Quality Daily Report

2026/10/08
All🔴 High risk🟠 Watch🟢 Normal
159Active
68High risk
49Watch
42Normal
Stage boxes:All PASSAll FAIL1/5 FAIL1 of 5 judged reports failedNo resultQC Inline 14/20actual/required reports (2 per line per production day)DHU 8%QC Endline (ETS rework records, 1st check, cumulative)No report
① Due within 14 days 🔴 30 🟠 21 🟢 12 63
261292 LOGE · CB08/CB30/CB32… · Due 10/09 · 1d leftFinal Random PASS Not fixed: CB Broken stitch
No resultPP Sample1 reports
No reportPilot Run
09/07QC 1st Bundle1 reports
09/08QA 1st Bundle1 reports
28/46QC Inlineactual/required · 61%
DHU 16.9%QC Endline21 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty4,000 / 4,000
PDF reports42
Last report10/06

Cross-stage findings

Not fixed: CB Broken stitch

Found 17 times (37 pcs, 09/07–10/06) in earlier stages; latest Final Random (10/05) still has 3 major

Missed in earlier stages: 2

AB Shading (Shipment Sample 09/17), FA Wrong material (Shipment Sample 09/17): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (10/05): CE Broken seam 1 (earlier 45 times), DJ Pleat 2 (earlier 12 times)

Found earlier but still reached later stages: 3

EC Asymmetry 3, EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

Shipment Sample 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 9); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), CC Skip stitch (1 Major), EE Raw edge (1 Major), DA Exceed seam allowance (1 Major), DE Cut to broken (1 Major); Only QC 1st Bundle: BA Thread ends (1), ED Gathering crease (1), CA Thread tension (1), CG Grinning (1), DF Twisted seam/skewing (1), CB Broken stitch (1); Both: EC Asymmetry (4/5), CE Broken seam (1/1); DHU QC 1st Bundle 84.6% / QA 1st Bundle 92.3%

Caught in earlier stages

CG Grinning (152), ED Gathering crease (135), CC Skip stitch (100), EA Uneven seam allowance (75), DB Run-off stitching (52) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—84.6%
QA 1st Bundle1 reports—92.3%
QC Inline34 reports
required on prod. days 28/46 (61%)
—111.6%
QC Endline21 days—16.9%
QA Inline3 reports343.8%
Shipment Sample1 reports1—
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3417.0%
3714 / 21 days
40.6%PASS
09/09–10/08
BA Thread ends, ED Gathering crease, CE Broken seam
CB300.0%
10 / 1 days
——
10/05–10/05
—
CB320.0%
10 / 1 days
——
09/29–09/29
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB34214228 (67%)11310/03, 10/05, 10/06, 10/07, 10/08
CB30120 (0%)1110/05
CB32120 (0%)1109/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
CE Broken seam111778821
CG Grinning11501
BA Thread ends1213736
EC Asymmetry4456050103
ED Gathering crease113598
CC Skip stitch12574
EA Uneven seam allowance75
DB Run-off stitching3022
261675 RGOR · CS17 · Due 10/09 · 1d leftFinal Random FAIL Latest Final Random (10/01) FAILED
No reportPP Sample
No reportPilot Run
09/17QC 1st Bundle1 reports
09/17QA 1st Bundle1 reports
17/32QC Inlineactual/required · 53%
DHU 17.2%QC Endline16 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All FAILFinal Random1 reports
Order/Ship qty3,375 / 3,375
PDF reports25
Last report10/03

Cross-stage findings

Latest Final Random (10/01) FAILED

20 major: DJ Pleat 12, DB Run-off stitching 4, AD Fabric stains 4

Not fixed: EC Asymmetry

Found 14 times (37 pcs, 09/17–09/29) in earlier stages; latest Shipment Sample (10/03) still has 4 major

Not fixed: CB Broken stitch

Found 20 times (56 pcs, 09/17–10/01) in earlier stages; latest Shipment Sample (10/03) still has 1 major

Found earlier but still reached later stages: 8

DJ Pleat 14, AD Fabric stains 4, DB Run-off stitching 9, BA Thread ends 20, CE Broken seam 2, EA Unsmooth/puckering/bubbling 1, ED Gathering crease 1, EB Measurement issue 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DI High-low/uneven (1 Major), EH Poor lamination/bonding (1 Major), DD Thread not straight/waving (1 Major), CE Broken seam (1 Major), CG Grinning (1 Major), BB Missing cut seam allowance (1 Major), CB Broken stitch (1 Major); Both: BA Thread ends (5/2), DB Run-off stitching (3/2), AD Fabric stains (3/1), EC Asymmetry (3/1), DF Twisted seam/skewing (2/1), AC Fabric hole (1/1), DJ Pleat (1/1); DHU QC 1st Bundle 90.0% / QA 1st Bundle 80.0%

Caught in earlier stages

CC Skip stitch (37), GA Missing bartack/button (32), DC Join stitching (23), CA Thread tension (15), DF Twisted seam/skewing (7) did not reach later stages

Report line differs from production line

QGR2644289 Final Random (10/01) CS02; actual production line(s) CS17 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—90.0%
QA 1st Bundle1 reports—80.0%
QC Inline17 reports
required on prod. days 17/32 (53%)
—1159.4%
QC Endline16 days—17.2%
QA Inline3 reports343.8%
Shipment Sample1 reports1—
Pre-final1 reports16.0%
Final Random1 reports110.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1717.2%
3383 / 16 days
43.8%—
09/17–10/06
BA Thread ends, DB Run-off stitching, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS17163217 (53%)10510/01, 10/02, 10/03, 10/05, 10/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends521033092515
DB Run-off stitching32251881054
DJ Pleat113312212
CB Broken stitch15411
CE Broken seam1442
EC Asymmetry311911341
CC Skip stitch2341
ED Gathering crease331
261676 RGOR · CS12 · Due 10/09 · 1d leftFinal Random PASS Not fixed: BD Snagging
No reportPP Sample
No reportPilot Run
09/12QC 1st Bundle1 reports
09/12QA 1st Bundle1 reports
18/36QC Inlineactual/required · 50%
DHU 5.0%QC Endline18 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty3,165 / 3,165
PDF reports27
Last report09/30

Cross-stage findings

Not fixed: BD Snagging

Found 3 times (10 pcs, 09/12–09/21) in earlier stages; latest Final Random (09/30) still has 3 major

Missed in earlier stages: 4

DC Join stitching (Shipment Sample 09/16), CA Thread tension (Shipment Sample 09/16), DI High-low/uneven (Shipment Sample 09/16), CG Grinning (Shipment Sample 09/16): first found in later stages, never recorded before

QA Inline DHU is 5.5× QC Endline

QA Inline DHU 27.6% vs QC Endline 5.0% (09/11–10/06, 18 days, 3205 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 5

Latest Final Random (09/30): DB Run-off stitching 1 (earlier 15 times), DJ Pleat 2 (earlier 9 times), AD Fabric stains 1 (earlier 7 times), CE Broken seam 1 (earlier 3 times), AC Fabric hole 2 (earlier 3 times)

Found earlier but still reached later stages: 4

EC Asymmetry 3, DF Twisted seam/skewing 1, CB Broken stitch 1, EI Inaccurate/skewed stitching 2 pcs (later stages total)

134 defects recorded as 'Others' without detail

QC 1st Bundle 11, QC Inline 123; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 12); zero in QC Endline records

QC Endline data errors: 15

09/11 CS12 261676 (defective pcs 3 > defects 1), 09/12 CS12 261676 (defective pcs 10 > defects 4), 09/14 CS12 261676 (defective pcs 11 > defects 7), 09/15 CS12 261676 (defective pcs 30 > defects 14)…

Duplicate report numbers

QGR2644279 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DB Run-off stitching (2 Major), AD Fabric stains (2 Major), DJ Pleat (2 Major), CC Skip stitch (1 Major), BA Thread ends (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CF Pulling yarn (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: BD Snagging (4); Both: ED Gathering crease (5/1), EC Asymmetry (3/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (60), CC Skip stitch (56), CF Pulling yarn (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—100.0%
QC Inline18 reports
required on prod. days 18/36 (50%)
—0.0%
QC Endline18 days—5.0%
QA Inline4 reports427.6%
Shipment Sample1 reports1—
Final Random2 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS125.0%
3205 / 18 days
27.6%PASS
09/11–10/06
BA Thread ends, ED Gathering crease, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS12183618 (50%)12609/26, 09/29, 09/30, 10/02, 10/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
Others (no detail)11123
BA Thread ends12857710
ED Gathering crease519378
CC Skip stitch133175
DB Run-off stitching2201771
DJ Pleat227312
CB Broken stitch2491
AD Fabric stains2101011
261677 RGOR · CS17 · Due 10/09 · 1d leftFinal Random PASS Not fixed: EC Asymmetry
No reportPP Sample
No reportPilot Run
09/10QC 1st Bundle1 reports
09/10QA 1st Bundle1 reports
3/22QC Inlineactual/required · 14%
DHU 13.8%QC Endline11 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports
1/2 FAILPre-final2 reports
1/2 FAILFinal Random2 reports
Order/Ship qty1,360 / 1,360
PDF reports13
Last report10/03

Cross-stage findings

Not fixed: EC Asymmetry

Found 7 times (15 pcs, 09/10–09/16) in earlier stages; latest Shipment Sample (10/03) still has 2 major

Missed in earlier stages: 6

BB Missing cut seam allowance (Shipment Sample 09/16), DF Twisted seam/skewing (Shipment Sample 09/16), CF Pulling yarn (Pre-final 09/26), DD Thread not straight/waving (Final Random 09/28), AC Fabric hole (Final Random 09/28), HA Poor pressing (Final Random 09/28): first found in later stages, never recorded before

QA Inline DHU is 2.6× QC Inline

QA Inline DHU 37.5% vs QC Inline 14.7%; QC Inline may be missing defects

Found earlier but still reached later stages: 8

DJ Pleat 1, GA Missing bartack/button 1, CB Broken stitch 5, BA Thread ends 24, EI Inaccurate/skewed stitching 2, EA Unsmooth/puckering/bubbling 4, DB Run-off stitching 17, ED Gathering crease 3 pcs (later stages total)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (3 Major), GB Missing sewing operation (2 Major), AB Shading (1 Major), EI Inaccurate/skewed stitching (1 Major), EG Wrong panel assembly (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: CG Grinning (3); Both: BA Thread ends (4/1), GA Missing bartack/button (4/1), CB Broken stitch (3/2), CC Skip stitch (3/1), DJ Pleat (3/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 75.0%

Caught in earlier stages

CC Skip stitch (23), CE Broken seam (14), CA Thread tension (9), CG Grinning (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—75.0%
QC Inline3 reports
required on prod. days 3/22 (14%)
—14.7%
QC Endline11 days—13.8%
QA Inline2 reports237.5%
Shipment Sample2 reports2—
Pre-final2 reports14.0%
Final Random2 reports19.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1713.8%
1330 / 11 days
37.5%PASS
09/10–10/02
DB Run-off stitching, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1711223 (14%)11809/17, 09/18, 09/21, 09/23, 10/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
DB Run-off stitching3991115
BA Thread ends41185011212
CC Skip stitch31163
CB Broken stitch327414
EC Asymmetry121115
CE Broken seam347
DJ Pleat31611
ED Gathering crease721
261678 RGOR · CP02/CP06 · Due 10/09 · 1d leftShipment Sample FAIL Latest Shipment Sample (09/26) FAILED
No reportPP Sample
No reportPilot Run
09/30QC 1st Bundle1 reports
09/30QA 1st Bundle1 reports
2/16QC Inlineactual/required · 12%
DHU 35.6%QC Endline7 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty1,360 / 1,360
PDF reports8
Last report10/07

Cross-stage findings

Latest Shipment Sample (09/26) FAILED

7 major: EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 1, CG Grinning 1, AD Fabric stains 1, DF Twisted seam/skewing 1, EC Asymmetry 1, CE Broken seam 1

1 defects recorded as 'Others' without detail

QC 1st Bundle 1; cannot compare across stages

QC Endline data errors: 1

10/01 CP06 261678 (defective pcs 19 > defects 17)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (4 Major), BB Missing cut seam allowance (3 Major), DJ Pleat (2 Major), ED Gathering crease (1 Major), EG Wrong panel assembly (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: CB Broken stitch (5), DB Run-off stitching (2), EI Inaccurate/skewed stitching (1), FC Wrong label (1); Both: BA Thread ends (6/3), CE Broken seam (4/4); DHU QC 1st Bundle — / QA 1st Bundle 95.0%

Caught in earlier stages

BA Thread ends (162), CC Skip stitch (75), EB Measurement issue (54), ED Gathering crease (48), AC Fabric hole (31) did not reach later stages

Found before bulk production (Shipment Sample): 7

EI Inaccurate/skewed stitching, EA Unsmooth/puckering/bubbling, CG Grinning, AD Fabric stains, DF Twisted seam/skewing, EC Asymmetry, CE Broken seam: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—95.0%
QC Inline2 reports
required on prod. days 2/16 (12%)
——
QC Endline7 days—35.6%
QA Inline3 reports345.8%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0636.0%
1207 / 7 days
45.8%—
09/30–10/07
BA Thread ends, CC Skip stitch, EB Measurement issue
CP020.0%
14 / 1 days
——
10/02–10/02
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP067142 (14%)7510/02, 10/03, 10/05, 10/06, 10/07
CP02120 (0%)1110/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends631449
CC Skip stitch372
EB Measurement issue54
DF Twisted seam/skewing8441
ED Gathering crease147
CE Broken seam443311
AC Fabric hole31
DB Run-off stitching21434
261679 RGOR · CS05 · Due 10/09 · 1d leftFinal Random PASS Not fixed: CB Broken stitch
No reportPP Sample
No reportPilot Run
09/19QC 1st Bundle1 reports
09/21QA 1st Bundle1 reports
13/24QC Inlineactual/required · 54%
DHU 23.0%QC Endline12 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
1/2 FAILFinal Random2 reports
Order/Ship qty2,295 / 2,295
PDF reports19
Last report09/30

Cross-stage findings

Not fixed: CB Broken stitch

Found 3 times (10 pcs, 09/19–09/26) in earlier stages; latest Final Random (09/30) still has 4 major

Not fixed: DJ Pleat

Found 9 times (27 pcs, 09/21–09/30) in earlier stages; latest Final Random (09/30) still has 11 major

Not fixed: CC Skip stitch

Found 16 times (156 pcs, 09/21–10/02) in earlier stages; latest Final Random (09/30) still has 7 major

Missed in earlier stages: 2

DE Cut to broken (Final Random 09/30), AD Fabric stains (Final Random 09/30): first found in later stages, never recorded before

Recurring in small numbers: 4

Latest Final Random (09/30): BB Missing cut seam allowance 1 (earlier 4 times), CE Broken seam 1 (earlier 3 times), AC Fabric hole 2 (earlier 7 times), DB Run-off stitching 1 (earlier 4 times)

84 defects recorded as 'Others' without detail

QC Inline 84; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 9 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (1 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CA Thread tension (1 Major), DJ Pleat (1 Major), CE Broken seam (1 Major), AC Fabric hole (1 Major), EI Inaccurate/skewed stitching (1 Major), AA Fabric defect (1 Major); Only QC 1st Bundle: CB Broken stitch (2); Both: BB Missing cut seam allowance (4/1), EC Asymmetry (2/2), DF Twisted seam/skewing (2/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

EC Asymmetry (145), ED Gathering crease (90), CA Thread tension (36), EA Unsmooth/puckering/bubbling (13), EB Measurement issue (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline13 reports
required on prod. days 13/24 (54%)
—28.0%
QC Endline12 days—23.0%
QA Inline2 reports229.7%
Final Random2 reports115.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0523.0%
2285 / 12 days
29.7%PASS
09/19–10/06
CC Skip stitch, EC Asymmetry, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS05122413 (54%)7509/22, 09/26, 10/01, 10/02, 10/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
CC Skip stitch1413937
EC Asymmetry2228113
BA Thread ends116110216
ED Gathering crease1881
Others (no detail)84
DJ Pleat122411
CA Thread tension135
DB Run-off stitching2321
261275 DJLF · CS19 · Due 10/12 · 4d leftNo final Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
08/15QC 1st Bundle1 reports
08/17QA 1st Bundle1 reports
5/22QC Inlineactual/required · 23%
DHU 9.3%QC Endline11 days
All FAILQA Inline2 reports
No reportShipment Sample
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty2,465 / 2,465
PDF reports10
Last report08/25

Cross-stage findings

Not fixed: ED Gathering crease

Found 19 times (63 pcs, 08/15–08/22) in earlier stages; latest Pre-final (08/25) still has 2 major

Not fixed: AD Fabric stains

Found 14 times (88 pcs, 08/17–08/24) in earlier stages; latest Pre-final (08/25) still has 3 major

Not fixed: CC Skip stitch

Found 6 times (12 pcs, 08/17–08/24) in earlier stages; latest Pre-final (08/25) still has 1 major

Found earlier but still reached later stages: 2

CE Broken seam 2, CB Broken stitch 1 pcs (later stages total)

QC Endline data errors: 1

08/24 CS19 261275 (defective pcs 18 > defects 16)

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (2 Major), AD Fabric stains (2 Major), EI Inaccurate/skewed stitching (2 Major), AC Fabric hole (1 Major), CE Broken seam (1 Major), DI High-low/uneven (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: ED Gathering crease (8), BA Thread ends (4), CG Grinning (2), DJ Pleat (2); DHU QC 1st Bundle 20.0% / QA 1st Bundle 50.0%

Caught in earlier stages

DB Run-off stitching (19), DI High-low/uneven (14), DJ Pleat (10), CG Grinning (7), EA Unsmooth/puckering/bubbling (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—20.0%
QA 1st Bundle1 reports—50.0%
QC Inline5 reports
required on prod. days 5/22 (23%)
—25.8%
QC Endline11 days—9.3%
QA Inline2 reports226.6%
Pre-final1 reports17.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS199.3%
2465 / 11 days
26.6%—
08/15–08/31
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1911225 (23%)11608/22, 08/24, 08/25, 08/26, 08/31

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-final
BA Thread ends4347933
AD Fabric stains2137213
ED Gathering crease8153732
DB Run-off stitching217
DI High-low/uneven1112
CC Skip stitch121
DJ Pleat262
CG Grinning25
261277 DJLF · CS02 · Due 10/12 · 4d leftFinal Random PASS Not fixed: AD Fabric stains
No resultPP Sample1 reports
No reportPilot Run
08/29QC 1st Bundle1 reports
08/29QA 1st Bundle2 reports
5/18QC Inlineactual/required · 28%
DHU 17.4%QC Endline9 days
All FAILQA Inline2 reports
No resultShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,225 / 2,225
PDF reports14
Last report09/11

Cross-stage findings

Not fixed: AD Fabric stains

Found 17 times (114 pcs, 08/29–09/07) in earlier stages; latest Final Random (09/11) still has 4 major

QA Inline DHU is 3.1× QC Inline

QA Inline DHU 37.5% vs QC Inline 12.2%; QC Inline may be missing defects

Recurring in small numbers: 1

Latest Final Random (09/11): CB Broken stitch 1 (earlier 5 times)

Found earlier but still reached later stages: 3

ED Gathering crease 4, EC Asymmetry 3, CF Pulling yarn 2 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA 1st Bundle 4, Final Random 1; cannot compare across stages

Duplicate report numbers

QGR2637218 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 9 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DJ Pleat (4 Major), CC Skip stitch (2 Major), EB Measurement issue (2 Major), BA Thread ends (2 Major), DD Thread not straight/waving (2 Major), EA Unsmooth/puckering/bubbling (2 Major), GC Missing pocket/label (2 Major), EI Inaccurate/skewed stitching (2 Major), EC Asymmetry (2 Major); Only QC 1st Bundle: CG Grinning (2), BC Sticker left (2); Both: AD Fabric stains (2/4), DI High-low/uneven (2/2), ED Gathering crease (2/2); DHU QC 1st Bundle 12.5% / QA 1st Bundle 160.0%

Caught in earlier stages

CC Skip stitch (45), DI High-low/uneven (11), DF Twisted seam/skewing (9), DJ Pleat (8) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—12.5%
QA 1st Bundle2 reports—160.0%
QC Inline5 reports
required on prod. days 5/18 (28%)
—12.2%
QC Endline9 days—17.4%
QA Inline2 reports237.5%
Shipment Sample1 reports0—
Pre-final1 reports112.8%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0217.4%
2225 / 9 days
37.5%PASS
08/29–09/26
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS029185 (28%)9409/03, 09/05, 09/07, 09/08, 09/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends24127256
AD Fabric stains24129514
ED Gathering crease2277734
EC Asymmetry273323
CC Skip stitch24363
Others (no detail)4101
DI High-low/uneven2234
CB Broken stitch4321
260270 MKSC · CB19/CB20 · Due 10/14 · 6d leftFinal Random PASS Not fixed: EA Unsmooth/puckering/bubbling
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
3/28QC Inlineactual/required · 11%
DHU 19.3%QC Endline14 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty2,000 / 593
PDF reports8
Last report08/18

Cross-stage findings

Not fixed: EA Unsmooth/puckering/bubbling

Found 6 times (11 pcs, 07/07–07/08) in earlier stages; latest Final Random (08/18) still has 4 major

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 07/20): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (08/18): BA Thread ends 2 (earlier 5 times)

Found earlier but still reached later stages: 2

ED Gathering crease 2, AD Fabric stains 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

Caught in earlier stages

DB Run-off stitching (81), CC Skip stitch (77), Q61 Lace raw edge or broken lace (47), DJ Pleat (6), CE Broken seam (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC Inline3 reports
required on prod. days 3/28 (11%)
—34.4%
QC Endline14 days—19.3%
QA Inline1 reports121.9%
Final Random4 reports03.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2019.4%
1986 / 13 days
21.9%PASS
06/29–07/16
CC Skip stitch, ED Gathering crease, DB Run-off stitching
CB190.0%
10 / 1 days
——
09/23–09/23
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2013263 (12%)131007/11, 07/13, 07/14, 07/15, 07/16
CB19120 (0%)1109/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC InlineQC EndlineQA InlineFinal Random
DB Run-off stitching675
ED Gathering crease7522
CC Skip stitch77
AD Fabric stains711
Q61 Lace raw edge or broken lace47
BA Thread ends254
EA Unsmooth/puckering/bubbling1014
DJ Pleat6
261133 MKSC · CB02/CB11/CB30 · Due 10/14 · 6d leftFinal Random FAIL Latest Final Random (09/17) FAILED
No reportPP Sample
No reportPilot Run
08/21QC 1st Bundle1 reports
08/20QA 1st Bundle1 reports
11/48QC Inlineactual/required · 23%
DHU 16.4%QC Endline20 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
1/4 FAILFinal Random4 reports
Order/Ship qty5,250 / 1,750
PDF reports20
Last report09/17

Cross-stage findings

Latest Final Random (09/17) FAILED

11 major: BA Thread ends 1, BB Missing cut seam allowance 1, ED Gathering crease 9

Not fixed: EA Unsmooth/puckering/bubbling

Found 23 times (73 pcs, 08/20–09/07) in earlier stages; latest Final Random (09/17) still has 2 major

Not fixed: ED Gathering crease

Found 35 times (182 pcs, 08/20–09/10) in earlier stages; latest Final Random (09/17) still has 10 major

Not fixed: CG Grinning

Found 8 times (18 pcs, 08/20–09/07) in earlier stages; latest Final Random (09/17) still has 1 major

Not fixed: DJ Pleat

Found 4 times (10 pcs, 08/21–09/07) in earlier stages; latest Final Random (09/17) still has 1 major

Not fixed: BA Thread ends

Found 19 times (202 pcs, 08/21–09/14) in earlier stages; latest Final Random (09/17) still has 2 major

Missed in earlier stages: 1

BB Missing cut seam allowance (Final Random 09/17): first found in later stages, never recorded before

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 4; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 11); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (1 Major); Only QC 1st Bundle: DB Run-off stitching (2), DJ Pleat (1); Both: ED Gathering crease (3/5), EA Unsmooth/puckering/bubbling (3/2), CG Grinning (1/2); DHU QC 1st Bundle 76.9% / QA 1st Bundle 84.6%

Caught in earlier stages

AD Fabric stains (169), CC Skip stitch (106), EC Asymmetry (68), DB Run-off stitching (43), Q10 Reject after repairing (35) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—84.6%
QC Inline11 reports
required on prod. days 11/48 (23%)
—61.8%
QC Endline20 days—16.4%
QA Inline3 reports329.2%
Final Random4 reports14.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0216.5%
5145 / 20 days
29.2%FAIL
08/20–09/14
BA Thread ends, AD Fabric stains, ED Gathering crease
CB300.0%
30 / 3 days
——
08/24–09/01
—
CB110.0%
10 / 1 days
——
09/02–09/02
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB02204011 (28%)20909/08, 09/09, 09/10, 09/11, 09/14
CB30360 (0%)3308/24, 08/26, 09/01
CB11120 (0%)1109/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends2025
ED Gathering crease3535135412
AD Fabric stains3166
CC Skip stitch997
EA Unsmooth/puckering/bubbling326174
EC Asymmetry115466
Others (no detail)1524
DB Run-off stitching23011
261502 LOGE · CP01/CP02/CP03… · Due 10/14 · 6d leftFinal Random FAIL Latest Final Random (09/26) FAILED
No resultPP Sample1 reports
No reportPilot Run
09/15QC 1st Bundle2 reports
09/09–09/16QA 1st Bundle4 reports
9/108QC Inlineactual/required · 8%
DHU 9.4%QC Endline15 days
All FAILQA Inline5 reports
All FAILShipment Sample2 reports
No reportPre-final
All FAILFinal Random1 reports
Order/Ship qty12,000 / 12,000
PDF reports24
Last report10/02

Cross-stage findings

Latest Final Random (09/26) FAILED

11 major: CB Broken stitch 1, BB Missing cut seam allowance 2, DC Join stitching 2, CE Broken seam 2, EI Inaccurate/skewed stitching 2, Others (no detail) 1, AB Shading 1

Not fixed: AD Fabric stains

Found 42 times (219 pcs, 09/09–09/26) in earlier stages; latest Shipment Sample (10/02) still has 1 major

Not fixed: EC Asymmetry

Found 20 times (45 pcs, 09/09–09/26) in earlier stages; latest Shipment Sample (10/02) still has 7 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 23 times (90 pcs, 09/14–09/26) in earlier stages; latest Shipment Sample (10/02) still has 2 major

Not fixed: CB Broken stitch

Found 3 times (4 pcs, 09/19–09/22) in earlier stages; latest Shipment Sample (10/02) still has 1 major

Missed in earlier stages: 3

FB Material defect (Shipment Sample 09/25), DC Join stitching (Final Random 09/26), AB Shading (Final Random 09/26): first found in later stages, never recorded before

Found earlier but still reached later stages: 7

BA Thread ends 30, CE Broken seam 2, CG Grinning 2, EI Inaccurate/skewed stitching 4, DE Cut to broken 1, BB Missing cut seam allowance 2, DB Run-off stitching 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

Shipment Sample 3, Final Random 1; cannot compare across stages

QC Endline data errors: 1

09/14 CP01 261502-3 (defective pcs 9 > defects 8)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (6 Major), EI Inaccurate/skewed stitching (4 Major), BB Missing cut seam allowance (3 Major), CG Grinning (2 Major), AA Fabric defect (1 Major); Only QC 1st Bundle: DG Fastening loose/misplaced (4), GB Missing sewing operation (3), ED Gathering crease (1); Both: EA Unsmooth/puckering/bubbling (9/13), CE Broken seam (5/5), EC Asymmetry (4/3), AD Fabric stains (2/4), DJ Pleat (4/2), CC Skip stitch (4/1), DE Cut to broken (2/1), DF Twisted seam/skewing (1/1); DHU QC 1st Bundle 97.5% / QA 1st Bundle 76.7%

Caught in earlier stages

CC Skip stitch (216), EB Measurement issue (90), ED Gathering crease (53), DJ Pleat (25), CA Thread tension (11) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—97.5%
QA 1st Bundle4 reports—76.7%
QC Inline9 reports
required on prod. days 9/108 (8%)
—61.6%
QC Endline15 days—9.4%
QA Inline5 reports540.6%
Shipment Sample2 reports2—
Final Random1 reports13.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP139.0%
4000 / 8 days
71.9%FAIL
09/15–09/23
BA Thread ends, EA Unsmooth/puckering/bubbling, CC Skip stitch
CP1714.6%
3745 / 13 days
51.6%—
09/15–10/02
BA Thread ends, CC Skip stitch, CE Broken seam
CP078.5%
1755 / 9 days
14.1%—
09/17–09/30
BA Thread ends, AD Fabric stains, CE Broken seam
CP014.5%
780 / 5 days
——
09/14–09/23
BA Thread ends, AD Fabric stains, EC Asymmetry
CP154.5%
640 / 6 days
——
09/16–09/26
BA Thread ends, AD Fabric stains
CP020.7%
440 / 3 days
——
09/17–09/21
EC Asymmetry, BA Thread ends
CP060.0%
420 / 7 days
——
09/15–09/23
—
CP030.0%
100 / 1 days
——
09/17–09/17
—
CP1610.0%
60 / 1 days
——
09/18–09/18
BA Thread ends, CC Skip stitch
CP190.0%
20 / 1 days
——
09/18–09/18
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1713267 (27%)13609/25, 09/26, 09/29, 09/30, 10/02
CP079180 (0%)9909/22, 09/23, 09/26, 09/28, 09/30
CP138162 (12%)8609/18, 09/19, 09/21, 09/22, 09/23
CP067140 (0%)7709/17, 09/18, 09/19, 09/22, 09/23
CP156120 (0%)6609/19, 09/22, 09/23, 09/25, 09/26
CP015100 (0%)5509/14, 09/15, 09/17, 09/19, 09/23
CP02360 (0%)3309/17, 09/19, 09/21
CP03120 (0%)1109/17
CP16120 (0%)1109/18
CP19120 (0%)1109/18

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends613426330
AD Fabric stains3242318342
CC Skip stitch4113198
CE Broken seam1552810052
EA Unsmooth/puckering/bubbling2913105422
EB Measurement issue90
EC Asymmetry1431910812
ED Gathering crease111401
261506 LOGE · CP09 · Due 10/14 · 6d leftShipment Sample FAIL Latest Shipment Sample (09/25) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/11QA 1st Bundle1 reports
10/28QC Inlineactual/required · 36%
DHU 10.4%QC Endline14 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty7,000 / 7,000
PDF reports14
Last report09/25

Cross-stage findings

Latest Shipment Sample (09/25) FAILED

10 major: Others (no detail) 1, EI Inaccurate/skewed stitching 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1, AD Fabric stains 1, EC Asymmetry 1, DE Cut to broken 1, EC Asymmetry 1

Not fixed: EC Asymmetry

Found 21 times (45 pcs, 09/11–09/22) in earlier stages; latest Shipment Sample (09/25) still has 6 major

Not fixed: EI Inaccurate/skewed stitching

Found 6 times (16 pcs, 09/11–09/22) in earlier stages; latest Shipment Sample (09/25) still has 1 major

Not fixed: AD Fabric stains

Found 20 times (82 pcs, 09/11–09/26) in earlier stages; latest Shipment Sample (09/25) still has 1 major

Missed in earlier stages: 1

DE Cut to broken (Shipment Sample 09/25): first found in later stages, never recorded before

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 68.8% vs QC Inline 37.8%; QC Inline may be missing defects

QA Inline DHU is 6.6× QC Endline

QA Inline DHU 68.8% vs QC Endline 10.4% (09/10–09/26, 14 days, 7000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

3 defects recorded as 'Others' without detail

QC Inline 2, Shipment Sample 1; cannot compare across stages

Caught in earlier stages

BA Thread ends (313), CC Skip stitch (120), DB Run-off stitching (94), ED Gathering crease (80), CE Broken seam (73) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—95.0%
QC Inline10 reports
required on prod. days 10/28 (36%)
—37.8%
QC Endline14 days—10.4%
QA Inline2 reports268.8%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0910.4%
7000 / 14 days
68.8%—
09/10–09/26
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP09142810 (36%)14409/21, 09/22, 09/23, 09/25, 09/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends2472613
CC Skip stitch41142
DB Run-off stitching490
AD Fabric stains166511
ED Gathering crease11681
CE Broken seam1164412
EC Asymmetry71315106
EB Measurement issue29
261510 LOGE · CP05/CP11/CP12… · Due 10/14 · 6d leftShipment Sample FAIL Latest Shipment Sample (09/25) FAILED
No reportPP Sample
No reportPilot Run
10/03QC 1st Bundle1 reports
09/21–10/02QA 1st Bundle2 reports
1/46QC Inlineactual/required · 2%
DHU 4.3%QC Endline13 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty2,500 / 2,500
PDF reports8
Last report10/05

Cross-stage findings

Latest Shipment Sample (09/25) FAILED

14 major: EC Asymmetry 1, EI Inaccurate/skewed stitching 1, CB Broken stitch 1, CE Broken seam 1, AD Fabric stains 1, EI Inaccurate/skewed stitching 1, EI Inaccurate/skewed stitching 1, GB Missing sewing operation 1, EI Inaccurate/skewed stitching 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, CE Broken seam 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1

Missed in earlier stages: 5

EC Asymmetry (Shipment Sample 09/25), EI Inaccurate/skewed stitching (Shipment Sample 09/25), CE Broken seam (Shipment Sample 09/25), AD Fabric stains (Shipment Sample 09/25), GB Missing sewing operation (Shipment Sample 09/25): first found in later stages, never recorded before

QA Inline DHU is 7.3× QC Endline

QA Inline DHU 31.2% vs QC Endline 4.3% (09/19–10/08, 13 days, 4160 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 9); zero in QC Endline records

QC Endline data errors: 5

10/02 CP18 261510-1 (defective pcs 50 > defects 32), 10/03 CP18 261510-1 (defective pcs 22 > defects 18), 10/05 CP18 261510-1 (defective pcs 47 > defects 43), 10/06 CP18 261510-1 (defective pcs 63 > defects 57)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (3 Major), DF Twisted seam/skewing (2 Major), CB Broken stitch (2 Major), BD Snagging (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), CA Thread tension (3), CE Broken seam (3), DB Run-off stitching (2), CC Skip stitch (1); Both: BA Thread ends (5/6), EI Inaccurate/skewed stitching (1/5), EC Asymmetry (1/3), DJ Pleat (1/2), DE Cut to broken (1/1); DHU QC 1st Bundle — / QA 1st Bundle 65.0%

Caught in earlier stages

BA Thread ends (88), ED Gathering crease (50), CC Skip stitch (46), EA Uneven seam allowance (16), EA Unsmooth/puckering/bubbling (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle2 reports—65.0%
QC Inline1 reports
required on prod. days 1/46 (2%)
——
QC Endline13 days—4.3%
QA Inline3 reports331.2%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP186.5%
2520 / 5 days
34.4%—
10/02–10/07
BA Thread ends, ED Gathering crease, CC Skip stitch
CP130.0%
1040 / 9 days
25.0%—
09/19–10/07
—
CP125.4%
240 / 4 days
——
09/22–10/07
BA Thread ends, CC Skip stitch, GB Missing sewing operation
CP190.0%
160 / 2 days
——
10/06–10/07
—
CP050.0%
100 / 1 days
——
10/08–10/08
—
CP110.0%
60 / 1 days
——
09/25–09/25
—
CP200.0%
40 / 1 days
——
09/28–09/28
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP139180 (0%)9909/28, 09/29, 09/30, 10/06, 10/07
CP185101 (10%)5410/02, 10/03, 10/05, 10/06, 10/07
CP12480 (0%)4409/22, 09/26, 09/29, 10/07
CP19240 (0%)2210/06, 10/07
CP05120 (0%)1110/08
CP11120 (0%)1109/25
CP20120 (0%)1109/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends565639
ED Gathering crease347
CC Skip stitch1243
EA Uneven seam allowance16
EI Inaccurate/skewed stitching1536
EC Asymmetry1363
CE Broken seam32232
EA Unsmooth/puckering/bubbling333
261671 RGOR · CB31/CB32/CB35 · Due 10/16 · 8d leftFinal Random PASS Not fixed: AD Fabric stains
No resultPP Sample1 reports
No reportPilot Run
09/26QC 1st Bundle1 reports
No reportQA 1st Bundle
15/28QC Inlineactual/required · 54%
DHU 18.1%QC Endline12 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty11,080 / 7,758
PDF reports20
Last report10/08

Cross-stage findings

Not fixed: AD Fabric stains

Found 40 times (228 pcs, 09/22–10/08) in earlier stages; latest Final Random (10/06) still has 6 major

Recurring in small numbers: 2

Latest Final Random (10/06): CB Broken stitch 1 (earlier 9 times), CC Skip stitch 1 (earlier 17 times)

Found earlier but still reached later stages: 1

BB Missing cut seam allowance 2 pcs (later stages total)

Duplicate report numbers

QGR2645763 have multiple reports with different content

Caught in earlier stages

EC Asymmetry (142), EB Measurement issue (78), ED Gathering crease (75), CE Broken seam (65), DB Run-off stitching (36) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QC Inline15 reports
required on prod. days 15/28 (54%)
——
QC Endline12 days—18.1%
QA Inline2 reports237.5%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3517.6%
3520 / 12 days
37.5%PASS
09/25–10/08
AD Fabric stains, EB Measurement issue, EC Asymmetry
CB3132.9%
70 / 1 days
——
09/30–09/30
AD Fabric stains, EC Asymmetry, ED Gathering crease
CB3236.7%
30 / 1 days
——
10/08–10/08
AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB35122415 (62%)6309/26, 10/03, 10/05, 10/06, 10/08
CB31120 (0%)1109/30
CB32120 (0%)1110/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQC InlineQC EndlineQA InlineFinal Random
AD Fabric stains112819176
EC Asymmetry1261762
EB Measurement issue762
ED Gathering crease1659
BA Thread ends1053210
CE Broken seam263
CC Skip stitch6551
DB Run-off stitching1233
261672 RGOR · CB07/CB19/CB30 · Due 10/16 · 8d leftShipment Sample FAIL Latest Shipment Sample (09/28) FAILED
No resultPP Sample1 reports
No reportPilot Run
09/25QC 1st Bundle1 reports
09/25QA 1st Bundle1 reports
23/28QC Inlineactual/required · 82%
DHU 15.1%QC Endline8 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty7,375 / 7,375
PDF reports37
Last report10/08

Cross-stage findings

Latest Shipment Sample (09/28) FAILED

12 major: GC Missing pocket/label 1, AD Fabric stains 1, Others (no detail) 1, ED Gathering crease 1, Others (no detail) 1, EA Unsmooth/puckering/bubbling 1, DJ Pleat 1, EC Asymmetry 1, DE Cut to broken 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1

Not fixed: AD Fabric stains

Found 43 times (213 pcs, 09/21–10/08) in earlier stages; latest Shipment Sample (09/28) still has 1 major

Not fixed: EC Asymmetry

Found 12 times (20 pcs, 09/21–10/07) in earlier stages; latest Shipment Sample (09/28) still has 4 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 3 times (4 pcs, 09/21–09/30) in earlier stages; latest Shipment Sample (09/28) still has 1 major

Not fixed: DJ Pleat

Found 13 times (33 pcs, 09/26–10/07) in earlier stages; latest Shipment Sample (09/28) still has 1 major

Missed in earlier stages: 3

GC Missing pocket/label (Shipment Sample 09/28), ED Gathering crease (Shipment Sample 09/28), DE Cut to broken (Shipment Sample 09/28): first found in later stages, never recorded before

4 defects recorded as 'Others' without detail

PP Sample 1, QA 1st Bundle 1, Shipment Sample 2; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EE Raw edge (2 Major), EI Inaccurate/skewed stitching (2 Major), DF Twisted seam/skewing (2 Major), EB Measurement issue (1 Major), CE Broken seam (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: CG Grinning (8), AD Fabric stains (4), DI High-low/uneven (2), CC Skip stitch (1), EA Unsmooth/puckering/bubbling (1), DB Run-off stitching (1); Both: DD Thread not straight/waving (2/2); DHU QC 1st Bundle 190.0% / QA 1st Bundle 92.3%

Caught in earlier stages

CC Skip stitch (96), EB Measurement issue (86), CG Grinning (73), CB Broken stitch (70), BA Thread ends (53) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—190.0%
QA 1st Bundle1 reports—92.3%
QC Inline30 reports
required on prod. days 23/28 (82%)
——
QC Endline8 days—15.1%
QA Inline3 reports332.3%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0714.9%
2130 / 8 days
32.3%—
09/30–10/08
AD Fabric stains, EB Measurement issue, ED Gathering crease
CB1916.1%
540 / 5 days
——
10/02–10/08
BA Thread ends, AD Fabric stains, CD Needle hole
CB300.0%
10 / 1 days
——
10/07–10/07
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0781613 (81%)2110/07, 10/08
CB1951010 (100%)1010/08
CB30120 (0%)1110/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
AD Fabric stains148811551
CC Skip stitch167244
EB Measurement issue1832
CG Grinning865
CB Broken stitch682
BA Thread ends494
CE Broken seam1473
ED Gathering crease3441
261673 RGOR · CP10/CP14 · Due 10/16 · 8d leftShipment Sample FAIL Latest Shipment Sample (09/29) FAILED
No reportPP Sample
No reportPilot Run
09/25QC 1st Bundle1 reports
09/26QA 1st Bundle1 reports
6/26QC Inlineactual/required · 23%
DHU 18.4%QC Endline12 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty10,745 / 10,745
PDF reports13
Last report10/08

Cross-stage findings

Latest Shipment Sample (09/29) FAILED

5 major: AD Fabric stains 1, DF Twisted seam/skewing 1, ED Gathering crease 1, ED Gathering crease 1, ED Gathering crease 1

Not fixed: DF Twisted seam/skewing

Found 17 times (111 pcs, 09/25–10/08) in earlier stages; latest Shipment Sample (09/29) still has 1 major

Not fixed: AD Fabric stains

Found 15 times (557 pcs, 09/25–10/08) in earlier stages; latest Shipment Sample (09/29) still has 1 major

Not fixed: ED Gathering crease

Found 20 times (385 pcs, 09/25–10/08) in earlier stages; latest Shipment Sample (09/29) still has 3 major

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), EI Inaccurate/skewed stitching (2 Major), BA Thread ends (2 Major); Only QC 1st Bundle: EC Asymmetry (7), DJ Pleat (2), DA Exceed seam allowance (2), DI High-low/uneven (1); Both: ED Gathering crease (5/4), AD Fabric stains (2/4), DF Twisted seam/skewing (4/2); DHU QC 1st Bundle — / QA 1st Bundle 85.0%

Caught in earlier stages

BA Thread ends (429), CC Skip stitch (191), EC Asymmetry (41), EB Measurement issue (36), EA Unsmooth/puckering/bubbling (33) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—85.0%
QC Inline6 reports
required on prod. days 6/26 (23%)
——
QC Endline12 days—18.4%
QA Inline4 reports442.2%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1418.3%
8936 / 12 days
42.2%—
09/25–10/08
AD Fabric stains, BA Thread ends, ED Gathering crease
CP1025.7%
140 / 1 days
——
09/26–09/26
ED Gathering crease, AD Fabric stains, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1412246 (25%)12610/03, 10/05, 10/06, 10/07, 10/08
CP10120 (0%)1109/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
AD Fabric stains2454651
BA Thread ends2184027
ED Gathering crease541236313
CC Skip stitch191
DF Twisted seam/skewing42247291
EC Asymmetry712139
EB Measurement issue36
EA Unsmooth/puckering/bubbling312153
261674 RGOR · CP06 · Due 10/16 · 8d leftFinal Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
09/16QC 1st Bundle1 reports
09/16QA 1st Bundle1 reports
7/28QC Inlineactual/required · 25%
DHU 11.7%QC Endline14 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty7,170 / 7,170
PDF reports13
Last report09/30

Cross-stage findings

Not fixed: AD Fabric stains

Found 22 times (244 pcs, 09/16–09/29) in earlier stages; latest Final Random (09/30) still has 4 major

Recurring in small numbers: 2

Latest Final Random (09/30): CB Broken stitch 1 (earlier 9 times), CC Skip stitch 1 (earlier 15 times)

Found earlier but still reached later stages: 4

EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, ED Gathering crease 1, EB Measurement issue 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (5 Major), BA Thread ends (2 Major), CA Thread tension (1 Major), EG Wrong panel assembly (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: BB Missing cut seam allowance (4), CB Broken stitch (1), FC Wrong label (1); Both: EI Inaccurate/skewed stitching (6/1), AD Fabric stains (4/2), CC Skip stitch (1/2), DD Thread not straight/waving (1/2), DI High-low/uneven (1/2), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%

Caught in earlier stages

CE Broken seam (62), AC Fabric hole (33), DB Run-off stitching (24), EI Inaccurate/skewed stitching (21), DJ Pleat (16) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—100.0%
QC Inline7 reports
required on prod. days 7/28 (25%)
—131.0%
QC Endline14 days—11.7%
QA Inline2 reports240.6%
Shipment Sample1 reports1—
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0611.7%
7086 / 14 days
40.6%PASS
09/16–10/06
BA Thread ends, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0614287 (25%)14709/28, 09/29, 09/30, 10/05, 10/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
AD Fabric stains4240192614
BA Thread ends2822365
CC Skip stitch1217611
CE Broken seam1943
ED Gathering crease44311
EB Measurement issue391
AC Fabric hole33
EC Asymmetry11931
261833 LOGE · CB01/CB14/CB26… · Due 10/16 · 8d leftFinal Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
09/15–10/06QC 1st Bundle2 reports
09/15QA 1st Bundle1 reports
56/120QC Inlineactual/required · 47%
DHU 8.7%QC Endline21 days
All FAILQA Inline12 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty11,097 / 11,097
PDF reports80
Last report10/08

Cross-stage findings

Not fixed: AD Fabric stains

Found 103 times (610 pcs, 09/15–10/08) in earlier stages; latest Final Random (10/03) still has 3 major

Missed in earlier stages: 1

GA Missing bartack/button (Final Random 10/01): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (10/03): CC Skip stitch 2 (earlier 72 times), CB Broken stitch 2 (earlier 27 times)

Found earlier but still reached later stages: 3

EA Unsmooth/puckering/bubbling 3, ED Gathering crease 3, DJ Pleat 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA Inline 2, Final Random 1; cannot compare across stages

QC Endline data errors: 2

10/06 CB01 261833-S (defective pcs 43 > defects 42), 10/07 CB01 261833-S (defective pcs 30 > defects 26)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), DB Run-off stitching (2 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: BA Thread ends (3), EA Unsmooth/puckering/bubbling (3), CA Thread tension (2), AD Fabric stains (2), DJ Pleat (2), EE Raw edge (1); Both: EC Asymmetry (5/6); DHU QC 1st Bundle 180.0% / QA 1st Bundle 84.6%

Caught in earlier stages

EC Asymmetry (247), DB Run-off stitching (156), EB Measurement issue (133), CE Broken seam (107), AC Fabric hole (76) did not reach later stages

Report line differs from production line

QGR2645050 Final Random (10/03) CB32; actual production line(s) CB01/CB14/CB26/CB29/CB30/CB31 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—180.0%
QA 1st Bundle1 reports—84.6%
QC Inline62 reports
required on prod. days 56/120 (47%)
—126.0%
QC Endline21 days—8.7%
QA Inline12 reports1232.3%
Final Random3 reports03.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB317.5%
9137 / 16 days
32.1%PASS
09/17–10/07
AD Fabric stains, BA Thread ends, CC Skip stitch
CB2911.5%
8241 / 17 days
38.5%PASS
09/16–10/06
ED Gathering crease, AD Fabric stains, BA Thread ends
CB147.8%
6915 / 15 days
25.0%PASS
09/14–10/02
ED Gathering crease, BA Thread ends, AC Fabric hole
CB016.7%
1892 / 4 days
21.9%—
10/05–10/08
AD Fabric stains, DB Run-off stitching, BA Thread ends
CB300.0%
183 / 7 days
——
09/21–10/08
—
CB260.0%
10 / 1 days
——
10/08–10/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB29173424 (71%)7309/19, 10/02, 10/03, 10/05, 10/06
CB31163225 (78%)7009/26, 09/29, 10/03, 10/05, 10/07
CB1415306 (20%)15909/26, 09/28, 09/29, 09/30, 10/02
CB307140 (0%)7709/30, 10/01, 10/02, 10/07, 10/08
CB01481 (12%)4310/05, 10/06, 10/07, 10/08
CB26120 (0%)1110/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease269534203
AD Fabric stains2133462138
BA Thread ends314458427
CC Skip stitch4326672
EC Asymmetry561369010
EA Unsmooth/puckering/bubbling3945393
DB Run-off stitching2331165
EB Measurement issue61216
261834 LOGE · CB01/CB02/CB09… · Due 10/16 · 8d leftFinal Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
09/16QC 1st Bundle2 reports
09/16QA 1st Bundle1 reports
65/142QC Inlineactual/required · 46%
DHU 10.6%QC Endline20 days
All FAILQA Inline8 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty7,338 / 7,338
PDF reports82
Last report10/08

Cross-stage findings

Not fixed: AD Fabric stains

Found 89 times (726 pcs, 09/16–10/08) in earlier stages; latest Final Random (10/01) still has 3 major

Recurring in small numbers: 2

Latest Final Random (10/01): EA Unsmooth/puckering/bubbling 2 (earlier 44 times), CC Skip stitch 1 (earlier 42 times)

Found earlier but still reached later stages: 2

ED Gathering crease 5, AC Fabric hole 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QC Inline 1; cannot compare across stages

QC Endline data errors: 3

09/17 CB11 261834-S1 (defective pcs 14 > defects 12), 09/21 CB12 261834-S1 (defective pcs 60 > defects 59), 10/06 CB12 261834-S1 (defective pcs 3 > defects 2)

Duplicate report numbers

QGR2644026, QGR2644862 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CH Incorrect stitch density (3 Major), DI High-low/uneven (2 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: AF Crushed foam cup (2), ED Gathering crease (2), DC Join stitching (2), DJ Pleat (2), CE Broken seam (2), DF Twisted seam/skewing (2); Both: EA Unsmooth/puckering/bubbling (3/2), EC Asymmetry (4/1), BA Thread ends (4/1); DHU QC 1st Bundle 80.8% / QA 1st Bundle 76.9%

Caught in earlier stages

CE Broken seam (306), DB Run-off stitching (252), EC Asymmetry (247), EB Measurement issue (92), CB Broken stitch (71) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—80.8%
QA 1st Bundle1 reports—76.9%
QC Inline69 reports
required on prod. days 65/142 (46%)
—80.2%
QC Endline20 days—10.6%
QA Inline8 reports830.1%
Final Random2 reports03.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB129.0%
8442 / 18 days
25.0%PASS
09/16–10/08
BA Thread ends, AC Fabric hole, ED Gathering crease
CB0110.0%
7138 / 17 days
28.1%PASS
09/16–10/06
AD Fabric stains, BA Thread ends, DB Run-off stitching
CB1112.2%
6247 / 19 days
39.1%—
09/02–10/08
AD Fabric stains, ED Gathering crease, CE Broken seam
CB1413.1%
3266 / 8 days
28.1%—
09/30–10/08
CC Skip stitch, DB Run-off stitching, CE Broken seam
CB300.0%
66 / 7 days
——
09/18–10/03
—
CB090.0%
10 / 1 days
——
10/03–10/03
—
CB290.0%
10 / 1 days
——
10/03–10/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB11193818 (47%)16410/03, 10/05, 10/06, 10/07, 10/08
CB12183623 (64%)12110/01, 10/03, 10/05, 10/06, 10/08
CB01173419 (56%)9609/29, 10/01, 10/03, 10/05, 10/06
CB148165 (31%)8310/03, 10/05, 10/06, 10/07, 10/08
CB307140 (0%)7709/22, 09/30, 10/01, 10/02, 10/03
CB09120 (0%)1110/03
CB29120 (0%)1110/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends41747761012
AD Fabric stains7664287
ED Gathering crease24726445
CE Broken seam21021993
DB Run-off stitching402102
EC Asymmetry41192428
CC Skip stitch331761
AC Fabric hole318911
261224 DJLF · CP13 · Due 10/19 · 11d leftNo final Not fixed: CC Skip stitch
No reportPP Sample
No reportPilot Run
09/23QC 1st Bundle1 reports
09/23QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 12.4%QC Endline6 days
All FAILQA Inline2 reports
No reportShipment Sample
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty2,110 / 2,110
PDF reports6
Last report09/30

Cross-stage findings

Not fixed: CC Skip stitch

Found 6 times (89 pcs, 09/23–09/28) in earlier stages; latest Pre-final (09/30) still has 1 major

Not fixed: ED Gathering crease

Found 6 times (15 pcs, 09/22–09/28) in earlier stages; latest Pre-final (09/30) still has 3 major

Found earlier but still reached later stages: 1

CB Broken stitch 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

Pre-final 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (2 Major), AD Fabric stains (1 Major), DI High-low/uneven (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: DB Run-off stitching (2), CG Grinning (1), CB Broken stitch (1); Both: EA Unsmooth/puckering/bubbling (8/5), BA Thread ends (3/3), EI Inaccurate/skewed stitching (3/3), EC Asymmetry (3/1), CC Skip stitch (2/1), DD Thread not straight/waving (2/1), DJ Pleat (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

EA Unsmooth/puckering/bubbling (69), EB Measurement issue (21), DB Run-off stitching (14), EC Asymmetry (11), EI Inaccurate/skewed stitching (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline1 reports
required on prod. days 1/12 (8%)
——
QC Endline6 days—12.4%
QA Inline2 reports240.6%
Pre-final1 reports16.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1312.4%
2110 / 6 days
40.6%—
09/22–10/02
CC Skip stitch, BA Thread ends, EA Unsmooth/puckering/bubbling

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP136121 (8%)6509/23, 09/25, 09/26, 09/28, 10/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-final
BA Thread ends33373922
CC Skip stitch213831
EA Unsmooth/puckering/bubbling85515
EB Measurement issue21
ED Gathering crease1323
DB Run-off stitching212
EC Asymmetry3125
EI Inaccurate/skewed stitching333
261225 DJLF · CS19 · Due 10/19 · 11d leftFinal Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
08/31QC 1st Bundle1 reports
08/31QA 1st Bundle1 reports
7/28QC Inlineactual/required · 25%
DHU 8.1%QC Endline14 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
1/2 FAILFinal Random2 reports
Order/Ship qty2,000 / 2,000
PDF reports17
Last report10/02

Cross-stage findings

Not fixed: ED Gathering crease

Found 7 times (23 pcs, 09/04–09/11) in earlier stages; latest Final Random (10/02) still has 3 major

QA Inline DHU is 2.1× QC Inline

QA Inline DHU 38.3% vs QC Inline 18.6%; QC Inline may be missing defects

Pre-final DHU is 2.1× QC Endline

Pre-final DHU 16.8% vs QC Endline 8.1% (08/31–09/21, 14 days, 2000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects; Final Random 10.4%

Recurring in small numbers: 2

Latest Final Random (10/02): DJ Pleat 1 (earlier 12 times), AC Fabric hole 1 (earlier 4 times)

Found earlier but still reached later stages: 2

EC Asymmetry 6, DF Twisted seam/skewing 2 pcs (later stages total)

13 defects recorded as 'Others' without detail

QC Inline 5, QA Inline 1, Pre-final 6, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 13); zero in QC Endline records

QC Endline data errors: 7

08/31 CS19 261225 (defective pcs 13 > defects 6), 09/01 CS19 261225 (defective pcs 48 > defects 18), 09/02 CS19 261225 (defective pcs 26 > defects 4), 09/03 CS19 261225 (defective pcs 23 > defects 3)…

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (3 Major), EA Unsmooth/puckering/bubbling (2 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: BA Thread ends (2), DJ Pleat (2), DI High-low/uneven (2), EC Asymmetry (2), CC Skip stitch (1), DK Twisted shoulder strap (1); Both: EI Inaccurate/skewed stitching (2/4), CB Broken stitch (3/2); DHU QC 1st Bundle 75.0% / QA 1st Bundle 60.0%

Caught in earlier stages

CC Skip stitch (42), DK Twisted shoulder strap (19), DI High-low/uneven (17), EB Measurement issue (16), EI Inaccurate/skewed stitching (9) did not reach later stages

Found before bulk production (Shipment Sample): 2

AD Fabric stains, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—60.0%
QC Inline7 reports
required on prod. days 7/28 (25%)
—18.6%
QC Endline14 days—8.1%
QA Inline4 reports438.3%
Shipment Sample1 reports1—
Pre-final1 reports116.8%
Final Random2 reports110.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS198.1%
2000 / 14 days
38.3%PASS
08/31–09/21
BA Thread ends, CC Skip stitch, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1914287 (25%)14709/10, 09/11, 09/16, 09/17, 09/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends234562327
AD Fabric stains42061518
CC Skip stitch15351
ED Gathering crease219273
EC Asymmetry21476
DJ Pleat213511
CB Broken stitch327612
DK Twisted shoulder strap1810
261278 DJLF · CS15 · Due 10/19 · 11d leftShipment Sample No result Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
09/28QC 1st Bundle1 reports
09/29QA 1st Bundle1 reports
18/20QC Inlineactual/required · 90%
DHU 49.6%QC Endline10 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty2,500 / 2,500
PDF reports26
Last report10/08

Cross-stage findings

Not fixed: AD Fabric stains

Found 24 times (518 pcs, 09/28–10/08) in earlier stages; latest Pre-final (10/02) still has 8 major

Not fixed: CG Grinning

Found 6 times (9 pcs, 10/02–10/07) in earlier stages; latest Pre-final (10/02) still has 2 major

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (3 Major), AD Fabric stains (2 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: ED Gathering crease (1), DB Run-off stitching (1), FC Wrong label (1); Both: EC Asymmetry (4/3), EA Unsmooth/puckering/bubbling (2/2), CB Broken stitch (2/1), AC Fabric hole (1/1), DJ Pleat (1/1), GA Missing bartack/button (1/1), DF Twisted seam/skewing (1/1); DHU QC 1st Bundle — / QA 1st Bundle 80.0%

Caught in earlier stages

CC Skip stitch (264), DB Run-off stitching (126), EC Asymmetry (47), CB Broken stitch (46), AC Fabric hole (31) did not reach later stages

Report line differs from production line

QGR2644816 Pre-final (10/02) CS09; actual production line(s) CS15 (cards show production lines only)

Found before bulk production (Shipment Sample): 2

EA Unsmooth/puckering/bubbling, DD Thread not straight/waving: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—80.0%
QC Inline18 reports
required on prod. days 18/20 (90%)
——
QC Endline10 days—49.6%
QA Inline3 reports338.5%
Shipment Sample2 reports1—
Pre-final1 reports18.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1549.6%
2047 / 10 days
38.5%—
09/28–10/08
AD Fabric stains, CC Skip stitch, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS15102018 (90%)1109/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
AD Fabric stains21849178
CC Skip stitch4260
BA Thread ends12437
DB Run-off stitching1111131
EC Asymmetry43337
CB Broken stitch21412
AC Fabric hole111217
ED Gathering crease11915
262056 CIWH · CS08 · Due 10/19 · 11d leftNo final Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
09/28QC 1st Bundle1 reports
09/29QA 1st Bundle1 reports
5/8QC Inlineactual/required · 62%
DHU 5.3%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty1,500 / 1,500
PDF reports9
Last report10/03

Cross-stage findings

Not fixed: ED Gathering crease

Found 11 times (42 pcs, 09/29–10/02) in earlier stages; latest Pre-final (10/03) still has 3 major

QA Inline DHU is 5.3× QC Endline

QA Inline DHU 28.1% vs QC Endline 5.3% (09/29–10/02, 4 days, 2978 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Pre-final (10/03): AD Fabric stains 2 (earlier 4 times)

Main QA defects never recorded by QC Endline: 1

ED Gathering crease (QA 7); zero in QC Endline records

QC Endline data errors: 3

09/29 CS08 262056 (defective pcs 38 > defects 20), 09/30 CS08 262056 (defective pcs 27 > defects 25), 10/02 CS08 262056 (defective pcs 50 > defects 30)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), BA Thread ends (3 Major), BB Missing cut seam allowance (2 Major), ED Gathering crease (2 Major); Only QC 1st Bundle: CB Broken stitch (7), AC Fabric hole (3), DB Run-off stitching (2), CA Thread tension (1); DHU QC 1st Bundle — / QA 1st Bundle 50.0%

Caught in earlier stages

CC Skip stitch (27), CB Broken stitch (21), EA Unsmooth/puckering/bubbling (9), DB Run-off stitching (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—50.0%
QC Inline5 reports
required on prod. days 5/8 (62%)
——
QC Endline4 days—5.3%
QA Inline1 reports128.1%
Pre-final1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS085.3%
2978 / 4 days
28.1%—
09/29–10/02
AD Fabric stains, CC Skip stitch, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS08485 (62%)3009/30, 10/01, 10/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-final
AD Fabric stains21122
ED Gathering crease23643
BA Thread ends33212
CC Skip stitch261
CB Broken stitch7131
EA Unsmooth/puckering/bubbling36
DB Run-off stitching26
DF Twisted seam/skewing31
260347 MKSC · CB06 · Due 10/21 · 13d leftShipment Sample FAIL Latest Shipment Sample (09/23) FAILED
No resultPP Sample1 reports
No reportPilot Run
10/05QC 1st Bundle1 reports
10/06QA 1st Bundle1 reports
4/8QC Inlineactual/required · 50%
DHU 19.2%QC Endline4 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty9,928 / 2,114
PDF reports9
Last report10/08

Cross-stage findings

Latest Shipment Sample (09/23) FAILED

10 major: EA Unsmooth/puckering/bubbling 1, CB Broken stitch 1, CB Broken stitch 1, EA Unsmooth/puckering/bubbling 1, BA Thread ends 1, EA Unsmooth/puckering/bubbling 1, CE Broken seam 1, CE Broken seam 1, DF Twisted seam/skewing 1, CE Broken seam 1

12 defects recorded as 'Others' without detail

PP Sample 5, QA 1st Bundle 1, QA Inline 6; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AB Shading (1 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (2), CE Broken seam (2), CA Thread tension (1); Both: EC Asymmetry (4/2), DB Run-off stitching (1/1); DHU QC 1st Bundle — / QA 1st Bundle 46.2%

Caught in earlier stages

EC Asymmetry (29), ED Gathering crease (29), Q61 Lace raw edge or broken lace (19), DB Run-off stitching (8), CG Grinning (8) did not reach later stages

Found before bulk production (Shipment Sample): 5

EA Unsmooth/puckering/bubbling, CB Broken stitch, BA Thread ends, CE Broken seam, DF Twisted seam/skewing: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—46.2%
QC Inline4 reports
required on prod. days 4/8 (50%)
——
QC Endline4 days—19.2%
QA Inline1 reports150.0%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0619.2%
530 / 4 days
50.0%—
10/05–10/08
ED Gathering crease, CE Broken seam, Q61 Lace raw edge or broken lace

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB06484 (50%)3110/05, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
CE Broken seam228223
EC Asymmetry42194
ED Gathering crease326
Q61 Lace raw edge or broken lace19
Others (no detail)516
EA Unsmooth/puckering/bubbling1613
BA Thread ends101
DB Run-off stitching11132
261514 GECL · CS20 · Due 10/21 · 13d leftShipment Sample No result Not fixed: EA Unsmooth/puckering/bubbling
No reportPP Sample
No reportPilot Run
09/07QC 1st Bundle1 reports
09/08QA 1st Bundle1 reports
40/54QC Inlineactual/required · 74%
DHU 14.5%QC Endline27 days
All FAILQA Inline3 reports
No resultShipment Sample1 reports
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty11,608 / 11,608
PDF reports47
Last report10/08

Cross-stage findings

Not fixed: EA Unsmooth/puckering/bubbling

Found 45 times (109 pcs, 09/07–10/08) in earlier stages; latest Pre-final (09/18) still has 1 major

Not fixed: CB Broken stitch

Found 33 times (51 pcs, 09/07–10/08) in earlier stages; latest Pre-final (09/18) still has 3 major

Not fixed: BA Thread ends

Found 69 times (848 pcs, 09/07–10/08) in earlier stages; latest Pre-final (09/18) still has 6 major

Not fixed: ED Gathering crease

Found 71 times (532 pcs, 09/07–10/08) in earlier stages; latest Pre-final (09/18) still has 6 major

Not fixed: DJ Pleat

Found 25 times (44 pcs, 09/12–10/07) in earlier stages; latest Pre-final (09/18) still has 2 major

Missed in earlier stages: 1

AA Fabric defect (Pre-final 09/18): first found in later stages, never recorded before

Found earlier but still reached later stages: 6

CG Grinning 1, CF Pulling yarn 1, EC Asymmetry 2, CE Broken seam 1, EI Inaccurate/skewed stitching 2, AC Fabric hole 2 pcs (later stages total)

2 defects recorded as 'Others' without detail

QC 1st Bundle 1, Pre-final 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 8); zero in QC Endline records

QC Endline data errors: 1

09/16 CS20 261514 (defective pcs 31 > defects 30)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (3 Major), EC Asymmetry (2 Major), ED Gathering crease (1 Major); Only QC 1st Bundle: DI High-low/uneven (1), DA Exceed seam allowance (1), GB Missing sewing operation (1), CG Grinning (1), CB Broken stitch (1); Both: EA Unsmooth/puckering/bubbling (3/11), BA Thread ends (4/2), CF Pulling yarn (2/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (335), EB Measurement issue (55), DF Twisted seam/skewing (35), DA Exceed seam allowance (34), DB Run-off stitching (19) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—100.0%
QC Inline40 reports
required on prod. days 40/54 (74%)
—75.1%
QC Endline27 days—14.5%
QA Inline3 reports349.0%
Shipment Sample1 reports0—
Pre-final1 reports17.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2014.5%
10623 / 27 days
49.0%—
09/07–10/08
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS20275440 (74%)12209/15, 09/16, 09/17, 09/18, 09/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends42184655316
ED Gathering crease191435526
CC Skip stitch1334
EA Unsmooth/puckering/bubbling31190521
CB Broken stitch148213
EB Measurement issue55
DJ Pleat442
CF Pulling yarn215271
261515 GECL · CS10/CS23 · Due 10/21 · 13d leftShipment Sample No result Not fixed: CG Grinning
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/07QA 1st Bundle1 reports
21/44QC Inlineactual/required · 48%
DHU 16.2%QC Endline21 days
All FAILQA Inline3 reports
No resultShipment Sample4 reports
All PASSPre-final2 reports
No reportFinal Random
Order/Ship qty9,600 / 9,600
PDF reports31
Last report09/28

Cross-stage findings

Not fixed: CG Grinning

Found 3 times (10 pcs, 09/07–09/15) in earlier stages; latest Pre-final (09/21) still has 3 major

Missed in earlier stages: 3

DD Thread not straight/waving (Shipment Sample 09/12), BD Snagging (Pre-final 09/15), FA Wrong material (Pre-final 09/21): first found in later stages, never recorded before

Found earlier but still reached later stages: 9

CB Broken stitch 3, DF Twisted seam/skewing 3, DE Cut to broken 1, EI Inaccurate/skewed stitching 1, EC Asymmetry 3, ED Gathering crease 1, AC Fabric hole 1, CF Pulling yarn 3, BB Missing cut seam allowance 1 pcs (later stages total)

13 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 8, Shipment Sample 1, Pre-final 2; cannot compare across stages

QC Endline data errors: 4

09/07 CS23 261515 (defective pcs 84 > defects 77), 09/08 CS23 261515 (defective pcs 90 > defects 81), 09/09 CS23 261515 (defective pcs 95 > defects 68), 09/10 CS23 261515 (defective pcs 58 > defects 42)

Caught in earlier stages

CC Skip stitch (228), DB Run-off stitching (106), EA Unsmooth/puckering/bubbling (60), CE Broken seam (32), CD Needle hole (27) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline21 reports
required on prod. days 21/44 (48%)
—94.0%
QC Endline21 days—16.2%
QA Inline3 reports358.3%
Shipment Sample4 reports0—
Pre-final2 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1015.4%
8100 / 16 days
53.1%—
09/11–10/06
BA Thread ends, CC Skip stitch, DB Run-off stitching
CS2321.0%
1400 / 6 days
68.8%—
09/05–09/11
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS10163219 (59%)11209/23, 09/26, 09/28, 09/29, 10/06
CS236122 (17%)6409/07, 09/08, 09/09, 09/10, 09/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends12199275
CC Skip stitch9219
ED Gathering crease19901
DB Run-off stitching1888
EA Unsmooth/puckering/bubbling582
CB Broken stitch64043
AC Fabric hole133141
EI Inaccurate/skewed stitching34111
261516 GECL · CS13 · Due 10/21 · 13d leftFinal Random PASS Not fixed: BA Thread ends
No reportPP Sample
No reportPilot Run
09/15QC 1st Bundle1 reports
09/15QA 1st Bundle1 reports
19/28QC Inlineactual/required · 68%
DHU 8.5%QC Endline14 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty9,600 / 9,600
PDF reports25
Last report10/06

Cross-stage findings

Not fixed: BA Thread ends

Found 26 times (500 pcs, 09/15–09/30) in earlier stages; latest Final Random (10/06) still has 3 major

Missed in earlier stages: 1

AD Fabric stains (Pre-final 09/21): first found in later stages, never recorded before

QA Inline DHU is 8.8× QC Endline

QA Inline DHU 75.0% vs QC Endline 8.5% (09/15–10/01, 14 days, 9600 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 1

CF Pulling yarn 4 pcs (later stages total)

128 defects recorded as 'Others' without detail

QC 1st Bundle 10, QA 1st Bundle 2, QC Inline 111, QA Inline 5; cannot compare across stages

QC Endline data errors: 3

09/21 CS13 261516 (defective pcs 78 > defects 73), 09/22 CS13 261516 (defective pcs 84 > defects 81), 09/23 CS13 261516 (defective pcs 86 > defects 85)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (3 Major), BB Missing cut seam allowance (1 Major), AC Fabric hole (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: CB Broken stitch (4), DJ Pleat (3); Both: CE Broken seam (4/1), BA Thread ends (3/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 50.0%

Caught in earlier stages

CC Skip stitch (122), AC Fabric hole (49), CB Broken stitch (48), DB Run-off stitching (38), CE Broken seam (12) did not reach later stages

Found before bulk production (Shipment Sample): 5

EI Inaccurate/skewed stitching, EA Unsmooth/puckering/bubbling, ED Gathering crease, BD Snagging, EC Asymmetry: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—50.0%
QC Inline19 reports
required on prod. days 19/28 (68%)
—0.0%
QC Endline14 days—8.5%
QA Inline1 reports175.0%
Shipment Sample1 reports1—
Pre-final1 reports03.5%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS138.5%
9600 / 14 days
75.0%PASS
09/15–10/01
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS13142819 (68%)7209/22, 09/26, 09/29, 09/30, 10/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends3145449238
ED Gathering crease3251692
Others (no detail)1021115
CC Skip stitch8114
AC Fabric hole1345
CB Broken stitch4413
DB Run-off stitching434
CE Broken seam4143
261545 GECL · CS07/CS13 · Due 10/21 · 13d leftShipment Sample FAIL Latest Shipment Sample (10/03) FAILED
No reportPP Sample
No reportPilot Run
09/25QC 1st Bundle1 reports
09/25QA 1st Bundle1 reports
4/10QC Inlineactual/required · 40%
DHU 10.7%QC Endline5 days
No reportQA Inline
All FAILShipment Sample5 reports3 no result
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty1,130 / 1,130
PDF reports12
Last report10/05

Cross-stage findings

Latest Shipment Sample (10/03) FAILED

10 major: ED Gathering crease 1, CG Grinning 1, CB Broken stitch 1, EC Asymmetry 1, ED Gathering crease 1, EI Inaccurate/skewed stitching 1, DF Twisted seam/skewing 1, AD Fabric stains 1, BB Missing cut seam allowance 1, EI Inaccurate/skewed stitching 1

Missed in earlier stages: 3

CB Broken stitch (Shipment Sample 10/03), BB Missing cut seam allowance (Shipment Sample 10/03), CF Pulling yarn (Pre-final 10/05): first found in later stages, never recorded before

Pre-final DHU is 1.3× QC Endline

Pre-final DHU 13.8% vs QC Endline 10.7% (09/25–10/08, 5 days, 1130 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 1

CG Grinning 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (4 Major), CG Grinning (2 Major); Only QC 1st Bundle: DJ Pleat (2), EC Asymmetry (2); Both: DF Twisted seam/skewing (3/6), AD Fabric stains (3/4), ED Gathering crease (3/4); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Found before bulk production (Shipment Sample): 11

EC Asymmetry, AD Fabric stains, DI High-low/uneven, DD Thread not straight/waving, CE Broken seam, GB Missing sewing operation, FA Wrong material, EI Inaccurate/skewed stitching, EA Unsmooth/puckering/bubbling, DF Twisted seam/skewing, ED Gathering crease: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline4 reports
required on prod. days 4/10 (40%)
——
QC Endline5 days—10.7%
Shipment Sample5 reports2—
Pre-final1 reports113.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0710.8%
1120 / 4 days
——
09/25–09/29
AD Fabric stains, BA Thread ends, DF Twisted seam/skewing
CS130.0%
10 / 1 days
——
10/08–10/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS07484 (50%)2209/25, 09/29
CS13120 (0%)1110/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SamplePre-final
AD Fabric stains3486155
DF Twisted seam/skewing36361635
BA Thread ends242
ED Gathering crease34683
EC Asymmetry2210
GB Missing sewing operation62
CE Broken seam41
EI Inaccurate/skewed stitching4
262151 OSIT · CS06 · Due 10/21 · 13d leftFinal Random PASS Not fixed: EC Asymmetry
No reportPP Sample
No reportPilot Run
09/19QC 1st Bundle1 reports
09/19QA 1st Bundle1 reports
9/18QC Inlineactual/required · 50%
DHU 10.5%QC Endline9 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports1 no result
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty6,200 / 6,200
PDF reports17
Last report10/08

Cross-stage findings

Not fixed: EC Asymmetry

Found 18 times (88 pcs, 09/19–09/25) in earlier stages; latest Final Random (10/08) still has 3 major

Missed in earlier stages: 2

IA 2nd operation issue (Pre-final 09/23), EI Inaccurate/skewed stitching (Shipment Sample 09/28): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (10/08): AD Fabric stains 1 (earlier 4 times), EH Poor lamination/bonding 2 (earlier 4 times)

Found earlier but still reached later stages: 2

CB Broken stitch 1, AB Shading 2 pcs (later stages total)

64 defects recorded as 'Others' without detail

QA 1st Bundle 5, QC Inline 51, QA Inline 8; cannot compare across stages

QC Endline data errors: 2

09/26 CS06 262151 (defective pcs 3 > defects 1), 10/08 CS06 262151 (defective pcs 4 > defects 2)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DE Cut to broken (2 Major), CG Grinning (1 Major); Both: ED Gathering crease (9/1), EC Asymmetry (2/2), CB Broken stitch (1/1); DHU QC 1st Bundle — / QA 1st Bundle 60.0%

Caught in earlier stages

ED Gathering crease (103), DF Twisted seam/skewing (85), EA Uneven seam allowance (44), CC Skip stitch (34), EA Unsmooth/puckering/bubbling (25) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—60.0%
QC Inline9 reports
required on prod. days 9/18 (50%)
—24.0%
QC Endline9 days—10.5%
QA Inline2 reports234.4%
Shipment Sample2 reports1—
Pre-final1 reports04.0%
Final Random1 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0610.5%
5982 / 9 days
34.4%PASS
09/19–10/08
BA Thread ends, ED Gathering crease, DF Twisted seam/skewing

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS069189 (50%)7409/22, 09/26, 09/29, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends1618545
ED Gathering crease916861
EC Asymmetry2224573143
DF Twisted seam/skewing85
Others (no detail)5518
EA Uneven seam allowance44
AB Shading322
CC Skip stitch331
262235 OSIT · CS06/CS09/CS10 · Due 10/21 · 13d leftFinal Random PASS Not fixed: CC Skip stitch
No reportPP Sample
No reportPilot Run
09/22QC 1st Bundle1 reports
09/22QA 1st Bundle1 reports
10/20QC Inlineactual/required · 50%
DHU 12.6%QC Endline7 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty11,900 / 11,900
PDF reports19
Last report10/06

Cross-stage findings

Not fixed: CC Skip stitch

Found 5 times (43 pcs, 09/22–09/29) in earlier stages; latest Final Random (10/06) still has 3 major

Missed in earlier stages: 1

BD Snagging (Pre-final 09/23): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (10/06): ED Gathering crease 2 (earlier 23 times), IA 2nd operation issue 2 (earlier 4 times)

Found earlier but still reached later stages: 3

EC Asymmetry 4, EA Unsmooth/puckering/bubbling 4, CB Broken stitch 2 pcs (later stages total)

QC Endline data errors: 1

09/30 CS09 262235 (defective pcs 3 > defects 1)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (5 Major), DF Twisted seam/skewing (3 Major), BA Thread ends (1 Major); Only QC 1st Bundle: DB Run-off stitching (2), DJ Pleat (1), EI Inaccurate/skewed stitching (1), EC Asymmetry (1); Both: ED Gathering crease (3/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

AB Shading (50), DB Run-off stitching (18), EB Measurement issue (10), EI Inaccurate/skewed stitching (9), DJ Pleat (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline10 reports
required on prod. days 10/20 (50%)
——
QC Endline7 days—12.6%
QA Inline3 reports328.1%
Shipment Sample2 reports1—
Pre-final1 reports15.1%
Final Random1 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0912.4%
11103 / 7 days
28.1%PASS
09/22–09/30
BA Thread ends, ED Gathering crease, EC Asymmetry
CS1026.1%
138 / 1 days
——
09/30–09/30
BA Thread ends
CS060.0%
33 / 2 days
——
09/22–09/26
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0971410 (71%)3109/22, 09/23, 09/30
CS06240 (0%)2209/22, 09/26
CS10120 (0%)1109/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends181110357
ED Gathering crease3151144192
EC Asymmetry1529984
EA Unsmooth/puckering/bubbling54874
AB Shading3911
CC Skip stitch4393
IA 2nd operation issue182
DB Run-off stitching288
261992 RGOR · CP14 · Due 10/09 · 1d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/09QC 1st Bundle1 reports
09/09QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 11.5%QC Endline6 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,110 / 2,110
PDF reports7
Last report09/25

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 09/25): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/25): EC Asymmetry 1 (earlier 11 times), ED Gathering crease 1 (earlier 8 times)

Found earlier but still reached later stages: 2

CC Skip stitch 1, AD Fabric stains 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (3 Major), BA Thread ends (3 Major), ED Gathering crease (2 Major), DE Cut to broken (2 Major), DJ Pleat (2 Major), EI Inaccurate/skewed stitching (1 Major), CE Broken seam (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: CH Incorrect stitch density (4), EA Unsmooth/puckering/bubbling (3), BB Missing cut seam allowance (1); Both: EC Asymmetry (5/4); DHU QC 1st Bundle 65.0% / QA 1st Bundle 95.0%

Caught in earlier stages

EA Unsmooth/puckering/bubbling (55), DJ Pleat (11), EB Measurement issue (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—65.0%
QA 1st Bundle1 reports—95.0%
QC Inline1 reports
required on prod. days 1/12 (8%)
—34.4%
QC Endline6 days—11.5%
QA Inline2 reports235.9%
Final Random2 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1411.5%
3184 / 6 days
35.9%PASS
09/08–09/14
BA Thread ends, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP146121 (8%)6509/09, 09/10, 09/11, 09/12, 09/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends3139312
ED Gathering crease238121
AD Fabric stains6341
EA Unsmooth/puckering/bubbling3511
EC Asymmetry5441351
CC Skip stitch3101
DJ Pleat245
EB Measurement issue6
261994 RGOR · CP14 · Due 10/09 · 1d leftFinal Random PASS QA Inline DHU is 7.0× QC Endline
No reportPP Sample
No reportPilot Run
09/17QC 1st Bundle1 reports
09/17QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 6.3%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,835 / 1,835
PDF reports4
Last report09/25

Cross-stage findings

QA Inline DHU is 7.0× QC Endline

QA Inline DHU 43.8% vs QC Endline 6.3% (09/16–09/19, 4 days, 1891 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 2

Latest Final Random (09/25): EC Asymmetry 1 (earlier 5 times), DJ Pleat 2 (earlier 6 times)

Found earlier but still reached later stages: 1

CB Broken stitch 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 5); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (4 Major), DF Twisted seam/skewing (3 Major), HA Poor pressing (1 Major); Only QC 1st Bundle: EC Asymmetry (7), ED Gathering crease (2), CB Broken stitch (1); Both: DJ Pleat (7/3), BA Thread ends (2/2), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 70.0%

Caught in earlier stages

CC Skip stitch (29), ED Gathering crease (24), EB Measurement issue (22), EA Unsmooth/puckering/bubbling (15) did not reach later stages

Report line differs from production line

QGR2642809 Final Random (09/25) CP10; actual production line(s) CP14 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—70.0%
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—6.3%
QA Inline1 reports143.8%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP146.3%
1891 / 4 days
43.8%—
09/16–09/19
BA Thread ends, CC Skip stitch, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP14480 (0%)4409/16, 09/17, 09/18, 09/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends223915
CC Skip stitch281
ED Gathering crease2193
EB Measurement issue22
EA Unsmooth/puckering/bubbling11121
DJ Pleat7312
EC Asymmetry741
CG Grinning4
261995 RGOR · CP14 · Due 10/09 · 1d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/19QC 1st Bundle1 reports
09/19QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 4.4%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty1,040 / 1,040
PDF reports4
Last report09/25

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 09/25): first found in later stages, never recorded before

QA Inline DHU is 7.8× QC Endline

QA Inline DHU 34.4% vs QC Endline 4.4% (09/19–09/23, 4 days, 1052 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 1

DJ Pleat 2 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (3 Major), BA Thread ends (2 Major), DA Exceed seam allowance (1 Major), EI Inaccurate/skewed stitching (1 Major), EG Wrong panel assembly (1 Major); Only QC 1st Bundle: DJ Pleat (6), CG Grinning (2), DB Run-off stitching (2), DF Twisted seam/skewing (1), DE Cut to broken (1); Both: ED Gathering crease (7/2), EA Unsmooth/puckering/bubbling (4/3); DHU QC 1st Bundle — / QA 1st Bundle 65.0%

Caught in earlier stages

ED Gathering crease (18), EA Unsmooth/puckering/bubbling (15), AC Fabric hole (8), CC Skip stitch (6) did not reach later stages

Report line differs from production line

QGR2642811 Final Random (09/25) CP13; actual production line(s) CP14 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—65.0%
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—4.4%
QA Inline1 reports134.4%
Final Random1 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP144.4%
1052 / 4 days
34.4%—
09/19–09/23
BA Thread ends, AC Fabric hole, EA Unsmooth/puckering/bubbling

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP14480 (0%)4409/19, 09/21, 09/22, 09/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends2174
ED Gathering crease7236
EA Unsmooth/puckering/bubbling438
DJ Pleat62
AC Fabric hole8
CC Skip stitch6
EB Measurement issue4
EC Asymmetry3
261996 RGOR · CP14 · Due 10/09 · 1d leftFinal Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
09/22QC 1st Bundle1 reports
09/22QA 1st Bundle1 reports
0/6QC Inlineactual/required · 0%
DHU 12.0%QC Endline3 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,205 / 1,205
PDF reports5
Last report09/30

Cross-stage findings

Missed in earlier stages: 2

CB Broken stitch (Final Random 09/26), AD Fabric stains (Final Random 09/30): first found in later stages, never recorded before

Found earlier but still reached later stages: 1

EB Measurement issue 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: GA Missing bartack/button (1 Major); Only QC 1st Bundle: DI High-low/uneven (5), DJ Pleat (2), EA Unsmooth/puckering/bubbling (1), DE Cut to broken (1); Both: BA Thread ends (5/1), ED Gathering crease (3/2), CG Grinning (1/4), EI Inaccurate/skewed stitching (1/3), EC Asymmetry (1/1); DHU QC 1st Bundle — / QA 1st Bundle 60.0%

Caught in earlier stages

CC Skip stitch (25), AC Fabric hole (15), ED Gathering crease (10), CG Grinning (8), EA Unsmooth/puckering/bubbling (7) did not reach later stages

Report line differs from production line

QGR2643338 Final Random (09/26) CP11; actual production line(s) CP14 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—60.0%
QC Inline0 reports
required on prod. days 0/6 (0%)
——
QC Endline3 days—12.0%
QA Inline1 reports140.6%
Final Random2 reports02.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1412.0%
1241 / 3 days
40.6%PASS
09/22–09/26
BA Thread ends, EB Measurement issue, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP14360 (0%)3309/22, 09/23, 09/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends5155212
EB Measurement issue441
CC Skip stitch25
AC Fabric hole15
ED Gathering crease3214
CG Grinning143
EA Unsmooth/puckering/bubbling151
DI High-low/uneven5
261222 DJLF · CS17 · Due 10/12 · 4d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/04QC 1st Bundle1 reports
09/03QA 1st Bundle1 reports
3/16QC Inlineactual/required · 19%
DHU 11.5%QC Endline8 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty1,800 / 1,800
PDF reports12
Last report09/18

Cross-stage findings

Missed in earlier stages: 1

FC Wrong label (Shipment Sample 09/07): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/18): CC Skip stitch 1 (earlier 5 times), CB Broken stitch 2 (earlier 4 times)

Found earlier but still reached later stages: 5

AC Fabric hole 1, AD Fabric stains 2, BD Snagging 2, ED Gathering crease 2, DF Twisted seam/skewing 2 pcs (later stages total)

9 defects recorded as 'Others' without detail

QA 1st Bundle 3, Pre-final 5, Final Random 1; cannot compare across stages

QC Endline data errors: 1

09/03 CS17 261222 (defective pcs 34 > defects 33)

QC 1st Bundle vs QA 1st Bundle: 9 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (2 Major), CH Incorrect stitch density (1 Major), CC Skip stitch (1 Major), DE Cut to broken (1 Major), AD Fabric stains (1 Major), AC Fabric hole (1 Major), DG Fastening loose/misplaced (1 Major), GB Missing sewing operation (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: BD Snagging (2); Both: BA Thread ends (4/3), DJ Pleat (5/1), EI Inaccurate/skewed stitching (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 90.0%

Caught in earlier stages

DB Run-off stitching (23), DJ Pleat (17), EI Inaccurate/skewed stitching (12), EC Asymmetry (11), EB Measurement issue (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—90.0%
QC Inline3 reports
required on prod. days 3/16 (19%)
—21.2%
QC Endline8 days—11.5%
QA Inline3 reports329.2%
Shipment Sample2 reports1—
Pre-final1 reports17.2%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1711.5%
1790 / 8 days
29.2%PASS
09/02–09/12
BA Thread ends, ED Gathering crease, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS178163 (19%)8509/05, 09/07, 09/08, 09/09, 09/12

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends43101037128
ED Gathering crease35412
DB Run-off stitching221
DJ Pleat5183
CC Skip stitch1141
EI Inaccurate/skewed stitching2127
EC Asymmetry2315
Others (no detail)3151
261223 DJLF · CS10/CS11 · Due 10/12 · 4d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/26QC 1st Bundle1 reports
08/26QA 1st Bundle1 reports
6/26QC Inlineactual/required · 23%
DHU 16.1%QC Endline12 days
2/3 FAILQA Inline3 reports
All FAILShipment Sample1 reports
All FAILPre-final2 reports
All PASSFinal Random1 reports
Order/Ship qty2,410 / 2,410
PDF reports15
Last report09/08

Cross-stage findings

Missed in earlier stages: 1

GA Missing bartack/button (Pre-final 09/05): first found in later stages, never recorded before

Found earlier but still reached later stages: 3

DJ Pleat 1, CE Broken seam 2, CG Grinning 1 pcs (later stages total)

75 defects recorded as 'Others' without detail

QC 1st Bundle 8, QA 1st Bundle 3, QC Inline 60, QA Inline 4; cannot compare across stages

QC Endline data errors: 3

08/26 CS11 261223-S (defective pcs 14 > defects 12), 09/03 CS11 261223-S (defective pcs 22 > defects 20), 09/05 CS11 261223-S (defective pcs 5 > defects 4)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AC Fabric hole (2 Major), CG Grinning (2 Major), CB Broken stitch (2 Major), CA Thread tension (1 Major), DJ Pleat (1 Major), CE Broken seam (1 Major); Only QC 1st Bundle: BA Thread ends (4); Both: DD Thread not straight/waving (4/2); DHU QC 1st Bundle 0.0% / QA 1st Bundle 70.0%

Caught in earlier stages

EB Measurement issue (13), DD Thread not straight/waving (8), GB Missing sewing operation (8), FC Wrong label (8), EI Inaccurate/skewed stitching (5) did not reach later stages

Found before bulk production (Shipment Sample): 5

CB Broken stitch, DF Twisted seam/skewing, EE Raw edge, CC Skip stitch, ED Gathering crease: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—70.0%
QC Inline6 reports
required on prod. days 6/26 (23%)
—12.2%
QC Endline12 days—16.1%
QA Inline3 reports217.7%
Shipment Sample1 reports1—
Pre-final2 reports215.6%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1116.2%
2390 / 12 days
17.7%PASS
08/26–09/11
CC Skip stitch, BA Thread ends, ED Gathering crease
CS100.0%
10 / 1 days
——
08/29–08/29
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1112246 (25%)12609/04, 09/05, 09/07, 09/08, 09/11
CS10120 (0%)1108/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
CC Skip stitch19011
BA Thread ends4171402178
Others (no detail)83604
ED Gathering crease391152
CB Broken stitch210411
EB Measurement issue13
DJ Pleat1911
DD Thread not straight/waving422
261231 DJLF · CS19/CS24 · Due 10/12 · 4d leftFinal Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
09/04QC 1st Bundle1 reports
09/04QA 1st Bundle1 reports
6/24QC Inlineactual/required · 25%
DHU 17.7%QC Endline11 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,800 / 2,800
PDF reports15
Last report09/17

Cross-stage findings

Missed in earlier stages: 2

CF Pulling yarn (Pre-final 09/10), BD Snagging (Pre-final 09/10): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/17): AD Fabric stains 2 (earlier 18 times), DF Twisted seam/skewing 2 (earlier 7 times)

Found earlier but still reached later stages: 7

CB Broken stitch 1, EA Unsmooth/puckering/bubbling 3, ED Gathering crease 4, EI Inaccurate/skewed stitching 1, DJ Pleat 1, CC Skip stitch 1, DE Cut to broken 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Final Random 1; cannot compare across stages

QC Endline data errors: 1

09/10 CS24 261231 (defective pcs 20 > defects 18)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), CG Grinning (1 Major), CE Broken seam (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: ED Gathering crease (3); Both: AD Fabric stains (6/2), EI Inaccurate/skewed stitching (4/1), EA Unsmooth/puckering/bubbling (2/2), DF Twisted seam/skewing (2/2), CB Broken stitch (3/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 65.0%

Caught in earlier stages

DB Run-off stitching (45), EC Asymmetry (15), BB Missing cut seam allowance (12), CD Needle hole (11), EB Measurement issue (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—65.0%
QC Inline6 reports
required on prod. days 6/24 (25%)
—60.8%
QC Endline11 days—17.7%
QA Inline3 reports331.2%
Shipment Sample2 reports1—
Pre-final1 reports113.6%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2417.8%
2788 / 11 days
31.2%PASS
09/03–09/21
BA Thread ends, CC Skip stitch, AD Fabric stains
CS190.0%
10 / 1 days
——
09/05–09/05
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2411226 (27%)11509/10, 09/11, 09/12, 09/14, 09/21
CS19120 (0%)1109/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends2245478
AD Fabric stains621488322
CC Skip stitch4891
DB Run-off stitching4365
DF Twisted seam/skewing2220122
EI Inaccurate/skewed stitching411461
EA Unsmooth/puckering/bubbling22183
CB Broken stitch31191
261232 DJLF · CS22 · Due 10/12 · 4d leftFinal Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
08/29QC 1st Bundle1 reports
08/28QA 1st Bundle1 reports
8/28QC Inlineactual/required · 29%
DHU 23.4%QC Endline14 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,400 / 2,400
PDF reports16
Last report09/17

Cross-stage findings

Missed in earlier stages: 2

BB Missing cut seam allowance (Pre-final 09/01), CF Pulling yarn (Pre-final 09/01): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/17): ED Gathering crease 2 (earlier 15 times), CB Broken stitch 1 (earlier 13 times), AD Fabric stains 1 (earlier 10 times)

Found earlier but still reached later stages: 5

EC Asymmetry 3, CC Skip stitch 1, DC Join stitching 1, EA Unsmooth/puckering/bubbling 2, AC Fabric hole 2 pcs (later stages total)

7 defects recorded as 'Others' without detail

QC Inline 6, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 5); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), DJ Pleat (1 Major), CG Grinning (1 Major), DF Twisted seam/skewing (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: BA Thread ends (4), DC Join stitching (3), FC Wrong label (2); Both: CC Skip stitch (4/1), DB Run-off stitching (3/1), EC Asymmetry (2/2); DHU QC 1st Bundle 90.0% / QA 1st Bundle 50.0%

Caught in earlier stages

DB Run-off stitching (137), DJ Pleat (30), EB Measurement issue (22), DD Thread not straight/waving (11), CG Grinning (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—90.0%
QA 1st Bundle1 reports—50.0%
QC Inline8 reports
required on prod. days 8/28 (29%)
—30.9%
QC Endline14 days—23.4%
QA Inline2 reports235.9%
Shipment Sample2 reports1—
Pre-final1 reports112.0%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2223.4%
2395 / 14 days
35.9%PASS
08/28–09/15
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2214288 (29%)14609/08, 09/09, 09/10, 09/14, 09/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends452142576
CC Skip stitch4191321
ED Gathering crease26127212
DB Run-off stitching3122111
CB Broken stitch133131
AD Fabric stains92111
DJ Pleat1245
EB Measurement issue22
261276 DJLF · CS02 · Due 10/12 · 4d leftFinal Random PASS QA Inline DHU is 3.3× QC Inline
No resultPP Sample1 reports
No reportPilot Run
09/07QC 1st Bundle1 reports
09/07QA 1st Bundle1 reports
5/14QC Inlineactual/required · 36%
DHU 15.5%QC Endline7 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty2,015 / 2,015
PDF reports13
Last report09/28

Cross-stage findings

QA Inline DHU is 3.3× QC Inline

QA Inline DHU 42.2% vs QC Inline 12.8%; QC Inline may be missing defects

Recurring in small numbers: 3

Latest Final Random (09/28): CB Broken stitch 1 (earlier 5 times), ED Gathering crease 2 (earlier 10 times), AD Fabric stains 2 (earlier 7 times)

Found earlier but still reached later stages: 2

EA Unsmooth/puckering/bubbling 3, CC Skip stitch 1 pcs (later stages total)

9 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 7; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (4 Major), CB Broken stitch (2 Major), CC Skip stitch (1 Major), CE Broken seam (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: DJ Pleat (2); Both: EC Asymmetry (5/3), EA Unsmooth/puckering/bubbling (3/1); DHU QC 1st Bundle 12.5% / QA 1st Bundle 75.0%

Caught in earlier stages

EC Asymmetry (57), DF Twisted seam/skewing (8), CG Grinning (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—12.5%
QA 1st Bundle1 reports—75.0%
QC Inline5 reports
required on prod. days 5/14 (36%)
—12.8%
QC Endline7 days—15.5%
QA Inline2 reports242.2%
Shipment Sample1 reports1—
Final Random2 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0215.5%
2015 / 7 days
42.2%PASS
09/07–09/14
AD Fabric stains, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS027145 (36%)7209/09, 09/10, 09/11, 09/12, 09/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
AD Fabric stains310813
BA Thread ends876510
EC Asymmetry534432
ED Gathering crease46443
CC Skip stitch143521
EA Unsmooth/puckering/bubbling318212
Others (no detail)27
DF Twisted seam/skewing53
261569 DJLF · CS23 · Due 10/12 · 4d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/11QC 1st Bundle1 reports
09/11QA 1st Bundle1 reports
6/18QC Inlineactual/required · 33%
DHU 16.5%QC Endline9 days
All FAILQA Inline2 reports
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,300 / 2,300
PDF reports12
Last report09/19

Cross-stage findings

Missed in earlier stages: 1

CF Pulling yarn (Final Random 09/19): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Final Random (09/19): DB Run-off stitching 1 (earlier 12 times), CB Broken stitch 2 (earlier 6 times), CC Skip stitch 2 (earlier 8 times)

Found earlier but still reached later stages: 2

ED Gathering crease 7, AC Fabric hole 1 pcs (later stages total)

7 defects recorded as 'Others' without detail

QC Inline 4, Pre-final 3; cannot compare across stages

QC Endline data errors: 6

09/12 CS23 261569 (defective pcs 54 > defects 48), 09/15 CS23 261569 (defective pcs 79 > defects 69), 09/16 CS23 261569 (defective pcs 97 > defects 55), 09/17 CS23 261569 (defective pcs 110 > defects 77)…

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (2 Major), DF Twisted seam/skewing (2 Major), EC Asymmetry (2 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: DB Run-off stitching (4), BA Thread ends (4); Both: DJ Pleat (1/1), CB Broken stitch (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 45.0%

Caught in earlier stages

DF Twisted seam/skewing (79), CE Broken seam (27), EC Asymmetry (20), DD Thread not straight/waving (18), DJ Pleat (13) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—45.0%
QC Inline6 reports
required on prod. days 6/18 (33%)
—28.2%
QC Endline9 days—16.5%
QA Inline2 reports228.1%
Pre-final1 reports114.4%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2316.5%
2293 / 9 days
28.1%PASS
09/11–09/21
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS239186 (33%)9309/16, 09/17, 09/18, 09/19, 09/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends42984377
ED Gathering crease56947
CC Skip stitch37612
DF Twisted seam/skewing210616
AC Fabric hole321
DB Run-off stitching417621
CE Broken seam27
EC Asymmetry21062
261129 MKSC · CP02/CP03 · Due 10/14 · 6d leftFinal Random PASS Missed in earlier stages: 4
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/02QA 1st Bundle1 reports
0/32QC Inlineactual/required · 0%
DHU 12.8%QC Endline15 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty6,180 / 3,000
PDF reports9
Last report10/02

Cross-stage findings

Missed in earlier stages: 4

CD Needle hole (Shipment Sample 09/04), EI Inaccurate/skewed stitching (Shipment Sample 09/04), BD Snagging (Final Random 09/08), DJ Pleat (Final Random 09/16): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (10/02): AD Fabric stains 1 (earlier 26 times)

Found earlier but still reached later stages: 6

EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, GA Missing bartack/button 1, ED Gathering crease 4, CB Broken stitch 2, CC Skip stitch 1 pcs (later stages total)

9 defects recorded as 'Others' without detail

QA Inline 8, Final Random 1; cannot compare across stages

Caught in earlier stages

EA Uneven seam allowance (26), EB Measurement issue (12), DB Run-off stitching (6) did not reach later stages

Report line differs from production line

QGR2639216 Final Random (09/08) CP12; actual production line(s) CP02/CP03 (cards show production lines only)

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—55.0%
QC Inline0 reports
required on prod. days 0/32 (0%)
——
QC Endline15 days—12.8%
QA Inline3 reports346.9%
Shipment Sample1 reports1—
Final Random4 reports03.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0212.5%
5556 / 14 days
46.9%PASS
09/02–10/03
EC Asymmetry, ED Gathering crease, AD Fabric stains
CP0315.7%
515 / 2 days
——
10/02–10/03
BA Thread ends, CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0214280 (0%)141409/12, 09/14, 09/15, 09/26, 10/03
CP03240 (0%)2210/02, 10/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineShipment SampleFinal Random
ED Gathering crease217122
EC Asymmetry121261
AD Fabric stains3116414
BA Thread ends19324
CC Skip stitch621
EA Unsmooth/puckering/bubbling531201
EA Uneven seam allowance26
EB Measurement issue12
261448 MKSC · CP07 · Due 10/14 · 6d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/12QC 1st Bundle1 reports
09/12QA 1st Bundle1 reports
1/16QC Inlineactual/required · 6%
DHU 32.2%QC Endline8 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,250 / 750
PDF reports6
Last report10/06

Cross-stage findings

Missed in earlier stages: 1

DB Run-off stitching (Final Random 09/25): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (10/06): EC Asymmetry 1 (earlier 12 times)

Found earlier but still reached later stages: 3

DJ Pleat 1, CB Broken stitch 2, ED Gathering crease 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

Final Random 2; cannot compare across stages

QC Endline data errors: 1

09/14 CP07 261448A (defective pcs 8 > defects 7)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (7 Major), EA Unsmooth/puckering/bubbling (2 Major), DE Cut to broken (1 Major), GB Missing sewing operation (1 Major), DJ Pleat (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: DF Twisted seam/skewing (4), CG Grinning (3); Both: DD Thread not straight/waving (8/6), CE Broken seam (4/1); DHU QC 1st Bundle 95.0% / QA 1st Bundle 100.0%

Caught in earlier stages

BA Thread ends (67), EB Measurement issue (61), CE Broken seam (44), DF Twisted seam/skewing (43), CC Skip stitch (33) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—95.0%
QA 1st Bundle1 reports—100.0%
QC Inline1 reports
required on prod. days 1/16 (6%)
—28.0%
QC Endline8 days—32.2%
QA Inline1 reports121.9%
Final Random2 reports05.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0732.2%
1250 / 8 days
21.9%PASS
09/11–09/28
ED Gathering crease, BA Thread ends, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP078161 (6%)8709/15, 09/16, 09/17, 09/21, 09/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease1131
BA Thread ends67
EB Measurement issue61
EC Asymmetry74411
CE Broken seam413351
DF Twisted seam/skewing4336
CC Skip stitch33
DD Thread not straight/waving863
261459 RTMS · CB29/CB30/CB32… · Due 10/14 · 6d leftFinal Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
09/23QA 1st Bundle1 reports
0/30QC Inlineactual/required · 0%
DHU 12.0%QC Endline12 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty3,500 / 3,500
PDF reports9
Last report10/05

Cross-stage findings

Missed in earlier stages: 1

DB Run-off stitching (Shipment Sample 09/28): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (10/05): AD Fabric stains 2 (earlier 18 times), AC Fabric hole 1 (earlier 4 times)

Found earlier but still reached later stages: 3

CC Skip stitch 2, DD Thread not straight/waving 2, CB Broken stitch 2 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 3; cannot compare across stages

Caught in earlier stages

ED Gathering crease (105), EB Measurement issue (23), CE Broken seam (13), EA Uneven seam allowance (5) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/30 (0%)
——
QC Endline12 days—12.0%
QA Inline3 reports326.0%
Shipment Sample2 reports1—
Pre-final1 reports02.0%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3612.1%
3562 / 12 days
26.0%PASS
09/23–10/07
CC Skip stitch, ED Gathering crease, AD Fabric stains
CB290.0%
10 / 1 days
——
10/05–10/05
—
CB300.0%
10 / 1 days
——
10/07–10/07
—
CB320.0%
10 / 1 days
——
09/25–09/25
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB3612240 (0%)121210/02, 10/03, 10/05, 10/06, 10/07
CB29120 (0%)1110/05
CB30120 (0%)1110/07
CB32120 (0%)1109/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineShipment SamplePre-finalFinal Random
CC Skip stitch12432
ED Gathering crease2985
AD Fabric stains1905222
BA Thread ends16097
EB Measurement issue23
CE Broken seam13
AC Fabric hole71
DD Thread not straight/waving32
261653 RGOR · CS08 · Due 10/16 · 8d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/18QC 1st Bundle1 reports
09/18QA 1st Bundle1 reports
10/16QC Inlineactual/required · 62%
DHU 3.1%QC Endline8 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
1/2 FAILPre-final2 reports
All PASSFinal Random1 reports
Order/Ship qty2,395 / 2,395
PDF reports18
Last report10/01

Cross-stage findings

Missed in earlier stages: 1

EH Poor lamination/bonding (Pre-final 09/26): first found in later stages, never recorded before

QA Inline DHU is 8.1× QC Endline

QA Inline DHU 25.0% vs QC Endline 3.1% (09/18–09/28, 8 days, 2395 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects; Pre-final 5.6%

Recurring in small numbers: 2

Latest Final Random (10/01): ED Gathering crease 1 (earlier 5 times), CC Skip stitch 1 (earlier 10 times)

Found earlier but still reached later stages: 5

CG Grinning 1, EC Asymmetry 5, AD Fabric stains 4, EI Inaccurate/skewed stitching 2, CE Broken seam 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

QC Endline data errors: 8

09/18 CS08 261653 (defective pcs 8 > defects 4), 09/19 CS08 261653 (defective pcs 13 > defects 9), 09/21 CS08 261653 (defective pcs 24 > defects 12), 09/22 CS08 261653 (defective pcs 14 > defects 9)…

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (4 Major), BA Thread ends (1 Major), AD Fabric stains (1 Major), GC Missing pocket/label (1 Major), EI Inaccurate/skewed stitching (1 Major), EG Wrong panel assembly (1 Major), DI High-low/uneven (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), FB Material defect (3), CA Thread tension (2), CG Grinning (2), FC Wrong label (1); Both: EC Asymmetry (2/2); DHU QC 1st Bundle — / QA 1st Bundle 65.0%

Caught in earlier stages

CB Broken stitch (41), FB Material defect (5), EG Wrong panel assembly (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—65.0%
QC Inline10 reports
required on prod. days 10/16 (62%)
——
QC Endline8 days—3.1%
QA Inline2 reports225.0%
Shipment Sample1 reports1—
Pre-final2 reports15.6%
Final Random1 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS083.1%
2395 / 8 days
25.0%PASS
09/18–09/28
BA Thread ends, CC Skip stitch, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0881610 (62%)5109/18, 09/19, 09/21, 09/22, 09/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends14422114
CB Broken stitch1391
CC Skip stitch326111
EA Unsmooth/puckering/bubbling3152131
ED Gathering crease41011
EC Asymmetry22114
AD Fabric stains124
FB Material defect32
261230 DJLF · CS24 · Due 10/19 · 11d leftFinal Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
09/14QC 1st Bundle1 reports
09/14QA 1st Bundle1 reports
5/24QC Inlineactual/required · 21%
DHU 11.3%QC Endline12 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,500 / 2,500
PDF reports13
Last report10/03

Cross-stage findings

Missed in earlier stages: 2

BC Sticker left (Pre-final 09/17), IA 2nd operation issue (Pre-final 09/17): first found in later stages, never recorded before

Recurring in small numbers: 4

Latest Final Random (10/03): EC Asymmetry 1 (earlier 12 times), ED Gathering crease 1 (earlier 5 times), AD Fabric stains 2 (earlier 13 times), CC Skip stitch 1 (earlier 9 times)

Found earlier but still reached later stages: 4

EI Inaccurate/skewed stitching 1, CB Broken stitch 1, DF Twisted seam/skewing 5, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 2

EC Asymmetry (QA 14), DF Twisted seam/skewing (QA 7); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), ED Gathering crease (1 Major); Only QC 1st Bundle: DJ Pleat (2), CE Broken seam (2); Both: EC Asymmetry (6/2), EI Inaccurate/skewed stitching (3/2), CB Broken stitch (3/2); DHU QC 1st Bundle 80.0% / QA 1st Bundle 45.0%

Caught in earlier stages

DB Run-off stitching (29), DJ Pleat (10), CE Broken seam (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—80.0%
QA 1st Bundle1 reports—45.0%
QC Inline5 reports
required on prod. days 5/24 (21%)
—82.9%
QC Endline12 days—11.3%
QA Inline2 reports231.2%
Shipment Sample2 reports1—
Pre-final1 reports17.5%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2411.3%
2499 / 12 days
31.2%PASS
09/12–10/02
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2412245 (21%)12709/21, 09/22, 09/25, 09/29, 10/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends174396
CC Skip stitch3671
AD Fabric stains161932
EC Asymmetry62154181
DB Run-off stitching821
CB Broken stitch321921
DF Twisted seam/skewing1925
EI Inaccurate/skewed stitching32111
261487 CHTE · CS22/CS23 · Due 10/19 · 11d leftShipment Sample No result Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
10/01QC 1st Bundle1 reports
10/01QA 1st Bundle1 reports
7/14QC Inlineactual/required · 50%
DHU 24.3%QC Endline6 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports1 no result
All PASSPre-final2 reports
No reportFinal Random
Order/Ship qty1,726 / 1,726
PDF reports14
Last report10/07

Cross-stage findings

Missed in earlier stages: 2

IA 2nd operation issue (Pre-final 10/05), DJ Pleat (Pre-final 10/05): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Pre-final (10/07): CB Broken stitch 1 (earlier 22 times), EC Asymmetry 1 (earlier 4 times)

Found earlier but still reached later stages: 2

CF Pulling yarn 5, EI Inaccurate/skewed stitching 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

CF Pulling yarn (QA 7); zero in QC Endline records

Duplicate report numbers

QGR2645198 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), AA Fabric defect (2 Major), CF Pulling yarn (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (1), DD Thread not straight/waving (1); Both: EC Asymmetry (1/3), CB Broken stitch (2/1), DI High-low/uneven (1/1), DB Run-off stitching (1/1); DHU QC 1st Bundle — / QA 1st Bundle 60.0%

Caught in earlier stages

DB Run-off stitching (94), CC Skip stitch (92), ED Gathering crease (87), DI High-low/uneven (11), AA Fabric defect (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—60.0%
QC Inline7 reports
required on prod. days 7/14 (50%)
——
QC Endline6 days—24.3%
QA Inline1 reports125.0%
Shipment Sample2 reports1—
Pre-final2 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2224.5%
1641 / 6 days
25.0%—
10/01–10/07
BA Thread ends, CC Skip stitch, ED Gathering crease
CS230.0%
11 / 1 days
——
10/05–10/05
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS226127 (58%)3210/01, 10/06, 10/07
CS23120 (0%)1110/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends1130210
DB Run-off stitching118822
CC Skip stitch92
ED Gathering crease87
CB Broken stitch213812
DI High-low/uneven119
CF Pulling yarn1214
AA Fabric defect26
261488 CHTE · CS22 · Due 10/19 · 11d leftShipment Sample No result Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
09/28QC 1st Bundle1 reports
09/28QA 1st Bundle1 reports
4/10QC Inlineactual/required · 40%
DHU 21.4%QC Endline5 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports1 no result
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty1,069 / 1,069
PDF reports10
Last report10/02

Cross-stage findings

Missed in earlier stages: 2

DJ Pleat (Pre-final 10/02), AC Fabric hole (Pre-final 10/02): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Pre-final (10/02): CB Broken stitch 1 (earlier 12 times)

Found earlier but still reached later stages: 2

CF Pulling yarn 2, ED Gathering crease 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

CF Pulling yarn (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (1 Major), CF Pulling yarn (1 Major), FB Material defect (1 Major); Both: DE Cut to broken (2/3), DI High-low/uneven (2/1), CB Broken stitch (1/2), DB Run-off stitching (1/1), EC Asymmetry (1/1); DHU QC 1st Bundle — / QA 1st Bundle 55.0%

Caught in earlier stages

CC Skip stitch (60), DB Run-off stitching (53), EC Asymmetry (7), DI High-low/uneven (6), DE Cut to broken (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—55.0%
QC Inline4 reports
required on prod. days 4/10 (40%)
——
QC Endline5 days—21.4%
QA Inline1 reports128.1%
Shipment Sample2 reports1—
Pre-final1 reports06.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2221.4%
1050 / 5 days
28.1%—
09/26–10/01
CC Skip stitch, ED Gathering crease, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS225104 (40%)3309/26, 09/28, 10/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends105524
CC Skip stitch456
ED Gathering crease562
DB Run-off stitching1151
CB Broken stitch121321
EC Asymmetry1141
DI High-low/uneven2121
DE Cut to broken231
261493 CHTE · CS19 · Due 10/19 · 11d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/10–09/11QC 1st Bundle2 reports
09/11QA 1st Bundle1 reports
8/24QC Inlineactual/required · 33%
DHU 10.8%QC Endline12 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
1/2 FAILPre-final2 reports
All PASSFinal Random1 reports
Order/Ship qty2,651 / 2,651
PDF reports19
Last report10/05

Cross-stage findings

Missed in earlier stages: 1

CF Pulling yarn (Shipment Sample 09/21): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (10/05): AD Fabric stains 2 (earlier 9 times), DF Twisted seam/skewing 2 (earlier 3 times)

Found earlier but still reached later stages: 7

CC Skip stitch 1, CB Broken stitch 2, BB Missing cut seam allowance 1, ED Gathering crease 4, CG Grinning 1, BD Snagging 1, AC Fabric hole 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

DF Twisted seam/skewing (QA 10); zero in QC Endline records

QC Endline data errors: 1

09/19 CS19 261493 (defective pcs 33 > defects 32)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CH Incorrect stitch density (1 Major), DF Twisted seam/skewing (1 Major), ED Gathering crease (1 Major), BB Missing cut seam allowance (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: BA Thread ends (2), BC Sticker left (2), CC Skip stitch (1), DD Thread not straight/waving (1), GA Missing bartack/button (1), CB Broken stitch (1); Both: EC Asymmetry (7/2), AD Fabric stains (1/2), DI High-low/uneven (1/1), CE Broken seam (1/1); DHU QC 1st Bundle 45.0% / QA 1st Bundle 55.0%

Caught in earlier stages

EC Asymmetry (53), DB Run-off stitching (45), EB Measurement issue (17), DD Thread not straight/waving (14), DI High-low/uneven (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—45.0%
QA 1st Bundle1 reports—55.0%
QC Inline8 reports
required on prod. days 8/24 (33%)
—28.3%
QC Endline12 days—10.8%
QA Inline3 reports331.2%
Shipment Sample2 reports1—
Pre-final2 reports15.9%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1910.8%
2651 / 12 days
31.2%PASS
09/11–09/26
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1912248 (33%)11509/18, 09/19, 09/22, 09/25, 09/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends2461234196
CC Skip stitch196431
EC Asymmetry723644
DB Run-off stitching14382
AD Fabric stains12325322
EB Measurement issue17
CB Broken stitch1752
DD Thread not straight/waving113
261513 GECL · CS16/CS17/CS27 · Due 10/21 · 13d leftFinal Random PASS 1 later-stage PDF report(s) blank
No reportPP Sample
No reportPilot Run
09/03QC 1st Bundle1 reports
09/03QA 1st Bundle1 reports
44/90QC Inlineactual/required · 49%
DHU 8.6%QC Endline26 days
All FAILQA Inline4 reports
No resultShipment Sample1 reports
All FAILPre-final1 reports
1/3 FAILFinal Random3 reports
Order/Ship qty14,060 / 8,960
PDF reports56
Last report10/06

Cross-stage findings

1 later-stage PDF report(s) blank

Final Random 09/16 QGR2640953 (FAIL); please check if the report was completed

QA Inline DHU is 6.4× QC Endline

QA Inline DHU 54.7% vs QC Endline 8.6% (09/02–10/03, 26 days, 14080 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects; Pre-final 32.0%

Recurring in small numbers: 4

Latest Final Random (10/06): CB Broken stitch 1 (earlier 34 times), AC Fabric hole 1 (earlier 12 times), CE Broken seam 1 (earlier 6 times), CF Pulling yarn 1 (earlier 4 times)

Found earlier but still reached later stages: 11

DJ Pleat 3, ED Gathering crease 3, DD Thread not straight/waving 3, EA Unsmooth/puckering/bubbling 6, DF Twisted seam/skewing 1, EC Asymmetry 2, GA Missing bartack/button 1, CG Grinning 4, CC Skip stitch 2, AA Fabric defect 1, BD Snagging 2 pcs (later stages total)

12 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 7, Final Random 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 18); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (8 Major), EA Unsmooth/puckering/bubbling (6 Major), EC Asymmetry (2 Major), DA Exceed seam allowance (2 Major); Only QC 1st Bundle: CB Broken stitch (6), DB Run-off stitching (3), DD Thread not straight/waving (2), ED Gathering crease (2), EI Inaccurate/skewed stitching (1), DJ Pleat (1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 100.0%

Caught in earlier stages

DB Run-off stitching (92), DA Exceed seam allowance (29), DI High-low/uneven (19), DE Cut to broken (15), CA Thread tension (15) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—100.0%
QC Inline45 reports
required on prod. days 44/90 (49%)
—42.4%
QC Endline26 days—8.6%
QA Inline4 reports454.7%
Shipment Sample1 reports0—
Pre-final1 reports132.0%
Final Random3 reports12.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS166.4%
7225 / 26 days
57.8%PASS
09/02–10/03
BA Thread ends, ED Gathering crease, CC Skip stitch
CS2710.8%
6695 / 18 days
51.6%PASS
09/08–09/29
BA Thread ends, ED Gathering crease, CC Skip stitch
CS1716.9%
160 / 1 days
——
09/08–09/08
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS16265224 (46%)21709/23, 09/29, 09/30, 10/02, 10/03
CS27183620 (56%)14209/18, 09/19, 09/26, 09/28, 09/29
CS17120 (0%)1109/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends145588839
ED Gathering crease2103294912
CC Skip stitch14263111
EA Unsmooth/puckering/bubbling68383132
DB Run-off stitching36425
CG Grinning611213
CB Broken stitch66032
DJ Pleat16133
261517 GECL · CP19/CS07 · Due 10/21 · 13d leftShipment Sample No result Missed in earlier stages: 10
No reportPP Sample
No reportPilot Run
09/10–10/07QC 1st Bundle2 reports
09/11–10/07QA 1st Bundle2 reports
3/20QC Inlineactual/required · 15%
DHU 11.9%QC Endline10 days
No reportQA Inline
All FAILShipment Sample6 reports5 no result
All PASSPre-final2 reports
No reportFinal Random
Order/Ship qty1,040 / 1,040
PDF reports15
Last report10/07

Cross-stage findings

Missed in earlier stages: 10

FA Wrong material (Shipment Sample 09/14), EC Asymmetry (Shipment Sample 09/14), EG Wrong panel assembly (Shipment Sample 09/14), DD Thread not straight/waving (Shipment Sample 09/14), CE Broken seam (Shipment Sample 09/14), CF Pulling yarn (Shipment Sample 09/14), EB Measurement issue (Shipment Sample 09/14), BD Snagging (Pre-final 09/16), CG Grinning (Shipment Sample 09/16), EA Unsmooth/puckering/bubbling (Shipment Sample 09/16): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Pre-final (09/22): ED Gathering crease 2 (earlier 10 times)

Found earlier but still reached later stages: 4

CB Broken stitch 3, EI Inaccurate/skewed stitching 2, DF Twisted seam/skewing 1, AD Fabric stains 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

QC Endline data errors: 5

09/11 CS07 261517-1 (defective pcs 23 > defects 22), 09/14 CS07 261517-1 (defective pcs 11 > defects 10), 09/15 CS07 261517-1 (defective pcs 33 > defects 21), 09/16 CS07 261517-1 (defective pcs 2 > defects 1)…

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CE Broken seam (6 Major), CG Grinning (2 Major), BD Snagging (1 Major), CC Skip stitch (1 Major), EI Inaccurate/skewed stitching (1 Major), BB Missing cut seam allowance (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: AB Shading (3), DB Run-off stitching (2), EC Asymmetry (1); Both: BA Thread ends (6/2), BC Sticker left (6/2), ED Gathering crease (1/4), DD Thread not straight/waving (3/1), DF Twisted seam/skewing (1/3); DHU QC 1st Bundle 176.9% / QA 1st Bundle 70.0%

Caught in earlier stages

CC Skip stitch (37), GB Missing sewing operation (18), BC Sticker left (13), DB Run-off stitching (8), HA Poor pressing (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—176.9%
QA 1st Bundle2 reports—70.0%
QC Inline3 reports
required on prod. days 3/20 (15%)
—15.0%
QC Endline10 days—11.9%
Shipment Sample6 reports1—
Pre-final2 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS077.2%
1030 / 8 days
——
09/10–09/21
BA Thread ends, CC Skip stitch, ED Gathering crease
CP1938.4%
185 / 2 days
——
10/07–10/08
CC Skip stitch, GB Missing sewing operation, DD Thread not straight/waving

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS078163 (19%)8509/14, 09/15, 09/16, 09/19, 09/21
CP19240 (0%)2210/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SamplePre-final
BA Thread ends623514
CC Skip stitch136
ED Gathering crease1461224
GB Missing sewing operation513
DD Thread not straight/waving31112
CE Broken seam654
BC Sticker left625
DF Twisted seam/skewing13611
262165 OSIT · CS09 · Due 10/21 · 13d leftFinal Random PASS Missed in earlier stages: 5
No reportPP Sample
No reportPilot Run
09/21QC 1st Bundle1 reports
09/21QA 1st Bundle1 reports
1/4QC Inlineactual/required · 25%
DHU 7.4%QC Endline2 days
No reportQA Inline
No resultShipment Sample2 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports7
Last report10/06

Cross-stage findings

Missed in earlier stages: 5

EI Inaccurate/skewed stitching (Shipment Sample 09/22), AD Fabric stains (Pre-final 09/23), HA Poor pressing (Pre-final 09/23), DJ Pleat (Final Random 10/06), IA 2nd operation issue (Final Random 10/06): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Final Random (10/06): EC Asymmetry 1 (earlier 4 times)

Found earlier but still reached later stages: 3

DF Twisted seam/skewing 1, CB Broken stitch 3, CC Skip stitch 2 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA 1st Bundle 4, Pre-final 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (2 Major), BA Thread ends (1 Major); Only QC 1st Bundle: DF Twisted seam/skewing (2), EC Asymmetry (2); Both: ED Gathering crease (2/3), CB Broken stitch (1/2); DHU QC 1st Bundle — / QA 1st Bundle 60.0%

Caught in earlier stages

DB Run-off stitching (14), ED Gathering crease (12) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—60.0%
QC Inline1 reports
required on prod. days 1/4 (25%)
——
QC Endline2 days—7.4%
Shipment Sample2 reports0—
Pre-final1 reports14.8%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS097.4%
2003 / 2 days
—PASS
09/21–09/22
BA Thread ends, EC Asymmetry, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS09241 (25%)2109/21, 09/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment SamplePre-finalFinal Random
BA Thread ends186115
EC Asymmetry24361
DB Run-off stitching311
CC Skip stitch1211
ED Gathering crease2361
CB Broken stitch1221
DF Twisted seam/skewing221
Others (no detail)41
261993 RGOR · CP14 · Due 10/09 · 1d leftFinal Random PASS No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
09/14QC 1st Bundle1 reports
09/14QA 1st Bundle1 reports
0/8QC Inlineactual/required · 0%
DHU 8.0%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,660 / 1,660
PDF reports5
Last report09/25

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (09/25): DE Cut to broken 1 (earlier 4 times), AD Fabric stains 1 (earlier 3 times)

Found earlier but still reached later stages: 2

CB Broken stitch 2, DJ Pleat 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 10 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (4 Major), DJ Pleat (2 Major), DF Twisted seam/skewing (2 Major), BA Thread ends (1 Major), CD Needle hole (1 Major), AD Fabric stains (1 Major), EI Inaccurate/skewed stitching (1 Major), GA Missing bartack/button (1 Major), CG Grinning (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: DG Fastening loose/misplaced (5), DA Exceed seam allowance (3), CB Broken stitch (1); Both: ED Gathering crease (6/2), CC Skip stitch (4/1), DE Cut to broken (1/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (51), EC Asymmetry (16), CC Skip stitch (15), EB Measurement issue (13), EI Inaccurate/skewed stitching (6) did not reach later stages

Report line differs from production line

QGR2642807 Final Random (09/25) CP06; actual production line(s) CP14 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/8 (0%)
——
QC Endline4 days—8.0%
QA Inline1 reports131.2%
Final Random2 reports03.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP148.0%
2692 / 4 days
31.2%PASS
09/14–09/17
BA Thread ends, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP14480 (0%)4409/14, 09/15, 09/16, 09/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends1968
ED Gathering crease6243
AD Fabric stains1403
EC Asymmetry493
CC Skip stitch4110
EB Measurement issue13
DE Cut to broken1221
EI Inaccurate/skewed stitching15
261124 MKSC · CB05/CB06/CB08… · Due 10/14 · 6d leftFinal Random PASS No major issue (5 minor notes)
No reportPP Sample
No resultPilot Run6 reports
09/07QC 1st Bundle1 reports
09/07QA 1st Bundle1 reports
33/68QC Inlineactual/required · 49%
DHU 14.4%QC Endline27 days
All FAILQA Inline6 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty9,644 / 2,000
PDF reports50
Last report10/07

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (10/07): EA Unsmooth/puckering/bubbling 1 (earlier 33 times), ED Gathering crease 1 (earlier 105 times), AD Fabric stains 1 (earlier 50 times)

Found earlier but still reached later stages: 3

AC Fabric hole 1, CB Broken stitch 1, DJ Pleat 1 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 3, Pilot Run 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 14); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: AD Fabric stains (2), CE Broken seam (2), DJ Pleat (1), CB Broken stitch (1); Both: EA Unsmooth/puckering/bubbling (1/4), EC Asymmetry (4/1), DD Thread not straight/waving (4/1), CG Grinning (2/1); DHU QC 1st Bundle 130.8% / QA 1st Bundle 76.9%

Caught in earlier stages

EC Asymmetry (153), CC Skip stitch (120), CE Broken seam (98), DD Thread not straight/waving (35), DB Run-off stitching (33) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run6 reports0—
QC 1st Bundle1 reports—130.8%
QA 1st Bundle1 reports—76.9%
QC Inline33 reports
required on prod. days 33/68 (49%)
—58.8%
QC Endline27 days—14.4%
QA Inline6 reports624.5%
Final Random3 reports02.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0615.2%
7956 / 25 days
25.0%PASS
09/07–10/07
ED Gathering crease, BA Thread ends, AD Fabric stains
CB1610.3%
1480 / 6 days
21.9%—
10/02–10/08
ED Gathering crease, BA Thread ends, AD Fabric stains
CB300.0%
20 / 2 days
——
09/17–09/30
—
CB050.0%
10 / 1 days
——
09/14–09/14
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB06255025 (50%)19610/01, 10/02, 10/03, 10/05, 10/07
CB166128 (67%)2210/07, 10/08
CB30240 (0%)2209/17, 09/30
CB05120 (0%)1109/14

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease9118548533
AD Fabric stains25022742
BA Thread ends325837
EC Asymmetry3412510911
CC Skip stitch3882
CE Broken seam221732
EA Unsmooth/puckering/bubbling21452113
DD Thread not straight/waving4117121
261177 MKSC · CB22 · Due 10/14 · 6d leftFinal Random PASS No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
08/12QC 1st Bundle1 reports
08/11QA 1st Bundle1 reports
3/22QC Inlineactual/required · 14%
DHU 17.1%QC Endline11 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,310 / 1,060
PDF reports8
Last report08/31

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (08/31): BA Thread ends 1 (earlier 12 times), ED Gathering crease 1 (earlier 8 times)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (4 Major), CB Broken stitch (1 Major), DE Cut to broken (1 Major); Only QC 1st Bundle: CC Skip stitch (2), ED Gathering crease (2), CE Broken seam (2), BA Thread ends (2); Both: EC Asymmetry (3/1), BB Missing cut seam allowance (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 61.5%

Caught in earlier stages

EC Asymmetry (133), CC Skip stitch (28), CG Grinning (8), CE Broken seam (7), CB Broken stitch (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—61.5%
QC Inline3 reports
required on prod. days 3/22 (14%)
—42.7%
QC Endline11 days—17.1%
QA Inline2 reports223.4%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2217.1%
2310 / 11 days
23.4%PASS
08/11–08/25
BA Thread ends, EC Asymmetry, Others (no detail)

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2211223 (14%)11808/18, 08/19, 08/20, 08/22, 08/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends231663
EC Asymmetry3181201
ED Gathering crease294021
Others (no detail)49
CC Skip stitch25201
CG Grinning44
CE Broken seam241
CB Broken stitch122
261362 MKSC · CB04/CB05/CB17 · Due 10/14 · 6d leftFinal Random PASS No major issue (5 minor notes)
No reportPP Sample
No resultPilot Run2 reports
09/17QC 1st Bundle1 reports
09/17QA 1st Bundle1 reports
4/10QC Inlineactual/required · 40%
DHU 16.9%QC Endline5 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,000 / 0
PDF reports12
Last report10/02

Cross-stage findings

2 defects recorded as 'Others' without detail

Final Random 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records

QC Endline data errors: 1

09/18 CB17 261362-L (defective pcs 37 > defects 36)

Duplicate report numbers

QGR2643971 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (1 Major), FA Wrong material (1 Major), EA Unsmooth/puckering/bubbling (1 Major), DC Join stitching (1 Major), DJ Pleat (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (2), CA Thread tension (2); Both: EC Asymmetry (4/4), CC Skip stitch (1/2), CE Broken seam (1/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (41), DB Run-off stitching (18), AD Fabric stains (11), CG Grinning (10), DA Exceed seam allowance (9) did not reach later stages

Found before bulk production (Shipment Sample): 6

DI High-low/uneven, EA Unsmooth/puckering/bubbling, EC Asymmetry, CE Broken seam, ED Gathering crease, BB Missing cut seam allowance: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—100.0%
QC Inline4 reports
required on prod. days 4/10 (40%)
—35.0%
QC Endline5 days—16.9%
QA Inline1 reports146.9%
Shipment Sample1 reports1—
Final Random2 reports05.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1716.9%
1000 / 5 days
—PASS
09/16–09/21
EC Asymmetry, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB175104 (40%)4209/16, 09/17, 09/19, 09/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
EC Asymmetry344313522
ED Gathering crease231414
CC Skip stitch12335
BA Thread ends16182
CE Broken seam11191
DB Run-off stitching18
AD Fabric stains65
CG Grinning181
261504 LOGE · CP04/CP05 · Due 10/14 · 6d leftFinal Random PASS No major issue (4 minor notes)
No resultPP Sample1 reports
No reportPilot Run
09/17QC 1st Bundle1 reports
09/17QA 1st Bundle1 reports
1/14QC Inlineactual/required · 7%
DHU 8.4%QC Endline6 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports7
Last report09/29

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (09/29): AD Fabric stains 2 (earlier 10 times), CB Broken stitch 2 (earlier 4 times), CE Broken seam 1 (earlier 4 times)

Found earlier but still reached later stages: 2

EC Asymmetry 3, EI Inaccurate/skewed stitching 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (4 Major), DA Exceed seam allowance (3 Major), CC Skip stitch (1 Major), DE Cut to broken (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (1); Both: EC Asymmetry (6/1), BA Thread ends (3/2), AD Fabric stains (3/2), ED Gathering crease (3/1), CE Broken seam (2/2), CB Broken stitch (2/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (37), CC Skip stitch (35), EA Unsmooth/puckering/bubbling (12), AC Fabric hole (8) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—100.0%
QC Inline1 reports
required on prod. days 1/14 (7%)
—48.0%
QC Endline6 days—8.4%
QA Inline1 reports137.5%
Shipment Sample1 reports1—
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP058.5%
1940 / 6 days
37.5%PASS
09/17–09/25
AD Fabric stains, BA Thread ends, ED Gathering crease
CP040.0%
20 / 1 days
——
09/23–09/23
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP056121 (8%)6509/18, 09/19, 09/21, 09/23, 09/25
CP04120 (0%)1109/23

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
AD Fabric stains232104932
BA Thread ends324027
ED Gathering crease1312273
CC Skip stitch1826
EC Asymmetry16133
EA Unsmooth/puckering/bubbling111
CB Broken stitch22212
CE Broken seam22211
261489 CHTE · CP15/CS15 · Due 10/19 · 11d leftFinal Random PASS No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
09/12QC 1st Bundle1 reports
09/12QA 1st Bundle2 reports
14/32QC Inlineactual/required · 44%
DHU 14.7%QC Endline16 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,607 / 2,607
PDF reports23
Last report10/02

Cross-stage findings

Recurring in small numbers: 4

Latest Final Random (10/02): ED Gathering crease 1 (earlier 21 times), CB Broken stitch 1 (earlier 28 times), CF Pulling yarn 1 (earlier 7 times), EI Inaccurate/skewed stitching 1 (earlier 4 times)

Found earlier but still reached later stages: 4

DJ Pleat 4, CC Skip stitch 3, AD Fabric stains 2, DF Twisted seam/skewing 1 pcs (later stages total)

Duplicate report numbers

QGR2640248 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DI High-low/uneven (2 Major), BA Thread ends (2 Major), CF Pulling yarn (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), EC Asymmetry (3), ED Gathering crease (2), AC Fabric hole (2), DJ Pleat (2), BD Snagging (1), DB Run-off stitching (1); Both: CB Broken stitch (3/1), DD Thread not straight/waving (2/1); DHU QC 1st Bundle 95.0% / QA 1st Bundle 20.0%

Caught in earlier stages

DB Run-off stitching (30), DI High-low/uneven (22), CA Thread tension (16), BC Sticker left (12), EC Asymmetry (11) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—95.0%
QA 1st Bundle2 reports—20.0%
QC Inline14 reports
required on prod. days 14/32 (44%)
—57.6%
QC Endline16 days—14.7%
QA Inline2 reports253.1%
Shipment Sample2 reports1—
Pre-final1 reports111.2%
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1514.7%
2559 / 16 days
50.0%PASS
09/11–10/03
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS15163214 (44%)12609/19, 09/21, 09/28, 09/29, 10/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends221756115
CC Skip stitch48712
ED Gathering crease21362561
CB Broken stitch3146221
DJ Pleat22814
DB Run-off stitching11415
AD Fabric stains4192
CF Pulling yarn112711
262055 CIWH · CS08 · Due 10/19 · 11d leftNo final No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
10/02QC 1st Bundle1 reports
10/02QA 1st Bundle1 reports
6/10QC Inlineactual/required · 60%
DHU 5.6%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,250 / 1,250
PDF reports8
Last report10/06

Cross-stage findings

4 defects recorded as 'Others' without detail

QA 1st Bundle 4; cannot compare across stages

QC Endline data errors: 1

10/06 CS08 262055 (defective pcs 21 > defects 12)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (1 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: CA Thread tension (3), AD Fabric stains (2), BB Missing cut seam allowance (2); Both: EC Asymmetry (4/1), CB Broken stitch (2/1); DHU QC 1st Bundle — / QA 1st Bundle 50.0%

Caught in earlier stages

AD Fabric stains (99), BA Thread ends (48), CC Skip stitch (24), CB Broken stitch (18), DF Twisted seam/skewing (12) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—50.0%
QC Inline6 reports
required on prod. days 6/10 (60%)
——
QC Endline5 days—5.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS085.6%
2748 / 5 days
——
10/02–10/07
AD Fabric stains, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS085106 (60%)2210/02, 10/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC Endline
AD Fabric stains21087
BA Thread ends1542
CC Skip stitch24
CB Broken stitch2115
DF Twisted seam/skewing111
ED Gathering crease19
EC Asymmetry413
BB Missing cut seam allowance23
260349 MKSC · CP01/CP08 · Due 10/21 · 13d leftNo final No major issue (1 minor notes)
No reportPP Sample
No resultPilot Run2 reports
No reportQC 1st Bundle
09/28QA 1st Bundle1 reports
0/16QC Inlineactual/required · 0%
DHU 34.5%QC Endline8 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty5,473 / 3,973
PDF reports4
Last report09/29

Cross-stage findings

8 defects recorded as 'Others' without detail

QA 1st Bundle 4, QA Inline 4; cannot compare across stages

Caught in earlier stages

ED Gathering crease (367), BA Thread ends (260), EC Asymmetry (184), EA Unsmooth/puckering/bubbling (114), CC Skip stitch (77) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QA 1st Bundle1 reports—70.0%
QC Inline0 reports
required on prod. days 0/16 (0%)
——
QC Endline8 days—34.5%
QA Inline1 reports146.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0134.5%
3011 / 8 days
46.9%—
09/25–10/05
ED Gathering crease, BA Thread ends, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP018160 (0%)8809/29, 09/30, 10/01, 10/02, 10/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQA 1st BundleQC EndlineQA Inline
ED Gathering crease3364
BA Thread ends260
EC Asymmetry41791
EA Unsmooth/puckering/bubbling141009
CC Skip stitch77
Q94 Glue marks29
EB Measurement issue20
Others (no detail)44
260352 MKSC · CB11/CB25/CB26… · Due 10/21 · 13d leftFinal Random PASS No major issue (6 minor notes)
No resultPP Sample1 reports
No resultPilot Run2 reports
09/15QC 1st Bundle1 reports
09/15QA 1st Bundle1 reports
20/38QC Inlineactual/required · 53%
DHU 13.7%QC Endline17 days
All FAILQA Inline7 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty11,504 / 7,004
PDF reports34
Last report10/08

Cross-stage findings

Recurring in small numbers: 4

Latest Final Random (10/06): AD Fabric stains 2 (earlier 56 times), EA Unsmooth/puckering/bubbling 1 (earlier 15 times), AB Shading 1 (earlier 4 times), BA Thread ends 1 (earlier 21 times)

Found earlier but still reached later stages: 2

AC Fabric hole 1, BB Missing cut seam allowance 1 pcs (later stages total)

14 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 11; cannot compare across stages

Main QA defects never recorded by QC Endline: 3

EA Unsmooth/puckering/bubbling (QA 13), AB Shading (QA 12), CE Broken seam (QA 10); zero in QC Endline records

Duplicate report numbers

QGR2645353 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (3 Major), DJ Pleat (1 Major); Only QC 1st Bundle: CE Broken seam (4), ED Gathering crease (2), AD Fabric stains (2), EC Asymmetry (2), CB Broken stitch (1); Both: CG Grinning (1/4), EA Unsmooth/puckering/bubbling (1/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (224), EC Asymmetry (117), EA Uneven seam allowance (52), CC Skip stitch (41), EB Measurement issue (37) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run2 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—100.0%
QC Inline21 reports
required on prod. days 20/38 (53%)
—139.2%
QC Endline17 days—13.7%
QA Inline7 reports732.6%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2513.7%
4288 / 17 days
32.6%PASS
09/18–10/08
AD Fabric stains, BA Thread ends, ED Gathering crease
CB260.0%
10 / 1 days
——
10/03–10/03
—
CB300.0%
10 / 1 days
——
10/02–10/02
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB25173420 (59%)12210/03, 10/05, 10/06, 10/07, 10/08
CB26120 (0%)1110/03
CB30120 (0%)1110/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
AD Fabric stains1126118742
ED Gathering crease72951191
BA Thread ends51342
EC Asymmetry121095
EA Uneven seam allowance52
CC Skip stitch3335
EB Measurement issue37
CE Broken seam41410
260355 MKSC · CP01 · Due 10/21 · 13d leftFinal Random PASS No major issue (3 minor notes)
No resultPP Sample1 reports
No resultPilot Run4 reports
No reportQC 1st Bundle
09/16QA 1st Bundle1 reports
0/28QC Inlineactual/required · 0%
DHU 25.5%QC Endline14 days
All FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty6,955 / 3,955
PDF reports9
Last report09/28

Cross-stage findings

Recurring in small numbers: 3

Latest Final Random (09/28): EC Asymmetry 2 (earlier 17 times), AD Fabric stains 1 (earlier 18 times), DB Run-off stitching 2 (earlier 4 times)

Found earlier but still reached later stages: 2

CE Broken seam 1, DJ Pleat 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

Pilot Run 1; cannot compare across stages

Caught in earlier stages

CC Skip stitch (157), Q94 Glue marks (107), ED Gathering crease (81), EA Unsmooth/puckering/bubbling (24), CG Grinning (10) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run4 reports0—
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/28 (0%)
——
QC Endline14 days—25.5%
QA Inline2 reports257.8%
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0125.5%
3974 / 14 days
57.8%PASS
09/16–10/05
AD Fabric stains, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0114280 (0%)141409/28, 09/29, 09/30, 10/02, 10/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQA 1st BundleQC EndlineQA InlineFinal Random
AD Fabric stains2334431
BA Thread ends116231
CC Skip stitch141466
EC Asymmetry33314012
Q94 Glue marks107
ED Gathering crease1719
EA Unsmooth/puckering/bubbling117105
DB Run-off stitching1112
262183 OSIT · CS06 · Due 10/21 · 13d leftShipment Sample No result No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/28QA 1st Bundle1 reports
12/18QC Inlineactual/required · 67%
DHU 16.5%QC Endline9 days
All FAILQA Inline3 reports
No resultShipment Sample1 reports
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty3,000 / 3,000
PDF reports18
Last report10/05

Cross-stage findings

Found earlier but still reached later stages: 3

BA Thread ends 6, CC Skip stitch 2, ED Gathering crease 3 pcs (later stages total)

89 defects recorded as 'Others' without detail

QC Inline 82, QA Inline 7; cannot compare across stages

Caught in earlier stages

EC Asymmetry (71), DF Twisted seam/skewing (56), AD Fabric stains (51), DB Run-off stitching (37), DJ Pleat (21) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline12 reports
required on prod. days 12/18 (67%)
——
QC Endline9 days—16.5%
QA Inline3 reports335.4%
Shipment Sample1 reports0—
Pre-final1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0616.5%
3010 / 9 days
35.4%—
09/26–10/06
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0691812 (67%)4209/26, 10/01, 10/02, 10/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlinePre-final
BA Thread ends22513646
Others (no detail)827
ED Gathering crease853
CC Skip stitch126392
EC Asymmetry12572
DF Twisted seam/skewing551
AD Fabric stains1347
DB Run-off stitching433
262261 OSIT · CS06/CS09/CS10 · Due 10/21 · 13d leftShipment Sample No result No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
09/16QC 1st Bundle1 reports
09/16QA 1st Bundle1 reports
7/20QC Inlineactual/required · 35%
DHU 15.8%QC Endline8 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports1 no result
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty7,400 / 7,400
PDF reports13
Last report09/30

Cross-stage findings

Recurring in small numbers: 2

Latest Shipment Sample (09/18): ED Gathering crease 1 (earlier 18 times), EC Asymmetry 2 (earlier 19 times)

Found earlier but still reached later stages: 3

BA Thread ends 7, CB Broken stitch 2, FC Wrong label 1 pcs (later stages total)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EF Cup/pocket issue (3 Major), IA 2nd operation issue (1 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: EI Inaccurate/skewed stitching (2), EA Unsmooth/puckering/bubbling (2); Both: ED Gathering crease (2/4), EC Asymmetry (1/3), BA Thread ends (1/2); DHU QC 1st Bundle 40.0% / QA 1st Bundle 70.0%

Caught in earlier stages

DB Run-off stitching (64), CC Skip stitch (57), EA Unsmooth/puckering/bubbling (19), EB Measurement issue (14), EI Inaccurate/skewed stitching (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—40.0%
QA 1st Bundle1 reports—70.0%
QC Inline7 reports
required on prod. days 7/20 (35%)
—290.0%
QC Endline8 days—15.8%
QA Inline1 reports137.5%
Shipment Sample2 reports1—
Pre-final1 reports01.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0915.7%
6722 / 7 days
37.5%—
09/16–10/01
BA Thread ends, EC Asymmetry, CC Skip stitch
CS1019.1%
298 / 2 days
——
09/30–10/01
BA Thread ends
CS060.0%
11 / 1 days
——
09/22–09/22
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS097147 (50%)4309/16, 09/21, 09/30, 10/01
CS10240 (0%)2209/30, 10/01
CS06120 (0%)1109/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends121085047
EC Asymmetry132710132
ED Gathering crease2429491
DB Run-off stitching856
CC Skip stitch561
EA Unsmooth/puckering/bubbling2152
EB Measurement issue14
FC Wrong label111
② Due in more than 14 days 🔴 38 🟠 28 🟢 30 96
261670 RGOR · CB22/CB23 · Due 10/23 · 15d leftShipment Sample FAIL Latest Shipment Sample (10/06) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
10/02QA 1st Bundle1 reports
14/20QC Inlineactual/required · 70%
DHU 28.3%QC Endline7 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty11,595 / 8,117
PDF reports19
Last report10/08

Cross-stage findings

Latest Shipment Sample (10/06) FAILED

4 major: AD Fabric stains 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, ED Gathering crease 1

Not fixed: EC Asymmetry

Found 12 times (44 pcs, 10/01–10/08) in earlier stages; latest Shipment Sample (10/06) still has 1 major

Not fixed: ED Gathering crease

Found 10 times (84 pcs, 10/02–10/08) in earlier stages; latest Shipment Sample (10/06) still has 1 major

Not fixed: AD Fabric stains

Found 24 times (207 pcs, 10/01–10/08) in earlier stages; latest Shipment Sample (10/06) still has 1 major

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

Duplicate report numbers

QGR2644512 have multiple reports with different content

Caught in earlier stages

BA Thread ends (180), CE Broken seam (121), EB Measurement issue (79), DB Run-off stitching (74), DJ Pleat (57) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—92.3%
QC Inline15 reports
required on prod. days 14/20 (70%)
——
QC Endline7 days—28.3%
QA Inline2 reports242.2%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2233.2%
1830 / 7 days
42.2%—
10/01–10/08
BA Thread ends, AD Fabric stains, ED Gathering crease
CB2315.4%
700 / 3 days
——
10/06–10/08
AD Fabric stains, BA Thread ends, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2271410 (71%)3110/02, 10/03, 10/08
CB23364 (67%)2010/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
AD Fabric stains22717171
BA Thread ends11745
CE Broken seam4378
ED Gathering crease2821
EB Measurement issue178
DB Run-off stitching2054
DJ Pleat2523
CG Grinning513
261501 LOGE · CB04 · Due 10/26 · 18d leftShipment Sample FAIL Latest Shipment Sample (09/28) FAILED
No resultPP Sample1 reports
No reportPilot Run
09/29QC 1st Bundle1 reports
09/29QA 1st Bundle1 reports
9/20QC Inlineactual/required · 45%
DHU 19.9%QC Endline10 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty4,000 / 4,000
PDF reports16
Last report10/08

Cross-stage findings

Latest Shipment Sample (09/28) FAILED

13 major: EA Unsmooth/puckering/bubbling 1, Others (no detail) 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, Others (no detail) 1, EA Unsmooth/puckering/bubbling 1, AD Fabric stains 1, Others (no detail) 1, CG Grinning 1, Others (no detail) 1, DH Pressing mark 1, CC Skip stitch 1, ED Gathering crease 1

Not fixed: EA Unsmooth/puckering/bubbling

Found 15 times (32 pcs, 09/21–10/08) in earlier stages; latest Shipment Sample (09/28) still has 2 major

Not fixed: AD Fabric stains

Found 34 times (125 pcs, 09/28–10/08) in earlier stages; latest Shipment Sample (09/28) still has 1 major

Found earlier but still reached later stages: 1

EI Inaccurate/skewed stitching 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

Shipment Sample 4; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (2 Major), DA Exceed seam allowance (2), ED Gathering crease (2 Major), EC Asymmetry (2 Major), EE Raw edge (1 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: CB Broken stitch (4), AD Fabric stains (3), CE Broken seam (2); Both: EA Unsmooth/puckering/bubbling (3/1); DHU QC 1st Bundle — / QA 1st Bundle 69.2%

Caught in earlier stages

BA Thread ends (157), EB Measurement issue (46), CB Broken stitch (23), DJ Pleat (15), DB Run-off stitching (15) did not reach later stages

Found before bulk production (Shipment Sample): 5

EC Asymmetry, CG Grinning, DH Pressing mark, CC Skip stitch, ED Gathering crease: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—69.2%
QC Inline9 reports
required on prod. days 9/20 (45%)
——
QC Endline10 days—19.9%
QA Inline3 reports332.3%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0419.9%
2236 / 10 days
32.3%—
09/28–10/08
BA Thread ends, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0410209 (45%)8310/02, 10/03, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends1552
AD Fabric stains3299211
ED Gathering crease2209351
EB Measurement issue2242
EA Unsmooth/puckering/bubbling13119532
CC Skip stitch61921
CB Broken stitch4181
DJ Pleat15
261503 LOGE · CB24 · Due 10/26 · 18d leftShipment Sample FAIL Latest Shipment Sample (10/06) FAILED
No resultPP Sample1 reports
No reportPilot Run
09/29QC 1st Bundle1 reports
09/29QA 1st Bundle1 reports
4/16QC Inlineactual/required · 25%
DHU 35.4%QC Endline8 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty2,000 / 2,000
PDF reports10
Last report10/06

Cross-stage findings

Latest Shipment Sample (10/06) FAILED

12 major: ED Gathering crease 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, AD Fabric stains 1, ED Gathering crease 1, CF Pulling yarn 1, EC Asymmetry 1, EC Asymmetry 1, DE Cut to broken 1, ED Gathering crease 1, ED Gathering crease 1, EC Asymmetry 1

Not fixed: AD Fabric stains

Found 21 times (192 pcs, 09/28–10/08) in earlier stages; latest Shipment Sample (10/06) still has 1 major

Not fixed: ED Gathering crease

Found 13 times (126 pcs, 09/29–10/08) in earlier stages; latest Shipment Sample (10/06) still has 4 major

Not fixed: EC Asymmetry

Found 9 times (16 pcs, 09/29–10/05) in earlier stages; latest Shipment Sample (10/06) still has 4 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 4 times (7 pcs, 09/29–10/02) in earlier stages; latest Shipment Sample (10/06) still has 1 major

Missed in earlier stages: 2

CF Pulling yarn (Shipment Sample 10/06), DE Cut to broken (Shipment Sample 10/06): first found in later stages, never recorded before

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (3 Major), DB Run-off stitching (1 Major), DD Thread not straight/waving (1 Major), CA Thread tension (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: CC Skip stitch (1), DA Exceed seam allowance (1), ED Gathering crease (1), CE Broken seam (1); Both: EA Unsmooth/puckering/bubbling (2/2), AD Fabric stains (1/2), EC Asymmetry (2/1), DJ Pleat (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

CE Broken seam (117), BA Thread ends (98), DF Twisted seam/skewing (59), CC Skip stitch (50), EI Inaccurate/skewed stitching (8) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline4 reports
required on prod. days 4/16 (25%)
——
QC Endline8 days—35.4%
QA Inline2 reports242.2%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2435.4%
1644 / 8 days
42.2%—
09/30–10/08
AD Fabric stains, ED Gathering crease, CE Broken seam

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB248164 (25%)8410/03, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
AD Fabric stains112817461
ED Gathering crease1412014
CE Broken seam1121022
BA Thread ends296
DF Twisted seam/skewing133484
CC Skip stitch15422
EC Asymmetry211214
EI Inaccurate/skewed stitching26
261505 LOGE · CB09/CB10 · Due 10/26 · 18d leftShipment Sample FAIL Latest Shipment Sample (09/28) FAILED
No resultPP Sample1 reports
No reportPilot Run
09/25QC 1st Bundle1 reports
09/26QA 1st Bundle1 reports
8/24QC Inlineactual/required · 33%
DHU 19.2%QC Endline11 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty4,500 / 4,500
PDF reports15
Last report10/08

Cross-stage findings

Latest Shipment Sample (09/28) FAILED

9 major: EC Asymmetry 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, ED Gathering crease 1, CG Grinning 1, AD Fabric stains 1, EC Asymmetry 1, EC Asymmetry 1

Not fixed: AD Fabric stains

Found 30 times (206 pcs, 09/16–10/08) in earlier stages; latest Shipment Sample (09/28) still has 1 major

Not fixed: EC Asymmetry

Found 34 times (101 pcs, 09/16–10/08) in earlier stages; latest Shipment Sample (09/28) still has 5 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 8 times (14 pcs, 09/25–10/02) in earlier stages; latest Shipment Sample (09/28) still has 1 major

Not fixed: CG Grinning

Found 6 times (13 pcs, 09/26–10/08) in earlier stages; latest Shipment Sample (09/28) still has 1 major

Not fixed: ED Gathering crease

Found 6 times (17 pcs, 09/28–10/05) in earlier stages; latest Shipment Sample (09/28) still has 1 major

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), GA Missing bartack/button (1 Major), DD Thread not straight/waving (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: CC Skip stitch (2), CA Thread tension (2), DI High-low/uneven (1), DJ Pleat (1); Both: EC Asymmetry (1/4), AD Fabric stains (1/2), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 90.0% / QA 1st Bundle 92.3%

Caught in earlier stages

CE Broken seam (143), BA Thread ends (123), CC Skip stitch (29), EI Inaccurate/skewed stitching (15), AC Fabric hole (14) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—90.0%
QA 1st Bundle1 reports—92.3%
QC Inline8 reports
required on prod. days 8/24 (33%)
——
QC Endline11 days—19.2%
QA Inline3 reports336.5%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0919.3%
2794 / 11 days
36.5%—
09/26–10/08
AD Fabric stains, CE Broken seam, BA Thread ends
CB100.0%
20 / 1 days
——
09/26–09/26
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0911228 (36%)10410/03, 10/05, 10/06, 10/07, 10/08
CB10120 (0%)1109/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
AD Fabric stains1121218461
CE Broken seam11132
BA Thread ends1185
EC Asymmetry214385245
CC Skip stitch2621
ED Gathering crease1431
EA Unsmooth/puckering/bubbling117231
EI Inaccurate/skewed stitching276
261507 LOGE · CB04/CB05 · Due 10/26 · 18d leftShipment Sample FAIL Latest Shipment Sample (09/30) FAILED
No resultPP Sample1 reports
No reportPilot Run
09/25QC 1st Bundle1 reports
09/28QA 1st Bundle1 reports
5/22QC Inlineactual/required · 23%
DHU 17.1%QC Endline10 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty5,000 / 5,000
PDF reports10
Last report10/06

Cross-stage findings

Latest Shipment Sample (09/30) FAILED

6 major: EC Asymmetry 1, CA Thread tension 1, Others (no detail) 1, EC Asymmetry 1, DE Cut to broken 1, EC Asymmetry 1

Not fixed: EC Asymmetry

Found 8 times (11 pcs, 09/19–09/30) in earlier stages; latest Shipment Sample (09/30) still has 3 major

Missed in earlier stages: 2

CA Thread tension (Shipment Sample 09/30), DE Cut to broken (Shipment Sample 09/30): first found in later stages, never recorded before

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 4); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DF Twisted seam/skewing (2 Major), DD Thread not straight/waving (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: CG Grinning (2), CE Broken seam (2); Both: CC Skip stitch (2/2), EC Asymmetry (2/2), DA Exceed seam allowance (2/1), CB Broken stitch (1/2); DHU QC 1st Bundle — / QA 1st Bundle 84.6%

Caught in earlier stages

ED Gathering crease (92), CE Broken seam (86), CC Skip stitch (63), EB Measurement issue (54), BA Thread ends (52) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—84.6%
QC Inline5 reports
required on prod. days 5/22 (23%)
——
QC Endline10 days—17.1%
QA Inline1 reports128.1%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0517.2%
2200 / 10 days
28.1%—
09/28–10/08
ED Gathering crease, CE Broken seam, EB Measurement issue
CB040.0%
10 / 1 days
——
10/02–10/02
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB0510205 (25%)10510/03, 10/05, 10/06, 10/07, 10/08
CB04120 (0%)1110/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
ED Gathering crease1082
CE Broken seam217661
CC Skip stitch226512
EB Measurement issue1152
BA Thread ends502
GB Missing sewing operation24
Q61 Lace raw edge or broken lace23
DF Twisted seam/skewing2121
261508 LOGE · CP08/CP09/CP10… · Due 10/26 · 18d leftShipment Sample FAIL Latest Shipment Sample (09/25) FAILED
No resultPP Sample1 reports
No reportPilot Run
09/16QC 1st Bundle1 reports
09/12–10/02QA 1st Bundle3 reports
7/146QC Inlineactual/required · 5%
DHU 12.0%QC Endline20 days
All FAILQA Inline8 reports
All FAILShipment Sample2 reports
No reportPre-final
No reportFinal Random
Order/Ship qty5,000 / 5,000
PDF reports22
Last report10/07

Cross-stage findings

Latest Shipment Sample (09/25) FAILED

12 major: Others (no detail) 1, CE Broken seam 1, EC Asymmetry 1, EC Asymmetry 1, Others (no detail) 1, EC Asymmetry 1, ED Gathering crease 1, EC Asymmetry 1, Others (no detail) 1, DB Run-off stitching 1, EI Inaccurate/skewed stitching 1, Others (no detail) 1

Not fixed: EC Asymmetry

Found 36 times (87 pcs, 09/15–10/07) in earlier stages; latest Shipment Sample (09/25) still has 4 major

Not fixed: DB Run-off stitching

Found 17 times (63 pcs, 09/16–10/07) in earlier stages; latest Shipment Sample (09/25) still has 1 major

Not fixed: EI Inaccurate/skewed stitching

Found 14 times (21 pcs, 09/22–10/07) in earlier stages; latest Shipment Sample (09/25) still has 1 major

Not fixed: CE Broken seam

Found 12 times (26 pcs, 09/17–10/08) in earlier stages; latest Shipment Sample (09/25) still has 1 major

Not fixed: ED Gathering crease

Found 18 times (229 pcs, 09/17–10/08) in earlier stages; latest Shipment Sample (09/25) still has 1 major

4 defects recorded as 'Others' without detail

Shipment Sample 4; cannot compare across stages

QC Endline data errors: 3

09/19 CP10 261508-3 (defective pcs 9 > defects 3), 09/21 CP08 261508-3 (defective pcs 10 > defects 7), 09/23 CP10 261508-3 (defective pcs 10 > defects 7)

QC 1st Bundle vs QA 1st Bundle: 9 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (7 Major), EA Unsmooth/puckering/bubbling (6 Major), CB Broken stitch (4 Major), GA Missing bartack/button (3 Major), ED Gathering crease (2 Major), DA Exceed seam allowance (1 Major), AC Fabric hole (1 Major), CE Broken seam (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: CC Skip stitch (3), DB Run-off stitching (1), DE Cut to broken (1); Both: EC Asymmetry (9/4), BA Thread ends (2/7), DJ Pleat (4/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 65.0%

Caught in earlier stages

BA Thread ends (634), CC Skip stitch (288), EB Measurement issue (216), EA Unsmooth/puckering/bubbling (81), DF Twisted seam/skewing (47) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle3 reports—65.0%
QC Inline7 reports
required on prod. days 7/146 (5%)
—141.0%
QC Endline20 days—12.0%
QA Inline8 reports834.8%
Shipment Sample2 reports2—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1610.2%
5000 / 11 days
75.0%—
09/17–09/30
CC Skip stitch, BA Thread ends, EB Measurement issue
CP1532.2%
2854 / 6 days
44.8%—
10/02–10/08
BA Thread ends, ED Gathering crease, EB Measurement issue
CP090.0%
1260 / 14 days
14.1%—
09/16–10/06
—
CP191.7%
1140 / 13 days
——
09/21–10/08
BA Thread ends, CC Skip stitch, ED Gathering crease
CP112.4%
840 / 9 days
15.6%—
09/15–10/02
BA Thread ends
CP104.5%
620 / 8 days
——
09/19–10/02
BA Thread ends
CP181.2%
520 / 6 days
25.0%—
09/15–10/07
CC Skip stitch, BA Thread ends
CP200.0%
160 / 3 days
——
09/18–09/29
—
CP088.8%
80 / 1 days
——
09/21–09/21
BA Thread ends, DB Run-off stitching, CC Skip stitch
CP130.0%
80 / 2 days
——
09/29–10/08
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0914280 (0%)141410/01, 10/02, 10/03, 10/05, 10/06
CP1913260 (0%)131310/02, 10/05, 10/06, 10/07, 10/08
CP1611227 (32%)11409/25, 09/26, 09/28, 09/29, 09/30
CP119180 (0%)9909/28, 09/29, 09/30, 10/01, 10/02
CP108160 (0%)8809/28, 09/29, 09/30, 10/01, 10/02
CP156120 (0%)6610/03, 10/05, 10/06, 10/07, 10/08
CP186120 (0%)6609/16, 09/21, 09/23, 09/25, 10/07
CP20360 (0%)3309/18, 09/19, 09/29
CP13240 (0%)2209/29, 10/08
CP08120 (0%)1109/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends27659821
CC Skip stitch372771
ED Gathering crease222431
EB Measurement issue216
EC Asymmetry3944691610
EA Unsmooth/puckering/bubbling262665
DB Run-off stitching18541
DF Twisted seam/skewing115301
261509 LOGE · CB10 · Due 10/26 · 18d leftShipment Sample FAIL Latest Shipment Sample (10/05) FAILED
No resultPP Sample1 reports
No reportPilot Run
09/22QC 1st Bundle1 reports
09/28QA 1st Bundle1 reports
13/18QC Inlineactual/required · 72%
DHU 32.7%QC Endline9 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty2,500 / 2,500
PDF reports24
Last report10/08

Cross-stage findings

Latest Shipment Sample (10/05) FAILED

11 major: EI Inaccurate/skewed stitching 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, EC Asymmetry 1, CA Thread tension 1, EC Asymmetry 1, CE Broken seam 1, GA Missing bartack/button 1, EI Inaccurate/skewed stitching 1, EC Asymmetry 1

Not fixed: EC Asymmetry

Found 57 times (150 pcs, 09/17–10/08) in earlier stages; latest Shipment Sample (10/05) still has 5 major

Not fixed: EI Inaccurate/skewed stitching

Found 6 times (9 pcs, 09/17–10/07) in earlier stages; latest Shipment Sample (10/05) still has 2 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 9 times (14 pcs, 09/17–10/08) in earlier stages; latest Shipment Sample (10/05) still has 1 major

Not fixed: CE Broken seam

Found 31 times (74 pcs, 09/25–10/08) in earlier stages; latest Shipment Sample (10/05) still has 1 major

Missed in earlier stages: 2

CA Thread tension (Shipment Sample 10/05), GA Missing bartack/button (Shipment Sample 10/05): first found in later stages, never recorded before

3 defects recorded as 'Others' without detail

QC Inline 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (3 Major), EA Unsmooth/puckering/bubbling (2 Major), DE Cut to broken (2 Major), EB Measurement issue (1 Major), EG Wrong panel assembly (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (4); Both: EC Asymmetry (6/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 84.6%

Caught in earlier stages

CC Skip stitch (139), ED Gathering crease (62), BA Thread ends (51), DA Exceed seam allowance (46), DJ Pleat (46) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—84.6%
QC Inline17 reports
required on prod. days 13/18 (72%)
—306.0%
QC Endline9 days—32.7%
QA Inline3 reports335.4%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1032.7%
777 / 9 days
35.4%—
09/29–10/08
CC Skip stitch, ED Gathering crease, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB1091813 (72%)5010/02, 10/03, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
EC Asymmetry2621072855
CC Skip stitch38983
CE Broken seam44301
ED Gathering crease18503
BA Thread ends6387
DA Exceed seam allowance4402
DJ Pleat451
EA Unsmooth/puckering/bubbling12651
261511 LOGE · CB13/CB15 · Due 10/26 · 18d leftShipment Sample No result Not fixed: EC Asymmetry
No resultPP Sample1 reports
No reportPilot Run
09/28QC 1st Bundle1 reports
09/28QA 1st Bundle1 reports
5/18QC Inlineactual/required · 28%
DHU 55.5%QC Endline8 days
All FAILQA Inline3 reports
No resultShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty6,000 / 6,000
PDF reports13
Last report10/07

Cross-stage findings

Not fixed: EC Asymmetry

Found 20 times (45 pcs, 09/22–10/06) in earlier stages; latest Shipment Sample (09/26) still has 4 major

1 defects recorded as 'Others' without detail

PP Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 10); zero in QC Endline records

Duplicate report numbers

QGR2645240 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CH Incorrect stitch density (2 Major), EE Raw edge (2 Major), BA Thread ends (2 Major), EA Unsmooth/puckering/bubbling (2 Major), EI Inaccurate/skewed stitching (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: CG Grinning (3), CC Skip stitch (1), EB Measurement issue (1), IA 2nd operation issue (1), ED Gathering crease (1); Both: DJ Pleat (1/2), EC Asymmetry (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (317), CE Broken seam (222), EB Measurement issue (214), BA Thread ends (79), CC Skip stitch (24) did not reach later stages

Found before bulk production (Shipment Sample): 3

DF Twisted seam/skewing, CB Broken stitch, CG Grinning: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—100.0%
QC Inline6 reports
required on prod. days 5/18 (28%)
——
QC Endline8 days—55.5%
QA Inline3 reports337.5%
Shipment Sample1 reports0—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1356.3%
1438 / 8 days
37.5%—
09/30–10/08
ED Gathering crease, EB Measurement issue, CE Broken seam
CB150.0%
20 / 1 days
37.5%—
10/05–10/05
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB138165 (31%)8310/03, 10/05, 10/06, 10/07, 10/08
CB15120 (0%)1110/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
ED Gathering crease13124
CE Broken seam22200
EB Measurement issue116206
BA Thread ends2716
EC Asymmetry3213364
CC Skip stitch11220
CG Grinning31811
EI Inaccurate/skewed stitching11101
261554 LOGE · CB28 · Due 10/26 · 18d leftShipment Sample FAIL Latest Shipment Sample (10/06) FAILED
No resultPP Sample1 reports
No reportPilot Run
10/08QC 1st Bundle1 reports
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty7,000 / 7,000
PDF reports3
Last report10/08

Cross-stage findings

Latest Shipment Sample (10/06) FAILED

12 major: EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, EA Unsmooth/puckering/bubbling 1, AD Fabric stains 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1, ED Gathering crease 1, CB Broken stitch 1, EI Inaccurate/skewed stitching 1, CG Grinning 1

Not fixed: EC Asymmetry

Found 3 times (3 pcs, 10/06–10/08) in earlier stages; latest Shipment Sample (10/06) still has 4 major

Found earlier but still reached later stages: 1

EA Unsmooth/puckering/bubbling 3 pcs (later stages total)

Found before bulk production (Shipment Sample): 5

AD Fabric stains, ED Gathering crease, CB Broken stitch, EI Inaccurate/skewed stitching, CG Grinning: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
Shipment Sample1 reports1—

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleShipment Sample
EC Asymmetry214
EA Unsmooth/puckering/bubbling13
AD Fabric stains21
CG Grinning21
DB Run-off stitching11
CB Broken stitch11
CH Incorrect stitch density1
DD Thread not straight/waving1
261559 LOGE · CP12 · Due 10/26 · 18d leftFinal Random PASS Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
09/28QC 1st Bundle1 reports
09/28QA 1st Bundle1 reports
2/20QC Inlineactual/required · 10%
DHU 11.8%QC Endline10 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty11,000 / 11,000
PDF reports10
Last report10/06

Cross-stage findings

Not fixed: AD Fabric stains

Found 7 times (15 pcs, 09/29–10/05) in earlier stages; latest Final Random (10/03) still has 3 major

Recurring in small numbers: 2

Latest Final Random (10/03): CB Broken stitch 2 (earlier 5 times), CC Skip stitch 2 (earlier 11 times)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 9); zero in QC Endline records

QC Endline data errors: 2

10/02 CP12 261559 (defective pcs 70 > defects 69), 10/06 CP12 261559 (defective pcs 168 > defects 165)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), BB Missing cut seam allowance (2 Major), CE Broken seam (1 Major); Only QC 1st Bundle: DB Run-off stitching (3), DJ Pleat (2), GA Missing bartack/button (2), DA Exceed seam allowance (1), EI Inaccurate/skewed stitching (1); Both: BA Thread ends (5/3), ED Gathering crease (2/4), EC Asymmetry (3/2), CB Broken stitch (1/1); DHU QC 1st Bundle — / QA 1st Bundle 80.0%

Caught in earlier stages

EB Measurement issue (290), AA Fabric defect (77), DK Twisted shoulder strap (18), EA Uneven seam allowance (9), GB Missing sewing operation (8) did not reach later stages

Found before bulk production (Shipment Sample): 5

ED Gathering crease, EI Inaccurate/skewed stitching, DE Cut to broken, EA Unsmooth/puckering/bubbling, EC Asymmetry: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—80.0%
QC Inline2 reports
required on prod. days 2/20 (10%)
——
QC Endline10 days—11.8%
QA Inline4 reports435.9%
Shipment Sample1 reports1—
Final Random1 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1211.8%
10580 / 10 days
35.9%PASS
09/28–10/08
BA Thread ends, EB Measurement issue, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1210202 (10%)10810/03, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends536161012
EB Measurement issue290
CC Skip stitch41802
AA Fabric defect77
ED Gathering crease244221
AD Fabric stains41013
DK Twisted shoulder strap18
EC Asymmetry321101
261560 DJLF · CS07 · Due 10/26 · 18d leftFinal Random PASS Not fixed: ED Gathering crease
No reportPP Sample
No reportPilot Run
09/16QC 1st Bundle1 reports
09/16QA 1st Bundle1 reports
7/20QC Inlineactual/required · 35%
DHU 9.9%QC Endline10 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,000 / 2,000
PDF reports15
Last report10/06

Cross-stage findings

Not fixed: ED Gathering crease

Found 9 times (24 pcs, 09/16–09/23) in earlier stages; latest Final Random (10/06) still has 3 major

Missed in earlier stages: 2

HA Poor pressing (Pre-final 09/19), EI Inaccurate/skewed stitching (Shipment Sample 09/23): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (10/06): DF Twisted seam/skewing 2 (earlier 32 times), EA Unsmooth/puckering/bubbling 1 (earlier 10 times)

Found earlier but still reached later stages: 3

CB Broken stitch 2, DI High-low/uneven 1, DB Run-off stitching 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 2; cannot compare across stages

QC Endline data errors: 3

09/16 CS07 261560 (defective pcs 9 > defects 8), 09/18 CS07 261560 (defective pcs 25 > defects 22), 09/21 CS07 261560 (defective pcs 34 > defects 31)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), CB Broken stitch (2 Major), EA Unsmooth/puckering/bubbling (1 Major), DJ Pleat (1 Major), AA Fabric defect (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: EC Asymmetry (1); Both: DF Twisted seam/skewing (10/2), CC Skip stitch (2/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 65.0%

Caught in earlier stages

CC Skip stitch (19), CE Broken seam (13), DJ Pleat (6), EC Asymmetry (5), EB Measurement issue (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—65.0%
QC Inline7 reports
required on prod. days 7/20 (35%)
——
QC Endline10 days—9.9%
QA Inline3 reports339.6%
Shipment Sample1 reports1—
Pre-final1 reports19.6%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS079.9%
1877 / 10 days
39.6%PASS
09/16–10/06
BA Thread ends, DF Twisted seam/skewing, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0710207 (35%)9409/22, 09/23, 09/25, 09/28, 10/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
DF Twisted seam/skewing1026049392
BA Thread ends866108
ED Gathering crease220213
CB Broken stitch21252
CC Skip stitch22411
EA Unsmooth/puckering/bubbling16161
CE Broken seam121
DB Run-off stitching2611
261568 DJLF · CS04 · Due 10/26 · 18d leftShipment Sample FAIL Latest Shipment Sample (10/01) FAILED
No reportPP Sample
No reportPilot Run
09/28QC 1st Bundle1 reports
09/28QA 1st Bundle1 reports
6/14QC Inlineactual/required · 43%
DHU 22.6%QC Endline7 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty1,900 / 1,900
PDF reports14
Last report10/06

Cross-stage findings

Latest Shipment Sample (10/01) FAILED

2 major: EA Unsmooth/puckering/bubbling 1, CF Pulling yarn 1

Not fixed: CF Pulling yarn

Found 7 times (14 pcs, 09/28–10/05) in earlier stages; latest Shipment Sample (10/01) still has 1 major

Found earlier but still reached later stages: 5

DF Twisted seam/skewing 1, BA Thread ends 11, DJ Pleat 1, CB Broken stitch 1, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA Inline 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DJ Pleat (2 Major), EA Unsmooth/puckering/bubbling (1 Major), CF Pulling yarn (1 Major), CE Broken seam (1 Major), CG Grinning (1 Major), DB Run-off stitching (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DF Twisted seam/skewing (2), BD Snagging (1), EC Asymmetry (1), CA Thread tension (1); Both: BA Thread ends (2/1), BC Sticker left (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

EC Asymmetry (141), DB Run-off stitching (42), CC Skip stitch (41), ED Gathering crease (13), CA Thread tension (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline7 reports
required on prod. days 6/14 (43%)
——
QC Endline7 days—22.6%
QA Inline3 reports327.1%
Shipment Sample1 reports1—
Pre-final1 reports14.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0422.6%
1900 / 7 days
27.1%—
09/28–10/05
BA Thread ends, EC Asymmetry, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS047146 (43%)7109/30, 10/01, 10/02, 10/03, 10/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends2114208411
EC Asymmetry11373
DB Run-off stitching19311
CC Skip stitch2372
DJ Pleat21721
CF Pulling yarn166112
ED Gathering crease112
CB Broken stitch1361
261593 DJLF · CS24 · Due 10/26 · 18d leftShipment Sample FAIL Latest Shipment Sample (09/28) FAILED
No reportPP Sample
No reportPilot Run
09/21QC 1st Bundle1 reports
09/21QA 1st Bundle1 reports
3/8QC Inlineactual/required · 38%
DHU 12.2%QC Endline4 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
1/2 FAILPre-final2 reports
No reportFinal Random
Order/Ship qty1,010 / 1,010
PDF reports10
Last report09/29

Cross-stage findings

Latest Shipment Sample (09/28) FAILED

3 major: CB Broken stitch 1, CB Broken stitch 1, EI Inaccurate/skewed stitching 1

Not fixed: ED Gathering crease

Found 8 times (19 pcs, 09/21–09/23) in earlier stages; latest Pre-final (09/29) still has 5 major

Not fixed: DF Twisted seam/skewing

Found 6 times (9 pcs, 09/21–09/23) in earlier stages; latest Pre-final (09/29) still has 4 major

Missed in earlier stages: 1

AD Fabric stains (Pre-final 09/29): first found in later stages, never recorded before

1 later-stage PDF report(s) blank

Pre-final 09/28 QGR2643578 (FAIL); please check if the report was completed

Found earlier but still reached later stages: 2

CB Broken stitch 2, EI Inaccurate/skewed stitching 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 2

ED Gathering crease (QA 8), DF Twisted seam/skewing (QA 5); zero in QC Endline records

QC Endline data errors: 2

09/22 CS24 261593-S (defective pcs 50 > defects 49), 09/23 CS24 261593-L (defective pcs 23 > defects 22)

Duplicate report numbers

QGR2643578 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (1 Major), CE Broken seam (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: CC Skip stitch (1), BB Missing cut seam allowance (1), DJ Pleat (1), CB Broken stitch (1); Both: DF Twisted seam/skewing (2/2), ED Gathering crease (2/2), CG Grinning (1/2), EI Inaccurate/skewed stitching (1/2); DHU QC 1st Bundle — / QA 1st Bundle 55.0%

Caught in earlier stages

CC Skip stitch (22), DB Run-off stitching (20), DJ Pleat (7), CE Broken seam (5), EC Asymmetry (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—55.0%
QC Inline3 reports
required on prod. days 3/8 (38%)
——
QC Endline4 days—12.2%
QA Inline2 reports226.6%
Shipment Sample1 reports1—
Pre-final2 reports16.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2412.2%
1010 / 4 days
26.6%—
09/21–09/25
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS24483 (38%)3209/21, 09/23, 09/25

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends1082412
ED Gathering crease221235
CC Skip stitch121
EI Inaccurate/skewed stitching121621
DB Run-off stitching20
CB Broken stitch1102
DF Twisted seam/skewing22414
DJ Pleat16
260356 MKSC · CP01/CP15 · Due 10/28 · 20d leftShipment Sample FAIL Latest Shipment Sample (09/22) FAILED
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
10/03QA 1st Bundle1 reports
0/14QC Inlineactual/required · 0%
DHU 36.2%QC Endline6 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty6,677 / 5,177
PDF reports3
Last report10/06

Cross-stage findings

Latest Shipment Sample (09/22) FAILED

9 major: EC Asymmetry 1, GA Missing bartack/button 2, EI Inaccurate/skewed stitching 1, AD Fabric stains 1, EC Asymmetry 1, CE Broken seam 1, EA Unsmooth/puckering/bubbling 1, EA Unsmooth/puckering/bubbling 1

7 defects recorded as 'Others' without detail

QA 1st Bundle 5, QA Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

CE Broken seam (QA 3); zero in QC Endline records

QC Endline data errors: 3

10/03 CP01 260356A (defective pcs 43 > defects 40), 10/07 CP01 260356A (defective pcs 200 > defects 109), 10/08 CP01 260356A (defective pcs 71 > defects 28)

Caught in earlier stages

ED Gathering crease (118), BA Thread ends (110), CC Skip stitch (61), EB Measurement issue (33), DB Run-off stitching (15) did not reach later stages

Found before bulk production (Shipment Sample): 6

EC Asymmetry, GA Missing bartack/button, EI Inaccurate/skewed stitching, AD Fabric stains, CE Broken seam, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—95.0%
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline6 days—36.2%
QA Inline1 reports159.4%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0136.4%
2499 / 6 days
59.4%—
10/02–10/08
EA Unsmooth/puckering/bubbling, AD Fabric stains, EC Asymmetry
CP1525.0%
40 / 1 days
——
10/03–10/03
ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP016120 (0%)6610/03, 10/05, 10/06, 10/07, 10/08
CP15120 (0%)1110/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineShipment Sample
EA Unsmooth/puckering/bubbling426862
AD Fabric stains319811
ED Gathering crease31132
EC Asymmetry1102
BA Thread ends1073
CC Skip stitch160
EB Measurement issue33
DB Run-off stitching141
260758 RGOR · CB20/CB30 · Due 10/30 · 22d leftFinal Random PASS Not fixed: AD Fabric stains
No resultPP Sample1 reports
No reportPilot Run
09/04–09/05QC 1st Bundle2 reports
09/04QA 1st Bundle1 reports
51/94QC Inlineactual/required · 54%
DHU 20.0%QC Endline28 days
8/9 FAILQA Inline9 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty7,615 / 7,615
PDF reports70
Last report10/08

Cross-stage findings

Not fixed: AD Fabric stains

Found 26 times (85 pcs, 09/07–10/08) in earlier stages; latest Final Random (10/05) still has 3 major

Recurring in small numbers: 1

Latest Final Random (10/05): CC Skip stitch 2 (earlier 49 times)

Found earlier but still reached later stages: 8

EA Unsmooth/puckering/bubbling 2, EB Measurement issue 1, EC Asymmetry 5, CB Broken stitch 2, EI Inaccurate/skewed stitching 1, DJ Pleat 3, ED Gathering crease 1, CA Thread tension 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

DD Thread not straight/waving (QA 19); zero in QC Endline records

QC Endline data errors: 1

10/07 CB30 260758 (defective pcs 31 > defects 27)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (4 Major), EB Measurement issue (2 Major), BA Thread ends (2 Major), DA Exceed seam allowance (1 Major); Only QC 1st Bundle: CC Skip stitch (2), CG Grinning (2), CH Incorrect stitch density (1), DJ Pleat (1), AA Fabric defect (1), BB Missing cut seam allowance (1), CB Broken stitch (1); Both: EC Asymmetry (3/1), DB Run-off stitching (1/2), DD Thread not straight/waving (1/2), CE Broken seam (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 75.0%

Caught in earlier stages

DB Run-off stitching (795), CE Broken seam (226), EA Uneven seam allowance (148), DD Thread not straight/waving (82), CG Grinning (75) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle2 reports—100.0%
QA 1st Bundle1 reports—75.0%
QC Inline54 reports
required on prod. days 51/94 (54%)
—97.9%
QC Endline28 days—20.0%
QA Inline9 reports830.2%
Shipment Sample1 reports1—
Final Random2 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2015.4%
7605 / 23 days
31.2%PASS
09/05–10/06
DB Run-off stitching, CC Skip stitch, ED Gathering crease
CB3025.0%
7016 / 24 days
29.7%PASS
09/09–10/08
BA Thread ends, DB Run-off stitching, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB30244829 (60%)13609/19, 10/02, 10/03, 10/05, 10/08
CB20234622 (48%)141009/16, 09/17, 09/30, 10/01, 10/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends220841812
DB Run-off stitching1127270613
CC Skip stitch25736912
ED Gathering crease41241
CE Broken seam121141756
EB Measurement issue12101751
EC Asymmetry31137695
EA Uneven seam allowance148
260761 RGOR · CB61 · Due 10/30 · 22d leftFinal Random FAIL Latest Final Random (09/29) FAILED
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All FAILFinal Random1 reports
Order/Ship qty7,050 / 7,050
PDF reports3
Last report09/29

Cross-stage findings

Latest Final Random (09/29) FAILED

13 major: EI Inaccurate/skewed stitching 1, CB Broken stitch 1, CB Broken stitch 1, DE Cut to broken 2, DA Exceed seam allowance 3, CE Broken seam 4, CA Thread tension 1

Missed in earlier stages: 6

EI Inaccurate/skewed stitching (Final Random 09/29), CB Broken stitch (Final Random 09/29), DE Cut to broken (Final Random 09/29), DA Exceed seam allowance (Final Random 09/29), CA Thread tension (Final Random 09/29), BB Missing cut seam allowance (Final Random 09/29): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

CE Broken seam 4, BA Thread ends 6 pcs (later stages total)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA Inline1 reports18.8%
Final Random1 reports16.5%

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQA InlineFinal Random
BA Thread ends46
BB Missing cut seam allowance6
CE Broken seam14
EA Unsmooth/puckering/bubbling3
EE Raw edge3
DA Exceed seam allowance3
FA Wrong material2
DF Twisted seam/skewing2
260762 RGOR · CB61 · Due 10/30 · 22d leftFinal Random FAIL Latest Final Random (09/30) FAILED
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
09/04–09/12QA 1st Bundle2 reports
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
All FAILFinal Random1 reports
Order/Ship qty6,400 / 6,400
PDF reports4
Last report09/30

Cross-stage findings

Latest Final Random (09/30) FAILED

8 major: DE Cut to broken 3, CB Broken stitch 2, EA Unsmooth/puckering/bubbling 3

Missed in earlier stages: 2

CB Broken stitch (Final Random 09/30), GA Missing bartack/button (Final Random 09/30): first found in later stages, never recorded before

Found earlier but still reached later stages: 4

DE Cut to broken 3, EA Unsmooth/puckering/bubbling 3, BA Thread ends 8, EE Raw edge 7 pcs (later stages total)

Caught in earlier stages

DI High-low/uneven (14) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA 1st Bundle2 reports—31.2%
Final Random1 reports14.0%

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQA 1st BundleFinal Random
DI High-low/uneven14
BA Thread ends58
EE Raw edge37
EA Unsmooth/puckering/bubbling33
DE Cut to broken13
GA Missing bartack/button3
FA Wrong material2
CB Broken stitch2
260763 RGOR · CB21/CB22/CB23… · Due 10/30 · 22d leftShipment Sample FAIL Latest Shipment Sample (09/01) FAILED
No reportPP Sample
No reportPilot Run
08/26–09/23QC 1st Bundle2 reports
08/26QA 1st Bundle1 reports
43/78QC Inlineactual/required · 55%
DHU 23.2%QC Endline36 days
All FAILQA Inline5 reports
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty5,210 / 5,210
PDF reports54
Last report10/08

Cross-stage findings

Latest Shipment Sample (09/01) FAILED

28 major: FA Wrong material 1, FA Wrong material 1, FC Wrong label 1, FC Wrong label 1, FC Wrong label 1, FC Wrong label 1, ED Gathering crease 1, EI Inaccurate/skewed stitching 1, DB Run-off stitching 1, GB Missing sewing operation 1, EA Unsmooth/puckering/bubbling 1, GB Missing sewing operation 1, ED Gathering crease 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 1, GB Missing sewing operation 1, EA Unsmooth/puckering/bubbling 1, AD Fabric stains 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, EI Inaccurate/skewed stitching 1, EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 1, FA Wrong material 1, Others (no detail) 1, EC Asymmetry 1

Not fixed: EC Asymmetry

Found 73 times (475 pcs, 08/26–10/08) in earlier stages; latest Shipment Sample (09/01) still has 3 major

Not fixed: DB Run-off stitching

Found 19 times (56 pcs, 08/26–10/06) in earlier stages; latest Shipment Sample (09/01) still has 1 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 16 times (60 pcs, 08/26–10/02) in earlier stages; latest Shipment Sample (09/01) still has 5 major

Missed in earlier stages: 5

FA Wrong material (Shipment Sample 09/01), FC Wrong label (Shipment Sample 09/01), ED Gathering crease (Shipment Sample 09/01), GB Missing sewing operation (Shipment Sample 09/01), AD Fabric stains (Shipment Sample 09/01): first found in later stages, never recorded before

Found earlier but still reached later stages: 1

EI Inaccurate/skewed stitching 5 pcs (later stages total)

1 defects recorded as 'Others' without detail

Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

DD Thread not straight/waving (QA 9); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EB Measurement issue (5 Major), EE Raw edge (2 Major), FB Material defect (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (3), DB Run-off stitching (2), CB Broken stitch (2), BB Missing cut seam allowance (1); Both: CE Broken seam (2/3), EC Asymmetry (2/2), EA Unsmooth/puckering/bubbling (1/2), BA Thread ends (1/2); DHU QC 1st Bundle 107.7% / QA 1st Bundle 90.0%

Caught in earlier stages

BA Thread ends (1167), EB Measurement issue (297), CD Needle hole (176), BB Missing cut seam allowance (122), CE Broken seam (118) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—107.7%
QA 1st Bundle1 reports—90.0%
QC Inline45 reports
required on prod. days 43/78 (55%)
—104.6%
QC Endline36 days—23.2%
QA Inline5 reports538.8%
Shipment Sample1 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2123.4%
9438 / 35 days
38.8%—
08/25–10/08
BA Thread ends, EC Asymmetry, EB Measurement issue
CB300.0%
80 / 3 days
——
09/14–10/03
—
CB220.0%
20 / 1 days
——
09/17–09/17
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB21357043 (61%)22509/15, 09/16, 09/17, 09/19, 09/23
CB30360 (0%)3309/14, 09/18, 10/03
CB22120 (0%)1109/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends126410955
EC Asymmetry22126331143
EB Measurement issue52893
AD Fabric stains3423631
CD Needle hole176
BB Missing cut seam allowance1121
CE Broken seam2392192
CB Broken stitch2666
260764 RGOR · CS21 · Due 10/30 · 22d leftFinal Random FAIL Latest Final Random (10/01) FAILED
No reportPP Sample
No reportPilot Run
09/01QC 1st Bundle1 reports
09/01QA 1st Bundle1 reports
42/62QC Inlineactual/required · 68%
DHU 12.2%QC Endline31 days
All FAILQA Inline14 reports
2/3 FAILShipment Sample3 reports
2/4 FAILPre-final4 reports
1/2 FAILFinal Random2 reports
Order/Ship qty5,150 / 5,150
PDF reports68
Last report10/08

Cross-stage findings

Latest Final Random (10/01) FAILED

10 major: DE Cut to broken 1, CC Skip stitch 2, CB Broken stitch 1, BB Missing cut seam allowance 1, EI Inaccurate/skewed stitching 2, AD Fabric stains 1, BA Thread ends 1, DB Run-off stitching 1

Not fixed: CB Broken stitch

Found 100 times (181 pcs, 09/01–10/08) in earlier stages; latest Pre-final (10/02) still has 1 major

Not fixed: BA Thread ends

Found 49 times (1126 pcs, 09/01–10/08) in earlier stages; latest Pre-final (10/02) still has 4 major

Not fixed: EC Asymmetry

Found 32 times (91 pcs, 09/01–10/08) in earlier stages; latest Pre-final (10/02) still has 2 major

Not fixed: CC Skip stitch

Found 50 times (375 pcs, 09/01–10/08) in earlier stages; latest Pre-final (10/02) still has 1 major

Not fixed: DE Cut to broken

Found 3 times (4 pcs, 09/03–09/29) in earlier stages; latest Pre-final (10/02) still has 14 major

Not fixed: AD Fabric stains

Found 31 times (149 pcs, 09/16–10/08) in earlier stages; latest Pre-final (10/02) still has 2 major

Missed in earlier stages: 1

CF Pulling yarn (Shipment Sample 09/19): first found in later stages, never recorded before

1 later-stage PDF report(s) blank

Shipment Sample 09/19 QGR2642959 (FAIL); please check if the report was completed

Found earlier but still reached later stages: 8

DJ Pleat 7, ED Gathering crease 1, DB Run-off stitching 3, AC Fabric hole 1, EI Inaccurate/skewed stitching 5, GA Missing bartack/button 1, BB Missing cut seam allowance 7, EA Unsmooth/puckering/bubbling 3 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

DD Thread not straight/waving (QA 34); zero in QC Endline records

QC Endline data errors: 1

09/15 CS21 260764 (defective pcs 72 > defects 59)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (3 Major), EA Unsmooth/puckering/bubbling (2 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: EI Inaccurate/skewed stitching (1), AC Fabric hole (1), CE Broken seam (1), GA Missing bartack/button (1), DB Run-off stitching (1); Both: EC Asymmetry (3/4), BA Thread ends (2/3), CB Broken stitch (3/1), ED Gathering crease (1/1), DJ Pleat (1/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 80.0%

Caught in earlier stages

DD Thread not straight/waving (48), CE Broken seam (39), CG Grinning (36), DA Exceed seam allowance (24), CA Thread tension (11) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—80.0%
QC Inline43 reports
required on prod. days 42/62 (68%)
—52.7%
QC Endline31 days—12.2%
QA Inline14 reports1423.1%
Shipment Sample3 reports2—
Pre-final4 reports25.4%
Final Random2 reports13.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2112.2%
15429 / 31 days
23.1%FAIL
09/01–10/08
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS21316242 (68%)18209/17, 09/18, 09/19, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends23501045262210
CC Skip stitch30339612
DB Run-off stitching145176421
ED Gathering crease114913831
CB Broken stitch311671011
AD Fabric stains201227261
EC Asymmetry3414502063
DJ Pleat11677232
260765 RGOR · CP02/CP11/CP12… · Due 10/30 · 22d leftFinal Random FAIL Latest Final Random (09/22) FAILED
No reportPP Sample
No reportPilot Run
09/05–09/09QC 1st Bundle2 reports
09/07QA 1st Bundle1 reports
25/96QC Inlineactual/required · 26%
DHU 9.4%QC Endline21 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
1/3 FAILFinal Random3 reports
Order/Ship qty31,890 / 13,545
PDF reports35
Last report09/25

Cross-stage findings

Latest Final Random (09/22) FAILED

12 major: GA Missing bartack/button 2, DE Cut to broken 1, CE Broken seam 1, CB Broken stitch 3, CC Skip stitch 2, AD Fabric stains 3

Not fixed: AD Fabric stains

Found 25 times (122 pcs, 09/05–09/18) in earlier stages; latest Final Random (09/22) still has 3 major

Not fixed: CC Skip stitch

Found 74 times (687 pcs, 09/05–09/28) in earlier stages; latest Final Random (09/22) still has 2 major

Not fixed: CE Broken seam

Found 21 times (32 pcs, 09/05–09/22) in earlier stages; latest Final Random (09/22) still has 1 major

Not fixed: DE Cut to broken

Found 7 times (17 pcs, 09/05–09/25) in earlier stages; latest Final Random (09/22) still has 1 major

Not fixed: CB Broken stitch

Found 18 times (39 pcs, 09/07–09/25) in earlier stages; latest Final Random (09/22) still has 3 major

QC Endline data errors: 13

09/05 CP20 260765-S (defective pcs 30 > defects 6), 09/07 CP20 260765-S (defective pcs 54 > defects 51), 09/08 CP20 260765-L (defective pcs 18 > defects 9), 09/09 CP12 260765-S (defective pcs 16 > defects 11)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (2 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: CB Broken stitch (3), DA Exceed seam allowance (2), CE Broken seam (2), GA Missing bartack/button (2), BD Snagging (1), ED Gathering crease (1), GC Missing pocket/label (1); Both: BA Thread ends (9/2), CC Skip stitch (2/4), DE Cut to broken (2/4), EC Asymmetry (4/2), AD Fabric stains (2/2), DJ Pleat (2/1), BB Missing cut seam allowance (1/2); DHU QC 1st Bundle 85.0% / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (275), EB Measurement issue (193), AA Fabric defect (73), EA Uneven seam allowance (51), BD Snagging (39) did not reach later stages

Found before bulk production (Shipment Sample): 5

EC Asymmetry, GA Missing bartack/button, CG Grinning, DB Run-off stitching, CF Pulling yarn: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—85.0%
QA 1st Bundle1 reports—100.0%
QC Inline25 reports
required on prod. days 25/96 (26%)
—49.8%
QC Endline21 days—9.4%
QA Inline3 reports337.5%
Shipment Sample1 reports1—
Final Random3 reports12.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1210.7%
13941 / 18 days
31.2%PASS
09/09–09/30
BA Thread ends, CC Skip stitch, EB Measurement issue
CP206.1%
10719 / 15 days
25.0%FAIL
09/05–09/25
BA Thread ends, CC Skip stitch, ED Gathering crease
CP1911.6%
7892 / 13 days
—PASS
09/07–09/21
BA Thread ends, DB Run-off stitching, CC Skip stitch
CP020.0%
20 / 1 days
——
09/07–09/07
—
CP160.0%
20 / 1 days
——
09/15–09/15
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1218366 (17%)181209/25, 09/26, 09/28, 09/29, 09/30
CP2015309 (30%)14709/17, 09/18, 09/19, 09/21, 09/25
CP19132610 (38%)13309/16, 09/17, 09/18, 09/19, 09/21
CP02120 (0%)1109/07
CP16120 (0%)1109/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends9228914101136
CC Skip stitch24156662
ED Gathering crease12722
DB Run-off stitching52221
EB Measurement issue193
AD Fabric stains2223955
AA Fabric defect73
EC Asymmetry4237275
260766 RGOR · CS05/CS24/CS25 · Due 10/30 · 22d leftFinal Random PASS Not fixed: BB Missing cut seam allowance
No reportPP Sample
No reportPilot Run
09/05QC 1st Bundle1 reports
09/07QA 1st Bundle1 reports
33/56QC Inlineactual/required · 59%
DHU 6.1%QC Endline26 days
All FAILQA Inline11 reports
All FAILShipment Sample1 reports
2/4 FAILPre-final4 reports
All PASSFinal Random1 reports
Order/Ship qty7,145 / 7,145
PDF reports52
Last report10/03

Cross-stage findings

Not fixed: BB Missing cut seam allowance

Found 12 times (22 pcs, 09/07–10/02) in earlier stages; latest Pre-final (10/03) still has 5 major

Not fixed: CG Grinning

Found 17 times (41 pcs, 09/07–09/30) in earlier stages; latest Pre-final (10/03) still has 2 major

Not fixed: DJ Pleat

Found 11 times (26 pcs, 09/09–10/02) in earlier stages; latest Pre-final (10/03) still has 1 major

Missed in earlier stages: 1

GB Missing sewing operation (Pre-final 09/14): first found in later stages, never recorded before

QA Inline DHU is 5.4× QC Endline

QA Inline DHU 33.2% vs QC Endline 6.1% (09/05–10/06, 26 days, 25973 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 4

CB Broken stitch 2, DA Exceed seam allowance 1, EI Inaccurate/skewed stitching 1, CC Skip stitch 1 pcs (later stages total)

QC Endline data errors: 25

09/05 CS25 260766 (defective pcs 10 > defects 1), 09/07 CS25 260766 (defective pcs 129 > defects 18), 09/08 CS25 260766 (defective pcs 182 > defects 34), 09/09 CS25 260766 (defective pcs 162 > defects 28)…

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (3 Major), BB Missing cut seam allowance (2 Major), BA Thread ends (1 Major), DA Exceed seam allowance (1 Major), CA Thread tension (1 Major), AD Fabric stains (1 Major), CE Broken seam (1 Major), DI High-low/uneven (1 Major); Both: CB Broken stitch (9/2), EC Asymmetry (5/1); DHU QC 1st Bundle 70.0% / QA 1st Bundle 70.0%

Caught in earlier stages

EB Measurement issue (63), Q10 Reject after repairing (49), CE Broken seam (21), AC Fabric hole (20), CD Needle hole (15) did not reach later stages

Found before bulk production (Shipment Sample): 8

DB Run-off stitching, CA Thread tension, DE Cut to broken, EA Unsmooth/puckering/bubbling, GA Missing bartack/button, ED Gathering crease, EC Asymmetry, AD Fabric stains: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—70.0%
QA 1st Bundle1 reports—70.0%
QC Inline33 reports
required on prod. days 33/56 (59%)
—97.9%
QC Endline26 days—6.1%
QA Inline11 reports1133.2%
Shipment Sample1 reports1—
Pre-final4 reports24.0%
Final Random1 reports01.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS256.1%
25949 / 26 days
33.2%PASS
09/05–10/06
BA Thread ends, CC Skip stitch, ED Gathering crease
CS240.0%
20 / 1 days
——
09/08–09/08
—
CS050.0%
4 / 1 days
——
09/17–09/17
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS25265233 (63%)16309/18, 09/26, 10/03, 10/05, 10/06
CS05120 (0%)1109/17
CS24120 (0%)1109/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends12353692111
ED Gathering crease32142201451
CC Skip stitch233431
AD Fabric stains15921511172
CB Broken stitch9220272
EC Asymmetry5111070114
EB Measurement issue63
EA Unsmooth/puckering/bubbling3214521
260767 RGOR · CP08/CP09/CP10 · Due 10/30 · 22d leftFinal Random FAIL Latest Final Random (10/06) FAILED
No reportPP Sample
No reportPilot Run
09/08QC 1st Bundle1 reports
09/08QA 1st Bundle1 reports
15/68QC Inlineactual/required · 22%
DHU 9.8%QC Endline20 days
All FAILQA Inline4 reports
All FAILShipment Sample1 reports
No reportPre-final
1/3 FAILFinal Random3 reports
Order/Ship qty6,905 / 6,905
PDF reports25
Last report10/06

Cross-stage findings

Latest Final Random (10/06) FAILED

24 major: DJ Pleat 1, EI Inaccurate/skewed stitching 1, AD Fabric stains 16, BB Missing cut seam allowance 6

Not fixed: DJ Pleat

Found 16 times (32 pcs, 09/08–09/21) in earlier stages; latest Final Random (10/06) still has 1 major

Found earlier but still reached later stages: 3

CB Broken stitch 3, CC Skip stitch 1, BB Missing cut seam allowance 6 pcs (later stages total)

QC Endline data errors: 7

09/08 CP08 260767 (defective pcs 88 > defects 56), 09/16 CP08 260767 (defective pcs 103 > defects 101), 09/17 CP08 260767 (defective pcs 60 > defects 56), 09/19 CP08 260767 (defective pcs 61 > defects 60)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EG Wrong panel assembly (2 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: CB Broken stitch (3), CE Broken seam (2), CC Skip stitch (1), DD Thread not straight/waving (1), AD Fabric stains (1), DJ Pleat (1); Both: ED Gathering crease (4/3), DA Exceed seam allowance (2/4), EA Unsmooth/puckering/bubbling (3/2), BA Thread ends (2/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 70.0%

Caught in earlier stages

EA Uneven seam allowance (178), EB Measurement issue (100), DA Exceed seam allowance (48), DB Run-off stitching (43), GB Missing sewing operation (27) did not reach later stages

Found before bulk production (Shipment Sample): 6

ED Gathering crease, EI Inaccurate/skewed stitching, EC Asymmetry, EA Unsmooth/puckering/bubbling, AD Fabric stains, GA Missing bartack/button: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—70.0%
QC Inline15 reports
required on prod. days 15/68 (22%)
—35.4%
QC Endline20 days—9.8%
QA Inline4 reports443.0%
Shipment Sample1 reports1—
Final Random3 reports16.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP087.5%
12719 / 18 days
40.6%PASS
09/07–10/01
BA Thread ends, CC Skip stitch, EA Uneven seam allowance
CP1012.5%
11001 / 15 days
45.3%FAIL
09/11–09/29
BA Thread ends, AD Fabric stains, CC Skip stitch
CP090.0%
20 / 1 days
——
09/10–09/10
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP08183610 (28%)18809/22, 09/23, 09/25, 09/26, 10/01
CP1015305 (17%)151009/23, 09/25, 09/26, 09/28, 09/29
CP09120 (0%)1109/10

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends2271777531
AD Fabric stains13139713123
CC Skip stitch11417101
ED Gathering crease431123032
EA Uneven seam allowance178
EB Measurement issue100
EC Asymmetry177115
EA Unsmooth/puckering/bubbling3236082
260768 RGOR · CS03 · Due 10/30 · 22d leftFinal Random PASS Not fixed: DE Cut to broken
No reportPP Sample
No reportPilot Run
08/17QC 1st Bundle1 reports
08/18QA 1st Bundle1 reports
23/76QC Inlineactual/required · 30%
DHU 10.1%QC Endline38 days
All FAILQA Inline12 reports
All FAILShipment Sample1 reports
3/4 FAILPre-final4 reports
All PASSFinal Random1 reports
Order/Ship qty9,705 / 9,705
PDF reports43
Last report09/30

Cross-stage findings

Not fixed: DE Cut to broken

Found 9 times (12 pcs, 08/17–09/19) in earlier stages; latest Pre-final (09/29) still has 1 major

Not fixed: EC Asymmetry

Found 15 times (35 pcs, 08/19–09/28) in earlier stages; latest Pre-final (09/29) still has 3 major

Not fixed: BB Missing cut seam allowance

Found 10 times (17 pcs, 08/20–09/30) in earlier stages; latest Pre-final (09/29) still has 1 major

Not fixed: CE Broken seam

Found 11 times (24 pcs, 08/21–09/25) in earlier stages; latest Pre-final (09/29) still has 1 major

Not fixed: CC Skip stitch

Found 33 times (335 pcs, 08/21–09/30) in earlier stages; latest Pre-final (09/29) still has 3 major

Missed in earlier stages: 2

AD Fabric stains (Shipment Sample 08/24), DD Thread not straight/waving (Pre-final 09/17): first found in later stages, never recorded before

QA Inline DHU is 1.8× QC Inline

QA Inline DHU 33.1% vs QC Inline 18.4%; QC Inline may be missing defects

Found earlier but still reached later stages: 6

CB Broken stitch 8, EI Inaccurate/skewed stitching 6, DJ Pleat 1, GA Missing bartack/button 2, EA Unsmooth/puckering/bubbling 1, GB Missing sewing operation 2 pcs (later stages total)

QC Endline data errors: 19

08/25 CS03 260768 (defective pcs 147 > defects 120), 08/26 CS03 260768 (defective pcs 136 > defects 128), 08/31 CS03 260768 (defective pcs 120 > defects 93), 09/01 CS03 260768 (defective pcs 120 > defects 101)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (1 Major), DJ Pleat (1 Major); Only QC 1st Bundle: ED Gathering crease (2), DB Run-off stitching (2), DE Cut to broken (1); Both: CB Broken stitch (2/4), BA Thread ends (2/4), EI Inaccurate/skewed stitching (2/2); DHU QC 1st Bundle 34.4% / QA 1st Bundle 60.0%

Caught in earlier stages

AC Fabric hole (196), ED Gathering crease (105), DB Run-off stitching (52), Q61 Lace raw edge or broken lace (48), EB Measurement issue (27) did not reach later stages

Report line differs from production line

QGR2641561 Final Random (09/18) CS06; actual production line(s) CS03 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—34.4%
QA 1st Bundle1 reports—60.0%
QC Inline23 reports
required on prod. days 23/76 (30%)
—18.4%
QC Endline38 days—10.1%
QA Inline12 reports1233.1%
Shipment Sample1 reports1—
Pre-final4 reports33.8%
Final Random1 reports01.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0310.1%
29351 / 38 days
33.1%—
08/18–10/03
BA Thread ends, CC Skip stitch, AC Fabric hole

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS03387623 (30%)371609/29, 09/30, 10/01, 10/02, 10/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends24132131323920
CC Skip stitch11323162
AC Fabric hole81862
ED Gathering crease278412
CB Broken stitch245419161
DB Run-off stitching2842
AD Fabric stains728536
Q61 Lace raw edge or broken lace48
261175 MKSC · CB06/CB07/CB16… · Due 11/04 · 27d leftFinal Random PASS Not fixed: DJ Pleat
No resultPP Sample1 reports
No resultPilot Run3 reports
No reportQC 1st Bundle
08/13QA 1st Bundle1 reports
24/66QC Inlineactual/required · 36%
DHU 16.0%QC Endline30 days
All FAILQA Inline6 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random7 reports
Order/Ship qty6,269 / 1,000
PDF reports43
Last report10/06

Cross-stage findings

Not fixed: DJ Pleat

Found 7 times (14 pcs, 08/15–10/01) in earlier stages; latest Final Random (10/06) still has 4 major

Recurring in small numbers: 2

Latest Final Random (10/06): EA Unsmooth/puckering/bubbling 2 (earlier 21 times), DB Run-off stitching 2 (earlier 24 times)

Found earlier but still reached later stages: 4

CG Grinning 2, ED Gathering crease 2, CC Skip stitch 1, AC Fabric hole 1 pcs (later stages total)

24 defects recorded as 'Others' without detail

PP Sample 1, QA 1st Bundle 3, QA Inline 16, Final Random 4; cannot compare across stages

Duplicate report numbers

QGR2645430 have multiple reports with different content

Caught in earlier stages

CE Broken seam (116), EC Asymmetry (72), CD Needle hole (57), Q61 Lace raw edge or broken lace (25), DD Thread not straight/waving (24) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run3 reports0—
QA 1st Bundle1 reports—92.3%
QC Inline25 reports
required on prod. days 24/66 (36%)
—52.7%
QC Endline30 days—16.0%
QA Inline6 reports627.1%
Final Random7 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0613.2%
6479 / 24 days
28.1%PASS
08/14–09/14
ED Gathering crease, BA Thread ends, CC Skip stitch
CB1625.4%
1967 / 7 days
25.0%PASS
09/03–10/03
ED Gathering crease, BA Thread ends, CD Needle hole
CB300.0%
33 / 2 days
——
09/30–10/02
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB06244816 (33%)24809/07, 09/08, 09/09, 09/12, 09/14
CB167148 (57%)3309/03, 10/02, 10/03
CB30240 (0%)2209/30, 10/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease13113167132
BA Thread ends25910
CC Skip stitch11812811
CE Broken seam155591
DB Run-off stitching13713
EC Asymmetry33125346
EA Unsmooth/puckering/bubbling14291275
CD Needle hole255
261522 GECL · CS16 · Due 11/04 · 27d leftShipment Sample No result Not fixed: EC Asymmetry
No reportPP Sample
No reportPilot Run
09/30QC 1st Bundle1 reports
09/30QA 1st Bundle1 reports
13/16QC Inlineactual/required · 81%
DHU 23.1%QC Endline8 days
No reportQA Inline
No resultShipment Sample2 reports
No reportPre-final
No reportFinal Random
Order/Ship qty10,625 / 10,625
PDF reports17
Last report10/08

Cross-stage findings

Not fixed: EC Asymmetry

Found 10 times (27 pcs, 09/30–10/08) in earlier stages; latest Shipment Sample (10/06) still has 6 major

Missed in earlier stages: 1

FA Wrong material (Shipment Sample 10/06): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Shipment Sample (10/06): CG Grinning 2 (earlier 12 times)

Found earlier but still reached later stages: 2

EA Unsmooth/puckering/bubbling 2, EI Inaccurate/skewed stitching 2 pcs (later stages total)

1 defects recorded as 'Others' without detail

QA 1st Bundle 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

Duplicate report numbers

QGR2645636 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (5 Major), EC Asymmetry (3 Major), GA Missing bartack/button (2 Major), ED Gathering crease (2 Major); Only QC 1st Bundle: CG Grinning (4), CA Thread tension (3), BD Snagging (1); Both: CC Skip stitch (2/1); DHU QC 1st Bundle — / QA 1st Bundle 70.0%

Caught in earlier stages

BA Thread ends (186), AD Fabric stains (121), CC Skip stitch (114), CE Broken seam (48), CA Thread tension (47) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—70.0%
QC Inline13 reports
required on prod. days 13/16 (81%)
——
QC Endline8 days—23.1%
Shipment Sample2 reports0—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1623.1%
1880 / 8 days
——
09/30–10/08
BA Thread ends, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1681613 (81%)2109/30, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineShipment Sample
BA Thread ends4182
AD Fabric stains10111
CC Skip stitch211794
CE Broken seam2325
CA Thread tension344
CG Grinning4322
EC Asymmetry3246
DB Run-off stitching164
261525 GECL · CP19 · Due 11/04 · 27d leftShipment Sample No result Not fixed: EC Asymmetry
No reportPP Sample
No reportPilot Run
09/21QC 1st Bundle1 reports
09/21QA 1st Bundle1 reports
8/30QC Inlineactual/required · 27%
DHU 17.8%QC Endline15 days
All FAILQA Inline1 reports
No resultShipment Sample1 reports
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty10,560 / 10,560
PDF reports13
Last report10/06

Cross-stage findings

Not fixed: EC Asymmetry

Found 14 times (23 pcs, 09/21–10/06) in earlier stages; latest Shipment Sample (10/06) still has 3 major

Recurring in small numbers: 3

Latest Shipment Sample (10/06): CE Broken seam 1 (earlier 14 times), DD Thread not straight/waving 1 (earlier 7 times), AD Fabric stains 1 (earlier 16 times)

Found earlier but still reached later stages: 2

BA Thread ends 10, EI Inaccurate/skewed stitching 1 pcs (later stages total)

6 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (2 Major), EI Inaccurate/skewed stitching (1 Major), CE Broken seam (1 Major); Only QC 1st Bundle: CG Grinning (3), BD Snagging (1), CC Skip stitch (1); Both: BA Thread ends (6/2), ED Gathering crease (1/5), CB Broken stitch (3/2), DJ Pleat (3/1), EC Asymmetry (1/2), BB Missing cut seam allowance (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (350), ED Gathering crease (184), EA Uneven seam allowance (117), DB Run-off stitching (64), CD Needle hole (47) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline8 reports
required on prod. days 8/30 (27%)
——
QC Endline15 days—17.8%
QA Inline1 reports143.8%
Shipment Sample1 reports0—
Pre-final1 reports01.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1917.8%
8900 / 15 days
43.8%—
09/21–10/08
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1915308 (27%)15710/03, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends629149410
CC Skip stitch123461
ED Gathering crease151177
AD Fabric stains5166212
EA Uneven seam allowance117
CE Broken seam17721
DB Run-off stitching64
CD Needle hole47
261526 GECL · CS03/CS24 · Due 11/04 · 27d leftNo final Not fixed: CB Broken stitch
No reportPP Sample
No reportPilot Run
09/26–09/30QC 1st Bundle2 reports
09/26–10/02QA 1st Bundle2 reports
19/34QC Inlineactual/required · 56%
DHU 31.6%QC Endline11 days
All FAILQA Inline1 reports
No reportShipment Sample
All FAILPre-final2 reports
No reportFinal Random
Order/Ship qty9,250 / 9,250
PDF reports26
Last report10/08

Cross-stage findings

Not fixed: CB Broken stitch

Found 35 times (84 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/05) still has 2 major

Not fixed: AD Fabric stains

Found 18 times (220 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/05) still has 2 major

Not fixed: AC Fabric hole

Found 10 times (49 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/05) still has 1 major

Not fixed: DB Run-off stitching

Found 15 times (161 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/05) still has 1 major

Not fixed: BA Thread ends

Found 24 times (1280 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/05) still has 2 major

Missed in earlier stages: 2

DI High-low/uneven (Pre-final 10/02), DE Cut to broken (Pre-final 10/05): first found in later stages, never recorded before

Found earlier but still reached later stages: 3

EC Asymmetry 2, CC Skip stitch 8, GA Missing bartack/button 1 pcs (later stages total)

13 defects recorded as 'Others' without detail

QA 1st Bundle 8, QA Inline 3, Pre-final 2; cannot compare across stages

QC Endline data errors: 1

10/08 CS03 261526-2 (defective pcs 179 > defects 159)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), DA Exceed seam allowance (1 Major), EI Inaccurate/skewed stitching (1 Major), AC Fabric hole (1 Major), CE Broken seam (1 Major); Only QC 1st Bundle: DJ Pleat (2), EA Unsmooth/puckering/bubbling (2); Both: EC Asymmetry (5/4), CB Broken stitch (3/4), AD Fabric stains (5/1), BA Thread ends (2/3), CA Thread tension (2/2), BB Missing cut seam allowance (1/2); DHU QC 1st Bundle — / QA 1st Bundle 75.0%

Caught in earlier stages

EB Measurement issue (152), ED Gathering crease (49), CD Needle hole (47), GB Missing sewing operation (44), DJ Pleat (32) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports——
QA 1st Bundle2 reports—75.0%
QC Inline19 reports
required on prod. days 19/34 (56%)
——
QC Endline11 days—31.6%
QA Inline1 reports128.1%
Pre-final2 reports27.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0317.0%
3967 / 6 days
——
10/02–10/08
BA Thread ends, EB Measurement issue, GB Missing sewing operation
CS2448.9%
3347 / 11 days
28.1%—
09/26–10/08
BA Thread ends, CC Skip stitch, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS24112214 (64%)7109/29, 10/03, 10/05, 10/07, 10/08
CS036125 (42%)6110/03, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-final
BA Thread ends23111262217
CC Skip stitch73798
AD Fabric stains5112132
DB Run-off stitching91522
EB Measurement issue152
CB Broken stitch347525
AC Fabric hole1103711
ED Gathering crease3712
261527 GECL · CS11 · Due 11/04 · 27d leftShipment Sample FAIL Latest Shipment Sample (10/03) FAILED
No reportPP Sample
No reportPilot Run
09/14QC 1st Bundle1 reports
09/14QA 1st Bundle1 reports
33/42QC Inlineactual/required · 79%
DHU 13.0%QC Endline21 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty16,980 / 16,980
PDF reports38
Last report10/08

Cross-stage findings

Latest Shipment Sample (10/03) FAILED

6 major: CG Grinning 1, DJ Pleat 1, CB Broken stitch 1, EC Asymmetry 1, DE Cut to broken 1, EA Unsmooth/puckering/bubbling 1

Not fixed: EA Unsmooth/puckering/bubbling

Found 10 times (31 pcs, 09/14–10/08) in earlier stages; latest Shipment Sample (10/03) still has 1 major

Not fixed: CB Broken stitch

Found 11 times (44 pcs, 09/14–10/07) in earlier stages; latest Shipment Sample (10/03) still has 1 major

Not fixed: DJ Pleat

Found 15 times (63 pcs, 09/16–10/08) in earlier stages; latest Shipment Sample (10/03) still has 1 major

Not fixed: EC Asymmetry

Found 14 times (61 pcs, 09/14–10/05) in earlier stages; latest Shipment Sample (10/03) still has 1 major

Missed in earlier stages: 2

DE Cut to broken (Pre-final 09/18), BB Missing cut seam allowance (Pre-final 09/18): first found in later stages, never recorded before

Found earlier but still reached later stages: 3

AD Fabric stains 2, CG Grinning 1, BA Thread ends 15 pcs (later stages total)

241 defects recorded as 'Others' without detail

QC 1st Bundle 14, QA 1st Bundle 4, QC Inline 221, Pre-final 2; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (4 Major), CB Broken stitch (4 Major); Only QC 1st Bundle: ED Gathering crease (10); Both: EA Unsmooth/puckering/bubbling (5/8); DHU QC 1st Bundle 0.0% / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (507), ED Gathering crease (164), DB Run-off stitching (33), AC Fabric hole (21), GB Missing sewing operation (10) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—100.0%
QC Inline33 reports
required on prod. days 33/42 (79%)
—25.7%
QC Endline21 days—13.0%
QA Inline1 reports131.2%
Shipment Sample1 reports1—
Pre-final1 reports111.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1113.0%
10340 / 21 days
31.2%—
09/14–10/08
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS11214233 (79%)8109/23, 09/26, 09/29, 10/01, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends4761615
CC Skip stitch304761
Others (no detail)1442212
ED Gathering crease1022132
AD Fabric stains16772
DJ Pleat603111
EC Asymmetry55613
CB Broken stitch4401
261530 GECL · CP20 · Due 11/04 · 27d leftFinal Random PASS Not fixed: EC Asymmetry
No reportPP Sample
No reportPilot Run
09/18QC 1st Bundle1 reports
09/19QA 1st Bundle1 reports
10/34QC Inlineactual/required · 29%
DHU 7.6%QC Endline17 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty12,160 / 12,160
PDF reports17
Last report10/07

Cross-stage findings

Not fixed: EC Asymmetry

Found 8 times (21 pcs, 09/18–10/07) in earlier stages; latest Shipment Sample (10/07) still has 3 major

Not fixed: BD Snagging

Found 7 times (13 pcs, 09/18–10/02) in earlier stages; latest Shipment Sample (10/07) still has 1 major

Not fixed: AD Fabric stains

Found 13 times (25 pcs, 09/19–10/07) in earlier stages; latest Shipment Sample (10/07) still has 1 major

Not fixed: CB Broken stitch

Found 4 times (6 pcs, 09/19–10/02) in earlier stages; latest Shipment Sample (10/07) still has 1 major

Missed in earlier stages: 1

DC Join stitching (Shipment Sample 10/07): first found in later stages, never recorded before

QA Inline DHU is 6.8× QC Endline

QA Inline DHU 51.6% vs QC Endline 7.6% (09/18–10/08, 17 days, 10100 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 5

ED Gathering crease 2, BA Thread ends 11, EI Inaccurate/skewed stitching 1, CE Broken seam 1, EA Unsmooth/puckering/bubbling 3 pcs (later stages total)

7 defects recorded as 'Others' without detail

QA Inline 5, Pre-final 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 5); zero in QC Endline records

QC Endline data errors: 16

09/19 CP20 261530 (defective pcs 31 > defects 28), 09/21 CP20 261530 (defective pcs 36 > defects 21), 09/22 CP20 261530 (defective pcs 63 > defects 58), 09/23 CP20 261530 (defective pcs 56 > defects 33)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AD Fabric stains (3 Major), DA Exceed seam allowance (1 Major), EI Inaccurate/skewed stitching (1 Major), CE Broken seam (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: GA Missing bartack/button (2), CF Pulling yarn (1), CG Grinning (1); Both: ED Gathering crease (6/7), BA Thread ends (4/1), DJ Pleat (2/1), EC Asymmetry (2/1), BD Snagging (1/1), DE Cut to broken (1/1); DHU QC 1st Bundle — / QA 1st Bundle 95.0%

Caught in earlier stages

CC Skip stitch (248), CD Needle hole (23), CG Grinning (22), DJ Pleat (14), AC Fabric hole (9) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—95.0%
QC Inline10 reports
required on prod. days 10/34 (29%)
——
QC Endline17 days—7.6%
QA Inline2 reports251.6%
Shipment Sample1 reports1—
Pre-final1 reports01.0%
Final Random1 reports01.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP207.6%
10100 / 17 days
51.6%PASS
09/18–10/08
CC Skip stitch, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP20173410 (29%)17710/03, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends41100243156
ED Gathering crease67822682
CC Skip stitch2453
CE Broken seam142411
AD Fabric stains314441
EC Asymmetry211623
CD Needle hole23
CG Grinning1192
261533 GECL · CB30/CB32 · Due 11/04 · 27d leftShipment Sample No result Not fixed: EA Unsmooth/puckering/bubbling
No resultPP Sample1 reports
No reportPilot Run
09/28QC 1st Bundle1 reports
09/29QA 1st Bundle1 reports
10/22QC Inlineactual/required · 45%
DHU 35.7%QC Endline10 days
All FAILQA Inline2 reports
No resultShipment Sample4 reports
No reportPre-final
No reportFinal Random
Order/Ship qty14,012 / 6,104
PDF reports19
Last report10/08

Cross-stage findings

Not fixed: EA Unsmooth/puckering/bubbling

Found 13 times (22 pcs, 09/23–10/06) in earlier stages; latest Shipment Sample (09/28) still has 4 major

Not fixed: ED Gathering crease

Found 20 times (327 pcs, 09/23–10/08) in earlier stages; latest Shipment Sample (09/28) still has 4 major

Missed in earlier stages: 1

EI Inaccurate/skewed stitching (Shipment Sample 09/28): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Shipment Sample (09/28): AC Fabric hole 2 (earlier 9 times), EC Asymmetry 1 (earlier 13 times), CE Broken seam 2 (earlier 12 times)

Found earlier but still reached later stages: 1

DD Thread not straight/waving 2 pcs (later stages total)

3 defects recorded as 'Others' without detail

PP Sample 2, Shipment Sample 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 8); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AC Fabric hole (3 Major), EI Inaccurate/skewed stitching (2 Major), CG Grinning (1 Major); Only QC 1st Bundle: DB Run-off stitching (1), DA Exceed seam allowance (1), DF Twisted seam/skewing (1), EC Asymmetry (1); Both: EA Unsmooth/puckering/bubbling (1/4), CB Broken stitch (1/2), BD Snagging (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (72), BA Thread ends (67), EA Uneven seam allowance (53), DJ Pleat (21), EB Measurement issue (12) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline10 reports
required on prod. days 10/22 (45%)
——
QC Endline10 days—35.7%
QA Inline2 reports225.0%
Shipment Sample4 reports0—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB3235.9%
1600 / 10 days
25.0%—
09/28–10/08
ED Gathering crease, CC Skip stitch, BA Thread ends
CB300.0%
10 / 1 days
——
10/02–10/02
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB32102010 (50%)9110/03, 10/05, 10/06, 10/07, 10/08
CB30120 (0%)1110/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
ED Gathering crease1302964
CC Skip stitch270
BA Thread ends67
EA Uneven seam allowance53
CE Broken seam7342
EC Asymmetry1112231
CB Broken stitch122511
EA Unsmooth/puckering/bubbling1141244
261535 GECL · CP07/CP09 · Due 11/04 · 27d leftShipment Sample FAIL Latest Shipment Sample (10/07) FAILED
No reportPP Sample
No reportPilot Run
09/28QC 1st Bundle1 reports
09/28QA 1st Bundle1 reports
6/24QC Inlineactual/required · 25%
DHU 9.1%QC Endline11 days
All FAILQA Inline1 reports
All FAILShipment Sample1 reports
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty11,840 / 11,840
PDF reports11
Last report10/07

Cross-stage findings

Latest Shipment Sample (10/07) FAILED

5 major: AD Fabric stains 1, DE Cut to broken 1, ED Gathering crease 1, EC Asymmetry 1, ED Gathering crease 1

Not fixed: ED Gathering crease

Found 15 times (126 pcs, 09/26–10/08) in earlier stages; latest Shipment Sample (10/07) still has 2 major

Not fixed: DE Cut to broken

Found 6 times (14 pcs, 09/28–10/07) in earlier stages; latest Shipment Sample (10/07) still has 1 major

Missed in earlier stages: 1

AD Fabric stains (Pre-final 10/01): first found in later stages, never recorded before

QA Inline DHU is 6.5× QC Endline

QA Inline DHU 59.4% vs QC Endline 9.1% (09/26–10/08, 11 days, 7200 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 2

BA Thread ends 4, EC Asymmetry 1 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 3; cannot compare across stages

QC Endline data errors: 2

10/03 CP09 261535 (defective pcs 32 > defects 31), 10/08 CP09 261535 (defective pcs 76 > defects 74)

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (1 Major); Only QC 1st Bundle: BD Snagging (2), ED Gathering crease (2), DE Cut to broken (2), EI Inaccurate/skewed stitching (2), DI High-low/uneven (2), DF Twisted seam/skewing (2), DB Run-off stitching (1), CB Broken stitch (1); Both: BA Thread ends (2/7), DJ Pleat (3/2), EA Unsmooth/puckering/bubbling (1/4); DHU QC 1st Bundle — / QA 1st Bundle 75.0%

Caught in earlier stages

DB Run-off stitching (162), CC Skip stitch (81), DJ Pleat (23), DI High-low/uneven (22), CE Broken seam (22) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—75.0%
QC Inline6 reports
required on prod. days 6/24 (25%)
——
QC Endline11 days—9.1%
QA Inline1 reports159.4%
Shipment Sample1 reports1—
Pre-final1 reports01.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP099.2%
7180 / 11 days
59.4%—
09/26–10/08
BA Thread ends, DB Run-off stitching, ED Gathering crease
CP070.0%
20 / 1 days
——
10/03–10/03
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0911226 (27%)11510/03, 10/05, 10/06, 10/07, 10/08
CP07120 (0%)1110/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends271027134
DB Run-off stitching1161
ED Gathering crease241101022
CC Skip stitch378
DJ Pleat3218
DI High-low/uneven220
CE Broken seam22
DE Cut to broken2121
261536 GECL · CS04/CS07/CS13 · Due 11/04 · 27d leftShipment Sample FAIL Latest Shipment Sample (10/07) FAILED
No reportPP Sample
No reportPilot Run
09/29–10/01QC 1st Bundle3 reports
09/29–10/01QA 1st Bundle2 reports
20/34QC Inlineactual/required · 59%
DHU 11.5%QC Endline9 days
All FAILQA Inline2 reports
All FAILShipment Sample2 reports
All PASSPre-final2 reports
No reportFinal Random
Order/Ship qty9,860 / 9,860
PDF reports31
Last report10/08

Cross-stage findings

Latest Shipment Sample (10/07) FAILED

6 major: GA Missing bartack/button 1, EI Inaccurate/skewed stitching 1, DF Twisted seam/skewing 1, ED Gathering crease 1, EI Inaccurate/skewed stitching 1, CE Broken seam 1

Not fixed: DF Twisted seam/skewing

Found 38 times (158 pcs, 09/29–10/08) in earlier stages; latest Shipment Sample (10/07) still has 1 major

Missed in earlier stages: 2

DI High-low/uneven (Pre-final 10/05), AD Fabric stains (Pre-final 10/05): first found in later stages, never recorded before

Found earlier but still reached later stages: 6

BA Thread ends 11, CF Pulling yarn 1, GA Missing bartack/button 1, EI Inaccurate/skewed stitching 2, DJ Pleat 1, CE Broken seam 1 pcs (later stages total)

88 defects recorded as 'Others' without detail

QA 1st Bundle 9, QC 1st Bundle 9, QC Inline 68, QA Inline 2; cannot compare across stages

QC Endline data errors: 3

10/02 CS07 261536-1 (defective pcs 40 > defects 34), 10/05 CS07 261536-1 (defective pcs 49 > defects 48), 10/06 CS07 261536-1 (defective pcs 52 > defects 50)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), BA Thread ends (2 Major), EC Asymmetry (2 Major), CF Pulling yarn (1 Major), GA Missing bartack/button (1 Major); Both: DF Twisted seam/skewing (16/4), ED Gathering crease (5/3); DHU QC 1st Bundle — / QA 1st Bundle 62.5%

Caught in earlier stages

CC Skip stitch (108), GB Missing sewing operation (49), AC Fabric hole (23), DB Run-off stitching (18), FC Wrong label (6) did not reach later stages

Found before bulk production (Shipment Sample): 5

EA Unsmooth/puckering/bubbling, ED Gathering crease, EC Asymmetry, CB Broken stitch, BD Snagging: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QC 1st Bundle3 reports——
QA 1st Bundle2 reports—62.5%
QC Inline20 reports
required on prod. days 20/34 (59%)
——
QC Endline9 days—11.5%
QA Inline2 reports245.3%
Shipment Sample2 reports2—
Pre-final2 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1314.2%
4656 / 7 days
43.8%—
10/01–10/08
BA Thread ends, ED Gathering crease, CC Skip stitch
CS078.5%
4096 / 9 days
46.9%—
09/29–10/08
BA Thread ends, DF Twisted seam/skewing, ED Gathering crease
CS040.0%
10 / 1 days
——
10/05–10/05
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0791812 (67%)4209/29, 09/30, 10/01, 10/07
CS137148 (57%)5110/01, 10/05, 10/06, 10/07, 10/08
CS04120 (0%)1110/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends2224991111
ED Gathering crease5357192341
DF Twisted seam/skewing164716711
CC Skip stitch108
Others (no detail)99682
GB Missing sewing operation1435
CF Pulling yarn1461
EC Asymmetry21518413
262186 OSIT · CP02/CP18 · Due 11/04 · 27d leftNo final Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/26QA 1st Bundle1 reports
0/24QC Inlineactual/required · 0%
DHU 17.9%QC Endline11 days
All FAILQA Inline4 reports
No reportShipment Sample
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty8,000 / 8,000
PDF reports6
Last report10/05

Cross-stage findings

Not fixed: AD Fabric stains

Found 15 times (761 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/01) still has 15 major

Not fixed: CB Broken stitch

Found 5 times (10 pcs, 09/26–10/05) in earlier stages; latest Pre-final (10/01) still has 1 major

Not fixed: EA Unsmooth/puckering/bubbling

Found 12 times (164 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/01) still has 1 major

Missed in earlier stages: 1

DE Cut to broken (Pre-final 10/01): first found in later stages, never recorded before

5 defects recorded as 'Others' without detail

Pre-final 5; cannot compare across stages

Caught in earlier stages

EC Asymmetry (793), ED Gathering crease (296), CC Skip stitch (79), EA Uneven seam allowance (15), EB Measurement issue (13) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—100.0%
QC Inline0 reports
required on prod. days 0/24 (0%)
——
QC Endline11 days—17.9%
QA Inline4 reports453.1%
Pre-final1 reports111.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0218.0%
13480 / 11 days
53.1%—
09/26–10/08
EC Asymmetry, AD Fabric stains, BA Thread ends
CP180.0%
20 / 1 days
——
09/30–09/30
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0211220 (0%)111110/03, 10/05, 10/06, 10/07, 10/08
CP18120 (0%)1109/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlinePre-final
EC Asymmetry276130
AD Fabric stains6748715
BA Thread ends134464
ED Gathering crease2933
EA Unsmooth/puckering/bubbling116211
CC Skip stitch79
EA Uneven seam allowance15
EB Measurement issue13
260354 MKSC · CB17 · Due 11/11 · 34d leftShipment Sample FAIL Latest Shipment Sample (09/15) FAILED
No resultPP Sample1 reports
No resultPilot Run2 reports
No reportQC 1st Bundle
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
All FAILShipment Sample1 reports
No reportPre-final
No reportFinal Random
Order/Ship qty17,060 / 0
PDF reports4
Last report10/02

Cross-stage findings

Latest Shipment Sample (09/15) FAILED

9 major: AD Fabric stains 1, DD Thread not straight/waving 1, DA Exceed seam allowance 1, CG Grinning 1, EA Unsmooth/puckering/bubbling 1, AD Fabric stains 1, EI Inaccurate/skewed stitching 1, AC Fabric hole 1, CB Broken stitch 1

6 defects recorded as 'Others' without detail

PP Sample 6; cannot compare across stages

Found before bulk production (Shipment Sample): 8

AD Fabric stains, DD Thread not straight/waving, DA Exceed seam allowance, CG Grinning, EA Unsmooth/puckering/bubbling, EI Inaccurate/skewed stitching, AC Fabric hole, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run2 reports0—
Shipment Sample1 reports1—

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunShipment Sample
Others (no detail)6
AD Fabric stains12
CG Grinning21
DD Thread not straight/waving11
AC Fabric hole11
EC Asymmetry11
ED Gathering crease2
DA Exceed seam allowance1
261179 MKSC · CP01/CP02 · Due 11/18 · 41d leftFinal Random PASS Not fixed: CC Skip stitch
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/15QA 1st Bundle1 reports
0/14QC Inlineactual/required · 0%
DHU 12.4%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty3,337 / 1,000
PDF reports4
Last report09/26

Cross-stage findings

Not fixed: CC Skip stitch

Found 11 times (65 pcs, 09/15–09/21) in earlier stages; latest Final Random (09/26) still has 3 major

Missed in earlier stages: 1

DB Run-off stitching (Final Random 09/26): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

DJ Pleat 1, BA Thread ends 4 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA 1st Bundle 2; cannot compare across stages

Caught in earlier stages

EC Asymmetry (190), ED Gathering crease (110), EA Unsmooth/puckering/bubbling (25), CB Broken stitch (5) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—65.0%
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—12.4%
QA Inline1 reports150.0%
Final Random2 reports02.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0212.4%
3222 / 7 days
50.0%PASS
09/15–09/22
EC Asymmetry, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP027140 (0%)7709/17, 09/18, 09/19, 09/21, 09/22

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
EC Asymmetry11881
ED Gathering crease31061
CC Skip stitch6143
EA Unsmooth/puckering/bubbling421
BA Thread ends154
CB Broken stitch5
CG Grinning21
CE Broken seam3
261972 RTMS · CP15 · Due 11/18 · 41d leftShipment Sample No result Not fixed: AD Fabric stains
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/18QA 1st Bundle1 reports
0/20QC Inlineactual/required · 0%
DHU 10.5%QC Endline10 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
1/2 FAILPre-final2 reports
No reportFinal Random
Order/Ship qty1,500 / 1,500
PDF reports8
Last report09/30

Cross-stage findings

Not fixed: AD Fabric stains

Found 11 times (76 pcs, 09/18–09/29) in earlier stages; latest Shipment Sample (09/30) still has 3 major

Missed in earlier stages: 2

CB Broken stitch (Pre-final 09/22), BB Missing cut seam allowance (Pre-final 09/26): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Shipment Sample (09/30): ED Gathering crease 1 (earlier 12 times), EA Unsmooth/puckering/bubbling 1 (earlier 7 times)

Found earlier but still reached later stages: 1

BA Thread ends 22 pcs (later stages total)

QC Endline data errors: 2

09/18 CP15 261972 (defective pcs 12 > defects 11), 09/29 CP15 261972 (defective pcs 14 > defects 11)

Caught in earlier stages

AC Fabric hole (44), EB Measurement issue (16), EI Inaccurate/skewed stitching (14), CC Skip stitch (10), CG Grinning (6) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—60.0%
QC Inline0 reports
required on prod. days 0/20 (0%)
——
QC Endline10 days—10.5%
QA Inline3 reports343.8%
Shipment Sample2 reports1—
Pre-final2 reports12.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1510.5%
2808 / 10 days
43.8%—
09/18–10/03
ED Gathering crease, AD Fabric stains, AC Fabric hole

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1510200 (0%)101009/25, 09/26, 09/28, 09/29, 10/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineShipment SamplePre-final
ED Gathering crease511521
AD Fabric stains272234
AC Fabric hole404
EA Unsmooth/puckering/bubbling3411
BA Thread ends14522
EB Measurement issue16
EI Inaccurate/skewed stitching410
CC Skip stitch64
262034 LOGE · CS23 · Due 11/18 · 41d leftNo final Not fixed: CB Broken stitch
No reportPP Sample
No reportPilot Run
09/29QC 1st Bundle1 reports
09/29QA 1st Bundle2 reports
16/18QC Inlineactual/required · 89%
DHU 11.8%QC Endline9 days
All FAILQA Inline5 reports
No reportShipment Sample
All FAILPre-final2 reports
No reportFinal Random
Order/Ship qty2,866 / 2,866
PDF reports26
Last report10/08

Cross-stage findings

Not fixed: CB Broken stitch

Found 19 times (40 pcs, 09/29–10/07) in earlier stages; latest Pre-final (10/06) still has 3 major

Not fixed: BD Snagging

Found 14 times (22 pcs, 09/29–10/07) in earlier stages; latest Pre-final (10/06) still has 1 major

Not fixed: AD Fabric stains

Found 22 times (241 pcs, 09/29–10/08) in earlier stages; latest Pre-final (10/06) still has 3 major

Not fixed: EC Asymmetry

Found 12 times (99 pcs, 09/30–10/08) in earlier stages; latest Pre-final (10/06) still has 4 major

Not fixed: CE Broken seam

Found 7 times (32 pcs, 09/30–10/08) in earlier stages; latest Pre-final (10/06) still has 1 major

2 defects recorded as 'Others' without detail

QC Inline 2; cannot compare across stages

QC Endline data errors: 9

09/29 CS23 262034 (defective pcs 21 > defects 16), 09/30 CS23 262034 (defective pcs 117 > defects 83), 10/01 CS23 262034 (defective pcs 161 > defects 123), 10/02 CS23 262034 (defective pcs 176 > defects 134)…

Duplicate report numbers

QGR2643947 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DI High-low/uneven (3 Major), BA Thread ends (2 Major), DE Cut to broken (1 Major), AD Fabric stains (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: DJ Pleat (1); Both: BD Snagging (2/3), GB Missing sewing operation (2/2), CB Broken stitch (2/1); DHU QC 1st Bundle — / QA 1st Bundle 35.0%

Caught in earlier stages

CC Skip stitch (200), ED Gathering crease (133), DF Twisted seam/skewing (64), AC Fabric hole (48), DB Run-off stitching (39) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle2 reports—35.0%
QC Inline16 reports
required on prod. days 16/18 (89%)
——
QC Endline9 days—11.8%
QA Inline5 reports525.0%
Pre-final2 reports25.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2311.8%
9371 / 9 days
25.0%—
09/29–10/08
BA Thread ends, AD Fabric stains, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2391816 (89%)1109/29

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-final
BA Thread ends2243161016
AD Fabric stains11721583
CC Skip stitch10190
ED Gathering crease5128
EC Asymmetry9186
DF Twisted seam/skewing64
AC Fabric hole48
CB Broken stitch213526
261381 DJLF · CS19 · Due 11/23 · 46d leftShipment Sample FAIL Latest Shipment Sample (08/13) FAILED
No reportPP Sample
No reportPilot Run
08/08QC 1st Bundle1 reports
08/08QA 1st Bundle1 reports
4/30QC Inlineactual/required · 13%
DHU 10.0%QC Endline15 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty2,200 / 2,200
PDF reports10
Last report08/26

Cross-stage findings

Latest Shipment Sample (08/13) FAILED

3 major: EC Asymmetry 1, AD Fabric stains 2

Not fixed: ED Gathering crease

Found 20 times (64 pcs, 08/08–08/22) in earlier stages; latest Pre-final (08/26) still has 3 major

Not fixed: AD Fabric stains

Found 16 times (95 pcs, 08/08–08/24) in earlier stages; latest Pre-final (08/26) still has 2 major

Not fixed: DJ Pleat

Found 4 times (6 pcs, 08/10–08/17) in earlier stages; latest Pre-final (08/26) still has 2 major

Missed in earlier stages: 1

HA Poor pressing (Pre-final 08/26): first found in later stages, never recorded before

Found earlier but still reached later stages: 2

EC Asymmetry 1, AC Fabric hole 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

QC Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 7); zero in QC Endline records

QC Endline data errors: 1

08/10 CS19 261381 (defective pcs 17 > defects 16)

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DE Cut to broken (3 Major), EA Unsmooth/puckering/bubbling (1 Major), AC Fabric hole (1 Major), DF Twisted seam/skewing (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: BA Thread ends (4), CC Skip stitch (3), CG Grinning (1), GA Missing bartack/button (1); Both: ED Gathering crease (2/4), AD Fabric stains (3/2); DHU QC 1st Bundle 70.0% / QA 1st Bundle 65.0%

Caught in earlier stages

DD Thread not straight/waving (10), CC Skip stitch (9), DI High-low/uneven (9), EA Unsmooth/puckering/bubbling (8), DB Run-off stitching (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—70.0%
QA 1st Bundle1 reports—65.0%
QC Inline4 reports
required on prod. days 4/30 (13%)
—24.7%
QC Endline15 days—10.0%
QA Inline2 reports229.7%
Shipment Sample1 reports1—
Pre-final1 reports17.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1910.0%
2184 / 15 days
29.7%—
08/08–10/06
BA Thread ends, AD Fabric stains, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1915304 (13%)151108/21, 08/22, 08/24, 09/01, 10/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends4247910
AD Fabric stains321374322
ED Gathering crease24164023
Others (no detail)214
DD Thread not straight/waving10
CC Skip stitch36
DI High-low/uneven81
EA Unsmooth/puckering/bubbling17
261119 SAIN · CB25/CB30 · Due 10/26 · 18d leftFinal Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
08/08QC 1st Bundle1 reports
08/07QA 1st Bundle1 reports
7/42QC Inlineactual/required · 17%
DHU 11.3%QC Endline20 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty8,399 / 2,560
PDF reports16
Last report09/09

Cross-stage findings

Missed in earlier stages: 2

GB Missing sewing operation (Final Random 09/02), EI Inaccurate/skewed stitching (Final Random 09/02): first found in later stages, never recorded before

QA Inline DHU is 1.5× QC Inline

QA Inline DHU 32.3% vs QC Inline 21.1%; QC Inline may be missing defects

Recurring in small numbers: 2

Latest Final Random (09/09): CB Broken stitch 2 (earlier 3 times), AD Fabric stains 2 (earlier 10 times)

Found earlier but still reached later stages: 5

EC Asymmetry 1, EE Raw edge 1, EA Unsmooth/puckering/bubbling 1, ED Gathering crease 1, AC Fabric hole 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 5); zero in QC Endline records

QC Endline data errors: 11

08/07 CB25 261119 (defective pcs 30 > defects 18), 08/08 CB25 261119 (defective pcs 28 > defects 18), 08/10 CB25 261119 (defective pcs 23 > defects 15), 08/11 CB25 261119 (defective pcs 16 > defects 12)…

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CH Incorrect stitch density (2 Major), EE Raw edge (2 Major), AD Fabric stains (2 Major), CC Skip stitch (1 Major), DJ Pleat (1 Major), CE Broken seam (1 Major), DI High-low/uneven (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: BA Thread ends (3), DA Exceed seam allowance (2), DE Cut to broken (2); Both: EC Asymmetry (5/2); DHU QC 1st Bundle 92.3% / QA 1st Bundle 100.0%

Caught in earlier stages

BA Thread ends (419), Q94 Glue marks (116), EA Uneven seam allowance (77), EH Poor lamination/bonding (34), CD Needle hole (27) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—100.0%
QC Inline7 reports
required on prod. days 7/42 (17%)
—21.1%
QC Endline20 days—11.3%
QA Inline3 reports332.3%
Shipment Sample1 reports1—
Final Random3 reports03.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2511.3%
8651 / 20 days
32.3%PASS
08/07–08/31
BA Thread ends, ED Gathering crease, Q94 Glue marks
CB300.0%
10 / 1 days
——
08/26–08/26
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2520407 (18%)201308/25, 08/26, 08/28, 08/29, 08/31
CB30120 (0%)1108/26

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends3153974
ED Gathering crease419211
Q94 Glue marks116
Others (no detail)98
EA Uneven seam allowance77
AD Fabric stains28295
EC Asymmetry522841
EH Poor lamination/bonding331
261512 LOGE · CP11/CP18 · Due 10/26 · 18d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/29QA 1st Bundle1 reports
2/22QC Inlineactual/required · 9%
DHU 9.6%QC Endline9 days
All FAILQA Inline5 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty8,000 / 8,000
PDF reports10
Last report10/08

Cross-stage findings

Missed in earlier stages: 1

AC Fabric hole (Final Random 10/05): first found in later stages, never recorded before

QA Inline DHU is 5.7× QC Endline

QA Inline DHU 55.0% vs QC Endline 9.6% (09/29–10/08, 9 days, 6018 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

QC Endline data errors: 3

10/06 CP11 261512 (defective pcs 127 > defects 124), 10/07 CP18 261512 (defective pcs 24 > defects 15), 10/08 CP18 261512 (defective pcs 36 > defects 22)

Caught in earlier stages

CC Skip stitch (154), EB Measurement issue (54), EA Unsmooth/puckering/bubbling (34), EA Uneven seam allowance (24), DK Twisted shoulder strap (21) did not reach later stages

Found before bulk production (Shipment Sample): 5

EI Inaccurate/skewed stitching, EC Asymmetry, ED Gathering crease, CB Broken stitch, CF Pulling yarn: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—90.0%
QC Inline2 reports
required on prod. days 2/22 (9%)
——
QC Endline9 days—9.6%
QA Inline5 reports555.0%
Shipment Sample1 reports1—
Final Random1 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1110.5%
5158 / 9 days
57.0%PASS
09/29–10/08
BA Thread ends, CC Skip stitch, ED Gathering crease
CP184.3%
860 / 2 days
46.9%—
10/07–10/08
ED Gathering crease, BA Thread ends, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP119182 (11%)9710/03, 10/05, 10/06, 10/07, 10/08
CP18240 (0%)2210/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends1861212
CC Skip stitch41482
ED Gathering crease357712
EC Asymmetry617343
EB Measurement issue54
EA Unsmooth/puckering/bubbling2311
EI Inaccurate/skewed stitching422043
EA Uneven seam allowance24
261556 LOGE · CB26/CB28 · Due 10/26 · 18d leftShipment Sample PASS 1 later-stage PDF report(s) blank
No resultPP Sample1 reports
No reportPilot Run
09/28QC 1st Bundle1 reports
09/28QA 1st Bundle1 reports
20/26QC Inlineactual/required · 77%
DHU 11.8%QC Endline8 days
All FAILQA Inline3 reports
1/2 FAILShipment Sample2 reports
No reportPre-final
No reportFinal Random
Order/Ship qty7,000 / 7,000
PDF reports34
Last report10/07

Cross-stage findings

1 later-stage PDF report(s) blank

Shipment Sample 09/17 QGR2641464 (FAIL); please check if the report was completed

4 defects recorded as 'Others' without detail

QA Inline 4; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 10); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BD Snagging (2 Major); Only QC 1st Bundle: DA Exceed seam allowance (2), DJ Pleat (2), CB Broken stitch (1); Both: AD Fabric stains (2/2), EC Asymmetry (1/2), DB Run-off stitching (1/1); DHU QC 1st Bundle — / QA 1st Bundle 53.8%

Caught in earlier stages

BA Thread ends (181), CC Skip stitch (141), EB Measurement issue (111), DB Run-off stitching (86), DA Exceed seam allowance (59) did not reach later stages

Found before bulk production (Shipment Sample): 4

EI Inaccurate/skewed stitching, EA Unsmooth/puckering/bubbling, ED Gathering crease, EC Asymmetry: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—53.8%
QC Inline26 reports
required on prod. days 20/26 (77%)
——
QC Endline8 days—11.8%
QA Inline3 reports346.9%
Shipment Sample2 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2613.9%
2158 / 6 days
50.0%—
10/01–10/08
CC Skip stitch, EB Measurement issue, BA Thread ends
CB289.6%
2121 / 7 days
45.3%—
09/29–10/06
BA Thread ends, DB Run-off stitching, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2871413 (93%)1110/06
CB266127 (58%)3210/03, 10/06, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends5176
CC Skip stitch141
EB Measurement issue1092
DB Run-off stitching11148341
EC Asymmetry1126091
DA Exceed seam allowance257
DJ Pleat2442
AD Fabric stains1222982
261570 DJLF · CS22 · Due 10/26 · 18d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/16QC 1st Bundle1 reports
09/16QA 1st Bundle1 reports
12/20QC Inlineactual/required · 60%
DHU 24.1%QC Endline10 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,600 / 2,600
PDF reports20
Last report10/02

Cross-stage findings

Missed in earlier stages: 1

HA Poor pressing (Final Random 10/02): first found in later stages, never recorded before

Recurring in small numbers: 5

Latest Final Random (10/02): CB Broken stitch 1 (earlier 18 times), DF Twisted seam/skewing 1 (earlier 6 times), CC Skip stitch 1 (earlier 12 times), DB Run-off stitching 1 (earlier 11 times), AC Fabric hole 1 (earlier 7 times)

Found earlier but still reached later stages: 3

EC Asymmetry 7, DJ Pleat 1, DI High-low/uneven 1 pcs (later stages total)

6 defects recorded as 'Others' without detail

Pre-final 6; cannot compare across stages

QC Endline data errors: 1

09/26 CS22 261570 (defective pcs 46 > defects 44)

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (2 Major), DI High-low/uneven (2 Major), CC Skip stitch (1 Major), EA Unsmooth/puckering/bubbling (1 Major), DE Cut to broken (1 Major), CF Pulling yarn (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: DJ Pleat (3), ED Gathering crease (2), CB Broken stitch (2); Both: EC Asymmetry (5/4), BA Thread ends (4/3), DF Twisted seam/skewing (2/1); DHU QC 1st Bundle 90.0% / QA 1st Bundle 85.0%

Caught in earlier stages

EB Measurement issue (20), DD Thread not straight/waving (14), EI Inaccurate/skewed stitching (8), DA Exceed seam allowance (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—90.0%
QA 1st Bundle1 reports—85.0%
QC Inline12 reports
required on prod. days 12/20 (60%)
—89.8%
QC Endline10 days—24.1%
QA Inline3 reports334.4%
Shipment Sample1 reports1—
Pre-final1 reports111.2%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2224.1%
2599 / 10 days
34.4%PASS
09/16–09/28
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS22102012 (60%)6209/17, 09/18, 09/19, 09/26, 09/28

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends4357194673
CC Skip stitch1214311
ED Gathering crease21241
DB Run-off stitching31221
EC Asymmetry543217816
CB Broken stitch234111
DJ Pleat31931
EB Measurement issue155
261571 DJLF · CS04 · Due 10/26 · 18d leftFinal Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
09/17QC 1st Bundle2 reports
09/17QA 1st Bundle1 reports
6/20QC Inlineactual/required · 30%
DHU 20.4%QC Endline10 days
All FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,100 / 2,100
PDF reports16
Last report10/06

Cross-stage findings

Missed in earlier stages: 3

HA Poor pressing (Pre-final 09/22), CF Pulling yarn (Shipment Sample 09/25), DA Exceed seam allowance (Final Random 10/06): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (10/06): AD Fabric stains 2 (earlier 18 times), ED Gathering crease 2 (earlier 9 times)

Found earlier but still reached later stages: 3

CB Broken stitch 2, CC Skip stitch 1, DF Twisted seam/skewing 5 pcs (later stages total)

6 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 1, QC Inline 4; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), DI High-low/uneven (1 Major), ED Gathering crease (1 Major), CG Grinning (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: EB Measurement issue (2), EC Asymmetry (1); Both: DF Twisted seam/skewing (3/2), AD Fabric stains (2/2), CC Skip stitch (2/1), CB Broken stitch (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 65.0%

Caught in earlier stages

EC Asymmetry (78), DB Run-off stitching (42), DI High-low/uneven (17) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports—100.0%
QA 1st Bundle1 reports—65.0%
QC Inline6 reports
required on prod. days 6/20 (30%)
——
QC Endline10 days—20.4%
QA Inline3 reports335.4%
Shipment Sample2 reports1—
Pre-final1 reports112.0%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0420.4%
2100 / 10 days
35.4%PASS
09/17–10/03
BA Thread ends, AD Fabric stains, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS0410206 (30%)9509/22, 09/25, 09/26, 09/28, 10/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends2143357
AD Fabric stains227115422
EC Asymmetry12723
CC Skip stitch2124261
DB Run-off stitching13371
ED Gathering crease1419222
CB Broken stitch111262
DI High-low/uneven1142
261572 DJLF · CS23 · Due 10/26 · 18d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/19QC 1st Bundle1 reports
09/19QA 1st Bundle1 reports
11/18QC Inlineactual/required · 61%
DHU 22.2%QC Endline9 days
All FAILQA Inline2 reports
No resultShipment Sample1 reports
All FAILPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty2,300 / 2,300
PDF reports18
Last report10/07

Cross-stage findings

Missed in earlier stages: 1

GA Missing bartack/button (Pre-final 09/26): first found in later stages, never recorded before

Recurring in small numbers: 4

Latest Final Random (10/07): ED Gathering crease 2 (earlier 16 times), DJ Pleat 2 (earlier 7 times), CF Pulling yarn 1 (earlier 5 times), AD Fabric stains 1 (earlier 8 times)

Found earlier but still reached later stages: 3

CB Broken stitch 6, DE Cut to broken 2, CC Skip stitch 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QC Inline 1; cannot compare across stages

QC Endline data errors: 8

09/19 CS23 261572 (defective pcs 26 > defects 23), 09/21 CS23 261572 (defective pcs 95 > defects 82), 09/22 CS23 261572 (defective pcs 56 > defects 51), 09/23 CS23 261572 (defective pcs 99 > defects 66)…

QC 1st Bundle vs QA 1st Bundle: 8 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), CF Pulling yarn (2 Major), DB Run-off stitching (1 Major), DE Cut to broken (1 Major), EI Inaccurate/skewed stitching (1 Major), DJ Pleat (1 Major), CG Grinning (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: DI High-low/uneven (3), CB Broken stitch (2), BD Snagging (1); Both: EC Asymmetry (1/2); DHU QC 1st Bundle — / QA 1st Bundle 60.0%

Caught in earlier stages

DD Thread not straight/waving (41), DF Twisted seam/skewing (39), AC Fabric hole (28), EC Asymmetry (25), DI High-low/uneven (24) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—60.0%
QC Inline11 reports
required on prod. days 11/18 (61%)
——
QC Endline9 days—22.2%
QA Inline2 reports223.4%
Shipment Sample1 reports0—
Pre-final1 reports115.2%
Final Random1 reports04.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2322.2%
2243 / 9 days
23.4%PASS
09/19–09/30
CC Skip stitch, BA Thread ends, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2391811 (61%)4309/19, 09/28, 09/29, 09/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends43108247
CC Skip stitch1201
AD Fabric stains9631
ED Gathering crease2847222
CB Broken stitch23726
DD Thread not straight/waving14252
DF Twisted seam/skewing1371
AC Fabric hole271
262019 OSIT · CS09/CS12 · Due 10/28 · 20d leftShipment Sample No result Missed in earlier stages: 2
No resultPP Sample1 reports
No reportPilot Run
09/30QC 1st Bundle1 reports
09/30QA 1st Bundle1 reports
11/16QC Inlineactual/required · 69%
DHU 6.5%QC Endline8 days
2/3 FAILQA Inline3 reports
All FAILShipment Sample2 reports1 no result
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty7,500 / 7,500
PDF reports20
Last report10/08

Cross-stage findings

Missed in earlier stages: 2

CB Broken stitch (Pre-final 10/06), EF Cup/pocket issue (Pre-final 10/06): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Shipment Sample (10/06): EC Asymmetry 2 (earlier 25 times), EA Unsmooth/puckering/bubbling 1 (earlier 11 times)

Found earlier but still reached later stages: 2

BA Thread ends 7, CC Skip stitch 1 pcs (later stages total)

76 defects recorded as 'Others' without detail

QC 1st Bundle 6, QC Inline 70; cannot compare across stages

QC Endline data errors: 7

10/01 CS12 262019 (defective pcs 58 > defects 19), 10/02 CS12 262019 (defective pcs 51 > defects 22), 10/03 CS12 262019 (defective pcs 69 > defects 23), 10/05 CS12 262019 (defective pcs 59 > defects 28)…

Duplicate report numbers

QGR2644567 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), EA Unsmooth/puckering/bubbling (2 Major), DI High-low/uneven (1 Major), ED Gathering crease (1 Major), CG Grinning (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: DC Join stitching (4); Both: EC Asymmetry (3/2); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (89), FC Wrong label (10), CG Grinning (5) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline11 reports
required on prod. days 11/16 (69%)
——
QC Endline8 days—6.5%
QA Inline3 reports222.9%
Shipment Sample2 reports1—
Pre-final1 reports16.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS126.5%
2743 / 8 days
——
09/30–10/08
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1281611 (69%)4109/30, 10/01, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
EC Asymmetry325434924
ED Gathering crease123596
Others (no detail)670
BA Thread ends25927
EA Unsmooth/puckering/bubbling22631
CC Skip stitch241
FC Wrong label10
CG Grinning14
260759 RGOR · CB61 · Due 10/30 · 22d leftFinal Random PASS Missed in earlier stages: 3
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
09/04QA 1st Bundle1 reports
No reportQC Inline
No dataQC Endline
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty9,460 / 9,460
PDF reports4
Last report10/01

Cross-stage findings

Missed in earlier stages: 3

IA 2nd operation issue (Final Random 10/01), DK Twisted shoulder strap (Final Random 10/01), GA Missing bartack/button (Final Random 10/01): first found in later stages, never recorded before

Found earlier but still reached later stages: 3

CB Broken stitch 2, EE Raw edge 4, BA Thread ends 6 pcs (later stages total)

Caught in earlier stages

DI High-low/uneven (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA 1st Bundle1 reports—18.8%
QA Inline1 reports110.0%
Final Random1 reports01.5%

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQA 1st BundleQA InlineFinal Random
BA Thread ends36
EE Raw edge34
DI High-low/uneven6
CB Broken stitch22
EI Inaccurate/skewed stitching3
BB Missing cut seam allowance3
EA Unsmooth/puckering/bubbling12
IA 2nd operation issue3
260760 RGOR · CS26 · Due 10/30 · 22d leftFinal Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
08/29QC 1st Bundle1 reports
08/29QA 1st Bundle1 reports
36/70QC Inlineactual/required · 51%
DHU 18.3%QC Endline35 days
All FAILQA Inline8 reports
All FAILShipment Sample1 reports
3/5 FAILPre-final5 reports
All PASSFinal Random1 reports
Order/Ship qty4,345 / 4,345
PDF reports53
Last report10/06

Cross-stage findings

Missed in earlier stages: 2

AD Fabric stains (Shipment Sample 09/12), AC Fabric hole (Pre-final 09/14): first found in later stages, never recorded before

Recurring in small numbers: 4

Latest Final Random (10/06): DJ Pleat 1 (earlier 32 times), DE Cut to broken 1 (earlier 16 times), CC Skip stitch 2 (earlier 48 times), DF Twisted seam/skewing 1 (earlier 4 times)

Found earlier but still reached later stages: 11

EA Unsmooth/puckering/bubbling 7, EC Asymmetry 7, ED Gathering crease 1, CB Broken stitch 6, BB Missing cut seam allowance 10, DB Run-off stitching 6, EI Inaccurate/skewed stitching 3, CG Grinning 2, GB Missing sewing operation 1, CE Broken seam 1, DD Thread not straight/waving 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

Shipment Sample 2; cannot compare across stages

QC Endline data errors: 1

09/16 CS26 260760-S (defective pcs 56 > defects 48)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CB Broken stitch (3 Major), DA Exceed seam allowance (1 Major), BB Missing cut seam allowance (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: DJ Pleat (3), ED Gathering crease (3); Both: EC Asymmetry (5/4), EA Unsmooth/puckering/bubbling (3/2); DHU QC 1st Bundle 70.0% / QA 1st Bundle 60.0%

Caught in earlier stages

DI High-low/uneven (29), DA Exceed seam allowance (22), CA Thread tension (19), GA Missing bartack/button (7) did not reach later stages

Report line differs from production line

QGR2640439 Pre-final (09/14) CS25; actual production line(s) CS26 (cards show production lines only)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—70.0%
QA 1st Bundle1 reports—60.0%
QC Inline36 reports
required on prod. days 36/70 (51%)
—54.1%
QC Endline35 days—18.3%
QA Inline8 reports835.2%
Shipment Sample1 reports1—
Pre-final5 reports33.7%
Final Random1 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2618.3%
14406 / 35 days
35.2%PASS
08/28–10/08
BA Thread ends, CC Skip stitch, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS26357036 (51%)28610/01, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends166106911377
CC Skip stitch590532
DB Run-off stitching4634146
AD Fabric stains31110417
ED Gathering crease3612211
CB Broken stitch3105815
EC Asymmetry545710177
DJ Pleat3787341
261182 MKSC · CB03/CB04/CB05 · Due 11/04 · 27d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No resultPilot Run2 reports
08/15QC 1st Bundle1 reports
08/15QA 1st Bundle1 reports
13/38QC Inlineactual/required · 34%
DHU 29.4%QC Endline19 days
All FAILQA Inline5 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty5,050 / 1,000
PDF reports25
Last report09/22

Cross-stage findings

Missed in earlier stages: 1

BD Snagging (Final Random 09/07): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/22): BA Thread ends 2 (earlier 25 times), CB Broken stitch 1 (earlier 11 times)

Found earlier but still reached later stages: 2

AD Fabric stains 1, ED Gathering crease 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (2 Major), EC Asymmetry (2 Major); Only QC 1st Bundle: DA Exceed seam allowance (4), DJ Pleat (4), EA Unsmooth/puckering/bubbling (3); Both: AD Fabric stains (4/2); DHU QC 1st Bundle 115.4% / QA 1st Bundle 61.5%

Caught in earlier stages

EB Measurement issue (310), EA Unsmooth/puckering/bubbling (206), DB Run-off stitching (141), EC Asymmetry (103), DJ Pleat (38) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports—115.4%
QA 1st Bundle1 reports—61.5%
QC Inline13 reports
required on prod. days 13/38 (34%)
—47.4%
QC Endline19 days—29.4%
QA Inline5 reports530.6%
Final Random3 reports02.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0429.4%
5023 / 19 days
28.9%PASS
08/15–09/11
AD Fabric stains, EB Measurement issue, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB04193813 (34%)19609/02, 09/03, 09/04, 09/10, 09/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
AD Fabric stains424733181
EB Measurement issue1309
ED Gathering crease423681
EA Unsmooth/puckering/bubbling13501466
BA Thread ends2186611
DB Run-off stitching10131
EC Asymmetry2217757
DJ Pleat434
261184 MKSC · CB16 · Due 11/04 · 27d leftFinal Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
09/16QC 1st Bundle1 reports
09/16QA 1st Bundle1 reports
5/12QC Inlineactual/required · 42%
DHU 26.1%QC Endline6 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
1/2 FAILFinal Random2 reports
Order/Ship qty3,201 / 1,000
PDF reports11
Last report10/08

Cross-stage findings

Missed in earlier stages: 1

AF Crushed foam cup (Final Random 09/21): first found in later stages, never recorded before

1 later-stage PDF report(s) blank

Final Random 09/21 QGR2642166 (FAIL); please check if the report was completed

Recurring in small numbers: 3

Latest Final Random (09/21): ED Gathering crease 1 (earlier 18 times), EA Unsmooth/puckering/bubbling 1 (earlier 6 times), AD Fabric stains 1 (earlier 14 times)

2 defects recorded as 'Others' without detail

PP Sample 1, Final Random 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

Duplicate report numbers

QGR2642166 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (6 Major), DJ Pleat (1 Major), DH Pressing mark (1 Major); Only QC 1st Bundle: ED Gathering crease (5), CG Grinning (2), CA Thread tension (2), EA Unsmooth/puckering/bubbling (1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 61.5%

Caught in earlier stages

BA Thread ends (97), CE Broken seam (55), DB Run-off stitching (46), EC Asymmetry (29), CC Skip stitch (25) did not reach later stages

Report line differs from production line

QGR2642166 Final Random (09/21) CB06; actual production line(s) CB16 (cards show production lines only)

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—61.5%
QC Inline5 reports
required on prod. days 5/12 (42%)
—91.0%
QC Endline6 days—26.1%
QA Inline1 reports128.1%
Final Random2 reports12.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1626.1%
1582 / 6 days
28.1%PASS
09/16–10/08
BA Thread ends, ED Gathering crease, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB166125 (42%)5209/16, 09/17, 09/18, 09/19, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
ED Gathering crease5248431
AD Fabric stains20831
BA Thread ends97
CE Broken seam253
DB Run-off stitching244
EC Asymmetry2610101
CC Skip stitch421
CD Needle hole17
261188 MKSC · CS19 · Due 11/04 · 27d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/05QC 1st Bundle1 reports
08/05QA 1st Bundle1 reports
1/8QC Inlineactual/required · 12%
DHU 8.1%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty1,168 / 144
PDF reports6
Last report09/08

Cross-stage findings

Missed in earlier stages: 1

CB Broken stitch (Final Random 09/03): first found in later stages, never recorded before

QA Inline DHU is 2.1× QC Inline

QA Inline DHU 53.1% vs QC Inline 25.0%; QC Inline may be missing defects

QA Inline DHU is 6.6× QC Endline

QA Inline DHU 53.1% vs QC Endline 8.1% (08/05–08/08, 4 days, 1168 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 1

AD Fabric stains 1 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

HA Poor pressing (QA 5); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (2 Major), ED Gathering crease (2 Major); Only QC 1st Bundle: CG Grinning (3), EC Asymmetry (3), HA Poor pressing (2), DI High-low/uneven (2); Both: BA Thread ends (4/5), AD Fabric stains (1/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 55.0%

Caught in earlier stages

EC Asymmetry (17), ED Gathering crease (11), DI High-low/uneven (8), HA Poor pressing (7), CG Grinning (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—55.0%
QC Inline1 reports
required on prod. days 1/8 (12%)
—25.0%
QC Endline4 days—8.1%
QA Inline1 reports153.1%
Final Random2 reports03.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS198.1%
1168 / 4 days
53.1%PASS
08/05–08/08
BA Thread ends, Others (no detail), ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS19481 (12%)4308/05, 08/06, 08/07, 08/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends456474
Others (no detail)1211
EC Asymmetry3617
AD Fabric stains1191
ED Gathering crease29
DI High-low/uneven251
HA Poor pressing25
CG Grinning32
261343 MKSC · CP02/CP07 · Due 11/04 · 27d leftShipment Sample PASS 1 later-stage PDF report(s) blank
No resultPP Sample1 reports
No reportPilot Run
10/02QC 1st Bundle1 reports
10/02QA 1st Bundle1 reports
3/14QC Inlineactual/required · 21%
DHU 8.5%QC Endline6 days
All FAILQA Inline1 reports
1/2 FAILShipment Sample2 reports
No reportPre-final
No reportFinal Random
Order/Ship qty5,560 / 5,560
PDF reports9
Last report10/06

Cross-stage findings

1 later-stage PDF report(s) blank

Shipment Sample 10/01 QGR2645776 (FAIL); please check if the report was completed

QA Inline DHU is 8.8× QC Endline

QA Inline DHU 75.0% vs QC Endline 8.5% (10/02–10/08, 6 days, 2872 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

5 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (4 Major), BA Thread ends (2 Major), CA Thread tension (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (7), EA Unsmooth/puckering/bubbling (2), CB Broken stitch (2), ED Gathering crease (1), CE Broken seam (1); Both: AD Fabric stains (7/1); DHU QC 1st Bundle — / QA 1st Bundle 50.0%

Caught in earlier stages

BA Thread ends (75), CC Skip stitch (43), CE Broken seam (36), DD Thread not straight/waving (15), CG Grinning (12) did not reach later stages

Found before bulk production (Shipment Sample): 7

EI Inaccurate/skewed stitching, EC Asymmetry, CA Thread tension, AD Fabric stains, ED Gathering crease, EA Unsmooth/puckering/bubbling, CB Broken stitch: before 1st bundle/inline started, for reference only

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—50.0%
QC Inline3 reports
required on prod. days 3/14 (21%)
——
QC Endline6 days—8.5%
QA Inline1 reports175.0%
Shipment Sample2 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP078.6%
2832 / 6 days
75.0%—
10/02–10/08
BA Thread ends, ED Gathering crease, CC Skip stitch
CP020.0%
40 / 1 days
——
10/06–10/06
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP076123 (25%)6310/03, 10/05, 10/06, 10/07, 10/08
CP02120 (0%)1110/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends273
ED Gathering crease1144961
CC Skip stitch5371
CE Broken seam13311
AD Fabric stains1711272
EA Unsmooth/puckering/bubbling22121
EC Asymmetry1212
CB Broken stitch121231
261529 GECL · CP04/CP17 · Due 11/04 · 27d leftFinal Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
09/12QC 1st Bundle1 reports
09/11QA 1st Bundle1 reports
3/34QC Inlineactual/required · 9%
DHU 13.7%QC Endline16 days
All FAILQA Inline2 reports
All FAILShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty11,840 / 11,840
PDF reports11
Last report09/30

Cross-stage findings

Missed in earlier stages: 1

EI Inaccurate/skewed stitching (Shipment Sample 09/22): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/30): CB Broken stitch 1 (earlier 9 times), AD Fabric stains 1 (earlier 21 times)

Found earlier but still reached later stages: 3

EA Unsmooth/puckering/bubbling 1, ED Gathering crease 1, EC Asymmetry 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

PP Sample 1; cannot compare across stages

QC Endline data errors: 1

09/14 CP04 261529 (defective pcs 44 > defects 39)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (4 Major), CG Grinning (3 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (5), GA Missing bartack/button (3), AD Fabric stains (1), DC Join stitching (1); Both: CC Skip stitch (6/1), CB Broken stitch (2/2), DJ Pleat (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 60.0%

Caught in earlier stages

CC Skip stitch (338), AC Fabric hole (138), EB Measurement issue (57), GB Missing sewing operation (42), DJ Pleat (13) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—60.0%
QC Inline3 reports
required on prod. days 3/34 (9%)
—51.8%
QC Endline16 days—13.7%
QA Inline2 reports232.8%
Shipment Sample1 reports1—
Pre-final1 reports00.6%
Final Random1 reports00.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0413.7%
11820 / 16 days
32.8%PASS
09/11–09/30
BA Thread ends, CC Skip stitch, AD Fabric stains
CP170.0%
20 / 1 days
——
09/17–09/17
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0416323 (9%)161309/25, 09/26, 09/28, 09/29, 09/30
CP17120 (0%)1109/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends418519553
CC Skip stitch619322
AD Fabric stains17241211
ED Gathering crease18221
AC Fabric hole1371
EC Asymmetry2751
EB Measurement issue57
EA Unsmooth/puckering/bubbling54331
261531 GECL · CS02/CS25 · Due 11/04 · 27d leftFinal Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
09/25–10/05QC 1st Bundle2 reports
09/25–10/06QA 1st Bundle2 reports
21/32QC Inlineactual/required · 66%
DHU 17.1%QC Endline12 days
All FAILQA Inline1 reports
All FAILShipment Sample4 reports3 no result
No reportPre-final
All PASSFinal Random1 reports
Order/Ship qty9,860 / 0
PDF reports31
Last report10/08

Cross-stage findings

Missed in earlier stages: 2

EE Raw edge (Shipment Sample 09/30), EI Inaccurate/skewed stitching (Shipment Sample 09/30): first found in later stages, never recorded before

Recurring in small numbers: 6

Latest Final Random (10/02): ED Gathering crease 1 (earlier 29 times), AD Fabric stains 1 (earlier 30 times), CB Broken stitch 2 (earlier 13 times), BA Thread ends 1 (earlier 26 times), DJ Pleat 1 (earlier 4 times), CF Pulling yarn 1 (earlier 3 times)

Found earlier but still reached later stages: 2

AB Shading 2, DK Twisted shoulder strap 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 3; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

QC Endline data errors: 1

10/08 CS25 261531-2 (defective pcs 94 > defects 64)

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AB Shading (4 Major), CE Broken seam (3 Major), CF Pulling yarn (1 Major), EI Inaccurate/skewed stitching (1 Major), GA Missing bartack/button (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DI High-low/uneven (2), DB Run-off stitching (2); Both: DF Twisted seam/skewing (11/12), AD Fabric stains (6/6), ED Gathering crease (3/2), BA Thread ends (1/2); DHU QC 1st Bundle — / QA 1st Bundle 90.0%

Caught in earlier stages

DF Twisted seam/skewing (256), EC Asymmetry (138), CC Skip stitch (87), DB Run-off stitching (24), EA Uneven seam allowance (22) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle2 reports——
QA 1st Bundle2 reports—90.0%
QC Inline21 reports
required on prod. days 21/32 (66%)
——
QC Endline12 days—17.1%
QA Inline1 reports165.6%
Shipment Sample4 reports1—
Final Random1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0214.4%
4848 / 12 days
65.6%PASS
09/25–10/08
BA Thread ends, AD Fabric stains, ED Gathering crease
CS2526.8%
1366 / 4 days
——
10/05–10/08
AD Fabric stains, ED Gathering crease, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS02122417 (71%)6109/26, 09/30, 10/01, 10/02, 10/08
CS25484 (50%)3110/05, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
AD Fabric stains6630229341
DF Twisted seam/skewing1112631664
BA Thread ends121621744
ED Gathering crease323417911
EC Asymmetry301062
CC Skip stitch285
CB Broken stitch12512
DB Run-off stitching2715
261534 GECL · CP04/CP05 · Due 11/04 · 27d leftFinal Random PASS Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
09/21QC 1st Bundle1 reports
09/21QA 1st Bundle1 reports
6/34QC Inlineactual/required · 18%
DHU 15.9%QC Endline15 days
All FAILQA Inline1 reports
1/2 FAILShipment Sample2 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty11,840 / 11,840
PDF reports13
Last report10/02

Cross-stage findings

Missed in earlier stages: 2

AD Fabric stains (Final Random 10/02), EI Inaccurate/skewed stitching (Shipment Sample 10/02): first found in later stages, never recorded before

1 later-stage PDF report(s) blank

Shipment Sample 10/02 QGR2645791 (FAIL); please check if the report was completed

Recurring in small numbers: 3

Latest Shipment Sample (10/02): EA Unsmooth/puckering/bubbling 1 (earlier 18 times), EC Asymmetry 1 (earlier 22 times), DE Cut to broken 1 (earlier 3 times)

Found earlier but still reached later stages: 3

CB Broken stitch 1, DJ Pleat 2, BA Thread ends 10 pcs (later stages total)

4 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 1; cannot compare across stages

QC Endline data errors: 4

09/28 CP05 261534 (defective pcs 269 > defects 245), 10/02 CP04 261534 (defective pcs 24 > defects 23), 10/07 CP05 261534 (defective pcs 68 > defects 65), 10/08 CP05 261534 (defective pcs 109 > defects 98)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (4 Major), CC Skip stitch (1 Major); Only QC 1st Bundle: EC Asymmetry (4), DE Cut to broken (2), DF Twisted seam/skewing (1), ED Gathering crease (1), DI High-low/uneven (1), DB Run-off stitching (1); Both: EA Unsmooth/puckering/bubbling (3/8), DJ Pleat (5/2), CB Broken stitch (2/2); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (419), ED Gathering crease (273), DB Run-off stitching (199), AC Fabric hole (110), CE Broken seam (44) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline6 reports
required on prod. days 6/34 (18%)
—228.0%
QC Endline15 days—15.9%
QA Inline1 reports153.1%
Shipment Sample2 reports1—
Pre-final1 reports00.3%
Final Random1 reports01.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0516.2%
10740 / 15 days
53.1%PASS
09/21–10/08
CC Skip stitch, BA Thread ends, ED Gathering crease
CP0412.9%
1020 / 2 days
——
10/01–10/02
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0515306 (20%)15910/03, 10/05, 10/06, 10/07, 10/08
CP04240 (0%)2210/01, 10/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends434555
CC Skip stitch124151
ED Gathering crease1152552
EC Asymmetry4142271
DB Run-off stitching113185
EA Unsmooth/puckering/bubbling3841531
AC Fabric hole4106
DJ Pleat5235311
261630 GECL · CP06/CP16/CP17 · Due 11/04 · 27d leftShipment Sample No result Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
09/30QC 1st Bundle1 reports
09/11QA 1st Bundle1 reports
8/28QC Inlineactual/required · 29%
DHU 13.4%QC Endline13 days
All FAILQA Inline3 reports
No resultShipment Sample3 reports
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty28,800 / 15,300
PDF reports17
Last report10/07

Cross-stage findings

Missed in earlier stages: 2

CF Pulling yarn (Shipment Sample 09/22), AA Fabric defect (Shipment Sample 09/22): first found in later stages, never recorded before

Recurring in small numbers: 4

Latest Shipment Sample (09/22): DF Twisted seam/skewing 2 (earlier 7 times), EC Asymmetry 1 (earlier 11 times), CE Broken seam 1 (earlier 11 times), CB Broken stitch 2 (earlier 13 times)

Found earlier but still reached later stages: 4

BA Thread ends 5, ED Gathering crease 1, EA Unsmooth/puckering/bubbling 2, BB Missing cut seam allowance 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 1, Shipment Sample 1, QA Inline 1; cannot compare across stages

QC Endline data errors: 1

10/08 CP16 261630A (defective pcs 88 > defects 82)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DI High-low/uneven (4 Major), DE Cut to broken (3 Major), DF Twisted seam/skewing (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: CB Broken stitch (8), CC Skip stitch (5), DJ Pleat (1), CA Thread tension (1); Both: BA Thread ends (3/3), ED Gathering crease (1/4), EC Asymmetry (1/1); DHU QC 1st Bundle — / QA 1st Bundle 90.0%

Caught in earlier stages

CC Skip stitch (285), DB Run-off stitching (106), EB Measurement issue (64), GB Missing sewing operation (33), DI High-low/uneven (26) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—90.0%
QC Inline8 reports
required on prod. days 8/28 (29%)
—139.0%
QC Endline13 days—13.4%
QA Inline3 reports347.6%
Shipment Sample3 reports0—
Pre-final1 reports00.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1614.3%
7100 / 8 days
55.8%—
09/30–10/08
BA Thread ends, CC Skip stitch, ED Gathering crease
CP068.8%
1500 / 5 days
34.4%—
09/11–09/16
CC Skip stitch, BA Thread ends, ED Gathering crease
CP1710.0%
40 / 1 days
——
10/06–10/06
CC Skip stitch, EA Unsmooth/puckering/bubbling, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP168166 (38%)8210/03, 10/05, 10/06, 10/07, 10/08
CP065102 (20%)5309/11, 09/12, 09/14, 09/15, 09/16
CP17120 (0%)1110/06

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends3337225
CC Skip stitch5280
ED Gathering crease141423151
DB Run-off stitching2104
EB Measurement issue64
EA Unsmooth/puckering/bubbling12492
CB Broken stitch81935
GB Missing sewing operation33
261811 LOGE · CS10/CS13 · Due 11/04 · 27d leftNo final Missed in earlier stages: 2
No reportPP Sample
No reportPilot Run
09/23QC 1st Bundle1 reports
09/25QA 1st Bundle1 reports
14/26QC Inlineactual/required · 54%
DHU 11.2%QC Endline12 days
All FAILQA Inline11 reports
No reportShipment Sample
1/4 FAILPre-final4 reports
No reportFinal Random
Order/Ship qty3,236 / 3,236
PDF reports31
Last report10/06

Cross-stage findings

Missed in earlier stages: 2

BD Snagging (Pre-final 10/05), GB Missing sewing operation (Pre-final 10/05): first found in later stages, never recorded before

Recurring in small numbers: 3

Latest Pre-final (10/06): EA Unsmooth/puckering/bubbling 2 (earlier 42 times), BB Missing cut seam allowance 2 (earlier 4 times), AD Fabric stains 2 (earlier 13 times)

Found earlier but still reached later stages: 5

ED Gathering crease 1, DJ Pleat 1, CB Broken stitch 3, CC Skip stitch 1, CE Broken seam 1 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 71); zero in QC Endline records

QC Endline data errors: 1

10/07 CS10 261811 (defective pcs 18 > defects 7)

Duplicate report numbers

QGR2645008, QGR2645529 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), HA Poor pressing (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: EC Asymmetry (3), DD Thread not straight/waving (2); Both: EA Unsmooth/puckering/bubbling (5/8), ED Gathering crease (2/2), EI Inaccurate/skewed stitching (1/1); DHU QC 1st Bundle — / QA 1st Bundle 75.0%

Caught in earlier stages

DB Run-off stitching (298), EI Inaccurate/skewed stitching (37), EC Asymmetry (31), DD Thread not straight/waving (30), DF Twisted seam/skewing (18) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—75.0%
QC Inline14 reports
required on prod. days 14/26 (54%)
——
QC Endline12 days—11.2%
QA Inline11 reports1122.7%
Pre-final4 reports13.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1011.3%
22195 / 12 days
22.7%—
09/23–10/07
BA Thread ends, ED Gathering crease, DB Run-off stitching
CS130.0%
20 / 1 days
——
10/05–10/05
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS10122414 (58%)7309/26, 09/28, 09/30, 10/01, 10/07
CS13120 (0%)1110/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-final
BA Thread ends25614683122
ED Gathering crease2242374151
DB Run-off stitching19279
CC Skip stitch1821541
AD Fabric stains3114442
EA Unsmooth/puckering/bubbling58895912
EI Inaccurate/skewed stitching11305
EC Asymmetry315211
262333 OSIT · CS09 · Due 11/04 · 27d leftShipment Sample No result Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
10/05QC 1st Bundle1 reports
10/05QA 1st Bundle1 reports
4/8QC Inlineactual/required · 50%
DHU 29.2%QC Endline4 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports1 no result
No reportPre-final
No reportFinal Random
Order/Ship qty5,200 / 5,200
PDF reports9
Last report10/08

Cross-stage findings

Missed in earlier stages: 1

DI High-low/uneven (Shipment Sample 10/06): first found in later stages, never recorded before

Recurring in small numbers: 1

Latest Shipment Sample (10/06): EC Asymmetry 2 (earlier 13 times)

5 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 3; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AB Shading (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (1); Both: ED Gathering crease (2/5), BB Missing cut seam allowance (2/1), BA Thread ends (2/1), EC Asymmetry (1/1); DHU QC 1st Bundle — / QA 1st Bundle 84.6%

Caught in earlier stages

BA Thread ends (1028), ED Gathering crease (197), CC Skip stitch (102), DB Run-off stitching (41), Q93 Heat seal logo peeling off (15) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—84.6%
QC Inline4 reports
required on prod. days 4/8 (50%)
——
QC Endline4 days—29.2%
QA Inline1 reports128.1%
Shipment Sample2 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0929.2%
5142 / 4 days
28.1%—
10/05–10/08
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS09484 (50%)3110/05, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment Sample
BA Thread ends21510182
ED Gathering crease2522168
EC Asymmetry111816122
CC Skip stitch102
DB Run-off stitching932
Q93 Heat seal logo peeling off15
BB Missing cut seam allowance2111
CB Broken stitch131
261171 MKSC · CP03/CP07 · Due 11/11 · 34d leftFinal Random PASS Missed in earlier stages: 3
No reportPP Sample
No resultPilot Run1 reports
08/26QC 1st Bundle1 reports
08/26QA 1st Bundle1 reports
3/28QC Inlineactual/required · 11%
DHU 13.2%QC Endline14 days
All FAILQA Inline3 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty5,875 / 1,500
PDF reports13
Last report10/03

Cross-stage findings

Missed in earlier stages: 3

GA Missing bartack/button (Shipment Sample 09/01), BB Missing cut seam allowance (Final Random 09/09), HA Poor pressing (Final Random 10/03): first found in later stages, never recorded before

Found earlier but still reached later stages: 9

ED Gathering crease 2, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, CB Broken stitch 2, EA Unsmooth/puckering/bubbling 2, CC Skip stitch 1, AD Fabric stains 4, CE Broken seam 2, DB Run-off stitching 1 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 3; cannot compare across stages

QC Endline data errors: 4

08/25 CP03 261171A (defective pcs 21 > defects 14), 08/26 CP03 261171A (defective pcs 60 > defects 58), 08/28 CP03 261171A (defective pcs 65 > defects 56), 09/01 CP03 261171A (defective pcs 63 > defects 58)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (4 Major), EI Inaccurate/skewed stitching (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: EC Asymmetry (3), DD Thread not straight/waving (2), ED Gathering crease (2), AC Fabric hole (2), DF Twisted seam/skewing (2); Both: BA Thread ends (7/5), DJ Pleat (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 75.0%

Caught in earlier stages

EA Uneven seam allowance (118), DD Thread not straight/waving (12), DJ Pleat (7), CG Grinning (7), DE Cut to broken (5) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run1 reports0—
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—75.0%
QC Inline3 reports
required on prod. days 3/28 (11%)
—212.5%
QC Endline14 days—13.2%
QA Inline3 reports341.2%
Shipment Sample1 reports1—
Final Random3 reports02.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0313.2%
5855 / 14 days
41.2%PASS
08/25–10/03
BA Thread ends, CC Skip stitch, EA Uneven seam allowance

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0314283 (11%)141109/29, 09/30, 10/01, 10/02, 10/03

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends758207135
CC Skip stitch416581
ED Gathering crease2211682
EA Uneven seam allowance118
EC Asymmetry3217641
AD Fabric stains881113
DD Thread not straight/waving210
DB Run-off stitching81
261521 GECL · CP08/CP13 · Due 11/11 · 34d leftFinal Random PASS QA Inline DHU is 8.2× QC Endline
No reportPP Sample
No reportPilot Run
09/22QC 1st Bundle1 reports
09/23QA 1st Bundle1 reports
3/20QC Inlineactual/required · 15%
DHU 5.7%QC Endline9 days
All FAILQA Inline1 reports
No resultShipment Sample1 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty4,640 / 4,640
PDF reports9
Last report10/03

Cross-stage findings

QA Inline DHU is 8.2× QC Endline

QA Inline DHU 46.9% vs QC Endline 5.7% (09/22–10/02, 9 days, 4580 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (10/03): CB Broken stitch 2 (earlier 5 times)

Found earlier but still reached later stages: 1

EC Asymmetry 1 pcs (later stages total)

1 defects recorded as 'Others' without detail

QC 1st Bundle 1; cannot compare across stages

QC Endline data errors: 3

09/25 CP08 261521 (defective pcs 43 > defects 41), 09/29 CP08 261521 (defective pcs 32 > defects 23), 10/01 CP08 261521 (defective pcs 22 > defects 19)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (3 Major), CA Thread tension (2 Major), ED Gathering crease (1 Major), DC Join stitching (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (3), AD Fabric stains (3), CC Skip stitch (1), EI Inaccurate/skewed stitching (1), CE Broken seam (1), EC Asymmetry (1); Both: BA Thread ends (3/7), CB Broken stitch (3/3), DJ Pleat (2/2), DI High-low/uneven (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

ED Gathering crease (57), EA Uneven seam allowance (46), CC Skip stitch (34), DB Run-off stitching (17), DA Exceed seam allowance (14) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline3 reports
required on prod. days 3/20 (15%)
——
QC Endline9 days—5.7%
QA Inline1 reports146.9%
Shipment Sample1 reports0—
Pre-final1 reports01.5%
Final Random1 reports01.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP085.8%
4560 / 9 days
46.9%PASS
09/22–10/02
BA Thread ends, ED Gathering crease, EA Uneven seam allowance
CP130.0%
20 / 1 days
——
09/30–09/30
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP089183 (17%)9609/28, 09/29, 09/30, 10/01, 10/02
CP13120 (0%)1109/30

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends371479265
ED Gathering crease12513
EA Uneven seam allowance46
CC Skip stitch133
DB Run-off stitching17
DA Exceed seam allowance311
CB Broken stitch33422
EC Asymmetry1471
261532 GECL · CB02/CB30 · Due 11/11 · 34d leftFinal Random PASS Missed in earlier stages: 1
No resultPP Sample1 reports
No reportPilot Run
09/16QC 1st Bundle1 reports
09/15QA 1st Bundle1 reports
26/42QC Inlineactual/required · 62%
DHU 17.9%QC Endline20 days
All FAILQA Inline4 reports
No resultShipment Sample3 reports
All PASSPre-final1 reports
All PASSFinal Random1 reports
Order/Ship qty16,890 / 16,890
PDF reports38
Last report10/06

Cross-stage findings

Missed in earlier stages: 1

DE Cut to broken (Shipment Sample 09/30): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (10/05): EA Unsmooth/puckering/bubbling 1 (earlier 30 times), ED Gathering crease 2 (earlier 46 times)

Found earlier but still reached later stages: 7

EC Asymmetry 1, DB Run-off stitching 1, CF Pulling yarn 1, CB Broken stitch 1, CE Broken seam 1, CD Needle hole 1, DK Twisted shoulder strap 1 pcs (later stages total)

12 defects recorded as 'Others' without detail

PP Sample 3, QA 1st Bundle 1, QA Inline 8; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: CC Skip stitch (1); Both: EC Asymmetry (6/3), EA Unsmooth/puckering/bubbling (1/3), ED Gathering crease (2/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 76.9%

Caught in earlier stages

CC Skip stitch (313), DF Twisted seam/skewing (104), Q61 Lace raw edge or broken lace (76), EB Measurement issue (62), AC Fabric hole (49) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—76.9%
QA 1st Bundle1 reports—76.9%
QC Inline26 reports
required on prod. days 26/42 (62%)
—93.5%
QC Endline20 days—17.9%
QA Inline4 reports435.9%
Shipment Sample3 reports0—
Pre-final1 reports01.3%
Final Random1 reports01.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0217.9%
7752 / 20 days
35.9%PASS
09/15–10/08
CC Skip stitch, BA Thread ends, ED Gathering crease
CB300.0%
10 / 1 days
——
09/17–09/17
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB02204026 (65%)9509/29, 10/03, 10/05, 10/07, 10/08
CB30120 (0%)1109/17

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-finalFinal Random
BA Thread ends330735
CC Skip stitch1312
ED Gathering crease21701302232
EC Asymmetry63466081
DB Run-off stitching141061
DF Twisted seam/skewing16871
EA Unsmooth/puckering/bubbling13725131
Q61 Lace raw edge or broken lace76
261187 MKSC · CP03 · Due 11/18 · 41d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/17QC 1st Bundle1 reports
09/17QA 1st Bundle1 reports
2/24QC Inlineactual/required · 8%
DHU 11.2%QC Endline12 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random3 reports
Order/Ship qty5,107 / 1,000
PDF reports8
Last report10/05

Cross-stage findings

Missed in earlier stages: 1

CF Pulling yarn (Final Random 10/05): first found in later stages, never recorded before

QA Inline DHU is 5.6× QC Endline

QA Inline DHU 62.5% vs QC Endline 11.2% (09/17–10/05, 12 days, 4947 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 3

Latest Final Random (10/05): EA Unsmooth/puckering/bubbling 1 (earlier 8 times), CC Skip stitch 1 (earlier 17 times), CB Broken stitch 1 (earlier 3 times)

Found earlier but still reached later stages: 2

ED Gathering crease 1, BA Thread ends 6 pcs (later stages total)

2 defects recorded as 'Others' without detail

QA Inline 2; cannot compare across stages

QC Endline data errors: 1

09/23 CP03 261187C (defective pcs 4 > defects 3)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: AC Fabric hole (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: CC Skip stitch (1), DD Thread not straight/waving (1), CE Broken seam (1); Both: EC Asymmetry (5/5), ED Gathering crease (5/3), EA Unsmooth/puckering/bubbling (3/5), AD Fabric stains (4/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 85.0%

Caught in earlier stages

EC Asymmetry (140), EA Uneven seam allowance (53), DB Run-off stitching (26), DD Thread not straight/waving (7), CE Broken seam (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—100.0%
QA 1st Bundle1 reports—85.0%
QC Inline2 reports
required on prod. days 2/24 (8%)
—98.0%
QC Endline12 days—11.2%
QA Inline1 reports162.5%
Final Random3 reports03.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0311.2%
4947 / 12 days
62.5%PASS
09/17–10/05
EC Asymmetry, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP0312242 (8%)121009/26, 09/28, 09/29, 10/02, 10/05

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
EC Asymmetry5591165
BA Thread ends111446
ED Gathering crease5379341
CC Skip stitch14791
AD Fabric stains428564
EA Uneven seam allowance53
DB Run-off stitching26
EA Unsmooth/puckering/bubbling35731
261581 DJLF · CS61 · Due 11/23 · 46d leftNo final Missed in earlier stages: 3
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
09/29QA 1st Bundle1 reports
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
All FAILPre-final1 reports
No reportFinal Random
Order/Ship qty2,800 / 2,800
PDF reports3
Last report10/05

Cross-stage findings

Missed in earlier stages: 3

DJ Pleat (Pre-final 10/05), CF Pulling yarn (Pre-final 10/05), CB Broken stitch (Pre-final 10/05): first found in later stages, never recorded before

Found earlier but still reached later stages: 3

EA Unsmooth/puckering/bubbling 2, BA Thread ends 5, EC Asymmetry 3 pcs (later stages total)

3 defects recorded as 'Others' without detail

QA 1st Bundle 1, Pre-final 2; cannot compare across stages

Caught in earlier stages

BB Missing cut seam allowance (5), ED Gathering crease (5) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA 1st Bundle1 reports—130.0%
Pre-final1 reports112.0%

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundlePre-final
BA Thread ends105
BB Missing cut seam allowance5
ED Gathering crease5
EA Unsmooth/puckering/bubbling22
EC Asymmetry13
DJ Pleat4
Others (no detail)12
CB Broken stitch3
261185 MKSC · CB21/CB22/CB23… · Due 11/25 · 48d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
08/19QC 1st Bundle1 reports
08/19QA 1st Bundle1 reports
4/24QC Inlineactual/required · 17%
DHU 16.3%QC Endline10 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty4,050 / 1,000
PDF reports9
Last report09/23

Cross-stage findings

Missed in earlier stages: 1

AC Fabric hole (Final Random 09/21): first found in later stages, never recorded before

Recurring in small numbers: 2

Latest Final Random (09/23): CG Grinning 2 (earlier 4 times), EA Unsmooth/puckering/bubbling 1 (earlier 6 times)

4 defects recorded as 'Others' without detail

QA 1st Bundle 2, QA Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (2 Major), CG Grinning (1 Major), DB Run-off stitching (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: ED Gathering crease (3), AD Fabric stains (2), DJ Pleat (2); Both: EB Measurement issue (3/5), EC Asymmetry (3/2); DHU QC 1st Bundle 65.0% / QA 1st Bundle 70.0%

Caught in earlier stages

EC Asymmetry (91), ED Gathering crease (41), AD Fabric stains (20), EB Measurement issue (8), CC Skip stitch (7) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—65.0%
QA 1st Bundle1 reports—70.0%
QC Inline4 reports
required on prod. days 4/24 (17%)
—35.4%
QC Endline10 days—16.3%
QA Inline1 reports128.1%
Final Random2 reports04.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2216.8%
1993 / 9 days
28.1%PASS
08/19–09/10
BA Thread ends, EC Asymmetry, Others (no detail)
CB230.0%
20 / 1 days
——
08/18–08/18
—
CB240.0%
20 / 1 days
——
08/20–08/20
—
CB210.0%
17 / 1 days
——
08/22–08/22
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB229184 (22%)9508/24, 08/25, 08/26, 09/01, 09/10
CB21120 (0%)1108/22
CB23120 (0%)1108/18
CB24120 (0%)1108/20

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineFinal Random
BA Thread ends71633
EC Asymmetry3211741
Others (no detail)2502
ED Gathering crease3929
AD Fabric stains2414
EA Unsmooth/puckering/bubbling1023
CG Grinning183
EB Measurement issue35
261199 SAIN · CB04/CB21/CB25… · Due 11/30 · 53d leftFinal Random PASS Missed in earlier stages: 4
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
08/12QA 1st Bundle1 reports
0/34QC Inlineactual/required · 0%
DHU 1.8%QC Endline14 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
All PASSFinal Random4 reports
Order/Ship qty6,510 / 1,000
PDF reports6
Last report09/26

Cross-stage findings

Missed in earlier stages: 4

BD Snagging (Final Random 08/25), CB Broken stitch (Final Random 08/25), GB Missing sewing operation (Final Random 09/23), BB Missing cut seam allowance (Final Random 09/26): first found in later stages, never recorded before

QA Inline DHU is 15.6× QC Endline

QA Inline DHU 28.1% vs QC Endline 1.8% (08/12–09/17, 14 days, 6361 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Recurring in small numbers: 1

Latest Final Random (09/26): AD Fabric stains 1 (earlier 3 times)

Found earlier but still reached later stages: 2

DE Cut to broken 2, AC Fabric hole 2 pcs (later stages total)

Main QA defects never recorded by QC Endline: 1

AC Fabric hole (QA 3); zero in QC Endline records

QC Endline data errors: 1

08/15 CB21 261199 (defective pcs 9 > defects 6)

Caught in earlier stages

Q95 HTL position incorrect (37), EC Asymmetry (6) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—75.0%
QC Inline0 reports
required on prod. days 0/34 (0%)
——
QC Endline14 days—1.8%
QA Inline1 reports128.1%
Final Random4 reports03.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB211.3%
3637 / 10 days
——
08/12–08/22
BA Thread ends, AD Fabric stains, Others (no detail)
CB252.6%
2644 / 4 days
——
09/14–09/17
Q95 HTL position incorrect, BA Thread ends, AD Fabric stains
CB040.0%
40 / 2 days
——
08/17–08/21
—
CB300.0%
40 / 1 days
——
08/19–08/19
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB2110200 (0%)101008/18, 08/19, 08/20, 08/21, 08/22
CB25480 (0%)4409/14, 09/15, 09/16, 09/17
CB04240 (0%)2208/17, 08/21
CB30120 (0%)1108/19

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC EndlineQA InlineFinal Random
BA Thread ends5927
Q95 HTL position incorrect37
AD Fabric stains143
EC Asymmetry6
BD Snagging6
Others (no detail)5
DB Run-off stitching21
DE Cut to broken12
261447 MKSC · CS11 · Due 12/02 · 55d leftFinal Random PASS Missed in earlier stages: 1
No reportPP Sample
No reportPilot Run
09/07QC 1st Bundle1 reports
09/07QA 1st Bundle1 reports
4/18QC Inlineactual/required · 22%
DHU 17.2%QC Endline9 days
All FAILQA Inline1 reports
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random2 reports
Order/Ship qty1,000 / 500
PDF reports10
Last report09/25

Cross-stage findings

Missed in earlier stages: 1

EA Unsmooth/puckering/bubbling (Pre-final 09/10): first found in later stages, never recorded before

Found earlier but still reached later stages: 5

AC Fabric hole 1, DE Cut to broken 2, CB Broken stitch 2, DJ Pleat 1, CC Skip stitch 1 pcs (later stages total)

48 defects recorded as 'Others' without detail

QC 1st Bundle 4, QA 1st Bundle 7, QC Inline 33, QA Inline 3, Pre-final 1; cannot compare across stages

QC Endline data errors: 1

09/07 CS11 261447A (defective pcs 15 > defects 14)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DE Cut to broken (4 Major), AC Fabric hole (2 Major), CG Grinning (1 Major); Only QC 1st Bundle: BA Thread ends (6), ED Gathering crease (5); DHU QC 1st Bundle 0.0% / QA 1st Bundle 70.0%

Caught in earlier stages

ED Gathering crease (23), EB Measurement issue (14), EC Asymmetry (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—70.0%
QC Inline4 reports
required on prod. days 4/18 (22%)
—0.0%
QC Endline9 days—17.2%
QA Inline1 reports146.9%
Pre-final1 reports06.2%
Final Random2 reports04.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1117.2%
1000 / 9 days
46.9%PASS
09/07–09/21
BA Thread ends, CC Skip stitch, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS119184 (22%)9509/11, 09/12, 09/16, 09/19, 09/21

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlinePre-finalFinal Random
BA Thread ends621105624
Others (no detail)473331
CC Skip stitch321
ED Gathering crease518
EB Measurement issue14
AC Fabric hole231
DE Cut to broken411
EC Asymmetry5
261256 MKSC · CS19 · Due 12/08 · 61d leftFinal Random PASS Missed in earlier stages: 3
No reportPP Sample
No reportPilot Run
08/03QC 1st Bundle1 reports
08/03QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 7.9%QC Endline6 days
No reportQA Inline
No reportShipment Sample
All FAILPre-final1 reports
All PASSFinal Random2 reports
Order/Ship qty1,031 / 505
PDF reports6
Last report09/08

Cross-stage findings

Missed in earlier stages: 3

EA Unsmooth/puckering/bubbling (Pre-final 08/18), BD Snagging (Pre-final 08/18), CB Broken stitch (Final Random 08/28): first found in later stages, never recorded before

Pre-final DHU is 1.6× QC Endline

Pre-final DHU 12.5% vs QC Endline 7.9% (08/01–08/11, 6 days, 1031 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects

Found earlier but still reached later stages: 3

EC Asymmetry 2, HA Poor pressing 1, ED Gathering crease 3 pcs (later stages total)

5 defects recorded as 'Others' without detail

QA 1st Bundle 3, Final Random 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 1 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DA Exceed seam allowance (2 Major); Only QC 1st Bundle: DI High-low/uneven (3), EC Asymmetry (2); Both: BA Thread ends (4/3), DJ Pleat (4/1), CG Grinning (2/2); DHU QC 1st Bundle 75.0% / QA 1st Bundle 55.0%

Caught in earlier stages

DB Run-off stitching (11), DJ Pleat (9), DI High-low/uneven (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—75.0%
QA 1st Bundle1 reports—55.0%
QC Inline1 reports
required on prod. days 1/12 (8%)
—23.8%
QC Endline6 days—7.9%
Pre-final1 reports112.5%
Final Random2 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS197.9%
1031 / 6 days
—PASS
08/01–08/11
BA Thread ends, Others (no detail), DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS196121 (8%)6508/03, 08/04, 08/05, 08/06, 08/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlinePre-finalFinal Random
BA Thread ends437396
Others (no detail)3152
ED Gathering crease921
DB Run-off stitching11
DJ Pleat414
EC Asymmetry232
DI High-low/uneven32
CG Grinning22
261146 LOGE · CB03 · Due 10/26 · 18d leftNo final No major issue (3 minor notes)
No resultPP Sample1 reports
No reportPilot Run
09/11QC 1st Bundle1 reports
09/11QA 1st Bundle1 reports
27/44QC Inlineactual/required · 61%
DHU 23.2%QC Endline22 days
All FAILQA Inline5 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty7,000 / 7,000
PDF reports35
Last report10/08

Cross-stage findings

2 defects recorded as 'Others' without detail

PP Sample 1, QA Inline 1; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 11); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DE Cut to broken (2 Major), EI Inaccurate/skewed stitching (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: AD Fabric stains (2); Both: EC Asymmetry (6/2), CC Skip stitch (2/1), CE Broken seam (2/1); DHU QC 1st Bundle 92.3% / QA 1st Bundle 45.0%

Caught in earlier stages

BA Thread ends (412), EB Measurement issue (335), EA Unsmooth/puckering/bubbling (192), CC Skip stitch (146), AD Fabric stains (144) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports—92.3%
QA 1st Bundle1 reports—45.0%
QC Inline27 reports
required on prod. days 27/44 (61%)
—106.1%
QC Endline22 days—23.2%
QA Inline5 reports541.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB0323.2%
6015 / 22 days
41.9%—
09/12–10/08
BA Thread ends, EB Measurement issue, EA Unsmooth/puckering/bubbling

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB03224427 (61%)14310/02, 10/03, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends84004
EB Measurement issue3314
EA Unsmooth/puckering/bubbling11431416
CC Skip stitch121231145
AD Fabric stains12341043
DB Run-off stitching1301
ED Gathering crease1046
EC Asymmetry628811
261558 LOGE · CB17/CB20/CB21 · Due 10/26 · 18d leftNo final No major issue (1 minor notes)
No resultPP Sample1 reports
No reportPilot Run
09/22QC 1st Bundle1 reports
09/22QA 1st Bundle1 reports
36/40QC Inlineactual/required · 90%
DHU 24.2%QC Endline14 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty8,000 / 8,000
PDF reports44
Last report10/08

Cross-stage findings

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (4 Major), EE Raw edge (2 Major), CC Skip stitch (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (2), BA Thread ends (2), CG Grinning (1); Both: EA Unsmooth/puckering/bubbling (3/2), CB Broken stitch (1/1); DHU QC 1st Bundle — / QA 1st Bundle 76.9%

Caught in earlier stages

EC Asymmetry (373), DB Run-off stitching (350), CC Skip stitch (256), CE Broken seam (251), EA Unsmooth/puckering/bubbling (168) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—76.9%
QC Inline38 reports
required on prod. days 36/40 (90%)
——
QC Endline14 days—24.2%
QA Inline3 reports335.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1720.9%
4537 / 14 days
37.5%—
09/22–10/08
DB Run-off stitching, EC Asymmetry, CE Broken seam
CB2036.2%
1262 / 6 days
31.2%—
10/02–10/08
CC Skip stitch, DB Run-off stitching, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB17142826 (93%)2009/22, 10/08
CB2061210 (83%)1110/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
EC Asymmetry41781847
DB Run-off stitching1313162
CC Skip stitch110245
CE Broken seam77174
EA Unsmooth/puckering/bubbling232120365
EB Measurement issue291372
ED Gathering crease171392
BA Thread ends249487
260757 RGOR · CB18/CB19/CB22… · Due 10/30 · 22d leftFinal Random PASS No major issue (5 minor notes)
No reportPP Sample
No reportPilot Run
09/02QC 1st Bundle1 reports
08/28QA 1st Bundle1 reports
78/144QC Inlineactual/required · 54%
DHU 17.2%QC Endline33 days
All FAILQA Inline13 reports
All FAILShipment Sample1 reports
No reportPre-final
All PASSFinal Random2 reports
Order/Ship qty35,250 / 35,250
PDF reports107
Last report10/07

Cross-stage findings

Recurring in small numbers: 2

Latest Final Random (09/29): CE Broken seam 1 (earlier 80 times), CB Broken stitch 2 (earlier 64 times)

Found earlier but still reached later stages: 9

AD Fabric stains 5, DJ Pleat 2, EC Asymmetry 6, EI Inaccurate/skewed stitching 1, CG Grinning 1, EA Unsmooth/puckering/bubbling 2, DB Run-off stitching 1, DD Thread not straight/waving 1, GA Missing bartack/button 1 pcs (later stages total)

11 defects recorded as 'Others' without detail

QC Inline 2, QA Inline 7, Final Random 2; cannot compare across stages

QC Endline data errors: 14

09/08 CB19 260757-S1 (defective pcs 57 > defects 30), 09/10 CB19 260757-S1 (defective pcs 51 > defects 30), 09/11 CB19 260757-L1 (defective pcs 15 > defects 10), 09/11 CB19 260757-S1 (defective pcs 93 > defects 70)…

QC 1st Bundle vs QA 1st Bundle: 7 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EE Raw edge (2 Major), BA Thread ends (2 Major), AD Fabric stains (2 Major), GC Missing pocket/label (2 Major), DJ Pleat (2 Major), GB Missing sewing operation (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (2); Both: BB Missing cut seam allowance (2/3), EC Asymmetry (2/2), CE Broken seam (1/1); DHU QC 1st Bundle 87.5% / QA 1st Bundle 90.0%

Caught in earlier stages

CC Skip stitch (499), ED Gathering crease (366), EB Measurement issue (356), AC Fabric hole (194), Q61 Lace raw edge or broken lace (177) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—87.5%
QA 1st Bundle1 reports—90.0%
QC Inline89 reports
required on prod. days 78/144 (54%)
—90.4%
QC Endline33 days—17.2%
QA Inline13 reports1344.7%
Shipment Sample1 reports1—
Final Random2 reports01.4%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB2310.1%
10835 / 32 days
61.3%PASS
08/28–10/08
BA Thread ends, AC Fabric hole, CC Skip stitch
CB1914.2%
3790 / 18 days
31.8%PASS
09/08–10/06
BA Thread ends, DF Twisted seam/skewing, ED Gathering crease
CB1856.2%
2275 / 20 days
42.2%—
09/15–10/08
BA Thread ends, EB Measurement issue, CC Skip stitch
CB220.0%
20 / 1 days
——
10/03–10/03
—
CB300.0%
20 / 1 days
——
09/11–09/11
—

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB23326425 (39%)291010/03, 10/05, 10/06, 10/07, 10/08
CB18204034 (85%)5109/15, 09/16, 09/17, 10/03, 10/08
CB19183619 (53%)10709/16, 09/17, 10/02, 10/05, 10/06
CB22120 (0%)1110/03
CB30120 (0%)1109/11

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SampleFinal Random
BA Thread ends2299271828
CC Skip stitch993991
ED Gathering crease3931710
EB Measurement issue43475
CE Broken seam112407271
EC Asymmetry2271151206
DJ Pleat2201242
DB Run-off stitching9410251
261662 RGOR · CP15 · Due 10/30 · 22d leftNo final No major issue (3 minor notes)
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
09/29QA 1st Bundle1 reports
0/10QC Inlineactual/required · 0%
DHU 23.3%QC Endline5 days
1/2 FAILQA Inline2 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,385 / 2,385
PDF reports4
Last report09/30

Cross-stage findings

Main QA defects never recorded by QC Endline: 1

DF Twisted seam/skewing (QA 7); zero in QC Endline records

QC Endline data errors: 1

09/28 CP15 261662 (defective pcs 5 > defects 4)

Duplicate report numbers

QGR2644194 have multiple reports with different content

Caught in earlier stages

EA Unsmooth/puckering/bubbling (81), BA Thread ends (32), CC Skip stitch (23), EB Measurement issue (21), ED Gathering crease (11) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA 1st Bundle1 reports—90.0%
QC Inline0 reports
required on prod. days 0/10 (0%)
——
QC Endline5 days—23.3%
QA Inline2 reports118.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1523.3%
675 / 5 days
18.8%—
09/28–10/02
EA Unsmooth/puckering/bubbling, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP155100 (0%)5509/28, 09/29, 09/30, 10/01, 10/02

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQA 1st BundleQC EndlineQA Inline
EA Unsmooth/puckering/bubbling15732
BA Thread ends2228
CC Skip stitch221
EB Measurement issue21
ED Gathering crease11
DF Twisted seam/skewing7
EC Asymmetry111
DI High-low/uneven12
261684 RGOR · CS17 · Due 10/30 · 22d leftNo final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
10/05QC 1st Bundle1 reports
10/06QA 1st Bundle1 reports
3/8QC Inlineactual/required · 38%
DHU 36.9%QC Endline4 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,735 / 1,735
PDF reports6
Last report10/08

Cross-stage findings

QC 1st Bundle vs QA 1st Bundle: 9 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), DF Twisted seam/skewing (2 Major), FA Wrong material (1 Major), DD Thread not straight/waving (1 Major), DA Exceed seam allowance (1 Major), DJ Pleat (1 Major), AC Fabric hole (1 Major), EG Wrong panel assembly (1 Major), BC Sticker left (1 Major); Only QC 1st Bundle: GC Missing pocket/label (1), DK Twisted shoulder strap (1); Both: DB Run-off stitching (1/2), CE Broken seam (2/1), EC Asymmetry (1/2), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle — / QA 1st Bundle 85.0%

Caught in earlier stages

BA Thread ends (55), DB Run-off stitching (30), EB Measurement issue (19), DK Twisted shoulder strap (14), BB Missing cut seam allowance (11) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—85.0%
QC Inline3 reports
required on prod. days 3/8 (38%)
——
QC Endline4 days—36.9%
QA Inline1 reports153.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1736.9%
287 / 4 days
53.1%—
10/05–10/08
BA Thread ends, EB Measurement issue, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS17483 (38%)4110/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends550
DB Run-off stitching127164
EB Measurement issue19
DK Twisted shoulder strap149
BB Missing cut seam allowance11
DF Twisted seam/skewing28
CB Broken stitch71
CC Skip stitch7
261685 RGOR · CS04/CS05 · Due 10/30 · 22d leftNo final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
10/07QC 1st Bundle1 reports
10/07QA 1st Bundle1 reports
1/12QC Inlineactual/required · 8%
DHU 28.3%QC Endline5 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,120 / 1,120
PDF reports3
Last report10/08

Cross-stage findings

QC Endline data errors: 1

09/29 CS05 261685 (defective pcs 3 > defects 2)

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CC Skip stitch (1 Major), GC Missing pocket/label (1 Major), ED Gathering crease (1 Major), DC Join stitching (1 Major); Both: EC Asymmetry (4/2), CG Grinning (3/2), EA Unsmooth/puckering/bubbling (1/2), GB Missing sewing operation (1/1), DB Run-off stitching (1/1), CB Broken stitch (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

CG Grinning (10), EC Asymmetry (9), DB Run-off stitching (8), EA Unsmooth/puckering/bubbling (6), Q94 Glue marks (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline1 reports
required on prod. days 1/12 (8%)
——
QC Endline5 days—28.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0512.5%
48 / 3 days
——
09/28–10/07
Q94 Glue marks
CS0445.5%
44 / 3 days
——
10/06–10/08
BA Thread ends, DB Run-off stitching, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS04361 (17%)3210/06, 10/07, 10/08
CS05360 (0%)3309/28, 09/29, 10/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC Endline
CG Grinning325
EC Asymmetry423
DB Run-off stitching1124
EA Unsmooth/puckering/bubbling123
Q94 Glue marks6
BA Thread ends6
CB Broken stitch112
CC Skip stitch13
262230 RGOR · CP06 · Due 10/30 · 22d leftNo final No major issue
No reportPP Sample
No reportPilot Run
10/08QC 1st Bundle1 reports
No reportQA 1st Bundle
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,360 / 2,360
PDF reports1
Last report10/08

Cross-stage findings

Caught in earlier stages

DI High-low/uneven (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st Bundle
DI High-low/uneven6
HA Poor pressing3
DJ Pleat3
EA Unsmooth/puckering/bubbling3
EC Asymmetry2
CB Broken stitch2
DC Join stitching1
261687 CISO · CP13 · Due 11/02 · 25d leftNo final No major issue (2 minor notes)
No resultPP Sample1 reports
No reportPilot Run
10/07QC 1st Bundle1 reports
10/07QA 1st Bundle1 reports
0/4QC Inlineactual/required · 0%
DHU 30.6%QC Endline2 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,100 / 1,100
PDF reports3
Last report10/07

Cross-stage findings

8 defects recorded as 'Others' without detail

PP Sample 8; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DB Run-off stitching (3 Major), BB Missing cut seam allowance (2 Major), BA Thread ends (1 Major); Only QC 1st Bundle: CC Skip stitch (2), CG Grinning (2), DJ Pleat (2), ED Gathering crease (2); Both: EA Unsmooth/puckering/bubbling (4/6), EC Asymmetry (2/1), DE Cut to broken (1/2); DHU QC 1st Bundle — / QA 1st Bundle 75.0%

Caught in earlier stages

EA Unsmooth/puckering/bubbling (29), BA Thread ends (17), ED Gathering crease (11), CC Skip stitch (10) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—75.0%
QC Inline0 reports
required on prod. days 0/4 (0%)
——
QC Endline2 days—30.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1330.6%
180 / 2 days
——
10/07–10/08
EA Unsmooth/puckering/bubbling, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP13240 (0%)2210/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SampleQC 1st BundleQA 1st BundleQC Endline
EA Unsmooth/puckering/bubbling4619
BA Thread ends116
ED Gathering crease29
CC Skip stitch28
Others (no detail)8
EC Asymmetry121
BB Missing cut seam allowance12
DE Cut to broken12
260348 MKSC · CB01/CB14 · Due 11/04 · 27d leftNo final No major issue (1 minor notes)
No resultPP Sample1 reports
No resultPilot Run3 reports
10/08QC 1st Bundle1 reports
No reportQA 1st Bundle
0/2QC Inlineactual/required · 0%
DHU 13.6%QC Endline1 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty16,357 / 8,357
PDF reports5
Last report10/08

Cross-stage findings

6 defects recorded as 'Others' without detail

Pilot Run 2, PP Sample 4; cannot compare across stages

Caught in earlier stages

EC Asymmetry (17), CE Broken seam (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
Pilot Run3 reports0—
QC 1st Bundle1 reports——
QC Inline0 reports
required on prod. days 0/2 (0%)
——
QC Endline1 days—13.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1413.6%
110 / 1 days
——
10/08–10/08
EC Asymmetry, CE Broken seam

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB14120 (0%)1110/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPP SamplePilot RunQC 1st BundleQC Endline
EC Asymmetry23210
CE Broken seam15
Others (no detail)42
ED Gathering crease22
FA Wrong material3
AC Fabric hole2
EI Inaccurate/skewed stitching2
CG Grinning2
261336 MKSC · CP17 · Due 11/04 · 27d leftNo final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
09/26QC 1st Bundle1 reports
09/26QA 1st Bundle1 reports
8/22QC Inlineactual/required · 36%
DHU 15.0%QC Endline11 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty10,008 / 7,508
PDF reports11
Last report10/07

Cross-stage findings

4 defects recorded as 'Others' without detail

QA 1st Bundle 3, QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (2 Major), BD Snagging (1 Major), CG Grinning (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: EC Asymmetry (7), CC Skip stitch (2), DJ Pleat (2), CB Broken stitch (2), CA Thread tension (1), DE Cut to broken (1), CE Broken seam (1); Both: EA Unsmooth/puckering/bubbling (2/1), BA Thread ends (1/2), DD Thread not straight/waving (1/1); DHU QC 1st Bundle — / QA 1st Bundle 60.0%

Caught in earlier stages

CC Skip stitch (235), DB Run-off stitching (150), BA Thread ends (140), ED Gathering crease (135), EC Asymmetry (123) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—60.0%
QC Inline8 reports
required on prod. days 8/22 (36%)
——
QC Endline11 days—15.0%
QA Inline1 reports146.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1715.0%
6355 / 11 days
46.9%—
09/26–10/08
CC Skip stitch, DB Run-off stitching, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1711228 (36%)11310/03, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
CC Skip stitch2222056
DB Run-off stitching2148
BA Thread ends1211315
ED Gathering crease233100
EC Asymmetry72789
EA Unsmooth/puckering/bubbling21874
DF Twisted seam/skewing51
EB Measurement issue147
261350 MKSC · CP10 · Due 11/04 · 27d leftNo final No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
09/25QC 1st Bundle1 reports
09/25QA 1st Bundle1 reports
3/24QC Inlineactual/required · 12%
DHU 22.6%QC Endline12 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty7,835 / 7,835
PDF reports6
Last report10/07

Cross-stage findings

2 defects recorded as 'Others' without detail

QA 1st Bundle 2; cannot compare across stages

QC Endline data errors: 3

10/05 CP10 261350A (defective pcs 124 > defects 121), 10/06 CP10 261350A (defective pcs 125 > defects 122), 10/07 CP10 261350B (defective pcs 29 > defects 28)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (4 Major), BA Thread ends (3 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: DB Run-off stitching (4), DD Thread not straight/waving (3), DE Cut to broken (2), EC Asymmetry (2), CC Skip stitch (1), CE Broken seam (1); Both: ED Gathering crease (4/4), CB Broken stitch (1/5), DJ Pleat (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

BA Thread ends (339), EB Measurement issue (318), CC Skip stitch (294), ED Gathering crease (292), EA Uneven seam allowance (151) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline3 reports
required on prod. days 3/24 (12%)
——
QC Endline12 days—22.6%
QA Inline1 reports140.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1022.6%
6367 / 12 days
40.6%—
09/25–10/08
BA Thread ends, EB Measurement issue, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP1012243 (12%)12910/03, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends343284
EB Measurement issue318
CC Skip stitch1293
ED Gathering crease4422811
EA Uneven seam allowance151
Others (no detail)250
CB Broken stitch1582
DB Run-off stitching483
261357 MKSC · CB06/CB15 · Due 11/04 · 27d leftNo final No major issue (4 minor notes)
No reportPP Sample
No resultPilot Run2 reports
10/02QC 1st Bundle1 reports
10/01QA 1st Bundle1 reports
5/14QC Inlineactual/required · 36%
DHU 55.9%QC Endline7 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,162 / 1,662
PDF reports10
Last report10/07

Cross-stage findings

3 defects recorded as 'Others' without detail

QA Inline 1, Pilot Run 2; cannot compare across stages

QC Endline data errors: 1

10/08 CB15 261357A-L (defective pcs 10 > defects 9)

Duplicate report numbers

QGR2644882, QGR2645298 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DJ Pleat (4 Major), EC Asymmetry (3 Major); Only QC 1st Bundle: CG Grinning (2), CC Skip stitch (1), ED Gathering crease (1), BA Thread ends (1); Both: EI Inaccurate/skewed stitching (2/2), EA Unsmooth/puckering/bubbling (2/1), AD Fabric stains (1/1); DHU QC 1st Bundle — / QA 1st Bundle 84.6%

Caught in earlier stages

BA Thread ends (203), EC Asymmetry (124), EB Measurement issue (91), CC Skip stitch (74), ED Gathering crease (65) did not reach later stages

Stage summary

StageCountFAILDHU
Pilot Run2 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—84.6%
QC Inline5 reports
required on prod. days 5/14 (36%)
——
QC Endline7 days—55.9%
QA Inline1 reports131.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CB1555.9%
1219 / 7 days
31.2%—
10/01–10/08
BA Thread ends, EC Asymmetry, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CB157145 (36%)6310/02, 10/03, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectPilot RunQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends16196
EC Asymmetry9319885
EB Measurement issue2683
CC Skip stitch173
ED Gathering crease2162
AC Fabric hole62
EA Unsmooth/puckering/bubbling3212461
AD Fabric stains1116
261452 MKSC · CS19 · Due 11/04 · 27d leftNo final No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
09/30QC 1st Bundle1 reports
09/30QA 1st Bundle1 reports
12/18QC Inlineactual/required · 67%
DHU 14.9%QC Endline9 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,580 / 2,580
PDF reports15
Last report10/07

Cross-stage findings

13 defects recorded as 'Others' without detail

QA 1st Bundle 9, QA Inline 4; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

EC Asymmetry (QA 6); zero in QC Endline records

QC Endline data errors: 1

10/02 CS19 261452A (defective pcs 42 > defects 41)

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), AD Fabric stains (2 Major); Only QC 1st Bundle: DI High-low/uneven (2), CB Broken stitch (2), DB Run-off stitching (1), DD Thread not straight/waving (1); Both: EC Asymmetry (1/3); DHU QC 1st Bundle — / QA 1st Bundle 85.0%

Caught in earlier stages

BA Thread ends (246), CC Skip stitch (71), AD Fabric stains (42), DD Thread not straight/waving (37), ED Gathering crease (37) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—85.0%
QC Inline12 reports
required on prod. days 12/18 (67%)
——
QC Endline9 days—14.9%
QA Inline1 reports156.2%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1914.9%
2590 / 9 days
56.2%—
09/29–10/08
BA Thread ends, CC Skip stitch, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS1991812 (67%)3309/29, 09/30, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends61185
CC Skip stitch665
AD Fabric stains2391
DD Thread not straight/waving12016
ED Gathering crease334
DI High-low/uneven232
EC Asymmetry13176
DB Run-off stitching124
261523 GECL · CS26/CS27 · Due 11/04 · 27d leftNo final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
09/29QC 1st Bundle1 reports
09/30QA 1st Bundle1 reports
15/20QC Inlineactual/required · 75%
DHU 15.9%QC Endline9 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty10,700 / 10,700
PDF reports18
Last report10/08

Cross-stage findings

5 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 4; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (4 Major), CC Skip stitch (1 Major), ED Gathering crease (1 Major), DA Exceed seam allowance (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: DJ Pleat (5), CA Thread tension (3), DB Run-off stitching (2), CE Broken seam (2); Both: CG Grinning (3/7), AD Fabric stains (2/1), CB Broken stitch (1/1); DHU QC 1st Bundle — / QA 1st Bundle 90.0%

Caught in earlier stages

BA Thread ends (316), AD Fabric stains (112), CC Skip stitch (99), EC Asymmetry (75), DA Exceed seam allowance (50) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—90.0%
QC Inline15 reports
required on prod. days 15/20 (75%)
——
QC Endline9 days—15.9%
QA Inline1 reports175.0%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2714.8%
3330 / 9 days
75.0%—
09/29–10/08
BA Thread ends, AD Fabric stains, CC Skip stitch
CS2690.0%
50 / 1 days
——
10/08–10/08
BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS2791814 (78%)4109/29, 10/01, 10/02, 10/08
CS26121 (50%)1010/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends14302
AD Fabric stains218101
CC Skip stitch11187
EC Asymmetry1722
DA Exceed seam allowance1463
DB Run-off stitching2820
DJ Pleat522
CA Thread tension3192
261528 GECL · CS01 · Due 11/04 · 27d leftShipment Sample No result No major issue (6 minor notes)
No reportPP Sample
No reportPilot Run
09/21QC 1st Bundle1 reports
09/21QA 1st Bundle1 reports
24/30QC Inlineactual/required · 80%
DHU 20.6%QC Endline15 days
All FAILQA Inline1 reports
No resultShipment Sample2 reports
All PASSPre-final1 reports
No reportFinal Random
Order/Ship qty13,983 / 0
PDF reports30
Last report10/08

Cross-stage findings

Recurring in small numbers: 3

Latest Shipment Sample (10/03): EC Asymmetry 1 (earlier 17 times), DF Twisted seam/skewing 1 (earlier 10 times), EA Unsmooth/puckering/bubbling 1 (earlier 9 times)

Found earlier but still reached later stages: 7

DJ Pleat 1, CF Pulling yarn 1, AD Fabric stains 1, CE Broken seam 2, CB Broken stitch 1, CC Skip stitch 1, BA Thread ends 3 pcs (later stages total)

7 defects recorded as 'Others' without detail

QA 1st Bundle 3, Pre-final 2, QA Inline 2; cannot compare across stages

Main QA defects never recorded by QC Endline: 2

EA Unsmooth/puckering/bubbling (QA 13), CE Broken seam (QA 8); zero in QC Endline records

QC Endline data errors: 1

10/01 CS01 261528 (defective pcs 66 > defects 65)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (9 Major), AD Fabric stains (2 Major), CF Pulling yarn (2 Major); Only QC 1st Bundle: EC Asymmetry (4), DF Twisted seam/skewing (3), DJ Pleat (1); Both: CG Grinning (5/2), BB Missing cut seam allowance (2/2); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

DB Run-off stitching (134), ED Gathering crease (133), CG Grinning (40), BB Missing cut seam allowance (15), DK Twisted shoulder strap (6) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline24 reports
required on prod. days 24/30 (80%)
——
QC Endline15 days—20.6%
QA Inline1 reports187.5%
Shipment Sample2 reports0—
Pre-final1 reports03.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0120.6%
4253 / 15 days
87.5%—
09/21–10/08
CC Skip stitch, BA Thread ends, DB Run-off stitching

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS01153024 (80%)5109/21, 09/22, 09/23, 09/26, 10/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
CC Skip stitch212741
BA Thread ends2524633
DB Run-off stitching2132
ED Gathering crease121192
AD Fabric stains2135321
EC Asymmetry474521
CG Grinning5233
CB Broken stitch391
261810 LOGE · CP13 · Due 11/04 · 27d leftNo final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
09/29QC 1st Bundle1 reports
09/29QA 1st Bundle1 reports
4/18QC Inlineactual/required · 22%
DHU 16.9%QC Endline9 days
All FAILQA Inline5 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,432 / 1,432
PDF reports11
Last report10/05

Cross-stage findings

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DJ Pleat (4 Major), DD Thread not straight/waving (1 Major), CG Grinning (1 Major), BB Missing cut seam allowance (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: CA Thread tension (2), CC Skip stitch (1), DF Twisted seam/skewing (1); Both: ED Gathering crease (4/3), EC Asymmetry (4/3), BA Thread ends (4/1), DB Run-off stitching (1/3), EI Inaccurate/skewed stitching (1/2); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

BA Thread ends (281), CC Skip stitch (202), ED Gathering crease (84), EB Measurement issue (65), DB Run-off stitching (55) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline4 reports
required on prod. days 4/18 (22%)
——
QC Endline9 days—16.9%
QA Inline5 reports528.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP1316.9%
4036 / 9 days
28.7%—
09/28–10/08
BA Thread ends, CC Skip stitch, EB Measurement issue

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP139184 (22%)9510/02, 10/03, 10/05, 10/06, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends412688
CC Skip stitch16195
ED Gathering crease4315566
EB Measurement issue65
DB Run-off stitching131833
EC Asymmetry43121416
CB Broken stitch1234
DK Twisted shoulder strap26
262020 OSIT · CS06 · Due 11/04 · 27d leftNo final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
10/06QC 1st Bundle1 reports
10/07QA 1st Bundle1 reports
3/6QC Inlineactual/required · 50%
DHU 20.1%QC Endline3 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty7,500 / 7,500
PDF reports5
Last report10/08

Cross-stage findings

28 defects recorded as 'Others' without detail

QC 1st Bundle 6, QA 1st Bundle 1, QC Inline 21; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BB Missing cut seam allowance (2 Major), ED Gathering crease (1 Major), EC Asymmetry (1 Major), BA Thread ends (1 Major); Both: EA Unsmooth/puckering/bubbling (4/5), CB Broken stitch (3/1); DHU QC 1st Bundle — / QA 1st Bundle 60.0%

Caught in earlier stages

ED Gathering crease (30), BA Thread ends (26), EA Unsmooth/puckering/bubbling (22), EC Asymmetry (16), DF Twisted seam/skewing (11) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—60.0%
QC Inline3 reports
required on prod. days 3/6 (50%)
——
QC Endline3 days—20.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0620.1%
437 / 3 days
——
10/06–10/08
ED Gathering crease, BA Thread ends, DF Twisted seam/skewing

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS06363 (50%)2110/06, 10/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC Endline
ED Gathering crease1425
Others (no detail)6121
BA Thread ends1223
EA Unsmooth/puckering/bubbling4576
EC Asymmetry187
DF Twisted seam/skewing11
CC Skip stitch5
CB Broken stitch31
262185 OSIT · CP08 · Due 11/04 · 27d leftNo final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
09/30QC 1st Bundle1 reports
10/01QA 1st Bundle1 reports
6/16QC Inlineactual/required · 38%
DHU 10.1%QC Endline8 days
All FAILQA Inline3 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty8,000 / 8,000
PDF reports11
Last report10/08

Cross-stage findings

QC Endline data errors: 6

10/01 CP08 262185 (defective pcs 103 > defects 69), 10/02 CP08 262185 (defective pcs 71 > defects 56), 10/05 CP08 262185 (defective pcs 124 > defects 115), 10/06 CP08 262185 (defective pcs 105 > defects 102)…

QC 1st Bundle vs QA 1st Bundle: 2 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: CG Grinning (4 Major), CC Skip stitch (3 Major); Only QC 1st Bundle: DI High-low/uneven (3), BA Thread ends (3), EI Inaccurate/skewed stitching (1), EA Unsmooth/puckering/bubbling (1); Both: AD Fabric stains (5/4), EC Asymmetry (3/5), DJ Pleat (1/3), CB Broken stitch (3/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

BA Thread ends (236), AD Fabric stains (208), EA Uneven seam allowance (188), ED Gathering crease (82), CC Skip stitch (53) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline6 reports
required on prod. days 6/16 (38%)
——
QC Endline8 days—10.1%
QA Inline3 reports336.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0810.1%
7820 / 8 days
36.5%—
09/30–10/08
BA Thread ends, EA Uneven seam allowance, AD Fabric stains

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP088166 (38%)8210/03, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends3233
AD Fabric stains54241696
EA Uneven seam allowance188
ED Gathering crease2791
CC Skip stitch350
EC Asymmetry357289
DI High-low/uneven330
CB Broken stitch31193
262331 OSIT · CS09 · Due 11/04 · 27d leftShipment Sample No result No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
10/08QC 1st Bundle1 reports
No reportQA 1st Bundle
0/2QC Inlineactual/required · 0%
DHU 42.1%QC Endline1 days
No reportQA Inline
All FAILShipment Sample2 reports1 no result
No reportPre-final
No reportFinal Random
Order/Ship qty10,600 / 10,600
PDF reports3
Last report10/08

Cross-stage findings

Recurring in small numbers: 1

Latest Shipment Sample (10/08): EA Unsmooth/puckering/bubbling 1 (earlier 3 times)

Caught in earlier stages

BA Thread ends (174), ED Gathering crease (56), EC Asymmetry (22), CC Skip stitch (8) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QC Inline0 reports
required on prod. days 0/2 (0%)
——
QC Endline1 days—42.1%
Shipment Sample2 reports1—

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0942.1%
624 / 1 days
——
10/08–10/08
BA Thread ends, ED Gathering crease, EC Asymmetry

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS09120 (0%)1110/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQC EndlineShipment Sample
BA Thread ends174
ED Gathering crease56
EC Asymmetry121
CC Skip stitch8
EA Unsmooth/puckering/bubbling31
DB Run-off stitching4
FC Wrong label1
EB Measurement issue1
262218 CIWH · CS08 · Due 11/09 · 32d leftNo final No major issue (3 minor notes)
No reportPP Sample
No reportPilot Run
10/07QC 1st Bundle1 reports
10/07QA 1st Bundle1 reports
0/4QC Inlineactual/required · 0%
DHU 3.1%QC Endline2 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,500 / 1,500
PDF reports2
Last report10/07

Cross-stage findings

4 defects recorded as 'Others' without detail

QA 1st Bundle 4; cannot compare across stages

QC Endline data errors: 2

10/07 CS08 262218 (defective pcs 52 > defects 27), 10/08 CS08 262218 (defective pcs 30 > defects 18)

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: ED Gathering crease (1 Major), DB Run-off stitching (1 Major), CA Thread tension (1 Major); Only QC 1st Bundle: EC Asymmetry (5); Both: EA Unsmooth/puckering/bubbling (3/1); DHU QC 1st Bundle — / QA 1st Bundle 40.0%

Caught in earlier stages

BA Thread ends (34), CC Skip stitch (11), EC Asymmetry (5) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—40.0%
QC Inline0 reports
required on prod. days 0/4 (0%)
——
QC Endline2 days—3.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS083.1%
1467 / 2 days
——
10/07–10/08
BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS08240 (0%)2210/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC Endline
BA Thread ends34
CC Skip stitch11
EC Asymmetry5
EA Unsmooth/puckering/bubbling31
Others (no detail)4
ED Gathering crease1
CA Thread tension1
DB Run-off stitching1
262219 CIWH · CS08 · Due 11/09 · 32d leftNo final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
10/08QC 1st Bundle1 reports
No reportQA 1st Bundle
0/2QC Inlineactual/required · 0%
DHU 2.5%QC Endline1 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,500 / 2,500
PDF reports1
Last report10/08

Cross-stage findings

QC Endline data errors: 1

10/08 CS08 262219 (defective pcs 9 > defects 4)

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QC Inline0 reports
required on prod. days 0/2 (0%)
——
QC Endline1 days—2.5%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS082.5%
160 / 1 days
——
10/08–10/08
BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS08120 (0%)1110/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQC Endline
ED Gathering crease4
CA Thread tension3
BA Thread ends3
DF Twisted seam/skewing2
EA Unsmooth/puckering/bubbling2
AC Fabric hole2
CC Skip stitch1
262032 LOGE · CS05 · Due 11/11 · 34d leftNo final No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
10/02QC 1st Bundle1 reports
10/02QA 1st Bundle1 reports
9/12QC Inlineactual/required · 75%
DHU 15.8%QC Endline6 days
All FAILQA Inline4 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty6,632 / 6,632
PDF reports15
Last report10/08

Cross-stage findings

67 defects recorded as 'Others' without detail

QC 1st Bundle 8, QC Inline 59; cannot compare across stages

Main QA defects never recorded by QC Endline: 1

HA Poor pressing (QA 7); zero in QC Endline records

Duplicate report numbers

QGR2645078 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 9 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EC Asymmetry (3 Major), CB Broken stitch (2 Major), BD Snagging (1 Major), EB Measurement issue (1 Major), BA Thread ends (1 Major), EA Unsmooth/puckering/bubbling (1 Major), EI Inaccurate/skewed stitching (1 Major), CE Broken seam (1 Major), EG Wrong panel assembly (1 Major); Only QC 1st Bundle: ED Gathering crease (4), DB Run-off stitching (4); Both: DJ Pleat (2/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (190), BA Thread ends (182), ED Gathering crease (170), EC Asymmetry (121), DB Run-off stitching (53) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline9 reports
required on prod. days 9/12 (75%)
——
QC Endline6 days—15.8%
QA Inline4 reports418.6%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0515.8%
4550 / 6 days
18.6%—
10/02–10/08
CC Skip stitch, BA Thread ends, ED Gathering crease

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS056129 (75%)2110/02, 10/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
CC Skip stitch190
BA Thread ends151679
ED Gathering crease441602
EC Asymmetry316948
Others (no detail)859
DB Run-off stitching44405
AC Fabric hole52
DJ Pleat21125
262332 OSIT · CS09/CS10 · Due 11/11 · 34d leftShipment Sample No result No major issue (4 minor notes)
No reportPP Sample
No reportPilot Run
09/30QC 1st Bundle1 reports
09/30QA 1st Bundle1 reports
6/14QC Inlineactual/required · 43%
DHU 14.6%QC Endline6 days
All FAILQA Inline1 reports
All FAILShipment Sample2 reports1 no result
All PASSPre-final2 reports
No reportFinal Random
Order/Ship qty8,200 / 8,200
PDF reports13
Last report10/05

Cross-stage findings

Recurring in small numbers: 2

Latest Shipment Sample (10/05): EC Asymmetry 1 (earlier 17 times), ED Gathering crease 1 (earlier 15 times)

Found earlier but still reached later stages: 3

BA Thread ends 10, CB Broken stitch 4, IA 2nd operation issue 4 pcs (later stages total)

Duplicate report numbers

QGR2645059 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DD Thread not straight/waving (1 Major), DB Run-off stitching (1 Major), CA Thread tension (1 Major); Only QC 1st Bundle: CB Broken stitch (1); Both: BA Thread ends (2/3), EA Unsmooth/puckering/bubbling (1/2), ED Gathering crease (1/1), EC Asymmetry (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%

Caught in earlier stages

CC Skip stitch (76), EA Unsmooth/puckering/bubbling (35), EB Measurement issue (20), Q93 Heat seal logo peeling off (15), DB Run-off stitching (13) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—100.0%
QC Inline6 reports
required on prod. days 6/14 (43%)
——
QC Endline6 days—14.6%
QA Inline1 reports137.5%
Shipment Sample2 reports1—
Pre-final2 reports03.7%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS0914.0%
7527 / 6 days
37.5%—
09/30–10/06
BA Thread ends, EC Asymmetry, CC Skip stitch
CS1022.3%
606 / 1 days
——
10/01–10/01
BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS096126 (50%)4209/30, 10/01, 10/05, 10/06
CS10120 (0%)1110/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA InlineShipment SamplePre-final
BA Thread ends2310956310
EC Asymmetry112988214
ED Gathering crease11384311
CC Skip stitch76
EA Unsmooth/puckering/bubbling12284
EB Measurement issue20
Q93 Heat seal logo peeling off15
IA 2nd operation issue914
261186 MKSC · CP03 · Due 11/18 · 41d leftNo final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
10/05QC 1st Bundle1 reports
10/06QA 1st Bundle1 reports
1/10QC Inlineactual/required · 10%
DHU 17.9%QC Endline5 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty3,250 / 3,250
PDF reports4
Last report10/07

Cross-stage findings

2 defects recorded as 'Others' without detail

QA 1st Bundle 1, QA Inline 1; cannot compare across stages

QC 1st Bundle vs QA 1st Bundle: 4 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: DE Cut to broken (2 Major), GA Missing bartack/button (1 Major), DJ Pleat (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: EC Asymmetry (6), ED Gathering crease (2), DB Run-off stitching (2); Both: EA Unsmooth/puckering/bubbling (10/5); DHU QC 1st Bundle — / QA 1st Bundle 55.0%

Caught in earlier stages

ED Gathering crease (114), CC Skip stitch (97), BA Thread ends (71), EA Uneven seam allowance (65), EB Measurement issue (29) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—55.0%
QC Inline1 reports
required on prod. days 1/10 (10%)
——
QC Endline5 days—17.9%
QA Inline1 reports121.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0317.9%
2341 / 5 days
21.9%—
10/03–10/08
ED Gathering crease, CC Skip stitch, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP035101 (10%)5410/03, 10/05, 10/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
ED Gathering crease21111
CC Skip stitch3931
BA Thread ends71
EA Uneven seam allowance65
EB Measurement issue128
AD Fabric stains2211
EA Unsmooth/puckering/bubbling1057
CA Thread tension21
261580 DJLF · CS61 · Due 11/23 · 46d leftNo final No major issue (1 minor notes)
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
10/01QA 1st Bundle1 reports
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,700 / 2,700
PDF reports2
Last report10/01

Cross-stage findings

1 defects recorded as 'Others' without detail

QA 1st Bundle 1; cannot compare across stages

Caught in earlier stages

BA Thread ends (6) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA 1st Bundle1 reports—45.0%

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st Bundle
BA Thread ends6
DF Twisted seam/skewing4
BB Missing cut seam allowance2
EA Unsmooth/puckering/bubbling2
Others (no detail)1
261595 DJLF · CS22 · Due 11/23 · 46d leftNo final No major issue (3 minor notes)
No resultPP Sample1 reports
No reportPilot Run
10/07QC 1st Bundle1 reports
10/07QA 1st Bundle2 reports
2/4QC Inlineactual/required · 50%
DHU 50.9%QC Endline2 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,220 / 2,220
PDF reports6
Last report10/08

Cross-stage findings

1 defects recorded as 'Others' without detail

QC 1st Bundle 1; cannot compare across stages

Duplicate report numbers

QGR2645724 have multiple reports with different content

QC 1st Bundle vs QA 1st Bundle: 6 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (4 Major), AD Fabric stains (4 Major), BA Thread ends (2 Major), EI Inaccurate/skewed stitching (2 Major), DJ Pleat (2 Major), DI High-low/uneven (2 Major); Only QC 1st Bundle: DD Thread not straight/waving (1), ED Gathering crease (1); Both: CB Broken stitch (1/4), EC Asymmetry (2/2), GB Missing sewing operation (1/2); DHU QC 1st Bundle — / QA 1st Bundle 60.0%

Caught in earlier stages

AD Fabric stains (78), BA Thread ends (48), CC Skip stitch (36), ED Gathering crease (24), DB Run-off stitching (19) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QC 1st Bundle1 reports——
QA 1st Bundle2 reports—60.0%
QC Inline2 reports
required on prod. days 2/4 (50%)
——
QC Endline2 days—50.9%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS2250.9%
383 / 2 days
——
10/07–10/08
AD Fabric stains, BA Thread ends, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS22242 (50%)1110/07

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC Endline
AD Fabric stains4470
BA Thread ends246
CC Skip stitch36
ED Gathering crease123
DB Run-off stitching19
CB Broken stitch1410
EC Asymmetry222
DD Thread not straight/waving14
261812 LOGE · CS10 · Due 11/30 · 53d leftNo final No major issue (2 minor notes)
No reportPP Sample
No reportPilot Run
10/07QC 1st Bundle1 reports
10/07QA 1st Bundle1 reports
1/6QC Inlineactual/required · 17%
DHU 25.8%QC Endline3 days
All FAILQA Inline1 reports
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,035 / 1,035
PDF reports4
Last report10/08

Cross-stage findings

Main QA defects never recorded by QC Endline: 1

CE Broken seam (QA 3); zero in QC Endline records

QC 1st Bundle vs QA 1st Bundle: 3 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: GA Missing bartack/button (1 Major), ED Gathering crease (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: AD Fabric stains (3), EB Measurement issue (1); Both: EC Asymmetry (4/2), EA Unsmooth/puckering/bubbling (3/2), EI Inaccurate/skewed stitching (2/1), BA Thread ends (1/2); DHU QC 1st Bundle — / QA 1st Bundle 50.0%

Caught in earlier stages

BA Thread ends (445), ED Gathering crease (112), CC Skip stitch (81), DB Run-off stitching (31), AD Fabric stains (17) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports——
QA 1st Bundle1 reports—50.0%
QC Inline1 reports
required on prod. days 1/6 (17%)
——
QC Endline3 days—25.8%
QA Inline1 reports128.1%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS1025.8%
2602 / 3 days
28.1%—
10/06–10/08
BA Thread ends, ED Gathering crease, CC Skip stitch

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS10361 (17%)3210/06, 10/07, 10/08

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlineQA Inline
BA Thread ends1254361
ED Gathering crease181021
CC Skip stitch81
DB Run-off stitching229
AD Fabric stains3131
EC Asymmetry423
EA Unsmooth/puckering/bubbling3221
DD Thread not straight/waving5
261449 MKSC · CS12 · Due 12/02 · 55d leftFinal Random PASS No major issue (5 minor notes)
No reportPP Sample
No reportPilot Run
09/07QC 1st Bundle1 reports
09/07QA 1st Bundle1 reports
2/14QC Inlineactual/required · 14%
DHU 5.4%QC Endline7 days
No reportQA Inline
No reportShipment Sample
All PASSPre-final1 reports
All PASSFinal Random2 reports
Order/Ship qty1,000 / 350
PDF reports7
Last report09/17

Cross-stage findings

Recurring in small numbers: 1

Latest Final Random (09/17): ED Gathering crease 1 (earlier 5 times)

Found earlier but still reached later stages: 2

CB Broken stitch 3, HA Poor pressing 2 pcs (later stages total)

27 defects recorded as 'Others' without detail

QC 1st Bundle 11, QC Inline 16; cannot compare across stages

QC Endline data errors: 8

09/07 CS12 261449A (defective pcs 27 > defects 11), 09/07 CS12 261449B (defective pcs 3 > defects 1), 09/08 CS12 261449A (defective pcs 22 > defects 13), 09/09 CS12 261449A (defective pcs 11 > defects 6)…

QC 1st Bundle vs QA 1st Bundle: 5 defect(s) found only by QA 1st Bundle

Only QA 1st Bundle: BA Thread ends (2 Major), HA Poor pressing (2 Major), DC Join stitching (1 Major), DJ Pleat (1 Major), EI Inaccurate/skewed stitching (1 Major); Both: CB Broken stitch (5/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 40.0%

Caught in earlier stages

DF Twisted seam/skewing (13) did not reach later stages

Stage summary

StageCountFAILDHU
QC 1st Bundle1 reports—0.0%
QA 1st Bundle1 reports—40.0%
QC Inline2 reports
required on prod. days 2/14 (14%)
—0.0%
QC Endline7 days—5.4%
Pre-final1 reports03.8%
Final Random2 reports03.8%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CS125.4%
1000 / 7 days
—PASS
09/07–09/15
ED Gathering crease, DF Twisted seam/skewing, BA Thread ends

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CS127142 (14%)7509/09, 09/10, 09/11, 09/12, 09/15

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQC 1st BundleQA 1st BundleQC InlineQC EndlinePre-finalFinal Random
Others (no detail)11162
BA Thread ends271034
ED Gathering crease1811
DF Twisted seam/skewing13
CB Broken stitch5112
HA Poor pressing22
EC Asymmetry4
GB Missing sewing operation2
261180 MKSC · CP02 · Due 12/09 · 62d leftNo final No major issue (1 minor notes)
No reportPP Sample
No reportPilot Run
No reportQC 1st Bundle
09/22QA 1st Bundle1 reports
0/14QC Inlineactual/required · 0%
DHU 11.3%QC Endline7 days
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty1,582 / 1,582
PDF reports1
Last report09/22

Cross-stage findings

1 defects recorded as 'Others' without detail

QA 1st Bundle 1; cannot compare across stages

Caught in earlier stages

EC Asymmetry (65), ED Gathering crease (51), EA Unsmooth/puckering/bubbling (28), BA Thread ends (20), CC Skip stitch (16) did not reach later stages

Stage summary

StageCountFAILDHU
QA 1st Bundle1 reports—95.0%
QC Inline0 reports
required on prod. days 0/14 (0%)
——
QC Endline7 days—11.3%

QC Endline by line

LineQC Endline DHU
pcs / days
QA Inline DHU (same line)Latest final (same line)Last 10 days with recordsTop 3 QC Endline defects
CP0211.3%
1522 / 7 days
——
09/21–10/01
EC Asymmetry, ED Gathering crease, EA Unsmooth/puckering/bubbling

Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).

QC Inline report count (2 per line per production day)

LineProd. daysRequiredActualDays with < 2Days with 0Recent short days
CP027140 (0%)7709/23, 09/25, 09/26, 09/28, 10/01

Production day = a day with ETS QC Endline records on that line. Red: less than half of required.

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st BundleQC Endline
EC Asymmetry362
ED Gathering crease150
EA Unsmooth/puckering/bubbling919
BA Thread ends119
CC Skip stitch16
DK Twisted shoulder strap5
CE Broken seam1
DE Cut to broken1
261586 DJLF · CS61 · Due 01/04 · 88d leftNo final No major issue (1 minor notes)
No resultPP Sample1 reports
No reportPilot Run
No reportQC 1st Bundle
10/02QA 1st Bundle1 reports
No reportQC Inline
No dataQC Endline
No reportQA Inline
No reportShipment Sample
No reportPre-final
No reportFinal Random
Order/Ship qty2,300 / 2,300
PDF reports2
Last report10/02

Cross-stage findings

1 defects recorded as 'Others' without detail

QA 1st Bundle 1; cannot compare across stages

Caught in earlier stages

BB Missing cut seam allowance (5) did not reach later stages

Stage summary

StageCountFAILDHU
PP Sample1 reports0—
QA 1st Bundle1 reports—100.0%

Defects × stage (pcs, top 8; color scaled per column)

DefectQA 1st Bundle
BB Missing cut seam allowance5
ED Gathering crease4
AD Fabric stains3
DJ Pleat2
DF Twisted seam/skewing2
EC Asymmetry2
EA Unsmooth/puckering/bubbling1
Others (no detail)1
No active PO matches. Search in history →
Common issues across active POs
QA Inline finds 3.0× the defects of QC Endline

QA Inline checks goods already passed by QC Endline, yet in 463 of 487 POs with both data its DHU is higher (median 35.9% vs 12.1%). QC Endline is widely missing or under-recording defects. 21 active POs with the largest gaps are marked 🟠; in 50 POs the main QA defects were never recorded by QC Endline.

QC Inline reports: 37% of required

Active POs require 4302 reports (2 per line per production day); actual 1603. Lowest lines: CP02 0/90, CP01 0/66, CP15 0/56, CB36 0/24, CP18 1/28, CP11 2/38

Defects found by QA 1st Bundle but not recorded by QC 1st Bundle

128 active POs have both. Most common: EI Inaccurate/skewed stitching (38 PO), BA Thread ends (37 PO), EA Unsmooth/puckering/bubbling (35 PO), CG Grinning (33 PO), ED Gathering crease (31 PO), EC Asymmetry (27 PO)

2342 data errors in QC Endline records

Rework pcs exceed defect count in ETS, which is impossible; please check how QC enters the data.

1577 defects recorded as "Others" without detail

These cannot be compared across stages; suggest making a description mandatory for "Others".

Defects most often reaching later stages

DefectPOs
BA Thread ends106/159
CB Broken stitch97/159
AD Fabric stains84/159
ED Gathering crease81/159
EC Asymmetry80/159
EA Unsmooth/puckering/bubbling74/159
📂 History →511 POs in history (past due or unknown due date); search, filter by month/customer/line, monthly trend
Active = POs due today or later, grouped as: ① due within 14 days; ② due in more than 14 days. POs past due or with an unknown due date are moved to history. QC Inline shows actual/required report count (2 per line per production day, production days from ETS QC Endline records). 1st bundle is split into QC and QA and shows inspection date only. QC Endline data comes from ETS rework records (since 06/01, 1st check only); ETS combines skip/broken stitch as CC and puckering/pleat as ED.