckering/bubbling5
CB Broken stitch22
261640 RGOR · CP19 · Due 09/18Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
09/01QC 1st Bundle1 reports
09/01QA 1st Bundle1 reports
0/6QC Inlineactual/required · 0%
DHU 38.5%QC Endline3 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,095 / 1,095
PDF reports4
Last report09/16

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (09/16): CC Skip stitch 1 (earlier 4 times)

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (5 Major), DJ Pleat (2 Major), AD Fabric stains (1 Major); Only QC 1st Bundle: DI High-low/uneven (2), CB Broken stitch (2), CC Skip stitch (1), DC Join stitching (1), GC Missing pocket/label (1), CG Grinning (1); Both: BA Thread ends (4/3), ED Gathering crease (3/2); DHU QC 1st Bundle 75.0% / QA 1st Bundle 65.0%

Caught in earlier stages

ED Gathering crease (90), EB Measurement issue (57), EA Uneven seam allowance (24), CD Needle hole (22), AD Fabric stains (14) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—65.0%
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—38.5%
QA Inline1 reports125.0%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1938.5%
1126 / 3 days
25.0%PASS
08/31–09/02
CC Skip stitch, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP19360 (0%)3308/31, 09/01, 09/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
CC Skip stitch114921
BA Thread ends438634
ED Gathering crease32832
EB Measurement issue57
EA Uneven seam allowance24
CD Needle hole22
AD Fabric stains113
EC Asymmetry5
260454 SAIN · CB21/CB30 · Due 09/21Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/32QC Inlineactual/required · 0%
DHU 6.8%QC Endline13 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty4,195 / 1,255
PDF reports2
Last report07/09

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (07/09): AD Fabric stains 2 (earlier 7 times), CC Skip stitch 1 (earlier 5 times)

Caught in earlier stages

CD Needle hole (41), EB Measurement issue (6), EC Asymmetry (5) did not reach later stages

Report line differs from production line

QGR2625941 Final Random (07/04) CB25; actual production line(s) CB21/CB30 (cards show production lines only)

Found before bulk production (Final Random): 2

CB Broken stitch, GB Missing sewing operation: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/32 (0%)
——
QC Endline13 days—6.8%
Final Random2 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB216.8%
4285 / 12 days
—PASS
06/13–07/01
BA Thread ends, CD Needle hole, AD Fabric stains
CB300.0%
40 / 4 days
——
06/20–06/30
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2112240 (0%)121206/24, 06/25, 06/27, 06/30, 07/01
CB30480 (0%)4406/20, 06/24, 06/26, 06/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1973
CD Needle hole41
AD Fabric stains334
CC Skip stitch72
EB Measurement issue6
EC Asymmetry5
CB Broken stitch3
DB Run-off stitching3
260284 MKSC · CP17 · Due 09/23Final Random PASS No major issue (5 minor notes)
No reportPP Sample
No reportPilot Run
07/11QC 1st Bundle1 reports
07/08QA 1st Bundle1 reports
0/16QC Inlineactual/required · 0%
DHU 22.7%QC Endline8 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports1 no result
Order/Ship qty1,800 / 750
PDF reports7
Last report09/14

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (09/14): AD Fabric stains 1 (earlier 6 times)

Found earlier but still reached later stages: 3

CB Broken stitch 1, CG Grinning 1, CD Needle hole 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 2, Final Random 1; cannot compare across stages

QC Endline data errors: 2

07/11 CP17 260284B (defective pcs 125 > defects 118), 07/14 CP17 260284B (defective pcs 61 > defects 55)

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), CC Skip stitch (1 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major), AC Fabric hole (1 Major), BB Missing cut seam allowance (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DB Run-off stitching (3), GA Missing bartack/button (2), CG Grinning (2), DE Cut to broken (1); Both: CE Broken seam (2/5), EC Asymmetry (6/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 80.0%

Caught in earlier stages

EA Uneven seam allowance (136), CC Skip stitch (28), DK Twisted shoulder strap (11), EC Asymmetry (10), CE Broken seam (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—80.0%
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline8 days—22.7%
QA Inline1 reports134.4%
Final Random4 reports02.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1722.7%
1821 / 8 days
34.4%PASS
07/08–07/21
BA Thread ends, EA Uneven seam allowance, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP178160 (0%)8807/11, 07/13, 07/14, 07/16, 07/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends214146
EA Uneven seam allowance136
AD Fabric stains8511
CC Skip stitch1261
DK Twisted shoulder strap11
EC Asymmetry6112
CE Broken seam251
EA Unsmooth/puckering/bubbling151
261257 MKSC · CP05 · Due 09/23Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
08/10QC 1st Bundle1 reports
08/06QA 1st Bundle1 reports
0/10QC Inlineactual/required · 0%
DHU 7.3%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,281 / 1,281
PDF reports4
Last report08/19

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (08/19): ED Gathering crease 1 (earlier 7 times), BA Thread ends 1 (earlier 6 times), AD Fabric stains 1 (earlier 3 times)

3 defects recorded as 'Others' without detail

QA 1st Bundle 3; cannot compare across stages

QC Endline data errors: 1

08/11 CP05 261257A (defective pcs 5 > defects 3)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (4 Major), DJ Pleat (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (3); Both: ED Gathering crease (6/2), BA Thread ends (5/2), EA Unsmooth/puckering/bubbling (2/2), DI High-low/uneven (2/2), EC Asymmetry (2/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 95.0%

Caught in earlier stages

CC Skip stitch (23), DB Run-off stitching (12), DF Twisted seam/skewing (7), AC Fabric hole (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—95.0%
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—7.3%
QA Inline1 reports134.4%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP057.3%
1261 / 5 days
34.4%PASS
08/07–08/18
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP055100 (0%)5508/07, 08/08, 08/10, 08/11, 08/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends52302
CC Skip stitch176
ED Gathering crease62111
DB Run-off stitching12
AD Fabric stains61
DF Twisted seam/skewing7
AC Fabric hole6
EC Asymmetry22
261285 LOGE · CB30/CB32/CB34 · Due 09/25Final Random PASS No major issue (4 minor notes)
No resultPP Sample1 reports
No reportPilot Run
08/20–08/21QC 1st Bundle2 reports
08/21QA 1st Bundle1 reports
34/90QC Inlineactual/required · 38%
DHU 19.0%QC Endline32 days
All FAILQA Inline5 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty10,000 / 10,000
PDF reports45
Last report09/22

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (09/16): DE Cut to broken 1 (earlier 12 times), CB Broken stitch 2 (earlier 13 times), ED Gathering crease 2 (earlier 38 times)

Found earlier but still reached later stages: 4

EB Measurement issue 1, EC Asymmetry 2, EA Unsmooth/puckering/bubbling 2, CG Grinning 2 pcs (later stages total)

2 defects recorded as 'Others' without detail

Shipment Sample 2; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (3 Major), BA Thread ends (3), BB Missing cut seam allowance (2 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), CC Skip stitch (2), DI High-low/uneven (2), CE Broken seam (1), DB Run-off stitching (1); Both: EC Asymmetry (5/2); DHU QC 1st Bundle 53.8% / QA 1st Bundle 35.0%

Caught in earlier stages

CC Skip stitch (533), DB Run-off stitching (136), AC Fabric hole (134), CE Broken seam (77), DJ Pleat (73) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—53.8%
QA 1st Bundle1 reports—35.0%
QC Inline34 reports
required on prod. days 34/90 (38%)
—34.8%
QC Endline32 days—19.0%
QA Inline5 reports539.4%
Shipment Sample1 reports1—
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3216.5%
8255 / 32 days
41.7%PASS
08/21–09/29
BA Thread ends, CC Skip stitch, EB Measurement issue
CB3432.4%
1555 / 9 days
35.9%—
08/22–09/02
CC Skip stitch, BA Thread ends, DB Run-off stitching
CB300.0%
40 / 4 days
——
09/16–09/29
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB32326426 (41%)30809/23, 09/25, 09/26, 09/28, 09/29
CB349188 (44%)9108/28, 08/29, 08/31, 09/01, 09/02
CB30480 (0%)4409/16, 09/26, 09/28, 09/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends312785812
CC Skip stitch2594702
EC Asymmetry25214417232
EB Measurement issue1614841
ED Gathering crease201372
DB Run-off stitching122113
AC Fabric hole2132
CE Broken seam1688
253711 MKSC · CB04/CB30 · Due 09/30Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
6/32QC Inlineactual/required · 19%
DHU 21.8%QC Endline15 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
1/4 FAILFinal Random4 reports
Order/Ship qty2,000 / 1,000
PDF reports12
Last report09/26

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (09/26): BA Thread ends 1 (earlier 15 times), ED Gathering crease 1 (earlier 19 times)

8 defects recorded as 'Others' without detail

Final Random 5, QA Inline 3; cannot compare across stages

Caught in earlier stages

EB Measurement issue (137), EC Asymmetry (42), DB Run-off stitching (26), EA Unsmooth/puckering/bubbling (17), CB Broken stitch (16) did not reach later stages

Found before bulk production (Final Random): 2

BB Missing cut seam allowance, BD Snagging: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline6 reports
required on prod. days 6/32 (19%)
—52.6%
QC Endline15 days—21.8%
QA Inline2 reports225.0%
Final Random4 reports17.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0421.9%
2449 / 14 days
25.0%PASS
06/19–09/22
ED Gathering crease, BA Thread ends, EB Measurement issue
CB300.0%
12 / 2 days
——
06/29–09/10
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0414286 (21%)14809/12, 09/14, 09/15, 09/16, 09/22
CB30240 (0%)2206/29, 09/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease315982
BA Thread ends315513
EB Measurement issue137
EC Asymmetry10293
DB Run-off stitching26
EA Unsmooth/puckering/bubbling152
CB Broken stitch16
CC Skip stitch16
253715 MKSC · CB17 · Due 09/30Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
08/14QC 1st Bundle1 reports
08/14QA 1st Bundle1 reports
2/14QC Inlineactual/required · 14%
DHU 97.9%QC Endline7 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,000 / 400
PDF reports8
Last report09/19

Cross-stage findings

Found earlier but still reached later stages: 6

DA Exceed seam allowance 1, EC Asymmetry 1, ED Gathering crease 1, EA Unsmooth/puckering/bubbling 1, DJ Pleat 1, BA Thread ends 5 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (2 Major), FB Material defect (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: ED Gathering crease (4), EC Asymmetry (3), DA Exceed seam allowance (2); DHU QC 1st Bundle 69.2% / QA 1st Bundle 53.8%

Caught in earlier stages

AC Fabric hole (300), EB Measurement issue (264), CC Skip stitch (200), DB Run-off stitching (16), CE Broken seam (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—53.8%
QC Inline2 reports
required on prod. days 2/14 (14%)
—38.0%
QC Endline7 days—97.9%
QA Inline2 reports229.7%
Final Random2 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1797.9%
977 / 7 days
29.7%PASS
08/14–09/02
AC Fabric hole, EB Measurement issue, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB177142 (14%)7508/17, 08/18, 08/19, 08/31, 09/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
AC Fabric hole300
EB Measurement issue264
CC Skip stitch200
ED Gathering crease4912931
BA Thread ends305
EC Asymmetry312971
DB Run-off stitching151
DA Exceed seam allowance271
253718 MKSC · CP05 · Due 09/30Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/10QC Inlineactual/required · 0%
DHU 12.6%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,100 / 552
PDF reports3
Last report07/15

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/15): ED Gathering crease 1 (earlier 9 times)

Found earlier but still reached later stages: 1

AC Fabric hole 1 pcs (later stages total)

QC Endline data errors: 7

06/24 CP05 253718CU (defective pcs 18 > defects 15), 06/25 CP05 253718CU (defective pcs 20 > defects 10), 06/25 CP05 253718AM (defective pcs 7 > defects 6), 06/25 CP05 253718BU (defective pcs 69 > defects 32)…

Caught in earlier stages

EC Asymmetry (22), EB Measurement issue (11), CE Broken seam (7), CC Skip stitch (6) did not reach later stages

Report line differs from production line

QGR2627098 Final Random (07/10) CB17; actual production line(s) CP05 (cards show production lines only)

Found before bulk production (Final Random): 1

CF Pulling yarn: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—12.6%
Final Random3 reports02.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0512.6%
1060 / 5 days
—PASS
06/24–07/08
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP055100 (0%)5506/24, 06/25, 06/26, 07/01, 07/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends365
ED Gathering crease342
EC Asymmetry22
EB Measurement issue11
AC Fabric hole61
CE Broken seam7
CC Skip stitch6
EA Unsmooth/puckering/bubbling4
260289 MKSC · CP06 · Due 09/30Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/16QC Inlineactual/required · 0%
DHU 6.9%QC Endline8 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports1 no result
Order/Ship qty2,686 / 851
PDF reports2
Last report07/30

Cross-stage findings

QC Endline data errors: 11

06/19 CP06 260289A (defective pcs 56 > defects 50), 06/20 CP06 260289C (defective pcs 25 > defects 9), 06/20 CP06 260289A (defective pcs 10 > defects 2), 06/20 CP06 260289B (defective pcs 40 > defects 11)…

Caught in earlier stages

ED Gathering crease (56), DB Run-off stitching (27), EC Asymmetry (11), EA Unsmooth/puckering/bubbling (7), CC Skip stitch (6) did not reach later stages

Report line differs from production line

QGR2629548 Final Random (07/30) CP04; actual production line(s) CP06 (cards show production lines only)

Found before bulk production (Final Random): 1

CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline8 days—6.9%
Final Random2 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP066.9%
2686 / 8 days
——
06/17–07/02
BA Thread ends, ED Gathering crease, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP068160 (0%)8806/22, 06/23, 06/24, 06/26, 07/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends712
ED Gathering crease56
DB Run-off stitching27
EC Asymmetry11
EA Unsmooth/puckering/bubbling7
CC Skip stitch6
AD Fabric stains4
CB Broken stitch2
260290 MKSC · CP03/CP07 · Due 09/30Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No resultPilot Run1 reports
No reportQC 1st Bundle
No reportQA 1st Bundle
0/20QC Inlineactual/required · 0%
DHU 10.4%QC Endline10 days
No reportQA Inline
No resultShipment Sample1 reports
No reportPre-final
1/5 FAILFinal Random5 reports
Order/Ship qty3,385 / 1,000
PDF reports7
Last report08/13

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (08/13): ED Gathering crease 1 (earlier 14 times)

Found earlier but still reached later stages: 3

CC Skip stitch 8, EI Inaccurate/skewed stitching 3, EC Asymmetry 3 pcs (later stages total)

3 defects recorded as 'Others' without detail

Final Random 2, Shipment Sample 1; cannot compare across stages

QC Endline data errors: 17

06/27 CP03 260290A (defective pcs 17 > defects 10), 06/29 CP03 260290A (defective pcs 69 > defects 38), 06/30 CP03 260290A (defective pcs 58 > defects 43), 06/30 CP03 260290B (defective pcs 30 > defects 19)…

Caught in earlier stages

EA Uneven seam allowance (43), AD Fabric stains (10), EA Unsmooth/puckering/bubbling (5) did not reach later stages

Found before bulk production (Final Random, Shipment Sample): 6

AC Fabric hole, DE Cut to broken, CB Broken stitch, CE Broken seam, AA Fabric defect, BB Missing cut seam allowance: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Pilot Run1 reports0—
QC Inline0 reports
required on prod. days 0/20 (0%)
——
QC Endline10 days—10.4%
Shipment Sample1 reports0—
Final Random5 reports16.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0310.4%
3365 / 10 days
—PASS
06/27–07/15
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0310200 (0%)101007/03, 07/10, 07/11, 07/14, 07/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC EndlineShipment SampleFinal Random
BA Thread ends9723
EC Asymmetry5703
ED Gathering crease751
CC Skip stitch478
EA Uneven seam allowance43
AD Fabric stains10
CB Broken stitch18
EI Inaccurate/skewed stitching221
260950 LOGE · CP01/CP02/CP03… · Due 09/30Final Random PASS No major issue (3 minor notes)
No resultPP Sample1 reports
No reportPilot Run
08/17–09/16QC 1st Bundle2 reports
08/10–09/17QA 1st Bundle3 reports
5/118QC Inlineactual/required · 4%
DHU 9.8%QC Endline28 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty12,000 / 12,000
PDF reports15
Last report09/29

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (09/29): CB Broken stitch 2 (earlier 7 times), ED Gathering crease 2 (earlier 33 times), AD Fabric stains 2 (earlier 3 times)

QC Endline data errors: 22

08/10 CP15 260950-3 (defective pcs 8 > defects 4), 08/12 CP15 260950-3 (defective pcs 10 > defects 3), 08/17 CP05 260950-2 (defective pcs 45 > defects 43), 08/18 CP01 260950-3 (defective pcs 3 > defects 1)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (4 Major), BB Missing cut seam allowance (3 Major), CG Grinning (2 Major), CC Skip stitch (1 Major), DE Cut to broken (1 Major); Only QC 1st Bundle: GA Missing bartack/button (3), DA Exceed seam allowance (2); Both: BA Thread ends (8/8), EC Asymmetry (10/3), CB Broken stitch (5/6), EA Unsmooth/puckering/bubbling (2/7), ED Gathering crease (3/3), DF Twisted seam/skewing (1/4), DJ Pleat (3/1), DI High-low/uneven (2/2), CE Broken seam (1/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 78.3%

Caught in earlier stages

CC Skip stitch (237), EC Asymmetry (111), EA Unsmooth/puckering/bubbling (66), EB Measurement issue (64), CE Broken seam (63) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—100.0%
QA 1st Bundle3 reports—78.3%
QC Inline5 reports
required on prod. days 5/118 (4%)
—88.6%
QC Endline28 days—9.8%
QA Inline3 reports344.8%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0514.0%
4260 / 10 days
53.1%—
08/17–09/02
BA Thread ends, ED Gathering crease, CC Skip stitch
CP1111.4%
3980 / 11 days
40.6%—
09/16–09/29
BA Thread ends, CC Skip stitch, ED Gathering crease
CP151.4%
980 / 9 days
——
08/10–08/25
BA Thread ends, EC Asymmetry
CP015.0%
860 / 9 days
——
08/10–08/29
BA Thread ends
CP166.3%
840 / 7 days
——
08/18–08/26
BA Thread ends, CC Skip stitch, ED Gathering crease
CP030.0%
460 / 6 days
——
08/14–08/25
—
CP040.0%
220 / 4 days
—PASS
08/21–08/26
—
CP070.0%
100 / 1 days
——
08/21–08/21
—
CP020.0%
80 / 1 days
——
08/31–08/31
—
CP171.7%
60 / 1 days
——
08/18–08/18
BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1111223 (14%)11809/23, 09/25, 09/26, 09/28, 09/29
CP0510202 (10%)10808/22, 08/24, 08/25, 08/26, 09/02
CP019180 (0%)9908/19, 08/20, 08/21, 08/26, 08/29
CP159180 (0%)9908/18, 08/19, 08/20, 08/21, 08/25
CP167140 (0%)7708/20, 08/21, 08/24, 08/25, 08/26
CP036120 (0%)6608/15, 08/19, 08/22, 08/24, 08/25
CP04480 (0%)4408/21, 08/22, 08/24, 08/26
CP02120 (0%)1108/31
CP07120 (0%)1108/21
CP17120 (0%)1108/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends8840269
CC Skip stitch18228
ED Gathering crease133614552
EC Asymmetry3103166613
EA Unsmooth/puckering/bubbling2277471
EB Measurement issue64
CE Broken seam126522
AC Fabric hole446
261173 MKSC · CP06/CP07/CS03 · Due 09/30Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No resultPilot Run3 reports
No reportQC 1st Bundle
09/09QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 16.2%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports7
Last report09/18

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (09/18): AD Fabric stains 1 (earlier 7 times)

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 3); zero in QC Endline records

Caught in earlier stages

ED Gathering crease (40), HA Poor pressing (29), CC Skip stitch (23), EC Asymmetry (5), DD Thread not straight/waving (5) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run3 reports0—
QA 1st Bundle1 reports—60.0%
QC Inline1 reports
required on prod. days 1/12 (8%)
—34.0%
QC Endline5 days—16.2%
QA Inline1 reports146.9%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0715.0%
840 / 5 days
46.9%PASS
09/09–09/25
BA Thread ends, ED Gathering crease, CC Skip stitch
CP0622.5%
160 / 1 days
——
09/11–09/11
BA Thread ends, HA Poor pressing, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP075101 (10%)5409/09, 09/10, 09/11, 09/12, 09/25
CP06120 (0%)1109/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends35023
ED Gathering crease2362
AD Fabric stains172521
HA Poor pressing128
CC Skip stitch23
EC Asymmetry113
DD Thread not straight/waving23
CG Grinning13
261176 MKSC · CB04 · Due 09/30Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
09/16QC 1st Bundle1 reports
09/16QA 1st Bundle1 reports
13/22QC Inlineactual/required · 59%
DHU 19.0%QC Endline11 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,560 / 560
PDF reports18
Last report09/28

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (09/28): CG Grinning 1 (earlier 13 times), ED Gathering crease 1 (earlier 17 times)

4 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (3 Major), EA Unsmooth/puckering/bubbling (2 Major), BD Snagging (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: EC Asymmetry (5), DJ Pleat (2), AC Fabric hole (2); Both: CG Grinning (2/3); DHU QC 1st Bundle 84.6% / QA 1st Bundle 100.0%

Caught in earlier stages

EB Measurement issue (98), EA Unsmooth/puckering/bubbling (49), EC Asymmetry (40), DJ Pleat (36), CB Broken stitch (32) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—84.6%
QA 1st Bundle1 reports—100.0%
QC Inline13 reports
required on prod. days 13/22 (59%)
—67.0%
QC Endline11 days—19.0%
QA Inline2 reports232.8%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0419.0%
1547 / 11 days
32.8%PASS
09/16–09/29
EB Measurement issue, ED Gathering crease, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB04112213 (59%)5409/16, 09/17, 09/26, 09/28, 09/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
EB Measurement issue98
ED Gathering crease311771
BA Thread ends9753
EA Unsmooth/puckering/bubbling2443
EC Asymmetry52411
DJ Pleat2313
CG Grinning232431
CB Broken stitch311
261264 MKSC · CP05 · Due 09/30Final Random PASS No major issue (5 minor notes)
No reportPP Sample
No reportPilot Run
08/13QC 1st Bundle1 reports
08/11QA 1st Bundle1 reports
0/10QC Inlineactual/required · 0%
DHU 17.3%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,190 / 1,190
PDF reports4
Last report09/01

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (09/01): ED Gathering crease 1 (earlier 7 times)

Found earlier but still reached later stages: 1

AD Fabric stains 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA 1st Bundle 1; cannot compare across stages

QC Endline data errors: 2

08/11 CP05 261264A (defective pcs 5 > defects 3), 08/13 CP05 261264A (defective pcs 96 > defects 47)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (3 Major), HA Poor pressing (2 Major), EA Unsmooth/puckering/bubbling (1 Major), CE Broken seam (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: CD Needle hole (6), DI High-low/uneven (2), CB Broken stitch (2); Both: ED Gathering crease (4/1), EC Asymmetry (4/1), DJ Pleat (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 60.0%

Caught in earlier stages

CC Skip stitch (35), AC Fabric hole (22), EC Asymmetry (21), EB Measurement issue (12), CE Broken seam (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—60.0%
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—17.3%
QA Inline1 reports131.2%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0517.3%
1142 / 5 days
31.2%PASS
08/11–08/18
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP055100 (0%)5508/11, 08/12, 08/13, 08/14, 08/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends34413
ED Gathering crease413941
CC Skip stitch35
AC Fabric hole22
EC Asymmetry4116
EB Measurement issue12
CE Broken seam18
DF Twisted seam/skewing9
261265 MKSC · CP05 · Due 09/30Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/13QA 1st Bundle1 reports
0/12QC Inlineactual/required · 0%
DHU 12.6%QC Endline6 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,142 / 1,142
PDF reports3
Last report09/07

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (09/07): CC Skip stitch 1 (earlier 5 times)

Found earlier but still reached later stages: 1

DJ Pleat 2 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA Inline 1; cannot compare across stages

QC Endline data errors: 1

08/15 CP05 261265A (defective pcs 85 > defects 35)

Caught in earlier stages

AD Fabric stains (22), ED Gathering crease (21), AC Fabric hole (14), EB Measurement issue (7), EC Asymmetry (6) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—80.0%
QC Inline0 reports
required on prod. days 0/12 (0%)
——
QC Endline6 days—12.6%
QA Inline1 reports121.9%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0512.6%
1082 / 6 days
21.9%PASS
08/14–08/26
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP056120 (0%)6608/15, 08/17, 08/18, 08/19, 08/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends322
CC Skip stitch22231
AD Fabric stains319
ED Gathering crease120
AC Fabric hole14
EB Measurement issue7
EC Asymmetry15
CG Grinning51
Aug 2026 157 · 🔴 35 🟠 77 🟢 45
Final Random FAIL: 8 POs
Most common in later stages: BA Thread ends (136), CB Broken stitch (102), AD Fabric stains (96)
🔴 Lines with most 🔴: CB30 (7), CP19 (4), CP13 (3), CP20 (3), CS10 (3)
260629 LOGE · CS26 · Due 08/04Final Random PASS Not fixed: DJ Pleat
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
15/52QC Inlineactual/required · 29%
DHU 8.9%QC Endline26 days
All FAILQA Inline3 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty3,388 / 3,388
PDF reports20
Last report08/03

Cross-stage findings

Not fixed: DJ Pleat

Found 11 times (22 pcs, 07/06–07/22) in earlier stages; latest Final Random (08/03) still has 3 major

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 36.5% vs QC Inline 21.3%; QC Inline may be missing defects

Recurring in small numbers: 3

Latest Final Random (08/03): CC Skip stitch 1 (earlier 33 times), BB Missing cut seam allowance 1 (earlier 5 times), EC Asymmetry 1 (earlier 9 times)

Found earlier but still reached later stages: 4

AD Fabric stains 2, AC Fabric hole 1, DD Thread not straight/waving 1, DB Run-off stitching 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 9); zero in QC Endline records

Caught in earlier stages

CB Broken stitch (41), GB Missing sewing operation (31), CA Thread tension (25), DI High-low/uneven (20), EB Measurement issue (17) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline15 reports
required on prod. days 15/52 (29%)
—21.3%
QC Endline26 days—8.9%
QA Inline3 reports336.5%
Pre-final1 reports03.5%
Final Random1 reports05.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS268.9%
10341 / 26 days
36.5%PASS
06/25–07/24
BA Thread ends, CC Skip stitch, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS26265215 (29%)241307/18, 07/20, 07/21, 07/23, 07/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends5518256
CC Skip stitch12284211
AD Fabric stains255612
CB Broken stitch365
GB Missing sewing operation625
DJ Pleat1933
CA Thread tension25
DB Run-off stitching15531
260661 LOGE · CP09/CP13/CP19… · Due 08/04Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
07/11QC 1st Bundle1 reports
No reportQA 1st Bundle
11/138QC Inlineactual/required · 8%
DHU 5.3%QC Endline51 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty20,000 / 60,000
PDF reports15
Last report08/03

Cross-stage findings

Not fixed: AD Fabric stains

Found 30 times (164 pcs, 06/05–08/01) in earlier stages; latest Final Random (07/14) still has 3 major

QA Inline DHU is 11.7× QC Endline

QA Inline DHU 62.2% vs QC Endline 5.3% (06/05–08/05, 51 days, 59080 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (07/14): CB Broken stitch 2 (earlier 12 times)

QC Endline data errors: 52

06/05 CP13 260661 (defective pcs 123 > defects 42), 06/06 CP13 260661 (defective pcs 90 > defects 28), 06/08 CP13 260661 (defective pcs 90 > defects 18), 06/09 CP13 260661 (defective pcs 150 > defects 24)…

Caught in earlier stages

ED Gathering crease (718), CC Skip stitch (589), CE Broken seam (230), EA Unsmooth/puckering/bubbling (191), EC Asymmetry (87) did not reach later stages

Report line differs from production line

QGR2627594 Final Random (07/14) CB09; actual production line(s) CP09/CP13/CP19/CP20 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—55.0%
QC Inline11 reports
required on prod. days 11/138 (8%)
—51.1%
QC Endline51 days—5.3%
QA Inline2 reports262.2%
Final Random1 reports01.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP134.0%
37620 / 42 days
——
06/05–08/05
BA Thread ends, ED Gathering crease, CC Skip stitch
CP207.7%
21160 / 23 days
62.2%—
07/10–08/05
BA Thread ends, CC Skip stitch, ED Gathering crease
CP090.0%
200 / 2 days
——
06/27–07/04
—
CP192.0%
100 / 2 days
——
07/04–07/06
BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1342842 (2%)424007/28, 07/30, 08/01, 08/04, 08/05
CP2023469 (20%)231407/31, 08/01, 08/03, 08/04, 08/05
CP09240 (0%)2206/27, 07/04
CP19240 (0%)2207/04, 07/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends10096267
ED Gathering crease127051
CC Skip stitch235813
CE Broken seam92201
EA Unsmooth/puckering/bubbling2917010
AD Fabric stains16223
Others (no detail)114
EC Asymmetry2254218
260673 LOGE · CS10 · Due 08/04Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/22QC Inlineactual/required · 0%
DHU 12.5%QC Endline11 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty9,500 / 9,500
PDF reports1
Last report08/03

Cross-stage findings

Not fixed: AD Fabric stains

Found 4 times (38 pcs, 06/19–06/26) in earlier stages; latest Final Random (08/03) still has 3 major

Recurring in small numbers: 1

Latest Final Random (08/03): ED Gathering crease 1 (earlier 9 times)

Caught in earlier stages

CC Skip stitch (9), DB Run-off stitching (6) did not reach later stages

Found before bulk production (Final Random): 1

CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/22 (0%)
——
QC Endline11 days—12.5%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1012.5%
9460 / 11 days
—PASS
06/17–07/03
BA Thread ends, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1011220 (0%)111106/25, 06/26, 06/27, 07/02, 07/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends10207
ED Gathering crease751
AD Fabric stains383
Others (no detail)30
CC Skip stitch9
DB Run-off stitching6
CB Broken stitch2
AC Fabric hole1
260710 LOGE · CB34/CB35 · Due 08/04Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
07/07QC 1st Bundle1 reports
07/07QA 1st Bundle1 reports
13/36QC Inlineactual/required · 36%
DHU 6.1%QC Endline17 days
All FAILQA Inline3 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random2 reports
Order/Ship qty3,994 / 3,994
PDF reports23
Last report07/30

Cross-stage findings

Not fixed: AD Fabric stains

Found 14 times (73 pcs, 07/07–07/18) in earlier stages; latest Final Random (07/30) still has 3 major

Recurring in small numbers: 4

Latest Final Random (07/30): CC Skip stitch 2 (earlier 34 times), DJ Pleat 2 (earlier 7 times), ED Gathering crease 1 (earlier 8 times), DB Run-off stitching 1 (earlier 25 times)

Found earlier but still reached later stages: 2

EA Unsmooth/puckering/bubbling 4, CB Broken stitch 3 pcs (later stages total)

QC Endline data errors: 6

07/10 CB34 260710-S1 (defective pcs 6 > defects 5), 07/10 CB34 260710-S2 (defective pcs 3 > defects 2), 07/13 CB34 260710-S2 (defective pcs 9 > defects 8), 07/16 CB34 260710-S2 (defective pcs 32 > defects 31)…

QC 1st Bundle vs QA 1st Bundle: 9 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (3 Major), FA Wrong material (2 Major), DA Exceed seam allowance (2 Major), CB Broken stitch (2 Major), DD Thread not straight/waving (1 Major), EI Inaccurate/skewed stitching (1 Major), DJ Pleat (1 Major), CE Broken seam (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: EC Asymmetry (2), CC Skip stitch (1), BA Thread ends (1), CD Needle hole (1), AD Fabric stains (1), BB Missing cut seam allowance (1); Both: EA Unsmooth/puckering/bubbling (1/1), CA Thread tension (1/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 80.0%

Caught in earlier stages

EC Asymmetry (92), AC Fabric hole (31), CG Grinning (24), BB Missing cut seam allowance (16), EA Uneven seam allowance (15) did not reach later stages

Report line differs from production line

QGR2628992 Pre-final (07/21) CB29, QGR2629352 Final Random (07/24) CB16; actual production line(s) CB34/CB35 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—80.0%
QC Inline15 reports
required on prod. days 13/36 (36%)
—31.5%
QC Endline17 days—6.1%
QA Inline3 reports330.2%
Pre-final1 reports05.6%
Final Random2 reports04.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB346.1%
8999 / 17 days
30.2%PASS
07/07–07/28
BA Thread ends, CC Skip stitch, DB Run-off stitching
CB350.0%
10 / 1 days
——
07/18–07/18
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB34173413 (38%)17407/23, 07/24, 07/25, 07/27, 07/28
CB35120 (0%)1107/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends1132035615
CC Skip stitch12012432
EC Asymmetry244379
DB Run-off stitching97631
AD Fabric stains1215125
EA Unsmooth/puckering/bubbling1130122
AC Fabric hole31
CB Broken stitch219221
260711 LOGE · CS10/CS13 · Due 08/04Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
07/08QC 1st Bundle1 reports
07/09QA 1st Bundle1 reports
31/76QC Inlineactual/required · 41%
DHU 9.6%QC Endline23 days
All FAILQA Inline8 reports
No reportShipment Sample
All FAILPre-final2 reports
All PASSFinal Random2 reports
Order/Ship qty27,227 / 27,339
PDF reports45
Last report08/05

Cross-stage findings

Not fixed: AD Fabric stains

Found 18 times (164 pcs, 07/16–07/29) in earlier stages; latest Final Random (08/05) still has 4 major

Missed in earlier stages: 1

BD Snagging (Final Random 08/05): first found in later stages, never recorded before

QA Inline DHU is 2.0× QC Inline

QA Inline DHU 39.1% vs QC Inline 19.5%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (08/05): CB Broken stitch 2 (earlier 17 times)

Found earlier but still reached later stages: 4

BB Missing cut seam allowance 7, ED Gathering crease 1, EA Unsmooth/puckering/bubbling 5, CC Skip stitch 1 pcs (later stages total)

180 defects recorded as 'Others' without detail

QC 1st Bundle 12, QC Inline 168; cannot compare across stages

QC Endline data errors: 1

07/30 CS13 260711 (defective pcs 2 > defects 1)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (3 Major), DD Thread not straight/waving (1 Major), ED Gathering crease (1 Major), DA Exceed seam allowance (1 Major), EI Inaccurate/skewed stitching (1 Major); Both: EC Asymmetry (3/2), BB Missing cut seam allowance (3/1), DJ Pleat (3/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 55.0%

Caught in earlier stages

DB Run-off stitching (433), EC Asymmetry (88), DA Exceed seam allowance (36), EI Inaccurate/skewed stitching (29), CE Broken seam (27) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—55.0%
QC Inline31 reports
required on prod. days 31/76 (41%)
—19.5%
QC Endline23 days—9.6%
QA Inline8 reports839.1%
Pre-final2 reports24.9%
Final Random2 reports02.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS137.8%
31588 / 22 days
35.6%PASS
07/08–08/01
BA Thread ends, Others (no detail), DB Run-off stitching
CS1012.6%
19536 / 16 days
44.8%—
07/16–08/03
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS13224419 (43%)21407/28, 07/29, 07/30, 07/31, 08/01
CS10163212 (38%)15507/29, 07/30, 07/31, 08/01, 08/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends1383219153713
Others (no detail)12168390
ED Gathering crease16540861
DB Run-off stitching45388
CC Skip stitch1436821
AD Fabric stains30125964
EC Asymmetry327211
CB Broken stitch531514
260815 LOGE · CB19/CB20/CB21… · Due 08/04Final Random PASS Not fixed: DJ Pleat
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
11/122QC Inlineactual/required · 9%
DHU 8.7%QC Endline34 days
All FAILQA Inline4 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty18,000 / 18,000
PDF reports23
Last report07/30

Cross-stage findings

Not fixed: DJ Pleat

Found 9 times (16 pcs, 07/11–07/28) in earlier stages; latest Final Random (07/25) still has 3 major

Missed in earlier stages: 1

EE Raw edge (Final Random 07/25): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (07/25): EA Unsmooth/puckering/bubbling 2 (earlier 23 times), CB Broken stitch 2 (earlier 8 times), AD Fabric stains 1 (earlier 7 times)

Caught in earlier stages

CC Skip stitch (284), DF Twisted seam/skewing (94), EB Measurement issue (76), ED Gathering crease (73), EC Asymmetry (72) did not reach later stages

Report line differs from production line

QGR2629875 Final Random (07/25) CB24; actual production line(s) CB19/CB20/CB21/CB26/CB29/CB30/CB31 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline18 reports
required on prod. days 11/122 (9%)
—34.4%
QC Endline34 days—8.7%
QA Inline4 reports441.4%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB199.0%
8263 / 23 days
39.1%—
06/26–08/06
BA Thread ends, DF Twisted seam/skewing, EB Measurement issue
CB268.5%
5879 / 20 days
43.8%—
07/04–07/31
BA Thread ends, CC Skip stitch
CB300.0%
190 / 14 days
——
07/03–08/04
—
CB310.0%
50 / 1 days
——
08/07–08/07
—
CB290.0%
20 / 1 days
——
07/24–07/24
—
CB20100.0%
10 / 1 days
——
06/25–06/25
AD Fabric stains, CC Skip stitch, CD Needle hole
CB210.0%
10 / 1 days
——
07/14–07/14
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1923466 (13%)231707/28, 07/29, 07/31, 08/01, 08/06
CB2620405 (12%)201507/24, 07/25, 07/28, 07/30, 07/31
CB3014280 (0%)141407/27, 07/29, 07/31, 08/01, 08/04
CB20120 (0%)1106/25
CB21120 (0%)1107/14
CB29120 (0%)1107/24
CB31120 (0%)1108/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends1048587
CC Skip stitch82733
DF Twisted seam/skewing94
EB Measurement issue76
ED Gathering crease712
EC Asymmetry28377
EA Unsmooth/puckering/bubbling3220102
DB Run-off stitching850
253628 MKSC · CB04/CB30 · Due 08/05Final Random PASS Not fixed: EC Asymmetry
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/16QC Inlineactual/required · 6%
DHU 23.2%QC Endline7 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty5,250 / 1,750
PDF reports2
Last report07/30

Cross-stage findings

Not fixed: EC Asymmetry

Found 7 times (90 pcs, 07/07–07/10) in earlier stages; latest Final Random (07/30) still has 3 major

Recurring in small numbers: 1

Latest Final Random (07/30): CC Skip stitch 2 (earlier 4 times)

Caught in earlier stages

BA Thread ends (176), EB Measurement issue (95), DB Run-off stitching (24), AD Fabric stains (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/16 (6%)
—46.9%
QC Endline7 days—23.2%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0423.3%
1741 / 7 days
—PASS
07/07–07/21
BA Thread ends, EB Measurement issue, EC Asymmetry
CB300.0%
10 / 1 days
——
07/10–07/10
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB047141 (7%)7607/09, 07/10, 07/11, 07/13, 07/21
CB30120 (0%)1107/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
BA Thread ends176
EB Measurement issue95
EC Asymmetry3873
CC Skip stitch6162
DB Run-off stitching24
AD Fabric stains8
CE Broken seam3
DA Exceed seam allowance3
261369 OSIT · CS24/CS25 · Due 08/05Final Random PASS Not fixed: EC Asymmetry
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/18QA 1st Bundle1 reports
6/22QC Inlineactual/required · 27%
DHU 9.7%QC Endline11 days
All FAILQA Inline4 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty16,200 / 16,200
PDF reports14
Last report07/31

Cross-stage findings

Not fixed: EC Asymmetry

Found 19 times (192 pcs, 07/18–07/28) in earlier stages; latest Final Random (07/31) still has 3 major

Not fixed: ED Gathering crease

Found 26 times (295 pcs, 07/18–07/28) in earlier stages; latest Final Random (07/31) still has 3 major

Not fixed: CB Broken stitch

Found 9 times (22 pcs, 07/20–07/27) in earlier stages; latest Final Random (07/31) still has 3 major

Missed in earlier stages: 2

CF Pulling yarn (Pre-final 07/27), EH Poor lamination/bonding (Final Random 07/31): first found in later stages, never recorded before

Found earlier but still reached later stages: 1

CC Skip stitch 3 pcs (later stages total)

Caught in earlier stages

DB Run-off stitching (88), EA Unsmooth/puckering/bubbling (79), EA Uneven seam allowance (53), AD Fabric stains (44), DD Thread not straight/waving (43) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—30.0%
QC Inline7 reports
required on prod. days 6/22 (27%)
—21.8%
QC Endline11 days—9.7%
QA Inline4 reports421.1%
Pre-final1 reports03.2%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS259.7%
16295 / 11 days
21.1%PASS
07/18–07/30
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2511226 (27%)11507/25, 07/27, 07/28, 07/29, 07/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends648577
ED Gathering crease243242833
CC Skip stitch526313
EC Asymmetry21716763
DB Run-off stitching781
EA Unsmooth/puckering/bubbling178
EA Uneven seam allowance53
AD Fabric stains242
261480 OSIT · CS25 · Due 08/05Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/15QA 1st Bundle1 reports
3/16QC Inlineactual/required · 19%
DHU 9.9%QC Endline8 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty5,500 / 5,500
PDF reports8
Last report07/28

Cross-stage findings

Not fixed: ED Gathering crease

Found 12 times (108 pcs, 07/15–07/18) in earlier stages; latest Final Random (07/28) still has 3 major

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 40.6% vs QC Inline 23.3%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (07/28): CE Broken seam 1 (earlier 5 times), CC Skip stitch 2 (earlier 5 times)

Found earlier but still reached later stages: 3

EC Asymmetry 2, CB Broken stitch 4, AD Fabric stains 1 pcs (later stages total)

Caught in earlier stages

Q95 HTL position incorrect (28), EA Unsmooth/puckering/bubbling (23), DB Run-off stitching (20), Q10 Reject after repairing (14) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—35.0%
QC Inline3 reports
required on prod. days 3/16 (19%)
—23.3%
QC Endline8 days—9.9%
QA Inline1 reports140.6%
Shipment Sample1 reports1—
Pre-final1 reports03.0%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS259.9%
5610 / 8 days
40.6%PASS
07/14–07/23
BA Thread ends, EC Asymmetry, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS258163 (19%)8507/17, 07/18, 07/21, 07/22, 07/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends18454
EC Asymmetry3101071111
ED Gathering crease2780123
CC Skip stitch2612
Q95 HTL position incorrect28
EA Unsmooth/puckering/bubbling3317
AD Fabric stains211
DB Run-off stitching20
260246 MKSC · CP01 · Due 08/12Final Random PASS Not fixed: BA Thread ends
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/20QC Inlineactual/required · 5%
DHU 6.2%QC Endline10 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty3,800 / 1,200
PDF reports5
Last report08/05

Cross-stage findings

Not fixed: BA Thread ends

Found 23 times (97 pcs, 06/27–07/13) in earlier stages; latest Final Random (08/05) still has 4 major

Missed in earlier stages: 2

CB Broken stitch (Final Random 07/06), CE Broken seam (Final Random 07/06): first found in later stages, never recorded before

QA Inline DHU is 6.2× QC Inline

QA Inline DHU 50.0% vs QC Inline 8.0%; QC Inline may be missing defects

QA Inline DHU is 8.1× QC Endline

QA Inline DHU 50.0% vs QC Endline 6.2% (06/27–07/13, 10 days, 3736 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/05): CC Skip stitch 1 (earlier 12 times)

QC Endline data errors: 22

06/27 CP01 260246AU (defective pcs 19 > defects 10), 06/27 CP01 260246AE (defective pcs 5 > defects 2), 06/29 CP01 260246AE (defective pcs 23 > defects 6), 06/29 CP01 260246BU (defective pcs 13 > defects 5)…

Caught in earlier stages

ED Gathering crease (53), EC Asymmetry (31), EA Unsmooth/puckering/bubbling (18), EB Measurement issue (9), CG Grinning (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/20 (5%)
—8.0%
QC Endline10 days—6.2%
QA Inline1 reports150.0%
Final Random3 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP016.2%
3736 / 10 days
50.0%PASS
06/27–07/13
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0110201 (5%)10907/03, 07/04, 07/06, 07/07, 07/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends59116
ED Gathering crease503
EC Asymmetry301
CC Skip stitch2172
EA Unsmooth/puckering/bubbling1161
EB Measurement issue9
CG Grinning6
Others (no detail)5
260570 LOGE · CP10 · Due 08/12Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
07/31QC 1st Bundle1 reports
07/31QA 1st Bundle1 reports
3/22QC Inlineactual/required · 14%
DHU 8.6%QC Endline11 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty11,500 / 11,500
PDF reports7
Last report08/11

Cross-stage findings

Not fixed: AD Fabric stains

Found 16 times (129 pcs, 07/31–08/12) in earlier stages; latest Final Random (08/11) still has 3 major

Recurring in small numbers: 3

Latest Final Random (08/11): DJ Pleat 2 (earlier 4 times), CB Broken stitch 2 (earlier 6 times), ED Gathering crease 2 (earlier 12 times)

QC Endline data errors: 11

07/31 CP10 260570 (defective pcs 60 > defects 22), 08/01 CP10 260570 (defective pcs 103 > defects 95), 08/03 CP10 260570 (defective pcs 165 > defects 148), 08/04 CP10 260570 (defective pcs 172 > defects 101)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (5 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: AJ Poor embroidery (1), DJ Pleat (1), CC Skip stitch (1); Both: EA Unsmooth/puckering/bubbling (4/4), BA Thread ends (5/2), AD Fabric stains (3/3), EC Asymmetry (3/2), CB Broken stitch (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 90.0%

Caught in earlier stages

CC Skip stitch (187), EA Uneven seam allowance (127), CE Broken seam (33), EC Asymmetry (17), EA Unsmooth/puckering/bubbling (9) did not reach later stages

Report line differs from production line

QGR2632758 Final Random (08/11) CP11; actual production line(s) CP10 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—90.0%
QC Inline3 reports
required on prod. days 3/22 (14%)
—26.7%
QC Endline11 days—8.6%
QA Inline1 reports125.0%
Final Random1 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP108.6%
11500 / 11 days
25.0%—
07/31–08/12
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1011223 (14%)11808/07, 08/08, 08/10, 08/11, 08/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends5214391110
CC Skip stitch17179
ED Gathering crease11502
AD Fabric stains331310913
EA Uneven seam allowance127
CE Broken seam825
EC Asymmetry3275
CB Broken stitch21612
260579 LOGE · CP14 · Due 08/12Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
08/07QC 1st Bundle1 reports
08/06QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 3.4%QC Endline6 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,000 / 3,000
PDF reports5
Last report08/11

Cross-stage findings

Not fixed: ED Gathering crease

Found 4 times (10 pcs, 08/06–08/08) in earlier stages; latest Final Random (08/11) still has 3 major

Missed in earlier stages: 1

CB Broken stitch (Final Random 08/11): first found in later stages, never recorded before

QA Inline DHU is 2.4× QC Inline

QA Inline DHU 53.1% vs QC Inline 22.5%; QC Inline may be missing defects

QA Inline DHU is 15.6× QC Endline

QA Inline DHU 53.1% vs QC Endline 3.4% (08/06–08/12, 6 days, 3000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/11): AD Fabric stains 1 (earlier 4 times)

Found earlier but still reached later stages: 1

BB Missing cut seam allowance 1 pcs (later stages total)

QC Endline data errors: 5

08/06 CP14 260579 (defective pcs 38 > defects 19), 08/07 CP14 260579 (defective pcs 87 > defects 40), 08/08 CP14 260579 (defective pcs 39 > defects 18), 08/10 CP14 260579 (defective pcs 34 > defects 21)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (5 Major), CA Thread tension (4 Major), ED Gathering crease (3 Major), CG Grinning (3 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: DB Run-off stitching (3), CC Skip stitch (2), AD Fabric stains (1), CE Broken seam (1); Both: EI Inaccurate/skewed stitching (4/3), BA Thread ends (5/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 100.0%

Caught in earlier stages

EC Asymmetry (21), CC Skip stitch (18), CG Grinning (8), EI Inaccurate/skewed stitching (7), DB Run-off stitching (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—100.0%
QC Inline1 reports
required on prod. days 1/12 (8%)
—22.5%
QC Endline6 days—3.4%
QA Inline1 reports153.1%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP143.4%
3000 / 6 days
53.1%PASS
08/06–08/12
BA Thread ends, CC Skip stitch, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP146121 (8%)6508/07, 08/08, 08/10, 08/11, 08/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends51105028
EC Asymmetry53103
CC Skip stitch2151
ED Gathering crease3433
AD Fabric stains1611
CG Grinning323
EI Inaccurate/skewed stitching43
DB Run-off stitching33
260645 LOGE · CB07/CB09 · Due 08/12Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
8/64QC Inlineactual/required · 12%
DHU 13.3%QC Endline31 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty7,000 / 7,000
PDF reports12
Last report08/06

Cross-stage findings

Not fixed: AD Fabric stains

Found 19 times (120 pcs, 07/02–08/03) in earlier stages; latest Final Random (08/06) still has 3 major

Missed in earlier stages: 2

DF Twisted seam/skewing (Final Random 08/06), BB Missing cut seam allowance (Final Random 08/06): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/06): DJ Pleat 2 (earlier 3 times)

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 6), CE Broken seam (QA 5); zero in QC Endline records

Caught in earlier stages

CC Skip stitch (150), ED Gathering crease (135), EB Measurement issue (79), EC Asymmetry (24), AC Fabric hole (23) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline8 reports
required on prod. days 8/64 (12%)
—41.4%
QC Endline31 days—13.3%
QA Inline3 reports341.7%
Final Random1 reports04.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0713.2%
6937 / 31 days
41.7%PASS
06/30–08/07
BA Thread ends, Others (no detail), CC Skip stitch
CB0931.7%
63 / 1 days
——
07/15–07/15
BA Thread ends, AD Fabric stains, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0731628 (13%)312308/01, 08/03, 08/04, 08/06, 08/07
CB09120 (0%)1107/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends28025
Others (no detail)166
CC Skip stitch6144
ED Gathering crease135
AD Fabric stains211623
EB Measurement issue2158
EC Asymmetry186
AC Fabric hole203
260646 LOGE · CP04/CP05/CP08… · Due 08/12Final Random PASS Not fixed: CB Broken stitch
No reportPP Sample
No reportPilot Run
07/20–07/29QC 1st Bundle2 reports
07/20–07/30QA 1st Bundle2 reports
2/140QC Inlineactual/required · 1%
DHU 5.7%QC Endline43 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty21,000 / 21,000
PDF reports11
Last report08/06

Cross-stage findings

Not fixed: CB Broken stitch

Found 6 times (6 pcs, 07/22–08/06) in earlier stages; latest Final Random (08/06) still has 4 major

Missed in earlier stages: 1

EE Raw edge (Final Random 08/06): first found in later stages, never recorded before

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 45.3% vs QC Inline 25.9%; QC Inline may be missing defects

QA Inline DHU is 7.9× QC Endline

QA Inline DHU 45.3% vs QC Endline 5.7% (06/01–08/24, 43 days, 19380 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/06): DJ Pleat 1 (earlier 6 times), AD Fabric stains 1 (earlier 28 times)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 10); zero in QC Endline records

QC Endline data errors: 32

06/01 CP11 260646-3 (defective pcs 5 > defects 2), 06/02 CP11 260646-3 (defective pcs 5 > defects 4), 06/03 CP08 260646-3 (defective pcs 25 > defects 12), 06/05 CP12 260646-3 (defective pcs 25 > defects 13)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: GB Missing sewing operation (4 Major), ED Gathering crease (2 Major); Only QC 1st Bundle: EI Inaccurate/skewed stitching (2), CE Broken seam (2), BD Snagging (1), DC Join stitching (1), DI High-low/uneven (1); Both: EC Asymmetry (8/9), BA Thread ends (6/8), AD Fabric stains (7/3), EA Unsmooth/puckering/bubbling (2/4), CC Skip stitch (2/2), DD Thread not straight/waving (3/1), CG Grinning (1/3), DJ Pleat (2/1), CB Broken stitch (1/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 95.0%

Caught in earlier stages

CC Skip stitch (347), EB Measurement issue (108), CE Broken seam (75), ED Gathering crease (50), EC Asymmetry (33) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—75.0%
QA 1st Bundle2 reports—95.0%
QC Inline4 reports
required on prod. days 2/140 (1%)
—25.9%
QC Endline43 days—5.7%
QA Inline2 reports245.3%
Final Random1 reports01.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP116.9%
15260 / 35 days
45.3%—
06/01–08/24
BA Thread ends, CC Skip stitch, EB Measurement issue
CP200.5%
1300 / 9 days
——
06/09–06/25
BA Thread ends
CP121.4%
940 / 6 days
——
06/05–06/22
AD Fabric stains, BA Thread ends, GB Missing sewing operation
CP130.0%
680 / 4 days
—PASS
06/02–06/13
—
CP084.0%
300 / 2 days
——
06/01–06/03
CC Skip stitch, BA Thread ends, AD Fabric stains
CP190.0%
280 / 4 days
——
06/04–06/12
—
CP042.0%
200 / 2 days
——
06/08–06/09
AD Fabric stains, BA Thread ends
CP050.0%
200 / 3 days
——
06/09–06/26
—
CP1810.0%
100 / 1 days
——
06/01–06/01
BA Thread ends, CC Skip stitch, DB Run-off stitching
CP100.0%
80 / 2 days
——
06/08–06/22
—
CP170.0%
40 / 2 days
——
06/25–08/10
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1135702 (3%)353308/10, 08/11, 08/12, 08/13, 08/24
CP209180 (0%)9906/13, 06/16, 06/17, 06/24, 06/25
CP126120 (0%)6606/08, 06/09, 06/13, 06/17, 06/22
CP13480 (0%)4406/02, 06/09, 06/10, 06/13
CP19480 (0%)4406/04, 06/09, 06/10, 06/12
CP05360 (0%)3306/09, 06/11, 06/26
CP04240 (0%)2206/08, 06/09
CP08240 (0%)2206/01, 06/03
CP10240 (0%)2206/08, 06/22
CP17240 (0%)2206/25, 08/10
CP18120 (0%)1106/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends683140348
CC Skip stitch224339
AD Fabric stains7310921
EB Measurement issue108
CE Broken seam214581
ED Gathering crease2345
EC Asymmetry89610
EA Unsmooth/puckering/bubbling241214
260704 OSIT · CS03/CS04/CS09… · Due 08/12Final Random PASS Not fixed: CC Skip stitch
No resultPP Sample1 reports
No reportPilot Run
07/14QC 1st Bundle1 reports
07/14QA 1st Bundle1 reports
9/40QC Inlineactual/required · 22%
DHU 12.7%QC Endline15 days
All FAILQA Inline5 reports
All FAILShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty10,000 / 10,000
PDF reports20
Last report07/31

Cross-stage findings

Not fixed: CC Skip stitch

Found 13 times (293 pcs, 07/13–07/25) in earlier stages; latest Final Random (07/31) still has 3 major

Missed in earlier stages: 3

AA Fabric defect (Shipment Sample 07/21), IA 2nd operation issue (Pre-final 07/23), EI Inaccurate/skewed stitching (Final Random 07/31): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/31): EC Asymmetry 2 (earlier 35 times)

Found earlier but still reached later stages: 2

CB Broken stitch 2, AD Fabric stains 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DI High-low/uneven (2 Major), CE Broken seam (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: BB Missing cut seam allowance (1), BC Sticker left (1); Both: EC Asymmetry (2/2), CB Broken stitch (2/1), BA Thread ends (1/2); DHU QC 1st Bundle 53.8% / QA 1st Bundle 55.0%

Caught in earlier stages

DB Run-off stitching (154), ED Gathering crease (45), BB Missing cut seam allowance (24), EA Unsmooth/puckering/bubbling (21), CD Needle hole (12) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—53.8%
QA 1st Bundle1 reports—55.0%
QC Inline9 reports
required on prod. days 9/40 (22%)
—53.8%
QC Endline15 days—12.7%
QA Inline5 reports535.6%
Shipment Sample1 reports1—
Pre-final1 reports03.0%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0912.8%
9382 / 15 days
35.6%PASS
07/13–07/29
BA Thread ends, CC Skip stitch, EC Asymmetry
CS040.0%
22 / 1 days
——
07/28–07/28
—
CS100.0%
22 / 2 days
——
07/15–07/18
—
CS030.0%
8 / 1 days
——
07/27–07/27
—
CS120.0%
7 / 1 days
——
07/28–07/28
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0915309 (30%)15607/24, 07/25, 07/27, 07/28, 07/29
CS10240 (0%)2207/15, 07/18
CS03120 (0%)1107/27
CS04120 (0%)1107/28
CS12120 (0%)1107/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends1223650457
CC Skip stitch3290223
EC Asymmetry2265140922
DB Run-off stitching7084
ED Gathering crease837
CB Broken stitch212622
BB Missing cut seam allowance1149
EA Unsmooth/puckering/bubbling11217
260723 GECL · CS23/CS24 · Due 08/12Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/09–07/16QA 1st Bundle2 reports
13/56QC Inlineactual/required · 23%
DHU 8.5%QC Endline18 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty16,960 / 1,990
PDF reports20
Last report08/04

Cross-stage findings

Not fixed: AD Fabric stains

Found 39 times (394 pcs, 07/09–07/28) in earlier stages; latest Final Random (08/04) still has 3 major

Missed in earlier stages: 6

GB Missing sewing operation (Shipment Sample 07/13), CG Grinning (Shipment Sample 07/13), DH Pressing mark (Shipment Sample 07/13), EH Poor lamination/bonding (Shipment Sample 07/13), CF Pulling yarn (Shipment Sample 07/13), EC Asymmetry (Shipment Sample 07/13): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/04): DF Twisted seam/skewing 1 (earlier 16 times), AC Fabric hole 1 (earlier 10 times)

Found earlier but still reached later stages: 1

EI Inaccurate/skewed stitching 1 pcs (later stages total)

22 defects recorded as 'Others' without detail

QA 1st Bundle 5, QC Inline 12, QA Inline 3, Final Random 2; cannot compare across stages

QC Endline data errors: 17

07/16 CS24 260723A-1 (defective pcs 106 > defects 104), 07/17 CS23 260723A-2 (defective pcs 115 > defects 82), 07/17 CS24 260723A-1 (defective pcs 76 > defects 72), 07/17 CS24 260723B-1 (defective pcs 9 > defects 7)…

Caught in earlier stages

CC Skip stitch (266), CE Broken seam (80), ED Gathering crease (70), DB Run-off stitching (70), DJ Pleat (41) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle2 reports—67.5%
QC Inline14 reports
required on prod. days 13/56 (23%)
—38.5%
QC Endline18 days—8.5%
QA Inline1 reports134.4%
Shipment Sample1 reports1—
Final Random2 reports03.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2411.0%
8480 / 15 days
—PASS
07/10–07/29
BA Thread ends, AD Fabric stains, CC Skip stitch
CS236.0%
8470 / 13 days
34.4%—
07/16–08/01
BA Thread ends, CC Skip stitch, CE Broken seam

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2415306 (20%)15907/22, 07/23, 07/27, 07/28, 07/29
CS2313267 (27%)13607/25, 07/27, 07/28, 07/29, 08/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends73854965
AD Fabric stains63835016
CC Skip stitch125240
Others (no detail)5126732
CE Broken seam1970
ED Gathering crease1951
DB Run-off stitching1456
DF Twisted seam/skewing44241
260724 GECL · CS03/CS11/CS12… · Due 08/12Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/06QA 1st Bundle1 reports
17/74QC Inlineactual/required · 23%
DHU 15.4%QC Endline26 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty16,960 / 1,990
PDF reports24
Last report08/05

Cross-stage findings

Not fixed: AD Fabric stains

Found 42 times (626 pcs, 06/29–07/28) in earlier stages; latest Final Random (08/05) still has 3 major

Missed in earlier stages: 1

EA Unsmooth/puckering/bubbling (Shipment Sample 07/07): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/05): CB Broken stitch 1 (earlier 9 times), DF Twisted seam/skewing 1 (earlier 12 times)

Found earlier but still reached later stages: 3

CC Skip stitch 1, EC Asymmetry 4, AC Fabric hole 1 pcs (later stages total)

79 defects recorded as 'Others' without detail

QA 1st Bundle 6, QC Inline 72, QA Inline 1; cannot compare across stages

QC Endline data errors: 18

07/06 CS23 260724A-2 (defective pcs 116 > defects 78), 07/07 CS23 260724A-2 (defective pcs 122 > defects 93), 07/08 CS23 260724A-2 (defective pcs 119 > defects 99), 07/09 CS23 260724A-2 (defective pcs 125 > defects 104)…

Caught in earlier stages

ED Gathering crease (317), CE Broken seam (165), DJ Pleat (21), EB Measurement issue (21), DD Thread not straight/waving (19) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—85.0%
QC Inline19 reports
required on prod. days 17/74 (23%)
—33.4%
QC Endline26 days—15.4%
QA Inline1 reports143.8%
Shipment Sample1 reports1—
Final Random2 reports03.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2311.5%
8465 / 19 days
43.8%PASS
07/06–07/31
BA Thread ends, CE Broken seam, EC Asymmetry
CS1119.3%
8441 / 17 days
—PASS
06/29–07/20
AD Fabric stains, BA Thread ends, CC Skip stitch
CS030.0%
17 / 1 days
——
07/21–07/21
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS23193810 (26%)19907/24, 07/27, 07/28, 07/29, 07/31
CS1117347 (21%)171007/13, 07/14, 07/17, 07/18, 07/20
CS03120 (0%)1107/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends56778145
AD Fabric stains439579415
CC Skip stitch1140011
ED Gathering crease1316
Others (no detail)6721381
CE Broken seam2163
EC Asymmetry61464
DF Twisted seam/skewing14251
261370 OSIT · CS06/CS13 · Due 08/12Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/24QA 1st Bundle1 reports
10/24QC Inlineactual/required · 42%
DHU 8.1%QC Endline12 days
All FAILQA Inline6 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty13,800 / 13,800
PDF reports19
Last report08/07

Cross-stage findings

Not fixed: ED Gathering crease

Found 24 times (194 pcs, 07/24–08/05) in earlier stages; latest Final Random (08/07) still has 5 major

Missed in earlier stages: 1

EI Inaccurate/skewed stitching (Pre-final 07/28): first found in later stages, never recorded before

QA Inline DHU is 2.4× QC Inline

QA Inline DHU 27.1% vs QC Inline 11.1%; QC Inline may be missing defects

Recurring in small numbers: 4

Latest Final Random (08/07): EC Asymmetry 1 (earlier 19 times), AD Fabric stains 2 (earlier 3 times), CC Skip stitch 1 (earlier 12 times), DF Twisted seam/skewing 1 (earlier 12 times)

Found earlier but still reached later stages: 1

IA 2nd operation issue 1 pcs (later stages total)

40 defects recorded as 'Others' without detail

QA 1st Bundle 5, QA Inline 12, QC Inline 23; cannot compare across stages

QC Endline data errors: 7

07/24 CS06 261370 (defective pcs 53 > defects 47), 07/25 CS06 261370 (defective pcs 45 > defects 43), 07/28 CS06 261370 (defective pcs 148 > defects 120), 07/29 CS06 261370 (defective pcs 124 > defects 98)…

Caught in earlier stages

DB Run-off stitching (100), EA Uneven seam allowance (54), EA Unsmooth/puckering/bubbling (48), Q93 Heat seal logo peeling off (42), AB Shading (40) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—50.0%
QC Inline10 reports
required on prod. days 10/24 (42%)
—11.1%
QC Endline12 days—8.1%
QA Inline6 reports627.1%
Pre-final1 reports02.5%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS068.1%
13864 / 11 days
27.1%PASS
07/24–08/05
CC Skip stitch, BA Thread ends, ED Gathering crease
CS130.0%
10 / 1 days
——
08/06–08/06
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS06112210 (45%)11107/31, 08/01, 08/03, 08/04, 08/05
CS13120 (0%)1108/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
CC Skip stitch22811
BA Thread ends23195677
ED Gathering crease191721255
DB Run-off stitching397
DF Twisted seam/skewing3731
EC Asymmetry2442521
EA Uneven seam allowance54
Others (no detail)5231012
261050 RGOR · CB24/CB30 · Due 08/14Shipment Sample FAIL Latest Shipment Sample (08/05) FAILED
All PASSPP Sample1 reports
No reportPilot Run
08/04QC 1st Bundle1 reports
08/04QA 1st Bundle1 reports
8/32QC Inlineactual/required · 25%
DHU 8.5%QC Endline15 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty6,505 / 6,505
PDF reports14
Last report08/19

Cross-stage findings

Latest Shipment Sample (08/05) FAILED

10 major: FC Wrong label 1, EA Unsmooth/puckering/bubbling 1, AD Fabric stains 1, ED Gathering crease 1, EC Asymmetry 1, DI High-low/uneven 1, EI Inaccurate/skewed stitching 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1

Not fixed: ED Gathering crease

Found 32 times (130 pcs, 08/01–08/20) in earlier stages; latest Shipment Sample (08/05) still has 1 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 15 times (29 pcs, 08/04–08/19) in earlier stages; latest Shipment Sample (08/05) still has 1 major

Not fixed: EC Asymmetry

Found 26 times (51 pcs, 08/04–08/19) in earlier stages; latest Shipment Sample (08/05) still has 4 major

Not fixed: AD Fabric stains

Found 15 times (53 pcs, 08/04–08/21) in earlier stages; latest Shipment Sample (08/05) still has 1 major

Missed in earlier stages: 3

FC Wrong label (Shipment Sample 08/05), DI High-low/uneven (Shipment Sample 08/05), EI Inaccurate/skewed stitching (Shipment Sample 08/05): first found in later stages, never recorded before

QA Inline DHU is 5.2× QC Endline

QA Inline DHU 43.8% vs QC Endline 8.5% (08/05–08/21, 15 days, 6554 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

3 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 10), EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (2 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: CG Grinning (2), DJ Pleat (1); Both: EC Asymmetry (3/4), EA Unsmooth/puckering/bubbling (1/3), AD Fabric stains (1/3), BA Thread ends (1/2), ED Gathering crease (1/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 85.0%

Caught in earlier stages

BA Thread ends (291), CC Skip stitch (117), CG Grinning (26), DF Twisted seam/skewing (16), DJ Pleat (8) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—85.0%
QC Inline8 reports
required on prod. days 8/32 (25%)
—30.8%
QC Endline15 days—8.5%
QA Inline2 reports243.8%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB248.5%
6534 / 15 days
43.8%—
08/05–08/21
BA Thread ends, CC Skip stitch, ED Gathering crease
CB300.0%
20 / 1 days
——
08/18–08/18
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2415308 (27%)15708/17, 08/18, 08/19, 08/20, 08/21
CB30120 (0%)1108/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends1242822
ED Gathering crease1111211321
CC Skip stitch1116
EC Asymmetry343864
AD Fabric stains133461
EA Unsmooth/puckering/bubbling132141
CG Grinning224
DF Twisted seam/skewing214
261051 RGOR · CB30/CB34 · Due 08/14Shipment Sample FAIL Latest Shipment Sample (08/07) FAILED
No resultPP Sample1 reports
No reportPilot Run
08/04QC 1st Bundle1 reports
08/04QA 1st Bundle1 reports
7/24QC Inlineactual/required · 29%
DHU 15.2%QC Endline11 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty5,185 / 5,185
PDF reports14
Last report08/19

Cross-stage findings

Latest Shipment Sample (08/07) FAILED

7 major: EC Asymmetry 1, EI Inaccurate/skewed stitching 1, AD Fabric stains 1, EC Asymmetry 1, DF Twisted seam/skewing 1, EA Unsmooth/puckering/bubbling 1, ED Gathering crease 1

Not fixed: ED Gathering crease

Found 16 times (49 pcs, 07/31–08/18) in earlier stages; latest Shipment Sample (08/07) still has 1 major

Not fixed: DF Twisted seam/skewing

Found 11 times (21 pcs, 07/31–08/19) in earlier stages; latest Shipment Sample (08/07) still has 1 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 7 times (13 pcs, 08/04–08/10) in earlier stages; latest Shipment Sample (08/07) still has 1 major

Not fixed: EC Asymmetry

Found 12 times (24 pcs, 08/04–08/18) in earlier stages; latest Shipment Sample (08/07) still has 2 major

Not fixed: AD Fabric stains

Found 14 times (73 pcs, 08/04–08/19) in earlier stages; latest Shipment Sample (08/07) still has 1 major

Missed in earlier stages: 1

EI Inaccurate/skewed stitching (Shipment Sample 08/07): first found in later stages, never recorded before

Found earlier but still reached later stages: 1

GA Missing bartack/button 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 4); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DJ Pleat (4 Major), AH Sharp edge (2 Major), CE Broken seam (1 Major), DB Run-off stitching (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: ED Gathering crease (2), CH Incorrect stitch density (1); Both: DF Twisted seam/skewing (3/1), AD Fabric stains (1/2), EC Asymmetry (1/2), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 75.0%

Caught in earlier stages

CC Skip stitch (229), BA Thread ends (182), DB Run-off stitching (109), AC Fabric hole (64), DJ Pleat (14) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—75.0%
QC Inline8 reports
required on prod. days 7/24 (29%)
—30.5%
QC Endline11 days—15.2%
QA Inline2 reports242.2%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3415.3%
4317 / 11 days
42.2%—
08/06–08/19
CC Skip stitch, BA Thread ends, DB Run-off stitching
CB300.0%
20 / 1 days
——
08/15–08/15
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3411227 (32%)11408/14, 08/15, 08/17, 08/18, 08/19
CB30120 (0%)1108/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
CC Skip stitch142231
BA Thread ends1802
DB Run-off stitching11071
AD Fabric stains12155321
AC Fabric hole64
ED Gathering crease12162641
EC Asymmetry121922
DF Twisted seam/skewing1311511
261055 RGOR · CS16 · Due 08/14Shipment Sample FAIL Latest Shipment Sample (08/03) FAILED
No reportPP Sample
No reportPilot Run
07/27QC 1st Bundle1 reports
07/25QA 1st Bundle1 reports
7/28QC Inlineactual/required · 25%
DHU 20.0%QC Endline14 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty3,450 / 3,450
PDF reports14
Last report08/05

Cross-stage findings

Latest Shipment Sample (08/03) FAILED

9 major: CB Broken stitch 1, ED Gathering crease 1, ED Gathering crease 1, AD Fabric stains 1, Others (no detail) 1, ED Gathering crease 1, Others (no detail) 1, DE Cut to broken 1, EC Asymmetry 1

Not fixed: AD Fabric stains

Found 21 times (271 pcs, 07/24–08/08) in earlier stages; latest Shipment Sample (08/03) still has 1 major

Not fixed: ED Gathering crease

Found 28 times (98 pcs, 07/24–08/08) in earlier stages; latest Shipment Sample (08/03) still has 3 major

Not fixed: CB Broken stitch

Found 14 times (36 pcs, 07/27–08/05) in earlier stages; latest Shipment Sample (08/03) still has 1 major

Not fixed: EC Asymmetry

Found 3 times (5 pcs, 07/31–08/04) in earlier stages; latest Shipment Sample (08/03) still has 1 major

Missed in earlier stages: 5

CG Grinning (Pre-final 07/30), BD Snagging (Pre-final 07/30), DF Twisted seam/skewing (Pre-final 07/30), CE Broken seam (Pre-final 07/30), DE Cut to broken (Shipment Sample 08/03): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

BA Thread ends 4, DJ Pleat 7 pcs (later stages total)

2 defects recorded as 'Others' without detail

Shipment Sample 2; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (2 Major), EH Poor lamination/bonding (2 Major), EA Unsmooth/puckering/bubbling (1 Major), EI Inaccurate/skewed stitching (1 Major), BB Missing cut seam allowance (1 Major), BC Sticker left (1 Major); Only QC 1st Bundle: CB Broken stitch (5), DD Thread not straight/waving (3), DC Join stitching (2); Both: BA Thread ends (5/1), ED Gathering crease (3/1); DHU QC 1st Bundle 90.0% / QA 1st Bundle 76.9%

Caught in earlier stages

CC Skip stitch (167), AC Fabric hole (8), EA Unsmooth/puckering/bubbling (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—90.0%
QA 1st Bundle1 reports—76.9%
QC Inline7 reports
required on prod. days 7/28 (25%)
—22.9%
QC Endline14 days—20.0%
QA Inline3 reports332.3%
Shipment Sample1 reports1—
Pre-final1 reports120.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1620.0%
3430 / 14 days
32.3%—
07/24–08/08
AD Fabric stains, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1614287 (25%)14708/04, 08/05, 08/06, 08/07, 08/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
AD Fabric stains210252713
BA Thread ends513616544
CC Skip stitch5162
ED Gathering crease312861533
CB Broken stitch528312
Others (no detail)352
DJ Pleat627
AC Fabric hole17
261268 RGOR · CB24/CB27 · Due 08/14Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
07/17QC 1st Bundle1 reports
07/17QA 1st Bundle1 reports
0/14QC Inlineactual/required · 0%
DHU 16.0%QC Endline7 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,785 / 1,785
PDF reports5
Last report08/14

Cross-stage findings

Not fixed: AD Fabric stains

Found 10 times (69 pcs, 07/17–07/24) in earlier stages; latest Final Random (08/14) still has 3 major

Missed in earlier stages: 1

CB Broken stitch (Final Random 08/14): first found in later stages, never recorded before

2 defects recorded as 'Others' without detail

QA 1st Bundle 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 8); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (3 Major), BA Thread ends (2 Major), CE Broken seam (2 Major), BB Missing cut seam allowance (2 Major), ED Gathering crease (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (2); Both: AD Fabric stains (4/2), EA Unsmooth/puckering/bubbling (3/3), EC Asymmetry (3/1), AC Fabric hole (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 95.0%

Caught in earlier stages

EC Asymmetry (65), CC Skip stitch (51), ED Gathering crease (27), EA Unsmooth/puckering/bubbling (14), CE Broken seam (13) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—95.0%
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—16.0%
QA Inline2 reports239.1%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2716.2%
1671 / 6 days
39.1%PASS
07/18–07/24
AD Fabric stains, BA Thread ends, EC Asymmetry
CB240.0%
20 / 1 days
——
08/08–08/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB276120 (0%)6607/20, 07/21, 07/22, 07/23, 07/24
CB24120 (0%)1108/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
AD Fabric stains426123
EC Asymmetry31583
BA Thread ends2603
CC Skip stitch51
ED Gathering crease1242
EA Unsmooth/puckering/bubbling338
CE Broken seam211
EB Measurement issue35
261270 RGOR · CP14/CP15 · Due 08/14Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/16QA 1st Bundle1 reports
0/16QC Inlineactual/required · 0%
DHU 10.5%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,355 / 2,355
PDF reports4
Last report08/14

Cross-stage findings

Not fixed: AD Fabric stains

Found 4 times (23 pcs, 07/18–07/22) in earlier stages; latest Final Random (08/14) still has 3 major

Found earlier but still reached later stages: 3

DE Cut to broken 1, CB Broken stitch 3, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

QC Endline data errors: 4

07/17 CP15 261270 (defective pcs 99 > defects 89), 07/20 CP15 261270 (defective pcs 157 > defects 136), 07/21 CP15 261270 (defective pcs 35 > defects 33), 07/22 CP15 261270 (defective pcs 4 > defects 3)

Caught in earlier stages

ED Gathering crease (98), EA Uneven seam allowance (84), CC Skip stitch (59), EC Asymmetry (10), DB Run-off stitching (9) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—70.0%
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline7 days—10.5%
QA Inline1 reports118.8%
Final Random2 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1510.5%
3902 / 7 days
18.8%PASS
07/16–07/23
BA Thread ends, ED Gathering crease, EA Uneven seam allowance
CP140.0%
20 / 1 days
——
07/18–07/18
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP157140 (0%)7707/18, 07/20, 07/21, 07/22, 07/23
CP14120 (0%)1107/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends212518
ED Gathering crease2951
EA Uneven seam allowance84
CC Skip stitch59
AD Fabric stains2213
EC Asymmetry19
DB Run-off stitching9
HA Poor pressing26
261274 RGOR · CP15 · Due 08/14Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/06QA 1st Bundle1 reports
0/10QC Inlineactual/required · 0%
DHU 7.4%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,305 / 2,305
PDF reports3
Last report08/14

Cross-stage findings

Not fixed: AD Fabric stains

Found 4 times (20 pcs, 08/06–08/08) in earlier stages; latest Final Random (08/14) still has 3 major

Missed in earlier stages: 1

CB Broken stitch (Final Random 08/14): first found in later stages, never recorded before

QA Inline DHU is 6.8× QC Endline

QA Inline DHU 50.0% vs QC Endline 7.4% (08/06–08/11, 5 days, 2377 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 1

DJ Pleat 1 pcs (later stages total)

QC Endline data errors: 3

08/06 CP15 261274 (defective pcs 113 > defects 40), 08/07 CP15 261274 (defective pcs 180 > defects 74), 08/08 CP15 261274 (defective pcs 130 > defects 61)

Caught in earlier stages

ED Gathering crease (52), EC Asymmetry (30), CC Skip stitch (25), EA Unsmooth/puckering/bubbling (13) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—85.0%
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—7.4%
QA Inline1 reports150.0%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP157.4%
2377 / 5 days
50.0%PASS
08/06–08/11
ED Gathering crease, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP155100 (0%)5508/06, 08/07, 08/08, 08/10, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends34736
ED Gathering crease349
EC Asymmetry5241
CC Skip stitch241
AD Fabric stains11633
EA Unsmooth/puckering/bubbling112
CG Grinning22
DJ Pleat31
261234 OSIT · CS01/CS02/CS09 · Due 08/19Final Random PASS Not fixed: ED Gathering crease
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
07/23QA 1st Bundle1 reports
3/18QC Inlineactual/required · 17%
DHU 11.0%QC Endline9 days
All FAILQA Inline2 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports9
Last report08/13

Cross-stage findings

Not fixed: ED Gathering crease

Found 13 times (29 pcs, 07/23–07/27) in earlier stages; latest Final Random (08/13) still has 3 major

Missed in earlier stages: 1

EH Poor lamination/bonding (Pre-final 07/27): first found in later stages, never recorded before

QA Inline DHU is 3.5× QC Inline

QA Inline DHU 40.6% vs QC Inline 11.7%; QC Inline may be missing defects

Found earlier but still reached later stages: 2

EC Asymmetry 1, AD Fabric stains 2 pcs (later stages total)

8 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 5; cannot compare across stages

Caught in earlier stages

CC Skip stitch (44), AB Shading (8), DF Twisted seam/skewing (7), DJ Pleat (5), CB Broken stitch (5) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA 1st Bundle1 reports—65.0%
QC Inline3 reports
required on prod. days 3/18 (17%)
—11.7%
QC Endline9 days—11.0%
QA Inline2 reports240.6%
Pre-final1 reports05.0%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0111.3%
940 / 7 days
40.6%PASS
07/23–08/11
Others (no detail), CC Skip stitch, ED Gathering crease
CS090.0%
18 / 1 days
——
08/08–08/08
—
CS020.0%
5 / 1 days
——
08/07–08/07
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS017143 (21%)7407/25, 07/27, 07/28, 08/10, 08/11
CS02120 (0%)1108/07
CS09120 (0%)1108/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
CC Skip stitch38321
Others (no detail)3345
ED Gathering crease516823
BA Thread ends1943
AB Shading8
DF Twisted seam/skewing16
EC Asymmetry321
DJ Pleat23
261368 OSIT · CS25 · Due 08/19Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
6/28QC Inlineactual/required · 21%
DHU 12.8%QC Endline14 days
All FAILQA Inline5 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty14,900 / 14,900
PDF reports13
Last report07/15

Cross-stage findings

Not fixed: ED Gathering crease

Found 20 times (377 pcs, 07/04–07/14) in earlier stages; latest Final Random (07/15) still has 3 major

Missed in earlier stages: 1

BB Missing cut seam allowance (Pre-final 07/08): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (07/15): EC Asymmetry 1 (earlier 20 times), CB Broken stitch 2 (earlier 22 times), AD Fabric stains 1 (earlier 8 times)

Found earlier but still reached later stages: 1

CC Skip stitch 20 pcs (later stages total)

Caught in earlier stages

DB Run-off stitching (94), EA Unsmooth/puckering/bubbling (75), CE Broken seam (75), Q95 HTL position incorrect (52), EB Measurement issue (22) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline6 reports
required on prod. days 6/28 (21%)
—31.2%
QC Endline14 days—12.8%
QA Inline5 reports523.8%
Pre-final1 reports17.9%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2512.8%
14397 / 14 days
23.8%PASS
07/04–07/22
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2514286 (21%)13907/15, 07/17, 07/18, 07/20, 07/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends75228
CC Skip stitch345020
ED Gathering crease38336333
EC Asymmetry18162111
DB Run-off stitching391
EA Unsmooth/puckering/bubbling6312
CE Broken seam966
CB Broken stitch481022
261049 RGOR · CB12/CB14/CB30 · Due 08/21Shipment Sample FAIL Latest Shipment Sample (08/10) FAILED
No resultPP Sample1 reports
No reportPilot Run
08/04–08/06QC 1st Bundle2 reports
08/04QA 1st Bundle1 reports
6/52QC Inlineactual/required · 12%
DHU 26.4%QC Endline13 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty5,980 / 5,980
PDF reports15
Last report08/17

Cross-stage findings

Latest Shipment Sample (08/10) FAILED

11 major: AD Fabric stains 1, Others (no detail) 1, Others (no detail) 1, EA Unsmooth/puckering/bubbling 1, EA Unsmooth/puckering/bubbling 1, BB Missing cut seam allowance 1, Others (no detail) 1, DB Run-off stitching 1, CC Skip stitch 1, EA Unsmooth/puckering/bubbling 1, Others (no detail) 1

Not fixed: EA Unsmooth/puckering/bubbling

Found 26 times (69 pcs, 07/27–08/18) in earlier stages; latest Shipment Sample (08/10) still has 3 major

Not fixed: DB Run-off stitching

Found 4 times (5 pcs, 07/27–08/12) in earlier stages; latest Shipment Sample (08/10) still has 1 major

Not fixed: AD Fabric stains

Found 30 times (307 pcs, 08/04–08/18) in earlier stages; latest Shipment Sample (08/10) still has 1 major

Not fixed: CC Skip stitch

Found 4 times (14 pcs, 08/04–08/18) in earlier stages; latest Shipment Sample (08/10) still has 1 major

Missed in earlier stages: 1

BB Missing cut seam allowance (Shipment Sample 08/10): first found in later stages, never recorded before

4 defects recorded as 'Others' without detail

Shipment Sample 4; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (3 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: CG Grinning (6), DA Exceed seam allowance (2), DJ Pleat (1), BA Thread ends (1); Both: EA Unsmooth/puckering/bubbling (4/3), ED Gathering crease (4/2), EC Asymmetry (3/2), CC Skip stitch (2/1), AD Fabric stains (2/1); DHU QC 1st Bundle 96.2% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (506), BA Thread ends (464), EC Asymmetry (243), AC Fabric hole (34), Q61 Lace raw edge or broken lace (26) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—96.2%
QA 1st Bundle1 reports—100.0%
QC Inline6 reports
required on prod. days 6/52 (12%)
—33.0%
QC Endline13 days—26.4%
QA Inline4 reports435.2%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB146.2%
3780 / 12 days
35.9%—
08/05–08/18
AD Fabric stains, ED Gathering crease, AC Fabric hole
CB1263.1%
2105 / 11 days
34.4%—
08/07–08/19
ED Gathering crease, BA Thread ends, EC Asymmetry
CB300.0%
30 / 3 days
——
08/12–08/18
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1412242 (8%)121008/13, 08/14, 08/15, 08/17, 08/18
CB1211224 (18%)11708/14, 08/15, 08/17, 08/18, 08/19
CB30360 (0%)3308/12, 08/17, 08/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
ED Gathering crease142144841
BA Thread ends184469
AD Fabric stains21329741
EC Asymmetry132212124
EA Unsmooth/puckering/bubbling143153883
AC Fabric hole34
Q61 Lace raw edge or broken lace26
EB Measurement issue23162
261060 RGOR · CP12 · Due 08/21Shipment Sample FAIL Latest Shipment Sample (07/25) FAILED
No resultPP Sample1 reports
No reportPilot Run
08/14QC 1st Bundle1 reports
08/14QA 1st Bundle1 reports
0/12QC Inlineactual/required · 0%
DHU 6.5%QC Endline6 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty2,425 / 2,425
PDF reports4
Last report08/14

Cross-stage findings

Latest Shipment Sample (07/25) FAILED

4 major: GA Missing bartack/button 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, EI Inaccurate/skewed stitching 1

QC Endline data errors: 3

08/14 CP12 261060 (defective pcs 30 > defects 9), 08/15 CP12 261060 (defective pcs 65 > defects 33), 08/19 CP12 261060 (defective pcs 35 > defects 13)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), AD Fabric stains (1 Major), DE Cut to broken (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (2), CB Broken stitch (1); Both: BA Thread ends (7/3), ED Gathering crease (5/3), EC Asymmetry (2/6), EI Inaccurate/skewed stitching (3/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 90.0%

Caught in earlier stages

BA Thread ends (70), ED Gathering crease (62), CC Skip stitch (11), EB Measurement issue (6) did not reach later stages

Found before bulk production (Shipment Sample): 4

GA Missing bartack/button, EC Asymmetry, EA Unsmooth/puckering/bubbling, EI Inaccurate/skewed stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—90.0%
QC Inline0 reports
required on prod. days 0/12 (0%)
——
QC Endline6 days—6.5%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP126.5%
2478 / 6 days
——
08/14–08/20
BA Thread ends, ED Gathering crease, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP126120 (0%)6608/15, 08/17, 08/18, 08/19, 08/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC EndlineShipment Sample
BA Thread ends37357
ED Gathering crease15353
Others (no detail)30
EC Asymmetry3261
CC Skip stitch11
EI Inaccurate/skewed stitching321
EB Measurement issue6
EA Unsmooth/puckering/bubbling21
254207 LOGE · CP05/CP08/CP09… · Due 08/26Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
08/13QC 1st Bundle2 reports
08/14–08/15QA 1st Bundle2 reports
3/130QC Inlineactual/required · 2%
DHU 7.1%QC Endline37 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty13,500 / 13,500
PDF reports9
Last report08/19

Cross-stage findings

Not fixed: ED Gathering crease

Found 19 times (239 pcs, 08/13–08/22) in earlier stages; latest Final Random (08/19) still has 3 major

Missed in earlier stages: 1

EE Raw edge (Final Random 08/19): first found in later stages, never recorded before

QA Inline DHU is 7.5× QC Endline

QA Inline DHU 53.1% vs QC Endline 7.1% (06/01–08/22, 37 days, 13400 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/19): CB Broken stitch 2 (earlier 3 times), DE Cut to broken 1 (earlier 3 times)

QC Endline data errors: 18

06/04 CP19 254207-3 (defective pcs 10 > defects 3), 06/05 CP18 254207-3 (defective pcs 6 > defects 4), 06/06 CP09 254207-3 (defective pcs 5 > defects 3), 06/17 CP18 254207-3 (defective pcs 10 > defects 6)…

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (5 Major), EA Unsmooth/puckering/bubbling (2 Major), EI Inaccurate/skewed stitching (2 Major), DE Cut to broken (1 Major), CA Thread tension (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (3), AD Fabric stains (2), DF Twisted seam/skewing (1), CB Broken stitch (1); Both: BA Thread ends (15/2), DI High-low/uneven (3/4), ED Gathering crease (4/2), BB Missing cut seam allowance (3/3), CE Broken seam (4/1), DB Run-off stitching (1/2); DHU QC 1st Bundle 92.5% / QA 1st Bundle 57.5%

Caught in earlier stages

CC Skip stitch (268), EA Uneven seam allowance (29), EC Asymmetry (18), DB Run-off stitching (14), CE Broken seam (13) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—92.5%
QA 1st Bundle2 reports—57.5%
QC Inline3 reports
required on prod. days 3/130 (2%)
—49.3%
QC Endline37 days—7.1%
QA Inline1 reports153.1%
Final Random1 reports02.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP208.5%
4560 / 9 days
—PASS
07/10–08/21
BA Thread ends, CC Skip stitch, ED Gathering crease
CP1011.6%
4540 / 10 days
53.1%—
07/08–08/22
BA Thread ends, CC Skip stitch, ED Gathering crease
CP090.2%
1420 / 12 days
——
06/03–06/30
CC Skip stitch, AD Fabric stains, BA Thread ends
CP050.0%
680 / 8 days
——
06/16–07/15
—
CP183.6%
660 / 6 days
——
06/01–07/27
BA Thread ends, DB Run-off stitching, CC Skip stitch
CP191.8%
660 / 8 days
——
06/03–07/03
BA Thread ends
CP080.0%
380 / 6 days
——
06/03–06/19
—
CP110.0%
180 / 2 days
——
06/06–07/01
—
CP130.0%
140 / 1 days
——
06/09–06/09
—
CP140.0%
100 / 1 days
——
06/17–06/17
—
CP170.0%
80 / 2 days
——
07/15–07/16
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0912240 (0%)121206/17, 06/22, 06/23, 06/24, 06/30
CP1010201 (5%)10908/18, 08/19, 08/20, 08/21, 08/22
CP209182 (11%)9708/17, 08/18, 08/19, 08/20, 08/21
CP058160 (0%)8807/10, 07/11, 07/13, 07/14, 07/15
CP198160 (0%)8806/09, 06/10, 06/25, 07/01, 07/03
CP086120 (0%)6606/05, 06/08, 06/11, 06/17, 06/19
CP186120 (0%)6606/05, 06/11, 06/17, 07/25, 07/27
CP11240 (0%)2206/06, 07/01
CP17240 (0%)2207/15, 07/16
CP13120 (0%)1106/09
CP14120 (0%)1106/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends15229377217
CC Skip stitch22651
ED Gathering crease422333
EA Uneven seam allowance29
EC Asymmetry5814
DB Run-off stitching1229
CE Broken seam41242
AD Fabric stains237
260788 OSIT · CS04/CS12 · Due 08/26Final Random PASS Not fixed: AB Shading
No resultPP Sample1 reports
No reportPilot Run
07/21QC 1st Bundle1 reports
07/21QA 1st Bundle1 reports
12/40QC Inlineactual/required · 30%
DHU 15.6%QC Endline19 days
All FAILQA Inline2 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty7,000 / 7,000
PDF reports19
Last report08/07

Cross-stage findings

Not fixed: AB Shading

Found 11 times (34 pcs, 07/21–08/04) in earlier stages; latest Final Random (08/07) still has 3 major

Missed in earlier stages: 2

BC Sticker left (Pre-final 07/25), AD Fabric stains (Final Random 08/07): first found in later stages, never recorded before

QA Inline DHU is 1.6× QC Inline

QA Inline DHU 23.4% vs QC Inline 14.7%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (08/07): EC Asymmetry 2 (earlier 21 times), CC Skip stitch 1 (earlier 21 times)

Found earlier but still reached later stages: 3

AC Fabric hole 2, EI Inaccurate/skewed stitching 3, DF Twisted seam/skewing 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (4 Major), BA Thread ends (2 Major), BB Missing cut seam allowance (1 Major), DE Cut to broken (1 Major); Only QC 1st Bundle: CB Broken stitch (2), EC Asymmetry (2), AB Shading (1), AC Fabric hole (1); Both: ED Gathering crease (3/1); DHU QC 1st Bundle 28.1% / QA 1st Bundle 55.0%

Caught in earlier stages

DB Run-off stitching (247), ED Gathering crease (101), CB Broken stitch (28), CA Thread tension (15), DC Join stitching (7) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—28.1%
QA 1st Bundle1 reports—55.0%
QC Inline12 reports
required on prod. days 12/40 (30%)
—14.7%
QC Endline19 days—15.6%
QA Inline2 reports223.4%
Pre-final1 reports15.5%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0415.6%
6959 / 19 days
23.4%PASS
07/20–08/19
CC Skip stitch, BA Thread ends, DB Run-off stitching
CS120.0%
12 / 1 days
——
08/01–08/01
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS04193812 (32%)18808/05, 08/06, 08/07, 08/18, 08/19
CS12120 (0%)1108/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
CC Skip stitch4639511
BA Thread ends210308278
DB Run-off stitching172291
ED Gathering crease3110861
EC Asymmetry21934342
AB Shading14293
CB Broken stitch2233
CA Thread tension15
261211 LOGE · CP01/CP07/CP15 · Due 08/26Shipment Sample FAIL Latest Shipment Sample (08/19) FAILED
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
08/12QA 1st Bundle1 reports
3/56QC Inlineactual/required · 5%
DHU 16.8%QC Endline14 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty13,000 / 13,000
PDF reports9
Last report08/26

Cross-stage findings

Latest Shipment Sample (08/19) FAILED

11 major: EC Asymmetry 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, DE Cut to broken 1, EC Asymmetry 1, AD Fabric stains 1, Others (no detail) 1, Others (no detail) 1, Others (no detail) 1, EC Asymmetry 1, Others (no detail) 1

Not fixed: EI Inaccurate/skewed stitching

Found 4 times (8 pcs, 08/12–08/22) in earlier stages; latest Shipment Sample (08/19) still has 1 major

Not fixed: AD Fabric stains

Found 24 times (184 pcs, 08/12–08/26) in earlier stages; latest Shipment Sample (08/19) still has 1 major

Not fixed: EC Asymmetry

Found 26 times (211 pcs, 08/12–08/26) in earlier stages; latest Shipment Sample (08/19) still has 4 major

Missed in earlier stages: 1

DE Cut to broken (Shipment Sample 08/19): first found in later stages, never recorded before

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 50.0% vs QC Inline 29.7%; QC Inline may be missing defects

4 defects recorded as 'Others' without detail

Shipment Sample 4; cannot compare across stages

QC Endline data errors: 14

08/17 CP01 261211 (defective pcs 199 > defects 189), 08/18 CP01 261211 (defective pcs 189 > defects 177), 08/18 CP15 261211 (defective pcs 18 > defects 9), 08/19 CP01 261211 (defective pcs 134 > defects 91)…

Caught in earlier stages

BA Thread ends (589), EA Unsmooth/puckering/bubbling (290), ED Gathering crease (187), EB Measurement issue (170), GB Missing sewing operation (142) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA 1st Bundle1 reports—90.0%
QC Inline3 reports
required on prod. days 3/56 (5%)
—29.7%
QC Endline14 days—16.8%
QA Inline3 reports350.0%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0119.5%
7495 / 14 days
59.4%—
08/11–08/26
BA Thread ends, EA Unsmooth/puckering/bubbling, EB Measurement issue
CP1511.0%
3620 / 8 days
40.6%—
08/18–08/26
BA Thread ends, EA Unsmooth/puckering/bubbling, EC Asymmetry
CP0717.0%
1725 / 6 days
50.0%—
08/13–08/26
ED Gathering crease, BA Thread ends, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0114280 (0%)141408/21, 08/22, 08/24, 08/25, 08/26
CP158160 (0%)8808/21, 08/22, 08/24, 08/25, 08/26
CP076123 (25%)6308/21, 08/22, 08/24, 08/25, 08/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends2135695
EA Unsmooth/puckering/bubbling2127710
EC Asymmetry519974
ED Gathering crease2211793
AD Fabric stains21815951
EB Measurement issue170
GB Missing sewing operation142
DD Thread not straight/waving22112
260403 RGOR · CS05 · Due 08/28Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
08/10QC 1st Bundle1 reports
08/10QA 1st Bundle1 reports
12/34QC Inlineactual/required · 35%
DHU 27.5%QC Endline17 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,840 / 3,840
PDF reports17
Last report08/31

Cross-stage findings

Not fixed: ED Gathering crease

Found 30 times (125 pcs, 08/10–08/29) in earlier stages; latest Final Random (08/31) still has 3 major

Missed in earlier stages: 1

BD Snagging (Shipment Sample 08/20): first found in later stages, never recorded before

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 31.2% vs QC Inline 17.9%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (08/31): CB Broken stitch 2 (earlier 23 times)

Found earlier but still reached later stages: 3

EC Asymmetry 2, CG Grinning 1, AD Fabric stains 2 pcs (later stages total)

19 defects recorded as 'Others' without detail

QC Inline 19; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 5), EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC Endline data errors: 1

08/21 CS05 260403-L1 (defective pcs 40 > defects 39)

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), BA Thread ends (1 Major), EA Unsmooth/puckering/bubbling (1 Major), AD Fabric stains (1 Major), EI Inaccurate/skewed stitching (1 Major), AC Fabric hole (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: DB Run-off stitching (2); Both: EC Asymmetry (3/2), CB Broken stitch (3/1), DJ Pleat (2/1), ED Gathering crease (2/1); DHU QC 1st Bundle 60.0% / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (472), AB Shading (38), CA Thread tension (33), EB Measurement issue (19), AC Fabric hole (18) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—60.0%
QA 1st Bundle1 reports—100.0%
QC Inline12 reports
required on prod. days 12/34 (35%)
—17.9%
QC Endline17 days—27.5%
QA Inline1 reports131.2%
Shipment Sample1 reports1—
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0527.5%
3304 / 17 days
31.2%PASS
08/10–08/29
CC Skip stitch, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS05173412 (35%)17508/24, 08/25, 08/26, 08/28, 08/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
CC Skip stitch13459
BA Thread ends162043
ED Gathering crease2116105113
CB Broken stitch314612
Others (no detail)1919
AB Shading38
CA Thread tension429
EB Measurement issue19
261040 RGOR · CB05/CB30 · Due 08/28Shipment Sample FAIL Latest Shipment Sample (08/18) FAILED
No resultPP Sample1 reports
No reportPilot Run
08/13QC 1st Bundle1 reports
08/12QA 1st Bundle1 reports
8/44QC Inlineactual/required · 18%
DHU 40.5%QC Endline19 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty5,200 / 5,200
PDF reports16
Last report09/02

Cross-stage findings

Latest Shipment Sample (08/18) FAILED

6 major: EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, CB Broken stitch 1, EA Unsmooth/puckering/bubbling 1, EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 1

Not fixed: EI Inaccurate/skewed stitching

Found 4 times (5 pcs, 08/08–08/18) in earlier stages; latest Shipment Sample (08/18) still has 1 major

Not fixed: EC Asymmetry

Found 50 times (156 pcs, 08/08–09/03) in earlier stages; latest Shipment Sample (08/18) still has 1 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 6 times (13 pcs, 08/12–08/21) in earlier stages; latest Shipment Sample (08/18) still has 3 major

Not fixed: CB Broken stitch

Found 8 times (16 pcs, 08/13–08/26) in earlier stages; latest Shipment Sample (08/18) still has 1 major

QC Endline data errors: 3

08/20 CB05 261040-L (defective pcs 58 > defects 57), 08/29 CB05 261040-L (defective pcs 57 > defects 56), 08/29 CB05 261040-S2 (defective pcs 34 > defects 33)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (3 Major), EC Asymmetry (3 Major), BA Thread ends (2 Major), EA Unsmooth/puckering/bubbling (2 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (2), CG Grinning (2), DB Run-off stitching (2), CB Broken stitch (2), DE Cut to broken (1); Both: CC Skip stitch (2/1), DJ Pleat (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%

Caught in earlier stages

EB Measurement issue (622), CC Skip stitch (288), BA Thread ends (207), DB Run-off stitching (189), ED Gathering crease (185) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—100.0%
QC Inline8 reports
required on prod. days 8/44 (18%)
—37.6%
QC Endline19 days—40.5%
QA Inline4 reports438.3%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0540.4%
5186 / 19 days
38.3%—
08/13–09/09
EB Measurement issue, CC Skip stitch, BA Thread ends
CB3050.0%
60 / 3 days
——
08/17–09/01
EA Uneven seam allowance, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0519388 (21%)191108/31, 09/01, 09/02, 09/03, 09/09
CB30360 (0%)3308/17, 08/22, 09/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
EB Measurement issue26182
CC Skip stitch21172653
BA Thread ends21978
DB Run-off stitching2181681
ED Gathering crease185
EA Uneven seam allowance183
CE Broken seam15162
EC Asymmetry132412261
261042 RGOR · CB10/CB30 · Due 08/28Shipment Sample FAIL Latest Shipment Sample (08/18) FAILED
No reportPP Sample
No reportPilot Run
08/15QC 1st Bundle1 reports
08/15QA 1st Bundle1 reports
7/36QC Inlineactual/required · 19%
DHU 24.0%QC Endline17 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty1,970 / 1,970
PDF reports12
Last report08/29

Cross-stage findings

Latest Shipment Sample (08/18) FAILED

5 major: Others (no detail) 1, EC Asymmetry 1, Others (no detail) 1, DJ Pleat 1, DJ Pleat 1

Not fixed: EC Asymmetry

Found 22 times (51 pcs, 08/15–09/02) in earlier stages; latest Shipment Sample (08/18) still has 1 major

Not fixed: DJ Pleat

Found 9 times (17 pcs, 08/15–08/20) in earlier stages; latest Shipment Sample (08/18) still has 2 major

5 defects recorded as 'Others' without detail

Shipment Sample 2, QC Inline 3; cannot compare across stages

QC Endline data errors: 1

08/31 CB10 261042-S2 (defective pcs 5 > defects 4)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (3 Major), EI Inaccurate/skewed stitching (2 Major), EE Raw edge (1 Major), CE Broken seam (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: EC Asymmetry (5); Both: CC Skip stitch (2/2), CB Broken stitch (2/2), DJ Pleat (2/1); DHU QC 1st Bundle 84.6% / QA 1st Bundle 100.0%

Caught in earlier stages

BA Thread ends (217), ED Gathering crease (67), CC Skip stitch (63), CD Needle hole (58), AC Fabric hole (52) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—84.6%
QA 1st Bundle1 reports—100.0%
QC Inline7 reports
required on prod. days 7/36 (19%)
—32.9%
QC Endline17 days—24.0%
QA Inline2 reports239.0%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1024.3%
1959 / 17 days
39.0%—
08/13–09/03
BA Thread ends, ED Gathering crease, CD Needle hole
CB300.0%
30 / 1 days
——
09/01–09/01
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1017347 (21%)171008/29, 08/31, 09/01, 09/02, 09/03
CB30120 (0%)1109/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends3101995
ED Gathering crease67
CC Skip stitch221247
CD Needle hole58
EC Asymmetry52610101
AC Fabric hole349
CE Broken seam1625
CB Broken stitch22137
261197 RGOR · CP19 · Due 08/28Final Random PASS Not fixed: CC Skip stitch
No reportPP Sample
No reportPilot Run
07/29QC 1st Bundle1 reports
07/28QA 1st Bundle1 reports
3/28QC Inlineactual/required · 11%
DHU 10.0%QC Endline14 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty5,070 / 2,365
PDF reports8
Last report08/18

Cross-stage findings

Not fixed: CC Skip stitch

Found 19 times (188 pcs, 07/28–08/17) in earlier stages; latest Final Random (08/18) still has 3 major

Found earlier but still reached later stages: 3

CB Broken stitch 2, AD Fabric stains 2, DE Cut to broken 1 pcs (later stages total)

QC Endline data errors: 16

07/28 CP19 261197-S (defective pcs 125 > defects 117), 07/28 CP19 261197-L (defective pcs 35 > defects 13), 07/29 CP19 261197-L (defective pcs 32 > defects 13), 07/30 CP19 261197-L (defective pcs 34 > defects 25)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (9 Major), ED Gathering crease (2 Major); Only QC 1st Bundle: CG Grinning (2), DA Exceed seam allowance (2), CE Broken seam (1); Both: BA Thread ends (6/2), EC Asymmetry (3/4), CB Broken stitch (1/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 90.0%

Caught in earlier stages

ED Gathering crease (155), CD Needle hole (48), EA Uneven seam allowance (42), EB Measurement issue (27), AC Fabric hole (20) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—90.0%
QC Inline3 reports
required on prod. days 3/28 (11%)
—67.7%
QC Endline14 days—10.0%
QA Inline1 reports146.9%
Final Random2 reports02.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1910.0%
9457 / 14 days
46.9%PASS
07/28–08/24
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1914283 (11%)141108/14, 08/15, 08/17, 08/18, 08/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends6235394310
CC Skip stitch91794
ED Gathering crease21494
AD Fabric stains27622
CD Needle hole48
EA Uneven seam allowance42
EB Measurement issue27
AC Fabric hole20
260457 SAIN · CB21/CB22/CB24… · Due 08/03Final Random PASS Final Random DHU is 3.9× QC Endline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/24QC Inlineactual/required · 0%
DHU 2.7%QC Endline10 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
1/2 FAILFinal Random2 reports
Order/Ship qty4,040 / 1,015
PDF reports2
Last report07/14

Cross-stage findings

Final Random DHU is 3.9× QC Endline

Final Random DHU 10.6% vs QC Endline 2.7% (06/02–07/01, 10 days, 4081 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 1

BA Thread ends 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

Caught in earlier stages

CC Skip stitch (26), AD Fabric stains (11), ED Gathering crease (9) did not reach later stages

Found before bulk production (Final Random): 6

DB Run-off stitching, GB Missing sewing operation, DJ Pleat, EA Unsmooth/puckering/bubbling, BD Snagging, IA 2nd operation issue: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/24 (0%)
——
QC Endline10 days—2.7%
Final Random2 reports110.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB242.8%
3257 / 8 days
—PASS
06/02–06/29
BA Thread ends, CC Skip stitch, AD Fabric stains
CB222.6%
782 / 2 days
——
06/30–07/01
BA Thread ends, CC Skip stitch
CB210.0%
22 / 1 days
——
06/29–06/29
—
CB300.0%
20 / 1 days
——
06/29–06/29
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB248160 (0%)8806/05, 06/06, 06/08, 06/27, 06/29
CB22240 (0%)2206/30, 07/01
CB21120 (0%)1106/29
CB30120 (0%)1106/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends662
CC Skip stitch26
AD Fabric stains11
ED Gathering crease9
IA 2nd operation issue5
EA Unsmooth/puckering/bubbling4
BD Snagging3
DB Run-off stitching2
260630 LOGE · CP05/CP16 · Due 08/04Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
10/68QC Inlineactual/required · 15%
DHU 6.9%QC Endline33 days
All FAILQA Inline5 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty17,248 / 17,248
PDF reports17
Last report08/01

Cross-stage findings

Missed in earlier stages: 1

FA Wrong material (Final Random 08/01): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (08/01): DJ Pleat 1 (earlier 6 times), CB Broken stitch 2 (earlier 11 times), AD Fabric stains 2 (earlier 12 times)

Found earlier but still reached later stages: 4

CC Skip stitch 1, BB Missing cut seam allowance 1, DE Cut to broken 1, CE Broken seam 1 pcs (later stages total)

QC Endline data errors: 31

06/24 CP16 260630 (defective pcs 45 > defects 33), 06/25 CP16 260630 (defective pcs 88 > defects 45), 06/26 CP16 260630 (defective pcs 219 > defects 72), 06/27 CP16 260630 (defective pcs 60 > defects 32)…

Duplicate report numbers

QGR2627904 have multiple reports with different content

Caught in earlier stages

ED Gathering crease (533), EA Unsmooth/puckering/bubbling (125), DB Run-off stitching (108), EB Measurement issue (89), EC Asymmetry (62) did not reach later stages

Report line differs from production line

QGR2627544 Final Random (07/14) CP18, QGR2631433 Final Random (08/01) CP06; actual production line(s) CP05/CP16 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline10 reports
required on prod. days 10/68 (15%)
—22.5%
QC Endline33 days—6.9%
QA Inline5 reports530.6%
Final Random2 reports02.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP166.9%
36093 / 33 days
30.6%—
06/24–08/03
BA Thread ends, CC Skip stitch, ED Gathering crease
CP050.0%
20 / 1 days
——
07/08–07/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP16336610 (15%)332307/27, 07/28, 07/29, 07/30, 08/03
CP05120 (0%)1107/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends47961718
CC Skip stitch856151
ED Gathering crease75251
EA Unsmooth/puckering/bubbling1214
DB Run-off stitching138411
EB Measurement issue89
EC Asymmetry16388
AD Fabric stains124332
260671 LOGE · CP05/CP06 · Due 08/04Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/16QC 1st Bundle1 reports
07/16QA 1st Bundle1 reports
4/30QC Inlineactual/required · 13%
DHU 5.1%QC Endline14 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty11,000 / 11,000
PDF reports9
Last report07/30

Cross-stage findings

Missed in earlier stages: 1

GA Missing bartack/button (Final Random 07/28): first found in later stages, never recorded before

QA Inline DHU is 2.6× QC Inline

QA Inline DHU 71.9% vs QC Inline 27.6%; QC Inline may be missing defects

QA Inline DHU is 14.1× QC Endline

QA Inline DHU 71.9% vs QC Endline 5.1% (07/16–08/03, 14 days, 10980 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (07/28): EA Unsmooth/puckering/bubbling 2 (earlier 12 times), CC Skip stitch 2 (earlier 15 times), DJ Pleat 2 (earlier 4 times)

Found earlier but still reached later stages: 1

DE Cut to broken 1 pcs (later stages total)

QC Endline data errors: 10

07/16 CP06 260671 (defective pcs 9 > defects 5), 07/17 CP06 260671 (defective pcs 73 > defects 34), 07/18 CP06 260671 (defective pcs 44 > defects 19), 07/20 CP06 260671 (defective pcs 64 > defects 24)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: FA Wrong material (10 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (2), BD Snagging (1); Both: BB Missing cut seam allowance (3/3), BA Thread ends (4/1), CE Broken seam (3/1), CB Broken stitch (1/1); DHU QC 1st Bundle 70.0% / QA 1st Bundle 85.0%

Caught in earlier stages

ED Gathering crease (75), DB Run-off stitching (68), EC Asymmetry (59), AD Fabric stains (14), EB Measurement issue (14) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—70.0%
QA 1st Bundle1 reports—85.0%
QC Inline4 reports
required on prod. days 4/30 (13%)
—27.6%
QC Endline14 days—5.1%
QA Inline2 reports271.9%
Final Random1 reports0—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP065.1%
10960 / 14 days
71.9%—
07/16–08/03
BA Thread ends, CC Skip stitch, DB Run-off stitching
CP050.0%
20 / 1 days
—PASS
07/30–07/30
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0614284 (14%)141007/27, 07/28, 07/29, 07/30, 08/03
CP05120 (0%)1107/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends412921865
CC Skip stitch37522
ED Gathering crease2649
DB Run-off stitching68
EC Asymmetry24611
EA Unsmooth/puckering/bubbling21852
AD Fabric stains311
EB Measurement issue14
260672 LOGE · CB29/CB30 · Due 08/04Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/23QC 1st Bundle1 reports
07/23QA 1st Bundle1 reports
5/32QC Inlineactual/required · 16%
DHU 5.7%QC Endline13 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
1/2 FAILFinal Random2 reports
Order/Ship qty5,500 / 5,500
PDF reports11
Last report08/04

Cross-stage findings

Missed in earlier stages: 1

GA Missing bartack/button (Final Random 08/03): first found in later stages, never recorded before

QA Inline DHU is 7.4× QC Endline

QA Inline DHU 42.2% vs QC Endline 5.7% (07/23–08/07, 13 days, 5122 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 4

Latest Final Random (08/04): AD Fabric stains 1 (earlier 5 times), ED Gathering crease 2 (earlier 8 times), DE Cut to broken 1 (earlier 5 times), DJ Pleat 1 (earlier 5 times)

Found earlier but still reached later stages: 2

BB Missing cut seam allowance 2, CB Broken stitch 3 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA Inline 2; cannot compare across stages

QC Endline data errors: 1

07/25 CB29 260672 (defective pcs 18 > defects 9)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (5 Major), EE Raw edge (2 Major), DE Cut to broken (2 Major), EF Cup/pocket issue (2 Major), EI Inaccurate/skewed stitching (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: ED Gathering crease (3), DB Run-off stitching (2), CA Thread tension (2), AD Fabric stains (1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%

Caught in earlier stages

Q61 Lace raw edge or broken lace (43), CE Broken seam (22), EC Asymmetry (21), DB Run-off stitching (12), CC Skip stitch (12) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—100.0%
QC Inline5 reports
required on prod. days 5/32 (16%)
—34.8%
QC Endline13 days—5.7%
QA Inline2 reports242.2%
Final Random2 reports15.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB295.7%
5079 / 13 days
42.2%PASS
07/23–08/07
BA Thread ends, Q61 Lace raw edge or broken lace, ED Gathering crease
CB300.0%
43 / 3 days
——
07/29–08/04
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2913265 (19%)13808/03, 08/04, 08/05, 08/06, 08/07
CB30360 (0%)3307/29, 08/03, 08/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends171210
ED Gathering crease34344
Q61 Lace raw edge or broken lace43
AD Fabric stains16142
CE Broken seam202
EC Asymmetry5637
DJ Pleat1313
DE Cut to broken2714
260813 LOGE · CB09/CB13/CB30 · Due 08/04Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
17/74QC Inlineactual/required · 23%
DHU 10.2%QC Endline33 days
All FAILQA Inline4 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty19,000 / 19,000
PDF reports25
Last report08/03

Cross-stage findings

Missed in earlier stages: 2

BB Missing cut seam allowance (Final Random 08/03), AD Fabric stains (Final Random 08/03): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/03): CB Broken stitch 2 (earlier 11 times), CE Broken seam 1 (earlier 40 times)

Found earlier but still reached later stages: 2

GC Missing pocket/label 1, GA Missing bartack/button 1 pcs (later stages total)

22 defects recorded as 'Others' without detail

QC Inline 22; cannot compare across stages

QC Endline data errors: 3

07/15 CB09 260813-S (defective pcs 59 > defects 56), 08/03 CB09 260813-S (defective pcs 10 > defects 9), 08/07 CB09 260813-S (defective pcs 8 > defects 4)

Caught in earlier stages

EC Asymmetry (483), EB Measurement issue (270), CC Skip stitch (159), CG Grinning (34), ED Gathering crease (31) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline20 reports
required on prod. days 17/74 (23%)
—32.0%
QC Endline33 days—10.2%
QA Inline4 reports431.2%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0910.3%
14946 / 32 days
31.2%PASS
06/26–08/07
BA Thread ends, EC Asymmetry, EB Measurement issue
CB300.0%
90 / 4 days
——
07/06–07/25
—
CB130.0%
20 / 1 days
——
08/08–08/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB09326417 (27%)321508/01, 08/03, 08/04, 08/06, 08/07
CB30480 (0%)4407/06, 07/08, 07/15, 07/25
CB13120 (0%)1108/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends25589510
EC Asymmetry12934410
EB Measurement issue2268
CE Broken seam4713931
CC Skip stitch161421
CG Grinning34
ED Gathering crease31
CB Broken stitch2232
260814 LOGE · CS10/CS13 · Due 08/04Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
3/50QC Inlineactual/required · 6%
DHU 7.5%QC Endline19 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty24,000 / 24,000
PDF reports5
Last report08/03

Cross-stage findings

Missed in earlier stages: 3

DJ Pleat (Final Random 07/18), CB Broken stitch (Final Random 08/03), DE Cut to broken (Final Random 08/03): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/03): AD Fabric stains 1 (earlier 9 times), ED Gathering crease 2 (earlier 19 times)

37 defects recorded as 'Others' without detail

QC Inline 37; cannot compare across stages

QC Endline data errors: 1

06/29 CS10 260814 (defective pcs 46 > defects 14)

Caught in earlier stages

DB Run-off stitching (118), AC Fabric hole (111), CC Skip stitch (62) did not reach later stages

Report line differs from production line

QGR2627738 Final Random (07/18) CS22; actual production line(s) CS10/CS13 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline3 reports
required on prod. days 3/50 (6%)
—0.0%
QC Endline19 days—7.5%
Final Random2 reports01.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS137.1%
21082 / 19 days
—PASS
06/20–07/13
BA Thread ends, ED Gathering crease, Others (no detail)
CS1010.6%
2858 / 6 days
——
06/27–07/03
BA Thread ends, ED Gathering crease, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1319383 (8%)191607/07, 07/08, 07/09, 07/11, 07/13
CS106120 (0%)6606/29, 06/30, 07/01, 07/02, 07/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
BA Thread ends597313
Others (no detail)37242
ED Gathering crease2742
DB Run-off stitching5113
AC Fabric hole111
CC Skip stitch62
AD Fabric stains5313
DJ Pleat2
260816 LOGE · CP10/CP12/CP14 · Due 08/04Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/24QA 1st Bundle1 reports
6/44QC Inlineactual/required · 14%
DHU 5.3%QC Endline12 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty21,000 / 21,000
PDF reports10
Last report08/04

Cross-stage findings

Missed in earlier stages: 1

CH Incorrect stitch density (Final Random 08/01): first found in later stages, never recorded before

QA Inline DHU is 8.5× QC Endline

QA Inline DHU 45.3% vs QC Endline 5.3% (07/24–08/06, 12 days, 21000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/01): DE Cut to broken 2 (earlier 7 times), CE Broken seam 1 (earlier 14 times)

QC Endline data errors: 20

07/24 CP12 260816 (defective pcs 135 > defects 65), 07/25 CP12 260816 (defective pcs 65 > defects 24), 07/27 CP12 260816 (defective pcs 103 > defects 49), 07/28 CP12 260816 (defective pcs 220 > defects 69)…

Caught in earlier stages

CC Skip stitch (211), ED Gathering crease (128), EC Asymmetry (56), DF Twisted seam/skewing (35), DB Run-off stitching (30) did not reach later stages

Report line differs from production line

QGR2630936 Final Random (08/01) CP11; actual production line(s) CP10/CP12/CP14 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—50.0%
QC Inline6 reports
required on prod. days 6/44 (14%)
—42.7%
QC Endline12 days—5.3%
QA Inline2 reports245.3%
Final Random1 reports01.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP125.9%
12457 / 12 days
50.0%—
07/24–08/06
BA Thread ends, CC Skip stitch, ED Gathering crease
CP144.3%
8483 / 9 days
40.6%—
07/28–08/06
BA Thread ends, CC Skip stitch, DF Twisted seam/skewing
CP1010.0%
60 / 1 days
——
08/04–08/04
BA Thread ends, CC Skip stitch, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1212242 (8%)121008/01, 08/03, 08/04, 08/05, 08/06
CP149184 (22%)9508/01, 08/03, 08/04, 08/05, 08/06
CP10120 (0%)1108/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends13055276
CC Skip stitch18202
ED Gathering crease21224
Others (no detail)70
EC Asymmetry211349
CE Broken seam17441
DF Twisted seam/skewing926
DB Run-off stitching1119
260837 LOGE · CS21 · Due 08/04No final QA Inline DHU is 1.6× QC Inline
No reportPP Sample
No reportPilot Run
07/06QC 1st Bundle1 reports
07/07QA 1st Bundle1 reports
10/30QC Inlineactual/required · 33%
DHU 10.9%QC Endline15 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty5,948 / 5,948
PDF reports14
Last report07/18

Cross-stage findings

QA Inline DHU is 1.6× QC Inline

QA Inline DHU 31.2% vs QC Inline 19.1%; QC Inline may be missing defects

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (1 Major), DA Exceed seam allowance (1 Major), DD Thread not straight/waving (1 Major), DB Run-off stitching (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: AC Fabric hole (2); Both: CB Broken stitch (6/1), CC Skip stitch (2/2), DJ Pleat (2/1), ED Gathering crease (1/1), GA Missing bartack/button (1/1), BB Missing cut seam allowance (1/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 60.0%

Caught in earlier stages

BA Thread ends (410), CC Skip stitch (149), ED Gathering crease (70), CB Broken stitch (58), DB Run-off stitching (35) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—60.0%
QC Inline10 reports
required on prod. days 10/30 (33%)
—19.1%
QC Endline15 days—10.9%
QA Inline2 reports231.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2110.9%
5948 / 15 days
31.2%—
07/04–07/21
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS21153010 (33%)15507/16, 07/17, 07/18, 07/20, 07/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends114053
CC Skip stitch2251382
ED Gathering crease1111552
CB Broken stitch61501
DB Run-off stitching1232
DJ Pleat2120
EC Asymmetry1163
Others (no detail)11
260838 LOGE · CP05/CP16 · Due 08/04Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/30QC 1st Bundle1 reports
07/30QA 1st Bundle1 reports
2/16QC Inlineactual/required · 12%
DHU 6.2%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty9,092 / 9,092
PDF reports6
Last report08/04

Cross-stage findings

Missed in earlier stages: 1

AD Fabric stains (Final Random 08/04): first found in later stages, never recorded before

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 37.5% vs QC Inline 21.9%; QC Inline may be missing defects

QA Inline DHU is 6.0× QC Endline

QA Inline DHU 37.5% vs QC Endline 6.2% (07/30–08/06, 7 days, 9092 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/04): EA Unsmooth/puckering/bubbling 1 (earlier 7 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

QC Endline data errors: 6

07/30 CP16 260838 (defective pcs 138 > defects 104), 07/31 CP16 260838 (defective pcs 155 > defects 141), 08/03 CP16 260838 (defective pcs 159 > defects 88), 08/04 CP16 260838 (defective pcs 65 > defects 32)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DE Cut to broken (2 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: CG Grinning (3), DD Thread not straight/waving (2), GB Missing sewing operation (1); Both: EC Asymmetry (4/5), BA Thread ends (5/2), CE Broken seam (3/2), ED Gathering crease (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 65.0%

Caught in earlier stages

CC Skip stitch (162), ED Gathering crease (119), DB Run-off stitching (31), EC Asymmetry (16), CG Grinning (10) did not reach later stages

Report line differs from production line

QGR2632670 Final Random (08/04) CP15; actual production line(s) CP05/CP16 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—65.0%
QC Inline2 reports
required on prod. days 2/16 (12%)
—21.9%
QC Endline7 days—6.2%
QA Inline1 reports137.5%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP166.3%
9032 / 7 days
37.5%—
07/30–08/06
BA Thread ends, CC Skip stitch, ED Gathering crease
CP050.0%
60 / 1 days
——
08/03–08/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP167142 (14%)7508/01, 08/03, 08/04, 08/05, 08/06
CP05120 (0%)1108/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends521020739
CC Skip stitch2160
ED Gathering crease211142
DB Run-off stitching31
EC Asymmetry45313
EA Unsmooth/puckering/bubbling1141
CG Grinning37
EB Measurement issue10
253653 MKSC · CB13/CB14 · Due 08/05Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/32QC Inlineactual/required · 3%
DHU 18.2%QC Endline15 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports2
Last report08/04

Cross-stage findings

Missed in earlier stages: 2

BB Missing cut seam allowance (Final Random 08/04), EA Unsmooth/puckering/bubbling (Final Random 08/04): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/04): BA Thread ends 1 (earlier 4 times), AC Fabric hole 1 (earlier 7 times)

QC Endline data errors: 4

06/04 CB13 253653B-L (defective pcs 40 > defects 33), 06/05 CB13 253653B-L (defective pcs 30 > defects 24), 06/06 CB13 253653B-L (defective pcs 10 > defects 8), 07/10 CB13 253653B-L (defective pcs 20 > defects 16)

Caught in earlier stages

CC Skip stitch (170), AA Fabric defect (16), CE Broken seam (7), EC Asymmetry (6) did not reach later stages

Report line differs from production line

QGR2631662 Final Random (08/04) CB04; actual production line(s) CB13/CB14 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/32 (3%)
—32.0%
QC Endline15 days—18.2%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1318.3%
2011 / 15 days
——
06/01–08/03
CC Skip stitch, AC Fabric hole, BA Thread ends
CB140.0%
20 / 1 days
——
06/04–06/04
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1315301 (3%)151407/10, 07/11, 07/27, 07/31, 08/03
CB14120 (0%)1106/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
CC Skip stitch2168
AC Fabric hole1461
BA Thread ends4321
AA Fabric defect16
CE Broken seam7
EC Asymmetry6
DD Thread not straight/waving4
EA Unsmooth/puckering/bubbling2
253654 MKSC · CB06/CB07/CB16… · Due 08/05Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
4/52QC Inlineactual/required · 8%
DHU 11.7%QC Endline18 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,500 / 2,500
PDF reports6
Last report08/05

Cross-stage findings

Missed in earlier stages: 1

AF Crushed foam cup (Final Random 08/03): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/03): ED Gathering crease 2 (earlier 29 times)

2 defects recorded as 'Others' without detail

QA Inline 2; cannot compare across stages

QC Endline data errors: 5

06/02 CB06 253654A-L (defective pcs 30 > defects 29), 06/03 CB06 253654A-S (defective pcs 16 > defects 15), 06/30 CB06 253654B-S (defective pcs 5 > defects 4), 08/04 CB06 253654B-S (defective pcs 5 > defects 4)…

Caught in earlier stages

CC Skip stitch (84), EC Asymmetry (73), CE Broken seam (57), DB Run-off stitching (54), EA Unsmooth/puckering/bubbling (21) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline4 reports
required on prod. days 4/52 (8%)
—40.6%
QC Endline18 days—11.7%
QA Inline1 reports118.8%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1612.1%
3205 / 10 days
——
06/01–07/03
Others (no detail), BA Thread ends, ED Gathering crease
CB0611.4%
2914 / 14 days
18.8%PASS
06/01–08/06
ED Gathering crease, EC Asymmetry, CC Skip stitch
CB070.0%
10 / 1 days
——
06/03–06/03
—
CB300.0%
10 / 1 days
——
07/01–07/01
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0614284 (14%)141008/01, 08/03, 08/04, 08/05, 08/06
CB1610200 (0%)101006/29, 06/30, 07/01, 07/02, 07/03
CB07120 (0%)1106/03
CB30120 (0%)1107/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease131962
BA Thread ends1193
Others (no detail)1042
CC Skip stitch15681
EC Asymmetry73
CE Broken seam1245
DB Run-off stitching351
EA Unsmooth/puckering/bubbling201
260359 LOGE · CB12 · Due 08/05Final Random PASS Missed in earlier stages: 2
No resultPP Sample1 reports
No reportPilot Run
07/17QC 1st Bundle1 reports
07/16QA 1st Bundle1 reports
0/32QC Inlineactual/required · 0%
DHU 19.8%QC Endline16 days
All FAILQA Inline5 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty3,000 / 3,000
PDF reports11
Last report08/04

Cross-stage findings

Missed in earlier stages: 2

DH Pressing mark (Shipment Sample 07/31), GA Missing bartack/button (Shipment Sample 07/31): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/04): EA Unsmooth/puckering/bubbling 2 (earlier 8 times), AD Fabric stains 2 (earlier 19 times)

Found earlier but still reached later stages: 6

EC Asymmetry 1, EI Inaccurate/skewed stitching 3, DF Twisted seam/skewing 1, DJ Pleat 2, CB Broken stitch 3, AC Fabric hole 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 8); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (1 Major), EB Measurement issue (1 Major), EE Raw edge (1 Major), CA Thread tension (1 Major), EF Cup/pocket issue (1 Major), EI Inaccurate/skewed stitching (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: CG Grinning (2), DF Twisted seam/skewing (2), ED Gathering crease (1), DJ Pleat (1), CB Broken stitch (1); Both: EA Unsmooth/puckering/bubbling (1/4), AD Fabric stains (2/2); DHU QC 1st Bundle 76.9% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (314), EF Cup/pocket issue (7), EE Raw edge (6) did not reach later stages

Report line differs from production line

QGR2631666 Final Random (08/03) CB23, QGR2632898 Final Random (08/04) CB23; actual production line(s) CB12 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/32 (0%)
——
QC Endline16 days—19.8%
QA Inline5 reports532.5%
Shipment Sample1 reports1—
Final Random2 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1219.8%
5730 / 16 days
32.5%—
07/16–08/05
BA Thread ends, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1216320 (0%)161607/30, 07/31, 08/01, 08/03, 08/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends351313
ED Gathering crease13103
AD Fabric stains22261714
AC Fabric hole20911
EA Unsmooth/puckering/bubbling214422
EC Asymmetry11261
EF Cup/pocket issue115
EI Inaccurate/skewed stitching133
260364 RTMS · CP08/CP09 · Due 08/05Final Random PASS QA Inline DHU is 4.2× QC Inline
No reportPP Sample
No reportPilot Run
07/25QC 1st Bundle1 reports
07/25QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 6.7%QC Endline4 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports6
Last report07/28

Cross-stage findings

QA Inline DHU is 4.2× QC Inline

QA Inline DHU 31.2% vs QC Inline 7.5%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (07/28): CB Broken stitch 2 (earlier 4 times)

QC Endline data errors: 4

07/24 CP09 260364 (defective pcs 26 > defects 7), 07/25 CP09 260364 (defective pcs 45 > defects 11), 07/27 CP09 260364 (defective pcs 137 > defects 37), 07/28 CP09 260364 (defective pcs 49 > defects 12)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (1 Major), DJ Pleat (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DI High-low/uneven (4), CC Skip stitch (2), DA Exceed seam allowance (2), EI Inaccurate/skewed stitching (1); Both: ED Gathering crease (2/8), BA Thread ends (4/2), AD Fabric stains (3/3), EC Asymmetry (1/2), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 95.0%

Caught in earlier stages

DI High-low/uneven (6) did not reach later stages

Found before bulk production (Shipment Sample): 5

ED Gathering crease, AD Fabric stains, CC Skip stitch, EC Asymmetry, DB Run-off stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—95.0%
QC Inline1 reports
required on prod. days 0/8 (0%)
—7.5%
QC Endline4 days—6.7%
QA Inline1 reports131.2%
Shipment Sample1 reports1—
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP096.7%
1000 / 4 days
31.2%PASS
07/24–07/28
AD Fabric stains, ED Gathering crease, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP09480 (0%)4407/24, 07/25, 07/27, 07/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
AD Fabric stains33429211
ED Gathering crease2821621
BA Thread ends426145
CC Skip stitch261
EC Asymmetry1221
DI High-low/uneven42
CB Broken stitch1122
EA Unsmooth/puckering/bubbling11
260365 RTMS · CP18 · Due 08/05Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/21QC 1st Bundle1 reports
07/21QA 1st Bundle1 reports
3/14QC Inlineactual/required · 21%
DHU 9.9%QC Endline7 days
All FAILQA Inline2 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,500 / 2,500
PDF reports9
Last report07/27

Cross-stage findings

Missed in earlier stages: 1

DJ Pleat (Pre-final 07/24): first found in later stages, never recorded before

QA Inline DHU is 2.5× QC Inline

QA Inline DHU 50.0% vs QC Inline 20.0%; QC Inline may be missing defects

QA Inline DHU is 5.1× QC Endline

QA Inline DHU 50.0% vs QC Endline 9.9% (07/21–07/28, 7 days, 2500 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects; Pre-final 26.4%

Recurring in small numbers: 2

Latest Final Random (07/27): BA Thread ends 2 (earlier 10 times), CC Skip stitch 1 (earlier 9 times)

Found earlier but still reached later stages: 3

AD Fabric stains 3, BB Missing cut seam allowance 3, CB Broken stitch 1 pcs (later stages total)

QC Endline data errors: 4

07/23 CP18 260365 (defective pcs 44 > defects 30), 07/24 CP18 260365 (defective pcs 140 > defects 89), 07/25 CP18 260365 (defective pcs 83 > defects 28), 07/27 CP18 260365 (defective pcs 9 > defects 6)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), DE Cut to broken (2 Major), CC Skip stitch (1 Major), CA Thread tension (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: AD Fabric stains (2), DB Run-off stitching (2), EA Unsmooth/puckering/bubbling (2), DD Thread not straight/waving (1); Both: EC Asymmetry (12/2), ED Gathering crease (1/10); DHU QC 1st Bundle 100.0% / QA 1st Bundle 95.0%

Caught in earlier stages

ED Gathering crease (96), EC Asymmetry (26), EA Uneven seam allowance (18), EA Unsmooth/puckering/bubbling (12), DE Cut to broken (7) did not reach later stages

Report line differs from production line

QGR2630162 Final Random (07/27) CP02; actual production line(s) CP18 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—95.0%
QC Inline3 reports
required on prod. days 3/14 (21%)
—20.0%
QC Endline7 days—9.9%
QA Inline2 reports250.0%
Pre-final1 reports126.4%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP189.9%
2500 / 7 days
50.0%—
07/21–07/28
ED Gathering crease, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP187143 (21%)7407/23, 07/24, 07/25, 07/27, 07/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends23606257
ED Gathering crease11027211
CC Skip stitch145711
AD Fabric stains24343
EC Asymmetry122516
EA Uneven seam allowance18
EA Unsmooth/puckering/bubbling273
DE Cut to broken25
260796 OSIT · CS14 · Due 08/05Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
07/15QC 1st Bundle1 reports
07/15QA 1st Bundle1 reports
3/16QC Inlineactual/required · 19%
DHU 17.7%QC Endline8 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,800 / 2,800
PDF reports9
Last report07/25

Cross-stage findings

Missed in earlier stages: 3

CG Grinning (Shipment Sample 07/20), DC Join stitching (Shipment Sample 07/20), BC Sticker left (Final Random 07/24): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (07/24): EC Asymmetry 1 (earlier 8 times), AD Fabric stains 2 (earlier 3 times), ED Gathering crease 1 (earlier 8 times)

Found earlier but still reached later stages: 2

CB Broken stitch 1, DE Cut to broken 5 pcs (later stages total)

42 defects recorded as 'Others' without detail

QC 1st Bundle 13, QC Inline 26, QA Inline 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

AD Fabric stains (QA 7); zero in QC Endline records

QC Endline data errors: 2

07/16 CS14 260796 (defective pcs 246 > defects 147), 07/17 CS14 260796 (defective pcs 83 > defects 20)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (3 Major), EA Unsmooth/puckering/bubbling (2 Major), BB Missing cut seam allowance (2 Major), DE Cut to broken (1 Major), CB Broken stitch (1 Major); Both: EC Asymmetry (5/3), AD Fabric stains (5/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 65.0%

Caught in earlier stages

EA Uneven seam allowance (72), CC Skip stitch (37), Q94 Glue marks (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—65.0%
QC Inline3 reports
required on prod. days 3/16 (19%)
—0.0%
QC Endline8 days—17.7%
QA Inline1 reports128.1%
Shipment Sample1 reports1—
Pre-final1 reports18.8%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1417.7%
2453 / 8 days
28.1%PASS
07/15–07/27
BA Thread ends, ED Gathering crease, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS148163 (19%)8507/18, 07/22, 07/24, 07/25, 07/27

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends234275
ED Gathering crease357811
EA Uneven seam allowance72
Others (no detail)13263
CC Skip stitch37
EC Asymmetry53101211
AD Fabric stains51142
CB Broken stitch1511
260881 LOGE · CS19 · Due 08/05Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/21QC 1st Bundle1 reports
07/20QA 1st Bundle1 reports
3/14QC Inlineactual/required · 21%
DHU 19.7%QC Endline7 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,200 / 1,200
PDF reports9
Last report08/04

Cross-stage findings

Missed in earlier stages: 1

BD Snagging (Final Random 08/04): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/04): EA Unsmooth/puckering/bubbling 2 (earlier 3 times)

Found earlier but still reached later stages: 3

DJ Pleat 1, EI Inaccurate/skewed stitching 1, DB Run-off stitching 2 pcs (later stages total)

9 defects recorded as 'Others' without detail

Shipment Sample 4, QC 1st Bundle 1, QC Inline 4; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 6), EA Unsmooth/puckering/bubbling (QA 6); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (2 Major), EA Unsmooth/puckering/bubbling (2 Major), CB Broken stitch (2 Major), AD Fabric stains (1 Major), GB Missing sewing operation (1 Major); Only QC 1st Bundle: BA Thread ends (4), DD Thread not straight/waving (2), ED Gathering crease (2), EI Inaccurate/skewed stitching (2), DB Run-off stitching (2), CF Pulling yarn (1); Both: DI High-low/uneven (2/2), DJ Pleat (1/1); DHU QC 1st Bundle 85.0% / QA 1st Bundle 84.6%

Caught in earlier stages

CC Skip stitch (59), DI High-low/uneven (16), DD Thread not straight/waving (6) did not reach later stages

Report line differs from production line

QGR2632371 Final Random (08/04) CS16; actual production line(s) CS19 (cards show production lines only)

Found before bulk production (Shipment Sample): 6

GA Missing bartack/button, EC Asymmetry, AD Fabric stains, CB Broken stitch, ED Gathering crease, AC Fabric hole: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—85.0%
QA 1st Bundle1 reports—84.6%
QC Inline3 reports
required on prod. days 3/14 (21%)
—25.4%
QC Endline7 days—19.7%
QA Inline1 reports131.2%
Shipment Sample1 reports1—
Pre-final1 reports18.0%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1919.7%
1200 / 7 days
31.2%—
07/21–07/30
BA Thread ends, CC Skip stitch, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS197143 (21%)7407/23, 07/24, 07/25, 07/28, 07/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends423881114
Others (no detail)14504
CC Skip stitch257
ED Gathering crease22221
DB Run-off stitching26912
DI High-low/uneven2293
AD Fabric stains1431111
CB Broken stitch2611
260882 LOGE · CS16 · Due 08/05Final Random PASS Missed in earlier stages: 4
No reportPP Sample
No reportPilot Run
07/17QC 1st Bundle1 reports
07/16QA 1st Bundle1 reports
4/18QC Inlineactual/required · 22%
DHU 9.5%QC Endline9 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,500 / 1,500
PDF reports11
Last report08/04

Cross-stage findings

Missed in earlier stages: 4

HA Poor pressing (Shipment Sample 07/24), GA Missing bartack/button (Shipment Sample 07/24), HB Missing/wrong trims (Pre-final 07/30), FB Material defect (Pre-final 07/30): first found in later stages, never recorded before

QA Inline DHU is 1.6× QC Inline

QA Inline DHU 32.8% vs QC Inline 20.6%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (08/04): CB Broken stitch 1 (earlier 6 times)

Found earlier but still reached later stages: 5

EC Asymmetry 5, EI Inaccurate/skewed stitching 3, BC Sticker left 1, AD Fabric stains 1, AC Fabric hole 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 5); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), BD Snagging (1 Major), DD Thread not straight/waving (1 Major), DA Exceed seam allowance (1 Major), GB Missing sewing operation (1 Major), DJ Pleat (1 Major); Only QC 1st Bundle: DB Run-off stitching (2), BC Sticker left (2); Both: BA Thread ends (5/1), EC Asymmetry (4/1), DI High-low/uneven (3/1), EI Inaccurate/skewed stitching (2/1), CE Broken seam (1/1); DHU QC 1st Bundle 95.0% / QA 1st Bundle 92.3%

Caught in earlier stages

DB Run-off stitching (23), CC Skip stitch (17), CE Broken seam (14), DI High-low/uneven (6), EA Unsmooth/puckering/bubbling (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—95.0%
QA 1st Bundle1 reports—92.3%
QC Inline4 reports
required on prod. days 4/18 (22%)
—20.6%
QC Endline9 days—9.5%
QA Inline2 reports232.8%
Shipment Sample1 reports1—
Pre-final1 reports17.2%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS169.5%
1500 / 9 days
32.8%PASS
07/16–07/29
BA Thread ends, CC Skip stitch, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS169184 (22%)9507/21, 07/22, 07/23, 07/24, 07/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends512385586
DB Run-off stitching28112
CC Skip stitch17
EC Asymmetry4165
CE Broken seam1175
Others (no detail)121
CB Broken stitch911
BC Sticker left241
261109 OSIT · CS09/CS10 · Due 08/05Final Random PASS Missed in earlier stages: 4
No reportPP Sample
No reportPilot Run
07/10QC 1st Bundle1 reports
07/10QA 1st Bundle1 reports
2/10QC Inlineactual/required · 20%
DHU 11.6%QC Endline5 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports10
Last report07/27

Cross-stage findings

Missed in earlier stages: 4

BB Missing cut seam allowance (Pre-final 07/14), AD Fabric stains (Final Random 07/27), CF Pulling yarn (Final Random 07/27), IA 2nd operation issue (Final Random 07/27): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/27): CC Skip stitch 1 (earlier 4 times)

Found earlier but still reached later stages: 7

EC Asymmetry 1, EI Inaccurate/skewed stitching 1, CD Needle hole 1, DB Run-off stitching 2, DI High-low/uneven 2, CB Broken stitch 2, DH Pressing mark 1 pcs (later stages total)

6 defects recorded as 'Others' without detail

QA Inline 6; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (4 Major), DI High-low/uneven (1 Major), CA Thread tension (1 Major); Only QC 1st Bundle: CH Incorrect stitch density (1), BA Thread ends (1), CD Needle hole (1), EI Inaccurate/skewed stitching (1), DB Run-off stitching (1); Both: EC Asymmetry (1/4), EA Unsmooth/puckering/bubbling (1/2); DHU QC 1st Bundle 53.8% / QA 1st Bundle 60.0%

Caught in earlier stages

ED Gathering crease (7), EG Wrong panel assembly (5), CE Broken seam (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—53.8%
QA 1st Bundle1 reports—60.0%
QC Inline2 reports
required on prod. days 2/10 (20%)
—61.0%
QC Endline5 days—11.6%
QA Inline3 reports337.5%
Shipment Sample1 reports1—
Pre-final1 reports110.0%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0911.7%
947 / 4 days
37.5%PASS
07/10–07/21
BA Thread ends, CC Skip stitch, EC Asymmetry
CS100.0%
9 / 1 days
——
07/18–07/18
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS09482 (25%)4207/10, 07/11, 07/13, 07/21
CS10120 (0%)1107/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends1786684
EC Asymmetry1411781
DB Run-off stitching11842
CC Skip stitch112311
DI High-low/uneven162
ED Gathering crease43
CB Broken stitch52
Others (no detail)6
260338 MKSC · CP01/CP15 · Due 08/12Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/27QA 1st Bundle1 reports
0/32QC Inlineactual/required · 0%
DHU 15.6%QC Endline10 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty4,500 / 1,250
PDF reports5
Last report08/07

Cross-stage findings

Missed in earlier stages: 2

DI High-low/uneven (Final Random 07/29), AC Fabric hole (Final Random 08/07): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/07): BA Thread ends 1 (earlier 20 times), CB Broken stitch 1 (earlier 3 times)

Found earlier but still reached later stages: 2

BB Missing cut seam allowance 1, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

14 defects recorded as 'Others' without detail

QA 1st Bundle 5, QA Inline 9; cannot compare across stages

QC Endline data errors: 14

07/27 CP15 260338A (defective pcs 101 > defects 40), 07/28 CP15 260338A (defective pcs 102 > defects 60), 07/29 CP15 260338A (defective pcs 99 > defects 53), 07/30 CP01 260338A (defective pcs 79 > defects 19)…

Caught in earlier stages

EC Asymmetry (126), EB Measurement issue (106), ED Gathering crease (96), CE Broken seam (64), CC Skip stitch (30) did not reach later stages

Report line differs from production line

QGR2630793 Final Random (07/29) CP05, QGR2632721 Final Random (08/07) CB15; actual production line(s) CP01/CP15 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/32 (0%)
——
QC Endline10 days—15.6%
QA Inline2 reports246.9%
Final Random2 reports01.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1518.1%
2598 / 10 days
46.9%—
07/27–08/25
BA Thread ends, EC Asymmetry, EB Measurement issue
CP0112.1%
1890 / 6 days
46.9%—
07/30–08/05
BA Thread ends, CE Broken seam, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1510200 (0%)101008/01, 08/03, 08/04, 08/05, 08/25
CP016120 (0%)6607/31, 08/01, 08/03, 08/04, 08/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends419113
EC Asymmetry1125
EB Measurement issue106
ED Gathering crease3885
EA Unsmooth/puckering/bubbling2781
CE Broken seam604
CC Skip stitch282
Others (no detail)519
260339 MKSC · CP04 · Due 08/12Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
07/16QC 1st Bundle1 reports
07/15QA 1st Bundle1 reports
6/26QC Inlineactual/required · 23%
DHU 17.1%QC Endline13 days
All FAILQA Inline5 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty4,650 / 1,650
PDF reports16
Last report08/11

Cross-stage findings

Missed in earlier stages: 2

GA Missing bartack/button (Shipment Sample 07/20), EI Inaccurate/skewed stitching (Shipment Sample 07/20): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (08/11): BA Thread ends 2 (earlier 26 times), EC Asymmetry 1 (earlier 24 times), CC Skip stitch 1 (earlier 13 times)

Found earlier but still reached later stages: 4

EA Unsmooth/puckering/bubbling 1, BB Missing cut seam allowance 1, AC Fabric hole 1, CB Broken stitch 4 pcs (later stages total)

10 defects recorded as 'Others' without detail

QA 1st Bundle 4, QA Inline 4, Final Random 2; cannot compare across stages

QC Endline data errors: 2

07/24 CP04 260339A (defective pcs 20 > defects 17), 08/05 CP04 260339B (defective pcs 20 > defects 19)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (4 Major), DJ Pleat (2 Major); Only QC 1st Bundle: ED Gathering crease (5), DD Thread not straight/waving (4), DA Exceed seam allowance (2), AC Fabric hole (2); Both: EA Unsmooth/puckering/bubbling (2/6), BA Thread ends (3/3), EC Asymmetry (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (196), AD Fabric stains (94), EB Measurement issue (31), DD Thread not straight/waving (16), DJ Pleat (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—100.0%
QC Inline6 reports
required on prod. days 6/26 (23%)
—77.1%
QC Endline13 days—17.1%
QA Inline5 reports543.2%
Shipment Sample1 reports1—
Final Random2 reports03.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0417.1%
4630 / 13 days
43.2%PASS
07/15–08/10
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0413266 (23%)13708/05, 08/06, 08/07, 08/08, 08/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends3368274125
ED Gathering crease5151706
EC Asymmetry218119731
CC Skip stitch99111
AD Fabric stains2902
EB Measurement issue31
DD Thread not straight/waving412
CB Broken stitch8313
260343 MKSC · CP07/CP17 · Due 08/12Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run2 reports
07/07QC 1st Bundle1 reports
07/07QA 1st Bundle1 reports
0/12QC Inlineactual/required · 0%
DHU 16.4%QC Endline6 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
1/3 FAILFinal Random3 reports
Order/Ship qty1,120 / 550
PDF reports7
Last report08/08

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 07/15): first found in later stages, never recorded before

Found earlier but still reached later stages: 5

CC Skip stitch 3, CE Broken seam 5, EA Unsmooth/puckering/bubbling 3, AD Fabric stains 1, BB Missing cut seam allowance 2 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA 1st Bundle 1, Final Random 1; cannot compare across stages

QC Endline data errors: 3

07/07 CP17 260343B (defective pcs 30 > defects 17), 07/07 CP17 260343A (defective pcs 40 > defects 21), 07/08 CP17 260343A (defective pcs 43 > defects 39)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (5 Major), EA Unsmooth/puckering/bubbling (2 Major), AD Fabric stains (2 Major), DJ Pleat (1 Major), AC Fabric hole (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: BA Thread ends (7), CC Skip stitch (5), DD Thread not straight/waving (2), EC Asymmetry (2), BD Snagging (1), DE Cut to broken (1); Both: DB Run-off stitching (5/1), ED Gathering crease (3/3), CA Thread tension (3/1), CE Broken seam (1/1); DHU QC 1st Bundle 150.0% / QA 1st Bundle 95.0%

Caught in earlier stages

ED Gathering crease (37), EC Asymmetry (32), EB Measurement issue (20), DB Run-off stitching (9), DF Twisted seam/skewing (5) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—150.0%
QA 1st Bundle1 reports—95.0%
QC Inline0 reports
required on prod. days 0/12 (0%)
——
QC Endline6 days—16.4%
Final Random3 reports17.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1716.4%
1120 / 6 days
—PASS
07/06–08/08
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP176120 (0%)6607/07, 07/08, 07/15, 07/27, 08/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC EndlineFinal Random
BA Thread ends7519
ED Gathering crease3331
EC Asymmetry5225
CE Broken seam11235
CC Skip stitch5173
EB Measurement issue20
AD Fabric stains271
DB Run-off stitching513
260569 LOGE · CB28/CB29 · Due 08/12Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/09QC 1st Bundle1 reports
07/08QA 1st Bundle1 reports
3/36QC Inlineactual/required · 8%
DHU 6.0%QC Endline17 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty8,000 / 8,000
PDF reports8
Last report07/28

Cross-stage findings

Missed in earlier stages: 1

EE Raw edge (Final Random 07/28): first found in later stages, never recorded before

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 54.7% vs QC Inline 31.3%; QC Inline may be missing defects

QA Inline DHU is 9.1× QC Endline

QA Inline DHU 54.7% vs QC Endline 6.0% (07/08–08/11, 17 days, 7960 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (07/28): EA Unsmooth/puckering/bubbling 2 (earlier 4 times), AD Fabric stains 1 (earlier 21 times), CC Skip stitch 1 (earlier 24 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

8 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 5; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 7); zero in QC Endline records

QC Endline data errors: 1

07/20 CB28 260569-L (defective pcs 8 > defects 7)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), EI Inaccurate/skewed stitching (3 Major), BA Thread ends (2 Major), CC Skip stitch (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: CE Broken seam (2), EC Asymmetry (2), DE Cut to broken (2); Both: AD Fabric stains (1/3); DHU QC 1st Bundle 87.5% / QA 1st Bundle 80.0%

Caught in earlier stages

ED Gathering crease (41), AC Fabric hole (20), EC Asymmetry (16), EI Inaccurate/skewed stitching (8), DB Run-off stitching (7) did not reach later stages

Report line differs from production line

QGR2629939 Final Random (07/28) CB19; actual production line(s) CB28/CB29 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—87.5%
QA 1st Bundle1 reports—80.0%
QC Inline3 reports
required on prod. days 3/36 (8%)
—31.3%
QC Endline17 days—6.0%
QA Inline2 reports254.7%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB286.0%
7920 / 16 days
54.7%—
07/08–07/25
BA Thread ends, CC Skip stitch, AD Fabric stains
CB290.0%
40 / 2 days
——
07/25–08/11
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2816323 (9%)161307/21, 07/22, 07/23, 07/24, 07/25
CB29240 (0%)2207/25, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends223947
CC Skip stitch19661
AD Fabric stains1367021
ED Gathering crease41
AC Fabric hole20
EC Asymmetry277
EA Unsmooth/puckering/bubbling3442
Others (no detail)35
260577 LOGE · CP02/CP04/CP05… · Due 08/12Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/21–07/27QC 1st Bundle2 reports
07/18–07/27QA 1st Bundle3 reports
10/140QC Inlineactual/required · 7%
DHU 6.7%QC Endline26 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty5,000 / 5,000
PDF reports18
Last report08/06

Cross-stage findings

Missed in earlier stages: 1

DE Cut to broken (Final Random 08/01): first found in later stages, never recorded before

QA Inline DHU is 6.1× QC Endline

QA Inline DHU 40.6% vs QC Endline 6.7% (07/10–08/11, 26 days, 15000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (08/01): CC Skip stitch 2 (earlier 31 times), EA Unsmooth/puckering/bubbling 2 (earlier 13 times), AD Fabric stains 2 (earlier 20 times)

QC Endline data errors: 22

07/21 CP02 260577-2 (defective pcs 40 > defects 15), 07/21 CP17 260577-2 (defective pcs 45 > defects 43), 07/22 CP02 260577-2 (defective pcs 19 > defects 7), 07/23 CP02 260577-2 (defective pcs 44 > defects 15)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (3 Major), BD Snagging (1 Major); Only QC 1st Bundle: DF Twisted seam/skewing (3), DI High-low/uneven (3), CA Thread tension (2), DB Run-off stitching (2), CB Broken stitch (2), AD Fabric stains (1); Both: CE Broken seam (2/14), EC Asymmetry (5/9), BA Thread ends (4/6), DJ Pleat (5/2), CC Skip stitch (5/1), ED Gathering crease (3/2), EA Unsmooth/puckering/bubbling (2/3); DHU QC 1st Bundle 97.5% / QA 1st Bundle 68.3%

Caught in earlier stages

ED Gathering crease (170), EB Measurement issue (88), EC Asymmetry (83), CE Broken seam (57), DI High-low/uneven (24) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—97.5%
QA 1st Bundle3 reports—68.3%
QC Inline10 reports
required on prod. days 10/140 (7%)
—27.8%
QC Endline26 days—6.7%
QA Inline2 reports240.6%
Final Random1 reports02.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1811.4%
5000 / 11 days
28.1%—
07/27–08/07
BA Thread ends, CC Skip stitch, ED Gathering crease
CP1710.3%
2980 / 5 days
——
07/21–07/25
BA Thread ends, CC Skip stitch, EA Unsmooth/puckering/bubbling
CP025.5%
1980 / 8 days
——
07/21–08/05
BA Thread ends, CC Skip stitch, ED Gathering crease
CP130.6%
1580 / 10 days
53.1%PASS
07/18–08/05
CC Skip stitch, BA Thread ends, CE Broken seam
CP040.0%
1300 / 16 days
——
07/10–08/03
—
CP090.0%
680 / 5 days
——
07/11–08/01
—
CP121.5%
680 / 5 days
53.1%—
07/21–08/11
BA Thread ends, CC Skip stitch
CP050.3%
600 / 7 days
——
07/15–08/03
BA Thread ends, DK Twisted shoulder strap
CP200.0%
160 / 1 days
——
07/25–07/25
—
CP070.0%
20 / 1 days
——
07/29–07/29
—
CP140.0%
20 / 1 days
——
08/03–08/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0416320 (0%)161607/25, 07/28, 07/29, 08/01, 08/03
CP1811228 (36%)11308/03, 08/04, 08/05, 08/06, 08/07
CP1310200 (0%)101007/28, 07/30, 07/31, 08/04, 08/05
CP028160 (0%)8807/24, 07/25, 07/27, 07/28, 08/05
CP057140 (0%)7707/18, 07/22, 07/31, 08/01, 08/03
CP095100 (0%)5507/11, 07/27, 07/30, 07/31, 08/01
CP125100 (0%)5507/21, 07/23, 07/25, 07/28, 08/11
CP175102 (20%)5307/21, 07/22, 07/23, 07/24, 07/25
CP07120 (0%)1107/29
CP14120 (0%)1108/03
CP20120 (0%)1107/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends465534147
CC Skip stitch5152212
ED Gathering crease326159
EB Measurement issue88
EC Asymmetry5929382
EA Unsmooth/puckering/bubbling233552
AD Fabric stains1173922
CE Broken seam2149239
260578 LOGE · CB36 · Due 08/12Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
07/24QC 1st Bundle1 reports
07/23QA 1st Bundle1 reports
1/24QC Inlineactual/required · 4%
DHU 9.2%QC Endline12 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,000 / 3,000
PDF reports7
Last report08/06

Cross-stage findings

Missed in earlier stages: 1

BC Sticker left (Final Random 08/06): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

CB Broken stitch 2, EE Raw edge 3 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC Endline data errors: 1

07/28 CB36 260578-S (defective pcs 23 > defects 22)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), EC Asymmetry (2 Major), DK Twisted shoulder strap (1 Major); Only QC 1st Bundle: BA Thread ends (2), AD Fabric stains (1), DJ Pleat (1); Both: CC Skip stitch (1/2), EA Unsmooth/puckering/bubbling (2/1), CB Broken stitch (2/1), CA Thread tension (1/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 50.0%

Caught in earlier stages

CC Skip stitch (73), ED Gathering crease (37), EC Asymmetry (12), EA Unsmooth/puckering/bubbling (12), EB Measurement issue (10) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—50.0%
QC Inline1 reports
required on prod. days 1/24 (4%)
—56.2%
QC Endline12 days—9.2%
QA Inline2 reports229.7%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB369.2%
2920 / 12 days
29.7%PASS
07/23–08/07
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3612241 (4%)121108/03, 08/04, 08/05, 08/06, 08/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends2214034
CC Skip stitch12367
ED Gathering crease2332
AD Fabric stains1151
EC Asymmetry12234
EA Unsmooth/puckering/bubbling12144
EB Measurement issue19
DJ Pleat153
260725 GECL · CS03/CS11/CS12 · Due 08/12Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/15QC 1st Bundle1 reports
07/15QA 1st Bundle3 reports
14/54QC Inlineactual/required · 26%
DHU 13.9%QC Endline13 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty16,960 / 1,990
PDF reports23
Last report08/07

Cross-stage findings

Missed in earlier stages: 1

BD Snagging (Final Random 08/07): first found in later stages, never recorded before

QA Inline DHU is 10.5× QC Inline

QA Inline DHU 48.4% vs QC Inline 4.6%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (08/07): AD Fabric stains 2 (earlier 6 times)

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

89 defects recorded as 'Others' without detail

QC 1st Bundle 8, QA 1st Bundle 3, QC Inline 65, QA Inline 13; cannot compare across stages

QC Endline data errors: 5

07/21 CS11 260725A-1 (defective pcs 117 > defects 115), 07/21 CS12 260725A-1 (defective pcs 2 > defects 1), 07/22 CS11 260725A-1 (defective pcs 68 > defects 67), 07/23 CS11 260725B-1 (defective pcs 73 > defects 68)…

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DB Run-off stitching (8 Major), EA Unsmooth/puckering/bubbling (3 Major), GA Missing bartack/button (3 Major), DJ Pleat (2 Major), CA Thread tension (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: DI High-low/uneven (3); Both: BA Thread ends (4/9); DHU QC 1st Bundle 0.0% / QA 1st Bundle 41.7%

Caught in earlier stages

CC Skip stitch (538), ED Gathering crease (121), DB Run-off stitching (109), DJ Pleat (38), DD Thread not straight/waving (13) did not reach later stages

Report line differs from production line

QGR2629852 Final Random (07/25) CS05;CS15, QGR2632701 Final Random (08/07) CS05;CS15; actual production line(s) CS03/CS11/CS12 (cards show production lines only)

Found before bulk production (Shipment Sample): 5

GA Missing bartack/button, CE Broken seam, EC Asymmetry, DF Twisted seam/skewing, CF Pulling yarn: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle3 reports—41.7%
QC Inline14 reports
required on prod. days 14/54 (26%)
—4.6%
QC Endline13 days—13.9%
QA Inline2 reports248.4%
Shipment Sample1 reports1—
Final Random2 reports02.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0316.8%
8526 / 13 days
56.2%—
07/14–07/28
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS1111.0%
8425 / 13 days
40.6%—
07/14–07/28
BA Thread ends, CC Skip stitch, ED Gathering crease
CS1210.0%
10 / 1 days
——
07/21–07/21
BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0313265 (19%)13807/23, 07/24, 07/25, 07/27, 07/28
CS1113269 (35%)13407/23, 07/24, 07/25, 07/27, 07/28
CS12120 (0%)1107/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends4916156855
CC Skip stitch4534
ED Gathering crease1192
DB Run-off stitching810892
Others (no detail)8365513
DJ Pleat2324
AD Fabric stains214
CF Pulling yarn151
260887 OSIT · CS09 · Due 08/12Final Random PASS Missed in earlier stages: 5
No reportPP Sample
No reportPilot Run
07/27QC 1st Bundle1 reports
07/27QA 1st Bundle1 reports
6/22QC Inlineactual/required · 27%
DHU 8.7%QC Endline11 days
All FAILQA Inline5 reports
All FAILShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty9,000 / 9,000
PDF reports16
Last report08/06

Cross-stage findings

Missed in earlier stages: 5

DI High-low/uneven (Shipment Sample 07/27), EI Inaccurate/skewed stitching (Shipment Sample 07/27), AD Fabric stains (Pre-final 08/04), CE Broken seam (Final Random 08/06), AC Fabric hole (Final Random 08/06): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/06): CB Broken stitch 2 (earlier 5 times)

Found earlier but still reached later stages: 5

EC Asymmetry 2, CG Grinning 3, CC Skip stitch 1, AB Shading 2, IA 2nd operation issue 1 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 2, Final Random 2; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (3 Major), BA Thread ends (2 Major), DB Run-off stitching (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: CH Incorrect stitch density (1), BC Sticker left (1); Both: EC Asymmetry (3/1); DHU QC 1st Bundle 38.5% / QA 1st Bundle 69.2%

Caught in earlier stages

DB Run-off stitching (51), EA Unsmooth/puckering/bubbling (35), ED Gathering crease (21), CA Thread tension (9), CD Needle hole (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—38.5%
QA 1st Bundle1 reports—69.2%
QC Inline6 reports
required on prod. days 6/22 (27%)
—64.0%
QC Endline11 days—8.7%
QA Inline5 reports541.2%
Shipment Sample1 reports1—
Pre-final1 reports04.0%
Final Random1 reports02.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS098.7%
7353 / 11 days
41.2%PASS
07/27–08/07
BA Thread ends, CC Skip stitch, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0911226 (27%)11508/03, 08/04, 08/05, 08/06, 08/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends2413934710
CC Skip stitch416051
EC Asymmetry31375972
DB Run-off stitching119238
EA Unsmooth/puckering/bubbling305
ED Gathering crease1551
DI High-low/uneven142
EI Inaccurate/skewed stitching142
261236 OSIT · CS07 · Due 08/12Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
07/24QC 1st Bundle1 reports
07/23QA 1st Bundle1 reports
3/10QC Inlineactual/required · 30%
DHU 3.6%QC Endline5 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
1/2 FAILFinal Random2 reports
Order/Ship qty3,000 / 3,000
PDF reports11
Last report08/03

Cross-stage findings

Missed in earlier stages: 2

CF Pulling yarn (Shipment Sample 07/27), CD Needle hole (Final Random 07/28): first found in later stages, never recorded before

QA Inline DHU is 2.4× QC Inline

QA Inline DHU 28.1% vs QC Inline 11.7%; QC Inline may be missing defects

QA Inline DHU is 7.8× QC Endline

QA Inline DHU 28.1% vs QC Endline 3.6% (07/23–07/28, 5 days, 3060 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects; Final Random 6.8%

Recurring in small numbers: 1

Latest Final Random (08/03): DF Twisted seam/skewing 2 (earlier 9 times)

Found earlier but still reached later stages: 5

ED Gathering crease 4, EC Asymmetry 5, AD Fabric stains 3, CE Broken seam 2, DJ Pleat 2 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 2, Final Random 1; cannot compare across stages

QC Endline data errors: 4

07/23 CS07 261236 (defective pcs 6 > defects 4), 07/24 CS07 261236 (defective pcs 27 > defects 24), 07/25 CS07 261236 (defective pcs 11 > defects 10), 07/27 CS07 261236 (defective pcs 45 > defects 36)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (4 Major), CB Broken stitch (3 Major), ED Gathering crease (2 Major), EC Asymmetry (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: AB Shading (3), EA Unsmooth/puckering/bubbling (3), DF Twisted seam/skewing (2), AD Fabric stains (2); DHU QC 1st Bundle 76.9% / QA 1st Bundle 60.0%

Caught in earlier stages

DB Run-off stitching (39), CB Broken stitch (12), CC Skip stitch (10), AB Shading (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—60.0%
QC Inline3 reports
required on prod. days 3/10 (30%)
—11.7%
QC Endline5 days—3.6%
QA Inline3 reports328.1%
Shipment Sample1 reports1—
Final Random2 reports16.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS073.6%
3060 / 5 days
28.1%PASS
07/23–07/28
DB Run-off stitching, BA Thread ends, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS075103 (30%)5207/23, 07/24, 07/25, 07/27, 07/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends424614
DB Run-off stitching336
EC Asymmetry1618523
DF Twisted seam/skewing21010222
ED Gathering crease210222
CB Broken stitch336
CC Skip stitch10
AB Shading332
261709 RTMS · CP13 · Due 08/12Final Random PASS Missed in earlier stages: 4
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/20QA 1st Bundle1 reports
1/20QC Inlineactual/required · 5%
DHU 10.2%QC Endline10 days
All FAILQA Inline3 reports
No reportShipment Sample
All FAILPre-final2 reports
All PASSFinal Random1 reports
Order/Ship qty4,000 / 4,000
PDF reports8
Last report07/29

Cross-stage findings

Missed in earlier stages: 4

CB Broken stitch (Pre-final 07/23), BB Missing cut seam allowance (Pre-final 07/23), AB Shading (Final Random 07/29), DJ Pleat (Final Random 07/29): first found in later stages, never recorded before

Pre-final DHU is 1.3× QC Endline

Pre-final DHU 12.8% vs QC Endline 10.2% (07/18–07/29, 10 days, 3161 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (07/29): AD Fabric stains 1 (earlier 13 times), DE Cut to broken 1 (earlier 4 times)

Found earlier but still reached later stages: 2

EC Asymmetry 1, ED Gathering crease 1 pcs (later stages total)

12 defects recorded as 'Others' without detail

Pre-final 10, Final Random 2; cannot compare across stages

QC Endline data errors: 10

07/18 CP13 261709 (defective pcs 16 > defects 9), 07/20 CP13 261709 (defective pcs 35 > defects 17), 07/21 CP13 261709 (defective pcs 60 > defects 37), 07/22 CP13 261709 (defective pcs 51 > defects 25)…

Caught in earlier stages

EH Poor lamination/bonding (149), Q94 Glue marks (86), EI Inaccurate/skewed stitching (6), CG Grinning (5), AC Fabric hole (5) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—55.0%
QC Inline1 reports
required on prod. days 1/20 (5%)
—59.4%
QC Endline10 days—10.2%
QA Inline3 reports338.5%
Pre-final2 reports212.8%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1310.2%
3161 / 10 days
38.5%PASS
07/18–07/29
EH Poor lamination/bonding, Q94 Glue marks, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1310201 (5%)10907/24, 07/25, 07/27, 07/28, 07/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
EH Poor lamination/bonding3146
AD Fabric stains610459172
Q94 Glue marks86
BA Thread ends229426
Others (no detail)1102
DE Cut to broken1421
EI Inaccurate/skewed stitching6
CG Grinning14
260360 LOGE · CB29/CB30 · Due 08/13Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
07/23QC 1st Bundle1 reports
07/23QA 1st Bundle1 reports
6/42QC Inlineactual/required · 14%
DHU 12.0%QC Endline18 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,500 / 2,500
PDF reports12
Last report08/07

Cross-stage findings

Missed in earlier stages: 3

EI Inaccurate/skewed stitching (Shipment Sample 07/30), FB Material defect (Shipment Sample 07/30), CD Needle hole (Shipment Sample 07/30): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (08/06): AD Fabric stains 2 (earlier 16 times), CB Broken stitch 1 (earlier 8 times), EA Unsmooth/puckering/bubbling 2 (earlier 6 times)

Found earlier but still reached later stages: 5

ED Gathering crease 4, EC Asymmetry 2, CG Grinning 1, CA Thread tension 1, CE Broken seam 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 2, Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 12); zero in QC Endline records

QC Endline data errors: 2

07/23 CB30 260360 (defective pcs 6 > defects 4), 08/04 CB30 260360 (defective pcs 51 > defects 49)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (2 Major), EE Raw edge (2 Major), BA Thread ends (2 Major); Only QC 1st Bundle: AD Fabric stains (1), CG Grinning (1), ED Gathering crease (1), CB Broken stitch (1); Both: EC Asymmetry (1/4), EA Unsmooth/puckering/bubbling (1/2); DHU QC 1st Bundle 75.0% / QA 1st Bundle 100.0%

Caught in earlier stages

EA Uneven seam allowance (264), DJ Pleat (15), CC Skip stitch (12), DI High-low/uneven (9), DE Cut to broken (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—100.0%
QC Inline6 reports
required on prod. days 6/42 (14%)
—41.1%
QC Endline18 days—12.0%
QA Inline2 reports229.3%
Shipment Sample1 reports1—
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3012.7%
4560 / 18 days
29.3%—
07/23–08/13
EA Uneven seam allowance, AD Fabric stains, ED Gathering crease
CB290.0%
254 / 3 days
—PASS
08/10–08/12
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3018366 (17%)181208/08, 08/10, 08/11, 08/12, 08/13
CB29360 (0%)3308/10, 08/11, 08/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
EA Uneven seam allowance264
AD Fabric stains114139512
ED Gathering crease131014
BA Thread ends24324
CD Needle hole3241
EC Asymmetry141822
CB Broken stitch11711
EA Unsmooth/puckering/bubbling124732
261272 RGOR · CP15 · Due 08/14Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/23QA 1st Bundle1 reports
0/16QC Inlineactual/required · 0%
DHU 8.3%QC Endline8 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,570 / 1,570
PDF reports4
Last report08/15

Cross-stage findings

Missed in earlier stages: 2

CB Broken stitch (Final Random 08/14), DE Cut to broken (Final Random 08/14): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/15): AD Fabric stains 2 (earlier 3 times), CC Skip stitch 1 (earlier 4 times)

QC Endline data errors: 3

07/23 CP15 261272 (defective pcs 90 > defects 65), 07/24 CP15 261272 (defective pcs 86 > defects 79), 07/25 CP15 261272 (defective pcs 73 > defects 66)

Caught in earlier stages

ED Gathering crease (55), EA Uneven seam allowance (51), EA Unsmooth/puckering/bubbling (24), CG Grinning (5), EC Asymmetry (5) did not reach later stages

Report line differs from production line

QGR2634347 Final Random (08/14) CP12; actual production line(s) CP15 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—50.0%
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline8 days—8.3%
QA Inline1 reports128.1%
Final Random2 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP158.3%
2814 / 8 days
28.1%PASS
07/23–08/08
BA Thread ends, ED Gathering crease, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP158160 (0%)8807/27, 07/28, 07/30, 08/01, 08/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends16547
ED Gathering crease1531
EA Uneven seam allowance51
AD Fabric stains2242
EA Unsmooth/puckering/bubbling24
CC Skip stitch151
CG Grinning32
EC Asymmetry221
261273 RGOR · CP15 · Due 08/14Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/05QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 10.2%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports3
Last report08/14

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 08/14): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/14): AD Fabric stains 1 (earlier 3 times)

QC Endline data errors: 3

08/05 CP15 261273 (defective pcs 110 > defects 63), 08/06 CP15 261273 (defective pcs 104 > defects 72), 08/07 CP15 261273 (defective pcs 87 > defects 76)

Caught in earlier stages

EC Asymmetry (41), ED Gathering crease (38), CC Skip stitch (25), EA Unsmooth/puckering/bubbling (24), CG Grinning (6) did not reach later stages

Report line differs from production line

QGR2634315 Final Random (08/14) CP19; actual production line(s) CP15 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—75.0%
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—10.2%
QA Inline1 reports128.1%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1510.2%
2063 / 4 days
28.1%—
08/05–08/08
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP15480 (0%)4408/05, 08/06, 08/07, 08/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends25724
EC Asymmetry8312
ED Gathering crease137
AD Fabric stains2271
CC Skip stitch25
EA Unsmooth/puckering/bubbling24
CG Grinning24
AC Fabric hole4
261374 RGOR · CP15 · Due 08/14No final QA Inline DHU is 13.1× QC Endline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/10QA 1st Bundle1 reports
0/12QC Inlineactual/required · 0%
DHU 3.5%QC Endline6 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,825 / 1,825
PDF reports2
Last report08/11

Cross-stage findings

QA Inline DHU is 13.1× QC Endline

QA Inline DHU 46.0% vs QC Endline 3.5% (08/08–08/14, 6 days, 3981 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

QC Endline data errors: 4

08/08 CP15 261374 (defective pcs 55 > defects 25), 08/10 CP15 261374 (defective pcs 97 > defects 47), 08/11 CP15 261374 (defective pcs 63 > defects 42), 08/12 CP15 261374 (defective pcs 60 > defects 27)

Caught in earlier stages

EC Asymmetry (45), BA Thread ends (42), ED Gathering crease (32), AD Fabric stains (20), CC Skip stitch (16) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—60.0%
QC Inline0 reports
required on prod. days 0/12 (0%)
——
QC Endline6 days—3.5%
QA Inline1 reports146.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP153.5%
3981 / 6 days
46.0%—
08/08–08/14
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP156120 (0%)6608/10, 08/11, 08/12, 08/13, 08/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA Inline
EC Asymmetry52911
BA Thread ends240
ED Gathering crease302
AD Fabric stains182
CC Skip stitch16
CG Grinning25
DJ Pleat31
EA Unsmooth/puckering/bubbling31
261377 RGOR · CP15 · Due 08/14No final QA Inline DHU is 6.7× QC Endline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/13QA 1st Bundle1 reports
0/10QC Inlineactual/required · 0%
DHU 6.1%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,760 / 1,760
PDF reports2
Last report08/17

Cross-stage findings

QA Inline DHU is 6.7× QC Endline

QA Inline DHU 40.6% vs QC Endline 6.1% (08/13–08/18, 5 days, 5419 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

QC Endline data errors: 4

08/14 CP15 261377 (defective pcs 99 > defects 67), 08/15 CP15 261377 (defective pcs 110 > defects 69), 08/17 CP15 261377 (defective pcs 234 > defects 128), 08/18 CP15 261377 (defective pcs 23 > defects 16)

Caught in earlier stages

BA Thread ends (96), ED Gathering crease (79), AD Fabric stains (69), EC Asymmetry (49), CC Skip stitch (22) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—70.0%
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—6.1%
QA Inline1 reports140.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP156.1%
5419 / 5 days
40.6%—
08/13–08/18
BA Thread ends, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP155100 (0%)5508/13, 08/14, 08/15, 08/17, 08/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA Inline
BA Thread ends2931
ED Gathering crease2752
AD Fabric stains366
EC Asymmetry2443
CC Skip stitch22
EB Measurement issue17
CG Grinning44
DB Run-off stitching5
261394 CIWH · CS08 · Due 08/17Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/24QC 1st Bundle1 reports
07/24QA 1st Bundle1 reports
12/28QC Inlineactual/required · 43%
DHU 7.3%QC Endline14 days
All FAILQA Inline3 reports
No reportShipment Sample
All PASSPre-final1 reports
1/4 FAILFinal Random4 reports
Order/Ship qty5,986 / 5,986
PDF reports22
Last report08/14

Cross-stage findings

Missed in earlier stages: 1

BD Snagging (Final Random 08/04): first found in later stages, never recorded before

QA Inline DHU is 2.8× QC Inline

QA Inline DHU 31.2% vs QC Inline 11.1%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (08/14): EA Unsmooth/puckering/bubbling 2 (earlier 6 times), AD Fabric stains 2 (earlier 19 times)

Found earlier but still reached later stages: 3

BB Missing cut seam allowance 3, ED Gathering crease 3, AC Fabric hole 1 pcs (later stages total)

12 defects recorded as 'Others' without detail

QA Inline 2, Final Random 4, Pre-final 1, QC Inline 5; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 12); zero in QC Endline records

Duplicate report numbers

QGR2632109 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (3 Major), CF Pulling yarn (1 Major), BB Missing cut seam allowance (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: AD Fabric stains (2), GB Missing sewing operation (2), DB Run-off stitching (2); Both: CB Broken stitch (3/1), EA Unsmooth/puckering/bubbling (2/1); DHU QC 1st Bundle 84.6% / QA 1st Bundle 40.0%

Caught in earlier stages

CC Skip stitch (76), DB Run-off stitching (45), CB Broken stitch (25), AG Printing/dyeing defect (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—84.6%
QA 1st Bundle1 reports—40.0%
QC Inline12 reports
required on prod. days 12/28 (43%)
—11.1%
QC Endline14 days—7.3%
QA Inline3 reports331.2%
Pre-final1 reports03.0%
Final Random4 reports14.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS087.3%
8385 / 14 days
31.2%PASS
07/25–08/13
AD Fabric stains, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS08142812 (43%)14208/05, 08/06, 08/07, 08/12, 08/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
AD Fabric stains231290437
BA Thread ends3514357
ED Gathering crease236153
CC Skip stitch733
DB Run-off stitching2637
EA Unsmooth/puckering/bubbling2111129
CB Broken stitch31183
Others (no detail)58214
261395 CIWH · CS08/CS13 · Due 08/17Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/08QC 1st Bundle1 reports
08/07QA 1st Bundle1 reports
3/14QC Inlineactual/required · 21%
DHU 9.5%QC Endline7 days
All FAILQA Inline2 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random2 reports
Order/Ship qty2,000 / 2,000
PDF reports11
Last report08/17

Cross-stage findings

Missed in earlier stages: 1

ED Gathering crease (Final Random 08/17): first found in later stages, never recorded before

QA Inline DHU is 12.4× QC Inline

QA Inline DHU 34.6% vs QC Inline 2.8%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (08/17): CB Broken stitch 2 (earlier 3 times), EA Unsmooth/puckering/bubbling 1 (earlier 4 times)

Found earlier but still reached later stages: 3

AD Fabric stains 3, BB Missing cut seam allowance 3, AC Fabric hole 1 pcs (later stages total)

24 defects recorded as 'Others' without detail

QC Inline 24; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 9); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (3 Major), EI Inaccurate/skewed stitching (2 Major), BA Thread ends (2 Major), CG Grinning (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), AB Shading (2), DJ Pleat (2); Both: CB Broken stitch (4/1); DHU QC 1st Bundle 84.6% / QA 1st Bundle 45.0%

Caught in earlier stages

CC Skip stitch (68), DB Run-off stitching (33), CE Broken seam (10), EC Asymmetry (5), DF Twisted seam/skewing (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—84.6%
QA 1st Bundle1 reports—45.0%
QC Inline4 reports
required on prod. days 3/14 (21%)
—2.8%
QC Endline7 days—9.5%
QA Inline2 reports234.6%
Pre-final1 reports04.0%
Final Random2 reports03.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS089.5%
3467 / 7 days
34.6%PASS
08/07–08/14
AD Fabric stains, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS087143 (21%)7408/10, 08/11, 08/12, 08/13, 08/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
AD Fabric stains15126212
BA Thread ends296443
CC Skip stitch563
DB Run-off stitching33
Others (no detail)24
EA Unsmooth/puckering/bubbling34621
CE Broken seam10
CB Broken stitch4113
260293 MKSC · CB02/CB05/CB06… · Due 08/18Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run4 reports
07/08QC 1st Bundle2 reports
07/07QA 1st Bundle1 reports
24/108QC Inlineactual/required · 22%
DHU 11.5%QC Endline27 days
All FAILQA Inline3 reports
No resultShipment Sample2 reports
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty12,959 / 1,000
PDF reports44
Last report08/17

Cross-stage findings

Missed in earlier stages: 1

DK Twisted shoulder strap (Final Random 08/01): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/17): ED Gathering crease 1 (earlier 74 times)

Found earlier but still reached later stages: 4

EC Asymmetry 2, DE Cut to broken 1, BA Thread ends 8, CD Needle hole 1 pcs (later stages total)

13 defects recorded as 'Others' without detail

Pilot Run 1, QC Inline 10, QA Inline 2; cannot compare across stages

QC Endline data errors: 6

07/11 CB06 260293A (defective pcs 15 > defects 14), 07/20 CB02 260293B (defective pcs 5 > defects 4), 07/21 CB06 260293B (defective pcs 13 > defects 11), 07/22 CB02 260293B (defective pcs 15 > defects 14)…

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BD Snagging (1 Major); Only QC 1st Bundle: EC Asymmetry (3), DD Thread not straight/waving (2), CG Grinning (2), AF Crushed foam cup (1), DE Cut to broken (1), DJ Pleat (1); Both: EA Unsmooth/puckering/bubbling (6/4), ED Gathering crease (5/1), AD Fabric stains (2/2), CC Skip stitch (2/1); DHU QC 1st Bundle 96.2% / QA 1st Bundle 69.2%

Caught in earlier stages

CC Skip stitch (173), AD Fabric stains (127), CE Broken seam (43), DD Thread not straight/waving (42), EA Uneven seam allowance (35) did not reach later stages

Report line differs from production line

QGR2631505 Final Random (08/01) CB04; actual production line(s) CB02/CB05/CB06/CB07/CB16/CB17/CB30 (cards show production lines only)

Found before bulk production (Shipment Sample): 5

AC Fabric hole, EA Unsmooth/puckering/bubbling, CG Grinning, DB Run-off stitching, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Pilot Run4 reports0—
QC 1st Bundle2 reports—96.2%
QA 1st Bundle1 reports—69.2%
QC Inline28 reports
required on prod. days 24/108 (22%)
—48.4%
QC Endline27 days—11.5%
QA Inline3 reports324.0%
Shipment Sample2 reports0—
Final Random4 reports02.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB027.6%
6419 / 24 days
24.0%PASS
07/07–08/13
ED Gathering crease, AD Fabric stains, BA Thread ends
CB0619.7%
3391 / 16 days
——
07/07–07/24
ED Gathering crease, BA Thread ends, CC Skip stitch
CB1610.6%
2865 / 9 days
——
07/10–07/25
Others (no detail), ED Gathering crease, BA Thread ends
CB300.0%
42 / 4 days
——
07/14–08/04
—
CB050.0%
11 / 1 days
——
08/05–08/05
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB02244814 (29%)241007/30, 07/31, 08/01, 08/03, 08/13
CB0616327 (22%)16907/20, 07/21, 07/22, 07/23, 07/24
CB169183 (17%)9607/15, 07/16, 07/17, 07/18, 07/25
CB30480 (0%)4407/14, 07/17, 07/31, 08/04
CB05120 (0%)1108/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
ED Gathering crease45188558425
BA Thread ends122028
EC Asymmetry63899292
CC Skip stitch2133137
Others (no detail)1101402
EA Unsmooth/puckering/bubbling649510516
AD Fabric stains2221102
DB Run-off stitching24601
260494 LOGE · CB04/CB09/CB10… · Due 08/19Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
20/98QC Inlineactual/required · 20%
DHU 12.2%QC Endline41 days
All FAILQA Inline4 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty4,000 / 4,000
PDF reports26
Last report08/07

Cross-stage findings

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 07/17): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/17): EC Asymmetry 2 (earlier 28 times)

21 defects recorded as 'Others' without detail

QC Inline 21; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 10); zero in QC Endline records

QC Endline data errors: 1

08/01 CB10 260494 (defective pcs 14 > defects 12)

Caught in earlier stages

CC Skip stitch (178), CE Broken seam (160), CB Broken stitch (56), AD Fabric stains (42), DJ Pleat (38) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline21 reports
required on prod. days 20/98 (20%)
—38.3%
QC Endline41 days—12.2%
QA Inline4 reports435.2%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1012.3%
7893 / 41 days
35.2%PASS
07/02–08/19
BA Thread ends, CC Skip stitch, CE Broken seam
CB300.0%
70 / 7 days
——
07/08–08/07
—
CB040.0%
10 / 1 days
——
08/03–08/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB10418220 (24%)412108/13, 08/14, 08/15, 08/18, 08/19
CB307140 (0%)7707/15, 07/21, 07/27, 08/04, 08/07
CB04120 (0%)1108/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends1564166
CC Skip stitch211543
CE Broken seam61981
EC Asymmetry6982
CB Broken stitch533
AD Fabric stains1626
DJ Pleat353
CG Grinning28
260495 LOGE · CP14 · Due 08/19Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
07/06QC 1st Bundle1 reports
07/08QA 1st Bundle1 reports
4/22QC Inlineactual/required · 18%
DHU 5.3%QC Endline11 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty4,000 / 4,000
PDF reports9
Last report08/10

Cross-stage findings

Missed in earlier stages: 2

EA Unsmooth/puckering/bubbling (Final Random 07/28), EE Raw edge (Final Random 07/28): first found in later stages, never recorded before

QA Inline DHU is 8.3× QC Endline

QA Inline DHU 43.8% vs QC Endline 5.3% (07/06–07/28, 11 days, 8000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/10): CB Broken stitch 2 (earlier 5 times), ED Gathering crease 1 (earlier 10 times)

QC Endline data errors: 11

07/06 CP14 260495 (defective pcs 30 > defects 15), 07/17 CP14 260495 (defective pcs 96 > defects 43), 07/18 CP14 260495 (defective pcs 101 > defects 50), 07/20 CP14 260495 (defective pcs 132 > defects 41)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: DB Run-off stitching (4), DJ Pleat (3), CF Pulling yarn (1); Both: CB Broken stitch (3/2), CC Skip stitch (2/2); DHU QC 1st Bundle 65.0% / QA 1st Bundle 35.0%

Caught in earlier stages

CC Skip stitch (97), EA Uneven seam allowance (57), DB Run-off stitching (36), CG Grinning (15), DJ Pleat (9) did not reach later stages

Report line differs from production line

QGR2635570 Final Random (08/10) CP13; actual production line(s) CP14 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—65.0%
QA 1st Bundle1 reports—35.0%
QC Inline4 reports
required on prod. days 4/22 (18%)
—57.8%
QC Endline11 days—5.3%
QA Inline1 reports143.8%
Final Random2 reports02.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP145.3%
8000 / 11 days
43.8%PASS
07/06–07/28
BA Thread ends, CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1411224 (18%)11707/23, 07/24, 07/25, 07/27, 07/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends28207614
CC Skip stitch221380
EA Uneven seam allowance57
ED Gathering crease511
DB Run-off stitching4428
CB Broken stitch3284
CG Grinning15
DJ Pleat36
260864 GECL · CS15/CS25 · Due 08/19Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
07/13QC 1st Bundle1 reports
07/13QA 1st Bundle1 reports
4/28QC Inlineactual/required · 14%
DHU 11.4%QC Endline14 days
No reportQA Inline
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random2 reports
Order/Ship qty3,800 / 740
PDF reports10
Last report08/04

Cross-stage findings

Missed in earlier stages: 3

CF Pulling yarn (Shipment Sample 07/15), EI Inaccurate/skewed stitching (Shipment Sample 07/15), DH Pressing mark (Shipment Sample 07/15): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/04): AD Fabric stains 2 (earlier 4 times), CB Broken stitch 1 (earlier 7 times)

Found earlier but still reached later stages: 2

DB Run-off stitching 1, EA Unsmooth/puckering/bubbling 2 pcs (later stages total)

3 defects recorded as 'Others' without detail

QC 1st Bundle 2, QA 1st Bundle 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (4 Major), DA Exceed seam allowance (1 Major), EC Asymmetry (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: DB Run-off stitching (3), DJ Pleat (2), CC Skip stitch (1), GB Missing sewing operation (1), AB Shading (1); Both: ED Gathering crease (1/5), CB Broken stitch (4/2); DHU QC 1st Bundle 75.0% / QA 1st Bundle 75.0%

Caught in earlier stages

CC Skip stitch (96), ED Gathering crease (95), CE Broken seam (20), EC Asymmetry (11), AC Fabric hole (9) did not reach later stages

Found before bulk production (Pre-final): 2

BD Snagging, DJ Pleat: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—75.0%
QC Inline4 reports
required on prod. days 4/28 (14%)
—23.5%
QC Endline14 days—11.4%
Shipment Sample1 reports1—
Pre-final1 reports111.2%
Final Random2 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS159.6%
1900 / 8 days
—PASS
07/11–07/20
BA Thread ends, ED Gathering crease, CC Skip stitch
CS2513.3%
1900 / 6 days
—PASS
06/30–07/08
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS158164 (25%)8407/15, 07/16, 07/17, 07/18, 07/20
CS256120 (0%)6607/01, 07/02, 07/03, 07/04, 07/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SamplePre-finalFinal Random
BA Thread ends116724
CC Skip stitch1194
ED Gathering crease15584
AD Fabric stains4125144
DB Run-off stitching3181
Others (no detail)2118
CE Broken seam128
CB Broken stitch4262
260865 GECL · CS03/CS11/CS17 · Due 08/19Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/11–07/13QC 1st Bundle2 reports
07/13QA 1st Bundle2 reports
4/26QC Inlineactual/required · 15%
DHU 16.1%QC Endline10 days
No reportQA Inline
All FAILShipment Sample2 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty3,400 / 630
PDF reports12
Last report08/06

Cross-stage findings

Missed in earlier stages: 1

EA Unsmooth/puckering/bubbling (Shipment Sample 07/18): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/06): AD Fabric stains 2 (earlier 20 times), CB Broken stitch 1 (earlier 3 times)

Found earlier but still reached later stages: 4

EI Inaccurate/skewed stitching 1, EC Asymmetry 1, DJ Pleat 1, CC Skip stitch 2 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 2, Final Random 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (2 Major), DA Exceed seam allowance (1 Major), DJ Pleat (1 Major), GA Missing bartack/button (1 Major), DI High-low/uneven (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: DC Join stitching (4), EI Inaccurate/skewed stitching (2), GB Missing sewing operation (1); Both: AD Fabric stains (4/14), BA Thread ends (6/4), ED Gathering crease (6/3), EC Asymmetry (2/3), DF Twisted seam/skewing (2/2); DHU QC 1st Bundle 51.9% / QA 1st Bundle 87.5%

Caught in earlier stages

ED Gathering crease (37), DB Run-off stitching (11), DF Twisted seam/skewing (7), CA Thread tension (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—51.9%
QA 1st Bundle2 reports—87.5%
QC Inline4 reports
required on prod. days 4/26 (15%)
—13.7%
QC Endline10 days—16.1%
Shipment Sample2 reports2—
Final Random2 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0322.4%
1700 / 4 days
—PASS
07/11–07/21
BA Thread ends, AD Fabric stains, CC Skip stitch
CS179.8%
1651 / 8 days
—PASS
07/10–07/25
BA Thread ends, AD Fabric stains, ED Gathering crease
CS110.0%
10 / 1 days
——
07/17–07/17
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS178162 (12%)8607/14, 07/15, 07/16, 07/18, 07/25
CS03482 (25%)4207/11, 07/13, 07/14, 07/21
CS11120 (0%)1107/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SampleFinal Random
BA Thread ends64122293
AD Fabric stains4141718023
CC Skip stitch3852
ED Gathering crease63325
EC Asymmetry236121
DB Run-off stitching110
DF Twisted seam/skewing223
CB Broken stitch232
261213 LOGE · CP14 · Due 08/19Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
08/12QC 1st Bundle1 reports
08/12QA 1st Bundle1 reports
4/24QC Inlineactual/required · 17%
DHU 3.4%QC Endline12 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty8,500 / 8,500
PDF reports9
Last report08/24

Cross-stage findings

Missed in earlier stages: 2

CA Thread tension (Shipment Sample 08/14), DE Cut to broken (Shipment Sample 08/14): first found in later stages, never recorded before

QA Inline DHU is 15.6× QC Endline

QA Inline DHU 53.1% vs QC Endline 3.4% (08/12–08/25, 12 days, 8500 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/17): CC Skip stitch 2 (earlier 11 times), AD Fabric stains 2 (earlier 13 times)

Found earlier but still reached later stages: 3

EC Asymmetry 4, CB Broken stitch 3, ED Gathering crease 2 pcs (later stages total)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

QC Endline data errors: 12

08/12 CP14 261213 (defective pcs 50 > defects 26), 08/13 CP14 261213 (defective pcs 46 > defects 24), 08/14 CP14 261213 (defective pcs 54 > defects 23), 08/15 CP14 261213 (defective pcs 33 > defects 11)…

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (2 Major), HB Missing/wrong trims (2 Major), BB Missing cut seam allowance (2 Major); Only QC 1st Bundle: CC Skip stitch (4), CE Broken seam (2), CG Grinning (2), DB Run-off stitching (2), CB Broken stitch (1); Both: BA Thread ends (7/3), EC Asymmetry (1/5); DHU QC 1st Bundle 95.0% / QA 1st Bundle 70.0%

Caught in earlier stages

CE Broken seam (21), DJ Pleat (20), DB Run-off stitching (19), CG Grinning (15), EB Measurement issue (13) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—95.0%
QA 1st Bundle1 reports—70.0%
QC Inline4 reports
required on prod. days 4/24 (17%)
—52.3%
QC Endline12 days—3.4%
QA Inline1 reports153.1%
Shipment Sample1 reports1—
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP143.4%
8500 / 12 days
53.1%PASS
08/12–08/25
BA Thread ends, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1412244 (17%)11908/20, 08/21, 08/22, 08/24, 08/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends7313115
AD Fabric stains250212
CC Skip stitch44112
EC Asymmetry1512674
CE Broken seam2163
ED Gathering crease1712
DJ Pleat20
DB Run-off stitching2413
261214 LOGE · CB19/CB25/CB26… · Due 08/19Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
08/08–08/10QC 1st Bundle2 reports
08/07QA 1st Bundle1 reports
18/58QC Inlineactual/required · 31%
DHU 10.4%QC Endline19 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty9,000 / 9,000
PDF reports34
Last report08/29

Cross-stage findings

Missed in earlier stages: 1

DM Gapping (Shipment Sample 08/18): first found in later stages, never recorded before

Recurring in small numbers: 5

Latest Final Random (08/29): CC Skip stitch 2 (earlier 25 times), DE Cut to broken 1 (earlier 6 times), CE Broken seam 1 (earlier 22 times), GA Missing bartack/button 1 (earlier 4 times), BB Missing cut seam allowance 1 (earlier 3 times)

Found earlier but still reached later stages: 3

EI Inaccurate/skewed stitching 1, EC Asymmetry 2, ED Gathering crease 4 pcs (later stages total)

1 defects recorded as 'Others' without detail

PP Sample 1; cannot compare across stages

QC Endline data errors: 6

08/14 CB19 261214-L (defective pcs 57 > defects 40), 08/14 CB19 261214-S (defective pcs 104 > defects 60), 08/15 CB19 261214-S (defective pcs 18 > defects 10), 08/19 CB19 261214-S (defective pcs 37 > defects 30)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AJ Poor embroidery (2 Major), BA Thread ends (2 Major), DF Twisted seam/skewing (2 Major), EB Measurement issue (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: CC Skip stitch (2), DD Thread not straight/waving (2), DA Exceed seam allowance (2), DJ Pleat (2), DB Run-off stitching (2), CB Broken stitch (2), DE Cut to broken (1), CE Broken seam (1); Both: EC Asymmetry (2/4), AC Fabric hole (1/2); DHU QC 1st Bundle 81.0% / QA 1st Bundle 107.7%

Caught in earlier stages

DB Run-off stitching (49), DF Twisted seam/skewing (47), AD Fabric stains (42), CB Broken stitch (41), DJ Pleat (37) did not reach later stages

Report line differs from production line

QGR2637136 Final Random (08/29) CB15; actual production line(s) CB19/CB25/CB26/CB28/CB30 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—81.0%
QA 1st Bundle1 reports—107.7%
QC Inline25 reports
required on prod. days 18/58 (31%)
—34.0%
QC Endline19 days—10.4%
QA Inline3 reports351.0%
Shipment Sample1 reports1—
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB267.0%
3258 / 12 days
53.1%—
08/11–08/31
CC Skip stitch, BA Thread ends, DB Run-off stitching
CB1915.9%
2195 / 12 days
46.9%—
08/08–08/31
BA Thread ends, EC Asymmetry, DF Twisted seam/skewing
CB280.0%
60 / 3 days
——
08/19–09/04
—
CB250.0%
20 / 1 days
——
09/01–09/01
—
CB300.0%
20 / 1 days
——
08/28–08/28
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1912249 (38%)12308/18, 08/19, 08/20, 08/21, 08/31
CB2612249 (38%)12308/25, 08/26, 08/28, 08/29, 08/31
CB28360 (0%)3308/19, 08/29, 09/04
CB25120 (0%)1109/01
CB30120 (0%)1108/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends212188513
CC Skip stitch22214912
EC Asymmetry124326072
CE Broken seam150131
DB Run-off stitching231151
DF Twisted seam/skewing23411
AD Fabric stains537
CB Broken stitch2372
261215 LOGE · CP07/CP08/CP10… · Due 08/19Final Random PASS 1 later-stage PDF report(s) blank
No resultPP Sample1 reports
No reportPilot Run
08/11–08/22QC 1st Bundle2 reports
08/10QA 1st Bundle1 reports
10/52QC Inlineactual/required · 19%
DHU 8.7%QC Endline17 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty12,000 / 12,000
PDF reports19
Last report08/26

Cross-stage findings

1 later-stage PDF report(s) blank

Final Random 08/19 QGR2635104 (FAIL); please check if the report was completed

QA Inline DHU is 11.5× QC Endline

QA Inline DHU 100.0% vs QC Endline 8.7% (08/08–08/28, 17 days, 11940 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/20): CB Broken stitch 2 (earlier 20 times), ED Gathering crease 2 (earlier 25 times)

Found earlier but still reached later stages: 5

EC Asymmetry 4, EI Inaccurate/skewed stitching 8, EA Unsmooth/puckering/bubbling 4, DE Cut to broken 2, DJ Pleat 2 pcs (later stages total)

4 defects recorded as 'Others' without detail

Shipment Sample 4; cannot compare across stages

QC Endline data errors: 23

08/08 CP13 261215 (defective pcs 15 > defects 3), 08/10 CP13 261215 (defective pcs 26 > defects 13), 08/11 CP13 261215 (defective pcs 66 > defects 30), 08/12 CP13 261215 (defective pcs 96 > defects 41)…

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (4 Major), AC Fabric hole (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: BA Thread ends (8), CB Broken stitch (4), DE Cut to broken (3), DD Thread not straight/waving (2), DJ Pleat (2), DF Twisted seam/skewing (1); Both: EC Asymmetry (3/7), EA Unsmooth/puckering/bubbling (2/4), CG Grinning (4/1), CC Skip stitch (2/1), CE Broken seam (2/1); DHU QC 1st Bundle 82.5% / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (327), CG Grinning (43), CE Broken seam (19), DA Exceed seam allowance (10), DL Wrong trim position (8) did not reach later stages

Report line differs from production line

QGR2635459 Final Random (08/20) CP18; actual production line(s) CP07/CP08/CP10/CP13/CP20 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—82.5%
QA 1st Bundle1 reports—100.0%
QC Inline10 reports
required on prod. days 10/52 (19%)
—69.7%
QC Endline17 days—8.7%
QA Inline1 reports1100.0%
Shipment Sample2 reports2—
Final Random2 reports01.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP138.0%
9923 / 17 days
—PASS
08/08–08/28
BA Thread ends, CC Skip stitch, ED Gathering crease
CP2012.6%
1757 / 5 days
100.0%—
08/21–08/26
BA Thread ends, CC Skip stitch, ED Gathering crease
CP107.5%
200 / 2 days
——
08/25–08/28
ED Gathering crease, BA Thread ends, CC Skip stitch
CP0815.0%
40 / 1 days
——
08/24–08/24
BA Thread ends, CC Skip stitch, EC Asymmetry
CP0715.0%
20 / 1 days
——
08/13–08/13
AD Fabric stains, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1317347 (21%)171008/22, 08/24, 08/25, 08/26, 08/28
CP205103 (30%)5208/21, 08/22, 08/24, 08/25, 08/26
CP10240 (0%)2208/25, 08/28
CP07120 (0%)1108/13
CP08120 (0%)1108/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends886337514
CC Skip stitch21163071
ED Gathering crease2277522
EC Asymmetry537611014
CG Grinning4138
CB Broken stitch42732
EA Unsmooth/puckering/bubbling124474
DJ Pleat21512
261235 OSIT · CS01 · Due 08/19Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/27QA 1st Bundle1 reports
2/10QC Inlineactual/required · 20%
DHU 14.8%QC Endline5 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports7
Last report08/13

Cross-stage findings

Missed in earlier stages: 1

EE Raw edge (Shipment Sample 08/03): first found in later stages, never recorded before

QA Inline DHU is 2.8× QC Inline

QA Inline DHU 34.4% vs QC Inline 12.5%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (08/13): ED Gathering crease 1 (earlier 8 times), AD Fabric stains 1 (earlier 4 times)

Found earlier but still reached later stages: 4

EC Asymmetry 1, CB Broken stitch 2, CG Grinning 1, EH Poor lamination/bonding 2 pcs (later stages total)

7 defects recorded as 'Others' without detail

QA 1st Bundle 5, QA Inline 1, Final Random 1; cannot compare across stages

Caught in earlier stages

CC Skip stitch (40), Q94 Glue marks (15), DI High-low/uneven (5) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—76.9%
QC Inline2 reports
required on prod. days 2/10 (20%)
—12.5%
QC Endline5 days—14.8%
QA Inline1 reports134.4%
Shipment Sample1 reports1—
Pre-final1 reports112.5%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0114.8%
869 / 5 days
34.4%PASS
07/27–08/11
CC Skip stitch, Others (no detail), ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS015102 (20%)5307/27, 07/28, 07/29, 08/10, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
CC Skip stitch2362
ED Gathering crease1523231
Others (no detail)52711
BA Thread ends2213154
AD Fabric stains213131
Q94 Glue marks15
CB Broken stitch312
DI High-low/uneven41
261263 OSIT · CS01/CS02 · Due 08/19Final Random PASS Missed in earlier stages: 2
No resultPP Sample1 reports
No reportPilot Run
07/20QC 1st Bundle1 reports
07/18QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 14.4%QC Endline5 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports10
Last report08/10

Cross-stage findings

Missed in earlier stages: 2

CE Broken seam (Final Random 08/10), IA 2nd operation issue (Final Random 08/10): first found in later stages, never recorded before

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 45.3% vs QC Inline 25.0%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (08/10): CB Broken stitch 1 (earlier 7 times)

Found earlier but still reached later stages: 3

CG Grinning 2, EC Asymmetry 6, AB Shading 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 10); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (3 Major), CC Skip stitch (1 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major), AD Fabric stains (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: EC Asymmetry (3), EE Raw edge (2), FC Wrong label (2); Both: BA Thread ends (3/2); DHU QC 1st Bundle 31.2% / QA 1st Bundle 55.0%

Caught in earlier stages

CC Skip stitch (52), ED Gathering crease (37), Q92 HTL letters not clear (8), DI High-low/uneven (6), EB Measurement issue (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—31.2%
QA 1st Bundle1 reports—55.0%
QC Inline2 reports
required on prod. days 1/12 (8%)
—25.0%
QC Endline5 days—14.4%
QA Inline2 reports245.3%
Shipment Sample1 reports1—
Pre-final1 reports18.8%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0114.2%
1004 / 5 days
45.3%PASS
07/20–07/24
CC Skip stitch, Others (no detail), ED Gathering crease
CS0223.1%
13 / 1 days
——
07/20–07/20
CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS015101 (10%)5407/20, 07/21, 07/22, 07/23, 07/24
CS02120 (0%)1107/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
CC Skip stitch1645
Others (no detail)1403
ED Gathering crease1333
BA Thread ends32315265
CB Broken stitch33521
EC Asymmetry3442
AD Fabric stains12131
Q92 HTL letters not clear8
261482 OSIT · CS06/CS25 · Due 08/19Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/05QC 1st Bundle1 reports
08/05QA 1st Bundle1 reports
2/12QC Inlineactual/required · 17%
DHU 6.5%QC Endline6 days
All FAILQA Inline2 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty6,500 / 6,500
PDF reports8
Last report08/11

Cross-stage findings

Missed in earlier stages: 1

IA 2nd operation issue (Pre-final 08/07): first found in later stages, never recorded before

QA Inline DHU is 2.7× QC Inline

QA Inline DHU 26.6% vs QC Inline 10.0%; QC Inline may be missing defects

Recurring in small numbers: 5

Latest Final Random (08/11): EC Asymmetry 1 (earlier 8 times), ED Gathering crease 1 (earlier 7 times), CB Broken stitch 2 (earlier 6 times), CC Skip stitch 1 (earlier 5 times), DF Twisted seam/skewing 1 (earlier 5 times)

Found earlier but still reached later stages: 2

DJ Pleat 1, BB Missing cut seam allowance 1 pcs (later stages total)

12 defects recorded as 'Others' without detail

QC 1st Bundle 8, QA 1st Bundle 3, QA Inline 1; cannot compare across stages

QC Endline data errors: 3

08/05 CS06 261482 (defective pcs 97 > defects 89), 08/06 CS06 261482 (defective pcs 94 > defects 92), 08/07 CS06 261482 (defective pcs 154 > defects 137)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (3 Major), BA Thread ends (2 Major), EA Unsmooth/puckering/bubbling (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: GB Missing sewing operation (3); Both: EC Asymmetry (8/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 55.0%

Caught in earlier stages

DB Run-off stitching (31), EA Uneven seam allowance (17), EA Unsmooth/puckering/bubbling (12), EB Measurement issue (10), Q93 Heat seal logo peeling off (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—55.0%
QC Inline2 reports
required on prod. days 2/12 (17%)
—10.0%
QC Endline6 days—6.5%
QA Inline2 reports226.6%
Pre-final1 reports03.5%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS066.6%
6497 / 5 days
26.6%PASS
08/05–08/10
CC Skip stitch, ED Gathering crease, BA Thread ends
CS250.0%
101 / 1 days
——
07/16–07/16
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS065102 (20%)5308/05, 08/06, 08/07, 08/08, 08/10
CS25120 (0%)1107/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
CC Skip stitch13211
BA Thread ends2282278
ED Gathering crease3851
EC Asymmetry812831
DB Run-off stitching31
EA Uneven seam allowance17
Others (no detail)8331
DF Twisted seam/skewing141
261385 RGOR · CB23 · Due 08/21Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/05QC 1st Bundle1 reports
08/05QA 1st Bundle1 reports
4/20QC Inlineactual/required · 20%
DHU 4.7%QC Endline10 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,600 / 2,600
PDF reports8
Last report08/22

Cross-stage findings

Missed in earlier stages: 1

CD Needle hole (Final Random 08/22): first found in later stages, never recorded before

QA Inline DHU is 9.3× QC Endline

QA Inline DHU 43.8% vs QC Endline 4.7% (08/05–08/18, 10 days, 2677 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 2

CB Broken stitch 1, DE Cut to broken 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: FA Wrong material (2 Major), DD Thread not straight/waving (2 Major), CH Incorrect stitch density (1 Major), CC Skip stitch (1 Major), DJ Pleat (1 Major), AH Sharp edge (1 Major); Only QC 1st Bundle: DB Run-off stitching (3), AD Fabric stains (2), BB Missing cut seam allowance (2), EA Unsmooth/puckering/bubbling (1); Both: BA Thread ends (2/2), CB Broken stitch (2/1), EC Asymmetry (1/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%

Caught in earlier stages

AC Fabric hole (24), CC Skip stitch (14), BB Missing cut seam allowance (13), DB Run-off stitching (9), CH Incorrect stitch density (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—100.0%
QC Inline4 reports
required on prod. days 4/20 (20%)
—42.2%
QC Endline10 days—4.7%
QA Inline1 reports143.8%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB234.7%
2677 / 10 days
43.8%PASS
08/05–08/18
BA Thread ends, AC Fabric hole, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2310204 (20%)10608/11, 08/12, 08/13, 08/17, 08/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends2289723
AC Fabric hole24
CC Skip stitch1661
BB Missing cut seam allowance292
DB Run-off stitching36
CH Incorrect stitch density15
DJ Pleat14
AD Fabric stains22
261386 RGOR · CB31 · Due 08/21No final QA Inline DHU is 10.4× QC Endline
No reportPP Sample
No reportPilot Run
07/31QC 1st Bundle1 reports
07/31QA 1st Bundle1 reports
2/4QC Inlineactual/required · 50%
DHU 3.6%QC Endline2 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,660 / 1,660
PDF reports6
Last report08/03

Cross-stage findings

QA Inline DHU is 10.4× QC Endline

QA Inline DHU 37.5% vs QC Endline 3.6% (08/01–08/03, 2 days, 1231 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 5), DD Thread not straight/waving (QA 4); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), EA Unsmooth/puckering/bubbling (2 Major), CE Broken seam (2 Major), EB Measurement issue (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: CB Broken stitch (1); Both: EC Asymmetry (3/3), DJ Pleat (3/1); DHU QC 1st Bundle 53.8% / QA 1st Bundle 92.3%

Caught in earlier stages

CC Skip stitch (28), EC Asymmetry (17), BA Thread ends (15), DJ Pleat (14), CE Broken seam (11) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—53.8%
QA 1st Bundle1 reports—92.3%
QC Inline2 reports
required on prod. days 2/4 (50%)
—34.0%
QC Endline2 days—3.6%
QA Inline2 reports237.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB313.6%
1231 / 2 days
37.5%—
08/01–08/03
CC Skip stitch, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB31242 (50%)2008/01, 08/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
CC Skip stitch28
EC Asymmetry3365
BA Thread ends2112
DJ Pleat3164
CE Broken seam281
DB Run-off stitching61
ED Gathering crease51
EI Inaccurate/skewed stitching13
261387 RGOR · CB30 · Due 08/21Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/12QC 1st Bundle1 reports
08/12QA 1st Bundle1 reports
1/14QC Inlineactual/required · 7%
DHU 12.5%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,630 / 1,630
PDF reports5
Last report08/22

Cross-stage findings

Missed in earlier stages: 1

DE Cut to broken (Final Random 08/22): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/22): DJ Pleat 1 (earlier 3 times)

Found earlier but still reached later stages: 1

CC Skip stitch 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 3); zero in QC Endline records

QC Endline data errors: 6

08/12 CB30 261387-L1 (defective pcs 9 > defects 5), 08/12 CB30 261387-S (defective pcs 9 > defects 4), 08/13 CB30 261387-S (defective pcs 72 > defects 66), 08/15 CB30 261387-S (defective pcs 44 > defects 36)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CA Thread tension (2 Major), BA Thread ends (2 Major); Only QC 1st Bundle: EC Asymmetry (2), CC Skip stitch (1), DI High-low/uneven (1), CB Broken stitch (1); Both: EA Unsmooth/puckering/bubbling (1/2), DJ Pleat (1/1); DHU QC 1st Bundle 87.5% / QA 1st Bundle 53.8%

Caught in earlier stages

ED Gathering crease (13), EC Asymmetry (8), DI High-low/uneven (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—87.5%
QA 1st Bundle1 reports—53.8%
QC Inline1 reports
required on prod. days 1/14 (7%)
—50.0%
QC Endline7 days—12.5%
QA Inline1 reports131.2%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3012.5%
1656 / 7 days
31.2%PASS
08/12–08/19
BA Thread ends, ED Gathering crease, CD Needle hole

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB307141 (7%)7608/14, 08/15, 08/17, 08/18, 08/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends21913
ED Gathering crease13
EC Asymmetry233
DJ Pleat1141
DI High-low/uneven132
CC Skip stitch131
CA Thread tension22
EA Unsmooth/puckering/bubbling12
261390 RGOR · CP19 · Due 08/21Final Random PASS QA Inline DHU is 5.3× QC Endline
No reportPP Sample
No reportPilot Run
08/19QC 1st Bundle1 reports
08/19QA 1st Bundle1 reports
2/12QC Inlineactual/required · 17%
DHU 11.2%QC Endline6 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,470 / 2,470
PDF reports6
Last report08/24

Cross-stage findings

QA Inline DHU is 5.3× QC Endline

QA Inline DHU 59.4% vs QC Endline 11.2% (08/19–08/25, 6 days, 2546 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (08/24): CB Broken stitch 1 (earlier 3 times), AD Fabric stains 1 (earlier 6 times), CC Skip stitch 1 (earlier 4 times)

Main QA defects never recorded by QC Endline: 1

DD Thread not straight/waving (QA 4); zero in QC Endline records

QC Endline data errors: 3

08/19 CP19 261390-S (defective pcs 55 > defects 13), 08/20 CP19 261390-S (defective pcs 170 > defects 139), 08/21 CP19 261390-S (defective pcs 86 > defects 76)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (3 Major), EI Inaccurate/skewed stitching (2 Major), ED Gathering crease (2 Major), EC Asymmetry (2 Major); Only QC 1st Bundle: BB Missing cut seam allowance (2), CB Broken stitch (2), DJ Pleat (1), AC Fabric hole (1); Both: BA Thread ends (9/3); DHU QC 1st Bundle 75.0% / QA 1st Bundle 60.0%

Caught in earlier stages

ED Gathering crease (51), CE Broken seam (16), EB Measurement issue (11), BB Missing cut seam allowance (8), DJ Pleat (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—60.0%
QC Inline2 reports
required on prod. days 2/12 (17%)
—67.2%
QC Endline6 days—11.2%
QA Inline1 reports159.4%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1911.2%
2546 / 6 days
59.4%PASS
08/19–08/25
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP196122 (17%)6408/20, 08/21, 08/22, 08/24, 08/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends93319623
CC Skip stitch791
ED Gathering crease2481
AD Fabric stains23711
CE Broken seam3103
EB Measurement issue11
BB Missing cut seam allowance233
DJ Pleat123
261392 RGOR · CP11/CP19 · Due 08/21No final QA Inline DHU is 6.5× QC Endline
No reportPP Sample
No reportPilot Run
08/25QC 1st Bundle1 reports
08/24QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 8.6%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,430 / 1,430
PDF reports3
Last report08/25

Cross-stage findings

QA Inline DHU is 6.5× QC Endline

QA Inline DHU 56.2% vs QC Endline 8.6% (08/22–08/26, 4 days, 1472 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

QC Endline data errors: 3

08/24 CP11 261392 (defective pcs 78 > defects 43), 08/25 CP11 261392 (defective pcs 189 > defects 82), 08/26 CP11 261392 (defective pcs 5 > defects 1)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (3 Major), EI Inaccurate/skewed stitching (2 Major), CG Grinning (2 Major), EA Unsmooth/puckering/bubbling (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: CC Skip stitch (2), ED Gathering crease (2), DI High-low/uneven (2), DB Run-off stitching (2), DD Thread not straight/waving (1); Both: BA Thread ends (6/3), CB Broken stitch (2/1); DHU QC 1st Bundle 85.0% / QA 1st Bundle 65.0%

Caught in earlier stages

BA Thread ends (76), CC Skip stitch (50), EC Asymmetry (24) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—85.0%
QA 1st Bundle1 reports—65.0%
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—8.6%
QA Inline1 reports156.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP118.7%
1452 / 3 days
56.2%—
08/24–08/26
BA Thread ends, CC Skip stitch, EC Asymmetry
CP190.0%
20 / 1 days
——
08/22–08/22
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP11360 (0%)3308/24, 08/25, 08/26
CP19120 (0%)1108/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA Inline
BA Thread ends635710
CC Skip stitch248
EC Asymmetry3192
EI Inaccurate/skewed stitching22
CG Grinning22
CB Broken stitch21
ED Gathering crease21
BB Missing cut seam allowance11
261393 RGOR · CP11 · Due 08/21No final QA Inline DHU is 7.8× QC Endline
No reportPP Sample
No reportPilot Run
08/19QC 1st Bundle1 reports
08/19QA 1st Bundle1 reports
0/10QC Inlineactual/required · 0%
DHU 5.2%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty4,620 / 4,620
PDF reports3
Last report08/22

Cross-stage findings

QA Inline DHU is 7.8× QC Endline

QA Inline DHU 40.6% vs QC Endline 5.2% (08/19–08/24, 5 days, 4760 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 3); zero in QC Endline records

QC Endline data errors: 5

08/19 CP11 261393 (defective pcs 42 > defects 25), 08/20 CP11 261393 (defective pcs 86 > defects 61), 08/21 CP11 261393 (defective pcs 102 > defects 58), 08/22 CP11 261393 (defective pcs 86 > defects 59)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (3 Major), CE Broken seam (2 Major), EC Asymmetry (2 Major), DD Thread not straight/waving (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DB Run-off stitching (4), AD Fabric stains (2), DJ Pleat (2), DE Cut to broken (1); Both: BA Thread ends (5/3), DI High-low/uneven (2/4), EI Inaccurate/skewed stitching (3/1); DHU QC 1st Bundle 95.0% / QA 1st Bundle 85.0%

Caught in earlier stages

BA Thread ends (121), CC Skip stitch (112), ED Gathering crease (23), DI High-low/uneven (6), EC Asymmetry (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—95.0%
QA 1st Bundle1 reports—85.0%
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—5.2%
QA Inline1 reports140.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP115.2%
4760 / 5 days
40.6%—
08/19–08/24
CC Skip stitch, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP115100 (0%)5508/19, 08/20, 08/21, 08/22, 08/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA Inline
BA Thread ends531103
CC Skip stitch1102
ED Gathering crease23
DI High-low/uneven24
EC Asymmetry23
EI Inaccurate/skewed stitching31
DB Run-off stitching4
AD Fabric stains22
260116 SAIN · CS04/CS21/CS24 · Due 08/24Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/18QC Inlineactual/required · 0%
DHU 11.7%QC Endline8 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty5,575 / 1,595
PDF reports3
Last report08/10

Cross-stage findings

Missed in earlier stages: 2

EI Inaccurate/skewed stitching (Final Random 08/10), CB Broken stitch (Final Random 08/10): first found in later stages, never recorded before

1 later-stage PDF report(s) blank

Final Random 08/07 QGR2632727 (FAIL); please check if the report was completed

Recurring in small numbers: 1

Latest Final Random (08/10): EC Asymmetry 1 (earlier 5 times)

Found earlier but still reached later stages: 1

AD Fabric stains 1 pcs (later stages total)

QC Endline data errors: 2

06/04 CS04 260116 (defective pcs 113 > defects 112), 07/30 CS24 260116 (defective pcs 36 > defects 10)

Caught in earlier stages

CC Skip stitch (212), DB Run-off stitching (33), ED Gathering crease (14) did not reach later stages

Report line differs from production line

QGR2632727 Final Random (08/07) CS15; actual production line(s) CS04/CS21/CS24 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/18 (0%)
——
QC Endline8 days—11.7%
QA Inline1 reports121.9%
Final Random2 reports02.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0412.6%
4378 / 6 days
——
06/01–06/06
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS242.6%
389 / 2 days
21.9%—
07/29–07/30
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS210.0%
21 / 1 days
—PASS
06/02–06/02
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS046120 (0%)6606/02, 06/03, 06/04, 06/05, 06/06
CS24240 (0%)2207/29, 07/30
CS21120 (0%)1106/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineQA InlineFinal Random
BA Thread ends2743
CC Skip stitch2111
DB Run-off stitching33
Others (no detail)21
ED Gathering crease113
EC Asymmetry1121
AD Fabric stains11
EI Inaccurate/skewed stitching2
260117 SAIN · CS04/CS10/CS21… · Due 08/24Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/18QC Inlineactual/required · 0%
DHU 10.2%QC Endline9 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty8,750 / 1,245
PDF reports4
Last report08/07

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 08/07): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/07): AD Fabric stains 2 (earlier 4 times), EC Asymmetry 1 (earlier 3 times)

Found earlier but still reached later stages: 1

CC Skip stitch 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

Caught in earlier stages

DB Run-off stitching (11), ED Gathering crease (5) did not reach later stages

Report line differs from production line

QGR2632819 Final Random (08/07) CS11; actual production line(s) CS04/CS10/CS21/CS24 (cards show production lines only)

Found before bulk production (Final Random): 2

EA Unsmooth/puckering/bubbling, EI Inaccurate/skewed stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/18 (0%)
——
QC Endline9 days—10.2%
QA Inline1 reports125.0%
Final Random3 reports04.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0412.2%
689 / 4 days
—PASS
06/02–06/08
BA Thread ends, CC Skip stitch, AD Fabric stains
CS248.6%
510 / 2 days
25.0%—
07/29–07/31
BA Thread ends, CC Skip stitch, AD Fabric stains
CS218.5%
282 / 2 days
——
06/01–06/04
BA Thread ends, CC Skip stitch, ED Gathering crease
CS100.0%
4 / 1 days
——
06/20–06/20
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS04480 (0%)4406/02, 06/05, 06/06, 06/08
CS21240 (0%)2206/01, 06/04
CS24240 (0%)2207/29, 07/31
CS10120 (0%)1106/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineQA InlineFinal Random
BA Thread ends71116
CC Skip stitch4321
AD Fabric stains166
DB Run-off stitching11
EC Asymmetry231
EA Unsmooth/puckering/bubbling5
ED Gathering crease5
Others (no detail)4
254204 LOGE · CS20 · Due 08/26Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/27QC 1st Bundle1 reports
07/28QA 1st Bundle1 reports
9/30QC Inlineactual/required · 30%
DHU 14.7%QC Endline15 days
All FAILQA Inline3 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty4,500 / 4,500
PDF reports16
Last report08/25

Cross-stage findings

Missed in earlier stages: 1

BB Missing cut seam allowance (Pre-final 07/29): first found in later stages, never recorded before

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 41.7% vs QC Inline 24.7%; QC Inline may be missing defects

Recurring in small numbers: 4

Latest Final Random (08/25): CB Broken stitch 2 (earlier 8 times), BA Thread ends 1 (earlier 28 times), CE Broken seam 2 (earlier 6 times), CC Skip stitch 1 (earlier 21 times)

Found earlier but still reached later stages: 2

EA Unsmooth/puckering/bubbling 2, DJ Pleat 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DJ Pleat (1 Major), ED Gathering crease (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: DI High-low/uneven (3), EA Unsmooth/puckering/bubbling (2), DK Twisted shoulder strap (1), CB Broken stitch (1); Both: BA Thread ends (4/2), EI Inaccurate/skewed stitching (2/2), EC Asymmetry (1/2), DA Exceed seam allowance (1/1), DE Cut to broken (1/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 55.0%

Caught in earlier stages

EB Measurement issue (78), EC Asymmetry (27), EI Inaccurate/skewed stitching (25), DA Exceed seam allowance (24), DE Cut to broken (18) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—55.0%
QC Inline9 reports
required on prod. days 9/30 (30%)
—24.7%
QC Endline15 days—14.7%
QA Inline3 reports341.7%
Pre-final1 reports13.5%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2014.7%
4500 / 15 days
41.7%PASS
07/25–08/11
BA Thread ends, CC Skip stitch, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2015309 (30%)15608/06, 08/07, 08/08, 08/10, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends42574421156
CC Skip stitch69931
EB Measurement issue78
EA Unsmooth/puckering/bubbling292212
EC Asymmetry12195
EI Inaccurate/skewed stitching22174
DA Exceed seam allowance11202
DE Cut to broken11610
254205 LOGE · CP03/CP04/CP08… · Due 08/26No final QA Inline DHU is 5.8× QC Inline
No reportPP Sample
No reportPilot Run
08/01–08/12QC 1st Bundle2 reports
08/01–08/12QA 1st Bundle2 reports
7/96QC Inlineactual/required · 7%
DHU 5.5%QC Endline34 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty4,500 / 4,500
PDF reports12
Last report08/12

Cross-stage findings

QA Inline DHU is 5.8× QC Inline

QA Inline DHU 50.0% vs QC Inline 8.6%; QC Inline may be missing defects

QA Inline DHU is 9.1× QC Endline

QA Inline DHU 50.0% vs QC Endline 5.5% (06/05–09/11, 34 days, 13260 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

QC Endline data errors: 30

06/06 CP12 254205-3 (defective pcs 40 > defects 16), 06/08 CP20 254205-3 (defective pcs 12 > defects 6), 06/10 CP11 254205-3 (defective pcs 10 > defects 4), 06/10 CP12 254205-3 (defective pcs 5 > defects 4)…

Duplicate report numbers

QGR2633597 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (5 Major), ED Gathering crease (3 Major), EG Wrong panel assembly (3 Major), DA Exceed seam allowance (2 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: CA Thread tension (7), CG Grinning (2), DF Twisted seam/skewing (2), GA Missing bartack/button (1); Both: BA Thread ends (9/5), EC Asymmetry (5/8), DJ Pleat (5/3), CE Broken seam (3/2), EI Inaccurate/skewed stitching (1/1); DHU QC 1st Bundle 87.5% / QA 1st Bundle 82.5%

Caught in earlier stages

BA Thread ends (352), CC Skip stitch (173), ED Gathering crease (132), EA Uneven seam allowance (46), EB Measurement issue (39) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—87.5%
QA 1st Bundle2 reports—82.5%
QC Inline7 reports
required on prod. days 7/96 (7%)
—8.6%
QC Endline34 days—5.5%
QA Inline1 reports150.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP188.0%
5100 / 12 days
——
06/19–09/11
BA Thread ends, CC Skip stitch, ED Gathering crease
CP095.4%
4500 / 11 days
50.0%—
08/01–08/13
BA Thread ends, ED Gathering crease, EB Measurement issue
CP112.0%
1240 / 8 days
——
06/09–07/09
BA Thread ends, CC Skip stitch
CP100.3%
940 / 4 days
——
06/22–06/30
BA Thread ends
CP124.7%
760 / 4 days
——
06/06–06/12
BA Thread ends, CC Skip stitch, CE Broken seam
CP190.9%
220 / 3 days
——
06/25–07/10
BA Thread ends, CC Skip stitch
CP203.0%
200 / 2 days
——
06/08–06/09
BA Thread ends
CP030.0%
100 / 1 days
——
06/05–06/05
—
CP130.0%
100 / 1 days
——
06/09–06/09
—
CP080.0%
60 / 1 days
——
06/08–06/08
—
CP040.0%
40 / 1 days
——
06/10–06/10
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1812240 (0%)121208/14, 08/15, 08/17, 08/18, 09/11
CP0911227 (32%)10508/07, 08/08, 08/10, 08/11, 08/13
CP118160 (0%)8806/25, 06/26, 06/27, 06/29, 07/09
CP10480 (0%)4406/22, 06/23, 06/25, 06/30
CP12480 (0%)4406/06, 06/10, 06/11, 06/12
CP19360 (0%)3306/25, 06/27, 07/10
CP20240 (0%)2206/08, 06/09
CP03120 (0%)1106/05
CP04120 (0%)1106/10
CP08120 (0%)1106/08
CP13120 (0%)1106/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends95372983
CC Skip stitch5168
ED Gathering crease34125
EA Uneven seam allowance46
EB Measurement issue39
EA Unsmooth/puckering/bubbling5245
CE Broken seam321673
DJ Pleat53193
260249 MKSC · CB17 · Due 08/26Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/08QC 1st Bundle1 reports
07/09QA 1st Bundle1 reports
2/22QC Inlineactual/required · 9%
DHU 39.8%QC Endline11 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,300 / 700
PDF reports10
Last report08/20

Cross-stage findings

Missed in earlier stages: 1

DF Twisted seam/skewing (Final Random 08/20): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/20): BA Thread ends 1 (earlier 4 times)

Found earlier but still reached later stages: 3

BB Missing cut seam allowance 1, DJ Pleat 1, CB Broken stitch 1 pcs (later stages total)

6 defects recorded as 'Others' without detail

QA 1st Bundle 3, Final Random 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (1 Major), CE Broken seam (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CA Thread tension (1 Major); Only QC 1st Bundle: ED Gathering crease (3), BA Thread ends (2), CC Skip stitch (1), EB Measurement issue (1), DA Exceed seam allowance (1); Both: EC Asymmetry (1/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 61.5%

Caught in earlier stages

EB Measurement issue (77), AD Fabric stains (30), AC Fabric hole (30), ED Gathering crease (29), EA Unsmooth/puckering/bubbling (14) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—61.5%
QC Inline5 reports
required on prod. days 2/22 (9%)
—39.2%
QC Endline11 days—39.8%
QA Inline1 reports118.8%
Final Random2 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1739.8%
801 / 11 days
18.8%PASS
07/10–08/11
BA Thread ends, EB Measurement issue, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1711222 (9%)11907/24, 07/28, 08/04, 08/05, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends231802
EB Measurement issue1670
EC Asymmetry112921
AD Fabric stains30
AC Fabric hole30
ED Gathering crease3179
EA Unsmooth/puckering/bubbling113
DJ Pleat911
260252 MKSC · CB01/CB12/CB19 · Due 08/26Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run1 reports
No reportQC 1st Bundle
07/08QA 1st Bundle1 reports
3/20QC Inlineactual/required · 15%
DHU 4.5%QC Endline10 days
All FAILQA Inline3 reports
No resultShipment Sample1 reports
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty2,900 / 800
PDF reports14
Last report08/18

Cross-stage findings

Missed in earlier stages: 1

BD Snagging (Final Random 07/15): first found in later stages, never recorded before

QA Inline DHU is 6.0× QC Endline

QA Inline DHU 27.1% vs QC Endline 4.5% (07/08–08/15, 10 days, 1587 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/18): EA Unsmooth/puckering/bubbling 2 (earlier 6 times), CC Skip stitch 1 (earlier 6 times)

Found earlier but still reached later stages: 3

BB Missing cut seam allowance 1, AD Fabric stains 2, ED Gathering crease 1 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA Inline 4, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

Caught in earlier stages

DB Run-off stitching (23), CB Broken stitch (19), CG Grinning (10), EC Asymmetry (7), DD Thread not straight/waving (6) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run1 reports0—
QA 1st Bundle1 reports—84.6%
QC Inline4 reports
required on prod. days 3/20 (15%)
—39.0%
QC Endline10 days—4.5%
QA Inline3 reports327.1%
Shipment Sample1 reports0—
Final Random4 reports03.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB014.5%
1577 / 9 days
27.1%PASS
07/08–08/15
DB Run-off stitching, AD Fabric stains, BA Thread ends
CB190.0%
10 / 1 days
——
08/13–08/13
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB019183 (17%)9608/08, 08/10, 08/11, 08/14, 08/15
CB19120 (0%)1108/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
AD Fabric stains112022
BA Thread ends11526
DB Run-off stitching23
CB Broken stitch172
EA Unsmooth/puckering/bubbling11122
CC Skip stitch7311
ED Gathering crease101
CG Grinning37
260313 MKSC · CP03 · Due 08/26Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/24QA 1st Bundle1 reports
0/22QC Inlineactual/required · 0%
DHU 11.3%QC Endline11 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,811 / 1,100
PDF reports5
Last report08/21

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 07/31): first found in later stages, never recorded before

Found earlier but still reached later stages: 3

EC Asymmetry 2, CE Broken seam 1, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

20 defects recorded as 'Others' without detail

QA 1st Bundle 9, QA Inline 11; cannot compare across stages

QC Endline data errors: 7

07/24 CP03 260313A (defective pcs 49 > defects 20), 07/25 CP03 260313A (defective pcs 90 > defects 65), 07/27 CP03 260313A (defective pcs 69 > defects 40), 07/28 CP03 260313A (defective pcs 78 > defects 50)…

Caught in earlier stages

CC Skip stitch (78), DF Twisted seam/skewing (65), EA Uneven seam allowance (57), ED Gathering crease (52), DB Run-off stitching (5) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—80.0%
QC Inline0 reports
required on prod. days 0/22 (0%)
——
QC Endline11 days—11.3%
QA Inline2 reports239.1%
Final Random2 reports03.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0311.3%
2811 / 11 days
39.1%PASS
07/24–08/20
CC Skip stitch, DF Twisted seam/skewing, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0311220 (0%)111108/07, 08/08, 08/10, 08/15, 08/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
CC Skip stitch78
BA Thread ends35933
DF Twisted seam/skewing65
EA Uneven seam allowance57
ED Gathering crease4462
Others (no detail)911
EC Asymmetry322
DB Run-off stitching5
260319 MKSC · CMD01/CP01 · Due 08/26Final Random PASS QA Inline DHU is 2.1× QC Inline
No reportPP Sample
No reportPilot Run
07/17QC 1st Bundle1 reports
07/18QA 1st Bundle1 reports
0/20QC Inlineactual/required · 0%
DHU 4.8%QC Endline10 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,344 / 550
PDF reports8
Last report08/14

Cross-stage findings

QA Inline DHU is 2.1× QC Inline

QA Inline DHU 46.9% vs QC Inline 21.9%; QC Inline may be missing defects

QA Inline DHU is 9.8× QC Endline

QA Inline DHU 46.9% vs QC Endline 4.8% (07/17–07/30, 10 days, 1344 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/14): AD Fabric stains 1 (earlier 6 times)

Found earlier but still reached later stages: 6

EC Asymmetry 2, DF Twisted seam/skewing 1, DE Cut to broken 1, CB Broken stitch 1, BB Missing cut seam allowance 2, GA Missing bartack/button 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 3; cannot compare across stages

QC Endline data errors: 9

07/17 CP01 260319A (defective pcs 10 > defects 3), 07/18 CP01 260319A (defective pcs 28 > defects 5), 07/20 CP01 260319A (defective pcs 59 > defects 14), 07/20 CP01 260319B (defective pcs 43 > defects 8)…

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (3 Major), CG Grinning (3 Major), EI Inaccurate/skewed stitching (2 Major), CB Broken stitch (2 Major), ED Gathering crease (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: EC Asymmetry (2), DF Twisted seam/skewing (1), DB Run-off stitching (1), DE Cut to broken (1); Both: BA Thread ends (4/5), AD Fabric stains (1/1); DHU QC 1st Bundle 50.0% / QA 1st Bundle 95.0%

Caught in earlier stages

ED Gathering crease (20), DB Run-off stitching (6), CE Broken seam (6), CG Grinning (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—50.0%
QA 1st Bundle1 reports—95.0%
QC Inline2 reports
required on prod. days 0/20 (0%)
—21.9%
QC Endline10 days—4.8%
QA Inline1 reports146.9%
Shipment Sample1 reports1—
Final Random2 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP014.8%
1344 / 10 days
46.9%PASS
07/17–07/30
BA Thread ends, EC Asymmetry, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0110200 (0%)101007/24, 07/25, 07/28, 07/29, 07/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends4511255
EC Asymmetry210162
ED Gathering crease15113
AD Fabric stains11321
DB Run-off stitching15
CE Broken seam312
CG Grinning32
DE Cut to broken121
260320 MKSC · CB07/CB09/CB15… · Due 08/26Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No resultPilot Run3 reports
07/18QC 1st Bundle1 reports
07/18QA 1st Bundle1 reports
5/44QC Inlineactual/required · 11%
DHU 11.9%QC Endline20 days
All FAILQA Inline4 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty4,031 / 1,794
PDF reports18
Last report08/24

Cross-stage findings

Missed in earlier stages: 1

CF Pulling yarn (Final Random 08/24): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/24): CG Grinning 1 (earlier 10 times), CC Skip stitch 1 (earlier 22 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

15 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 11, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 7); zero in QC Endline records

Duplicate report numbers

QGR2628818 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (1 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major), DJ Pleat (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: CA Thread tension (2), AD Fabric stains (1), CB Broken stitch (1), BA Thread ends (1); Both: EC Asymmetry (4/4), EB Measurement issue (1/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (100), EC Asymmetry (96), Q61 Lace raw edge or broken lace (32), EB Measurement issue (28), CE Broken seam (21) did not reach later stages

Report line differs from production line

QGR2630693 Final Random (07/30) CB04; actual production line(s) CB07/CB09/CB15/CB30 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run3 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—100.0%
QC Inline5 reports
required on prod. days 5/44 (11%)
—25.2%
QC Endline20 days—11.9%
QA Inline4 reports432.2%
Final Random3 reports02.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1512.0%
3827 / 20 days
32.2%PASS
07/20–08/25
BA Thread ends, ED Gathering crease, EC Asymmetry
CB300.0%
23 / 2 days
——
07/29–08/24
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1520405 (12%)191608/20, 08/21, 08/22, 08/24, 08/25
CB30240 (0%)2207/29, 08/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends1716126
ED Gathering crease199
EC Asymmetry4415649
CC Skip stitch124542
Q61 Lace raw edge or broken lace32
EB Measurement issue112213
CE Broken seam6123
CG Grinning11231
260336 MKSC · CB19/CB20/CB30 · Due 08/26Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
07/10QC 1st Bundle1 reports
07/13QA 1st Bundle1 reports
19/58QC Inlineactual/required · 33%
DHU 21.1%QC Endline26 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty5,850 / 1,254
PDF reports29
Last report08/20

Cross-stage findings

Missed in earlier stages: 3

EI Inaccurate/skewed stitching (Shipment Sample 07/20), BD Snagging (Shipment Sample 07/20), AD Fabric stains (Shipment Sample 07/20): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/20): ED Gathering crease 1 (earlier 24 times)

Found earlier but still reached later stages: 4

DJ Pleat 1, EA Unsmooth/puckering/bubbling 3, DE Cut to broken 1, AC Fabric hole 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 1, Shipment Sample 1, QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

AB Shading (QA 10), EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), ED Gathering crease (1 Major), DI High-low/uneven (1 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: CE Broken seam (2), DJ Pleat (1); Both: EA Unsmooth/puckering/bubbling (2/3), EC Asymmetry (1/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 76.9%

Caught in earlier stages

EA Uneven seam allowance (322), Q61 Lace raw edge or broken lace (246), DB Run-off stitching (186), CC Skip stitch (120), EC Asymmetry (68) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—76.9%
QC Inline20 reports
required on prod. days 19/58 (33%)
—33.4%
QC Endline26 days—21.1%
QA Inline3 reports330.2%
Shipment Sample1 reports1—
Final Random3 reports02.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2021.3%
5730 / 26 days
30.2%PASS
07/11–08/12
EA Uneven seam allowance, Q61 Lace raw edge or broken lace, DB Run-off stitching
CB300.0%
30 / 3 days
——
07/25–08/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB20265219 (37%)26708/05, 08/06, 08/07, 08/08, 08/12
CB30360 (0%)3307/25, 07/29, 08/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
EA Uneven seam allowance322
Q61 Lace raw edge or broken lace246
DB Run-off stitching186
ED Gathering crease111432
CC Skip stitch7113
AC Fabric hole1141
BA Thread ends1761216
EC Asymmetry1146164
260337 MKSC · CB01/CB05/CB30 · Due 08/26Final Random PASS Missed in earlier stages: 3
No resultPP Sample1 reports
No resultPilot Run2 reports
07/15QC 1st Bundle1 reports
07/17QA 1st Bundle1 reports
11/52QC Inlineactual/required · 21%
DHU 70.6%QC Endline25 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty5,250 / 1,961
PDF reports22
Last report08/25

Cross-stage findings

Missed in earlier stages: 3

GA Missing bartack/button (Shipment Sample 07/22), DI High-low/uneven (Shipment Sample 07/22), EE Raw edge (Final Random 07/29): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (08/25): EC Asymmetry 1 (earlier 89 times), BA Thread ends 1 (earlier 57 times), CB Broken stitch 1 (earlier 5 times)

Found earlier but still reached later stages: 5

DA Exceed seam allowance 1, CE Broken seam 1, BB Missing cut seam allowance 1, AD Fabric stains 1, DJ Pleat 1 pcs (later stages total)

5 defects recorded as 'Others' without detail

PP Sample 1, QA 1st Bundle 3, QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (2 Major), CE Broken seam (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (3), EB Measurement issue (2), EA Unsmooth/puckering/bubbling (1); Both: EC Asymmetry (4/2); DHU QC 1st Bundle 76.9% / QA 1st Bundle 69.2%

Caught in earlier stages

CC Skip stitch (1266), CD Needle hole (800), EA Uneven seam allowance (113), ED Gathering crease (50), EB Measurement issue (28) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run2 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—69.2%
QC Inline12 reports
required on prod. days 11/52 (21%)
—42.1%
QC Endline25 days—70.6%
QA Inline1 reports125.0%
Shipment Sample1 reports1—
Final Random3 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0570.7%
5241 / 25 days
25.0%PASS
07/15–08/20
CC Skip stitch, CD Needle hole, EC Asymmetry
CB300.0%
7 / 1 days
——
08/05–08/05
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB05255011 (22%)251408/08, 08/10, 08/11, 08/13, 08/20
CB30120 (0%)1108/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
CC Skip stitch91257
CD Needle hole800
EC Asymmetry114261677121
BA Thread ends55337
Others (no detail)131621
EA Uneven seam allowance113
CE Broken seam128421
DA Exceed seam allowance3471
260742 GECL · CS14/CS22 · Due 08/26Final Random PASS Missed in earlier stages: 5
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/09QA 1st Bundle1 reports
2/20QC Inlineactual/required · 10%
DHU 11.9%QC Endline10 days
No reportQA Inline
All FAILShipment Sample2 reports
All PASSPre-final1 reports
All PASSFinal Random2 reports
Order/Ship qty2,040 / 510
PDF reports8
Last report08/10

Cross-stage findings

Missed in earlier stages: 5

AB Shading (Shipment Sample 07/08), EA Unsmooth/puckering/bubbling (Shipment Sample 07/08), CA Thread tension (Shipment Sample 07/08), DG Fastening loose/misplaced (Shipment Sample 07/14), AC Fabric hole (Final Random 07/15): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (08/10): BA Thread ends 2 (earlier 8 times), AD Fabric stains 1 (earlier 4 times), CC Skip stitch 1 (earlier 4 times)

Found earlier but still reached later stages: 5

DA Exceed seam allowance 1, EC Asymmetry 3, ED Gathering crease 3, CB Broken stitch 1, DB Run-off stitching 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

Pre-final 2, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 3); zero in QC Endline records

QC Endline data errors: 1

06/30 CS14 260742-2 (defective pcs 33 > defects 30)

Found before bulk production (Pre-final): 1

BB Missing cut seam allowance: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—55.0%
QC Inline2 reports
required on prod. days 2/20 (10%)
—48.4%
QC Endline10 days—11.9%
Shipment Sample2 reports2—
Pre-final1 reports05.0%
Final Random2 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS148.7%
1020 / 3 days
—PASS
06/30–07/02
BA Thread ends, AD Fabric stains, ED Gathering crease
CS2215.1%
1020 / 7 days
—PASS
07/08–07/16
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS227142 (14%)7507/10, 07/11, 07/14, 07/15, 07/16
CS14360 (0%)3306/30, 07/01, 07/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineShipment SamplePre-finalFinal Random
BA Thread ends5612655
CC Skip stitch431
AD Fabric stains34112
DB Run-off stitching221
ED Gathering crease31621
EC Asymmetry163
EA Unsmooth/puckering/bubbling232
CB Broken stitch31
260787 OSIT · CS01/CS02/CS11 · Due 08/26Final Random PASS Missed in earlier stages: 3
No resultPP Sample1 reports
No reportPilot Run
07/16QC 1st Bundle1 reports
07/16QA 1st Bundle1 reports
17/48QC Inlineactual/required · 35%
DHU 17.4%QC Endline23 days
3/4 FAILQA Inline4 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty8,000 / 0
PDF reports27
Last report08/05

Cross-stage findings

Missed in earlier stages: 3

AC Fabric hole (Pre-final 07/21), IA 2nd operation issue (Pre-final 07/21), EI Inaccurate/skewed stitching (Shipment Sample 07/23): first found in later stages, never recorded before

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 22.7% vs QC Inline 12.9%; QC Inline may be missing defects

Found earlier but still reached later stages: 6

DI High-low/uneven 2, EA Unsmooth/puckering/bubbling 2, EC Asymmetry 4, EH Poor lamination/bonding 1, DB Run-off stitching 2, AD Fabric stains 2 pcs (later stages total)

8 defects recorded as 'Others' without detail

QC 1st Bundle 2, QA 1st Bundle 1, QA Inline 4, QC Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (3 Major), BA Thread ends (2 Major), ED Gathering crease (2 Major), EA Unsmooth/puckering/bubbling (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: CG Grinning (2), DF Twisted seam/skewing (2), FC Wrong label (1); Both: DI High-low/uneven (3/1); DHU QC 1st Bundle 31.2% / QA 1st Bundle 55.0%

Caught in earlier stages

CC Skip stitch (174), ED Gathering crease (104), AB Shading (40), CG Grinning (26), DF Twisted seam/skewing (24) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—31.2%
QA 1st Bundle1 reports—55.0%
QC Inline17 reports
required on prod. days 17/48 (35%)
—12.9%
QC Endline23 days—17.4%
QA Inline4 reports322.7%
Shipment Sample1 reports1—
Pre-final1 reports19.5%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0217.4%
7976 / 23 days
22.7%—
07/16–08/14
BA Thread ends, DB Run-off stitching, EC Asymmetry
CS110.0%
12 / 1 days
——
07/31–07/31
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS02234617 (37%)23608/06, 08/07, 08/08, 08/11, 08/14
CS11120 (0%)1107/31

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends212567657
DB Run-off stitching232962
EC Asymmetry125168522
CC Skip stitch61644
ED Gathering crease22676
Others (no detail)211414
AB Shading40
CG Grinning224
261233 OSIT · CB01/CS01/CS09 · Due 08/26Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/29QA 1st Bundle1 reports
18/44QC Inlineactual/required · 41%
DHU 15.0%QC Endline21 days
All FAILQA Inline6 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty12,000 / 0
PDF reports29
Last report09/18

Cross-stage findings

Missed in earlier stages: 2

BB Missing cut seam allowance (Final Random 08/12), IA 2nd operation issue (Final Random 08/12): first found in later stages, never recorded before

QA Inline DHU is 3.5× QC Inline

QA Inline DHU 42.2% vs QC Inline 12.2%; QC Inline may be missing defects

Recurring in small numbers: 5

Latest Final Random (08/12): AD Fabric stains 1 (earlier 19 times), DF Twisted seam/skewing 1 (earlier 6 times), CB Broken stitch 1 (earlier 16 times), ED Gathering crease 2 (earlier 35 times), EC Asymmetry 2 (earlier 30 times)

22 defects recorded as 'Others' without detail

QA 1st Bundle 5, QA Inline 8, Pre-final 9; cannot compare across stages

QC Endline data errors: 1

08/08 CS01 261233 (defective pcs 52 > defects 49)

Caught in earlier stages

CC Skip stitch (456), EH Poor lamination/bonding (120), Q94 Glue marks (37), AB Shading (37), DI High-low/uneven (26) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—80.0%
QC Inline19 reports
required on prod. days 18/44 (41%)
—12.2%
QC Endline21 days—15.0%
QA Inline6 reports642.2%
Shipment Sample1 reports1—
Pre-final1 reports14.8%
Final Random1 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0115.1%
10344 / 21 days
42.2%PASS
07/29–08/21
CC Skip stitch, BA Thread ends, ED Gathering crease
CS090.0%
10 / 1 days
——
08/19–08/19
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS01214218 (43%)21308/17, 08/18, 08/19, 08/20, 08/21
CS09120 (0%)1108/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
CC Skip stitch1264254
BA Thread ends214377236
ED Gathering crease1273071412
Others (no detail)514489
EH Poor lamination/bonding4116
EC Asymmetry21666932
AD Fabric stains118201211
Q94 Glue marks37
261320 OSIT · CS06/CS07 · Due 08/26Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/29QC 1st Bundle1 reports
07/28QA 1st Bundle1 reports
7/24QC Inlineactual/required · 29%
DHU 4.3%QC Endline11 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty5,000 / 5,000
PDF reports16
Last report08/07

Cross-stage findings

Missed in earlier stages: 1

IA 2nd operation issue (Pre-final 08/04): first found in later stages, never recorded before

QA Inline DHU is 3.2× QC Inline

QA Inline DHU 37.5% vs QC Inline 11.8%; QC Inline may be missing defects

QA Inline DHU is 8.7× QC Endline

QA Inline DHU 37.5% vs QC Endline 4.3% (07/28–08/12, 11 days, 5090 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/07): CC Skip stitch 2 (earlier 13 times), AD Fabric stains 2 (earlier 3 times)

Found earlier but still reached later stages: 3

CB Broken stitch 3, DJ Pleat 2, AC Fabric hole 1 pcs (later stages total)

17 defects recorded as 'Others' without detail

QA 1st Bundle 5, QA Inline 10, Final Random 2; cannot compare across stages

QC Endline data errors: 9

07/28 CS07 261320 (defective pcs 9 > defects 6), 07/29 CS07 261320 (defective pcs 38 > defects 36), 07/30 CS07 261320 (defective pcs 31 > defects 28), 07/31 CS07 261320 (defective pcs 37 > defects 36)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CA Thread tension (2 Major), CB Broken stitch (2 Major), CC Skip stitch (1 Major), DJ Pleat (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3); Both: BA Thread ends (3/2), EC Asymmetry (3/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 75.0%

Caught in earlier stages

ED Gathering crease (63), DF Twisted seam/skewing (28), AB Shading (22), Q93 Heat seal logo peeling off (14), EA Unsmooth/puckering/bubbling (12) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—75.0%
QC Inline7 reports
required on prod. days 7/24 (29%)
—11.8%
QC Endline11 days—4.3%
QA Inline4 reports437.5%
Shipment Sample1 reports1—
Pre-final1 reports13.0%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS074.3%
5080 / 11 days
37.5%PASS
07/28–08/12
BA Thread ends, ED Gathering crease, CC Skip stitch
CS060.0%
10 / 1 days
——
08/07–08/07
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0711227 (32%)11408/04, 08/05, 08/06, 08/07, 08/12
CS06120 (0%)1108/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends325808178
ED Gathering crease9522
CC Skip stitch1432622
DF Twisted seam/skewing12223
AB Shading22
Others (no detail)5102
Q93 Heat seal logo peeling off14
CB Broken stitch2712
261481 OSIT · CS25 · Due 08/26Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/29QA 1st Bundle1 reports
3/18QC Inlineactual/required · 17%
DHU 10.4%QC Endline9 days
All FAILQA Inline2 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty11,000 / 11,000
PDF reports8
Last report08/07

Cross-stage findings

Missed in earlier stages: 1

AC Fabric hole (Final Random 08/07): first found in later stages, never recorded before

Recurring in small numbers: 4

Latest Final Random (08/07): ED Gathering crease 2 (earlier 14 times), EC Asymmetry 2 (earlier 13 times), CC Skip stitch 2 (earlier 7 times), AD Fabric stains 2 (earlier 7 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

1 defects recorded as 'Others' without detail

Pre-final 1; cannot compare across stages

QC Endline data errors: 1

07/29 CS25 261481 (defective pcs 167 > defects 127)

Caught in earlier stages

EA Uneven seam allowance (121), Q95 HTL position incorrect (62), EA Unsmooth/puckering/bubbling (46), DB Run-off stitching (36), CE Broken seam (19) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—35.0%
QC Inline3 reports
required on prod. days 3/18 (17%)
—17.9%
QC Endline9 days—10.4%
QA Inline2 reports225.0%
Pre-final1 reports02.5%
Final Random1 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2510.4%
10857 / 9 days
25.0%PASS
07/29–08/07
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS259183 (17%)9608/03, 08/04, 08/05, 08/06, 08/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends636567
CC Skip stitch1812
ED Gathering crease113157432
EA Uneven seam allowance121
EC Asymmetry3494522
Q95 HTL position incorrect62
EA Unsmooth/puckering/bubbling343
DB Run-off stitching36
261041 RGOR · CB29/CB30 · Due 08/28Final Random PASS Missed in earlier stages: 2
No resultPP Sample1 reports
No reportPilot Run
08/19QC 1st Bundle1 reports
08/19QA 1st Bundle1 reports
6/28QC Inlineactual/required · 21%
DHU 25.6%QC Endline12 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty5,505 / 5,505
PDF reports15
Last report09/02

Cross-stage findings

Missed in earlier stages: 2

DE Cut to broken (Shipment Sample 08/19), AA Fabric defect (Shipment Sample 08/19): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (08/29): DD Thread not straight/waving 1 (earlier 4 times), EC Asymmetry 1 (earlier 17 times), DB Run-off stitching 1 (earlier 4 times)

Found earlier but still reached later stages: 2

EB Measurement issue 1, EA Unsmooth/puckering/bubbling 2 pcs (later stages total)

QC Endline data errors: 1

08/19 CB30 261041-S1 (defective pcs 42 > defects 41)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), BA Thread ends (2), CH Incorrect stitch density (1 Major), DJ Pleat (1 Major); Only QC 1st Bundle: DI High-low/uneven (2), EA Unsmooth/puckering/bubbling (1), DD Thread not straight/waving (1); Both: EC Asymmetry (1/4); DHU QC 1st Bundle 62.5% / QA 1st Bundle 40.0%

Caught in earlier stages

EA Uneven seam allowance (271), ED Gathering crease (191), CD Needle hole (88), CC Skip stitch (38), DJ Pleat (20) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—62.5%
QA 1st Bundle1 reports—40.0%
QC Inline7 reports
required on prod. days 6/28 (21%)
—31.4%
QC Endline12 days—25.6%
QA Inline3 reports332.3%
Shipment Sample1 reports1—
Final Random1 reports01.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3025.9%
4385 / 11 days
32.3%PASS
08/19–09/01
BA Thread ends, EA Uneven seam allowance, ED Gathering crease
CB290.0%
50 / 3 days
——
08/28–09/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3011226 (27%)11508/26, 08/28, 08/29, 08/31, 09/01
CB29360 (0%)3308/28, 08/31, 09/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends249664
EA Uneven seam allowance271
ED Gathering crease6185
CD Needle hole88
EC Asymmetry1141527621
CC Skip stitch929
Others (no detail)34
DJ Pleat1154
261043 RGOR · CP11 · Due 08/28Final Random PASS QA Inline DHU is 1.7× QC Inline
No reportPP Sample
No reportPilot Run
08/13QC 1st Bundle1 reports
08/14QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 5.8%QC Endline6 days
All FAILQA Inline1 reports
No resultShipment Sample2 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,855 / 3,855
PDF reports7
Last report08/18

Cross-stage findings

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 37.5% vs QC Inline 22.5%; QC Inline may be missing defects

QA Inline DHU is 6.5× QC Endline

QA Inline DHU 37.5% vs QC Endline 5.8% (08/13–08/19, 6 days, 3970 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/18): CB Broken stitch 2 (earlier 3 times)

7 defects recorded as 'Others' without detail

QC Inline 7; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 8); zero in QC Endline records

QC Endline data errors: 6

08/13 CP11 261043 (defective pcs 30 > defects 13), 08/14 CP11 261043 (defective pcs 84 > defects 52), 08/15 CP11 261043 (defective pcs 64 > defects 44), 08/17 CP11 261043 (defective pcs 73 > defects 48)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (3 Major), CG Grinning (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (2), DI High-low/uneven (2), BD Snagging (1), EI Inaccurate/skewed stitching (1); Both: BB Missing cut seam allowance (4/4), BA Thread ends (6/2), EC Asymmetry (2/2), CE Broken seam (1/1); DHU QC 1st Bundle 95.0% / QA 1st Bundle 45.0%

Caught in earlier stages

ED Gathering crease (21), BB Missing cut seam allowance (8), GC Missing pocket/label (5) did not reach later stages

Found before bulk production (Shipment Sample): 5

CE Broken seam, GA Missing bartack/button, EC Asymmetry, AD Fabric stains, CC Skip stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—95.0%
QA 1st Bundle1 reports—45.0%
QC Inline1 reports
required on prod. days 1/12 (8%)
—22.5%
QC Endline6 days—5.8%
QA Inline1 reports137.5%
Shipment Sample2 reports0—
Final Random1 reports01.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP115.8%
3970 / 6 days
37.5%PASS
08/13–08/19
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP116121 (8%)6508/14, 08/15, 08/17, 08/18, 08/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends6210135
CC Skip stitch21002
ED Gathering crease21
EC Asymmetry2226
CE Broken seam1172
CB Broken stitch3322
BB Missing cut seam allowance44
Others (no detail)7
261044 RGOR · CB09/CP09 · Due 08/28Final Random PASS QA Inline DHU is 1.7× QC Inline
No reportPP Sample
No reportPilot Run
08/13QC 1st Bundle1 reports
08/14QA 1st Bundle1 reports
6/20QC Inlineactual/required · 30%
DHU 3.3%QC Endline10 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty5,775 / 5,775
PDF reports12
Last report08/21

Cross-stage findings

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 12.5% vs QC Inline 7.3%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (08/19): CB Broken stitch 1 (earlier 8 times)

2 defects recorded as 'Others' without detail

Shipment Sample 1, QC 1st Bundle 1; cannot compare across stages

QC Endline data errors: 7

08/14 CP09 261044 (defective pcs 118 > defects 30), 08/15 CP09 261044 (defective pcs 107 > defects 15), 08/17 CP09 261044 (defective pcs 102 > defects 18), 08/18 CP09 261044 (defective pcs 161 > defects 38)…

Duplicate report numbers

QGR2634483 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DB Run-off stitching (1 Major); Only QC 1st Bundle: DJ Pleat (2), DD Thread not straight/waving (1), DA Exceed seam allowance (1); Both: CC Skip stitch (4/4), BA Thread ends (4/2), EC Asymmetry (3/1), CB Broken stitch (3/1), DE Cut to broken (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 50.0%

Caught in earlier stages

EC Asymmetry (28), DI High-low/uneven (18), DE Cut to broken (15), ED Gathering crease (15), DJ Pleat (9) did not reach later stages

Found before bulk production (Shipment Sample): 2

CC Skip stitch, CA Thread tension: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—50.0%
QC Inline6 reports
required on prod. days 6/20 (30%)
—7.3%
QC Endline10 days—3.3%
QA Inline2 reports212.5%
Shipment Sample1 reports1—
Final Random1 reports01.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP093.3%
5948 / 10 days
12.5%PASS
08/13–08/25
BA Thread ends, CC Skip stitch, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0910206 (30%)9508/19, 08/20, 08/21, 08/24, 08/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends423411488
CC Skip stitch444122
EC Asymmetry31618
DI High-low/uneven18
CB Broken stitch31741
DE Cut to broken1113
ED Gathering crease15
DJ Pleat234
261057 RGOR · CP08/CP09/CS04 · Due 08/28Final Random PASS Missed in earlier stages: 3
No resultPP Sample1 reports
No reportPilot Run
08/06–08/22QC 1st Bundle2 reports
08/07–08/22QA 1st Bundle2 reports
6/24QC Inlineactual/required · 25%
DHU 8.0%QC Endline11 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,300 / 1,150
PDF reports15
Last report08/31

Cross-stage findings

Missed in earlier stages: 3

AD Fabric stains (Shipment Sample 08/12), BD Snagging (Shipment Sample 08/19), DE Cut to broken (Shipment Sample 08/19): first found in later stages, never recorded before

QA Inline DHU is 3.4× QC Inline

QA Inline DHU 31.2% vs QC Inline 9.3%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (08/31): CB Broken stitch 1 (earlier 8 times)

Found earlier but still reached later stages: 3

EC Asymmetry 6, BB Missing cut seam allowance 1, GA Missing bartack/button 1 pcs (later stages total)

8 defects recorded as 'Others' without detail

Shipment Sample 7, QC 1st Bundle 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

CA Thread tension (QA 3); zero in QC Endline records

QC Endline data errors: 5

08/21 CP09 261057-2 (defective pcs 10 > defects 3), 08/22 CP09 261057-2 (defective pcs 30 > defects 13), 08/24 CP09 261057-2 (defective pcs 38 > defects 17), 08/25 CP09 261057-2 (defective pcs 78 > defects 32)…

QC 1st Bundle vs QA 1st Bundle: 9 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: GA Missing bartack/button (2 Major), CG Grinning (2 Major), BD Snagging (1 Major), EB Measurement issue (1 Major), ED Gathering crease (1 Major), FC Wrong label (1 Major), AC Fabric hole (1 Major), DJ Pleat (1 Major), EG Wrong panel assembly (1 Major); Only QC 1st Bundle: BB Missing cut seam allowance (5), CB Broken stitch (3), FA Wrong material (2), DA Exceed seam allowance (1), DE Cut to broken (1); Both: EC Asymmetry (8/4), BA Thread ends (2/5), DI High-low/uneven (2/2), DD Thread not straight/waving (2/1), EA Unsmooth/puckering/bubbling (1/2), CE Broken seam (1/1); DHU QC 1st Bundle 55.8% / QA 1st Bundle 78.8%

Caught in earlier stages

CC Skip stitch (43), ED Gathering crease (39), DI High-low/uneven (15), DB Run-off stitching (12), CE Broken seam (9) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—55.8%
QA 1st Bundle2 reports—78.8%
QC Inline6 reports
required on prod. days 6/24 (25%)
—9.3%
QC Endline11 days—8.0%
QA Inline1 reports131.2%
Shipment Sample2 reports2—
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS049.3%
1150 / 5 days
31.2%PASS
08/07–08/12
BA Thread ends, ED Gathering crease, CC Skip stitch
CP096.7%
1135 / 6 days
—PASS
08/21–08/28
BA Thread ends, CC Skip stitch, EC Asymmetry
CP080.0%
15 / 1 days
——
08/26–08/26
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP096123 (25%)6308/22, 08/24, 08/25, 08/26, 08/28
CS045103 (30%)5208/07, 08/08, 08/10, 08/11, 08/12
CP08120 (0%)1108/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends25188324
CC Skip stitch5353
ED Gathering crease138
EC Asymmetry2845116
CB Broken stitch31311
DI High-low/uneven2211
DB Run-off stitching111
CE Broken seam117
261191 RGOR · CB23 · Due 08/28Final Random PASS QA Inline DHU is 10.9× QC Endline
No reportPP Sample
No reportPilot Run
07/16QC 1st Bundle1 reports
07/16QA 1st Bundle1 reports
12/48QC Inlineactual/required · 25%
DHU 4.1%QC Endline24 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,975 / 2,350
PDF reports18
Last report08/04

Cross-stage findings

QA Inline DHU is 10.9× QC Endline

QA Inline DHU 44.8% vs QC Endline 4.1% (07/16–08/20, 24 days, 6182 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/03): CB Broken stitch 1 (earlier 3 times), CC Skip stitch 1 (earlier 15 times)

Found earlier but still reached later stages: 1

DE Cut to broken 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CH Incorrect stitch density (2 Major), DD Thread not straight/waving (2 Major), EI Inaccurate/skewed stitching (2 Major), CE Broken seam (2 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: DE Cut to broken (2), DB Run-off stitching (2), CA Thread tension (2), BA Thread ends (2); Both: EC Asymmetry (2/3), DJ Pleat (2/1); DHU QC 1st Bundle 92.3% / QA 1st Bundle 100.0%

Caught in earlier stages

EC Asymmetry (50), AC Fabric hole (37), DB Run-off stitching (22), BB Missing cut seam allowance (21), EA Unsmooth/puckering/bubbling (17) did not reach later stages

Report line differs from production line

QGR2631876 Final Random (08/03) CB27; actual production line(s) CB23 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—100.0%
QC Inline12 reports
required on prod. days 12/48 (25%)
—43.5%
QC Endline24 days—4.1%
QA Inline3 reports344.8%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB234.1%
6182 / 24 days
44.8%—
07/16–08/20
BA Thread ends, AC Fabric hole, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB23244812 (25%)241208/08, 08/10, 08/12, 08/18, 08/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends21616043
CC Skip stitch213621
EC Asymmetry23201213
AC Fabric hole37
DB Run-off stitching220
BB Missing cut seam allowance129
EA Unsmooth/puckering/bubbling17
CG Grinning15
261195 RGOR · CP18/CP19 · Due 08/28Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/10QC 1st Bundle1 reports
07/11QA 1st Bundle1 reports
4/22QC Inlineactual/required · 18%
DHU 7.0%QC Endline11 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty3,380 / 1,645
PDF reports10
Last report08/31

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 08/01): first found in later stages, never recorded before

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 37.5% vs QC Inline 20.6%; QC Inline may be missing defects

QA Inline DHU is 5.4× QC Endline

QA Inline DHU 37.5% vs QC Endline 7.0% (07/10–07/22, 11 days, 8091 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (08/31): AD Fabric stains 1 (earlier 12 times), CC Skip stitch 1 (earlier 14 times)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

QC Endline data errors: 11

07/11 CP18 261195-S (defective pcs 81 > defects 77), 07/11 CP18 261195-L (defective pcs 5 > defects 3), 07/13 CP18 261195-S (defective pcs 25 > defects 11), 07/13 CP18 261195-L (defective pcs 5 > defects 3)…

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: ED Gathering crease (2), DB Run-off stitching (2), CG Grinning (1), DC Join stitching (1); Both: BA Thread ends (5/4), EC Asymmetry (2/5), CE Broken seam (2/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 55.0%

Caught in earlier stages

ED Gathering crease (138), EA Uneven seam allowance (37), EC Asymmetry (16), DD Thread not straight/waving (9), CG Grinning (6) did not reach later stages

Report line differs from production line

QGR2637298 Final Random (08/31) CP10; actual production line(s) CP18/CP19 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—55.0%
QC Inline4 reports
required on prod. days 4/22 (18%)
—20.6%
QC Endline11 days—7.0%
QA Inline2 reports237.5%
Final Random2 reports02.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP187.0%
8091 / 11 days
46.9%PASS
07/10–07/22
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1811224 (18%)11707/17, 07/18, 07/20, 07/21, 07/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends542016245
CC Skip stitch31501
ED Gathering crease231285
AD Fabric stains138044
EA Uneven seam allowance37
EC Asymmetry2536
DD Thread not straight/waving9
CG Grinning15
261198 RGOR · CP08/CP10 · Due 08/28Final Random PASS QA Inline DHU is 6.0× QC Endline
No reportPP Sample
No reportPilot Run
07/20QC 1st Bundle1 reports
07/18QA 1st Bundle1 reports
1/18QC Inlineactual/required · 6%
DHU 6.2%QC Endline8 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty3,250 / 1,600
PDF reports6
Last report08/31

Cross-stage findings

QA Inline DHU is 6.0× QC Endline

QA Inline DHU 37.5% vs QC Endline 6.2% (07/17–07/25, 8 days, 7771 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 2

CB Broken stitch 3, AD Fabric stains 2 pcs (later stages total)

QC Endline data errors: 7

07/18 CP10 261198 (defective pcs 87 > defects 77), 07/20 CP10 261198 (defective pcs 119 > defects 77), 07/21 CP10 261198 (defective pcs 120 > defects 107), 07/22 CP10 261198 (defective pcs 89 > defects 27)…

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (10 Major), DI High-low/uneven (3 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: EI Inaccurate/skewed stitching (6), CG Grinning (4), DD Thread not straight/waving (1), EC Asymmetry (1), CB Broken stitch (1); Both: BA Thread ends (7/5); DHU QC 1st Bundle 100.0% / QA 1st Bundle 95.0%

Caught in earlier stages

CC Skip stitch (133), ED Gathering crease (58), EA Uneven seam allowance (46), EB Measurement issue (20), EI Inaccurate/skewed stitching (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—95.0%
QC Inline1 reports
required on prod. days 1/18 (6%)
—28.7%
QC Endline8 days—6.2%
QA Inline1 reports137.5%
Final Random2 reports02.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP106.2%
7691 / 8 days
37.5%PASS
07/17–07/25
BA Thread ends, CC Skip stitch, ED Gathering crease
CP087.5%
80 / 1 days
——
07/24–07/24
BA Thread ends, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP108161 (6%)8707/21, 07/22, 07/23, 07/24, 07/25
CP08120 (0%)1107/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends75721149
CC Skip stitch102121
ED Gathering crease58
EA Uneven seam allowance46
EB Measurement issue20
EI Inaccurate/skewed stitching631
AD Fabric stains72
CG Grinning422
261656 LOGE · CB28/CB29/CB30 · Due 08/28Final Random PASS QA Inline DHU is 11.1× QC Endline
No reportPP Sample
No reportPilot Run
08/11QC 1st Bundle1 reports
08/10QA 1st Bundle1 reports
1/20QC Inlineactual/required · 5%
DHU 3.1%QC Endline9 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,001 / 3,001
PDF reports5
Last report08/19

Cross-stage findings

QA Inline DHU is 11.1× QC Endline

QA Inline DHU 34.4% vs QC Endline 3.1% (08/10–08/20, 9 days, 2981 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (08/19): CC Skip stitch 1 (earlier 6 times)

Found earlier but still reached later stages: 2

EA Unsmooth/puckering/bubbling 1, CB Broken stitch 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (3 Major), EA Unsmooth/puckering/bubbling (2 Major), BA Thread ends (2 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: CE Broken seam (3), CC Skip stitch (2), DJ Pleat (2), CB Broken stitch (2); Both: EC Asymmetry (3/2); DHU QC 1st Bundle 60.0% / QA 1st Bundle 76.9%

Caught in earlier stages

DB Run-off stitching (24), EC Asymmetry (9), CE Broken seam (7), EI Inaccurate/skewed stitching (6), DJ Pleat (5) did not reach later stages

Report line differs from production line

QGR2635160 Final Random (08/19) CB15; actual production line(s) CB28/CB29/CB30 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—60.0%
QA 1st Bundle1 reports—76.9%
QC Inline1 reports
required on prod. days 1/20 (5%)
—42.0%
QC Endline9 days—3.1%
QA Inline1 reports134.4%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB283.1%
2955 / 8 days
34.4%—
08/10–08/20
BA Thread ends, DB Run-off stitching, CC Skip stitch
CB300.0%
20 / 1 days
——
08/18–08/18
—
CB290.0%
6 / 1 days
——
08/14–08/14
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB288161 (6%)8708/13, 08/14, 08/15, 08/17, 08/20
CB29120 (0%)1108/14
CB30120 (0%)1108/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends24526
DB Run-off stitching1320
CC Skip stitch2171
EC Asymmetry324
CE Broken seam34
EI Inaccurate/skewed stitching33
EA Unsmooth/puckering/bubbling221
DJ Pleat23
261118 SAIN · CB25 · Due 08/31Final Random PASS Missed in earlier stages: 5
No resultPP Sample1 reports
No reportPilot Run
07/27QC 1st Bundle1 reports
07/27QA 1st Bundle1 reports
13/58QC Inlineactual/required · 22%
DHU 9.7%QC Endline29 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty9,790 / 3,210
PDF reports23
Last report09/21

Cross-stage findings

Missed in earlier stages: 5

EA Unsmooth/puckering/bubbling (Shipment Sample 07/31), DF Twisted seam/skewing (Shipment Sample 07/31), DE Cut to broken (Final Random 08/11), AC Fabric hole (Final Random 08/18), GB Missing sewing operation (Final Random 08/18): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/21): AD Fabric stains 2 (earlier 31 times), CB Broken stitch 1 (earlier 4 times)

Found earlier but still reached later stages: 4

EC Asymmetry 1, EI Inaccurate/skewed stitching 1, CG Grinning 1, CE Broken seam 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

CB Broken stitch (QA 6); zero in QC Endline records

QC Endline data errors: 13

07/28 CB25 261118 (defective pcs 26 > defects 16), 07/30 CB25 261118 (defective pcs 26 > defects 15), 07/31 CB25 261118 (defective pcs 32 > defects 24), 08/01 CB25 261118 (defective pcs 30 > defects 24)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EE Raw edge (2 Major), DD Thread not straight/waving (2 Major), DK Twisted shoulder strap (1 Major), EH Poor lamination/bonding (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: BA Thread ends (3); Both: AD Fabric stains (3/4), ED Gathering crease (2/1), EC Asymmetry (2/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (201), Q94 Glue marks (171), EA Uneven seam allowance (98), CD Needle hole (27), EH Poor lamination/bonding (22) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—100.0%
QC Inline13 reports
required on prod. days 13/58 (22%)
—27.8%
QC Endline29 days—9.7%
QA Inline2 reports232.8%
Shipment Sample1 reports1—
Final Random4 reports03.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB259.7%
10030 / 29 days
32.8%PASS
07/27–09/17
BA Thread ends, ED Gathering crease, Q94 Glue marks

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB25295813 (22%)291609/10, 09/11, 09/12, 09/14, 09/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends32140149
ED Gathering crease214194
Q94 Glue marks171
EA Uneven seam allowance98
AD Fabric stains34383876
EC Asymmetry321741
Others (no detail)27
CD Needle hole27
260670 LOGE · CB29/CB30/CB31 · Due 08/04Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
4/66QC Inlineactual/required · 6%
DHU 13.2%QC Endline31 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty7,000 / 7,000
PDF reports6
Last report07/30

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (07/30): CB Broken stitch 2 (earlier 3 times), ED Gathering crease 2 (earlier 17 times), CC Skip stitch 1 (earlier 5 times)

Found earlier but still reached later stages: 2

EA Unsmooth/puckering/bubbling 1, AD Fabric stains 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 2

EA Unsmooth/puckering/bubbling (QA 3), DD Thread not straight/waving (QA 3); zero in QC Endline records

QC Endline data errors: 1

07/06 CB29 260670 (defective pcs 30 > defects 29)

Caught in earlier stages

CD Needle hole (97), AC Fabric hole (66), EB Measurement issue (37), EC Asymmetry (30), CE Broken seam (15) did not reach later stages

Report line differs from production line

QGR2631006 Final Random (07/30) CB28; actual production line(s) CB29/CB30/CB31 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline4 reports
required on prod. days 4/66 (6%)
—43.3%
QC Endline31 days—13.2%
QA Inline1 reports128.1%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2913.3%
6843 / 30 days
28.1%—
06/27–08/06
BA Thread ends, ED Gathering crease, CD Needle hole
CB300.0%
30 / 2 days
——
07/20–07/24
—
CB310.0%
10 / 1 days
——
08/07–08/07
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2930604 (7%)302607/27, 07/28, 07/29, 07/30, 08/06
CB30240 (0%)2207/20, 07/24
CB31120 (0%)1108/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends4486
ED Gathering crease41182
CD Needle hole97
CC Skip stitch921
AC Fabric hole66
EB Measurement issue37
EC Asymmetry13152
CE Broken seam123
253625 MKSC · CB03 · Due 08/05Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
07/31QC 1st Bundle1 reports
No reportQA 1st Bundle
2/10QC Inlineactual/required · 20%
DHU 15.8%QC Endline5 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,350 / 600
PDF reports6
Last report08/06

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (08/06): BA Thread ends 1 (earlier 7 times), AD Fabric stains 1 (earlier 7 times), EA Unsmooth/puckering/bubbling 1 (earlier 4 times)

6 defects recorded as 'Others' without detail

QA Inline 6; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 4); zero in QC Endline records

Caught in earlier stages

HB Missing/wrong trims (30), CC Skip stitch (15), EB Measurement issue (10), EA Uneven seam allowance (6), ED Gathering crease (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—269.2%
QC Inline2 reports
required on prod. days 2/10 (20%)
—65.6%
QC Endline5 days—15.8%
QA Inline2 reports225.0%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0315.8%
600 / 5 days
25.0%PASS
07/31–08/05
BA Thread ends, AD Fabric stains, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB035102 (20%)5307/31, 08/01, 08/03, 08/04, 08/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends14403
AD Fabric stains192411
HB Missing/wrong trims30
CC Skip stitch177
EA Unsmooth/puckering/bubbling1211
EB Measurement issue10
Others (no detail)6
EA Uneven seam allowance6
253661 MKSC · CP01 · Due 08/05Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/2QC Inlineactual/required · 0%
DHU 0.0%QC Endline1 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,500 / 1,000
PDF reports2
Last report07/31

Cross-stage findings

Main QA defects never recorded by QC Endline: 1

BA Thread ends (QA 4); zero in QC Endline records

Report line differs from production line

QGR2631202 Final Random (07/31) CP04; actual production line(s) CP01 (cards show production lines only)

Found before bulk production (Final Random): 6

DJ Pleat, BA Thread ends, CC Skip stitch, BB Missing cut seam allowance, CF Pulling yarn, DE Cut to broken: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/2 (0%)
——
QC Endline1 days—0.0%
Final Random2 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP010.0%
20 / 1 days
—PASS
06/12–06/12
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP01120 (0%)1106/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends4
DJ Pleat1
CC Skip stitch1
BB Missing cut seam allowance1
CF Pulling yarn1
DE Cut to broken1
253662 MKSC · CP03 · Due 08/05Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/20QC Inlineactual/required · 0%
DHU 12.7%QC Endline10 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty4,000 / 2,000
PDF reports1
Last report07/31

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (07/31): BA Thread ends 1 (earlier 12 times), EA Unsmooth/puckering/bubbling 1 (earlier 8 times)

QC Endline data errors: 12

06/05 CP03 253662B (defective pcs 35 > defects 17), 06/06 CP03 253662B (defective pcs 59 > defects 51), 06/08 CP03 253662B (defective pcs 100 > defects 91), 06/09 CP03 253662B (defective pcs 88 > defects 68)…

Caught in earlier stages

ED Gathering crease (131), CC Skip stitch (103), EA Uneven seam allowance (41), EC Asymmetry (16) did not reach later stages

Found before bulk production (Final Random): 1

DD Thread not straight/waving: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/20 (0%)
——
QC Endline10 days—12.7%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0312.7%
3980 / 10 days
—PASS
06/05–06/20
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0310200 (0%)101006/11, 06/12, 06/13, 06/16, 06/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1614
ED Gathering crease131
CC Skip stitch103
EA Unsmooth/puckering/bubbling471
EA Uneven seam allowance41
EC Asymmetry16
Others (no detail)3
DD Thread not straight/waving1
253676 MKSC · CP03 · Due 08/05Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/14QC Inlineactual/required · 0%
DHU 11.8%QC Endline7 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty4,700 / 2,200
PDF reports1
Last report08/03

Cross-stage findings

QC Endline data errors: 8

06/16 CP03 253676B (defective pcs 72 > defects 55), 06/19 CP03 253676C (defective pcs 26 > defects 16), 06/20 CP03 253676C (defective pcs 71 > defects 49), 06/20 CP03 253676B (defective pcs 4 > defects 2)…

Caught in earlier stages

AD Fabric stains (92), ED Gathering crease (82), EC Asymmetry (65), EA Unsmooth/puckering/bubbling (49), CC Skip stitch (45) did not reach later stages

Report line differs from production line

QGR2630187 Final Random (08/03) CP17; actual production line(s) CP03 (cards show production lines only)

Found before bulk production (Final Random): 2

CD Needle hole, CF Pulling yarn: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—11.8%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0311.8%
3932 / 7 days
——
06/16–06/24
AD Fabric stains, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP037140 (0%)7706/19, 06/20, 06/22, 06/23, 06/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends912
AD Fabric stains92
ED Gathering crease82
EC Asymmetry65
EA Unsmooth/puckering/bubbling49
CC Skip stitch45
EA Uneven seam allowance38
CD Needle hole2
260879 LOGE · CS08 · Due 08/05Final Random PASS No major issue (2 minor notes)
No resultPP Sample1 reports
No reportPilot Run
07/16QC 1st Bundle1 reports
07/16QA 1st Bundle1 reports
2/14QC Inlineactual/required · 14%
DHU 10.9%QC Endline7 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,500 / 1,500
PDF reports8
Last report07/24

Cross-stage findings

Found earlier but still reached later stages: 7

GB Missing sewing operation 1, EC Asymmetry 3, EI Inaccurate/skewed stitching 2, EA Unsmooth/puckering/bubbling 2, CB Broken stitch 1, CE Broken seam 2, ED Gathering crease 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (3 Major), CA Thread tension (1 Major), AD Fabric stains (1 Major), GB Missing sewing operation (1 Major), CE Broken seam (1 Major), AA Fabric defect (1 Major); Only QC 1st Bundle: EC Asymmetry (3), BA Thread ends (2); Both: DJ Pleat (1/1), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 53.8% / QA 1st Bundle 76.9%

Caught in earlier stages

CC Skip stitch (106), AD Fabric stains (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—53.8%
QA 1st Bundle1 reports—76.9%
QC Inline2 reports
required on prod. days 2/14 (14%)
—18.0%
QC Endline7 days—10.9%
QA Inline1 reports121.9%
Shipment Sample1 reports1—
Final Random1 reports01.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0810.9%
1500 / 7 days
21.9%PASS
07/16–08/05
CC Skip stitch, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS087142 (14%)7507/18, 07/20, 07/27, 07/28, 08/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
CC Skip stitch106
BA Thread ends24116
EC Asymmetry334313
ED Gathering crease681
EA Unsmooth/puckering/bubbling111612
EI Inaccurate/skewed stitching232
AD Fabric stains114
CB Broken stitch31
260880 LOGE · CS22 · Due 08/05Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/17QA 1st Bundle1 reports
3/12QC Inlineactual/required · 25%
DHU 13.7%QC Endline6 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,500 / 1,500
PDF reports7
Last report08/03

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (08/03): AD Fabric stains 2 (earlier 3 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

Caught in earlier stages

CC Skip stitch (77), DB Run-off stitching (32), ED Gathering crease (18), EC Asymmetry (18), DI High-low/uneven (17) did not reach later stages

Report line differs from production line

QGR2631117 Final Random (08/03) CS13; actual production line(s) CS22 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—84.6%
QC Inline3 reports
required on prod. days 3/12 (25%)
—58.3%
QC Endline6 days—13.7%
QA Inline2 reports225.0%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2213.7%
1500 / 6 days
25.0%—
07/16–07/29
CC Skip stitch, BA Thread ends, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS226123 (25%)6307/17, 07/18, 07/20, 07/21, 07/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends226935
CC Skip stitch1742
DB Run-off stitching1121
ED Gathering crease117
EC Asymmetry2142
DI High-low/uneven1133
AD Fabric stains62
DJ Pleat6
260883 LOGE · CS20/CS23 · Due 08/05Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/16QC Inlineactual/required · 0%
DHU 17.6%QC Endline7 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,500 / 1,500
PDF reports2
Last report07/15

Cross-stage findings

Found earlier but still reached later stages: 1

CE Broken seam 1 pcs (later stages total)

QC Endline data errors: 7

06/30 CS23 260883 (defective pcs 73 > defects 32), 07/01 CS23 260883 (defective pcs 105 > defects 61), 07/02 CS23 260883 (defective pcs 114 > defects 64), 07/03 CS23 260883 (defective pcs 108 > defects 55)…

Caught in earlier stages

CC Skip stitch (40), ED Gathering crease (10), DF Twisted seam/skewing (9), AC Fabric hole (6) did not reach later stages

Found before bulk production (Final Random, Shipment Sample): 3

CB Broken stitch, EC Asymmetry, BD Snagging: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline7 days—17.6%
Shipment Sample1 reports1—
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2317.5%
1489 / 7 days
—PASS
06/30–07/10
BA Thread ends, Others (no detail), CC Skip stitch
CS2027.3%
11 / 1 days
——
07/01–07/01
CC Skip stitch, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS237140 (0%)7707/02, 07/03, 07/04, 07/06, 07/10
CS20120 (0%)1107/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineShipment SampleFinal Random
BA Thread ends1205
Others (no detail)70
CC Skip stitch40
ED Gathering crease10
DF Twisted seam/skewing9
CB Broken stitch42
AC Fabric hole6
CE Broken seam41
253624 MKSC · CB04 · Due 08/12Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/22QC Inlineactual/required · 0%
DHU 19.4%QC Endline11 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty5,000 / 500
PDF reports4
Last report08/05

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (08/05): AD Fabric stains 2 (earlier 11 times)

Found earlier but still reached later stages: 2

EC Asymmetry 1, CC Skip stitch 2 pcs (later stages total)

Caught in earlier stages

EB Measurement issue (166), AB Shading (16), DB Run-off stitching (16) did not reach later stages

Found before bulk production (Final Random): 3

BB Missing cut seam allowance, DJ Pleat, AC Fabric hole: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/22 (0%)
——
QC Endline11 days—19.4%
Final Random4 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0419.4%
3210 / 11 days
—PASS
06/01–07/11
AD Fabric stains, EB Measurement issue, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0411220 (0%)111106/30, 07/01, 07/03, 07/10, 07/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
AD Fabric stains1804
EB Measurement issue166
EC Asymmetry1341
BA Thread ends1049
AB Shading16
DB Run-off stitching16
CC Skip stitch82
BB Missing cut seam allowance2
260244 MKSC · CB01/CB30 · Due 08/12Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/24QC Inlineactual/required · 0%
DHU 5.6%QC Endline11 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty3,100 / 1,000
PDF reports3
Last report07/11

Cross-stage findings

Found earlier but still reached later stages: 1

AD Fabric stains 2 pcs (later stages total)

1 defects recorded as 'Others' without detail

Final Random 1; cannot compare across stages

QC Endline data errors: 5

06/23 CB01 260244A-S (defective pcs 19 > defects 14), 06/24 CB01 260244A-S (defective pcs 13 > defects 12), 06/25 CB01 260244A-L (defective pcs 13 > defects 11), 06/27 CB01 260244B-L (defective pcs 5 > defects 4)…

Caught in earlier stages

DB Run-off stitching (81) did not reach later stages

Found before bulk production (Final Random): 5

ED Gathering crease, BD Snagging, CH Incorrect stitch density, CC Skip stitch, DJ Pleat: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/24 (0%)
——
QC Endline11 days—5.6%
Final Random3 reports04.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB015.6%
3090 / 11 days
—PASS
06/23–07/15
BA Thread ends, DB Run-off stitching, AD Fabric stains
CB300.0%
10 / 1 days
——
07/01–07/01
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0111220 (0%)111106/30, 07/01, 07/02, 07/03, 07/15
CB30120 (0%)1107/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends857
DB Run-off stitching81
AD Fabric stains82
ED Gathering crease2
BD Snagging2
CH Incorrect stitch density1
Others (no detail)1
CC Skip stitch1
260247 MKSC · CP04 · Due 08/12Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/10QC Inlineactual/required · 0%
DHU 12.4%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty2,850 / 900
PDF reports3
Last report08/08

Cross-stage findings

Found earlier but still reached later stages: 1

CC Skip stitch 2 pcs (later stages total)

QC Endline data errors: 3

06/30 CP04 260247AE (defective pcs 17 > defects 16), 07/02 CP04 260247AU (defective pcs 16 > defects 14), 07/03 CP04 260247AU (defective pcs 12 > defects 11)

Caught in earlier stages

AD Fabric stains (85), ED Gathering crease (34), EC Asymmetry (19) did not reach later stages

Report line differs from production line

QGR2632455 Final Random (08/06) CP03, QGR2633031 Final Random (08/08) CP03; actual production line(s) CP04 (cards show production lines only)

Found before bulk production (Final Random): 3

BB Missing cut seam allowance, CF Pulling yarn, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—12.4%
Final Random3 reports02.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0412.4%
2850 / 5 days
—PASS
06/30–07/04
BA Thread ends, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP045100 (0%)5506/30, 07/01, 07/02, 07/03, 07/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1226
AD Fabric stains85
CC Skip stitch802
ED Gathering crease34
EC Asymmetry19
CE Broken seam4
AC Fabric hole3
CF Pulling yarn2
260323 MKSC · CP02/CP03/CP07 · Due 08/12Final Random PASS No major issue (4 minor notes)
No resultPP Sample1 reports
No resultPilot Run2 reports
No reportQC 1st Bundle
07/29QA 1st Bundle1 reports
3/22QC Inlineactual/required · 14%
DHU 11.7%QC Endline10 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty4,540 / 1,500
PDF reports12
Last report08/12

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/12): CE Broken seam 1 (earlier 5 times), ED Gathering crease 1 (earlier 15 times)

Found earlier but still reached later stages: 3

EC Asymmetry 2, EA Unsmooth/puckering/bubbling 1, AD Fabric stains 1 pcs (later stages total)

12 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 10, PP Sample 1; cannot compare across stages

QC Endline data errors: 8

07/30 CP03 260323A (defective pcs 81 > defects 74), 08/03 CP03 260323A (defective pcs 69 > defects 52), 08/03 CP03 260323B (defective pcs 10 > defects 5), 08/04 CP03 260323A (defective pcs 55 > defects 41)…

Caught in earlier stages

EA Uneven seam allowance (85), CC Skip stitch (75), DF Twisted seam/skewing (49), DB Run-off stitching (38), DJ Pleat (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run2 reports0—
QA 1st Bundle1 reports—100.0%
QC Inline3 reports
required on prod. days 3/22 (14%)
—74.0%
QC Endline10 days—11.7%
QA Inline2 reports235.9%
Final Random3 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0311.8%
4422 / 10 days
35.9%PASS
07/29–08/08
BA Thread ends, ED Gathering crease, EA Uneven seam allowance
CP020.0%
20 / 1 days
—PASS
08/03–08/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0310203 (15%)10708/04, 08/05, 08/06, 08/07, 08/08
CP02120 (0%)1108/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends62012727
ED Gathering crease18613
EA Uneven seam allowance85
CC Skip stitch75
DF Twisted seam/skewing49
EC Asymmetry3229842
EA Unsmooth/puckering/bubbling143121
DB Run-off stitching236
260334 MKSC · CP17 · Due 08/12Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/10QC Inlineactual/required · 0%
DHU 31.7%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,829 / 700
PDF reports2
Last report08/06

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (08/06): BA Thread ends 1 (earlier 9 times)

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

Final Random 2; cannot compare across stages

QC Endline data errors: 5

06/29 CP17 260334A (defective pcs 122 > defects 94), 06/29 CP17 260334B (defective pcs 42 > defects 37), 06/30 CP17 260334A (defective pcs 91 > defects 76), 07/01 CP17 260334B (defective pcs 91 > defects 89)…

Caught in earlier stages

EC Asymmetry (172), ED Gathering crease (86), EB Measurement issue (44), CC Skip stitch (42), CE Broken seam (29) did not reach later stages

Report line differs from production line

QGR2632635 Final Random (08/06) CP03; actual production line(s) CP17 (cards show production lines only)

Found before bulk production (Final Random): 2

DJ Pleat, AC Fabric hole: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—31.7%
Final Random2 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1731.7%
1829 / 5 days
—PASS
06/27–07/02
BA Thread ends, EC Asymmetry, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP175100 (0%)5506/27, 06/29, 06/30, 07/01, 07/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1733
EC Asymmetry172
ED Gathering crease86
EB Measurement issue44
CC Skip stitch42
EA Unsmooth/puckering/bubbling311
CE Broken seam29
Others (no detail)2
260341 MKSC · CP17 · Due 08/12Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/10QC Inlineactual/required · 0%
DHU 22.9%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,641 / 500
PDF reports3
Last report08/05

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/05): CE Broken seam 1 (earlier 4 times), ED Gathering crease 1 (earlier 5 times)

QC Endline data errors: 2

07/04 CP17 260341A (defective pcs 50 > defects 49), 07/04 CP17 260341B (defective pcs 36 > defects 35)

Caught in earlier stages

AD Fabric stains (80), EC Asymmetry (39), EA Unsmooth/puckering/bubbling (25), CC Skip stitch (25), EB Measurement issue (15) did not reach later stages

Found before bulk production (Final Random): 2

CB Broken stitch, CF Pulling yarn: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—22.9%
Final Random3 reports04.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1722.9%
1641 / 5 days
—PASS
07/02–07/09
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP175100 (0%)5507/02, 07/03, 07/04, 07/06, 07/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1292
AD Fabric stains80
ED Gathering crease481
EC Asymmetry39
EA Unsmooth/puckering/bubbling25
CC Skip stitch25
CE Broken seam133
EB Measurement issue15
260576 LOGE · CS20 · Due 08/12Final Random PASS No major issue (6 minor notes)
No reportPP Sample
No reportPilot Run
07/07QC 1st Bundle1 reports
07/07QA 1st Bundle1 reports
14/36QC Inlineactual/required · 39%
DHU 16.6%QC Endline18 days
All FAILQA Inline2 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty5,000 / 5,000
PDF reports20
Last report08/10

Cross-stage findings

Recurring in small numbers: 4

Latest Final Random (08/10): EA Unsmooth/puckering/bubbling 1 (earlier 3 times), AD Fabric stains 2 (earlier 30 times), CE Broken seam 1 (earlier 17 times), CC Skip stitch 1 (earlier 32 times)

Found earlier but still reached later stages: 2

BB Missing cut seam allowance 2, BC Sticker left 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QC Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 8); zero in QC Endline records

QC Endline data errors: 1

07/25 CS20 260576-S (defective pcs 6 > defects 5)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (1 Major), DB Run-off stitching (1 Major), CB Broken stitch (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: BA Thread ends (4), DD Thread not straight/waving (1); Both: EC Asymmetry (4/2), EA Unsmooth/puckering/bubbling (3/1), DA Exceed seam allowance (2/1), AD Fabric stains (2/1), CE Broken seam (1/2); DHU QC 1st Bundle 85.0% / QA 1st Bundle 84.6%

Caught in earlier stages

EB Measurement issue (129), EC Asymmetry (31), DA Exceed seam allowance (29), DJ Pleat (26), DK Twisted shoulder strap (22) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—85.0%
QA 1st Bundle1 reports—84.6%
QC Inline14 reports
required on prod. days 14/36 (39%)
—26.4%
QC Endline18 days—16.6%
QA Inline2 reports237.5%
Pre-final1 reports02.5%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2016.6%
5000 / 18 days
37.5%PASS
07/07–07/28
BA Thread ends, EB Measurement issue, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS20183614 (39%)18407/22, 07/23, 07/24, 07/25, 07/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends480462176
EB Measurement issue1128
CC Skip stitch2410121
AD Fabric stains21276322
Others (no detail)141
EC Asymmetry42178
DA Exceed seam allowance21251
CE Broken seam122031
260722 GECL · CS03/CS24 · Due 08/12Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
7/62QC Inlineactual/required · 11%
DHU 14.7%QC Endline19 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty16,960 / 1,990
PDF reports9
Last report08/10

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/10): CB Broken stitch 1 (earlier 9 times), DF Twisted seam/skewing 1 (earlier 4 times)

Found earlier but still reached later stages: 4

DB Run-off stitching 1, DJ Pleat 1, BB Missing cut seam allowance 1, CF Pulling yarn 2 pcs (later stages total)

7 defects recorded as 'Others' without detail

QC Inline 3, Final Random 4; cannot compare across stages

QC Endline data errors: 3

06/26 CS24 260722A-1 (defective pcs 52 > defects 43), 07/09 CS24 260722B-1 (defective pcs 45 > defects 41), 07/09 CS24 260722A-1 (defective pcs 4 > defects 3)

Caught in earlier stages

CC Skip stitch (357), ED Gathering crease (49), CE Broken seam (19), AC Fabric hole (18), EC Asymmetry (16) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline7 reports
required on prod. days 7/62 (11%)
—11.7%
QC Endline19 days—14.7%
Final Random2 reports03.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0320.6%
8480 / 13 days
—PASS
06/29–07/15
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS248.8%
8470 / 18 days
—PASS
06/24–07/23
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2418362 (6%)181607/09, 07/10, 07/11, 07/17, 07/23
CS0313265 (19%)13807/08, 07/09, 07/10, 07/11, 07/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
BA Thread ends618826
CC Skip stitch2355
DB Run-off stitching201141
ED Gathering crease346
Others (no detail)3194
CB Broken stitch231
CE Broken seam19
AC Fabric hole216
261052 RGOR · CP19 · Due 08/14Final Random PASS No major issue (6 minor notes)
No reportPP Sample
No reportPilot Run
08/03QC 1st Bundle1 reports
08/03QA 1st Bundle1 reports
3/20QC Inlineactual/required · 15%
DHU 17.5%QC Endline10 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty5,645 / 5,645
PDF reports8
Last report08/14

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/14): CB Broken stitch 2 (earlier 5 times), CC Skip stitch 1 (earlier 10 times)

Found earlier but still reached later stages: 1

GA Missing bartack/button 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 4); zero in QC Endline records

QC Endline data errors: 8

08/04 CP19 261052 (defective pcs 115 > defects 41), 08/05 CP19 261052 (defective pcs 265 > defects 174), 08/06 CP19 261052 (defective pcs 227 > defects 165), 08/07 CP19 261052 (defective pcs 145 > defects 60)…

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (4 Major), ED Gathering crease (3 Major), CG Grinning (2 Major); Only QC 1st Bundle: GA Missing bartack/button (2), DD Thread not straight/waving (2), DB Run-off stitching (2), DC Join stitching (2); Both: BA Thread ends (7/2), AD Fabric stains (1/3), EC Asymmetry (1/3), DE Cut to broken (1/2), CB Broken stitch (1/1); DHU QC 1st Bundle 95.0% / QA 1st Bundle 100.0%

Caught in earlier stages

EA Uneven seam allowance (74), CD Needle hole (36), EB Measurement issue (30), HA Poor pressing (27), DE Cut to broken (7) did not reach later stages

Report line differs from production line

QGR2634224 Final Random (08/14) CP14; actual production line(s) CP19 (cards show production lines only)

Found before bulk production (Shipment Sample): 5

DF Twisted seam/skewing, EC Asymmetry, BD Snagging, AD Fabric stains, ED Gathering crease: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—95.0%
QA 1st Bundle1 reports—100.0%
QC Inline3 reports
required on prod. days 3/20 (15%)
—55.2%
QC Endline10 days—17.5%
QA Inline1 reports150.0%
Shipment Sample1 reports1—
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1917.5%
5664 / 10 days
50.0%—
08/01–08/12
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1910203 (15%)10708/07, 08/08, 08/10, 08/11, 08/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends722832049
AD Fabric stains13422011
ED Gathering crease3142311
CC Skip stitch41391
EA Uneven seam allowance74
CD Needle hole36
EB Measurement issue30
HA Poor pressing27
261053 RGOR · CP20 · Due 08/14Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
08/05QC 1st Bundle1 reports
08/04QA 1st Bundle1 reports
1/20QC Inlineactual/required · 5%
DHU 11.2%QC Endline10 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,550 / 3,550
PDF reports6
Last report08/15

Cross-stage findings

3 defects recorded as 'Others' without detail

Shipment Sample 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC Endline data errors: 8

08/04 CP20 261053 (defective pcs 20 > defects 9), 08/05 CP20 261053 (defective pcs 170 > defects 87), 08/06 CP20 261053 (defective pcs 164 > defects 54), 08/07 CP20 261053 (defective pcs 133 > defects 72)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (3 Major), AD Fabric stains (2 Major), DJ Pleat (2 Major), EA Unsmooth/puckering/bubbling (1 Major), DF Twisted seam/skewing (1 Major); Both: BA Thread ends (7/2), ED Gathering crease (3/4), BB Missing cut seam allowance (4/1), EC Asymmetry (2/3); DHU QC 1st Bundle 80.0% / QA 1st Bundle 95.0%

Caught in earlier stages

CC Skip stitch (138), BB Missing cut seam allowance (7), EA Unsmooth/puckering/bubbling (5) did not reach later stages

Report line differs from production line

QGR2634504 Final Random (08/15) CP15; actual production line(s) CP20 (cards show production lines only)

Found before bulk production (Shipment Sample): 8

AD Fabric stains, ED Gathering crease, CE Broken seam, DE Cut to broken, GB Missing sewing operation, BD Snagging, EC Asymmetry, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—95.0%
QC Inline1 reports
required on prod. days 1/20 (5%)
—75.0%
QC Endline10 days—11.2%
QA Inline1 reports143.8%
Shipment Sample1 reports1—
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP2011.2%
3659 / 10 days
43.8%—
08/04–08/14
CC Skip stitch, ED Gathering crease, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP2010201 (5%)10908/10, 08/11, 08/12, 08/13, 08/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends72913527
ED Gathering crease34136222
CC Skip stitch2136
EC Asymmetry2312
BB Missing cut seam allowance412
AD Fabric stains212
EA Unsmooth/puckering/bubbling14
CB Broken stitch112
261054 RGOR · CP12 · Due 08/14Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
08/06QC 1st Bundle1 reports
08/07QA 1st Bundle1 reports
2/18QC Inlineactual/required · 11%
DHU 11.2%QC Endline9 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty4,935 / 4,935
PDF reports6
Last report08/15

Cross-stage findings

Found earlier but still reached later stages: 2

DE Cut to broken 1, CB Broken stitch 2 pcs (later stages total)

QC Endline data errors: 4

08/06 CP12 261054 (defective pcs 125 > defects 77), 08/11 CP12 261054 (defective pcs 115 > defects 98), 08/13 CP12 261054 (defective pcs 40 > defects 31), 08/14 CP12 261054 (defective pcs 15 > defects 12)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: FB Material defect (3 Major), DE Cut to broken (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (4), CG Grinning (1), EC Asymmetry (1); Both: ED Gathering crease (5/2), BA Thread ends (3/2), AD Fabric stains (2/2), GA Missing bartack/button (1/3), DI High-low/uneven (1/3), EA Unsmooth/puckering/bubbling (1/1), EI Inaccurate/skewed stitching (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 90.0%

Caught in earlier stages

EB Measurement issue (76), CC Skip stitch (69), DI High-low/uneven (10), AA Fabric defect (9), CG Grinning (5) did not reach later stages

Found before bulk production (Shipment Sample): 4

AD Fabric stains, ED Gathering crease, EC Asymmetry, CE Broken seam: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—90.0%
QC Inline2 reports
required on prod. days 2/18 (11%)
—25.0%
QC Endline9 days—11.2%
Shipment Sample1 reports1—
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1211.2%
5085 / 9 days
—PASS
08/06–08/17
BA Thread ends, AD Fabric stains, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP129182 (11%)9708/11, 08/12, 08/13, 08/14, 08/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SampleFinal Random
BA Thread ends32141435
AD Fabric stains22612712
EB Measurement issue76
CC Skip stitch465
ED Gathering crease5234831
Others (no detail)60
CE Broken seam391
DI High-low/uneven136
261266 RGOR · CB35 · Due 08/14Final Random PASS No major issue (4 minor notes)
No resultPP Sample1 reports
No reportPilot Run
07/31QC 1st Bundle1 reports
07/31QA 1st Bundle1 reports
3/14QC Inlineactual/required · 21%
DHU 16.9%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,210 / 1,210
PDF reports8
Last report08/14

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (08/14): EA Unsmooth/puckering/bubbling 1 (earlier 8 times), AD Fabric stains 2 (earlier 10 times), CC Skip stitch 1 (earlier 5 times)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC Endline data errors: 5

08/01 CB35 261266 (defective pcs 30 > defects 29), 08/03 CB35 261266 (defective pcs 41 > defects 36), 08/04 CB35 261266 (defective pcs 49 > defects 48), 08/06 CB35 261266 (defective pcs 35 > defects 34)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (3 Major), CC Skip stitch (1), EE Raw edge (1 Major), EI Inaccurate/skewed stitching (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DJ Pleat (1), ED Gathering crease (1); Both: EA Unsmooth/puckering/bubbling (2/2), EC Asymmetry (3/1), AD Fabric stains (1/2), CG Grinning (1/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 92.3%

Caught in earlier stages

ED Gathering crease (68), EC Asymmetry (33), DB Run-off stitching (10), DJ Pleat (5), CG Grinning (5) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—92.3%
QC Inline3 reports
required on prod. days 3/14 (21%)
—29.3%
QC Endline7 days—16.9%
QA Inline1 reports140.6%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3516.9%
1234 / 7 days
40.6%PASS
07/31–08/07
AD Fabric stains, ED Gathering crease, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB357143 (21%)7408/03, 08/04, 08/05, 08/06, 08/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease1111541
AD Fabric stains1235522
BA Thread ends5023
EC Asymmetry311316
CC Skip stitch1241
EA Unsmooth/puckering/bubbling22931
DB Run-off stitching10
DJ Pleat113
261267 RGOR · CB24/CB27 · Due 08/14No final No major issue (2 minor notes)
No resultPP Sample1 reports
No reportPilot Run
07/28QC 1st Bundle1 reports
07/28QA 1st Bundle1 reports
5/18QC Inlineactual/required · 28%
DHU 17.7%QC Endline9 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,025 / 1,025
PDF reports9
Last report08/03

Cross-stage findings

2 defects recorded as 'Others' without detail

PP Sample 2; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), FC Wrong label (3 Major), CA Thread tension (1 Major); Only QC 1st Bundle: DF Twisted seam/skewing (2), AC Fabric hole (1); Both: AD Fabric stains (2/2), ED Gathering crease (1/3), DJ Pleat (1/1); DHU QC 1st Bundle 53.8% / QA 1st Bundle 100.0%

Caught in earlier stages

AD Fabric stains (87), ED Gathering crease (72), EC Asymmetry (34), EB Measurement issue (23), DF Twisted seam/skewing (17) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—53.8%
QA 1st Bundle1 reports—100.0%
QC Inline5 reports
required on prod. days 5/18 (28%)
—49.4%
QC Endline9 days—17.7%
QA Inline1 reports131.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2717.9%
1028 / 8 days
31.2%—
07/29–08/06
AD Fabric stains, ED Gathering crease, EC Asymmetry
CB240.0%
10 / 1 days
——
08/08–08/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB278165 (31%)8308/01, 08/03, 08/04, 08/05, 08/06
CB24120 (0%)1108/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
AD Fabric stains12212682
ED Gathering crease1311552
EC Asymmetry1627
EB Measurement issue221
DF Twisted seam/skewing215
DJ Pleat11101
CE Broken seam83
CC Skip stitch18
261269 RGOR · CB31 · Due 08/14No final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
08/04QC 1st Bundle1 reports
08/05QA 1st Bundle1 reports
3/10QC Inlineactual/required · 30%
DHU 9.3%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,520 / 1,520
PDF reports6
Last report08/07

Cross-stage findings

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 3), EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), EI Inaccurate/skewed stitching (2 Major), CH Incorrect stitch density (1 Major), BA Thread ends (1 Major), CA Thread tension (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: CC Skip stitch (1), DD Thread not straight/waving (1); Both: EC Asymmetry (2/2), AD Fabric stains (2/1), DJ Pleat (1/1), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 61.5% / QA 1st Bundle 100.0%

Caught in earlier stages

AD Fabric stains (113), BA Thread ends (29), CC Skip stitch (20), EC Asymmetry (15), DJ Pleat (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—61.5%
QA 1st Bundle1 reports—100.0%
QC Inline3 reports
required on prod. days 3/10 (30%)
—35.3%
QC Endline5 days—9.3%
QA Inline1 reports134.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB319.3%
1543 / 5 days
34.4%—
08/05–08/10
AD Fabric stains, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB315103 (30%)5208/05, 08/06, 08/07, 08/08, 08/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
AD Fabric stains2191001
BA Thread ends1271
CC Skip stitch1217
EC Asymmetry2283
DJ Pleat118
EA Unsmooth/puckering/bubbling1133
ED Gathering crease251
CA Thread tension13
261271 RGOR · CP15 · Due 08/14Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/20QA 1st Bundle1 reports
0/14QC Inlineactual/required · 0%
DHU 9.7%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,050 / 2,050
PDF reports4
Last report08/14

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/14): ED Gathering crease 1 (earlier 6 times), AD Fabric stains 2 (earlier 4 times)

Found earlier but still reached later stages: 2

CB Broken stitch 1, EI Inaccurate/skewed stitching 2 pcs (later stages total)

QC Endline data errors: 4

07/21 CP15 261271 (defective pcs 286 > defects 144), 07/22 CP15 261271 (defective pcs 228 > defects 166), 07/23 CP15 261271 (defective pcs 157 > defects 98), 07/29 CP15 261271 (defective pcs 5 > defects 4)

Caught in earlier stages

EA Uneven seam allowance (92), EA Unsmooth/puckering/bubbling (48), CC Skip stitch (27), CG Grinning (8), EC Asymmetry (8) did not reach later stages

Report line differs from production line

QGR2633243 Final Random (08/10) CP03; actual production line(s) CP15 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—65.0%
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—9.7%
QA Inline1 reports134.4%
Final Random2 reports03.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP159.7%
4331 / 7 days
34.4%PASS
07/21–08/01
BA Thread ends, EA Uneven seam allowance, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP157140 (0%)7707/23, 07/24, 07/27, 07/29, 08/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends11244
EA Uneven seam allowance92
ED Gathering crease8911
EA Unsmooth/puckering/bubbling147
AD Fabric stains3615
CC Skip stitch261
CG Grinning44
EC Asymmetry431
261375 RGOR · CP15 · Due 08/14No final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/13QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 3.9%QC Endline4 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,205 / 1,205
PDF reports1
Last report08/13

Cross-stage findings

QC Endline data errors: 1

08/12 CP15 261375 (defective pcs 81 > defects 46)

Caught in earlier stages

BA Thread ends (15), AD Fabric stains (13), ED Gathering crease (13), EC Asymmetry (8) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—60.0%
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—3.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP153.9%
1177 / 4 days
——
08/12–08/18
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP15480 (0%)4408/12, 08/13, 08/14, 08/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC Endline
BA Thread ends312
AD Fabric stains211
ED Gathering crease211
EC Asymmetry8
DJ Pleat3
CG Grinning2
CC Skip stitch2
EA Unsmooth/puckering/bubbling2
261376 RGOR · CP15 · Due 08/14No final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/13QA 1st Bundle1 reports
0/4QC Inlineactual/required · 0%
DHU 3.2%QC Endline2 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,180 / 1,180
PDF reports1
Last report08/13

Cross-stage findings

QC Endline data errors: 1

08/13 CP15 261376 (defective pcs 72 > defects 34)

Caught in earlier stages

ED Gathering crease (11), BA Thread ends (10), AD Fabric stains (10), EC Asymmetry (7) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—60.0%
QC Inline0 reports
required on prod. days 0/4 (0%)
——
QC Endline2 days—3.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP153.2%
1057 / 2 days
——
08/13–08/15
AD Fabric stains, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP15240 (0%)2208/13, 08/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC Endline
ED Gathering crease38
BA Thread ends28
AD Fabric stains10
EC Asymmetry16
BB Missing cut seam allowance3
DJ Pleat2
CC Skip stitch2
EA Unsmooth/puckering/bubbling1
261319 OSIT · CS13/CS14 · Due 08/19Final Random PASS No major issue (5 minor notes)
No reportPP Sample
No reportPilot Run
07/25QC 1st Bundle1 reports
07/25QA 1st Bundle1 reports
5/12QC Inlineactual/required · 42%
DHU 11.7%QC Endline6 days
All FAILQA Inline3 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty5,300 / 5,300
PDF reports12
Last report08/10

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/10): ED Gathering crease 1 (earlier 8 times), EC Asymmetry 2 (earlier 10 times)

Found earlier but still reached later stages: 6

BC Sticker left 1, AD Fabric stains 6, DE Cut to broken 2, BB Missing cut seam allowance 5, EH Poor lamination/bonding 1, AB Shading 1 pcs (later stages total)

57 defects recorded as 'Others' without detail

QC 1st Bundle 13, QC Inline 42, Pre-final 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 17); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (2 Major), EC Asymmetry (2 Major), IA 2nd operation issue (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: AC Fabric hole (4); Both: ED Gathering crease (5/3), BC Sticker left (5/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 50.0%

Caught in earlier stages

CC Skip stitch (66), DF Twisted seam/skewing (8), CB Broken stitch (6), CG Grinning (6), EB Measurement issue (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—50.0%
QC Inline5 reports
required on prod. days 5/12 (42%)
—0.0%
QC Endline6 days—11.7%
QA Inline3 reports343.8%
Pre-final1 reports17.5%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1411.7%
4888 / 5 days
43.8%—
07/27–07/31
BA Thread ends, ED Gathering crease, CC Skip stitch
CS130.0%
13 / 1 days
—PASS
08/03–08/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS145105 (50%)5007/27, 07/28, 07/29, 07/30, 07/31
CS13120 (0%)1108/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends1029257
ED Gathering crease5319811
CC Skip stitch642
Others (no detail)13422
EC Asymmetry2101412
AD Fabric stains2551
BC Sticker left5131
DF Twisted seam/skewing8
261388 RGOR · CB36 · Due 08/21Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
08/10QC 1st Bundle1 reports
08/07QA 1st Bundle2 reports
1/22QC Inlineactual/required · 5%
DHU 8.9%QC Endline11 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,155 / 2,155
PDF reports6
Last report08/22

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (08/22): CC Skip stitch 1 (earlier 16 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), AF Crushed foam cup (1 Major), EE Raw edge (1 Major), DD Thread not straight/waving (1 Major), ED Gathering crease (1 Major), DA Exceed seam allowance (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (2); Both: EC Asymmetry (2/2), AD Fabric stains (2/1), CC Skip stitch (2/1), DJ Pleat (2/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 50.0%

Caught in earlier stages

ED Gathering crease (40), AD Fabric stains (18), EC Asymmetry (8), EA Unsmooth/puckering/bubbling (7), CE Broken seam (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—76.9%
QA 1st Bundle2 reports—50.0%
QC Inline1 reports
required on prod. days 1/22 (5%)
—25.0%
QC Endline11 days—8.9%
QA Inline1 reports131.2%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB368.9%
2145 / 11 days
31.2%PASS
08/07–08/19
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3611221 (5%)111008/14, 08/15, 08/17, 08/18, 08/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends229923
ED Gathering crease1138
CC Skip stitch212611
AD Fabric stains2115
EC Asymmetry2222
EA Unsmooth/puckering/bubbling232
CE Broken seam6
DJ Pleat211
261389 RGOR · CP19/CP20 · Due 08/21No final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/18QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 18.5%QC Endline4 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,845 / 1,845
PDF reports1
Last report08/18

Cross-stage findings

QC Endline data errors: 2

08/18 CP19 261389-L (defective pcs 10 > defects 5), 08/19 CP19 261389-L (defective pcs 10 > defects 8)

Caught in earlier stages

BA Thread ends (97), CC Skip stitch (82), ED Gathering crease (62), AD Fabric stains (46), EA Uneven seam allowance (31) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—60.0%
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—18.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1918.9%
1805 / 3 days
——
08/18–08/25
BA Thread ends, CC Skip stitch, ED Gathering crease
CP200.0%
40 / 1 days
——
08/17–08/17
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP19360 (0%)3308/18, 08/19, 08/25
CP20120 (0%)1108/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC Endline
BA Thread ends493
CC Skip stitch82
ED Gathering crease260
AD Fabric stains46
EA Uneven seam allowance31
EB Measurement issue15
CE Broken seam18
CD Needle hole6
261391 RGOR · CP19/CP20 · Due 08/21Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/24QA 1st Bundle1 reports
2/8QC Inlineactual/required · 25%
DHU 6.7%QC Endline3 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,210 / 2,210
PDF reports4
Last report08/25

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (08/24): DE Cut to broken 1 (earlier 4 times), CC Skip stitch 1 (earlier 6 times), AD Fabric stains 1 (earlier 3 times)

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

QC Endline data errors: 5

08/22 CP19 261391-S (defective pcs 25 > defects 11), 08/22 CP19 261391-L (defective pcs 5 > defects 3), 08/24 CP19 261391-L (defective pcs 33 > defects 12), 08/25 CP19 261391-S (defective pcs 82 > defects 47)…

Caught in earlier stages

CD Needle hole (18), ED Gathering crease (14), EC Asymmetry (7) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline2 reports
required on prod. days 2/8 (25%)
—57.8%
QC Endline3 days—6.7%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP196.7%
2215 / 3 days
—PASS
08/22–08/25
BA Thread ends, CC Skip stitch, CD Needle hole
CP200.0%
20 / 1 days
——
08/25–08/25
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP19362 (33%)3108/22, 08/24, 08/25
CP20120 (0%)1108/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineFinal Random
BA Thread ends224913
CC Skip stitch1231
CD Needle hole18
ED Gathering crease212
EC Asymmetry34
DE Cut to broken321
AD Fabric stains121
DB Run-off stitching3
260111 SAIN · CS14/CS22 · Due 08/24Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/16QC Inlineactual/required · 6%
DHU 15.9%QC Endline8 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty3,665 / 2,355
PDF reports5
Last report08/03

Cross-stage findings

Found earlier but still reached later stages: 1

CC Skip stitch 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 4), EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC Endline data errors: 1

06/19 CS14 260111 (defective pcs 45 > defects 43)

Caught in earlier stages

DB Run-off stitching (16), DI High-low/uneven (6) did not reach later stages

Found before bulk production (Final Random): 8

EC Asymmetry, EA Unsmooth/puckering/bubbling, CB Broken stitch, BB Missing cut seam allowance, AB Shading, EI Inaccurate/skewed stitching, FC Wrong label, ED Gathering crease: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/16 (6%)
—59.4%
QC Endline8 days—15.9%
QA Inline1 reports125.0%
Final Random3 reports04.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1416.5%
818 / 4 days
—PASS
06/06–06/20
BA Thread ends, CC Skip stitch
CS2214.8%
431 / 4 days
25.0%—
06/02–08/04
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS14480 (0%)4406/06, 06/17, 06/19, 06/20
CS22481 (12%)4306/02, 08/01, 08/03, 08/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends614339
CC Skip stitch402
DB Run-off stitching313
DI High-low/uneven42
CB Broken stitch32
EC Asymmetry13
EA Unsmooth/puckering/bubbling3
ED Gathering crease21
260112 SAIN · CS04/CS24 · Due 08/24Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/8QC Inlineactual/required · 12%
DHU 11.1%QC Endline4 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty4,605 / 4,605
PDF reports3
Last report07/28

Cross-stage findings

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

Caught in earlier stages

CC Skip stitch (47), DI High-low/uneven (22), DB Run-off stitching (14), ED Gathering crease (6), EA Uneven seam allowance (6) did not reach later stages

Found before bulk production (Final Random): 5

EA Unsmooth/puckering/bubbling, EI Inaccurate/skewed stitching, AB Shading, CB Broken stitch, AD Fabric stains: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/8 (12%)
—41.2%
QC Endline4 days—11.1%
Final Random2 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2410.6%
878 / 2 days
—PASS
07/28–07/29
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS0412.0%
540 / 2 days
——
06/02–06/03
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS04240 (0%)2206/02, 06/03
CS24241 (25%)2107/28, 07/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
BA Thread ends838
CC Skip stitch47
DI High-low/uneven22
DB Run-off stitching14
CB Broken stitch43
ED Gathering crease42
EA Uneven seam allowance6
EA Unsmooth/puckering/bubbling3
260113 SAIN · CS24 · Due 08/24Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/6QC Inlineactual/required · 0%
DHU 0.0%QC Endline3 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty6,705 / 1,893
PDF reports1
Last report07/24

Cross-stage findings

Main QA defects never recorded by QC Endline: 1

BA Thread ends (QA 3); zero in QC Endline records

Found before bulk production (Final Random): 7

EA Unsmooth/puckering/bubbling, EI Inaccurate/skewed stitching, EC Asymmetry, AD Fabric stains, CC Skip stitch, CB Broken stitch, BA Thread ends: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—0.0%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS240.0%
110 / 3 days
—PASS
06/01–06/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS24360 (0%)3306/01, 06/05, 06/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends3
EA Unsmooth/puckering/bubbling1
EI Inaccurate/skewed stitching1
EC Asymmetry1
AD Fabric stains1
CC Skip stitch1
CB Broken stitch1
260114 SAIN · CS24 · Due 08/24Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/8QC Inlineactual/required · 0%
DHU 5.7%QC Endline4 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,599 / 1,595
PDF reports3
Last report07/24

Cross-stage findings

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

QC Endline data errors: 1

07/31 CS24 260114 (defective pcs 13 > defects 12)

Caught in earlier stages

CC Skip stitch (6) did not reach later stages

Report line differs from production line

QGR2627524 Final Random (07/11) CS11, QGR2627653 Final Random (07/15) CS11, QGR2629580 Final Random (07/24) CS11; actual production line(s) CS24 (cards show production lines only)

Found before bulk production (Final Random): 7

EI Inaccurate/skewed stitching, EA Unsmooth/puckering/bubbling, CB Broken stitch, BA Thread ends, HA Poor pressing, AD Fabric stains, AB Shading: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—5.7%
Final Random3 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS245.7%
419 / 4 days
——
07/31–08/04
BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS24480 (0%)4407/31, 08/01, 08/03, 08/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends189
CC Skip stitch6
EI Inaccurate/skewed stitching5
EA Unsmooth/puckering/bubbling5
CB Broken stitch5
HA Poor pressing1
AD Fabric stains1
AB Shading1
260115 SAIN · CS04/CS08/CS24 · Due 08/24Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/14QC Inlineactual/required · 0%
DHU 9.3%QC Endline7 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,510 / 1,453
PDF reports3
Last report08/10

Cross-stage findings

Found earlier but still reached later stages: 2

CC Skip stitch 2, EC Asymmetry 3 pcs (later stages total)

QC Endline data errors: 1

07/30 CS24 260115 (defective pcs 24 > defects 6)

Caught in earlier stages

DB Run-off stitching (12) did not reach later stages

Report line differs from production line

QGR2627173 Final Random (07/11) CS03, QGR2628570 Final Random (07/20) CS03, QGR2632847 Final Random (08/10) CS03; actual production line(s) CS04/CS08/CS24 (cards show production lines only)

Found before bulk production (Final Random): 6

EI Inaccurate/skewed stitching, AB Shading, AC Fabric hole, EA Unsmooth/puckering/bubbling, AD Fabric stains, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—9.3%
Final Random3 reports04.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0412.3%
1035 / 3 days
——
06/03–06/05
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS244.8%
589 / 3 days
——
07/29–07/31
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS080.0%
40 / 1 days
——
06/08–06/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS04360 (0%)3306/03, 06/04, 06/05
CS24360 (0%)3307/29, 07/30, 07/31
CS08120 (0%)1106/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends7616
CC Skip stitch502
EC Asymmetry93
DB Run-off stitching12
EI Inaccurate/skewed stitching5
Others (no detail)5
AB Shading2
ED Gathering crease2
260118 SAIN · CS14/CS22 · Due 08/24Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/30QC Inlineactual/required · 0%
DHU 10.3%QC Endline10 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty11,260 / 1,610
PDF reports2
Last report08/07

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (08/07): AD Fabric stains 2 (earlier 3 times)

Found earlier but still reached later stages: 1

EC Asymmetry 3 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

Caught in earlier stages

CC Skip stitch (127), ED Gathering crease (112), DB Run-off stitching (63), EB Measurement issue (11) did not reach later stages

Report line differs from production line

QGR2628641 Final Random (07/20) CS25, QGR2632833 Final Random (08/07) CS25; actual production line(s) CS14/CS22 (cards show production lines only)

Found before bulk production (Final Random): 2

EA Unsmooth/puckering/bubbling, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/30 (0%)
——
QC Endline10 days—10.3%
Final Random2 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1411.7%
4117 / 7 days
——
06/01–06/08
BA Thread ends, ED Gathering crease, CC Skip stitch
CS228.9%
3884 / 8 days
——
06/01–08/04
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS228160 (0%)8806/04, 06/08, 08/01, 08/03, 08/04
CS147140 (0%)7706/03, 06/04, 06/05, 06/06, 06/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends48811
CC Skip stitch127
ED Gathering crease112
DB Run-off stitching63
AD Fabric stains142
EB Measurement issue11
EC Asymmetry53
EA Unsmooth/puckering/bubbling3
260119 SAIN · CS03/CS20/CS24 · Due 08/24Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/14QC Inlineactual/required · 0%
DHU 14.2%QC Endline7 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty1,690 / 1,330
PDF reports3
Last report07/25

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/25): CC Skip stitch 1 (earlier 4 times)

Caught in earlier stages

DB Run-off stitching (6), ED Gathering crease (6) did not reach later stages

Found before bulk production (Final Random): 6

EI Inaccurate/skewed stitching, EA Unsmooth/puckering/bubbling, AC Fabric hole, CB Broken stitch, DJ Pleat, EC Asymmetry: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—14.2%
Final Random3 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0318.7%
822 / 4 days
——
06/19–06/25
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS245.1%
295 / 1 days
——
07/31–07/31
BA Thread ends, CC Skip stitch
CS200.0%
70 / 2 days
—PASS
06/01–06/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS03480 (0%)4406/19, 06/20, 06/22, 06/25
CS20240 (0%)2206/01, 06/08
CS24120 (0%)1107/31

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1179
CC Skip stitch401
EI Inaccurate/skewed stitching6
DB Run-off stitching6
ED Gathering crease6
CB Broken stitch4
EA Unsmooth/puckering/bubbling1
AC Fabric hole1
253619 MKSC · CP05 · Due 08/26Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,750 / 750
PDF reports2
Last report08/20

Cross-stage findings

Found before bulk production (Final Random): 6

CE Broken seam, BA Thread ends, BB Missing cut seam allowance, CB Broken stitch, DJ Pleat, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random2 reports03.1%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends3
CE Broken seam1
BB Missing cut seam allowance1
CB Broken stitch1
DJ Pleat1
EA Unsmooth/puckering/bubbling1
253632 MKSC · CP01/CP03 · Due 08/26Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,000 / 500
PDF reports2
Last report08/18

Cross-stage findings

Found before bulk production (Final Random): 4

CA Thread tension, BA Thread ends, EA Unsmooth/puckering/bubbling, DJ Pleat: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random2 reports03.1%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends5
CA Thread tension1
EA Unsmooth/puckering/bubbling1
DJ Pleat1
254206 LOGE · CB23 · Due 08/26No final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
3/40QC Inlineactual/required · 8%
DHU 20.0%QC Endline20 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty4,500 / 4,500
PDF reports4
Last report07/11

Cross-stage findings

QC Endline data errors: 3

07/08 CB23 254206-S (defective pcs 112 > defects 110), 07/09 CB23 254206-S (defective pcs 84 > defects 78), 07/10 CB23 254206-S (defective pcs 56 > defects 55)

Caught in earlier stages

BA Thread ends (279), EB Measurement issue (213), EC Asymmetry (110), AC Fabric hole (94), CC Skip stitch (92) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline3 reports
required on prod. days 3/40 (8%)
—44.8%
QC Endline20 days—20.0%
QA Inline1 reports153.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2320.0%
4460 / 20 days
53.1%—
06/26–07/24
BA Thread ends, EB Measurement issue, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2320403 (8%)201707/18, 07/20, 07/21, 07/23, 07/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA Inline
BA Thread ends2772
EB Measurement issue6207
EC Asymmetry31034
AC Fabric hole94
CC Skip stitch911
DB Run-off stitching86
ED Gathering crease315
AD Fabric stains47
260309 MKSC · CB03/CB15 · Due 08/26Final Random PASS No major issue (5 minor notes)
No resultPP Sample1 reports
No reportPilot Run
07/15QC 1st Bundle1 reports
07/16QA 1st Bundle1 reports
7/38QC Inlineactual/required · 18%
DHU 18.2%QC Endline19 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,906 / 600
PDF reports13
Last report08/24

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/24): DJ Pleat 1 (earlier 4 times), BA Thread ends 1 (earlier 21 times)

Found earlier but still reached later stages: 2

EC Asymmetry 1, CB Broken stitch 1 pcs (later stages total)

6 defects recorded as 'Others' without detail

PP Sample 3, QA 1st Bundle 2, Final Random 1; cannot compare across stages

QC Endline data errors: 1

08/10 CB15 260309B-S (defective pcs 4 > defects 3)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (5 Major), BD Snagging (1 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: AD Fabric stains (3), AC Fabric hole (3), BB Missing cut seam allowance (3), DJ Pleat (3); Both: CC Skip stitch (4/1); DHU QC 1st Bundle 123.1% / QA 1st Bundle 92.3%

Caught in earlier stages

CC Skip stitch (96), EB Measurement issue (67), ED Gathering crease (54), CE Broken seam (22), DB Run-off stitching (20) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—123.1%
QA 1st Bundle1 reports—92.3%
QC Inline7 reports
required on prod. days 7/38 (18%)
—33.7%
QC Endline19 days—18.2%
QA Inline1 reports131.2%
Final Random2 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0323.2%
1423 / 9 days
31.2%PASS
07/15–07/27
BA Thread ends, CC Skip stitch, ED Gathering crease
CB1512.5%
1219 / 10 days
——
07/29–08/24
BA Thread ends, EB Measurement issue, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1510201 (5%)10908/19, 08/20, 08/21, 08/22, 08/24
CB039186 (33%)9307/20, 07/21, 07/22, 07/23, 07/27

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends22162
CC Skip stitch412269
EB Measurement issue67
ED Gathering crease1521
EC Asymmetry5151461
Others (no detail)32161
CE Broken seam166
CB Broken stitch201
260311 MKSC · CB05/CB10/CB21 · Due 08/26Final Random PASS No major issue (4 minor notes)
No resultPP Sample1 reports
No resultPilot Run5 reports
07/15QC 1st Bundle1 reports
07/16QA 1st Bundle1 reports
5/38QC Inlineactual/required · 13%
DHU 13.1%QC Endline19 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty3,070 / 1,000
PDF reports17
Last report08/24

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (08/24): CB Broken stitch 1 (earlier 11 times)

10 defects recorded as 'Others' without detail

PP Sample 2, QA 1st Bundle 2, QA Inline 5, Final Random 1; cannot compare across stages

QC Endline data errors: 1

07/22 CB21 260311A (defective pcs 8 > defects 7)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (2 Major), CE Broken seam (1 Major); Only QC 1st Bundle: CG Grinning (3), DB Run-off stitching (1), CB Broken stitch (1); Both: EC Asymmetry (3/6); DHU QC 1st Bundle 61.5% / QA 1st Bundle 84.6%

Caught in earlier stages

EC Asymmetry (50), CD Needle hole (31), EA Unsmooth/puckering/bubbling (25), ED Gathering crease (24), CC Skip stitch (23) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run5 reports0—
QC 1st Bundle1 reports—61.5%
QA 1st Bundle1 reports—84.6%
QC Inline5 reports
required on prod. days 5/38 (13%)
—39.4%
QC Endline19 days—13.1%
QA Inline2 reports229.7%
Final Random2 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2113.1%
2791 / 19 days
29.7%PASS
07/15–08/25
BA Thread ends, CD Needle hole, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2119385 (13%)191408/03, 08/21, 08/22, 08/24, 08/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends42475
EC Asymmetry133612178
CD Needle hole31
EA Unsmooth/puckering/bubbling126142
ED Gathering crease5217
CC Skip stitch23
CB Broken stitch311512
EB Measurement issue115
260741 GECL · CS22 · Due 08/26Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/11QA 1st Bundle1 reports
2/8QC Inlineactual/required · 25%
DHU 17.5%QC Endline4 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,040 / 1,040
PDF reports5
Last report07/29

Cross-stage findings

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 3; cannot compare across stages

Caught in earlier stages

CC Skip stitch (44), DB Run-off stitching (26), EB Measurement issue (5) did not reach later stages

Found before bulk production (Shipment Sample): 6

EC Asymmetry, AA Fabric defect, EI Inaccurate/skewed stitching, AC Fabric hole, ED Gathering crease, AD Fabric stains: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—70.0%
QC Inline2 reports
required on prod. days 2/8 (25%)
—56.2%
QC Endline4 days—17.5%
Shipment Sample1 reports1—
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2217.5%
1040 / 4 days
—PASS
07/10–07/14
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS22482 (25%)4207/10, 07/11, 07/13, 07/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineShipment SampleFinal Random
BA Thread ends412772
CC Skip stitch341
DB Run-off stitching26
ED Gathering crease31511
AD Fabric stains2911
EC Asymmetry2332
Others (no detail)34
CB Broken stitch61
260743 GECL · CS22 · Due 08/26Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/15QA 1st Bundle1 reports
2/6QC Inlineactual/required · 33%
DHU 11.0%QC Endline3 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,040 / 1,040
PDF reports5
Last report07/29

Cross-stage findings

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

6 defects recorded as 'Others' without detail

Shipment Sample 1, QC Inline 3, QA 1st Bundle 1, Final Random 1; cannot compare across stages

Caught in earlier stages

CC Skip stitch (24), AD Fabric stains (21), DB Run-off stitching (10), CB Broken stitch (7), DC Join stitching (6) did not reach later stages

Found before bulk production (Shipment Sample): 3

EC Asymmetry, ED Gathering crease, EI Inaccurate/skewed stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—70.0%
QC Inline2 reports
required on prod. days 2/6 (33%)
—60.9%
QC Endline3 days—11.0%
Shipment Sample1 reports1—
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2211.0%
1040 / 3 days
—PASS
07/14–07/16
BA Thread ends, CC Skip stitch, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS22362 (33%)3107/14, 07/15, 07/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineShipment SampleFinal Random
BA Thread ends512562
CC Skip stitch123
AD Fabric stains1218
DB Run-off stitching10
EC Asymmetry2311
Others (no detail)13111
CB Broken stitch7
DC Join stitching6
260746 GECL · CS17 · Due 08/26Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
07/25QC 1st Bundle1 reports
07/25QA 1st Bundle1 reports
1/8QC Inlineactual/required · 12%
DHU 8.8%QC Endline4 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,040 / 1,040
PDF reports5
Last report08/03

Cross-stage findings

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DI High-low/uneven (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: AD Fabric stains (3), DF Twisted seam/skewing (1); Both: BA Thread ends (6/3), ED Gathering crease (3/1), EC Asymmetry (2/2); DHU QC 1st Bundle 75.0% / QA 1st Bundle 40.0%

Caught in earlier stages

CC Skip stitch (11), DJ Pleat (6) did not reach later stages

Found before bulk production (Shipment Sample): 5

EI Inaccurate/skewed stitching, AD Fabric stains, ED Gathering crease, EC Asymmetry, CE Broken seam: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—40.0%
QC Inline1 reports
required on prod. days 1/8 (12%)
—21.2%
QC Endline4 days—8.8%
Shipment Sample1 reports1—
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS178.8%
1030 / 4 days
—PASS
07/25–07/29
BA Thread ends, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS17481 (12%)4307/25, 07/27, 07/28, 07/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SampleFinal Random
BA Thread ends63362
ED Gathering crease313201
AD Fabric stains31712
CC Skip stitch11
EC Asymmetry2242
DJ Pleat6
DB Run-off stitching4
CB Broken stitch21
260315 MKSC · CP06/CP09/CP16 · Due 08/27Final Random PASS No major issue (5 minor notes)
No reportPP Sample
No resultPilot Run3 reports
07/29QC 1st Bundle1 reports
07/29QA 1st Bundle1 reports
3/10QC Inlineactual/required · 30%
DHU 8.2%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty710 / 542
PDF reports9
Last report08/03

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (08/03): EC Asymmetry 1 (earlier 14 times)

Found earlier but still reached later stages: 1

DF Twisted seam/skewing 2 pcs (later stages total)

2 defects recorded as 'Others' without detail

QC 1st Bundle 2; cannot compare across stages

QC Endline data errors: 4

07/29 CP09 260315 (defective pcs 37 > defects 10), 07/30 CP09 260315 (defective pcs 53 > defects 16), 07/31 CP09 260315 (defective pcs 56 > defects 12), 08/01 CP09 260315 (defective pcs 72 > defects 20)

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: CD Needle hole (2), GB Missing sewing operation (1), CB Broken stitch (1); Both: BA Thread ends (7/2), EC Asymmetry (5/3), CG Grinning (1/2), EI Inaccurate/skewed stitching (1/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 50.0%

Caught in earlier stages

DI High-low/uneven (15), CC Skip stitch (11), ED Gathering crease (9), CB Broken stitch (7), EI Inaccurate/skewed stitching (6) did not reach later stages

Report line differs from production line

QGR2630797 Final Random (08/03) CP05; actual production line(s) CP06/CP09/CP16 (cards show production lines only)

Stage summary

StageCountFAILDHU
Pilot Run3 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—50.0%
QC Inline3 reports
required on prod. days 3/10 (30%)
—20.4%
QC Endline5 days—8.2%
Final Random1 reports06.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP098.2%
710 / 5 days
——
07/29–08/03
BA Thread ends, CC Skip stitch, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP095103 (30%)4307/29, 07/30, 08/01, 08/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineFinal Random
BA Thread ends7218212
EC Asymmetry7534101
DI High-low/uneven15
CC Skip stitch11
ED Gathering crease9
CB Broken stitch16
EI Inaccurate/skewed stitching1122
EB Measurement issue6
Jul 2026 109 · 🔴 22 🟠 28 🟢 59
Final Random FAIL: 8 POs
Most common in later stages: BA Thread ends (86), CB Broken stitch (70), AD Fabric stains (47)
🔴 Lines with most 🔴: CP07 (6), CP17 (5), CP12 (5), CB30 (3), CP04 (3)
260778 OSIT · CS04 · Due 07/08Shipment Sample FAIL Latest Shipment Sample (07/02) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
6/50QC Inlineactual/required · 12%
DHU 15.1%QC Endline25 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty8,000 / 8,000
PDF reports7
Last report07/11

Cross-stage findings

Latest Shipment Sample (07/02) FAILED

8 major: EA Unsmooth/puckering/bubbling 3, EC Asymmetry 3, EA Unsmooth/puckering/bubbling 2

Not fixed: EC Asymmetry

Found 23 times (151 pcs, 06/11–07/10) in earlier stages; latest Shipment Sample (07/02) still has 3 major

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

Caught in earlier stages

BA Thread ends (230), ED Gathering crease (194), AD Fabric stains (149), Q93 Heat seal logo peeling off (108), CC Skip stitch (107) did not reach later stages

Found before bulk production (Shipment Sample): 1

EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline6 reports
required on prod. days 6/50 (12%)
—10.2%
QC Endline25 days—15.1%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0415.1%
7135 / 25 days
——
06/11–07/11
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0425506 (12%)251907/07, 07/08, 07/09, 07/10, 07/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineShipment Sample
BA Thread ends6224
ED Gathering crease194
EC Asymmetry21493
AD Fabric stains6143
Q93 Heat seal logo peeling off108
CC Skip stitch107
DB Run-off stitching55
AB Shading241
260212 RGOR · CP16 · Due 07/10Shipment Sample FAIL Latest Shipment Sample (07/06) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/07QA 1st Bundle1 reports
1/14QC Inlineactual/required · 7%
DHU 15.5%QC Endline7 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty1,010 / 1,010
PDF reports3
Last report07/09

Cross-stage findings

Latest Shipment Sample (07/06) FAILED

7 major: EI Inaccurate/skewed stitching 1, EI Inaccurate/skewed stitching 1, ED Gathering crease 1, CB Broken stitch 1, CE Broken seam 1, EC Asymmetry 1, GB Missing sewing operation 1

Not fixed: ED Gathering crease

Found 6 times (31 pcs, 07/06–07/14) in earlier stages; latest Shipment Sample (07/06) still has 1 major

Not fixed: EC Asymmetry

Found 8 times (36 pcs, 07/06–07/14) in earlier stages; latest Shipment Sample (07/06) still has 1 major

QC Endline data errors: 7

07/06 CP16 260212 (defective pcs 20 > defects 6), 07/07 CP16 260212 (defective pcs 45 > defects 12), 07/08 CP16 260212 (defective pcs 25 > defects 7), 07/09 CP16 260212 (defective pcs 15 > defects 4)…

Caught in earlier stages

BA Thread ends (50), CC Skip stitch (31), EB Measurement issue (14), EA Unsmooth/puckering/bubbling (7) did not reach later stages

Found before bulk production (Shipment Sample): 4

EI Inaccurate/skewed stitching, CB Broken stitch, CE Broken seam, GB Missing sewing operation: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—55.0%
QC Inline1 reports
required on prod. days 1/14 (7%)
—25.0%
QC Endline7 days—15.5%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1615.5%
1010 / 7 days
——
07/06–07/14
BA Thread ends, EC Asymmetry, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP167141 (7%)7607/08, 07/09, 07/11, 07/13, 07/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineShipment Sample
BA Thread ends446
EC Asymmetry2341
ED Gathering crease311
CC Skip stitch31
EB Measurement issue14
EA Unsmooth/puckering/bubbling25
EI Inaccurate/skewed stitching22
DF Twisted seam/skewing4
260393 RGOR · CB21/CB30 · Due 07/10Shipment Sample FAIL Latest Shipment Sample (07/09) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
2/40QC Inlineactual/required · 5%
DHU 16.8%QC Endline19 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty4,955 / 4,955
PDF reports3
Last report07/09

Cross-stage findings

Latest Shipment Sample (07/09) FAILED

5 major: DJ Pleat 1, EA Unsmooth/puckering/bubbling 1, EA Unsmooth/puckering/bubbling 1, EA Unsmooth/puckering/bubbling 1, CG Grinning 1

Missed in earlier stages: 1

CG Grinning (Shipment Sample 07/09): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

EA Unsmooth/puckering/bubbling 3, DJ Pleat 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC Endline data errors: 2

07/13 CB21 260393-L (defective pcs 17 > defects 15), 07/14 CB21 260393-L (defective pcs 14 > defects 13)

Caught in earlier stages

BA Thread ends (573), CD Needle hole (134), CC Skip stitch (82), EB Measurement issue (44), EC Asymmetry (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline2 reports
required on prod. days 2/40 (5%)
—39.1%
QC Endline19 days—16.8%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2116.9%
5005 / 19 days
——
06/24–07/15
BA Thread ends, CD Needle hole, CC Skip stitch
CB300.0%
4 / 1 days
——
07/15–07/15
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2119382 (5%)191707/10, 07/11, 07/13, 07/14, 07/15
CB30120 (0%)1107/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineShipment Sample
BA Thread ends573
CD Needle hole134
CC Skip stitch82
EB Measurement issue44
EA Unsmooth/puckering/bubbling63
EC Asymmetry8
DB Run-off stitching52
CE Broken seam4
260394 RGOR · CP07/CP15 · Due 07/10Shipment Sample FAIL Latest Shipment Sample (07/10) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
2/42QC Inlineactual/required · 5%
DHU 22.5%QC Endline17 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty4,810 / 4,810
PDF reports6
Last report07/14

Cross-stage findings

Latest Shipment Sample (07/10) FAILED

2 major: EA Unsmooth/puckering/bubbling 1, EI Inaccurate/skewed stitching 1

Not fixed: EA Unsmooth/puckering/bubbling

Found 18 times (110 pcs, 07/01–07/15) in earlier stages; latest Shipment Sample (07/10) still has 1 major

Not fixed: EI Inaccurate/skewed stitching

Found 3 times (6 pcs, 07/04–07/14) in earlier stages; latest Shipment Sample (07/10) still has 1 major

QA Inline DHU is 4.2× QC Inline

QA Inline DHU 47.9% vs QC Inline 11.4%; QC Inline may be missing defects

QC Endline data errors: 15

06/29 CP15 260394 (defective pcs 17 > defects 10), 06/30 CP15 260394 (defective pcs 35 > defects 17), 07/01 CP15 260394 (defective pcs 58 > defects 24), 07/02 CP15 260394 (defective pcs 97 > defects 47)…

Caught in earlier stages

BA Thread ends (222), EC Asymmetry (212), CC Skip stitch (127), DB Run-off stitching (124), ED Gathering crease (119) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline2 reports
required on prod. days 2/42 (5%)
—11.4%
QC Endline17 days—22.5%
QA Inline3 reports347.9%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1522.9%
3857 / 16 days
34.4%—
06/29–07/17
BA Thread ends, EC Asymmetry, CC Skip stitch
CP0720.8%
1078 / 5 days
75.0%—
07/11–07/16
EA Uneven seam allowance, EC Asymmetry, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1516321 (3%)161507/11, 07/13, 07/14, 07/15, 07/17
CP075101 (10%)5407/11, 07/13, 07/14, 07/15, 07/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends102048
EC Asymmetry2084
CC Skip stitch21241
DB Run-off stitching7117
ED Gathering crease11153
EA Unsmooth/puckering/bubbling110271
EA Uneven seam allowance105
EB Measurement issue47
260395 RGOR · CP07 · Due 07/10Shipment Sample FAIL Latest Shipment Sample (07/08) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/34QC Inlineactual/required · 3%
DHU 56.1%QC Endline17 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty3,950 / 3,950
PDF reports2
Last report07/08

Cross-stage findings

Latest Shipment Sample (07/08) FAILED

2 major: GB Missing sewing operation 1, EA Unsmooth/puckering/bubbling 1

Not fixed: GB Missing sewing operation

Found 7 times (25 pcs, 06/26–07/10) in earlier stages; latest Shipment Sample (07/08) still has 1 major

Missed in earlier stages: 1

GA Missing bartack/button (Shipment Sample 07/08): first found in later stages, never recorded before

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

Caught in earlier stages

ED Gathering crease (1124), BA Thread ends (581), DB Run-off stitching (177), EC Asymmetry (173), Q94 Glue marks (65) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/34 (3%)
—26.2%
QC Endline17 days—56.1%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0756.1%
4068 / 17 days
——
06/24–07/13
ED Gathering crease, BA Thread ends, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0717341 (3%)171607/08, 07/09, 07/10, 07/11, 07/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineShipment Sample
ED Gathering crease1124
BA Thread ends5576
DB Run-off stitching177
EC Asymmetry173
Q94 Glue marks65
CE Broken seam128
GB Missing sewing operation251
CC Skip stitch22
260396 RGOR · CP14 · Due 07/10Shipment Sample FAIL Latest Shipment Sample (07/10) FAILED
No reportPP Sample
No reportPilot Run
07/09QC 1st Bundle1 reports
07/08QA 1st Bundle1 reports
2/18QC Inlineactual/required · 11%
DHU 13.8%QC Endline9 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty1,475 / 1,475
PDF reports6
Last report07/14

Cross-stage findings

Latest Shipment Sample (07/10) FAILED

4 major: DF Twisted seam/skewing 1, DF Twisted seam/skewing 1, CB Broken stitch 1, Others (no detail) 1

Not fixed: DF Twisted seam/skewing

Found 4 times (5 pcs, 07/08–07/13) in earlier stages; latest Shipment Sample (07/10) still has 2 major

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

QC Endline data errors: 12

07/08 CP14 260396 (defective pcs 30 > defects 9), 07/09 CP14 260396 (defective pcs 65 > defects 17), 07/10 CP14 260396 (defective pcs 80 > defects 30), 07/10 CP14 260396-L (defective pcs 15 > defects 4)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (3 Major), CB Broken stitch (3 Major), BA Thread ends (2 Major), BB Missing cut seam allowance (2 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: DI High-low/uneven (5), EI Inaccurate/skewed stitching (2), AC Fabric hole (2), DA Exceed seam allowance (1), DE Cut to broken (1); Both: EC Asymmetry (3/6), CE Broken seam (2/3); DHU QC 1st Bundle 80.0% / QA 1st Bundle 100.0%

Caught in earlier stages

BA Thread ends (75), CC Skip stitch (53), EC Asymmetry (33), CE Broken seam (25), EA Uneven seam allowance (20) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—100.0%
QC Inline2 reports
required on prod. days 2/18 (11%)
—28.1%
QC Endline9 days—13.8%
QA Inline1 reports140.6%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1413.8%
1519 / 9 days
40.6%—
07/08–07/17
BA Thread ends, CC Skip stitch, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP149182 (11%)8807/11, 07/13, 07/15, 07/16, 07/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends210603
CC Skip stitch53
EC Asymmetry36213
CE Broken seam23218
EA Uneven seam allowance20
DB Run-off stitching16
ED Gathering crease11
DK Twisted shoulder strap10
260437 RGOR · CS11/CS12 · Due 07/10Final Random PASS Not fixed: CC Skip stitch
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/26QC Inlineactual/required · 0%
DHU 25.4%QC Endline12 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,015 / 2,015
PDF reports1
Last report07/11

Cross-stage findings

Not fixed: CC Skip stitch

Found 12 times (79 pcs, 06/16–06/30) in earlier stages; latest Final Random (07/11) still has 3 major

Caught in earlier stages

AD Fabric stains (9), ED Gathering crease (8) did not reach later stages

Found before bulk production (Final Random): 1

CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/26 (0%)
——
QC Endline12 days—25.4%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1125.5%
2005 / 12 days
—PASS
06/16–06/30
BA Thread ends, CC Skip stitch, AD Fabric stains
CS120.0%
10 / 1 days
——
06/30–06/30
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1112240 (0%)121206/25, 06/26, 06/27, 06/29, 06/30
CS12120 (0%)1106/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends4155
CC Skip stitch793
AD Fabric stains9
ED Gathering crease8
CB Broken stitch1
260446 OSIT · CS01/CS02/CS09 · Due 07/11Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
3/40QC Inlineactual/required · 8%
DHU 16.9%QC Endline18 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty9,000 / 9,000
PDF reports7
Last report07/14

Cross-stage findings

Not fixed: ED Gathering crease

Found 23 times (443 pcs, 06/23–07/08) in earlier stages; latest Final Random (07/14) still has 3 major

Recurring in small numbers: 3

Latest Final Random (07/14): CB Broken stitch 2 (earlier 7 times), AD Fabric stains 2 (earlier 3 times), CC Skip stitch 1 (earlier 15 times)

Caught in earlier stages

EC Asymmetry (124), DF Twisted seam/skewing (36), DB Run-off stitching (30), EA Unsmooth/puckering/bubbling (19), EH Poor lamination/bonding (17) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline3 reports
required on prod. days 3/40 (8%)
—76.7%
QC Endline18 days—16.9%
QA Inline3 reports342.7%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0918.2%
5176 / 11 days
42.7%PASS
06/30–07/13
BA Thread ends, ED Gathering crease, CC Skip stitch
CS0214.7%
3101 / 8 days
——
06/22–06/30
ED Gathering crease, BA Thread ends, CC Skip stitch
CS010.0%
13 / 1 days
——
06/29–06/29
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0911223 (14%)11807/07, 07/08, 07/09, 07/10, 07/13
CS028160 (0%)8806/25, 06/26, 06/27, 06/29, 06/30
CS01120 (0%)1106/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends385147
ED Gathering crease2341373
CC Skip stitch22911
EC Asymmetry91141
DF Twisted seam/skewing36
DB Run-off stitching30
EA Unsmooth/puckering/bubbling154
CB Broken stitch1062
254024 DJLF · CP18 · Due 07/13Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/18QC Inlineactual/required · 0%
DHU 14.6%QC Endline9 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,860 / 3,860
PDF reports1
Last report07/02

Cross-stage findings

Not fixed: ED Gathering crease

Found 6 times (81 pcs, 06/19–06/25) in earlier stages; latest Final Random (07/02) still has 3 major

Recurring in small numbers: 1

Latest Final Random (07/02): CC Skip stitch 1 (earlier 8 times)

1 defects recorded as 'Others' without detail

Final Random 1; cannot compare across stages

QC Endline data errors: 8

06/17 CP18 254024 (defective pcs 25 > defects 15), 06/19 CP18 254024 (defective pcs 94 > defects 73), 06/20 CP18 254024 (defective pcs 60 > defects 54), 06/22 CP18 254024 (defective pcs 111 > defects 91)…

Caught in earlier stages

EC Asymmetry (88), EA Uneven seam allowance (42), CD Needle hole (19), GB Missing sewing operation (17), EB Measurement issue (12) did not reach later stages

Found before bulk production (Final Random): 1

EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/18 (0%)
——
QC Endline9 days—14.6%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1814.6%
3760 / 9 days
—PASS
06/17–07/06
BA Thread ends, EC Asymmetry, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP189180 (0%)9906/23, 06/24, 06/25, 06/26, 07/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1969
EC Asymmetry88
ED Gathering crease813
CC Skip stitch791
EA Uneven seam allowance42
CD Needle hole19
GB Missing sewing operation17
EB Measurement issue12
260826 RGOR · CP17 · Due 07/17Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/12QC Inlineactual/required · 0%
DHU 12.5%QC Endline6 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,205 / 2,205
PDF reports2
Last report07/18

Cross-stage findings

Not fixed: AD Fabric stains

Found 4 times (36 pcs, 06/24–06/29) in earlier stages; latest Final Random (07/18) still has 3 major

QC Endline data errors: 2

06/24 CP17 260826 (defective pcs 41 > defects 35), 06/29 CP17 260826 (defective pcs 13 > defects 11)

Caught in earlier stages

ED Gathering crease (115), EB Measurement issue (41), EA Uneven seam allowance (38), CC Skip stitch (25), EA Unsmooth/puckering/bubbling (20) did not reach later stages

Report line differs from production line

QGR2628391 Final Random (07/18) CP15; actual production line(s) CP17 (cards show production lines only)

Found before bulk production (Final Random): 2

CB Broken stitch, DE Cut to broken: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/12 (0%)
——
QC Endline6 days—12.5%
Final Random2 reports03.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1712.5%
3291 / 6 days
—PASS
06/24–06/30
BA Thread ends, ED Gathering crease, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP176120 (0%)6606/25, 06/26, 06/27, 06/29, 06/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends11911
ED Gathering crease115
EB Measurement issue41
AD Fabric stains363
EA Uneven seam allowance38
CC Skip stitch25
EA Unsmooth/puckering/bubbling20
DF Twisted seam/skewing7
254212 LOGE · CB35/CB36 · Due 07/20Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
6/40QC Inlineactual/required · 15%
DHU 17.8%QC Endline19 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty5,000 / 5,000
PDF reports8
Last report07/14

Cross-stage findings

Not fixed: ED Gathering crease

Found 20 times (84 pcs, 06/26–07/17) in earlier stages; latest Final Random (07/14) still has 4 major

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

Caught in earlier stages

AD Fabric stains (196), EC Asymmetry (178), CC Skip stitch (89), DB Run-off stitching (65), EB Measurement issue (48) did not reach later stages

Report line differs from production line

QGR2628353 Final Random (07/14) CB34; actual production line(s) CB35/CB36 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline6 reports
required on prod. days 6/40 (15%)
—31.8%
QC Endline19 days—17.8%
QA Inline1 reports146.9%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3517.8%
4970 / 19 days
46.9%—
06/26–07/17
BA Thread ends, AD Fabric stains, EC Asymmetry
CB360.0%
10 / 1 days
——
07/03–07/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3519386 (16%)191307/13, 07/14, 07/15, 07/16, 07/17
CB36120 (0%)1107/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends22588
AD Fabric stains13183
EC Asymmetry201553
CC Skip stitch2852
ED Gathering crease47914
DB Run-off stitching65
EB Measurement issue48
CG Grinning12
260177 LOGE · CB24/CB27/CB30 · Due 07/20Final Random PASS Not fixed: EC Asymmetry
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
5/28QC Inlineactual/required · 18%
DHU 22.4%QC Endline12 days
All FAILQA Inline1 reports
No resultShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,500 / 2,500
PDF reports9
Last report07/17

Cross-stage findings

Not fixed: EC Asymmetry

Found 17 times (47 pcs, 07/04–07/15) in earlier stages; latest Shipment Sample (07/17) still has 3 major

Missed in earlier stages: 3

BD Snagging (Final Random 07/14), GA Missing bartack/button (Shipment Sample 07/17), EE Raw edge (Shipment Sample 07/17): first found in later stages, never recorded before

Found earlier but still reached later stages: 5

AC Fabric hole 1, CC Skip stitch 2, CG Grinning 1, BA Thread ends 7, CB Broken stitch 2 pcs (later stages total)

3 defects recorded as 'Others' without detail

Shipment Sample 3; cannot compare across stages

Caught in earlier stages

ED Gathering crease (90), CE Broken seam (54), BB Missing cut seam allowance (51), EA Uneven seam allowance (44), DB Run-off stitching (37) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline6 reports
required on prod. days 5/28 (18%)
—48.0%
QC Endline12 days—22.4%
QA Inline1 reports165.6%
Shipment Sample1 reports0—
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2419.9%
2120 / 10 days
65.6%—
07/07–07/17
BA Thread ends, ED Gathering crease, CC Skip stitch
CB2741.7%
290 / 3 days
——
07/04–07/07
BA Thread ends, CC Skip stitch, DB Run-off stitching
CB300.0%
10 / 1 days
—PASS
07/17–07/17
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2410205 (25%)10507/13, 07/14, 07/15, 07/16, 07/17
CB27360 (0%)3307/04, 07/06, 07/07
CB30120 (0%)1107/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends21427
CC Skip stitch21002
ED Gathering crease3843
CE Broken seam14391
BB Missing cut seam allowance492
EC Asymmetry311513
EA Uneven seam allowance44
DB Run-off stitching334
260180 LOGE · CP03/CP04/CP05… · Due 07/20Shipment Sample FAIL Latest Shipment Sample (07/15) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
3/158QC Inlineactual/required · 2%
DHU 7.6%QC Endline33 days
No reportQA Inline
All FAILShipment Sample2 reports
No reportPre-final
No reportFinal Random
Order/Ship qty6,000 / 6,000
PDF reports5
Last report07/16

Cross-stage findings

Latest Shipment Sample (07/15) FAILED

7 major: Others (no detail) 2, Others (no detail) 1, CE Broken seam 1, Others (no detail) 1, EC Asymmetry 1, EC Asymmetry 1

Not fixed: EC Asymmetry

Found 10 times (33 pcs, 06/09–07/07) in earlier stages; latest Shipment Sample (07/15) still has 2 major

Not fixed: CE Broken seam

Found 14 times (67 pcs, 06/11–07/18) in earlier stages; latest Shipment Sample (07/15) still has 1 major

Found earlier but still reached later stages: 1

DE Cut to broken 2 pcs (later stages total)

6 defects recorded as 'Others' without detail

Shipment Sample 6; cannot compare across stages

QC Endline data errors: 38

06/09 CP05 260180-2 (defective pcs 24 > defects 23), 06/12 CP12 260180-3 (defective pcs 20 > defects 13), 06/13 CP05 260180-2 (defective pcs 240 > defects 50), 06/16 CP05 260180-2 (defective pcs 44 > defects 30)…

Caught in earlier stages

BA Thread ends (458), CC Skip stitch (275), ED Gathering crease (248), EA Uneven seam allowance (108), EA Unsmooth/puckering/bubbling (85) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline3 reports
required on prod. days 3/158 (2%)
—15.6%
QC Endline33 days—7.6%
Shipment Sample2 reports2—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1011.5%
6160 / 23 days
——
06/22–07/17
BA Thread ends, CC Skip stitch, ED Gathering crease
CP058.9%
5943 / 16 days
——
06/09–07/10
BA Thread ends, ED Gathering crease, EA Unsmooth/puckering/bubbling
CP122.3%
3980 / 20 days
——
06/12–07/18
BA Thread ends, CC Skip stitch, CE Broken seam
CP082.4%
540 / 4 days
——
06/27–07/06
BA Thread ends, CC Skip stitch, ED Gathering crease
CP184.8%
400 / 3 days
——
07/02–07/06
BA Thread ends, DB Run-off stitching, CC Skip stitch
CP130.0%
320 / 4 days
——
06/12–07/16
—
CP030.0%
200 / 2 days
——
07/03–07/04
—
CP090.0%
100 / 1 days
——
06/29–06/29
—
CP190.0%
60 / 1 days
——
07/02–07/02
—
CP040.0%
40 / 2 days
——
07/01–07/09
—
CP070.0%
20 / 1 days
——
06/19–06/19
—
CP110.0%
20 / 1 days
——
07/04–07/04
—
CP170.0%
20 / 1 days
——
06/25–06/25
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1023463 (7%)232007/13, 07/14, 07/15, 07/16, 07/17
CP1220400 (0%)202007/03, 07/04, 07/06, 07/17, 07/18
CP0516320 (0%)161606/24, 06/27, 07/02, 07/03, 07/10
CP08480 (0%)4406/27, 06/30, 07/01, 07/06
CP13480 (0%)4406/12, 06/23, 07/08, 07/16
CP18360 (0%)3307/02, 07/03, 07/06
CP03240 (0%)2207/03, 07/04
CP04240 (0%)2207/01, 07/09
CP07120 (0%)1106/19
CP09120 (0%)1106/29
CP11120 (0%)1107/04
CP17120 (0%)1106/25
CP19120 (0%)1107/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineShipment Sample
BA Thread ends18440
CC Skip stitch2273
ED Gathering crease3245
EA Uneven seam allowance108
EA Unsmooth/puckering/bubbling85
CE Broken seam6611
EB Measurement issue54
EC Asymmetry2315
260678 OSIT · CP02/CP07/CP12 · Due 07/22Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
2/62QC Inlineactual/required · 3%
DHU 11.0%QC Endline31 days
No reportQA Inline
All FAILShipment Sample4 reports
1/3 FAILPre-final3 reports
All PASSFinal Random1 reports
Order/Ship qty35,000 / 35,000
PDF reports10
Last report07/16

Cross-stage findings

Not fixed: AD Fabric stains

Found 30 times (312 pcs, 06/17–07/21) in earlier stages; latest Shipment Sample (07/16) still has 9 major

Not fixed: EC Asymmetry

Found 29 times (220 pcs, 06/17–07/18) in earlier stages; latest Shipment Sample (07/16) still has 11 major

Missed in earlier stages: 3

DD Thread not straight/waving (Shipment Sample 07/09), GA Missing bartack/button (Pre-final 07/10), EI Inaccurate/skewed stitching (Shipment Sample 07/16): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

BA Thread ends 27, ED Gathering crease 4 pcs (later stages total)

14 defects recorded as 'Others' without detail

QC Inline 7, Pre-final 7; cannot compare across stages

QC Endline data errors: 20

06/23 CP02 260678 (defective pcs 133 > defects 93), 06/24 CP02 260678 (defective pcs 215 > defects 135), 06/25 CP02 260678 (defective pcs 168 > defects 115), 06/27 CP02 260678 (defective pcs 227 > defects 150)…

Duplicate report numbers

QGR2628030 have multiple reports with different content

Caught in earlier stages

DB Run-off stitching (487), CC Skip stitch (410), EA Unsmooth/puckering/bubbling (242), EB Measurement issue (104), GB Missing sewing operation (85) did not reach later stages

Found before bulk production (Shipment Sample): 2

CG Grinning, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline2 reports
required on prod. days 2/62 (3%)
—8.3%
QC Endline31 days—11.0%
Shipment Sample4 reports4—
Pre-final3 reports15.5%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0211.0%
34500 / 29 days
—PASS
06/17–07/21
BA Thread ends, ED Gathering crease, DB Run-off stitching
CP070.0%
20 / 1 days
——
07/24–07/24
—
CP120.0%
20 / 1 days
——
07/23–07/23
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0229582 (3%)292707/16, 07/17, 07/18, 07/20, 07/21
CP07120 (0%)1107/24
CP12120 (0%)1107/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineShipment SamplePre-finalFinal Random
BA Thread ends12971207
ED Gathering crease5314
DB Run-off stitching487
CC Skip stitch410
AD Fabric stains33091535
Others (no detail)72347
EA Unsmooth/puckering/bubbling242
EC Asymmetry92111182
260679 OSIT · CP08/CP09/CP10… · Due 07/22Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
12/78QC Inlineactual/required · 15%
DHU 3.9%QC Endline24 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
1/3 FAILPre-final3 reports
All PASSFinal Random2 reports
Order/Ship qty40,000 / 8,000
PDF reports19
Last report07/23

Cross-stage findings

Not fixed: AD Fabric stains

Found 32 times (184 pcs, 06/29–07/23) in earlier stages; latest Final Random (07/16) still has 3 major

Not fixed: ED Gathering crease

Found 30 times (264 pcs, 06/29–07/23) in earlier stages; latest Final Random (07/16) still has 4 major

Missed in earlier stages: 2

EC Asymmetry (Pre-final 07/08), CG Grinning (Shipment Sample 07/14): first found in later stages, never recorded before

QA Inline DHU is 2.7× QC Inline

QA Inline DHU 25.0% vs QC Inline 9.3%; QC Inline may be missing defects

QA Inline DHU is 6.4× QC Endline

QA Inline DHU 25.0% vs QC Endline 3.9% (06/29–07/25, 24 days, 39040 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 3 pcs (later stages total)

26 defects recorded as 'Others' without detail

QC Inline 26; cannot compare across stages

QC Endline data errors: 29

06/29 CP09 260679 (defective pcs 70 > defects 20), 06/30 CP09 260679 (defective pcs 199 > defects 35), 07/01 CP09 260679 (defective pcs 124 > defects 26), 07/02 CP09 260679 (defective pcs 176 > defects 41)…

Caught in earlier stages

CC Skip stitch (365), CE Broken seam (75), DI High-low/uneven (32), EA Uneven seam allowance (26), EB Measurement issue (21) did not reach later stages

Found before bulk production (Pre-final): 3

CB Broken stitch, BC Sticker left, DE Cut to broken: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline12 reports
required on prod. days 12/78 (15%)
—9.3%
QC Endline24 days—3.9%
QA Inline1 reports125.0%
Shipment Sample1 reports1—
Pre-final3 reports14.8%
Final Random2 reports02.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP093.5%
29940 / 24 days
—PASS
06/29–07/25
BA Thread ends, CC Skip stitch, ED Gathering crease
CP125.7%
8660 / 6 days
25.0%—
07/17–07/23
BA Thread ends, CC Skip stitch, CE Broken seam
CP130.0%
280 / 5 days
——
07/16–07/23
—
CP080.0%
60 / 1 days
——
07/23–07/23
—
CP105.0%
60 / 1 days
——
07/23–07/23
AD Fabric stains, BA Thread ends, CC Skip stitch
CP110.0%
20 / 1 days
——
07/22–07/22
—
CP170.0%
20 / 1 days
——
07/23–07/23
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP09244812 (25%)231307/20, 07/21, 07/22, 07/24, 07/25
CP126120 (0%)6607/18, 07/20, 07/21, 07/22, 07/23
CP135100 (0%)5507/16, 07/17, 07/21, 07/22, 07/23
CP08120 (0%)1107/23
CP10120 (0%)1107/23
CP11120 (0%)1107/22
CP17120 (0%)1107/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends624711210
CC Skip stitch2363
ED Gathering crease3259244
AD Fabric stains9175143
Others (no detail)2669
CE Broken seam75
EC Asymmetry2913231
DI High-low/uneven32
260680 OSIT · CP02/CP07/CP08… · Due 07/22Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
13/72QC Inlineactual/required · 18%
DHU 7.2%QC Endline23 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
All FAILPre-final3 reports
All PASSFinal Random1 reports
Order/Ship qty35,000 / 7,000
PDF reports21
Last report07/23

Cross-stage findings

Not fixed: AD Fabric stains

Found 35 times (426 pcs, 06/29–07/23) in earlier stages; latest Final Random (07/16) still has 3 major

Missed in earlier stages: 4

CB Broken stitch (Pre-final 07/07), AC Fabric hole (Pre-final 07/10), DF Twisted seam/skewing (Shipment Sample 07/10), CF Pulling yarn (Shipment Sample 07/10): first found in later stages, never recorded before

QA Inline DHU is 3.8× QC Inline

QA Inline DHU 39.6% vs QC Inline 10.4%; QC Inline may be missing defects

QA Inline DHU is 5.5× QC Endline

QA Inline DHU 39.6% vs QC Endline 7.2% (06/29–07/24, 23 days, 33900 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects; Pre-final 8.2%

Recurring in small numbers: 4

Latest Final Random (07/16): DJ Pleat 1 (earlier 10 times), EC Asymmetry 2 (earlier 29 times), ED Gathering crease 2 (earlier 28 times), CC Skip stitch 1 (earlier 29 times)

Found earlier but still reached later stages: 4

DI High-low/uneven 3, CE Broken seam 1, CG Grinning 1, GA Missing bartack/button 3 pcs (later stages total)

28 defects recorded as 'Others' without detail

Pre-final 2, QC Inline 25, Final Random 1; cannot compare across stages

QC Endline data errors: 29

06/29 CP08 260680 (defective pcs 100 > defects 61), 06/30 CP08 260680 (defective pcs 125 > defects 80), 07/01 CP08 260680 (defective pcs 107 > defects 72), 07/02 CP08 260680 (defective pcs 165 > defects 109)…

Caught in earlier stages

EA Uneven seam allowance (288), GB Missing sewing operation (69), EB Measurement issue (26), EA Unsmooth/puckering/bubbling (22), CD Needle hole (12) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline13 reports
required on prod. days 13/72 (18%)
—10.4%
QC Endline23 days—7.2%
QA Inline3 reports339.6%
Shipment Sample1 reports1—
Pre-final3 reports38.2%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP087.3%
27094 / 23 days
35.9%PASS
06/29–07/24
BA Thread ends, AD Fabric stains, EA Uneven seam allowance
CP126.7%
6430 / 5 days
46.9%—
07/13–07/17
BA Thread ends, AD Fabric stains, CE Broken seam
CP095.7%
176 / 3 days
——
07/08–07/23
BA Thread ends, CC Skip stitch, ED Gathering crease
CP0715.0%
100 / 1 days
——
07/23–07/23
EB Measurement issue, EC Asymmetry, BA Thread ends
CP022.5%
80 / 3 days
——
07/16–07/23
DB Run-off stitching, BA Thread ends
CP170.0%
20 / 1 days
——
07/18–07/18
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP08234612 (26%)231107/20, 07/21, 07/22, 07/23, 07/24
CP125101 (10%)5407/13, 07/14, 07/15, 07/16, 07/17
CP02360 (0%)3307/16, 07/20, 07/23
CP09360 (0%)3307/08, 07/11, 07/23
CP07120 (0%)1107/23
CP17120 (0%)1107/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends728342319
AD Fabric stains3239313193
CC Skip stitch13421
ED Gathering crease32781132
EA Uneven seam allowance288
EC Asymmetry42495832
CE Broken seam18151
GB Missing sewing operation69
260992 OSIT · CS14 · Due 07/29Final Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
07/17QC 1st Bundle1 reports
07/18QA 1st Bundle1 reports
6/20QC Inlineactual/required · 30%
DHU 17.9%QC Endline10 days
All FAILQA Inline3 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty4,800 / 4,800
PDF reports13
Last report07/29

Cross-stage findings

Not fixed: ED Gathering crease

Found 14 times (173 pcs, 07/17–07/27) in earlier stages; latest Final Random (07/29) still has 3 major

Missed in earlier stages: 2

IA 2nd operation issue (Pre-final 07/21), DJ Pleat (Pre-final 07/21): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/29): CB Broken stitch 2 (earlier 3 times)

Found earlier but still reached later stages: 2

EC Asymmetry 4, AD Fabric stains 2 pcs (later stages total)

107 defects recorded as 'Others' without detail

QC 1st Bundle 14, QC Inline 82, Pre-final 7, QA Inline 4; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 23); zero in QC Endline records

QC Endline data errors: 4

07/17 CS14 260992 (defective pcs 65 > defects 16), 07/18 CS14 260992 (defective pcs 119 > defects 42), 07/20 CS14 260992 (defective pcs 143 > defects 49), 07/21 CS14 260992 (defective pcs 101 > defects 48)

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (9 Major), EC Asymmetry (4 Major), CA Thread tension (3 Major), EI Inaccurate/skewed stitching (2 Major), DA Exceed seam allowance (1 Major), EA Unsmooth/puckering/bubbling (1 Major), DD Thread not straight/waving (1 Major), CB Broken stitch (1 Major); Both: BA Thread ends (4/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 115.0%

Caught in earlier stages

CC Skip stitch (96), EA Uneven seam allowance (52), Q94 Glue marks (24), EH Poor lamination/bonding (13), DB Run-off stitching (12) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—115.0%
QC Inline6 reports
required on prod. days 6/20 (30%)
—0.0%
QC Endline10 days—17.9%
QA Inline3 reports361.5%
Pre-final1 reports111.0%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1417.9%
4108 / 10 days
61.5%PASS
07/17–07/28
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1410206 (30%)10407/23, 07/24, 07/25, 07/27, 07/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends415401213
ED Gathering crease910149543
Others (no detail)148247
CC Skip stitch915
EA Uneven seam allowance52
EC Asymmetry421194
Q94 Glue marks24
CB Broken stitch15442
260496 LOGE · CS27 · Due 07/31Final Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
12/46QC Inlineactual/required · 26%
DHU 8.8%QC Endline23 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty5,000 / 5,000
PDF reports17
Last report07/22

Cross-stage findings

Not fixed: AD Fabric stains

Found 7 times (13 pcs, 07/13–07/21) in earlier stages; latest Final Random (07/22) still has 3 major

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 39.6% vs QC Inline 21.8%; QC Inline may be missing defects

Recurring in small numbers: 3

Latest Final Random (07/22): EA Unsmooth/puckering/bubbling 1 (earlier 6 times), CB Broken stitch 1 (earlier 3 times), EI Inaccurate/skewed stitching 1 (earlier 3 times)

Found earlier but still reached later stages: 3

CE Broken seam 2, BB Missing cut seam allowance 2, DJ Pleat 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 9); zero in QC Endline records

QC Endline data errors: 4

06/30 CS27 260496-S (defective pcs 39 > defects 38), 07/10 CS27 260496-L (defective pcs 3 > defects 2), 07/15 CS27 260496-S (defective pcs 34 > defects 33), 07/22 CS27 260496-S (defective pcs 12 > defects 11)

Caught in earlier stages

CC Skip stitch (241), DB Run-off stitching (109), ED Gathering crease (83), EC Asymmetry (71), DE Cut to broken (7) did not reach later stages

Report line differs from production line

QGR2628686 Final Random (07/21) CS25; actual production line(s) CS27 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline12 reports
required on prod. days 12/46 (26%)
—21.8%
QC Endline23 days—8.8%
QA Inline3 reports339.6%
Final Random2 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS278.8%
10000 / 23 days
39.6%PASS
06/27–07/23
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS27234612 (26%)231107/18, 07/20, 07/21, 07/22, 07/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
BA Thread ends21499512
CC Skip stitch7234
DB Run-off stitching4168
ED Gathering crease4772
EC Asymmetry629
EA Unsmooth/puckering/bubbling171
AD Fabric stains4543
CE Broken seam1012
260497 LOGE · CP01/CP02/CP03… · Due 07/31Final Random PASS Not fixed: CE Broken seam
No reportPP Sample
No reportPilot Run
07/14–07/16QC 1st Bundle2 reports
07/14–07/16QA 1st Bundle2 reports
10/230QC Inlineactual/required · 4%
DHU 7.5%QC Endline46 days
All FAILQA Inline4 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty30,000 / 30,000
PDF reports19
Last report07/30

Cross-stage findings

Not fixed: CE Broken seam

Found 31 times (101 pcs, 07/14–07/28) in earlier stages; latest Final Random (07/30) still has 3 major

Missed in earlier stages: 2

CH Incorrect stitch density (Final Random 07/30), BB Missing cut seam allowance (Final Random 07/30): first found in later stages, never recorded before

QA Inline DHU is 2.1× QC Inline

QA Inline DHU 64.1% vs QC Inline 30.1%; QC Inline may be missing defects

QA Inline DHU is 8.5× QC Endline

QA Inline DHU 64.1% vs QC Endline 7.5% (06/01–08/03, 46 days, 29340 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (07/30): DE Cut to broken 1 (earlier 6 times), CB Broken stitch 1 (earlier 9 times), CC Skip stitch 1 (earlier 40 times)

Found earlier but still reached later stages: 1

AB Shading 1 pcs (later stages total)

QC Endline data errors: 52

06/01 CP01 260497-3 (defective pcs 15 > defects 3), 06/01 CP15 260497-3 (defective pcs 7 > defects 3), 06/03 CP01 260497-3 (defective pcs 25 > defects 5), 06/16 CP01 260497-3 (defective pcs 6 > defects 2)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (4 Major), DE Cut to broken (2 Major), ED Gathering crease (1 Major), EG Wrong panel assembly (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (1); Both: CG Grinning (15/1), CE Broken seam (8/6), BA Thread ends (4/4), DJ Pleat (4/4), EI Inaccurate/skewed stitching (2/4), EC Asymmetry (4/2), EA Unsmooth/puckering/bubbling (1/3), DB Run-off stitching (1/3); DHU QC 1st Bundle 100.0% / QA 1st Bundle 90.0%

Caught in earlier stages

ED Gathering crease (446), DB Run-off stitching (249), GB Missing sewing operation (118), EC Asymmetry (95), DK Twisted shoulder strap (63) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—100.0%
QA 1st Bundle2 reports—90.0%
QC Inline10 reports
required on prod. days 10/230 (4%)
—30.1%
QC Endline46 days—7.5%
QA Inline4 reports464.1%
Final Random1 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0711.8%
11480 / 24 days
82.8%PASS
06/16–07/31
BA Thread ends, ED Gathering crease, DB Run-off stitching
CP056.3%
10860 / 24 days
45.3%PASS
06/25–08/03
BA Thread ends, ED Gathering crease, CC Skip stitch
CP153.9%
2160 / 12 days
——
06/01–07/31
BA Thread ends, EC Asymmetry, DK Twisted shoulder strap
CP014.4%
1740 / 15 days
—PASS
06/01–07/04
BA Thread ends, DK Twisted shoulder strap, EC Asymmetry
CP060.7%
1040 / 16 days
——
06/16–07/07
BA Thread ends, EC Asymmetry
CP020.6%
820 / 8 days
——
06/02–06/22
CC Skip stitch, Others (no detail), DB Run-off stitching
CP030.0%
780 / 9 days
——
06/03–07/03
—
CP170.0%
420 / 5 days
——
06/01–06/26
—
CP040.0%
20 / 1 days
——
06/27–06/27
—
CP120.0%
20 / 1 days
——
06/16–06/16
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0524484 (8%)242007/28, 07/29, 07/30, 07/31, 08/03
CP0724486 (12%)241807/27, 07/28, 07/29, 07/30, 07/31
CP0616320 (0%)161606/30, 07/02, 07/03, 07/06, 07/07
CP0115300 (0%)151506/30, 07/01, 07/02, 07/03, 07/04
CP1512240 (0%)121207/02, 07/03, 07/04, 07/08, 07/31
CP039180 (0%)9906/26, 06/29, 07/01, 07/02, 07/03
CP028160 (0%)8806/10, 06/12, 06/13, 06/17, 06/22
CP175100 (0%)5506/01, 06/04, 06/08, 06/24, 06/26
CP04120 (0%)1106/27
CP12120 (0%)1106/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends4431748136
ED Gathering crease14432
CC Skip stitch1429921
DB Run-off stitching132414
GB Missing sewing operation2116
CE Broken seam86334683
EC Asymmetry4257014
DK Twisted shoulder strap63
260498 LOGE · CB07/CB12/CB14… · Due 07/31Final Random PASS Not fixed: EA Unsmooth/puckering/bubbling
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/116QC Inlineactual/required · 0%
DHU 16.0%QC Endline31 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty13,500 / 13,500
PDF reports1
Last report07/18

Cross-stage findings

Not fixed: EA Unsmooth/puckering/bubbling

Found 4 times (83 pcs, 06/12–07/09) in earlier stages; latest Final Random (07/18) still has 5 major

Recurring in small numbers: 1

Latest Final Random (07/18): AD Fabric stains 2 (earlier 39 times)

QC Endline data errors: 5

06/17 CB12 260498-S (defective pcs 5 > defects 4), 06/19 CB12 260498-S (defective pcs 5 > defects 4), 06/20 CB12 260498-L (defective pcs 5 > defects 4), 06/27 CB14 260498-L (defective pcs 10 > defects 5)…

Caught in earlier stages

Q94 Glue marks (337), ED Gathering crease (49), AC Fabric hole (24), EB Measurement issue (5) did not reach later stages

Report line differs from production line

QGR2628347 Final Random (07/18) CB03; actual production line(s) CB07/CB12/CB14/CB30 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/116 (0%)
——
QC Endline31 days—16.0%
Final Random1 reports02.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1219.8%
7775 / 31 days
——
06/10–07/20
BA Thread ends, AD Fabric stains, Q94 Glue marks
CB1411.3%
5837 / 21 days
——
06/16–07/10
BA Thread ends, AD Fabric stains, Others (no detail)
CB300.0%
66 / 5 days
——
06/23–07/13
—
CB070.0%
8 / 1 days
——
07/01–07/01
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1231620 (0%)313107/13, 07/14, 07/15, 07/16, 07/20
CB1421420 (0%)212107/06, 07/07, 07/08, 07/09, 07/10
CB305100 (0%)5506/23, 06/25, 06/27, 07/07, 07/13
CB07120 (0%)1107/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends89910
AD Fabric stains6762
Q94 Glue marks337
Others (no detail)123
EA Unsmooth/puckering/bubbling835
ED Gathering crease49
AC Fabric hole24
EB Measurement issue5
260914 RGOR · CP04 · Due 07/31Shipment Sample FAIL Latest Shipment Sample (07/24) FAILED
No reportPP Sample
No reportPilot Run
07/24–07/30QC 1st Bundle2 reports
07/23QA 1st Bundle1 reports
3/28QC Inlineactual/required · 11%
DHU 9.6%QC Endline14 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty5,665 / 5,665
PDF reports10
Last report08/03

Cross-stage findings

Latest Shipment Sample (07/24) FAILED

5 major: EI Inaccurate/skewed stitching 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, ED Gathering crease 1, ED Gathering crease 1

Not fixed: EC Asymmetry

Found 18 times (89 pcs, 07/23–08/05) in earlier stages; latest Shipment Sample (07/24) still has 1 major

Not fixed: ED Gathering crease

Found 13 times (112 pcs, 07/23–08/05) in earlier stages; latest Shipment Sample (07/24) still has 2 major

Found earlier but still reached later stages: 2

EA Unsmooth/puckering/bubbling 1, EI Inaccurate/skewed stitching 1 pcs (later stages total)

QC Endline data errors: 4

07/30 CP04 260914 (defective pcs 138 > defects 90), 08/03 CP04 260914 (defective pcs 122 > defects 56), 08/04 CP04 260914 (defective pcs 133 > defects 129), 08/05 CP04 260914 (defective pcs 40 > defects 34)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (7 Major), ED Gathering crease (2 Major); Only QC 1st Bundle: BB Missing cut seam allowance (6), DJ Pleat (5), CA Thread tension (3), CE Broken seam (3), EA Unsmooth/puckering/bubbling (2), DF Twisted seam/skewing (2); Both: BA Thread ends (16/2), EC Asymmetry (2/7); DHU QC 1st Bundle 97.5% / QA 1st Bundle 90.0%

Caught in earlier stages

BA Thread ends (541), CC Skip stitch (196), CE Broken seam (88), EB Measurement issue (79), DF Twisted seam/skewing (23) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—97.5%
QA 1st Bundle1 reports—90.0%
QC Inline3 reports
required on prod. days 3/28 (11%)
—77.1%
QC Endline14 days—9.6%
QA Inline3 reports342.7%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP049.6%
10976 / 14 days
42.7%—
07/22–08/06
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0414283 (11%)141108/01, 08/03, 08/04, 08/05, 08/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends1622548018
CC Skip stitch196
ED Gathering crease21102
EC Asymmetry277191
CE Broken seam37771
EB Measurement issue79
DF Twisted seam/skewing2912
CB Broken stitch151
261194 RGOR · CS26 · Due 07/31No final Not fixed: CB Broken stitch
No reportPP Sample
No reportPilot Run
07/23QC 1st Bundle1 reports
07/23QA 1st Bundle1 reports
3/10QC Inlineactual/required · 30%
DHU 6.6%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty1,425 / 1,425
PDF reports7
Last report07/27

Cross-stage findings

Not fixed: CB Broken stitch

Found 4 times (7 pcs, 07/23–07/25) in earlier stages; latest Pre-final (07/27) still has 1 major

Not fixed: AD Fabric stains

Found 8 times (26 pcs, 07/23–07/27) in earlier stages; latest Pre-final (07/27) still has 2 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 3 times (11 pcs, 07/23–07/25) in earlier stages; latest Pre-final (07/27) still has 1 major

Not fixed: DJ Pleat

Found 3 times (5 pcs, 07/23–07/27) in earlier stages; latest Pre-final (07/27) still has 3 major

Not fixed: BA Thread ends

Found 7 times (31 pcs, 07/23–07/25) in earlier stages; latest Pre-final (07/27) still has 3 major

QA Inline DHU is 1.6× QC Inline

QA Inline DHU 28.1% vs QC Inline 17.9%; QC Inline may be missing defects

Pre-final DHU is 1.2× QC Endline

Pre-final DHU 8.0% vs QC Endline 6.6% (07/23–07/28, 5 days, 1469 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DE Cut to broken (9 Major), BA Thread ends (3 Major), CC Skip stitch (1 Major), DJ Pleat (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (4), CE Broken seam (2); Both: AD Fabric stains (4/1), BB Missing cut seam allowance (2/2), CB Broken stitch (2/1); DHU QC 1st Bundle 70.0% / QA 1st Bundle 95.0%

Caught in earlier stages

CC Skip stitch (54), DE Cut to broken (11), ED Gathering crease (9), CE Broken seam (8), DA Exceed seam allowance (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—70.0%
QA 1st Bundle1 reports—95.0%
QC Inline3 reports
required on prod. days 3/10 (30%)
—17.9%
QC Endline5 days—6.6%
QA Inline1 reports128.1%
Pre-final1 reports18.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS266.6%
1469 / 5 days
28.1%—
07/23–07/28
CC Skip stitch, BA Thread ends, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS265103 (30%)5207/23, 07/24, 07/25, 07/27, 07/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-final
CC Skip stitch1350
BA Thread ends32718
AD Fabric stains416152
EA Unsmooth/puckering/bubbling471
DE Cut to broken92
ED Gathering crease45
CB Broken stitch21221
CE Broken seam251
260840 RGOR · CB31 · Due 07/03Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/10QC Inlineactual/required · 10%
DHU 3.9%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,345 / 1,345
PDF reports2
Last report07/07

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 07/07): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/07): CC Skip stitch 1 (earlier 5 times)

Found earlier but still reached later stages: 1

AD Fabric stains 2 pcs (later stages total)

Caught in earlier stages

ED Gathering crease (30), EC Asymmetry (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/10 (10%)
—30.0%
QC Endline5 days—3.9%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB313.9%
2756 / 5 days
—PASS
07/02–07/07
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB315101 (10%)5407/02, 07/03, 07/04, 07/06, 07/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
BA Thread ends433
CC Skip stitch351
ED Gathering crease30
EC Asymmetry6
AD Fabric stains32
DJ Pleat3
CE Broken seam3
CB Broken stitch1
253685 MKSC · CB09/CB17 · Due 07/08Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run1 reports
No reportQC 1st Bundle
No reportQA 1st Bundle
2/20QC Inlineactual/required · 10%
DHU 83.5%QC Endline10 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,369 / 1,369
PDF reports4
Last report07/13

Cross-stage findings

Missed in earlier stages: 1

BA Thread ends (Final Random 07/13): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/13): ED Gathering crease 1 (earlier 8 times)

Found earlier but still reached later stages: 1

DJ Pleat 1 pcs (later stages total)

Caught in earlier stages

AD Fabric stains (160), EB Measurement issue (73), EC Asymmetry (42), EA Uneven seam allowance (40), EA Unsmooth/puckering/bubbling (8) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run1 reports0—
QC Inline2 reports
required on prod. days 2/20 (10%)
—36.0%
QC Endline10 days—83.5%
Final Random1 reports01.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1783.5%
1282 / 10 days
—PASS
06/24–07/07
ED Gathering crease, AD Fabric stains, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1710202 (10%)10806/30, 07/01, 07/02, 07/06, 07/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC InlineQC EndlineFinal Random
ED Gathering crease347701
AD Fabric stains160
EB Measurement issue1270
EC Asymmetry21030
EA Uneven seam allowance40
EA Unsmooth/puckering/bubbling17
CE Broken seam5
DJ Pleat31
254209 LOGE · CP01/CP02/CP03… · Due 07/08No final QA Inline DHU is 2.0× QC Inline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/86QC Inlineactual/required · 1%
DHU 9.2%QC Endline26 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty7,000 / 7,000
PDF reports3
Last report07/14

Cross-stage findings

QA Inline DHU is 2.0× QC Inline

QA Inline DHU 42.2% vs QC Inline 21.2%; QC Inline may be missing defects

QC Endline data errors: 32

06/17 CP01 254209-3 (defective pcs 8 > defects 6), 06/26 CP11 254209-1 (defective pcs 20 > defects 17), 06/26 CP18 254209-2 (defective pcs 40 > defects 18), 06/27 CP11 254209-1 (defective pcs 20 > defects 12)…

Caught in earlier stages

BA Thread ends (496), CC Skip stitch (356), ED Gathering crease (300), CE Broken seam (78), EB Measurement issue (47) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/86 (1%)
—21.2%
QC Endline26 days—9.2%
QA Inline2 reports242.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP118.2%
7000 / 20 days
43.8%—
06/26–07/18
CC Skip stitch, BA Thread ends, ED Gathering crease
CP1811.1%
6980 / 14 days
40.6%—
06/26–07/11
BA Thread ends, ED Gathering crease, CC Skip stitch
CP030.0%
340 / 3 days
——
06/01–06/03
—
CP020.0%
160 / 2 days
——
06/02–06/03
—
CP015.0%
120 / 1 days
——
06/17–06/17
BA Thread ends, EC Asymmetry
CP170.0%
40 / 2 days
——
06/08–07/21
—
CP090.0%
20 / 1 days
——
07/18–07/18
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1120401 (2%)201907/14, 07/15, 07/16, 07/17, 07/18
CP1814280 (0%)141407/07, 07/08, 07/09, 07/10, 07/11
CP03360 (0%)3306/01, 06/02, 06/03
CP02240 (0%)2206/02, 06/03
CP17240 (0%)2206/08, 07/21
CP01120 (0%)1106/17
CP09120 (0%)1107/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA Inline
BA Thread ends847810
CC Skip stitch356
ED Gathering crease2955
CE Broken seam2733
EB Measurement issue47
EA Uneven seam allowance34
GB Missing sewing operation25
EC Asymmetry203
260439 RGOR · CP20 · Due 07/10No final QA Inline DHU is 1.7× QC Inline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/34QC Inlineactual/required · 3%
DHU 9.9%QC Endline17 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty7,240 / 7,240
PDF reports2
Last report07/10

Cross-stage findings

QA Inline DHU is 1.7× QC Inline

QA Inline DHU 43.8% vs QC Inline 26.2%; QC Inline may be missing defects

QC Endline data errors: 14

06/24 CP20 260439 (defective pcs 6 > defects 3), 06/25 CP20 260439 (defective pcs 182 > defects 27), 06/26 CP20 260439 (defective pcs 65 > defects 18), 06/27 CP20 260439 (defective pcs 151 > defects 41)…

Caught in earlier stages

BA Thread ends (298), CC Skip stitch (233), ED Gathering crease (172), AD Fabric stains (25), EC Asymmetry (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/34 (3%)
—26.2%
QC Endline17 days—9.9%
QA Inline1 reports143.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP209.9%
7277 / 17 days
43.8%—
06/24–07/14
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP2017341 (3%)171607/08, 07/09, 07/10, 07/13, 07/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA Inline
BA Thread ends132832
CC Skip stitch12311
ED Gathering crease1711
AD Fabric stains25
EC Asymmetry62
CG Grinning8
EA Uneven seam allowance8
EB Measurement issue6
253669 MKSC · CB16 · Due 07/15Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/10QC Inlineactual/required · 10%
DHU 13.1%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty750 / 750
PDF reports2
Last report07/21

Cross-stage findings

Missed in earlier stages: 3

CF Pulling yarn (Final Random 07/21), DJ Pleat (Final Random 07/21), AF Crushed foam cup (Final Random 07/21): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/21): AD Fabric stains 2 (earlier 3 times)

Caught in earlier stages

CE Broken seam (17), ED Gathering crease (12), DB Run-off stitching (9) did not reach later stages

Report line differs from production line

QGR2628898 Final Random (07/21) CB02; actual production line(s) CB16 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/10 (10%)
—28.0%
QC Endline5 days—13.1%
Final Random1 reports06.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1613.1%
765 / 5 days
——
07/02–07/07
Others (no detail), BA Thread ends, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB165101 (10%)5407/02, 07/03, 07/04, 07/06, 07/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineFinal Random
Others (no detail)28
BA Thread ends3192
AD Fabric stains192
CE Broken seam17
ED Gathering crease48
DB Run-off stitching9
EA Unsmooth/puckering/bubbling3
EC Asymmetry2
260706 CHAN · CS15 · Due 07/15Final Random PASS Pre-final DHU is 1.5× QC Endline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/8QC Inlineactual/required · 0%
DHU 9.8%QC Endline4 days
No reportQA Inline
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,299 / 1,299
PDF reports3
Last report07/13

Cross-stage findings

Pre-final DHU is 1.5× QC Endline

Pre-final DHU 14.4% vs QC Endline 9.8% (07/01–07/04, 4 days, 1299 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (07/13): BA Thread ends 1 (earlier 3 times)

Found earlier but still reached later stages: 2

AD Fabric stains 3, ED Gathering crease 4 pcs (later stages total)

12 defects recorded as 'Others' without detail

Pre-final 12; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 3); zero in QC Endline records

Caught in earlier stages

CC Skip stitch (40) did not reach later stages

Found before bulk production (Final Random, Shipment Sample, Pre-final): 7

HA Poor pressing, EC Asymmetry, EI Inaccurate/skewed stitching, DI High-low/uneven, CG Grinning, EA Unsmooth/puckering/bubbling, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—9.8%
Shipment Sample1 reports1—
Pre-final1 reports114.4%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS159.8%
1299 / 4 days
—PASS
07/01–07/04
BA Thread ends, CC Skip stitch, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS15480 (0%)4407/01, 07/02, 07/03, 07/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineShipment SamplePre-finalFinal Random
BA Thread ends493
CC Skip stitch40
Others (no detail)812
AD Fabric stains1721
ED Gathering crease9121
EC Asymmetry3
DB Run-off stitching3
HA Poor pressing2
260707 CHAN · CS15/CS17 · Due 07/15Final Random PASS QA Inline DHU is 1.6× QC Inline
No reportPP Sample
No reportPilot Run
07/07QC 1st Bundle1 reports
07/07QA 1st Bundle1 reports
2/18QC Inlineactual/required · 11%
DHU 9.3%QC Endline6 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,950 / 1,950
PDF reports7
Last report07/14

Cross-stage findings

QA Inline DHU is 1.6× QC Inline

QA Inline DHU 37.5% vs QC Inline 24.0%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (07/14): ED Gathering crease 2 (earlier 3 times), CB Broken stitch 1 (earlier 4 times)

5 defects recorded as 'Others' without detail

QA 1st Bundle 5; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (1 Major); Only QC 1st Bundle: ED Gathering crease (2), EI Inaccurate/skewed stitching (2), CB Broken stitch (2), CC Skip stitch (1), AD Fabric stains (1), AC Fabric hole (1); Both: DB Run-off stitching (3/2); DHU QC 1st Bundle 60.0% / QA 1st Bundle 40.0%

Caught in earlier stages

CC Skip stitch (50), DB Run-off stitching (29), CG Grinning (5) did not reach later stages

Found before bulk production (Shipment Sample): 2

IA 2nd operation issue, AD Fabric stains: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—60.0%
QA 1st Bundle1 reports—40.0%
QC Inline2 reports
required on prod. days 2/18 (11%)
—24.0%
QC Endline6 days—9.3%
QA Inline1 reports137.5%
Shipment Sample1 reports1—
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS159.4%
1490 / 6 days
—PASS
07/07–07/13
BA Thread ends, CC Skip stitch, AD Fabric stains
CS178.9%
450 / 3 days
37.5%PASS
07/09–07/13
AD Fabric stains, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS156122 (17%)6407/08, 07/09, 07/10, 07/11, 07/13
CS17360 (0%)3307/09, 07/10, 07/13

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends1712
CC Skip stitch17384
AD Fabric stains13511
DB Run-off stitching32519
ED Gathering crease2822
Others (no detail)58
CB Broken stitch241
CG Grinning5
261039 OSIT · CS25 · Due 07/15Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/4QC Inlineactual/required · 0%
DHU 9.4%QC Endline2 days
No reportQA Inline
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports3
Last report07/08

Cross-stage findings

Missed in earlier stages: 2

CB Broken stitch (Pre-final 07/07), IA 2nd operation issue (Final Random 07/08): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/08): ED Gathering crease 1 (earlier 4 times)

Found earlier but still reached later stages: 2

BB Missing cut seam allowance 1, BA Thread ends 8 pcs (later stages total)

Caught in earlier stages

CC Skip stitch (16), FC Wrong label (7), DB Run-off stitching (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 0/4 (0%)
—56.2%
QC Endline2 days—9.4%
Pre-final1 reports05.0%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS259.4%
1018 / 2 days
—PASS
07/03–07/04
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS25240 (0%)2207/03, 07/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlinePre-finalFinal Random
BA Thread ends3844
ED Gathering crease52821
CC Skip stitch16
FC Wrong label7
DB Run-off stitching7
BB Missing cut seam allowance31
EI Inaccurate/skewed stitching3
CB Broken stitch21
260175 LOGE · CB36 · Due 07/20Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/24QC Inlineactual/required · 4%
DHU 12.3%QC Endline12 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,004
PDF reports4
Last report07/14

Cross-stage findings

Missed in earlier stages: 1

BD Snagging (Final Random 07/14): first found in later stages, never recorded before

Found earlier but still reached later stages: 3

EA Unsmooth/puckering/bubbling 2, EC Asymmetry 1, CB Broken stitch 3 pcs (later stages total)

Caught in earlier stages

CC Skip stitch (73), ED Gathering crease (23), CD Needle hole (9) did not reach later stages

Report line differs from production line

QGR2628354 Final Random (07/14) CB09; actual production line(s) CB36 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC Inline2 reports
required on prod. days 1/24 (4%)
—40.2%
QC Endline12 days—12.3%
Shipment Sample1 reports1—
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3612.3%
1645 / 12 days
——
07/01–07/16
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3612241 (4%)121107/11, 07/13, 07/14, 07/15, 07/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineShipment SampleFinal Random
BA Thread ends2986
CC Skip stitch172
ED Gathering crease23
EA Unsmooth/puckering/bubbling92
CD Needle hole9
CB Broken stitch43
EC Asymmetry51
CG Grinning3
260628 RTMS · CS01/CS02/CS13 · Due 07/22Final Random PASS QA Inline DHU is 2.1× QC Inline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
9/26QC Inlineactual/required · 35%
DHU 16.7%QC Endline11 days
All FAILQA Inline3 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty4,700 / 4,700
PDF reports14
Last report07/20

Cross-stage findings

QA Inline DHU is 2.1× QC Inline

QA Inline DHU 30.2% vs QC Inline 14.4%; QC Inline may be missing defects

Recurring in small numbers: 3

Latest Final Random (07/20): CB Broken stitch 2 (earlier 7 times), AD Fabric stains 2 (earlier 7 times), CC Skip stitch 2 (earlier 15 times)

Found earlier but still reached later stages: 1

ED Gathering crease 4 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA Inline 3, QC Inline 2; cannot compare across stages

Caught in earlier stages

DF Twisted seam/skewing (53), EA Unsmooth/puckering/bubbling (20), EC Asymmetry (20), DI High-low/uneven (16), EB Measurement issue (11) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline9 reports
required on prod. days 9/26 (35%)
—14.4%
QC Endline11 days—16.7%
QA Inline3 reports330.2%
Pre-final1 reports17.0%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0216.9%
4109 / 11 days
30.2%PASS
07/03–07/15
CC Skip stitch, BA Thread ends, ED Gathering crease
CS0113.3%
135 / 1 days
30.2%PASS
07/04–07/04
ED Gathering crease, CC Skip stitch, BA Thread ends
CS130.0%
11 / 1 days
——
07/08–07/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0211229 (41%)11207/10, 07/11, 07/13, 07/14, 07/15
CS01120 (0%)1107/04
CS13120 (0%)1107/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlinePre-finalFinal Random
CC Skip stitch82142
BA Thread ends131756127
ED Gathering crease314734
Others (no detail)2683
DF Twisted seam/skewing1142
AD Fabric stains514272
CB Broken stitch12332
EA Unsmooth/puckering/bubbling1046
260677 OSIT · CP08/CP12/CP13… · Due 07/22Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
3/76QC Inlineactual/required · 4%
DHU 6.2%QC Endline32 days
No reportQA Inline
All FAILShipment Sample1 reports
All PASSPre-final2 reports
All PASSFinal Random2 reports
Order/Ship qty35,000 / 6,701
PDF reports8
Last report07/16

Cross-stage findings

Missed in earlier stages: 1

EI Inaccurate/skewed stitching (Shipment Sample 07/07): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (07/16): AD Fabric stains 1 (earlier 26 times)

Found earlier but still reached later stages: 1

EC Asymmetry 7 pcs (later stages total)

2 defects recorded as 'Others' without detail

Final Random 2; cannot compare across stages

QC Endline data errors: 23

06/16 CP12 260677 (defective pcs 35 > defects 21), 06/17 CP12 260677 (defective pcs 28 > defects 25), 06/19 CP12 260677 (defective pcs 81 > defects 71), 06/20 CP12 260677 (defective pcs 90 > defects 69)…

Caught in earlier stages

CC Skip stitch (464), CE Broken seam (187), ED Gathering crease (166), EA Unsmooth/puckering/bubbling (86), EA Uneven seam allowance (46) did not reach later stages

Found before bulk production (Pre-final): 2

CB Broken stitch, DE Cut to broken: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline3 reports
required on prod. days 3/76 (4%)
—25.4%
QC Endline32 days—6.2%
Shipment Sample1 reports1—
Pre-final2 reports02.2%
Final Random2 reports03.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP126.2%
34420 / 31 days
—PASS
06/13–07/24
BA Thread ends, CC Skip stitch, AD Fabric stains
CP130.0%
100 / 5 days
——
07/02–07/27
—
CP170.0%
80 / 1 days
——
07/22–07/22
—
CP080.0%
20 / 1 days
——
07/24–07/24
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1231623 (5%)312807/16, 07/17, 07/18, 07/22, 07/24
CP135100 (0%)5507/02, 07/07, 07/08, 07/09, 07/27
CP08120 (0%)1107/24
CP17120 (0%)1107/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineShipment SamplePre-finalFinal Random
BA Thread ends227011112
CC Skip stitch464
AD Fabric stains1022131
CE Broken seam187
ED Gathering crease166
Others (no detail)1052
EA Unsmooth/puckering/bubbling284
EC Asymmetry397
261110 RGOR · CP19 · Due 07/24Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/17QC 1st Bundle1 reports
07/17QA 1st Bundle1 reports
1/10QC Inlineactual/required · 10%
DHU 10.3%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random2 reports
Order/Ship qty950 / 950
PDF reports7
Last report07/25

Cross-stage findings

Missed in earlier stages: 1

AD Fabric stains (Pre-final 07/21): first found in later stages, never recorded before

QA Inline DHU is 5.5× QC Endline

QA Inline DHU 56.2% vs QC Endline 10.3% (07/17–07/27, 5 days, 979 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (07/25): CC Skip stitch 1 (earlier 3 times)

Found earlier but still reached later stages: 1

CB Broken stitch 4 pcs (later stages total)

Main QA defects never recorded by QC Endline: 2

EA Unsmooth/puckering/bubbling (QA 8), EC Asymmetry (QA 4); zero in QC Endline records

QC Endline data errors: 2

07/18 CP19 261110-S (defective pcs 25 > defects 10), 07/18 CP19 261110-L (defective pcs 25 > defects 12)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (3), GA Missing bartack/button (2); Both: BA Thread ends (6/3), EC Asymmetry (2/5), CG Grinning (2/2), BB Missing cut seam allowance (1/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 65.0%

Caught in earlier stages

EA Uneven seam allowance (18), EC Asymmetry (14), ED Gathering crease (13), EA Unsmooth/puckering/bubbling (9), CG Grinning (6) did not reach later stages

Report line differs from production line

QGR2628844 Pre-final (07/21) CP18, QGR2629581 Final Random (07/24) CP20, QGR2629814 Final Random (07/25) CP18; actual production line(s) CP19 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—65.0%
QC Inline1 reports
required on prod. days 1/10 (10%)
—68.8%
QC Endline5 days—10.3%
QA Inline1 reports156.2%
Pre-final1 reports03.8%
Final Random2 reports03.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1910.3%
979 / 5 days
56.2%—
07/17–07/27
BA Thread ends, CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP195101 (10%)5407/17, 07/18, 07/20, 07/21, 07/27

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends639351410
CC Skip stitch2511
EA Uneven seam allowance18
EC Asymmetry2534
ED Gathering crease13
EA Unsmooth/puckering/bubbling18
CB Broken stitch1313
CG Grinning222
261112 RGOR · CP19 · Due 07/24Final Random PASS QA Inline DHU is 5.3× QC Endline
No reportPP Sample
No reportPilot Run
07/21QC 1st Bundle1 reports
07/21QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 7.1%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,215 / 1,215
PDF reports4
Last report07/27

Cross-stage findings

QA Inline DHU is 5.3× QC Endline

QA Inline DHU 37.5% vs QC Endline 7.1% (07/21–07/27, 4 days, 1225 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (07/27): AD Fabric stains 1 (earlier 3 times), CC Skip stitch 1 (earlier 4 times)

Found earlier but still reached later stages: 2

CB Broken stitch 2, DE Cut to broken 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 3); zero in QC Endline records

QC Endline data errors: 2

07/22 CP19 261112-S (defective pcs 40 > defects 21), 07/22 CP19 261112-L (defective pcs 15 > defects 5)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), CG Grinning (1 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: CA Thread tension (4), CB Broken stitch (2), BD Snagging (1); Both: BA Thread ends (10/1), EC Asymmetry (1/6), DD Thread not straight/waving (1/2), AD Fabric stains (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 75.0%

Caught in earlier stages

ED Gathering crease (12), EA Uneven seam allowance (12), CD Needle hole (11), EC Asymmetry (10), EB Measurement issue (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—75.0%
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—7.1%
QA Inline1 reports137.5%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP197.1%
1225 / 4 days
37.5%PASS
07/21–07/27
BA Thread ends, CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP19480 (0%)4407/21, 07/22, 07/25, 07/27

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends1012835
CC Skip stitch201
ED Gathering crease111
EA Uneven seam allowance12
CD Needle hole11
EC Asymmetry163
EB Measurement issue5
AD Fabric stains1111
260303 OSIT · CS04/CS05 · Due 07/29Final Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
18/60QC Inlineactual/required · 30%
DHU 23.6%QC Endline22 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty8,000 / 8,000
PDF reports24
Last report07/22

Cross-stage findings

Missed in earlier stages: 2

DC Join stitching (Shipment Sample 07/07), AA Fabric defect (Shipment Sample 07/07): first found in later stages, never recorded before

QA Inline DHU is 2.1× QC Inline

QA Inline DHU 38.5% vs QC Inline 18.3%; QC Inline may be missing defects

Recurring in small numbers: 6

Latest Final Random (07/16): CC Skip stitch 1 (earlier 35 times), CB Broken stitch 2 (earlier 26 times), EH Poor lamination/bonding 1 (earlier 6 times), EC Asymmetry 2 (earlier 20 times), ED Gathering crease 1 (earlier 31 times), AD Fabric stains 1 (earlier 8 times)

5 defects recorded as 'Others' without detail

QA Inline 3, QC Inline 2; cannot compare across stages

QC Endline data errors: 5

07/01 CS05 260303 (defective pcs 54 > defects 52), 07/06 CS05 260303 (defective pcs 92 > defects 90), 07/07 CS05 260303 (defective pcs 96 > defects 94), 07/11 CS05 260303 (defective pcs 70 > defects 69)…

Caught in earlier stages

DB Run-off stitching (76), CD Needle hole (44), AC Fabric hole (27), AB Shading (23), DJ Pleat (16) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline18 reports
required on prod. days 18/60 (30%)
—18.3%
QC Endline22 days—23.6%
QA Inline4 reports438.5%
Shipment Sample1 reports1—
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0526.7%
5331 / 22 days
28.1%PASS
06/30–07/25
CC Skip stitch, BA Thread ends, ED Gathering crease
CS0415.4%
1990 / 8 days
55.0%—
07/11–07/20
BA Thread ends, CC Skip stitch, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS05224415 (34%)21807/20, 07/21, 07/22, 07/23, 07/25
CS048163 (19%)8507/15, 07/16, 07/17, 07/18, 07/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineShipment SampleFinal Random
CC Skip stitch15578531
BA Thread ends1550767
ED Gathering crease836751
EC Asymmetry46392
DB Run-off stitching1066
CB Broken stitch6542
Others (no detail)2443
CD Needle hole44
260310 MKSC · CB10/CB36 · Due 07/29Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No resultPilot Run2 reports
07/17QC 1st Bundle1 reports
07/17QA 1st Bundle1 reports
1/16QC Inlineactual/required · 6%
DHU 11.7%QC Endline8 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty659 / 659
PDF reports7
Last report07/29

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 07/29): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (07/29): EC Asymmetry 1 (earlier 21 times), ED Gathering crease 1 (earlier 13 times)

Found earlier but still reached later stages: 1

AC Fabric hole 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

PP Sample 1, QA 1st Bundle 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DI High-low/uneven (2 Major), DJ Pleat (2 Major), ED Gathering crease (1 Major); Only QC 1st Bundle: CE Broken seam (2); Both: EC Asymmetry (5/5), EA Unsmooth/puckering/bubbling (3/2); DHU QC 1st Bundle 76.9% / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (16), EA Unsmooth/puckering/bubbling (11) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run2 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—100.0%
QC Inline1 reports
required on prod. days 1/16 (6%)
—34.4%
QC Endline8 days—11.7%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3611.7%
659 / 8 days
—PASS
07/16–07/24
ED Gathering crease, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB368161 (6%)8707/20, 07/21, 07/22, 07/23, 07/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineFinal Random
ED Gathering crease251291
BA Thread ends2243
EC Asymmetry195511
CC Skip stitch16
EA Unsmooth/puckering/bubbling13241
AB Shading4
CG Grinning12
DJ Pleat21
260316 MKSC · CB03/CB09/CB29… · Due 07/29Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No resultPilot Run1 reports
07/23QC 1st Bundle1 reports
07/24QA 1st Bundle1 reports
3/18QC Inlineactual/required · 17%
DHU 11.4%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,358 / 2,358
PDF reports13
Last report07/30

Cross-stage findings

Missed in earlier stages: 1

AD Fabric stains (Final Random 07/28): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (07/29): ED Gathering crease 1 (earlier 5 times), BA Thread ends 1 (earlier 12 times), AC Fabric hole 1 (earlier 4 times)

Found earlier but still reached later stages: 2

CB Broken stitch 1, CC Skip stitch 1 pcs (later stages total)

7 defects recorded as 'Others' without detail

PP Sample 1, QA 1st Bundle 4, QA Inline 1, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (4 Major), ED Gathering crease (1 Major); Only QC 1st Bundle: CC Skip stitch (4), CG Grinning (4), CB Broken stitch (4), BB Missing cut seam allowance (3); DHU QC 1st Bundle 115.4% / QA 1st Bundle 69.2%

Caught in earlier stages

EB Measurement issue (31), EC Asymmetry (11), BB Missing cut seam allowance (8), CG Grinning (7), DB Run-off stitching (7) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run1 reports0—
QC 1st Bundle1 reports—115.4%
QA 1st Bundle1 reports—69.2%
QC Inline6 reports
required on prod. days 3/18 (17%)
—51.3%
QC Endline7 days—11.4%
QA Inline1 reports128.1%
Final Random2 reports03.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0311.8%
1780 / 6 days
28.1%PASS
07/22–07/31
BA Thread ends, EB Measurement issue, CC Skip stitch
CB300.0%
50 / 2 days
——
07/29–07/30
—
CB290.0%
10 / 1 days
——
07/27–07/27
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB036123 (25%)6307/23, 07/27, 07/28, 07/29, 07/31
CB30240 (0%)2207/29, 07/30
CB29120 (0%)1107/27

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends1131402
CC Skip stitch424301
CB Broken stitch14521
EB Measurement issue31
AC Fabric hole171
EC Asymmetry236
Others (no detail)14211
ED Gathering crease2141
260317 MKSC · CB01/CB04/CB21… · Due 07/29Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run3 reports
07/24–07/27QC 1st Bundle2 reports
07/24QA 1st Bundle1 reports
4/20QC Inlineactual/required · 20%
DHU 11.5%QC Endline6 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,344 / 1,544
PDF reports14
Last report07/29

Cross-stage findings

Missed in earlier stages: 1

EE Raw edge (Final Random 07/29): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (07/29): EA Unsmooth/puckering/bubbling 2 (earlier 9 times), EC Asymmetry 1 (earlier 27 times), CB Broken stitch 1 (earlier 6 times)

Found earlier but still reached later stages: 4

EI Inaccurate/skewed stitching 1, CE Broken seam 2, DI High-low/uneven 1, CA Thread tension 1 pcs (later stages total)

12 defects recorded as 'Others' without detail

Pilot Run 4, QA 1st Bundle 2, QA Inline 6; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (5), DJ Pleat (3), ED Gathering crease (2), CB Broken stitch (2), BA Thread ends (1), AD Fabric stains (1), CE Broken seam (1); Both: EC Asymmetry (6/4); DHU QC 1st Bundle 80.8% / QA 1st Bundle 61.5%

Caught in earlier stages

ED Gathering crease (67), EB Measurement issue (58), DA Exceed seam allowance (11), CD Needle hole (10), DB Run-off stitching (8) did not reach later stages

Report line differs from production line

QGR2630625 Final Random (07/29) CB08; actual production line(s) CB01/CB04/CB21/CB30/CB31 (cards show production lines only)

Stage summary

StageCountFAILDHU
Pilot Run3 reports0—
QC 1st Bundle2 reports—80.8%
QA 1st Bundle1 reports—61.5%
QC Inline4 reports
required on prod. days 4/20 (20%)
—37.5%
QC Endline6 days—11.5%
QA Inline2 reports231.2%
Final Random2 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB217.8%
1901 / 6 days
37.5%PASS
07/24–07/30
BA Thread ends, CD Needle hole, ED Gathering crease
CB0429.6%
405 / 2 days
25.0%PASS
07/27–07/28
EB Measurement issue, ED Gathering crease, BA Thread ends
CB310.0%
10 / 1 days
——
07/30–07/30
—
CB300.0%
8 / 1 days
——
07/30–07/30
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB216124 (33%)6207/25, 07/27, 07/28, 07/29, 07/30
CB04240 (0%)2207/27, 07/28
CB30120 (0%)1107/30
CB31120 (0%)1107/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends11295
ED Gathering crease32557
EB Measurement issue157
EC Asymmetry66411671
EA Unsmooth/puckering/bubbling32342
Others (no detail)426
DA Exceed seam allowance56
CB Broken stitch281
260321 MKSC · CB01/CB04/CB05 · Due 07/29Final Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No resultPilot Run1 reports
07/14QC 1st Bundle1 reports
07/11QA 1st Bundle1 reports
9/42QC Inlineactual/required · 21%
DHU 23.8%QC Endline20 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty4,358 / 0
PDF reports19
Last report08/10

Cross-stage findings

Missed in earlier stages: 1

DF Twisted seam/skewing (Final Random 07/28): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (08/08): EC Asymmetry 1 (earlier 44 times), ED Gathering crease 1 (earlier 19 times)

Found earlier but still reached later stages: 4

BB Missing cut seam allowance 1, EA Unsmooth/puckering/bubbling 2, DB Run-off stitching 1, EB Measurement issue 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

PP Sample 3, QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: CE Broken seam (4), CG Grinning (2), CC Skip stitch (1); Both: EC Asymmetry (2/6), EA Unsmooth/puckering/bubbling (2/3); DHU QC 1st Bundle 84.6% / QA 1st Bundle 92.3%

Caught in earlier stages

AC Fabric hole (158), DA Exceed seam allowance (30), CC Skip stitch (19), CE Broken seam (17), CG Grinning (10) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run1 reports0—
QC 1st Bundle1 reports—84.6%
QA 1st Bundle1 reports—92.3%
QC Inline9 reports
required on prod. days 9/42 (21%)
—35.2%
QC Endline20 days—23.8%
QA Inline3 reports328.1%
Final Random3 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0423.8%
4338 / 20 days
28.1%PASS
07/11–08/03
ED Gathering crease, EC Asymmetry, BA Thread ends
CB010.0%
10 / 1 days
——
07/16–07/16
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0420409 (22%)201107/29, 07/30, 07/31, 08/01, 08/03
CB01120 (0%)1107/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
EC Asymmetry4263822892
ED Gathering crease1724312
BA Thread ends1754
AC Fabric hole71501
DB Run-off stitching8881
EB Measurement issue941
EA Unsmooth/puckering/bubbling2334872
DA Exceed seam allowance30
260335 MKSC · CS12 · Due 07/29Final Random PASS Final Random DHU is 1.4× QC Endline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/10QC Inlineactual/required · 0%
DHU 3.6%QC Endline5 days
No reportQA Inline
All FAILShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty577 / 577
PDF reports3
Last report07/21

Cross-stage findings

Final Random DHU is 1.4× QC Endline

Final Random DHU 5.0% vs QC Endline 3.6% (06/25–06/30, 5 days, 577 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 1

ED Gathering crease 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC Endline data errors: 3

06/26 CS12 260335 (defective pcs 16 > defects 7), 06/27 CS12 260335 (defective pcs 5 > defects 4), 06/29 CS12 260335 (defective pcs 7 > defects 4)

Found before bulk production (Final Random, Shipment Sample, Pre-final): 9

AD Fabric stains, HA Poor pressing, EC Asymmetry, CB Broken stitch, DI High-low/uneven, EA Unsmooth/puckering/bubbling, BD Snagging, DG Fastening loose/misplaced, DB Run-off stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—3.6%
Shipment Sample1 reports1—
Pre-final1 reports03.8%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS123.6%
577 / 5 days
—PASS
06/25–06/30
BA Thread ends, GB Missing sewing operation, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS125100 (0%)5506/25, 06/26, 06/27, 06/29, 06/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineShipment SamplePre-finalFinal Random
BA Thread ends1122
ED Gathering crease32
CB Broken stitch21
EA Unsmooth/puckering/bubbling12
GB Missing sewing operation3
HA Poor pressing2
EC Asymmetry2
Others (no detail)2
260726 GECL · CS11/CS12 · Due 07/29Final Random PASS QA Inline DHU is 9.3× QC Endline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
13/44QC Inlineactual/required · 30%
DHU 5.7%QC Endline22 days
All FAILQA Inline1 reports
No resultShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty6,597 / 6,597
PDF reports17
Last report07/21

Cross-stage findings

QA Inline DHU is 9.3× QC Endline

QA Inline DHU 53.1% vs QC Endline 5.7% (06/29–07/24, 22 days, 6585 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (07/21): AD Fabric stains 2 (earlier 7 times), CB Broken stitch 2 (earlier 3 times)

Found earlier but still reached later stages: 2

ED Gathering crease 1, EC Asymmetry 2 pcs (later stages total)

95 defects recorded as 'Others' without detail

QC Inline 94, QA Inline 1; cannot compare across stages

QC Endline data errors: 20

06/30 CS12 260726 (defective pcs 9 > defects 7), 07/01 CS12 260726 (defective pcs 37 > defects 20), 07/02 CS12 260726 (defective pcs 25 > defects 14), 07/03 CS12 260726 (defective pcs 18 > defects 7)…

Caught in earlier stages

CC Skip stitch (50), DD Thread not straight/waving (17), DB Run-off stitching (11), DJ Pleat (10), DI High-low/uneven (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline14 reports
required on prod. days 13/44 (30%)
—0.0%
QC Endline22 days—5.7%
QA Inline1 reports153.1%
Shipment Sample1 reports0—
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS125.7%
6585 / 22 days
53.1%PASS
06/29–07/24
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS12224413 (30%)22907/18, 07/20, 07/21, 07/22, 07/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends1013043
Others (no detail)94441
ED Gathering crease208221
EC Asymmetry124512
CC Skip stitch50
AD Fabric stains41512
DD Thread not straight/waving17
CB Broken stitch112
260811 OSIT · CS14 · Due 07/29Final Random PASS Missed in earlier stages: 5
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
8/32QC Inlineactual/required · 25%
DHU 9.0%QC Endline16 days
All FAILQA Inline3 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty8,600 / 8,600
PDF reports13
Last report07/22

Cross-stage findings

Missed in earlier stages: 5

CD Needle hole (Pre-final 07/07), AD Fabric stains (Pre-final 07/07), DE Cut to broken (Pre-final 07/07), AC Fabric hole (Pre-final 07/07), IA 2nd operation issue (Final Random 07/22): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (07/22): EC Asymmetry 2 (earlier 17 times), ED Gathering crease 1 (earlier 13 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

60 defects recorded as 'Others' without detail

QC Inline 58, QA Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 7); zero in QC Endline records

QC Endline data errors: 3

07/11 CS14 260811 (defective pcs 43 > defects 42), 07/13 CS14 260811 (defective pcs 43 > defects 27), 07/16 CS14 260811 (defective pcs 12 > defects 9)

Caught in earlier stages

CC Skip stitch (96), EA Uneven seam allowance (38), EA Unsmooth/puckering/bubbling (7), DB Run-off stitching (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline8 reports
required on prod. days 8/32 (25%)
—0.0%
QC Endline16 days—9.0%
QA Inline3 reports344.8%
Pre-final1 reports04.0%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS149.0%
7923 / 16 days
44.8%PASS
07/02–07/27
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1416328 (25%)16807/15, 07/16, 07/17, 07/22, 07/27

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends19494276
CC Skip stitch951
ED Gathering crease8151
Others (no detail)582
EC Asymmetry3741522
EA Uneven seam allowance38
AD Fabric stains521
AC Fabric hole521
261038 OSIT · CS07 · Due 07/29Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/15QC 1st Bundle1 reports
07/15QA 1st Bundle1 reports
6/16QC Inlineactual/required · 38%
DHU 6.3%QC Endline8 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty4,100 / 4,145
PDF reports13
Last report07/27

Cross-stage findings

Missed in earlier stages: 1

DI High-low/uneven (Shipment Sample 07/17): first found in later stages, never recorded before

QA Inline DHU is 1.9× QC Inline

QA Inline DHU 25.0% vs QC Inline 12.9%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (07/27): CB Broken stitch 2 (earlier 5 times), ED Gathering crease 2 (earlier 9 times)

Found earlier but still reached later stages: 2

DF Twisted seam/skewing 1, AD Fabric stains 5 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

AD Fabric stains (QA 7); zero in QC Endline records

QC Endline data errors: 6

07/16 CS07 261038 (defective pcs 37 > defects 32), 07/17 CS07 261038 (defective pcs 53 > defects 41), 07/18 CS07 261038 (defective pcs 27 > defects 21), 07/20 CS07 261038 (defective pcs 46 > defects 36)…

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AC Fabric hole (3 Major), CB Broken stitch (3 Major), BA Thread ends (2 Major), EH Poor lamination/bonding (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), BD Snagging (2), EC Asymmetry (2), DF Twisted seam/skewing (2); Both: BB Missing cut seam allowance (3/1); DHU QC 1st Bundle 92.3% / QA 1st Bundle 65.0%

Caught in earlier stages

AB Shading (67), EC Asymmetry (20), CC Skip stitch (17), DB Run-off stitching (13), EA Unsmooth/puckering/bubbling (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—65.0%
QC Inline6 reports
required on prod. days 6/16 (38%)
—12.9%
QC Endline8 days—6.3%
QA Inline2 reports225.0%
Shipment Sample1 reports1—
Pre-final1 reports03.0%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS076.3%
4162 / 8 days
25.0%PASS
07/15–07/23
BA Thread ends, AB Shading, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS078166 (38%)8207/18, 07/20, 07/21, 07/22, 07/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends27109477
ED Gathering crease55922
AB Shading364
EC Asymmetry2882
DF Twisted seam/skewing21321
CC Skip stitch152
DB Run-off stitching571
CB Broken stitch3322
260464 LOGE · CS24 · Due 07/31No final QA Inline DHU is 2.0× QC Inline
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/32QC Inlineactual/required · 3%
DHU 7.5%QC Endline16 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty6,182 / 6,182
PDF reports3
Last report07/23

Cross-stage findings

QA Inline DHU is 2.0× QC Inline

QA Inline DHU 37.5% vs QC Inline 18.8%; QC Inline may be missing defects

QA Inline DHU is 5.0× QC Endline

QA Inline DHU 37.5% vs QC Endline 7.5% (06/12–07/27, 16 days, 10925 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

QC Endline data errors: 2

06/23 CS24 260464 (defective pcs 64 > defects 63), 07/21 CS24 260464 (defective pcs 25 > defects 24)

Caught in earlier stages

BA Thread ends (491), CC Skip stitch (208), DB Run-off stitching (86), AD Fabric stains (34), DJ Pleat (14) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/32 (3%)
—18.8%
QC Endline16 days—7.5%
QA Inline2 reports237.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS247.5%
10925 / 16 days
37.5%—
06/12–07/27
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2416321 (3%)161507/22, 07/23, 07/24, 07/25, 07/27

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA Inline
BA Thread ends4892
CC Skip stitch208
DB Run-off stitching5801
AD Fabric stains34
DJ Pleat14
ED Gathering crease63
DI High-low/uneven5
CB Broken stitch3
260500 LOGE · CB25/CB30 · Due 07/31Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/08QC 1st Bundle1 reports
07/08QA 1st Bundle1 reports
11/38QC Inlineactual/required · 29%
DHU 9.7%QC Endline18 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,350 / 2,350
PDF reports17
Last report07/25

Cross-stage findings

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 07/25): first found in later stages, never recorded before

Recurring in small numbers: 4

Latest Final Random (07/25): AD Fabric stains 2 (earlier 24 times), EA Unsmooth/puckering/bubbling 1 (earlier 13 times), DJ Pleat 1 (earlier 4 times), EC Asymmetry 1 (earlier 9 times)

Found earlier but still reached later stages: 1

EI Inaccurate/skewed stitching 1 pcs (later stages total)

QC Endline data errors: 9

07/11 CB25 260500 (defective pcs 23 > defects 18), 07/13 CB25 260500 (defective pcs 17 > defects 12), 07/14 CB25 260500 (defective pcs 49 > defects 27), 07/16 CB25 260500 (defective pcs 22 > defects 12)…

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (3 Major), CE Broken seam (2 Major), CC Skip stitch (1 Major), EE Raw edge (1 Major), EA Unsmooth/puckering/bubbling (1 Major), AC Fabric hole (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: AD Fabric stains (3), BA Thread ends (3), HA Poor pressing (2), DA Exceed seam allowance (2); Both: ED Gathering crease (2/2); DHU QC 1st Bundle 92.3% / QA 1st Bundle 92.3%

Caught in earlier stages

Q94 Glue marks (117), ED Gathering crease (60), EH Poor lamination/bonding (54), HA Poor pressing (29), DD Thread not straight/waving (12) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—92.3%
QC Inline11 reports
required on prod. days 11/38 (29%)
—29.3%
QC Endline18 days—9.7%
QA Inline3 reports332.3%
Final Random1 reports05.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB259.7%
5143 / 18 days
32.3%PASS
07/08–07/30
BA Thread ends, Q94 Glue marks, AD Fabric stains
CB300.0%
3 / 1 days
——
07/20–07/20
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB25183611 (31%)18707/23, 07/24, 07/27, 07/28, 07/30
CB30120 (0%)1107/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends3321173
AD Fabric stains33210172
Q94 Glue marks117
ED Gathering crease22506
EH Poor lamination/bonding54
Others (no detail)36
EA Unsmooth/puckering/bubbling127141
HA Poor pressing227
260708 CHAN · CS05/CS06 · Due 07/31Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
07/17QA 1st Bundle1 reports
4/16QC Inlineactual/required · 25%
DHU 12.6%QC Endline8 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,500 / 2,500
PDF reports7
Last report07/24

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 07/24): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (07/24): AD Fabric stains 1 (earlier 9 times), CC Skip stitch 1 (earlier 10 times)

QC Endline data errors: 2

07/18 CS06 260708 (defective pcs 35 > defects 32), 07/22 CS06 260708 (defective pcs 54 > defects 45)

Caught in earlier stages

ED Gathering crease (44), DB Run-off stitching (31), DF Twisted seam/skewing (28), EC Asymmetry (26), EA Unsmooth/puckering/bubbling (19) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—70.0%
QC Inline5 reports
required on prod. days 4/16 (25%)
—14.2%
QC Endline8 days—12.6%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0612.6%
2500 / 8 days
—PASS
07/16–07/24
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS068164 (25%)8407/20, 07/21, 07/22, 07/23, 07/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineFinal Random
BA Thread ends43672
AD Fabric stains34651
ED Gathering crease44
CC Skip stitch14321
DB Run-off stitching31
DF Twisted seam/skewing127
EC Asymmetry2186
EA Unsmooth/puckering/bubbling19
260709 CHAN · CS06 · Due 07/31Final Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
07/14QC 1st Bundle1 reports
07/14QA 1st Bundle1 reports
1/8QC Inlineactual/required · 12%
DHU 12.7%QC Endline4 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,001 / 1,001
PDF reports5
Last report07/24

Cross-stage findings

Missed in earlier stages: 3

EI Inaccurate/skewed stitching (Shipment Sample 07/16), DC Join stitching (Shipment Sample 07/16), CB Broken stitch (Final Random 07/24): first found in later stages, never recorded before

Found earlier but still reached later stages: 4

AC Fabric hole 1, CG Grinning 1, EC Asymmetry 1, AD Fabric stains 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA 1st Bundle 2; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (3 Major), EA Unsmooth/puckering/bubbling (2 Major), DB Run-off stitching (2 Major), AC Fabric hole (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: AB Shading (3); Both: DA Exceed seam allowance (3/1), DJ Pleat (3/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 65.0%

Caught in earlier stages

ED Gathering crease (33), EA Unsmooth/puckering/bubbling (12), AB Shading (11), CC Skip stitch (11), DB Run-off stitching (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—65.0%
QC Inline1 reports
required on prod. days 1/8 (12%)
—14.0%
QC Endline4 days—12.7%
Shipment Sample1 reports1—
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0612.7%
1001 / 4 days
—PASS
07/13–07/16
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS06481 (12%)4307/13, 07/14, 07/15, 07/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SampleFinal Random
BA Thread ends3301
ED Gathering crease429
EC Asymmetry3101
Others (no detail)211
EA Unsmooth/puckering/bubbling210
AB Shading38
CC Skip stitch11
AD Fabric stains71
260913 RGOR · CP08/CP10 · Due 07/31Shipment Sample No result QA Inline DHU is 5.8× QC Inline
No reportPP Sample
No reportPilot Run
07/24–07/25QC 1st Bundle2 reports
07/25QA 1st Bundle1 reports
7/28QC Inlineactual/required · 25%
DHU 8.3%QC Endline8 days
All FAILQA Inline2 reports
No resultShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty1,090 / 5,280
PDF reports13
Last report08/01

Cross-stage findings

QA Inline DHU is 5.8× QC Inline

QA Inline DHU 57.8% vs QC Inline 9.9%; QC Inline may be missing defects

QA Inline DHU is 7.0× QC Endline

QA Inline DHU 57.8% vs QC Endline 8.3% (07/24–08/01, 8 days, 10331 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

DD Thread not straight/waving (QA 5); zero in QC Endline records

QC Endline data errors: 14

07/24 CP08 260913 (defective pcs 70 > defects 26), 07/25 CP08 260913 (defective pcs 35 > defects 16), 07/25 CP10 260913 (defective pcs 129 > defects 65), 07/27 CP08 260913 (defective pcs 98 > defects 57)…

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: GA Missing bartack/button (1 Major); Only QC 1st Bundle: DI High-low/uneven (4), ED Gathering crease (4), CG Grinning (3), DA Exceed seam allowance (2), DB Run-off stitching (2), CC Skip stitch (1); Both: BA Thread ends (10/3), EC Asymmetry (5/2), DE Cut to broken (3/2), DJ Pleat (1/3), AD Fabric stains (1/1), CE Broken seam (1/1), EI Inaccurate/skewed stitching (1/1), CB Broken stitch (1/1); DHU QC 1st Bundle 97.5% / QA 1st Bundle 75.0%

Caught in earlier stages

BA Thread ends (410), EA Uneven seam allowance (129), CC Skip stitch (121), ED Gathering crease (103), EB Measurement issue (76) did not reach later stages

Found before bulk production (Shipment Sample): 1

CA Thread tension: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—97.5%
QA 1st Bundle1 reports—75.0%
QC Inline7 reports
required on prod. days 7/28 (25%)
—9.9%
QC Endline8 days—8.3%
QA Inline2 reports257.8%
Shipment Sample1 reports0—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP087.6%
5378 / 8 days
46.9%—
07/24–08/01
BA Thread ends, EA Uneven seam allowance, CC Skip stitch
CP109.1%
4953 / 6 days
68.8%—
07/25–07/31
BA Thread ends, CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP088166 (38%)8207/28, 07/29, 07/30, 07/31, 08/01
CP106121 (8%)6507/27, 07/28, 07/29, 07/30, 07/31

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends103443458
EA Uneven seam allowance129
CC Skip stitch11164
ED Gathering crease4954
EB Measurement issue76
EC Asymmetry5212302
DB Run-off stitching237
DA Exceed seam allowance2205
261192 RGOR · CB30/CB31 · Due 07/31Final Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
07/07QC 1st Bundle1 reports
07/07QA 1st Bundle1 reports
7/18QC Inlineactual/required · 39%
DHU 8.5%QC Endline8 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,940 / 1,940
PDF reports11
Last report08/01

Cross-stage findings

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 08/01): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/01): CC Skip stitch 1 (earlier 9 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

Duplicate report numbers

QGR2627183 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EE Raw edge (2 Major), DB Run-off stitching (1 Major), CB Broken stitch (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: EH Poor lamination/bonding (2), DJ Pleat (1); Both: DI High-low/uneven (2/3), EC Asymmetry (2/3); DHU QC 1st Bundle 53.8% / QA 1st Bundle 84.6%

Caught in earlier stages

AD Fabric stains (80), EC Asymmetry (33), DJ Pleat (28), ED Gathering crease (22), CE Broken seam (19) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—53.8%
QA 1st Bundle1 reports—84.6%
QC Inline7 reports
required on prod. days 7/18 (39%)
—32.9%
QC Endline8 days—8.5%
QA Inline1 reports134.4%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB318.5%
4190 / 8 days
34.4%PASS
07/07–07/15
BA Thread ends, CC Skip stitch, AD Fabric stains
CB300.0%
10 / 1 days
——
07/09–07/09
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB318167 (44%)7207/09, 07/10, 07/13, 07/14, 07/15
CB30120 (0%)1107/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends118322
AD Fabric stains10682
CC Skip stitch731
EC Asymmetry23271
DJ Pleat127
ED Gathering crease211
CE Broken seam181
DI High-low/uneven238
253686 MKSC · CP06/CP16 · Due 07/01Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/20QC Inlineactual/required · 0%
DHU 17.0%QC Endline9 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty6,241 / 1,500
PDF reports1
Last report06/30

Cross-stage findings

QC Endline data errors: 1

06/13 CP06 253686A (defective pcs 19 > defects 1)

Caught in earlier stages

AD Fabric stains (138), DB Run-off stitching (101), ED Gathering crease (80), CC Skip stitch (31), EC Asymmetry (25) did not reach later stages

Found before bulk production (Final Random): 3

CD Needle hole, CB Broken stitch, CG Grinning: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/20 (0%)
——
QC Endline9 days—17.0%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0617.0%
4111 / 9 days
—PASS
06/01–06/13
BA Thread ends, AD Fabric stains, DB Run-off stitching
CP1618.0%
200 / 1 days
——
06/06–06/06
BA Thread ends, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP069180 (0%)9906/09, 06/10, 06/11, 06/12, 06/13
CP16120 (0%)1106/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends3082
AD Fabric stains138
DB Run-off stitching101
ED Gathering crease80
CC Skip stitch31
EC Asymmetry25
Others (no detail)24
EA Unsmooth/puckering/bubbling13
260843 RGOR · CS20/CS26 · Due 07/03Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/24QC Inlineactual/required · 0%
DHU 10.7%QC Endline11 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,830 / 2,830
PDF reports1
Last report07/06

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/06): CC Skip stitch 1 (earlier 11 times)

Found earlier but still reached later stages: 2

AD Fabric stains 2, GB Missing sewing operation 1 pcs (later stages total)

Caught in earlier stages

ED Gathering crease (40) did not reach later stages

Report line differs from production line

QGR2626621 Final Random (07/06) CS23; actual production line(s) CS20/CS26 (cards show production lines only)

Found before bulk production (Final Random): 1

CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/24 (0%)
——
QC Endline11 days—10.7%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2610.7%
2903 / 11 days
——
06/13–07/02
BA Thread ends, CC Skip stitch, ED Gathering crease
CS200.0%
5 / 1 days
——
06/25–06/25
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2611220 (0%)111106/23, 06/24, 06/25, 06/26, 07/02
CS20120 (0%)1106/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1314
CC Skip stitch1151
ED Gathering crease40
GB Missing sewing operation191
AD Fabric stains52
CB Broken stitch1
260845 RGOR · CP19 · Due 07/03Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/12QC Inlineactual/required · 0%
DHU 10.2%QC Endline6 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,940 / 3,940
PDF reports1
Last report07/06

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/06): AD Fabric stains 2 (earlier 5 times)

QC Endline data errors: 4

06/12 CP19 260845-S (defective pcs 110 > defects 87), 06/13 CP19 260845-S (defective pcs 59 > defects 46), 06/16 CP19 260845-S (defective pcs 102 > defects 88), 06/19 CP19 260845-L (defective pcs 5 > defects 3)

Caught in earlier stages

CC Skip stitch (106), ED Gathering crease (51), EA Uneven seam allowance (45), EB Measurement issue (6) did not reach later stages

Report line differs from production line

QGR2626798 Final Random (07/06) CP13; actual production line(s) CP19 (cards show production lines only)

Found before bulk production (Final Random): 3

CB Broken stitch, CD Needle hole, DE Cut to broken: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/12 (0%)
——
QC Endline6 days—10.2%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1910.2%
4039 / 6 days
——
06/12–06/23
BA Thread ends, CC Skip stitch, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP196120 (0%)6606/13, 06/16, 06/17, 06/19, 06/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1224
CC Skip stitch106
AD Fabric stains762
ED Gathering crease51
EA Uneven seam allowance45
EB Measurement issue6
Others (no detail)3
CB Broken stitch2
260456 SAIN · CB21/CB22/CB24… · Due 07/06Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/18QC Inlineactual/required · 0%
DHU 6.7%QC Endline8 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports1
Last report07/06

Cross-stage findings

Caught in earlier stages

CC Skip stitch (46) did not reach later stages

Found before bulk production (Final Random): 3

GB Missing sewing operation, CB Broken stitch, BD Snagging: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/18 (0%)
——
QC Endline8 days—6.7%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB227.7%
1285 / 6 days
——
06/25–07/06
BA Thread ends, CC Skip stitch, AD Fabric stains
CB248.0%
376 / 1 days
—PASS
06/09–06/09
CC Skip stitch, BA Thread ends, ED Gathering crease
CB210.0%
240 / 1 days
——
06/29–06/29
—
CB300.0%
27 / 1 days
——
06/29–06/29
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB226120 (0%)6606/26, 06/27, 06/30, 07/01, 07/06
CB21120 (0%)1106/29
CB24120 (0%)1106/09
CB30120 (0%)1106/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends782
CC Skip stitch46
ED Gathering crease4
CB Broken stitch2
BD Snagging2
GB Missing sewing operation1
AD Fabric stains1
253617 MKSC · CB04/CB08 · Due 07/08Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,000 / 500
PDF reports1
Last report07/04

Cross-stage findings

Found before bulk production (Final Random): 2

BA Thread ends, DE Cut to broken: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random1 reports04.0%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends2
DE Cut to broken1
253629 MKSC · CB03 · Due 07/08Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,800 / 500
PDF reports1
Last report07/04

Cross-stage findings

Found before bulk production (Final Random): 2

BA Thread ends, BB Missing cut seam allowance: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random1 reports04.0%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends2
BB Missing cut seam allowance1
253631 MKSC · CP05 · Due 07/08Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty5,600 / 1,200
PDF reports1
Last report07/06

Cross-stage findings

Found before bulk production (Final Random): 3

BA Thread ends, DB Run-off stitching, AD Fabric stains: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random1 reports03.8%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends1
DB Run-off stitching1
AD Fabric stains1
253670 MKSC · CB20 · Due 07/08Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/22QC Inlineactual/required · 0%
DHU 81.3%QC Endline11 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,563 / 1,300
PDF reports1
Last report07/02

Cross-stage findings

Caught in earlier stages

CC Skip stitch (328), ED Gathering crease (291), AD Fabric stains (147), EC Asymmetry (129), CE Broken seam (127) did not reach later stages

Found before bulk production (Final Random): 2

AC Fabric hole, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/22 (0%)
——
QC Endline11 days—81.3%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2081.3%
1553 / 11 days
—PASS
06/23–07/09
CC Skip stitch, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2011220 (0%)111106/30, 07/01, 07/04, 07/07, 07/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
CC Skip stitch328
ED Gathering crease291
AD Fabric stains147
EC Asymmetry129
CE Broken seam127
EB Measurement issue109
BA Thread ends702
Others (no detail)58
253695 MKSC · CP17 · Due 07/08Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty6,200 / 5,000
PDF reports1
Last report07/03

Cross-stage findings

Found before bulk production (Final Random): 3

AD Fabric stains, CB Broken stitch, BA Thread ends: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random1 reports02.0%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends3
AD Fabric stains2
CB Broken stitch2
254203 LOGE · CP12 · Due 07/08Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty14,000 / 14,000
PDF reports2
Last report07/04

Cross-stage findings

Found before bulk production (Final Random): 5

AC Fabric hole, CB Broken stitch, ED Gathering crease, BA Thread ends, DJ Pleat: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random2 reports01.6%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends20
CB Broken stitch4
AC Fabric hole2
ED Gathering crease2
DJ Pleat2
260174 LOGE · CP04/CP05/CP08… · Due 07/08No final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/124QC Inlineactual/required · 0%
DHU 10.9%QC Endline25 days
No reportQA Inline
No reportShipment Sample
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty15,000 / 15,000
PDF reports1
Last report07/04

Cross-stage findings

Recurring in small numbers: 1

Latest Pre-final (07/04): CE Broken seam 1 (earlier 13 times)

QC Endline data errors: 24

06/16 CP08 260174-2 (defective pcs 57 > defects 35), 06/17 CP08 260174-2 (defective pcs 37 > defects 23), 06/19 CP08 260174-2 (defective pcs 65 > defects 44), 06/20 CP08 260174-2 (defective pcs 24 > defects 16)…

Caught in earlier stages

CC Skip stitch (250), ED Gathering crease (248), EB Measurement issue (238), EC Asymmetry (112), EA Uneven seam allowance (38) did not reach later stages

Report line differs from production line

QGR2626029 Pre-final (07/04) CP14; actual production line(s) CP04/CP05/CP08/CP09/CP10/CP11/CP16/CP18/CP19 (cards show production lines only)

Found before bulk production (Pre-final): 3

DJ Pleat, GA Missing bartack/button, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/124 (0%)
——
QC Endline25 days—10.9%
Pre-final1 reports01.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP086.8%
5060 / 11 days
——
06/16–06/29
CC Skip stitch, BA Thread ends, ED Gathering crease
CP0423.9%
5000 / 19 days
——
06/08–07/06
BA Thread ends, EB Measurement issue, ED Gathering crease
CP090.0%
1340 / 7 days
——
06/24–07/10
—
CP102.6%
1300 / 8 days
——
06/23–07/09
BA Thread ends, CC Skip stitch, ED Gathering crease
CP113.2%
1000 / 5 days
——
06/29–07/09
BA Thread ends
CP182.5%
800 / 6 days
——
06/23–06/30
BA Thread ends, DB Run-off stitching, EA Uneven seam allowance
CP050.0%
280 / 4 days
——
07/04–07/10
—
CP160.0%
40 / 1 days
——
07/09–07/09
—
CP190.0%
40 / 1 days
——
06/25–06/25
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0419380 (0%)191906/26, 06/27, 06/29, 06/30, 07/06
CP0811220 (0%)111106/24, 06/25, 06/26, 06/27, 06/29
CP108160 (0%)8806/26, 06/27, 06/29, 06/30, 07/09
CP097140 (0%)7706/26, 06/27, 06/29, 07/09, 07/10
CP186120 (0%)6606/24, 06/25, 06/27, 06/29, 06/30
CP115100 (0%)5506/29, 06/30, 07/01, 07/02, 07/09
CP05480 (0%)4407/04, 07/06, 07/08, 07/10
CP16120 (0%)1107/09
CP19120 (0%)1106/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlinePre-final
BA Thread ends59810
CC Skip stitch250
ED Gathering crease248
EB Measurement issue238
EC Asymmetry112
CE Broken seam1001
EA Uneven seam allowance38
GB Missing sewing operation21
260179 LOGE · CB61 · Due 07/08Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty6,000 / 6,000
PDF reports1
Last report07/07

Cross-stage findings

Found before bulk production (Final Random): 3

BA Thread ends, CB Broken stitch, DB Run-off stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random1 reports01.5%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends7
CB Broken stitch2
DB Run-off stitching1
260181 LOGE · CB61 · Due 07/08Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
1/2 FAILFinal Random2 reports
Order/Ship qty10,000 / 10,000
PDF reports2
Last report07/09

Cross-stage findings

4 defects recorded as 'Others' without detail

Final Random 4; cannot compare across stages

Found before bulk production (Final Random): 11

CE Broken seam, CB Broken stitch, BA Thread ends, BB Missing cut seam allowance, EC Asymmetry, AC Fabric hole, GB Missing sewing operation, EI Inaccurate/skewed stitching, AD Fabric stains, CC Skip stitch, DC Join stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random2 reports15.8%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BB Missing cut seam allowance21
BA Thread ends20
EI Inaccurate/skewed stitching5
Others (no detail)4
CE Broken seam3
CB Broken stitch3
CC Skip stitch3
EC Asymmetry2
260232 LOGE · CB61 · Due 07/08Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty7,000 / 7,000
PDF reports1
Last report07/06

Cross-stage findings

Found before bulk production (Final Random): 8

DK Twisted shoulder strap, BA Thread ends, BB Missing cut seam allowance, DB Run-off stitching, EI Inaccurate/skewed stitching, CB Broken stitch, EB Measurement issue, BD Snagging: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random1 reports05.0%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends7
CB Broken stitch3
BB Missing cut seam allowance2
EI Inaccurate/skewed stitching2
EB Measurement issue2
BD Snagging2
DK Twisted shoulder strap1
DB Run-off stitching1
260233 LOGE · CP61 · Due 07/08Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty21,000 / 21,000
PDF reports1
Last report07/06

Cross-stage findings

Found before bulk production (Final Random): 5

BA Thread ends, BB Missing cut seam allowance, DJ Pleat, CE Broken seam, BD Snagging: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random1 reports01.6%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends10
BB Missing cut seam allowance3
BD Snagging3
DJ Pleat1
CE Broken seam1
260238 LOGE · CS61 · Due 07/08Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty9,000 / 9,000
PDF reports1
Last report07/06

Cross-stage findings

Found before bulk production (Final Random): 4

BA Thread ends, BD Snagging, CB Broken stitch, EC Asymmetry: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random1 reports04.5%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends5
EC Asymmetry4
CB Broken stitch3
BD Snagging2
260754 LOGE · CS22 · Due 07/08Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/8QC Inlineactual/required · 0%
DHU 15.6%QC Endline4 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports1
Last report07/08

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/08): AD Fabric stains 2 (earlier 3 times)

Caught in earlier stages

CC Skip stitch (34), ED Gathering crease (32), DB Run-off stitching (20), EB Measurement issue (7) did not reach later stages

Found before bulk production (Final Random): 1

CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—15.6%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2215.6%
1000 / 4 days
—PASS
06/29–07/02
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS22480 (0%)4406/29, 06/30, 07/01, 07/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends373
CC Skip stitch34
ED Gathering crease32
AD Fabric stains232
DB Run-off stitching20
EB Measurement issue7
EC Asymmetry3
CB Broken stitch2
260755 LOGE · CS15 · Due 07/08Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/14QC Inlineactual/required · 0%
DHU 14.6%QC Endline7 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,200 / 1,200
PDF reports1
Last report07/08

Cross-stage findings

Caught in earlier stages

DB Run-off stitching (35), CC Skip stitch (27), ED Gathering crease (7) did not reach later stages

Report line differs from production line

QGR2626931 Final Random (07/08) CS05; actual production line(s) CS15 (cards show production lines only)

Found before bulk production (Final Random): 3

EI Inaccurate/skewed stitching, CB Broken stitch, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—14.6%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1514.6%
1176 / 7 days
——
06/23–06/30
BA Thread ends, DB Run-off stitching, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS157140 (0%)7706/25, 06/26, 06/27, 06/29, 06/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1004
DB Run-off stitching35
CC Skip stitch27
ED Gathering crease7
EI Inaccurate/skewed stitching2
Others (no detail)2
CB Broken stitch1
EA Unsmooth/puckering/bubbling1
260392 RGOR · CB05/CB17/CB30 · Due 07/10Shipment Sample No result No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/44QC Inlineactual/required · 0%
DHU 27.4%QC Endline18 days
All FAILQA Inline1 reports
No resultShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty3,810 / 3,810
PDF reports2
Last report07/09

Cross-stage findings

Recurring in small numbers: 3

Latest Shipment Sample (07/09): EC Asymmetry 1 (earlier 9 times), CE Broken seam 1 (earlier 9 times), ED Gathering crease 1 (earlier 13 times)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC Endline data errors: 1

07/09 CB05 260392 (defective pcs 27 > defects 26)

Caught in earlier stages

CC Skip stitch (430), DB Run-off stitching (117), BA Thread ends (83), CD Needle hole (64), EB Measurement issue (34) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/44 (0%)
——
QC Endline18 days—27.4%
QA Inline1 reports143.8%
Shipment Sample1 reports0—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0528.0%
3669 / 18 days
43.8%—
06/25–07/16
CC Skip stitch, DB Run-off stitching, EC Asymmetry
CB300.0%
60 / 3 days
——
07/02–07/15
—
CB170.0%
20 / 1 days
——
07/14–07/14
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0518360 (0%)181807/11, 07/13, 07/14, 07/15, 07/16
CB30360 (0%)3307/02, 07/14, 07/15
CB17120 (0%)1107/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineQA InlineShipment Sample
CC Skip stitch430
DB Run-off stitching117
EC Asymmetry11041
BA Thread ends812
ED Gathering crease771
CD Needle hole64
Others (no detail)511
CE Broken seam4311
260434 RGOR · CB13/CB15 · Due 07/10No final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
3/46QC Inlineactual/required · 7%
DHU 15.5%QC Endline22 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty5,805 / 5,805
PDF reports3
Last report07/10

Cross-stage findings

QC Endline data errors: 4

07/09 CB15 260434-L3 (defective pcs 29 > defects 19), 07/09 CB15 260434-S1 (defective pcs 30 > defects 21), 07/09 CB15 260434-S2 (defective pcs 29 > defects 21), 07/11 CB15 260434-L1 (defective pcs 10 > defects 8)

Caught in earlier stages

BA Thread ends (500), EC Asymmetry (128), AC Fabric hole (83), CC Skip stitch (77), Q61 Lace raw edge or broken lace (74) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline3 reports
required on prod. days 3/46 (7%)
—38.6%
QC Endline22 days—15.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1515.5%
5860 / 22 days
——
06/23–07/22
BA Thread ends, EC Asymmetry, AC Fabric hole
CB1310.0%
20 / 1 days
——
06/24–06/24
CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1522443 (7%)221907/13, 07/14, 07/15, 07/16, 07/22
CB13120 (0%)1106/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC Endline
BA Thread ends9491
EC Asymmetry17111
AC Fabric hole83
CC Skip stitch473
Q61 Lace raw edge or broken lace74
EB Measurement issue45
CE Broken seam223
CB Broken stitch4
260435 RGOR · CB30 · Due 07/10No final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/38QC Inlineactual/required · 3%
DHU 17.8%QC Endline19 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty3,760 / 3,760
PDF reports2
Last report07/11

Cross-stage findings

QC Endline data errors: 9

06/26 CB30 260435 (defective pcs 60 > defects 39), 07/01 CB30 260435 (defective pcs 59 > defects 49), 07/02 CB30 260435 (defective pcs 90 > defects 84), 07/03 CB30 260435 (defective pcs 41 > defects 38)…

Caught in earlier stages

BA Thread ends (558), CC Skip stitch (58), Q61 Lace raw edge or broken lace (39), EC Asymmetry (7), CE Broken seam (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/38 (3%)
—43.8%
QC Endline19 days—17.8%
QA Inline1 reports137.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3017.8%
3786 / 19 days
37.5%—
06/25–07/16
BA Thread ends, CC Skip stitch, Q61 Lace raw edge or broken lace

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3019381 (3%)191807/11, 07/13, 07/14, 07/15, 07/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA Inline
BA Thread ends558
CC Skip stitch58
Q61 Lace raw edge or broken lace39
EC Asymmetry34
CE Broken seam34
FA Wrong material5
CD Needle hole5
AD Fabric stains5
260440 RGOR · CP19/CP20 · Due 07/10No final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
1/32QC Inlineactual/required · 3%
DHU 13.1%QC Endline15 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,880 / 2,880
PDF reports2
Last report07/09

Cross-stage findings

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 6), EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

QC Endline data errors: 10

07/02 CP19 260440 (defective pcs 20 > defects 12), 07/06 CP19 260440 (defective pcs 40 > defects 5), 07/07 CP19 260440 (defective pcs 50 > defects 8), 07/08 CP19 260440 (defective pcs 50 > defects 20)…

Caught in earlier stages

BA Thread ends (118), CC Skip stitch (79), EA Uneven seam allowance (59), EB Measurement issue (56), CD Needle hole (50) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline1 reports
required on prod. days 1/32 (3%)
—71.9%
QC Endline15 days—13.1%
QA Inline1 reports143.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1913.1%
2957 / 15 days
43.8%—
07/02–07/18
BA Thread ends, CC Skip stitch, EA Uneven seam allowance
CP200.0%
10 / 1 days
——
07/14–07/14
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1915301 (3%)151407/14, 07/15, 07/16, 07/17, 07/18
CP20120 (0%)1107/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA Inline
BA Thread ends111052
CC Skip stitch781
EA Uneven seam allowance59
EB Measurement issue56
CD Needle hole50
ED Gathering crease26
GB Missing sewing operation14
EC Asymmetry36
253977 DJLF · CS17 · Due 07/13Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/28QC Inlineactual/required · 0%
DHU 15.2%QC Endline14 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,800 / 1,800
PDF reports1
Last report07/13

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (07/13): AD Fabric stains 1 (earlier 10 times), ED Gathering crease 1 (earlier 8 times)

Caught in earlier stages

DB Run-off stitching (22), EC Asymmetry (19), CC Skip stitch (10) did not reach later stages

Found before bulk production (Final Random): 3

CB Broken stitch, AB Shading, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/28 (0%)
——
QC Endline14 days—15.2%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1715.2%
1780 / 14 days
—PASS
06/23–07/09
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1714280 (0%)141407/03, 07/04, 07/07, 07/08, 07/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends985
AD Fabric stains801
ED Gathering crease371
DB Run-off stitching22
EC Asymmetry19
CC Skip stitch10
CF Pulling yarn3
EA Unsmooth/puckering/bubbling2
254022 DJLF · CB31 · Due 07/13Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/16QC Inlineactual/required · 0%
DHU 8.0%QC Endline8 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,000 / 3,000
PDF reports1
Last report07/04

Cross-stage findings

Found earlier but still reached later stages: 1

ED Gathering crease 3 pcs (later stages total)

Caught in earlier stages

CC Skip stitch (80), EA Uneven seam allowance (25), EB Measurement issue (5) did not reach later stages

Found before bulk production (Final Random): 4

EA Unsmooth/puckering/bubbling, AD Fabric stains, CE Broken seam, BB Missing cut seam allowance: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline8 days—8.0%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB318.0%
2540 / 8 days
—PASS
06/20–07/01
BA Thread ends, CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB318160 (0%)8806/24, 06/25, 06/26, 06/27, 07/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends843
CC Skip stitch80
EA Uneven seam allowance25
ED Gathering crease83
EB Measurement issue5
EA Unsmooth/puckering/bubbling1
AD Fabric stains1
CE Broken seam1
254023 DJLF · CB06/CB13/CB30… · Due 07/13Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/10QC Inlineactual/required · 0%
DHU 5.2%QC Endline3 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,220 / 1,220
PDF reports1
Last report07/07

Cross-stage findings

Found earlier but still reached later stages: 1

BA Thread ends 5 pcs (later stages total)

Caught in earlier stages

CC Skip stitch (38) did not reach later stages

Report line differs from production line

QGR2626325 Final Random (07/07) CB27; actual production line(s) CB06/CB13/CB30/CB31 (cards show production lines only)

Found before bulk production (Final Random): 2

CB Broken stitch, ED Gathering crease: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline3 days—5.2%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB315.4%
1170 / 2 days
——
07/01–07/02
CC Skip stitch, BA Thread ends
CB060.0%
30 / 1 days
——
07/03–07/03
—
CB130.0%
10 / 1 days
——
07/03–07/03
—
CB300.0%
10 / 1 days
——
07/02–07/02
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB31240 (0%)2207/01, 07/02
CB06120 (0%)1107/03
CB13120 (0%)1107/03
CB30120 (0%)1107/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
CC Skip stitch38
BA Thread ends255
CB Broken stitch2
ED Gathering crease2
254025 DJLF · CP14 · Due 07/13Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/12QC Inlineactual/required · 0%
DHU 10.0%QC Endline6 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty4,290 / 4,290
PDF reports1
Last report07/07

Cross-stage findings

QC Endline data errors: 4

06/29 CP14 254025 (defective pcs 81 > defects 32), 07/02 CP14 254025 (defective pcs 131 > defects 50), 07/03 CP14 254025 (defective pcs 100 > defects 49), 07/04 CP14 254025 (defective pcs 77 > defects 40)

Caught in earlier stages

CC Skip stitch (99), ED Gathering crease (65), DF Twisted seam/skewing (29), DB Run-off stitching (28), EC Asymmetry (27) did not reach later stages

Found before bulk production (Final Random): 1

CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/12 (0%)
——
QC Endline6 days—10.0%
Final Random1 reports01.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1410.0%
4290 / 6 days
—PASS
06/29–07/04
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP146120 (0%)6606/30, 07/01, 07/02, 07/03, 07/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends1398
CC Skip stitch99
ED Gathering crease65
DF Twisted seam/skewing29
DB Run-off stitching28
EC Asymmetry27
EA Uneven seam allowance25
EB Measurement issue9
254026 DJLF · CP14 · Due 07/13Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
07/06QC 1st Bundle1 reports
07/06QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 7.2%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty601 / 601
PDF reports4
Last report07/13

Cross-stage findings

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

QC Endline data errors: 4

07/06 CP14 254026 (defective pcs 32 > defects 14), 07/07 CP14 254026 (defective pcs 10 > defects 8), 07/08 CP14 254026 (defective pcs 22 > defects 9), 07/09 CP14 254026 (defective pcs 30 > defects 12)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), DK Twisted shoulder strap (1 Major), EI Inaccurate/skewed stitching (1 Major), BB Missing cut seam allowance (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: EG Wrong panel assembly (3), DL Wrong trim position (2), GA Missing bartack/button (2), DE Cut to broken (1), DF Twisted seam/skewing (1); Both: CG Grinning (2/5), DB Run-off stitching (3/1), CC Skip stitch (2/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 65.0%

Caught in earlier stages

CC Skip stitch (12), CG Grinning (11), DK Twisted shoulder strap (10), DB Run-off stitching (8) did not reach later stages

Report line differs from production line

QGR2627365 Final Random (07/13) CP16; actual production line(s) CP14 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—65.0%
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—7.2%
QA Inline1 reports134.4%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP147.2%
601 / 4 days
34.4%—
07/06–07/09
BA Thread ends, DK Twisted shoulder strap, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP14480 (0%)4407/06, 07/07, 07/08, 07/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends22023
CC Skip stitch219
CG Grinning254
DK Twisted shoulder strap19
DB Run-off stitching3131
CB Broken stitch112
BB Missing cut seam allowance13
DF Twisted seam/skewing12
260406 CIWH · CS08/CS09 · Due 07/13Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/16QC Inlineactual/required · 0%
DHU 8.3%QC Endline7 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty4,291 / 4,291
PDF reports1
Last report07/01

Cross-stage findings

Recurring in small numbers: 5

Latest Final Random (07/01): CC Skip stitch 1 (earlier 5 times), EA Unsmooth/puckering/bubbling 2 (earlier 4 times), ED Gathering crease 1 (earlier 5 times), BA Thread ends 1 (earlier 6 times), AD Fabric stains 1 (earlier 5 times)

QC Endline data errors: 1

06/04 CS08 260406 (defective pcs 24 > defects 23)

Caught in earlier stages

DB Run-off stitching (56), CD Needle hole (14), EC Asymmetry (7), CE Broken seam (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline7 days—8.3%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS088.3%
4217 / 6 days
—PASS
06/04–06/10
BA Thread ends, CC Skip stitch, AD Fabric stains
CS090.0%
19 / 2 days
——
06/10–06/11
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS086120 (0%)6606/05, 06/06, 06/08, 06/09, 06/10
CS09240 (0%)2206/10, 06/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends791
CC Skip stitch691
AD Fabric stains661
DB Run-off stitching56
ED Gathering crease361
EA Unsmooth/puckering/bubbling132
CD Needle hole14
EC Asymmetry7
260541 CIWH · CS08 · Due 07/13Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/8QC Inlineactual/required · 0%
DHU 12.7%QC Endline4 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,000 / 3,000
PDF reports1
Last report07/01

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (07/01): ED Gathering crease 1 (earlier 4 times), AD Fabric stains 2 (earlier 3 times)

2 defects recorded as 'Others' without detail

Final Random 2; cannot compare across stages

Caught in earlier stages

CC Skip stitch (77), DB Run-off stitching (38), EC Asymmetry (19) did not reach later stages

Found before bulk production (Final Random): 3

BB Missing cut seam allowance, CB Broken stitch, AA Fabric defect: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—12.7%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0812.7%
3000 / 4 days
—PASS
06/16–06/20
AD Fabric stains, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS08480 (0%)4406/16, 06/17, 06/19, 06/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
AD Fabric stains922
CC Skip stitch77
ED Gathering crease731
BA Thread ends631
DB Run-off stitching38
Others (no detail)202
EC Asymmetry19
BB Missing cut seam allowance1
260542 CIWH · CS08 · Due 07/13Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/10QC Inlineactual/required · 0%
DHU 14.5%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,500 / 1,500
PDF reports1
Last report07/04

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/04): AD Fabric stains 2 (earlier 4 times)

1 defects recorded as 'Others' without detail

Final Random 1; cannot compare across stages

Caught in earlier stages

ED Gathering crease (147), CC Skip stitch (76), DB Run-off stitching (60), DF Twisted seam/skewing (36), CE Broken seam (9) did not reach later stages

Found before bulk production (Final Random): 1

CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—14.5%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0814.5%
3500 / 5 days
—PASS
06/10–06/16
ED Gathering crease, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS085100 (0%)5506/10, 06/11, 06/12, 06/13, 06/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
ED Gathering crease147
AD Fabric stains772
CC Skip stitch76
BA Thread ends662
DB Run-off stitching60
DF Twisted seam/skewing36
Others (no detail)141
CE Broken seam9
253657 MKSC · CB08/CB30 · Due 07/15Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/26QC Inlineactual/required · 0%
DHU 16.0%QC Endline12 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty500 / 500
PDF reports1
Last report07/08

Cross-stage findings

Found earlier but still reached later stages: 1

BA Thread ends 1 pcs (later stages total)

QC Endline data errors: 1

06/05 CB08 253657B-L1 (defective pcs 35 > defects 34)

Caught in earlier stages

EC Asymmetry (64), EB Measurement issue (41), ED Gathering crease (37), CE Broken seam (21) did not reach later stages

Found before bulk production (Final Random): 2

AC Fabric hole, CG Grinning: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/26 (0%)
——
QC Endline12 days—16.0%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0816.4%
1052 / 10 days
—PASS
06/01–06/23
EC Asymmetry, EB Measurement issue, ED Gathering crease
CB300.0%
30 / 3 days
——
06/03–06/12
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0810200 (0%)101006/08, 06/09, 06/10, 06/11, 06/23
CB30360 (0%)3306/03, 06/05, 06/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
EC Asymmetry64
EB Measurement issue41
ED Gathering crease37
CE Broken seam21
BA Thread ends101
AC Fabric hole1
CG Grinning1
254111 GECL · CS15/CS23 · Due 07/15Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,000 / 500
PDF reports1
Last report07/08

Cross-stage findings

Found before bulk production (Final Random): 1

AD Fabric stains: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random1 reports06.0%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
AD Fabric stains5
254112 GECL · CS17 · Due 07/15Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/4QC Inlineactual/required · 0%
DHU 0.0%QC Endline2 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,200 / 300
PDF reports1
Last report07/08

Cross-stage findings

Main QA defects never recorded by QC Endline: 1

AD Fabric stains (QA 4); zero in QC Endline records

Found before bulk production (Final Random): 1

AD Fabric stains: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/4 (0%)
——
QC Endline2 days—0.0%
Final Random1 reports02.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS170.0%
21 / 2 days
—PASS
06/01–06/02
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS17240 (0%)2206/01, 06/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
AD Fabric stains4
260448 OSIT · CS02 · Due 07/15Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/18QC Inlineactual/required · 0%
DHU 12.3%QC Endline9 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports1
Last report07/08

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/08): ED Gathering crease 2 (earlier 3 times)

Found earlier but still reached later stages: 1

BA Thread ends 5 pcs (later stages total)

Caught in earlier stages

DF Twisted seam/skewing (20), CC Skip stitch (10), EC Asymmetry (9) did not reach later stages

Found before bulk production (Final Random): 2

CB Broken stitch, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/18 (0%)
——
QC Endline9 days—12.3%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0212.3%
930 / 9 days
—PASS
06/19–07/03
ED Gathering crease, DF Twisted seam/skewing, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS029180 (0%)9906/24, 06/26, 06/27, 06/30, 07/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
ED Gathering crease542
DF Twisted seam/skewing20
BA Thread ends95
CC Skip stitch10
EC Asymmetry9
Others (no detail)9
EH Poor lamination/bonding3
CB Broken stitch1
260871 OSIT · CS09 · Due 07/15Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/6QC Inlineactual/required · 0%
DHU 14.5%QC Endline3 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,050 / 1,050
PDF reports1
Last report07/09

Cross-stage findings

Found earlier but still reached later stages: 1

ED Gathering crease 1 pcs (later stages total)

QC Endline data errors: 1

06/27 CS09 260871 (defective pcs 7 > defects 2)

Caught in earlier stages

CC Skip stitch (52), EC Asymmetry (8) did not reach later stages

Found before bulk production (Final Random): 3

CB Broken stitch, IA 2nd operation issue, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—14.5%
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0914.5%
1000 / 3 days
—PASS
06/27–06/30
CC Skip stitch, ED Gathering crease, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS09360 (0%)3306/27, 06/29, 06/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
CC Skip stitch52
BA Thread ends414
ED Gathering crease431
EC Asymmetry8
IA 2nd operation issue2
CB Broken stitch1
EA Unsmooth/puckering/bubbling1
Q94 Glue marks1
260404 RGOR · CS16 · Due 07/17No final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
2/30QC Inlineactual/required · 7%
DHU 23.0%QC Endline15 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty3,505 / 3,505
PDF reports2
Last report07/08

Cross-stage findings

2 defects recorded as 'Others' without detail

QC Inline 2; cannot compare across stages

Caught in earlier stages

BA Thread ends (233), AD Fabric stains (179), CC Skip stitch (168), CE Broken seam (68), ED Gathering crease (67) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline2 reports
required on prod. days 2/30 (7%)
—22.5%
QC Endline15 days—23.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1623.0%
3262 / 15 days
——
06/26–07/14
BA Thread ends, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1615302 (7%)151307/08, 07/09, 07/10, 07/11, 07/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC Endline
BA Thread ends11222
AD Fabric stains3176
CC Skip stitch3165
CE Broken seam761
ED Gathering crease67
Others (no detail)246
CB Broken stitch6
DB Run-off stitching5
260405 RGOR · CS08/CS11/CS14 · Due 07/17No final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
3/40QC Inlineactual/required · 8%
DHU 14.0%QC Endline17 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty5,550 / 5,550
PDF reports4
Last report07/08

Cross-stage findings

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC Endline data errors: 1

06/27 CS08 260405 (defective pcs 43 > defects 38)

Caught in earlier stages

ED Gathering crease (257), BA Thread ends (201), CC Skip stitch (174), DB Run-off stitching (33), EC Asymmetry (23) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline3 reports
required on prod. days 3/40 (8%)
—14.0%
QC Endline17 days—14.0%
QA Inline1 reports118.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0814.0%
4855 / 17 days
18.8%—
06/22–07/10
ED Gathering crease, BA Thread ends, CC Skip stitch
CS140.0%
16 / 2 days
——
06/27–06/29
—
CS110.0%
10 / 1 days
——
06/27–06/27
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0817343 (9%)171407/06, 07/07, 07/08, 07/09, 07/10
CS14240 (0%)2206/27, 06/29
CS11120 (0%)1106/27

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA Inline
ED Gathering crease92471
BA Thread ends3198
CC Skip stitch174
DB Run-off stitching33
EC Asymmetry221
Others (no detail)6
BB Missing cut seam allowance5
EA Unsmooth/puckering/bubbling3
260824 RGOR · CB29 · Due 07/17Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/12QC Inlineactual/required · 0%
DHU 6.6%QC Endline6 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,135 / 1,135
PDF reports1
Last report07/18

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/18): AD Fabric stains 1 (earlier 4 times)

Caught in earlier stages

EB Measurement issue (17), ED Gathering crease (9) did not reach later stages

Found before bulk production (Final Random): 2

CB Broken stitch, CE Broken seam: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/12 (0%)
——
QC Endline6 days—6.6%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB296.6%
1160 / 6 days
—PASS
06/23–06/29
AD Fabric stains, EB Measurement issue, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB296120 (0%)6606/24, 06/25, 06/26, 06/27, 06/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
AD Fabric stains321
BA Thread ends166
EB Measurement issue17
ED Gathering crease9
AC Fabric hole3
CB Broken stitch1
CE Broken seam1
260827 RGOR · CP15 · Due 07/17Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/16QC Inlineactual/required · 0%
DHU 11.3%QC Endline8 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty3,020 / 3,020
PDF reports1
Last report07/18

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/18): AD Fabric stains 2 (earlier 3 times)

QC Endline data errors: 2

06/20 CP15 260827 (defective pcs 17 > defects 14), 06/24 CP15 260827 (defective pcs 93 > defects 81)

Caught in earlier stages

ED Gathering crease (86), CC Skip stitch (54), EA Unsmooth/puckering/bubbling (51), EC Asymmetry (23), EB Measurement issue (6) did not reach later stages

Found before bulk production (Final Random): 2

CB Broken stitch, DE Cut to broken: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline8 days—11.3%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1511.3%
3073 / 8 days
—PASS
06/20–07/04
ED Gathering crease, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP158160 (0%)8806/24, 06/25, 06/26, 06/29, 07/04

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends844
ED Gathering crease86
CC Skip stitch54
EA Unsmooth/puckering/bubbling51
AD Fabric stains282
EC Asymmetry23
Others (no detail)13
EB Measurement issue6
260828 RGOR · CP15 · Due 07/17Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/12QC Inlineactual/required · 0%
DHU 9.9%QC Endline6 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,440 / 2,440
PDF reports1
Last report07/18

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (07/18): AD Fabric stains 2 (earlier 4 times), ED Gathering crease 1 (earlier 5 times)

QC Endline data errors: 5

06/24 CP15 260828 (defective pcs 56 > defects 54), 06/25 CP15 260828 (defective pcs 145 > defects 92), 06/26 CP15 260828 (defective pcs 162 > defects 88), 06/27 CP15 260828 (defective pcs 13 > defects 11)…

Caught in earlier stages

CC Skip stitch (42), EC Asymmetry (39), EA Unsmooth/puckering/bubbling (13) did not reach later stages

Found before bulk production (Final Random): 1

DE Cut to broken: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/12 (0%)
——
QC Endline6 days—9.9%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP159.9%
2516 / 6 days
—PASS
06/24–06/30
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP156120 (0%)6606/25, 06/26, 06/27, 06/29, 06/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends654
ED Gathering crease491
CC Skip stitch42
EC Asymmetry39
AD Fabric stains283
EA Unsmooth/puckering/bubbling13
Others (no detail)7
EB Measurement issue3
260829 RGOR · CP01/CP15 · Due 07/17Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/8QC Inlineactual/required · 0%
DHU 13.0%QC Endline3 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty975 / 975
PDF reports1
Last report07/18

Cross-stage findings

QC Endline data errors: 3

06/26 CP01 260829 (defective pcs 22 > defects 14), 06/26 CP15 260829 (defective pcs 21 > defects 17), 06/27 CP15 260829 (defective pcs 70 > defects 65)

Caught in earlier stages

EC Asymmetry (31), ED Gathering crease (28), EA Unsmooth/puckering/bubbling (17), CC Skip stitch (7), EB Measurement issue (6) did not reach later stages

Report line differs from production line

QGR2628390 Final Random (07/18) CP19; actual production line(s) CP01/CP15 (cards show production lines only)

Found before bulk production (Final Random): 3

DJ Pleat, DE Cut to broken, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline3 days—13.0%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1513.5%
865 / 3 days
——
06/26–06/29
BA Thread ends, EC Asymmetry, ED Gathering crease
CP0110.0%
140 / 1 days
——
06/26–06/26
DB Run-off stitching, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP15360 (0%)3306/26, 06/27, 06/29
CP01120 (0%)1106/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends335
EC Asymmetry31
ED Gathering crease28
EA Unsmooth/puckering/bubbling17
CC Skip stitch7
EB Measurement issue6
DB Run-off stitching4
Others (no detail)3
260121 SAIN · CS03 · Due 07/20Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/10QC Inlineactual/required · 0%
DHU 7.6%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty625 / 404
PDF reports1
Last report07/16

Cross-stage findings

Caught in earlier stages

CC Skip stitch (7) did not reach later stages

Report line differs from production line

QGR2628008 Final Random (07/16) CS07; actual production line(s) CS03 (cards show production lines only)

Found before bulk production (Final Random): 2

AD Fabric stains, EI Inaccurate/skewed stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—7.6%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS037.6%
331 / 5 days
——
06/25–07/09
BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS035100 (0%)5506/25, 07/01, 07/07, 07/08, 07/09

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends183
CC Skip stitch7
AD Fabric stains2
EI Inaccurate/skewed stitching1
260124 SAIN · CS14 · Due 07/20No final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/6QC Inlineactual/required · 0%
DHU 12.5%QC Endline3 days
No reportQA Inline
No reportShipment Sample
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty4,440 / 2,220
PDF reports1
Last report07/20

Cross-stage findings

Found earlier but still reached later stages: 2

EC Asymmetry 1, CC Skip stitch 1 pcs (later stages total)

QC Endline data errors: 1

06/03 CS14 260124 (defective pcs 19 > defects 18)

Caught in earlier stages

ED Gathering crease (7), AB Shading (7), CE Broken seam (5) did not reach later stages

Found before bulk production (Pre-final): 2

CB Broken stitch, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—12.5%
Pre-final1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1412.5%
1488 / 3 days
——
06/03–06/05
BA Thread ends, EC Asymmetry, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS14360 (0%)3306/03, 06/04, 06/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlinePre-final
BA Thread ends993
EC Asymmetry551
CC Skip stitch131
ED Gathering crease7
AB Shading7
CE Broken seam5
CB Broken stitch1
EA Unsmooth/puckering/bubbling1
260682 SAIN · CS20 · Due 07/20Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/32QC Inlineactual/required · 0%
DHU 14.8%QC Endline16 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty4,521 / 2,911
PDF reports2
Last report07/17

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/17): AD Fabric stains 2 (earlier 9 times)

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 3 pcs (later stages total)

Caught in earlier stages

CC Skip stitch (129), ED Gathering crease (37), DB Run-off stitching (13) did not reach later stages

Found before bulk production (Final Random): 2

CB Broken stitch, DJ Pleat: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/32 (0%)
——
QC Endline16 days—14.8%
Final Random2 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2014.8%
4521 / 16 days
—PASS
06/23–07/14
BA Thread ends, CC Skip stitch, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2016320 (0%)161607/06, 07/07, 07/08, 07/09, 07/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
BA Thread ends3816
CC Skip stitch129
Others (no detail)62
AD Fabric stains394
ED Gathering crease37
DB Run-off stitching13
EA Unsmooth/puckering/bubbling23
EB Measurement issue4
260292 MKSC · CP05 · Due 07/22Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
07/10QC 1st Bundle1 reports
07/10QA 1st Bundle1 reports
0/12QC Inlineactual/required · 0%
DHU 9.8%QC Endline6 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,060 / 1,060
PDF reports3
Last report07/21

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (07/21): BA Thread ends 1 (earlier 5 times), ED Gathering crease 1 (earlier 3 times)

1 defects recorded as 'Others' without detail

QA 1st Bundle 1; cannot compare across stages

QC Endline data errors: 1

07/15 CP05 260292A (defective pcs 37 > defects 29)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (9 Major), CC Skip stitch (1 Major), DD Thread not straight/waving (1 Major), EA Unsmooth/puckering/bubbling (1 Major), DJ Pleat (1 Major), CE Broken seam (1 Major); Only QC 1st Bundle: BA Thread ends (7); Both: EC Asymmetry (7/4), DI High-low/uneven (6/1); DHU QC 1st Bundle 62.5% / QA 1st Bundle 100.0%

Caught in earlier stages

AD Fabric stains (29), EC Asymmetry (15), CG Grinning (9), CC Skip stitch (9), AC Fabric hole (9) did not reach later stages

Report line differs from production line

QGR2628861 Final Random (07/21) CP07; actual production line(s) CP05 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—62.5%
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/12 (0%)
——
QC Endline6 days—9.8%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP059.8%
1006 / 6 days
——
07/14–07/21
AD Fabric stains, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP056120 (0%)6607/15, 07/16, 07/17, 07/20, 07/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineFinal Random
BA Thread ends7252
AD Fabric stains29
EC Asymmetry744
ED Gathering crease111
CG Grinning9
CC Skip stitch18
AC Fabric hole9
DI High-low/uneven61
260812 GECL · CS08 · Due 07/22Final Random PASS No major issue (3 minor notes)
No resultPP Sample1 reports
No reportPilot Run
07/10QC 1st Bundle1 reports
07/11QA 1st Bundle1 reports
2/10QC Inlineactual/required · 20%
DHU 10.5%QC Endline5 days
No reportQA Inline
No resultShipment Sample2 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,904 / 1,904
PDF reports8
Last report07/18

Cross-stage findings

Found earlier but still reached later stages: 5

CB Broken stitch 2, ED Gathering crease 1, EA Unsmooth/puckering/bubbling 1, BD Snagging 1, BA Thread ends 3 pcs (later stages total)

4 defects recorded as 'Others' without detail

PP Sample 1, Shipment Sample 1, QA 1st Bundle 2; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (5 Major), BA Thread ends (3 Major), BD Snagging (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: EC Asymmetry (5), EA Unsmooth/puckering/bubbling (3), DF Twisted seam/skewing (2), DD Thread not straight/waving (1); DHU QC 1st Bundle 84.6% / QA 1st Bundle 60.0%

Caught in earlier stages

CC Skip stitch (101), DB Run-off stitching (6), CG Grinning (5) did not reach later stages

Found before bulk production (Shipment Sample): 3

EI Inaccurate/skewed stitching, EG Wrong panel assembly, EC Asymmetry: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—84.6%
QA 1st Bundle1 reports—60.0%
QC Inline2 reports
required on prod. days 2/10 (20%)
—18.0%
QC Endline5 days—10.5%
Shipment Sample2 reports0—
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0810.5%
1904 / 5 days
—PASS
07/10–07/15
CC Skip stitch, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS085102 (20%)5307/10, 07/11, 07/13, 07/14, 07/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SampleFinal Random
CC Skip stitch101
BA Thread ends3643
ED Gathering crease1241
CB Broken stitch21112
EA Unsmooth/puckering/bubbling1341
EC Asymmetry521
Others (no detail)1221
DB Run-off stitching6
261254 RTMS · CS01/CS02 · Due 07/22Final Random PASS No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/18QC Inlineactual/required · 0%
DHU 11.6%QC Endline8 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,000 / 1,000
PDF reports2
Last report07/17

Cross-stage findings

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

Caught in earlier stages

CC Skip stitch (40), ED Gathering crease (29) did not reach later stages

Found before bulk production (Final Random, Shipment Sample): 6

EA Unsmooth/puckering/bubbling, DD Thread not straight/waving, AD Fabric stains, BB Missing cut seam allowance, DH Pressing mark, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/18 (0%)
——
QC Endline8 days—11.6%
Shipment Sample1 reports1—
Final Random1 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0211.6%
536 / 5 days
——
06/30–07/07
ED Gathering crease, CC Skip stitch, BA Thread ends
CS0111.6%
372 / 4 days
—PASS
06/26–06/30
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS025100 (0%)5506/30, 07/01, 07/02, 07/03, 07/07
CS01480 (0%)4406/26, 06/27, 06/29, 06/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineShipment SampleFinal Random
BA Thread ends355
CC Skip stitch40
ED Gathering crease29
EA Unsmooth/puckering/bubbling3
DD Thread not straight/waving2
AD Fabric stains2
BB Missing cut seam allowance1
DH Pressing mark1
261111 RGOR · CP19 · Due 07/24Final Random PASS No major issue (5 minor notes)
No reportPP Sample
No reportPilot Run
07/20QC 1st Bundle1 reports
07/20QA 1st Bundle1 reports
0/6QC Inlineactual/required · 0%
DHU 8.1%QC Endline3 days
All FAILQA Inline1 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,060 / 1,060
PDF reports5
Last report07/25

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/25): CC Skip stitch 1 (earlier 4 times)

Found earlier but still reached later stages: 3

DJ Pleat 1, AD Fabric stains 2, CB Broken stitch 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

AD Fabric stains (QA 4); zero in QC Endline records

QC Endline data errors: 3

07/18 CP19 261111-S (defective pcs 25 > defects 20), 07/20 CP19 261111-S (defective pcs 70 > defects 31), 07/21 CP19 261111-S (defective pcs 5 > defects 2)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (3 Major), EC Asymmetry (3 Major), ED Gathering crease (1 Major), CA Thread tension (1 Major), DF Twisted seam/skewing (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DI High-low/uneven (3), CG Grinning (2), BB Missing cut seam allowance (2); Both: BA Thread ends (14/2), DJ Pleat (4/4), CE Broken seam (2/1); DHU QC 1st Bundle 84.4% / QA 1st Bundle 85.0%

Caught in earlier stages

EA Uneven seam allowance (11), ED Gathering crease (9), CD Needle hole (9), EC Asymmetry (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—84.4%
QA 1st Bundle1 reports—85.0%
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—8.1%
QA Inline1 reports131.2%
Pre-final1 reports02.5%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP198.1%
1094 / 3 days
31.2%PASS
07/18–07/21
BA Thread ends, CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP19360 (0%)3307/18, 07/20, 07/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlinePre-finalFinal Random
BA Thread ends14232355
CC Skip stitch271
EA Uneven seam allowance11
DJ Pleat4411
ED Gathering crease171
CD Needle hole9
AD Fabric stains322
EC Asymmetry32
261113 RGOR · CP19 · Due 07/24Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
07/22QC 1st Bundle1 reports
07/23QA 1st Bundle1 reports
1/8QC Inlineactual/required · 12%
DHU 30.5%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty940 / 940
PDF reports5
Last report07/27

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/27): CC Skip stitch 2 (earlier 3 times)

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 3), CE Broken seam (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (8 Major), DJ Pleat (1 Major), DE Cut to broken (1 Major); Only QC 1st Bundle: ED Gathering crease (3), DD Thread not straight/waving (2), CB Broken stitch (1); Both: BA Thread ends (7/4), BB Missing cut seam allowance (5/1), EC Asymmetry (1/2), AD Fabric stains (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 90.0%

Caught in earlier stages

EA Uneven seam allowance (58), ED Gathering crease (55), EA Unsmooth/puckering/bubbling (39), EB Measurement issue (24), AD Fabric stains (16) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—90.0%
QC Inline1 reports
required on prod. days 1/8 (12%)
—75.0%
QC Endline4 days—30.5%
QA Inline1 reports140.6%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1930.5%
948 / 4 days
40.6%PASS
07/22–07/28
BA Thread ends, EA Uneven seam allowance, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP19481 (12%)4307/22, 07/23, 07/25, 07/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends74126056
EA Uneven seam allowance58
ED Gathering crease352
CC Skip stitch2452
EA Unsmooth/puckering/bubbling39
EB Measurement issue24
AD Fabric stains112102
BB Missing cut seam allowance515
261114 RGOR · CP19 · Due 07/24Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
07/23QC 1st Bundle1 reports
07/24QA 1st Bundle1 reports
0/6QC Inlineactual/required · 0%
DHU 12.1%QC Endline3 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,250 / 2,250
PDF reports4
Last report07/27

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/27): CC Skip stitch 2 (earlier 4 times)

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

QC Endline data errors: 2

07/24 CP19 261114 (defective pcs 150 > defects 136), 07/25 CP19 261114 (defective pcs 80 > defects 43)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), CC Skip stitch (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (2); Both: BA Thread ends (12/4), CG Grinning (3/1), CB Broken stitch (1/3), EC Asymmetry (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 65.0%

Caught in earlier stages

EA Uneven seam allowance (53), ED Gathering crease (32), EC Asymmetry (19), EA Unsmooth/puckering/bubbling (16), EB Measurement issue (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—65.0%
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—12.1%
QA Inline1 reports125.0%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1912.1%
2258 / 3 days
25.0%PASS
07/23–07/25
BA Thread ends, CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP19360 (0%)3307/23, 07/24, 07/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends1248545
CC Skip stitch1572
EA Uneven seam allowance53
ED Gathering crease32
EC Asymmetry21142
EA Unsmooth/puckering/bubbling313
EB Measurement issue9
CD Needle hole8
260866 CIWH · CS08 · Due 07/27Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
07/21QC 1st Bundle1 reports
07/21QA 1st Bundle1 reports
0/4QC Inlineactual/required · 0%
DHU 1.7%QC Endline2 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports5
Last report07/25

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (07/25): EA Unsmooth/puckering/bubbling 2 (earlier 4 times), CB Broken stitch 2 (earlier 3 times)

Found earlier but still reached later stages: 1

BB Missing cut seam allowance 1 pcs (later stages total)

QC Endline data errors: 1

07/21 CS08 260866 (defective pcs 17 > defects 15)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (1 Major), BB Missing cut seam allowance (1 Major), CA Thread tension (1 Major); Only QC 1st Bundle: DB Run-off stitching (3); Both: CB Broken stitch (2/2), BA Thread ends (2/2), EA Unsmooth/puckering/bubbling (2/1); DHU QC 1st Bundle 69.2% / QA 1st Bundle 40.0%

Caught in earlier stages

CC Skip stitch (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—69.2%
QA 1st Bundle1 reports—40.0%
QC Inline2 reports
required on prod. days 0/4 (0%)
—11.9%
QC Endline2 days—1.7%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS081.7%
863 / 2 days
—PASS
07/20–07/21
BA Thread ends, CC Skip stitch, CE Broken seam

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS08240 (0%)2207/20, 07/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineFinal Random
BA Thread ends2281
EA Unsmooth/puckering/bubbling2162
CB Broken stitch222
CC Skip stitch5
CA Thread tension13
AD Fabric stains121
DB Run-off stitching3
DF Twisted seam/skewing3
253614 MKSC · CB17 · Due 07/29Final Random PASS No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty900 / 400
PDF reports2
Last report07/24

Cross-stage findings

Found before bulk production (Final Random): 4

CF Pulling yarn, DJ Pleat, BA Thread ends, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Final Random2 reports04.0%

Defects × stage (pcs, top 8; color scaled per column)

DefectFinal Random
BA Thread ends4
CF Pulling yarn1
DJ Pleat1
EA Unsmooth/puckering/bubbling1
260312 MKSC · CB03/CB05/CB30 · Due 07/29Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No resultPilot Run2 reports
No reportQC 1st Bundle
07/09QA 1st Bundle1 reports
3/14QC Inlineactual/required · 21%
DHU 21.6%QC Endline7 days
No reportQA Inline
No resultShipment Sample1 reports
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty800 / 0
PDF reports10
Last report08/13

Cross-stage findings

2 defects recorded as 'Others' without detail

Shipment Sample 1, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 5), EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

Caught in earlier stages

EB Measurement issue (79), CC Skip stitch (18), DJ Pleat (12), DB Run-off stitching (8) did not reach later stages

Report line differs from production line

QGR2629952 Final Random (07/25) CB04, QGR2630011 Final Random (07/31) CB04; actual production line(s) CB03/CB05/CB30 (cards show production lines only)

Found before bulk production (Shipment Sample): 5

EA Unsmooth/puckering/bubbling, EC Asymmetry, EF Cup/pocket issue, CB Broken stitch, ED Gathering crease: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QA 1st Bundle1 reports—84.6%
QC Inline3 reports
required on prod. days 3/14 (21%)
—40.7%
QC Endline7 days—21.6%
Shipment Sample1 reports0—
Final Random3 reports05.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0321.9%
790 / 6 days
—PASS
07/09–07/17
EB Measurement issue, BA Thread ends, CC Skip stitch
CB300.0%
10 / 1 days
——
07/20–07/20
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB036123 (25%)6307/10, 07/11, 07/13, 07/14, 07/17
CB30120 (0%)1107/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQA 1st BundleQC InlineQC EndlineShipment SampleFinal Random
EB Measurement issue178
BA Thread ends662
CC Skip stitch810
ED Gathering crease31021
EC Asymmetry24423
CB Broken stitch1311
DJ Pleat48
DB Run-off stitching8
260322 MKSC · CB03/CB04/CP14 · Due 07/29Final Random PASS No major issue (4 minor notes)
No reportPP Sample
No resultPilot Run4 reports
No reportQC 1st Bundle
No reportQA 1st Bundle
2/18QC Inlineactual/required · 11%
DHU 12.5%QC Endline9 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty600 / 0
PDF reports8
Last report08/04

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (07/24): EA Unsmooth/puckering/bubbling 1 (earlier 3 times), EC Asymmetry 1 (earlier 6 times), EB Measurement issue 1 (earlier 4 times)

Found earlier but still reached later stages: 1

EI Inaccurate/skewed stitching 2 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EA Unsmooth/puckering/bubbling (QA 3), EC Asymmetry (QA 3); zero in QC Endline records

Caught in earlier stages

BA Thread ends (27), CC Skip stitch (13), CE Broken seam (12), DJ Pleat (8), ED Gathering crease (8) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run4 reports0—
QC Inline2 reports
required on prod. days 2/18 (11%)
—34.0%
QC Endline9 days—12.5%
QA Inline1 reports115.6%
Final Random1 reports06.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0312.5%
530 / 9 days
15.6%PASS
07/04–07/17
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB039182 (11%)9707/09, 07/10, 07/13, 07/14, 07/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC InlineQC EndlineQA InlineFinal Random
BA Thread ends27
CC Skip stitch49
CE Broken seam12
EC Asymmetry3321
EB Measurement issue81
DJ Pleat8
ED Gathering crease26
DB Run-off stitching8
260333 MKSC · CS03/CS16 · Due 07/29Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No resultPilot Run2 reports
07/11QC 1st Bundle1 reports
07/11QA 1st Bundle1 reports
2/16QC Inlineactual/required · 12%
DHU 27.5%QC Endline8 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty600 / 600
PDF reports7
Last report07/25

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/25): CB Broken stitch 2 (earlier 6 times)

5 defects recorded as 'Others' without detail

QA 1st Bundle 5; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (3 Major), GA Missing bartack/button (1 Major); Only QC 1st Bundle: CB Broken stitch (3), CE Broken seam (1), DE Cut to broken (1); Both: BA Thread ends (5/4), EC Asymmetry (4/1), EA Unsmooth/puckering/bubbling (2/1); DHU QC 1st Bundle 80.0% / QA 1st Bundle 75.0%

Caught in earlier stages

CC Skip stitch (62), ED Gathering crease (17), EC Asymmetry (8), GA Missing bartack/button (6), EA Unsmooth/puckering/bubbling (5) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—75.0%
QC Inline2 reports
required on prod. days 2/16 (12%)
—25.0%
QC Endline8 days—27.5%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1627.5%
600 / 8 days
—PASS
07/10–07/18
CC Skip stitch, BA Thread ends, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS168162 (12%)8607/14, 07/15, 07/16, 07/17, 07/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineFinal Random
BA Thread ends5411592
CC Skip stitch62
Others (no detail)522
ED Gathering crease314
CB Broken stitch2352
EC Asymmetry413
GA Missing bartack/button15
EA Unsmooth/puckering/bubbling212
260340 MKSC · CS02/CS07 · Due 07/29Final Random PASS No major issue (5 minor notes)
No reportPP Sample
No resultPilot Run2 reports
07/09QC 1st Bundle1 reports
07/09QA 1st Bundle1 reports
3/16QC Inlineactual/required · 19%
DHU 9.7%QC Endline8 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,529 / 1,529
PDF reports8
Last report07/20

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (07/20): AD Fabric stains 2 (earlier 5 times)

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 3; cannot compare across stages

QC Endline data errors: 4

07/09 CS07 260340 (defective pcs 23 > defects 18), 07/10 CS07 260340 (defective pcs 34 > defects 28), 07/11 CS07 260340 (defective pcs 34 > defects 31), 07/14 CS07 260340 (defective pcs 38 > defects 34)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (3 Major), BA Thread ends (2 Major), CG Grinning (1 Major), DJ Pleat (1 Major); Both: DI High-low/uneven (6/3); DHU QC 1st Bundle 46.2% / QA 1st Bundle 65.0%

Caught in earlier stages

CC Skip stitch (33), ED Gathering crease (26), DI High-low/uneven (12), EC Asymmetry (5), EA Unsmooth/puckering/bubbling (5) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—46.2%
QA 1st Bundle1 reports—65.0%
QC Inline3 reports
required on prod. days 3/16 (19%)
—15.3%
QC Endline8 days—9.7%
Final Random1 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS079.7%
1512 / 8 days
—PASS
07/09–07/20
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS078163 (19%)8507/13, 07/14, 07/15, 07/16, 07/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineFinal Random
BA Thread ends2642
CC Skip stitch330
AD Fabric stains13202
ED Gathering crease125
DI High-low/uneven633
EC Asymmetry23
EA Unsmooth/puckering/bubbling5
DD Thread not straight/waving22
260465 LOGE · CS15/CS21/CS22… · Due 07/31No final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
2/48QC Inlineactual/required · 4%
DHU 7.3%QC Endline22 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty15,785 / 15,785
PDF reports3
Last report07/22

Cross-stage findings

QC Endline data errors: 1

07/23 CS22 260465 (defective pcs 57 > defects 26)

Caught in earlier stages

BA Thread ends (805), DB Run-off stitching (237), CC Skip stitch (174), AD Fabric stains (90), ED Gathering crease (86) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline2 reports
required on prod. days 2/48 (4%)
—35.7%
QC Endline22 days—7.3%
QA Inline1 reports128.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS257.0%
19062 / 15 days
——
06/02–06/20
BA Thread ends, DB Run-off stitching, CC Skip stitch
CS2210.1%
2119 / 7 days
28.1%—
07/21–07/28
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS219.7%
134 / 1 days
——
06/16–06/16
DB Run-off stitching, BA Thread ends
CS150.0%
10 / 1 days
——
06/03–06/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2515300 (0%)151506/13, 06/16, 06/17, 06/19, 06/20
CS227142 (14%)7507/23, 07/24, 07/25, 07/27, 07/28
CS15120 (0%)1106/03
CS21120 (0%)1106/16

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA Inline
BA Thread ends127912
DB Run-off stitching5232
CC Skip stitch31692
AD Fabric stains387
ED Gathering crease383
EC Asymmetry172
CE Broken seam531
EB Measurement issue49
261193 RGOR · CB30 · Due 07/31No final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
07/15QC 1st Bundle1 reports
07/15QA 1st Bundle1 reports
1/16QC Inlineactual/required · 6%
DHU 12.8%QC Endline8 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,405 / 1,405
PDF reports5
Last report07/18

Cross-stage findings

QC Endline data errors: 3

07/16 CB30 261193-L2 (defective pcs 14 > defects 8), 07/16 CB30 261193-L1 (defective pcs 12 > defects 8), 07/21 CB30 261193-WS (defective pcs 6 > defects 4)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (2 Major), BA Thread ends (2 Major), EE Raw edge (2 Major), CC Skip stitch (1 Major), DE Cut to broken (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: DB Run-off stitching (2), EA Unsmooth/puckering/bubbling (2), CE Broken seam (1); Both: EC Asymmetry (2/1), DJ Pleat (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 84.6%

Caught in earlier stages

BA Thread ends (231), CC Skip stitch (31), AD Fabric stains (19), DK Twisted shoulder strap (16), ED Gathering crease (15) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—84.6%
QC Inline2 reports
required on prod. days 1/16 (6%)
—36.0%
QC Endline8 days—12.8%
QA Inline1 reports128.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3012.8%
2454 / 8 days
28.1%—
07/15–07/24
BA Thread ends, CC Skip stitch, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB308161 (6%)8707/20, 07/21, 07/22, 07/23, 07/24

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends22263
CC Skip stitch130
AD Fabric stains19
DK Twisted shoulder strap16
ED Gathering crease15
EC Asymmetry2161
DB Run-off stitching27
CE Broken seam16
261196 RGOR · CP19 · Due 07/31Final Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
07/27QC 1st Bundle1 reports
07/27QA 1st Bundle1 reports
0/6QC Inlineactual/required · 0%
DHU 17.7%QC Endline3 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty845 / 845
PDF reports4
Last report08/01

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (08/01): CC Skip stitch 1 (earlier 3 times)

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DJ Pleat (2 Major), CB Broken stitch (2 Major), CC Skip stitch (1 Major), EI Inaccurate/skewed stitching (1 Major), GA Missing bartack/button (1 Major); Only QC 1st Bundle: BD Snagging (2), DD Thread not straight/waving (2), DE Cut to broken (2); Both: BA Thread ends (5/6), EC Asymmetry (1/2); DHU QC 1st Bundle 60.0% / QA 1st Bundle 75.0%

Caught in earlier stages

ED Gathering crease (30), EA Uneven seam allowance (30), AC Fabric hole (12), EB Measurement issue (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—60.0%
QA 1st Bundle1 reports—75.0%
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—17.7%
QA Inline1 reports137.5%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1917.7%
872 / 3 days
37.5%PASS
07/27–07/29
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP19360 (0%)3307/27, 07/28, 07/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends564452
CC Skip stitch13021
ED Gathering crease30
EA Uneven seam allowance30
AC Fabric hole12
CB Broken stitch221
EB Measurement issue5
EC Asymmetry121
Jun 2026 1 · 🔴 0 🟠 0 🟢 1
Final Random FAIL: 0 POs
Most common in later stages: AD Fabric stains (1), BA Thread ends (1), ED Gathering crease (1)
🔴 Lines with most 🔴: none
253668 MKSC · CB02/CB06/CB16… · Due 06/24Final Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/84QC Inlineactual/required · 0%
DHU 8.4%QC Endline27 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty7,500 / 5,000
PDF reports2
Last report08/01

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/01): ED Gathering crease 1 (earlier 23 times), AD Fabric stains 2 (earlier 30 times)

QC Endline data errors: 3

06/10 CB02 253668A-L (defective pcs 4 > defects 3), 06/24 CB02 253668A-S (defective pcs 3 > defects 2), 06/24 CB06 253668A-L (defective pcs 5 > defects 4)

Caught in earlier stages

CC Skip stitch (56), EC Asymmetry (56), DB Run-off stitching (41), CE Broken seam (29), AC Fabric hole (27) did not reach later stages

Found before bulk production (Final Random): 1

CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/84 (0%)
——
QC Endline27 days—8.4%
Final Random2 reports02.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB027.3%
6864 / 26 days
—PASS
06/01–07/13
AD Fabric stains, BA Thread ends, ED Gathering crease
CB1612.1%
2010 / 8 days
——
06/03–06/25
Others (no detail), DB Run-off stitching, BA Thread ends
CB069.8%
560 / 4 days
——
06/24–06/30
ED Gathering crease, AD Fabric stains, BA Thread ends
CB300.0%
47 / 4 days
——
06/24–06/29
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0226520 (0%)262607/06, 07/07, 07/08, 07/11, 07/13
CB168160 (0%)8806/20, 06/22, 06/23, 06/24, 06/25
CB06480 (0%)4406/24, 06/25, 06/26, 06/30
CB30480 (0%)4406/24, 06/25, 06/27, 06/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineFinal Random
AD Fabric stains1673
BA Thread ends1614
ED Gathering crease1363
Others (no detail)95
CC Skip stitch56
EC Asymmetry56
DB Run-off stitching41
CE Broken seam29
Due date unknown 14 · 🔴 5 🟠 2 🟢 7
Final Random FAIL: 5 POs
Most common in later stages: EC Asymmetry (9), AD Fabric stains (5), EA Unsmooth/puckering/bubbling (4)
🔴 Lines with most 🔴: CS21 (1), CP61 (1)
260173 LOGE · CS21 · Due ?Shipment Sample FAIL Latest Shipment Sample (07/08) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/28QC Inlineactual/required · 0%
DHU 13.5%QC Endline14 days
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports1
Last report07/08

Cross-stage findings

Latest Shipment Sample (07/08) FAILED

6 major: FA Wrong material 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 5); zero in QC Endline records

Caught in earlier stages

BA Thread ends (490), CC Skip stitch (101), ED Gathering crease (44), DB Run-off stitching (26), DK Twisted shoulder strap (12) did not reach later stages

Found before bulk production (Shipment Sample): 2

FA Wrong material, EC Asymmetry: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/28 (0%)
——
QC Endline14 days—13.5%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2113.5%
5000 / 14 days
——
06/20–07/06
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2114280 (0%)141407/01, 07/02, 07/03, 07/04, 07/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineShipment Sample
BA Thread ends490
CC Skip stitch101
ED Gathering crease44
DB Run-off stitching26
DK Twisted shoulder strap12
EC Asymmetry5
Others (no detail)3
FA Wrong material1
260182 LOGE · CP61 · Due ?Shipment Sample FAIL Latest Shipment Sample (07/09) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports1
Last report07/09

Cross-stage findings

Latest Shipment Sample (07/09) FAILED

7 major: Others (no detail) 3, Others (no detail) 1, Others (no detail) 1, Others (no detail) 1, EC Asymmetry 1

6 defects recorded as 'Others' without detail

Shipment Sample 6; cannot compare across stages

Found before bulk production (Shipment Sample): 1

EC Asymmetry: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Shipment Sample1 reports1—

Defects × stage (pcs, top 8; color scaled per column)

DefectShipment Sample
Others (no detail)6
EC Asymmetry1
260350 MKSC · · Due ?Shipment Sample FAIL Latest Shipment Sample (09/21) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports1
Last report09/21

Cross-stage findings

Latest Shipment Sample (09/21) FAILED

11 major: AD Fabric stains 1, EA Unsmooth/puckering/bubbling 1, CE Broken seam 1, AD Fabric stains 1, EI Inaccurate/skewed stitching 1, AD Fabric stains 1, CB Broken stitch 1, AA Fabric defect 1, DI High-low/uneven 1, EC Asymmetry 1, ED Gathering crease 1

Found before bulk production (Shipment Sample): 9

AD Fabric stains, EA Unsmooth/puckering/bubbling, CE Broken seam, EI Inaccurate/skewed stitching, CB Broken stitch, AA Fabric defect, DI High-low/uneven, EC Asymmetry, ED Gathering crease: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Shipment Sample1 reports1—

Defects × stage (pcs, top 8; color scaled per column)

DefectShipment Sample
AD Fabric stains3
EA Unsmooth/puckering/bubbling1
CE Broken seam1
EI Inaccurate/skewed stitching1
CB Broken stitch1
AA Fabric defect1
DI High-low/uneven1
EC Asymmetry1
261342 MKSC · · Due ?Shipment Sample FAIL Latest Shipment Sample (10/05) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports1
Last report10/05

Cross-stage findings

Latest Shipment Sample (10/05) FAILED

13 major: BD Snagging 1, EA Unsmooth/puckering/bubbling 1, CB Broken stitch 1, EA Unsmooth/puckering/bubbling 1, CB Broken stitch 1, ED Gathering crease 1, AD Fabric stains 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, CD Needle hole 1, AD Fabric stains 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1

Found before bulk production (Shipment Sample): 8

BD Snagging, EA Unsmooth/puckering/bubbling, CB Broken stitch, ED Gathering crease, AD Fabric stains, EC Asymmetry, EI Inaccurate/skewed stitching, CD Needle hole: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Shipment Sample1 reports1—

Defects × stage (pcs, top 8; color scaled per column)

DefectShipment Sample
EA Unsmooth/puckering/bubbling3
CB Broken stitch2
AD Fabric stains2
EC Asymmetry2
BD Snagging1
ED Gathering crease1
EI Inaccurate/skewed stitching1
CD Needle hole1
261555 LOGE · · Due ?Shipment Sample FAIL Latest Shipment Sample (09/29) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports1
Last report09/29

Cross-stage findings

Latest Shipment Sample (09/29) FAILED

11 major: ED Gathering crease 1, EC Asymmetry 1, AD Fabric stains 1, Others (no detail) 1, DE Cut to broken 1, ED Gathering crease 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1, CC Skip stitch 1, Others (no detail) 1

2 defects recorded as 'Others' without detail

Shipment Sample 2; cannot compare across stages

Found before bulk production (Shipment Sample): 5

ED Gathering crease, EC Asymmetry, AD Fabric stains, DE Cut to broken, CC Skip stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Shipment Sample1 reports1—

Defects × stage (pcs, top 8; color scaled per column)

DefectShipment Sample
EC Asymmetry4
ED Gathering crease2
Others (no detail)2
AD Fabric stains1
DE Cut to broken1
CC Skip stitch1
261364 MKSC · · Due ?Shipment Sample PASS 1 later-stage PDF report(s) blank
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
1/2 FAILShipment Sample2 reports
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports2
Last report10/02

Cross-stage findings

1 later-stage PDF report(s) blank

Shipment Sample 10/02 QGR2645793 (FAIL); please check if the report was completed

Found before bulk production (Shipment Sample): 7

DI High-low/uneven, DE Cut to broken, EC Asymmetry, EA Unsmooth/puckering/bubbling, CE Broken seam, DJ Pleat, CG Grinning: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Shipment Sample2 reports1—

Defects × stage (pcs, top 8; color scaled per column)

DefectShipment Sample
DI High-low/uneven2
DE Cut to broken1
EC Asymmetry1
EA Unsmooth/puckering/bubbling1
CE Broken seam1
DJ Pleat1
CG Grinning1
261520 GECL · · Due ?Shipment Sample PASS 1 later-stage PDF report(s) blank
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
1/2 FAILShipment Sample2 reports
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports2
Last report10/05

Cross-stage findings

1 later-stage PDF report(s) blank

Shipment Sample 10/05 QGR2645794 (FAIL); please check if the report was completed

Found before bulk production (Shipment Sample): 3

EA Unsmooth/puckering/bubbling, CA Thread tension, EC Asymmetry: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Shipment Sample2 reports1—

Defects × stage (pcs, top 8; color scaled per column)

DefectShipment Sample
EA Unsmooth/puckering/bubbling1
CA Thread tension1
EC Asymmetry1
260752 LOGE · CS22 · Due ?Shipment Sample No result No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
0/14QC Inlineactual/required · 0%
DHU 14.9%QC Endline7 days
No reportQA Inline
No resultShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports1
Last report07/07

Cross-stage findings

Recurring in small numbers: 1

Latest Shipment Sample (07/07): CC Skip stitch 1 (earlier 5 times)

Found earlier but still reached later stages: 2

AD Fabric stains 1, EC Asymmetry 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

Shipment Sample 2; cannot compare across stages

Caught in earlier stages

BA Thread ends (43), ED Gathering crease (40), DB Run-off stitching (34), EB Measurement issue (5) did not reach later stages

Found before bulk production (Shipment Sample): 4

AC Fabric hole, DJ Pleat, DI High-low/uneven, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—14.9%
Shipment Sample1 reports0—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2214.9%
1162 / 7 days
——
06/24–07/02
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS227140 (0%)7706/26, 06/27, 06/29, 06/30, 07/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC EndlineShipment Sample
CC Skip stitch431
BA Thread ends43
ED Gathering crease40
DB Run-off stitching34
EC Asymmetry41
EB Measurement issue5
AD Fabric stains31
Others (no detail)12
261518 GECL · · Due ?Shipment Sample No result No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No resultShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports1
Last report10/06

Cross-stage findings

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

Found before bulk production (Shipment Sample): 6

FA Wrong material, EC Asymmetry, CE Broken seam, DF Twisted seam/skewing, ED Gathering crease, EI Inaccurate/skewed stitching: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Shipment Sample1 reports0—

Defects × stage (pcs, top 8; color scaled per column)

DefectShipment Sample
EC Asymmetry5
FA Wrong material1
Others (no detail)1
CE Broken seam1
DF Twisted seam/skewing1
ED Gathering crease1
EI Inaccurate/skewed stitching1
261524 GECL · · Due ?Shipment Sample No result No major issue
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No resultShipment Sample2 reports
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports2
Last report10/03

Cross-stage findings

Found before bulk production (Shipment Sample): 4

AB Shading, CB Broken stitch, AD Fabric stains, EG Wrong panel assembly: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Shipment Sample2 reports0—

Defects × stage (pcs, top 8; color scaled per column)

DefectShipment Sample
AB Shading1
CB Broken stitch1
AD Fabric stains1
EG Wrong panel assembly1
261573 DJLF · · Due ?No final No major issue
No resultPP Sample2 reports
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports2
Last report09/26

Cross-stage findings

Stage summary

StageCountFAILDHU
PP Sample2 reports0—

Defects × stage (pcs, top 8; color scaled per column)

Defect
262027 RGOR · · Due ?No final No major issue
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports1
Last report10/08

Cross-stage findings

Stage summary

StageCountFAILDHU
PP Sample1 reports0—

Defects × stage (pcs, top 8; color scaled per column)

DefectPP Sample
EE Raw edge2
EB Measurement issue1
GA Missing bartack/button1
GC Missing pocket/label1
AC Fabric hole1
EA Unsmooth/puckering/bubbling1
262172 CISO · · Due ?No final No major issue
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports1
Last report10/06

Cross-stage findings

Stage summary

StageCountFAILDHU
PP Sample1 reports0—

Defects × stage (pcs, top 8; color scaled per column)

DefectPP Sample
AD Fabric stains1
DJ Pleat1
EC Asymmetry1
AH Sharp edge1
262227 RGOR · · Due ?No final No major issue
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty /
PDF reports1
Last report10/07

Cross-stage findings

Stage summary

StageCountFAILDHU
PP Sample1 reports0—

Defects × stage (pcs, top 8; color scaled per column)

DefectPP Sample
EB Measurement issue1
CE Broken seam1
CA Thread tension1
EA Unsmooth/puckering/bubbling1
CC Skip stitch1
AC Fabric hole1
AD Fabric stains1
No PO in history matches. Search active POs →
History = POs past due or with an unknown due date (grouped by due month). The last 3 months are shown by default; search and filters cover all months. Tap a row for full details.