Found 17 times (37 pcs, 09/07–10/06) in earlier stages; latest Final Random (10/05) still has 3 major
AB Shading (Shipment Sample 09/17), FA Wrong material (Shipment Sample 09/17): first found in later stages, never recorded before
Latest Final Random (10/05): CE Broken seam 1 (earlier 45 times), DJ Pleat 2 (earlier 12 times)
EC Asymmetry 3, EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)
Shipment Sample 3; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 9); zero in QC Endline records
Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), CC Skip stitch (1 Major), EE Raw edge (1 Major), DA Exceed seam allowance (1 Major), DE Cut to broken (1 Major); Only QC 1st Bundle: BA Thread ends (1), ED Gathering crease (1), CA Thread tension (1), CG Grinning (1), DF Twisted seam/skewing (1), CB Broken stitch (1); Both: EC Asymmetry (4/5), CE Broken seam (1/1); DHU QC 1st Bundle 84.6% / QA 1st Bundle 92.3%
CG Grinning (152), ED Gathering crease (135), CC Skip stitch (100), EA Uneven seam allowance (75), DB Run-off stitching (52) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 84.6% |
| QA 1st Bundle | 1 reports | — | 92.3% |
| QC Inline | 34 reports required on prod. days 28/46 (61%) | — | 111.6% |
| QC Endline | 21 days | — | 16.9% |
| QA Inline | 3 reports | 3 | 43.8% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 1 reports | 0 | 3.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB34 | 17.0% 3714 / 21 days | 40.6% | PASS | 09/09–10/08 | BA Thread ends, ED Gathering crease, CE Broken seam |
| CB30 | 0.0% 10 / 1 days | — | — | 10/05–10/05 | — |
| CB32 | 0.0% 10 / 1 days | — | — | 09/29–09/29 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB34 | 21 | 42 | 28 (67%) | 11 | 3 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CB30 | 1 | 2 | 0 (0%) | 1 | 1 | 10/05 |
| CB32 | 1 | 2 | 0 (0%) | 1 | 1 | 09/29 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|---|
| CE Broken seam | 1 | 1 | 1 | 77 | 88 | 2 | 1 | |
| CG Grinning | 1 | 150 | 1 | |||||
| BA Thread ends | 1 | 2 | 137 | 3 | 6 | |||
| EC Asymmetry | 4 | 4 | 5 | 60 | 50 | 10 | 3 | |
| ED Gathering crease | 1 | 1 | 35 | 98 | ||||
| CC Skip stitch | 1 | 25 | 74 | |||||
| EA Uneven seam allowance | 75 | |||||||
| DB Run-off stitching | 30 | 22 |
20 major: DJ Pleat 12, DB Run-off stitching 4, AD Fabric stains 4
Found 14 times (37 pcs, 09/17–09/29) in earlier stages; latest Shipment Sample (10/03) still has 4 major
Found 20 times (56 pcs, 09/17–10/01) in earlier stages; latest Shipment Sample (10/03) still has 1 major
DJ Pleat 14, AD Fabric stains 4, DB Run-off stitching 9, BA Thread ends 20, CE Broken seam 2, EA Unsmooth/puckering/bubbling 1, ED Gathering crease 1, EB Measurement issue 1 pcs (later stages total)
Only QA 1st Bundle: DI High-low/uneven (1 Major), EH Poor lamination/bonding (1 Major), DD Thread not straight/waving (1 Major), CE Broken seam (1 Major), CG Grinning (1 Major), BB Missing cut seam allowance (1 Major), CB Broken stitch (1 Major); Both: BA Thread ends (5/2), DB Run-off stitching (3/2), AD Fabric stains (3/1), EC Asymmetry (3/1), DF Twisted seam/skewing (2/1), AC Fabric hole (1/1), DJ Pleat (1/1); DHU QC 1st Bundle 90.0% / QA 1st Bundle 80.0%
CC Skip stitch (37), GA Missing bartack/button (32), DC Join stitching (23), CA Thread tension (15), DF Twisted seam/skewing (7) did not reach later stages
QGR2644289 Final Random (10/01) CS02; actual production line(s) CS17 (cards show production lines only)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 90.0% |
| QA 1st Bundle | 1 reports | — | 80.0% |
| QC Inline | 17 reports required on prod. days 17/32 (53%) | — | 1159.4% |
| QC Endline | 16 days | — | 17.2% |
| QA Inline | 3 reports | 3 | 43.8% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 1 reports | 1 | 6.0% |
| Final Random | 1 reports | 1 | 10.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS17 | 17.2% 3383 / 16 days | 43.8% | — | 09/17–10/06 | BA Thread ends, DB Run-off stitching, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS17 | 16 | 32 | 17 (53%) | 10 | 5 | 10/01, 10/02, 10/03, 10/05, 10/06 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 5 | 2 | 103 | 309 | 2 | 5 | 15 | |
| DB Run-off stitching | 3 | 2 | 25 | 188 | 10 | 5 | 4 | |
| DJ Pleat | 1 | 1 | 33 | 12 | 2 | 12 | ||
| CB Broken stitch | 1 | 54 | 1 | 1 | ||||
| CE Broken seam | 1 | 44 | 2 | |||||
| EC Asymmetry | 3 | 1 | 19 | 11 | 3 | 4 | 1 | |
| CC Skip stitch | 2 | 34 | 1 | |||||
| ED Gathering crease | 33 | 1 |
Found 3 times (10 pcs, 09/12–09/21) in earlier stages; latest Final Random (09/30) still has 3 major
DC Join stitching (Shipment Sample 09/16), CA Thread tension (Shipment Sample 09/16), DI High-low/uneven (Shipment Sample 09/16), CG Grinning (Shipment Sample 09/16): first found in later stages, never recorded before
QA Inline DHU 27.6% vs QC Endline 5.0% (09/11–10/06, 18 days, 3205 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
Latest Final Random (09/30): DB Run-off stitching 1 (earlier 15 times), DJ Pleat 2 (earlier 9 times), AD Fabric stains 1 (earlier 7 times), CE Broken seam 1 (earlier 3 times), AC Fabric hole 2 (earlier 3 times)
EC Asymmetry 3, DF Twisted seam/skewing 1, CB Broken stitch 1, EI Inaccurate/skewed stitching 2 pcs (later stages total)
QC 1st Bundle 11, QC Inline 123; cannot compare across stages
EC Asymmetry (QA 12); zero in QC Endline records
09/11 CS12 261676 (defective pcs 3 > defects 1), 09/12 CS12 261676 (defective pcs 10 > defects 4), 09/14 CS12 261676 (defective pcs 11 > defects 7), 09/15 CS12 261676 (defective pcs 30 > defects 14)…
QGR2644279 have multiple reports with different content
Only QA 1st Bundle: DB Run-off stitching (2 Major), AD Fabric stains (2 Major), DJ Pleat (2 Major), CC Skip stitch (1 Major), BA Thread ends (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CF Pulling yarn (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: BD Snagging (4); Both: ED Gathering crease (5/1), EC Asymmetry (3/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 100.0%
ED Gathering crease (60), CC Skip stitch (56), CF Pulling yarn (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 0.0% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 18 reports required on prod. days 18/36 (50%) | — | 0.0% |
| QC Endline | 18 days | — | 5.0% |
| QA Inline | 4 reports | 4 | 27.6% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 2 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS12 | 5.0% 3205 / 18 days | 27.6% | PASS | 09/11–10/06 | BA Thread ends, ED Gathering crease, DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS12 | 18 | 36 | 18 (50%) | 12 | 6 | 09/26, 09/29, 09/30, 10/02, 10/06 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|
| Others (no detail) | 11 | 123 | |||||
| BA Thread ends | 1 | 28 | 57 | 7 | 10 | ||
| ED Gathering crease | 5 | 1 | 9 | 37 | 8 | ||
| CC Skip stitch | 1 | 33 | 17 | 5 | |||
| DB Run-off stitching | 2 | 20 | 17 | 7 | 1 | ||
| DJ Pleat | 2 | 27 | 3 | 1 | 2 | ||
| CB Broken stitch | 24 | 9 | 1 | ||||
| AD Fabric stains | 2 | 10 | 10 | 1 | 1 |
Found 7 times (15 pcs, 09/10–09/16) in earlier stages; latest Shipment Sample (10/03) still has 2 major
BB Missing cut seam allowance (Shipment Sample 09/16), DF Twisted seam/skewing (Shipment Sample 09/16), CF Pulling yarn (Pre-final 09/26), DD Thread not straight/waving (Final Random 09/28), AC Fabric hole (Final Random 09/28), HA Poor pressing (Final Random 09/28): first found in later stages, never recorded before
QA Inline DHU 37.5% vs QC Inline 14.7%; QC Inline may be missing defects
DJ Pleat 1, GA Missing bartack/button 1, CB Broken stitch 5, BA Thread ends 24, EI Inaccurate/skewed stitching 2, EA Unsmooth/puckering/bubbling 4, DB Run-off stitching 17, ED Gathering crease 3 pcs (later stages total)
Shipment Sample 1; cannot compare across stages
Only QA 1st Bundle: CE Broken seam (3 Major), GB Missing sewing operation (2 Major), AB Shading (1 Major), EI Inaccurate/skewed stitching (1 Major), EG Wrong panel assembly (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: CG Grinning (3); Both: BA Thread ends (4/1), GA Missing bartack/button (4/1), CB Broken stitch (3/2), CC Skip stitch (3/1), DJ Pleat (3/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 75.0%
CC Skip stitch (23), CE Broken seam (14), CA Thread tension (9), CG Grinning (7) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 75.0% |
| QC Inline | 3 reports required on prod. days 3/22 (14%) | — | 14.7% |
| QC Endline | 11 days | — | 13.8% |
| QA Inline | 2 reports | 2 | 37.5% |
| Shipment Sample | 2 reports | 2 | — |
| Pre-final | 2 reports | 1 | 4.0% |
| Final Random | 2 reports | 1 | 9.6% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS17 | 13.8% 1330 / 11 days | 37.5% | PASS | 09/10–10/02 | DB Run-off stitching, BA Thread ends, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS17 | 11 | 22 | 3 (14%) | 11 | 8 | 09/17, 09/18, 09/21, 09/23, 10/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| DB Run-off stitching | 3 | 99 | 1 | 1 | 15 | |||
| BA Thread ends | 4 | 1 | 18 | 50 | 1 | 12 | 12 | |
| CC Skip stitch | 3 | 1 | 16 | 3 | ||||
| CB Broken stitch | 3 | 2 | 7 | 4 | 1 | 4 | ||
| EC Asymmetry | 1 | 2 | 11 | 1 | 5 | |||
| CE Broken seam | 3 | 4 | 7 | |||||
| DJ Pleat | 3 | 1 | 6 | 1 | 1 | |||
| ED Gathering crease | 7 | 2 | 1 |
7 major: EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 1, CG Grinning 1, AD Fabric stains 1, DF Twisted seam/skewing 1, EC Asymmetry 1, CE Broken seam 1
QC 1st Bundle 1; cannot compare across stages
10/01 CP06 261678 (defective pcs 19 > defects 17)
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (4 Major), BB Missing cut seam allowance (3 Major), DJ Pleat (2 Major), ED Gathering crease (1 Major), EG Wrong panel assembly (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: CB Broken stitch (5), DB Run-off stitching (2), EI Inaccurate/skewed stitching (1), FC Wrong label (1); Both: BA Thread ends (6/3), CE Broken seam (4/4); DHU QC 1st Bundle — / QA 1st Bundle 95.0%
BA Thread ends (162), CC Skip stitch (75), EB Measurement issue (54), ED Gathering crease (48), AC Fabric hole (31) did not reach later stages
EI Inaccurate/skewed stitching, EA Unsmooth/puckering/bubbling, CG Grinning, AD Fabric stains, DF Twisted seam/skewing, EC Asymmetry, CE Broken seam: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 95.0% |
| QC Inline | 2 reports required on prod. days 2/16 (12%) | — | — |
| QC Endline | 7 days | — | 35.6% |
| QA Inline | 3 reports | 3 | 45.8% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP06 | 36.0% 1207 / 7 days | 45.8% | — | 09/30–10/07 | BA Thread ends, CC Skip stitch, EB Measurement issue |
| CP02 | 0.0% 14 / 1 days | — | — | 10/02–10/02 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP06 | 7 | 14 | 2 (14%) | 7 | 5 | 10/02, 10/03, 10/05, 10/06, 10/07 |
| CP02 | 1 | 2 | 0 (0%) | 1 | 1 | 10/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|
| BA Thread ends | 6 | 3 | 144 | 9 | ||
| CC Skip stitch | 3 | 72 | ||||
| EB Measurement issue | 54 | |||||
| DF Twisted seam/skewing | 8 | 44 | 1 | |||
| ED Gathering crease | 1 | 47 | ||||
| CE Broken seam | 4 | 4 | 33 | 1 | 1 | |
| AC Fabric hole | 31 | |||||
| DB Run-off stitching | 2 | 14 | 3 | 4 |
Found 3 times (10 pcs, 09/19–09/26) in earlier stages; latest Final Random (09/30) still has 4 major
Found 9 times (27 pcs, 09/21–09/30) in earlier stages; latest Final Random (09/30) still has 11 major
Found 16 times (156 pcs, 09/21–10/02) in earlier stages; latest Final Random (09/30) still has 7 major
DE Cut to broken (Final Random 09/30), AD Fabric stains (Final Random 09/30): first found in later stages, never recorded before
Latest Final Random (09/30): BB Missing cut seam allowance 1 (earlier 4 times), CE Broken seam 1 (earlier 3 times), AC Fabric hole 2 (earlier 7 times), DB Run-off stitching 1 (earlier 4 times)
QC Inline 84; cannot compare across stages
Only QA 1st Bundle: BA Thread ends (1 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CA Thread tension (1 Major), DJ Pleat (1 Major), CE Broken seam (1 Major), AC Fabric hole (1 Major), EI Inaccurate/skewed stitching (1 Major), AA Fabric defect (1 Major); Only QC 1st Bundle: CB Broken stitch (2); Both: BB Missing cut seam allowance (4/1), EC Asymmetry (2/2), DF Twisted seam/skewing (2/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
EC Asymmetry (145), ED Gathering crease (90), CA Thread tension (36), EA Unsmooth/puckering/bubbling (13), EB Measurement issue (7) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 13 reports required on prod. days 13/24 (54%) | — | 28.0% |
| QC Endline | 12 days | — | 23.0% |
| QA Inline | 2 reports | 2 | 29.7% |
| Final Random | 2 reports | 1 | 15.6% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS05 | 23.0% 2285 / 12 days | 29.7% | PASS | 09/19–10/06 | CC Skip stitch, EC Asymmetry, BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS05 | 12 | 24 | 13 (54%) | 7 | 5 | 09/22, 09/26, 10/01, 10/02, 10/06 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| CC Skip stitch | 14 | 139 | 3 | 7 | ||
| EC Asymmetry | 2 | 2 | 28 | 113 | ||
| BA Thread ends | 1 | 16 | 110 | 2 | 16 | |
| ED Gathering crease | 1 | 88 | 1 | |||
| Others (no detail) | 84 | |||||
| DJ Pleat | 1 | 22 | 4 | 11 | ||
| CA Thread tension | 1 | 35 | ||||
| DB Run-off stitching | 23 | 2 | 1 |
Found 19 times (63 pcs, 08/15–08/22) in earlier stages; latest Pre-final (08/25) still has 2 major
Found 14 times (88 pcs, 08/17–08/24) in earlier stages; latest Pre-final (08/25) still has 3 major
Found 6 times (12 pcs, 08/17–08/24) in earlier stages; latest Pre-final (08/25) still has 1 major
CE Broken seam 2, CB Broken stitch 1 pcs (later stages total)
08/24 CS19 261275 (defective pcs 18 > defects 16)
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (2 Major), AD Fabric stains (2 Major), EI Inaccurate/skewed stitching (2 Major), AC Fabric hole (1 Major), CE Broken seam (1 Major), DI High-low/uneven (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: ED Gathering crease (8), BA Thread ends (4), CG Grinning (2), DJ Pleat (2); DHU QC 1st Bundle 20.0% / QA 1st Bundle 50.0%
DB Run-off stitching (19), DI High-low/uneven (14), DJ Pleat (10), CG Grinning (7), EA Unsmooth/puckering/bubbling (7) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 20.0% |
| QA 1st Bundle | 1 reports | — | 50.0% |
| QC Inline | 5 reports required on prod. days 5/22 (23%) | — | 25.8% |
| QC Endline | 11 days | — | 9.3% |
| QA Inline | 2 reports | 2 | 26.6% |
| Pre-final | 1 reports | 1 | 7.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS19 | 9.3% 2465 / 11 days | 26.6% | — | 08/15–08/31 | BA Thread ends, AD Fabric stains, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS19 | 11 | 22 | 5 (23%) | 11 | 6 | 08/22, 08/24, 08/25, 08/26, 08/31 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Pre-final |
|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 34 | 79 | 3 | 3 | |
| AD Fabric stains | 2 | 13 | 72 | 1 | 3 | |
| ED Gathering crease | 8 | 15 | 37 | 3 | 2 | |
| DB Run-off stitching | 2 | 17 | ||||
| DI High-low/uneven | 1 | 11 | 2 | |||
| CC Skip stitch | 12 | 1 | ||||
| DJ Pleat | 2 | 6 | 2 | |||
| CG Grinning | 2 | 5 |
Found 17 times (114 pcs, 08/29–09/07) in earlier stages; latest Final Random (09/11) still has 4 major
QA Inline DHU 37.5% vs QC Inline 12.2%; QC Inline may be missing defects
Latest Final Random (09/11): CB Broken stitch 1 (earlier 5 times)
ED Gathering crease 4, EC Asymmetry 3, CF Pulling yarn 2 pcs (later stages total)
QA 1st Bundle 4, Final Random 1; cannot compare across stages
QGR2637218 have multiple reports with different content
Only QA 1st Bundle: DJ Pleat (4 Major), CC Skip stitch (2 Major), EB Measurement issue (2 Major), BA Thread ends (2 Major), DD Thread not straight/waving (2 Major), EA Unsmooth/puckering/bubbling (2 Major), GC Missing pocket/label (2 Major), EI Inaccurate/skewed stitching (2 Major), EC Asymmetry (2 Major); Only QC 1st Bundle: CG Grinning (2), BC Sticker left (2); Both: AD Fabric stains (2/4), DI High-low/uneven (2/2), ED Gathering crease (2/2); DHU QC 1st Bundle 12.5% / QA 1st Bundle 160.0%
CC Skip stitch (45), DI High-low/uneven (11), DF Twisted seam/skewing (9), DJ Pleat (8) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 12.5% |
| QA 1st Bundle | 2 reports | — | 160.0% |
| QC Inline | 5 reports required on prod. days 5/18 (28%) | — | 12.2% |
| QC Endline | 9 days | — | 17.4% |
| QA Inline | 2 reports | 2 | 37.5% |
| Shipment Sample | 1 reports | 0 | — |
| Pre-final | 1 reports | 1 | 12.8% |
| Final Random | 1 reports | 0 | 4.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS02 | 17.4% 2225 / 9 days | 37.5% | PASS | 08/29–09/26 | BA Thread ends, AD Fabric stains, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS02 | 9 | 18 | 5 (28%) | 9 | 4 | 09/03, 09/05, 09/07, 09/08, 09/26 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 4 | 127 | 2 | 5 | 6 | |
| AD Fabric stains | 2 | 4 | 12 | 95 | 1 | 4 | |
| ED Gathering crease | 2 | 2 | 7 | 77 | 3 | 4 | |
| EC Asymmetry | 2 | 7 | 33 | 2 | 3 | ||
| CC Skip stitch | 2 | 4 | 36 | 3 | |||
| Others (no detail) | 4 | 10 | 1 | ||||
| DI High-low/uneven | 2 | 2 | 3 | 4 | |||
| CB Broken stitch | 4 | 3 | 2 | 1 |
Found 6 times (11 pcs, 07/07–07/08) in earlier stages; latest Final Random (08/18) still has 4 major
BB Missing cut seam allowance (Final Random 07/20): first found in later stages, never recorded before
Latest Final Random (08/18): BA Thread ends 2 (earlier 5 times)
ED Gathering crease 2, AD Fabric stains 1 pcs (later stages total)
EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records
DB Run-off stitching (81), CC Skip stitch (77), Q61 Lace raw edge or broken lace (47), DJ Pleat (6), CE Broken seam (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC Inline | 3 reports required on prod. days 3/28 (11%) | — | 34.4% |
| QC Endline | 14 days | — | 19.3% |
| QA Inline | 1 reports | 1 | 21.9% |
| Final Random | 4 reports | 0 | 3.9% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB20 | 19.4% 1986 / 13 days | 21.9% | PASS | 06/29–07/16 | CC Skip stitch, ED Gathering crease, DB Run-off stitching |
| CB19 | 0.0% 10 / 1 days | — | — | 09/23–09/23 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB20 | 13 | 26 | 3 (12%) | 13 | 10 | 07/11, 07/13, 07/14, 07/15, 07/16 |
| CB19 | 1 | 2 | 0 (0%) | 1 | 1 | 09/23 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|
| DB Run-off stitching | 6 | 75 | ||
| ED Gathering crease | 75 | 2 | 2 | |
| CC Skip stitch | 77 | |||
| AD Fabric stains | 71 | 1 | ||
| Q61 Lace raw edge or broken lace | 47 | |||
| BA Thread ends | 25 | 4 | ||
| EA Unsmooth/puckering/bubbling | 10 | 1 | 4 | |
| DJ Pleat | 6 |
11 major: BA Thread ends 1, BB Missing cut seam allowance 1, ED Gathering crease 9
Found 23 times (73 pcs, 08/20–09/07) in earlier stages; latest Final Random (09/17) still has 2 major
Found 35 times (182 pcs, 08/20–09/10) in earlier stages; latest Final Random (09/17) still has 10 major
Found 8 times (18 pcs, 08/20–09/07) in earlier stages; latest Final Random (09/17) still has 1 major
Found 4 times (10 pcs, 08/21–09/07) in earlier stages; latest Final Random (09/17) still has 1 major
Found 19 times (202 pcs, 08/21–09/14) in earlier stages; latest Final Random (09/17) still has 2 major
BB Missing cut seam allowance (Final Random 09/17): first found in later stages, never recorded before
CB Broken stitch 1 pcs (later stages total)
QA 1st Bundle 1, QA Inline 4; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 11); zero in QC Endline records
Only QA 1st Bundle: EC Asymmetry (1 Major); Only QC 1st Bundle: DB Run-off stitching (2), DJ Pleat (1); Both: ED Gathering crease (3/5), EA Unsmooth/puckering/bubbling (3/2), CG Grinning (1/2); DHU QC 1st Bundle 76.9% / QA 1st Bundle 84.6%
AD Fabric stains (169), CC Skip stitch (106), EC Asymmetry (68), DB Run-off stitching (43), Q10 Reject after repairing (35) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 76.9% |
| QA 1st Bundle | 1 reports | — | 84.6% |
| QC Inline | 11 reports required on prod. days 11/48 (23%) | — | 61.8% |
| QC Endline | 20 days | — | 16.4% |
| QA Inline | 3 reports | 3 | 29.2% |
| Final Random | 4 reports | 1 | 4.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB02 | 16.5% 5145 / 20 days | 29.2% | FAIL | 08/20–09/14 | BA Thread ends, AD Fabric stains, ED Gathering crease |
| CB30 | 0.0% 30 / 3 days | — | — | 08/24–09/01 | — |
| CB11 | 0.0% 10 / 1 days | — | — | 09/02–09/02 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB02 | 20 | 40 | 11 (28%) | 20 | 9 | 09/08, 09/09, 09/10, 09/11, 09/14 |
| CB30 | 3 | 6 | 0 (0%) | 3 | 3 | 08/24, 08/26, 09/01 |
| CB11 | 1 | 2 | 0 (0%) | 1 | 1 | 09/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| BA Thread ends | 202 | 5 | ||||
| ED Gathering crease | 3 | 5 | 35 | 135 | 4 | 12 |
| AD Fabric stains | 3 | 166 | ||||
| CC Skip stitch | 9 | 97 | ||||
| EA Unsmooth/puckering/bubbling | 3 | 2 | 61 | 7 | 4 | |
| EC Asymmetry | 1 | 15 | 46 | 6 | ||
| Others (no detail) | 1 | 52 | 4 | |||
| DB Run-off stitching | 2 | 30 | 11 |
11 major: CB Broken stitch 1, BB Missing cut seam allowance 2, DC Join stitching 2, CE Broken seam 2, EI Inaccurate/skewed stitching 2, Others (no detail) 1, AB Shading 1
Found 42 times (219 pcs, 09/09–09/26) in earlier stages; latest Shipment Sample (10/02) still has 1 major
Found 20 times (45 pcs, 09/09–09/26) in earlier stages; latest Shipment Sample (10/02) still has 7 major
Found 23 times (90 pcs, 09/14–09/26) in earlier stages; latest Shipment Sample (10/02) still has 2 major
Found 3 times (4 pcs, 09/19–09/22) in earlier stages; latest Shipment Sample (10/02) still has 1 major
FB Material defect (Shipment Sample 09/25), DC Join stitching (Final Random 09/26), AB Shading (Final Random 09/26): first found in later stages, never recorded before
BA Thread ends 30, CE Broken seam 2, CG Grinning 2, EI Inaccurate/skewed stitching 4, DE Cut to broken 1, BB Missing cut seam allowance 2, DB Run-off stitching 1 pcs (later stages total)
Shipment Sample 3, Final Random 1; cannot compare across stages
09/14 CP01 261502-3 (defective pcs 9 > defects 8)
Only QA 1st Bundle: BA Thread ends (6 Major), EI Inaccurate/skewed stitching (4 Major), BB Missing cut seam allowance (3 Major), CG Grinning (2 Major), AA Fabric defect (1 Major); Only QC 1st Bundle: DG Fastening loose/misplaced (4), GB Missing sewing operation (3), ED Gathering crease (1); Both: EA Unsmooth/puckering/bubbling (9/13), CE Broken seam (5/5), EC Asymmetry (4/3), AD Fabric stains (2/4), DJ Pleat (4/2), CC Skip stitch (4/1), DE Cut to broken (2/1), DF Twisted seam/skewing (1/1); DHU QC 1st Bundle 97.5% / QA 1st Bundle 76.7%
CC Skip stitch (216), EB Measurement issue (90), ED Gathering crease (53), DJ Pleat (25), CA Thread tension (11) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 2 reports | — | 97.5% |
| QA 1st Bundle | 4 reports | — | 76.7% |
| QC Inline | 9 reports required on prod. days 9/108 (8%) | — | 61.6% |
| QC Endline | 15 days | — | 9.4% |
| QA Inline | 5 reports | 5 | 40.6% |
| Shipment Sample | 2 reports | 2 | — |
| Final Random | 1 reports | 1 | 3.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP13 | 9.0% 4000 / 8 days | 71.9% | FAIL | 09/15–09/23 | BA Thread ends, EA Unsmooth/puckering/bubbling, CC Skip stitch |
| CP17 | 14.6% 3745 / 13 days | 51.6% | — | 09/15–10/02 | BA Thread ends, CC Skip stitch, CE Broken seam |
| CP07 | 8.5% 1755 / 9 days | 14.1% | — | 09/17–09/30 | BA Thread ends, AD Fabric stains, CE Broken seam |
| CP01 | 4.5% 780 / 5 days | — | — | 09/14–09/23 | BA Thread ends, AD Fabric stains, EC Asymmetry |
| CP15 | 4.5% 640 / 6 days | — | — | 09/16–09/26 | BA Thread ends, AD Fabric stains |
| CP02 | 0.7% 440 / 3 days | — | — | 09/17–09/21 | EC Asymmetry, BA Thread ends |
| CP06 | 0.0% 420 / 7 days | — | — | 09/15–09/23 | — |
| CP03 | 0.0% 100 / 1 days | — | — | 09/17–09/17 | — |
| CP16 | 10.0% 60 / 1 days | — | — | 09/18–09/18 | BA Thread ends, CC Skip stitch |
| CP19 | 0.0% 20 / 1 days | — | — | 09/18–09/18 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP17 | 13 | 26 | 7 (27%) | 13 | 6 | 09/25, 09/26, 09/29, 09/30, 10/02 |
| CP07 | 9 | 18 | 0 (0%) | 9 | 9 | 09/22, 09/23, 09/26, 09/28, 09/30 |
| CP13 | 8 | 16 | 2 (12%) | 8 | 6 | 09/18, 09/19, 09/21, 09/22, 09/23 |
| CP06 | 7 | 14 | 0 (0%) | 7 | 7 | 09/17, 09/18, 09/19, 09/22, 09/23 |
| CP15 | 6 | 12 | 0 (0%) | 6 | 6 | 09/19, 09/22, 09/23, 09/25, 09/26 |
| CP01 | 5 | 10 | 0 (0%) | 5 | 5 | 09/14, 09/15, 09/17, 09/19, 09/23 |
| CP02 | 3 | 6 | 0 (0%) | 3 | 3 | 09/17, 09/19, 09/21 |
| CP03 | 1 | 2 | 0 (0%) | 1 | 1 | 09/17 |
| CP16 | 1 | 2 | 0 (0%) | 1 | 1 | 09/18 |
| CP19 | 1 | 2 | 0 (0%) | 1 | 1 | 09/18 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 6 | 13 | 426 | 3 | 30 | |||
| AD Fabric stains | 3 | 2 | 4 | 23 | 183 | 4 | 2 | |
| CC Skip stitch | 4 | 1 | 13 | 198 | ||||
| CE Broken seam | 1 | 5 | 5 | 28 | 100 | 5 | 2 | |
| EA Unsmooth/puckering/bubbling | 2 | 9 | 13 | 10 | 54 | 2 | 2 | |
| EB Measurement issue | 90 | |||||||
| EC Asymmetry | 1 | 4 | 3 | 19 | 10 | 8 | 12 | |
| ED Gathering crease | 1 | 11 | 40 | 1 |
10 major: Others (no detail) 1, EI Inaccurate/skewed stitching 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1, AD Fabric stains 1, EC Asymmetry 1, DE Cut to broken 1, EC Asymmetry 1
Found 21 times (45 pcs, 09/11–09/22) in earlier stages; latest Shipment Sample (09/25) still has 6 major
Found 6 times (16 pcs, 09/11–09/22) in earlier stages; latest Shipment Sample (09/25) still has 1 major
Found 20 times (82 pcs, 09/11–09/26) in earlier stages; latest Shipment Sample (09/25) still has 1 major
DE Cut to broken (Shipment Sample 09/25): first found in later stages, never recorded before
QA Inline DHU 68.8% vs QC Inline 37.8%; QC Inline may be missing defects
QA Inline DHU 68.8% vs QC Endline 10.4% (09/10–09/26, 14 days, 7000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
QC Inline 2, Shipment Sample 1; cannot compare across stages
BA Thread ends (313), CC Skip stitch (120), DB Run-off stitching (94), ED Gathering crease (80), CE Broken seam (73) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 95.0% |
| QC Inline | 10 reports required on prod. days 10/28 (36%) | — | 37.8% |
| QC Endline | 14 days | — | 10.4% |
| QA Inline | 2 reports | 2 | 68.8% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP09 | 10.4% 7000 / 14 days | 68.8% | — | 09/10–09/26 | BA Thread ends, CC Skip stitch, DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP09 | 14 | 28 | 10 (36%) | 14 | 4 | 09/21, 09/22, 09/23, 09/25, 09/26 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|
| BA Thread ends | 2 | 47 | 261 | 3 | |
| CC Skip stitch | 4 | 114 | 2 | ||
| DB Run-off stitching | 4 | 90 | |||
| AD Fabric stains | 16 | 65 | 1 | 1 | |
| ED Gathering crease | 11 | 68 | 1 | ||
| CE Broken seam | 1 | 16 | 44 | 12 | |
| EC Asymmetry | 7 | 13 | 15 | 10 | 6 |
| EB Measurement issue | 29 |
14 major: EC Asymmetry 1, EI Inaccurate/skewed stitching 1, CB Broken stitch 1, CE Broken seam 1, AD Fabric stains 1, EI Inaccurate/skewed stitching 1, EI Inaccurate/skewed stitching 1, GB Missing sewing operation 1, EI Inaccurate/skewed stitching 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, CE Broken seam 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1
EC Asymmetry (Shipment Sample 09/25), EI Inaccurate/skewed stitching (Shipment Sample 09/25), CE Broken seam (Shipment Sample 09/25), AD Fabric stains (Shipment Sample 09/25), GB Missing sewing operation (Shipment Sample 09/25): first found in later stages, never recorded before
QA Inline DHU 31.2% vs QC Endline 4.3% (09/19–10/08, 13 days, 4160 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
CB Broken stitch 1 pcs (later stages total)
EC Asymmetry (QA 9); zero in QC Endline records
10/02 CP18 261510-1 (defective pcs 50 > defects 32), 10/03 CP18 261510-1 (defective pcs 22 > defects 18), 10/05 CP18 261510-1 (defective pcs 47 > defects 43), 10/06 CP18 261510-1 (defective pcs 63 > defects 57)…
Only QA 1st Bundle: ED Gathering crease (3 Major), DF Twisted seam/skewing (2 Major), CB Broken stitch (2 Major), BD Snagging (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), CA Thread tension (3), CE Broken seam (3), DB Run-off stitching (2), CC Skip stitch (1); Both: BA Thread ends (5/6), EI Inaccurate/skewed stitching (1/5), EC Asymmetry (1/3), DJ Pleat (1/2), DE Cut to broken (1/1); DHU QC 1st Bundle — / QA 1st Bundle 65.0%
BA Thread ends (88), ED Gathering crease (50), CC Skip stitch (46), EA Uneven seam allowance (16), EA Unsmooth/puckering/bubbling (9) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 2 reports | — | 65.0% |
| QC Inline | 1 reports required on prod. days 1/46 (2%) | — | — |
| QC Endline | 13 days | — | 4.3% |
| QA Inline | 3 reports | 3 | 31.2% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP18 | 6.5% 2520 / 5 days | 34.4% | — | 10/02–10/07 | BA Thread ends, ED Gathering crease, CC Skip stitch |
| CP13 | 0.0% 1040 / 9 days | 25.0% | — | 09/19–10/07 | — |
| CP12 | 5.4% 240 / 4 days | — | — | 09/22–10/07 | BA Thread ends, CC Skip stitch, GB Missing sewing operation |
| CP19 | 0.0% 160 / 2 days | — | — | 10/06–10/07 | — |
| CP05 | 0.0% 100 / 1 days | — | — | 10/08–10/08 | — |
| CP11 | 0.0% 60 / 1 days | — | — | 09/25–09/25 | — |
| CP20 | 0.0% 40 / 1 days | — | — | 09/28–09/28 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP13 | 9 | 18 | 0 (0%) | 9 | 9 | 09/28, 09/29, 09/30, 10/06, 10/07 |
| CP18 | 5 | 10 | 1 (10%) | 5 | 4 | 10/02, 10/03, 10/05, 10/06, 10/07 |
| CP12 | 4 | 8 | 0 (0%) | 4 | 4 | 09/22, 09/26, 09/29, 10/07 |
| CP19 | 2 | 4 | 0 (0%) | 2 | 2 | 10/06, 10/07 |
| CP05 | 1 | 2 | 0 (0%) | 1 | 1 | 10/08 |
| CP11 | 1 | 2 | 0 (0%) | 1 | 1 | 09/25 |
| CP20 | 1 | 2 | 0 (0%) | 1 | 1 | 09/28 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|
| BA Thread ends | 5 | 6 | 5 | 63 | 9 | |
| ED Gathering crease | 3 | 47 | ||||
| CC Skip stitch | 1 | 2 | 43 | |||
| EA Uneven seam allowance | 16 | |||||
| EI Inaccurate/skewed stitching | 1 | 5 | 3 | 6 | ||
| EC Asymmetry | 1 | 3 | 6 | 3 | ||
| CE Broken seam | 3 | 2 | 2 | 3 | 2 | |
| EA Unsmooth/puckering/bubbling | 3 | 3 | 3 |
Found 40 times (228 pcs, 09/22–10/08) in earlier stages; latest Final Random (10/06) still has 6 major
Latest Final Random (10/06): CB Broken stitch 1 (earlier 9 times), CC Skip stitch 1 (earlier 17 times)
BB Missing cut seam allowance 2 pcs (later stages total)
QGR2645763 have multiple reports with different content
EC Asymmetry (142), EB Measurement issue (78), ED Gathering crease (75), CE Broken seam (65), DB Run-off stitching (36) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QC Inline | 15 reports required on prod. days 15/28 (54%) | — | — |
| QC Endline | 12 days | — | 18.1% |
| QA Inline | 2 reports | 2 | 37.5% |
| Final Random | 1 reports | 0 | 2.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB35 | 17.6% 3520 / 12 days | 37.5% | PASS | 09/25–10/08 | AD Fabric stains, EB Measurement issue, EC Asymmetry |
| CB31 | 32.9% 70 / 1 days | — | — | 09/30–09/30 | AD Fabric stains, EC Asymmetry, ED Gathering crease |
| CB32 | 36.7% 30 / 1 days | — | — | 10/08–10/08 | AD Fabric stains |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB35 | 12 | 24 | 15 (62%) | 6 | 3 | 09/26, 10/03, 10/05, 10/06, 10/08 |
| CB31 | 1 | 2 | 0 (0%) | 1 | 1 | 09/30 |
| CB32 | 1 | 2 | 0 (0%) | 1 | 1 | 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| AD Fabric stains | 1 | 1 | 28 | 191 | 7 | 6 |
| EC Asymmetry | 1 | 2 | 61 | 76 | 2 | |
| EB Measurement issue | 76 | 2 | ||||
| ED Gathering crease | 16 | 59 | ||||
| BA Thread ends | 10 | 53 | 2 | 10 | ||
| CE Broken seam | 2 | 63 | ||||
| CC Skip stitch | 6 | 55 | 1 | |||
| DB Run-off stitching | 1 | 2 | 33 |
12 major: GC Missing pocket/label 1, AD Fabric stains 1, Others (no detail) 1, ED Gathering crease 1, Others (no detail) 1, EA Unsmooth/puckering/bubbling 1, DJ Pleat 1, EC Asymmetry 1, DE Cut to broken 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1
Found 43 times (213 pcs, 09/21–10/08) in earlier stages; latest Shipment Sample (09/28) still has 1 major
Found 12 times (20 pcs, 09/21–10/07) in earlier stages; latest Shipment Sample (09/28) still has 4 major
Found 3 times (4 pcs, 09/21–09/30) in earlier stages; latest Shipment Sample (09/28) still has 1 major
Found 13 times (33 pcs, 09/26–10/07) in earlier stages; latest Shipment Sample (09/28) still has 1 major
GC Missing pocket/label (Shipment Sample 09/28), ED Gathering crease (Shipment Sample 09/28), DE Cut to broken (Shipment Sample 09/28): first found in later stages, never recorded before
PP Sample 1, QA 1st Bundle 1, Shipment Sample 2; cannot compare across stages
Only QA 1st Bundle: EE Raw edge (2 Major), EI Inaccurate/skewed stitching (2 Major), DF Twisted seam/skewing (2 Major), EB Measurement issue (1 Major), CE Broken seam (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: CG Grinning (8), AD Fabric stains (4), DI High-low/uneven (2), CC Skip stitch (1), EA Unsmooth/puckering/bubbling (1), DB Run-off stitching (1); Both: DD Thread not straight/waving (2/2); DHU QC 1st Bundle 190.0% / QA 1st Bundle 92.3%
CC Skip stitch (96), EB Measurement issue (86), CG Grinning (73), CB Broken stitch (70), BA Thread ends (53) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 190.0% |
| QA 1st Bundle | 1 reports | — | 92.3% |
| QC Inline | 30 reports required on prod. days 23/28 (82%) | — | — |
| QC Endline | 8 days | — | 15.1% |
| QA Inline | 3 reports | 3 | 32.3% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB07 | 14.9% 2130 / 8 days | 32.3% | — | 09/30–10/08 | AD Fabric stains, EB Measurement issue, ED Gathering crease |
| CB19 | 16.1% 540 / 5 days | — | — | 10/02–10/08 | BA Thread ends, AD Fabric stains, CD Needle hole |
| CB30 | 0.0% 10 / 1 days | — | — | 10/07–10/07 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB07 | 8 | 16 | 13 (81%) | 2 | 1 | 10/07, 10/08 |
| CB19 | 5 | 10 | 10 (100%) | 1 | 0 | 10/08 |
| CB30 | 1 | 2 | 0 (0%) | 1 | 1 | 10/07 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| AD Fabric stains | 1 | 4 | 88 | 115 | 5 | 1 | |
| CC Skip stitch | 1 | 67 | 24 | 4 | |||
| EB Measurement issue | 1 | 83 | 2 | ||||
| CG Grinning | 8 | 65 | |||||
| CB Broken stitch | 68 | 2 | |||||
| BA Thread ends | 49 | 4 | |||||
| CE Broken seam | 1 | 47 | 3 | ||||
| ED Gathering crease | 3 | 44 | 1 |
5 major: AD Fabric stains 1, DF Twisted seam/skewing 1, ED Gathering crease 1, ED Gathering crease 1, ED Gathering crease 1
Found 17 times (111 pcs, 09/25–10/08) in earlier stages; latest Shipment Sample (09/29) still has 1 major
Found 15 times (557 pcs, 09/25–10/08) in earlier stages; latest Shipment Sample (09/29) still has 1 major
Found 20 times (385 pcs, 09/25–10/08) in earlier stages; latest Shipment Sample (09/29) still has 3 major
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), EI Inaccurate/skewed stitching (2 Major), BA Thread ends (2 Major); Only QC 1st Bundle: EC Asymmetry (7), DJ Pleat (2), DA Exceed seam allowance (2), DI High-low/uneven (1); Both: ED Gathering crease (5/4), AD Fabric stains (2/4), DF Twisted seam/skewing (4/2); DHU QC 1st Bundle — / QA 1st Bundle 85.0%
BA Thread ends (429), CC Skip stitch (191), EC Asymmetry (41), EB Measurement issue (36), EA Unsmooth/puckering/bubbling (33) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 85.0% |
| QC Inline | 6 reports required on prod. days 6/26 (23%) | — | — |
| QC Endline | 12 days | — | 18.4% |
| QA Inline | 4 reports | 4 | 42.2% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP14 | 18.3% 8936 / 12 days | 42.2% | — | 09/25–10/08 | AD Fabric stains, BA Thread ends, ED Gathering crease |
| CP10 | 25.7% 140 / 1 days | — | — | 09/26–09/26 | ED Gathering crease, AD Fabric stains, BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP14 | 12 | 24 | 6 (25%) | 12 | 6 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CP10 | 1 | 2 | 0 (0%) | 1 | 1 | 09/26 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|
| AD Fabric stains | 2 | 4 | 546 | 5 | 1 | |
| BA Thread ends | 2 | 18 | 402 | 7 | ||
| ED Gathering crease | 5 | 4 | 12 | 363 | 1 | 3 |
| CC Skip stitch | 191 | |||||
| DF Twisted seam/skewing | 4 | 2 | 24 | 72 | 9 | 1 |
| EC Asymmetry | 7 | 12 | 13 | 9 | ||
| EB Measurement issue | 36 | |||||
| EA Unsmooth/puckering/bubbling | 3 | 12 | 15 | 3 |
Found 22 times (244 pcs, 09/16–09/29) in earlier stages; latest Final Random (09/30) still has 4 major
Latest Final Random (09/30): CB Broken stitch 1 (earlier 9 times), CC Skip stitch 1 (earlier 15 times)
EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, ED Gathering crease 1, EB Measurement issue 1 pcs (later stages total)
Shipment Sample 1; cannot compare across stages
Only QA 1st Bundle: DA Exceed seam allowance (5 Major), BA Thread ends (2 Major), CA Thread tension (1 Major), EG Wrong panel assembly (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: BB Missing cut seam allowance (4), CB Broken stitch (1), FC Wrong label (1); Both: EI Inaccurate/skewed stitching (6/1), AD Fabric stains (4/2), CC Skip stitch (1/2), DD Thread not straight/waving (1/2), DI High-low/uneven (1/2), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%
CE Broken seam (62), AC Fabric hole (33), DB Run-off stitching (24), EI Inaccurate/skewed stitching (21), DJ Pleat (16) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 7 reports required on prod. days 7/28 (25%) | — | 131.0% |
| QC Endline | 14 days | — | 11.7% |
| QA Inline | 2 reports | 2 | 40.6% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 1 reports | 0 | 3.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP06 | 11.7% 7086 / 14 days | 40.6% | PASS | 09/16–10/06 | BA Thread ends, AD Fabric stains, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP06 | 14 | 28 | 7 (25%) | 14 | 7 | 09/28, 09/29, 09/30, 10/05, 10/06 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|
| AD Fabric stains | 4 | 2 | 40 | 192 | 6 | 1 | 4 |
| BA Thread ends | 2 | 8 | 223 | 6 | 5 | ||
| CC Skip stitch | 1 | 2 | 176 | 1 | 1 | ||
| CE Broken seam | 19 | 43 | |||||
| ED Gathering crease | 4 | 43 | 1 | 1 | |||
| EB Measurement issue | 39 | 1 | |||||
| AC Fabric hole | 33 | ||||||
| EC Asymmetry | 1 | 19 | 3 | 1 |
Found 103 times (610 pcs, 09/15–10/08) in earlier stages; latest Final Random (10/03) still has 3 major
GA Missing bartack/button (Final Random 10/01): first found in later stages, never recorded before
Latest Final Random (10/03): CC Skip stitch 2 (earlier 72 times), CB Broken stitch 2 (earlier 27 times)
EA Unsmooth/puckering/bubbling 3, ED Gathering crease 3, DJ Pleat 1 pcs (later stages total)
QA Inline 2, Final Random 1; cannot compare across stages
10/06 CB01 261833-S (defective pcs 43 > defects 42), 10/07 CB01 261833-S (defective pcs 30 > defects 26)
Only QA 1st Bundle: ED Gathering crease (2 Major), DB Run-off stitching (2 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: BA Thread ends (3), EA Unsmooth/puckering/bubbling (3), CA Thread tension (2), AD Fabric stains (2), DJ Pleat (2), EE Raw edge (1); Both: EC Asymmetry (5/6); DHU QC 1st Bundle 180.0% / QA 1st Bundle 84.6%
EC Asymmetry (247), DB Run-off stitching (156), EB Measurement issue (133), CE Broken seam (107), AC Fabric hole (76) did not reach later stages
QGR2645050 Final Random (10/03) CB32; actual production line(s) CB01/CB14/CB26/CB29/CB30/CB31 (cards show production lines only)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 2 reports | — | 180.0% |
| QA 1st Bundle | 1 reports | — | 84.6% |
| QC Inline | 62 reports required on prod. days 56/120 (47%) | — | 126.0% |
| QC Endline | 21 days | — | 8.7% |
| QA Inline | 12 reports | 12 | 32.3% |
| Final Random | 3 reports | 0 | 3.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB31 | 7.5% 9137 / 16 days | 32.1% | PASS | 09/17–10/07 | AD Fabric stains, BA Thread ends, CC Skip stitch |
| CB29 | 11.5% 8241 / 17 days | 38.5% | PASS | 09/16–10/06 | ED Gathering crease, AD Fabric stains, BA Thread ends |
| CB14 | 7.8% 6915 / 15 days | 25.0% | PASS | 09/14–10/02 | ED Gathering crease, BA Thread ends, AC Fabric hole |
| CB01 | 6.7% 1892 / 4 days | 21.9% | — | 10/05–10/08 | AD Fabric stains, DB Run-off stitching, BA Thread ends |
| CB30 | 0.0% 183 / 7 days | — | — | 09/21–10/08 | — |
| CB26 | 0.0% 10 / 1 days | — | — | 10/08–10/08 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB29 | 17 | 34 | 24 (71%) | 7 | 3 | 09/19, 10/02, 10/03, 10/05, 10/06 |
| CB31 | 16 | 32 | 25 (78%) | 7 | 0 | 09/26, 09/29, 10/03, 10/05, 10/07 |
| CB14 | 15 | 30 | 6 (20%) | 15 | 9 | 09/26, 09/28, 09/29, 09/30, 10/02 |
| CB30 | 7 | 14 | 0 (0%) | 7 | 7 | 09/30, 10/01, 10/02, 10/07, 10/08 |
| CB01 | 4 | 8 | 1 (12%) | 4 | 3 | 10/05, 10/06, 10/07, 10/08 |
| CB26 | 1 | 2 | 0 (0%) | 1 | 1 | 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| ED Gathering crease | 2 | 69 | 534 | 20 | 3 | |
| AD Fabric stains | 2 | 133 | 462 | 13 | 8 | |
| BA Thread ends | 3 | 14 | 458 | 4 | 27 | |
| CC Skip stitch | 43 | 266 | 7 | 2 | ||
| EC Asymmetry | 5 | 6 | 136 | 90 | 10 | |
| EA Unsmooth/puckering/bubbling | 3 | 94 | 53 | 9 | 3 | |
| DB Run-off stitching | 2 | 33 | 116 | 5 | ||
| EB Measurement issue | 6 | 121 | 6 |
Found 89 times (726 pcs, 09/16–10/08) in earlier stages; latest Final Random (10/01) still has 3 major
Latest Final Random (10/01): EA Unsmooth/puckering/bubbling 2 (earlier 44 times), CC Skip stitch 1 (earlier 42 times)
ED Gathering crease 5, AC Fabric hole 1 pcs (later stages total)
QC Inline 1; cannot compare across stages
09/17 CB11 261834-S1 (defective pcs 14 > defects 12), 09/21 CB12 261834-S1 (defective pcs 60 > defects 59), 10/06 CB12 261834-S1 (defective pcs 3 > defects 2)
QGR2644026, QGR2644862 have multiple reports with different content
Only QA 1st Bundle: CH Incorrect stitch density (3 Major), DI High-low/uneven (2 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: AF Crushed foam cup (2), ED Gathering crease (2), DC Join stitching (2), DJ Pleat (2), CE Broken seam (2), DF Twisted seam/skewing (2); Both: EA Unsmooth/puckering/bubbling (3/2), EC Asymmetry (4/1), BA Thread ends (4/1); DHU QC 1st Bundle 80.8% / QA 1st Bundle 76.9%
CE Broken seam (306), DB Run-off stitching (252), EC Asymmetry (247), EB Measurement issue (92), CB Broken stitch (71) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 2 reports | — | 80.8% |
| QA 1st Bundle | 1 reports | — | 76.9% |
| QC Inline | 69 reports required on prod. days 65/142 (46%) | — | 80.2% |
| QC Endline | 20 days | — | 10.6% |
| QA Inline | 8 reports | 8 | 30.1% |
| Final Random | 2 reports | 0 | 3.1% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB12 | 9.0% 8442 / 18 days | 25.0% | PASS | 09/16–10/08 | BA Thread ends, AC Fabric hole, ED Gathering crease |
| CB01 | 10.0% 7138 / 17 days | 28.1% | PASS | 09/16–10/06 | AD Fabric stains, BA Thread ends, DB Run-off stitching |
| CB11 | 12.2% 6247 / 19 days | 39.1% | — | 09/02–10/08 | AD Fabric stains, ED Gathering crease, CE Broken seam |
| CB14 | 13.1% 3266 / 8 days | 28.1% | — | 09/30–10/08 | CC Skip stitch, DB Run-off stitching, CE Broken seam |
| CB30 | 0.0% 66 / 7 days | — | — | 09/18–10/03 | — |
| CB09 | 0.0% 10 / 1 days | — | — | 10/03–10/03 | — |
| CB29 | 0.0% 10 / 1 days | — | — | 10/03–10/03 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB11 | 19 | 38 | 18 (47%) | 16 | 4 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CB12 | 18 | 36 | 23 (64%) | 12 | 1 | 10/01, 10/03, 10/05, 10/06, 10/08 |
| CB01 | 17 | 34 | 19 (56%) | 9 | 6 | 09/29, 10/01, 10/03, 10/05, 10/06 |
| CB14 | 8 | 16 | 5 (31%) | 8 | 3 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CB30 | 7 | 14 | 0 (0%) | 7 | 7 | 09/22, 09/30, 10/01, 10/02, 10/03 |
| CB09 | 1 | 2 | 0 (0%) | 1 | 1 | 10/03 |
| CB29 | 1 | 2 | 0 (0%) | 1 | 1 | 10/03 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 1 | 74 | 776 | 10 | 12 |
| AD Fabric stains | 76 | 642 | 8 | 7 | ||
| ED Gathering crease | 2 | 47 | 264 | 4 | 5 | |
| CE Broken seam | 2 | 102 | 199 | 3 | ||
| DB Run-off stitching | 40 | 210 | 2 | |||
| EC Asymmetry | 4 | 1 | 192 | 42 | 8 | |
| CC Skip stitch | 33 | 176 | 1 | |||
| AC Fabric hole | 3 | 189 | 1 | 1 |
Found 6 times (89 pcs, 09/23–09/28) in earlier stages; latest Pre-final (09/30) still has 1 major
Found 6 times (15 pcs, 09/22–09/28) in earlier stages; latest Pre-final (09/30) still has 3 major
CB Broken stitch 1 pcs (later stages total)
Pre-final 3; cannot compare across stages
Only QA 1st Bundle: DF Twisted seam/skewing (2 Major), AD Fabric stains (1 Major), DI High-low/uneven (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: DB Run-off stitching (2), CG Grinning (1), CB Broken stitch (1); Both: EA Unsmooth/puckering/bubbling (8/5), BA Thread ends (3/3), EI Inaccurate/skewed stitching (3/3), EC Asymmetry (3/1), CC Skip stitch (2/1), DD Thread not straight/waving (2/1), DJ Pleat (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
EA Unsmooth/puckering/bubbling (69), EB Measurement issue (21), DB Run-off stitching (14), EC Asymmetry (11), EI Inaccurate/skewed stitching (9) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 1 reports required on prod. days 1/12 (8%) | — | — |
| QC Endline | 6 days | — | 12.4% |
| QA Inline | 2 reports | 2 | 40.6% |
| Pre-final | 1 reports | 1 | 6.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP13 | 12.4% 2110 / 6 days | 40.6% | — | 09/22–10/02 | CC Skip stitch, BA Thread ends, EA Unsmooth/puckering/bubbling |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP13 | 6 | 12 | 1 (8%) | 6 | 5 | 09/23, 09/25, 09/26, 09/28, 10/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Pre-final |
|---|---|---|---|---|---|---|
| BA Thread ends | 3 | 3 | 3 | 73 | 9 | 22 |
| CC Skip stitch | 2 | 1 | 3 | 83 | 1 | |
| EA Unsmooth/puckering/bubbling | 8 | 5 | 51 | 5 | ||
| EB Measurement issue | 21 | |||||
| ED Gathering crease | 13 | 2 | 3 | |||
| DB Run-off stitching | 2 | 12 | ||||
| EC Asymmetry | 3 | 1 | 2 | 5 | ||
| EI Inaccurate/skewed stitching | 3 | 3 | 3 |
Found 7 times (23 pcs, 09/04–09/11) in earlier stages; latest Final Random (10/02) still has 3 major
QA Inline DHU 38.3% vs QC Inline 18.6%; QC Inline may be missing defects
Pre-final DHU 16.8% vs QC Endline 8.1% (08/31–09/21, 14 days, 2000 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects; Final Random 10.4%
Latest Final Random (10/02): DJ Pleat 1 (earlier 12 times), AC Fabric hole 1 (earlier 4 times)
EC Asymmetry 6, DF Twisted seam/skewing 2 pcs (later stages total)
QC Inline 5, QA Inline 1, Pre-final 6, Final Random 1; cannot compare across stages
EC Asymmetry (QA 13); zero in QC Endline records
08/31 CS19 261225 (defective pcs 13 > defects 6), 09/01 CS19 261225 (defective pcs 48 > defects 18), 09/02 CS19 261225 (defective pcs 26 > defects 4), 09/03 CS19 261225 (defective pcs 23 > defects 3)…
Only QA 1st Bundle: DA Exceed seam allowance (3 Major), EA Unsmooth/puckering/bubbling (2 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: BA Thread ends (2), DJ Pleat (2), DI High-low/uneven (2), EC Asymmetry (2), CC Skip stitch (1), DK Twisted shoulder strap (1); Both: EI Inaccurate/skewed stitching (2/4), CB Broken stitch (3/2); DHU QC 1st Bundle 75.0% / QA 1st Bundle 60.0%
CC Skip stitch (42), DK Twisted shoulder strap (19), DI High-low/uneven (17), EB Measurement issue (16), EI Inaccurate/skewed stitching (9) did not reach later stages
AD Fabric stains, CB Broken stitch: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 75.0% |
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 7 reports required on prod. days 7/28 (25%) | — | 18.6% |
| QC Endline | 14 days | — | 8.1% |
| QA Inline | 4 reports | 4 | 38.3% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 1 reports | 1 | 16.8% |
| Final Random | 2 reports | 1 | 10.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS19 | 8.1% 2000 / 14 days | 38.3% | PASS | 08/31–09/21 | BA Thread ends, CC Skip stitch, AD Fabric stains |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS19 | 14 | 28 | 7 (25%) | 14 | 7 | 09/10, 09/11, 09/16, 09/17, 09/21 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 34 | 56 | 2 | 3 | 27 | ||
| AD Fabric stains | 4 | 20 | 6 | 1 | 5 | 18 | ||
| CC Skip stitch | 1 | 5 | 35 | 1 | ||||
| ED Gathering crease | 2 | 19 | 2 | 7 | 3 | |||
| EC Asymmetry | 2 | 14 | 7 | 6 | ||||
| DJ Pleat | 2 | 13 | 5 | 1 | 1 | |||
| CB Broken stitch | 3 | 2 | 7 | 6 | 1 | 2 | ||
| DK Twisted shoulder strap | 1 | 8 | 10 |
Found 24 times (518 pcs, 09/28–10/08) in earlier stages; latest Pre-final (10/02) still has 8 major
Found 6 times (9 pcs, 10/02–10/07) in earlier stages; latest Pre-final (10/02) still has 2 major
Only QA 1st Bundle: EI Inaccurate/skewed stitching (3 Major), AD Fabric stains (2 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: ED Gathering crease (1), DB Run-off stitching (1), FC Wrong label (1); Both: EC Asymmetry (4/3), EA Unsmooth/puckering/bubbling (2/2), CB Broken stitch (2/1), AC Fabric hole (1/1), DJ Pleat (1/1), GA Missing bartack/button (1/1), DF Twisted seam/skewing (1/1); DHU QC 1st Bundle — / QA 1st Bundle 80.0%
CC Skip stitch (264), DB Run-off stitching (126), EC Asymmetry (47), CB Broken stitch (46), AC Fabric hole (31) did not reach later stages
QGR2644816 Pre-final (10/02) CS09; actual production line(s) CS15 (cards show production lines only)
EA Unsmooth/puckering/bubbling, DD Thread not straight/waving: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 80.0% |
| QC Inline | 18 reports required on prod. days 18/20 (90%) | — | — |
| QC Endline | 10 days | — | 49.6% |
| QA Inline | 3 reports | 3 | 38.5% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 1 | 8.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS15 | 49.6% 2047 / 10 days | 38.5% | — | 09/28–10/08 | AD Fabric stains, CC Skip stitch, BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS15 | 10 | 20 | 18 (90%) | 1 | 1 | 09/28 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| AD Fabric stains | 2 | 18 | 491 | 7 | 8 | ||
| CC Skip stitch | 4 | 260 | |||||
| BA Thread ends | 124 | 3 | 7 | ||||
| DB Run-off stitching | 1 | 11 | 113 | 1 | |||
| EC Asymmetry | 4 | 3 | 33 | 7 | |||
| CB Broken stitch | 2 | 1 | 41 | 2 | |||
| AC Fabric hole | 1 | 1 | 12 | 17 | |||
| ED Gathering crease | 1 | 19 | 1 | 5 |
Found 11 times (42 pcs, 09/29–10/02) in earlier stages; latest Pre-final (10/03) still has 3 major
QA Inline DHU 28.1% vs QC Endline 5.3% (09/29–10/02, 4 days, 2978 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
Latest Pre-final (10/03): AD Fabric stains 2 (earlier 4 times)
ED Gathering crease (QA 7); zero in QC Endline records
09/29 CS08 262056 (defective pcs 38 > defects 20), 09/30 CS08 262056 (defective pcs 27 > defects 25), 10/02 CS08 262056 (defective pcs 50 > defects 30)
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), BA Thread ends (3 Major), BB Missing cut seam allowance (2 Major), ED Gathering crease (2 Major); Only QC 1st Bundle: CB Broken stitch (7), AC Fabric hole (3), DB Run-off stitching (2), CA Thread tension (1); DHU QC 1st Bundle — / QA 1st Bundle 50.0%
CC Skip stitch (27), CB Broken stitch (21), EA Unsmooth/puckering/bubbling (9), DB Run-off stitching (8) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 50.0% |
| QC Inline | 5 reports required on prod. days 5/8 (62%) | — | — |
| QC Endline | 4 days | — | 5.3% |
| QA Inline | 1 reports | 1 | 28.1% |
| Pre-final | 1 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS08 | 5.3% 2978 / 4 days | 28.1% | — | 09/29–10/02 | AD Fabric stains, CC Skip stitch, BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS08 | 4 | 8 | 5 (62%) | 3 | 0 | 09/30, 10/01, 10/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Pre-final |
|---|---|---|---|---|---|---|
| AD Fabric stains | 2 | 112 | 2 | |||
| ED Gathering crease | 2 | 36 | 4 | 3 | ||
| BA Thread ends | 3 | 3 | 21 | 2 | ||
| CC Skip stitch | 26 | 1 | ||||
| CB Broken stitch | 7 | 13 | 1 | |||
| EA Unsmooth/puckering/bubbling | 3 | 6 | ||||
| DB Run-off stitching | 2 | 6 | ||||
| DF Twisted seam/skewing | 3 | 1 |
10 major: EA Unsmooth/puckering/bubbling 1, CB Broken stitch 1, CB Broken stitch 1, EA Unsmooth/puckering/bubbling 1, BA Thread ends 1, EA Unsmooth/puckering/bubbling 1, CE Broken seam 1, CE Broken seam 1, DF Twisted seam/skewing 1, CE Broken seam 1
PP Sample 5, QA 1st Bundle 1, QA Inline 6; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records
Only QA 1st Bundle: AB Shading (1 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (2), CE Broken seam (2), CA Thread tension (1); Both: EC Asymmetry (4/2), DB Run-off stitching (1/1); DHU QC 1st Bundle — / QA 1st Bundle 46.2%
EC Asymmetry (29), ED Gathering crease (29), Q61 Lace raw edge or broken lace (19), DB Run-off stitching (8), CG Grinning (8) did not reach later stages
EA Unsmooth/puckering/bubbling, CB Broken stitch, BA Thread ends, CE Broken seam, DF Twisted seam/skewing: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 46.2% |
| QC Inline | 4 reports required on prod. days 4/8 (50%) | — | — |
| QC Endline | 4 days | — | 19.2% |
| QA Inline | 1 reports | 1 | 50.0% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB06 | 19.2% 530 / 4 days | 50.0% | — | 10/05–10/08 | ED Gathering crease, CE Broken seam, Q61 Lace raw edge or broken lace |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB06 | 4 | 8 | 4 (50%) | 3 | 1 | 10/05, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| CE Broken seam | 2 | 28 | 22 | 3 | |||
| EC Asymmetry | 4 | 2 | 19 | 4 | |||
| ED Gathering crease | 3 | 26 | |||||
| Q61 Lace raw edge or broken lace | 19 | ||||||
| Others (no detail) | 5 | 1 | 6 | ||||
| EA Unsmooth/puckering/bubbling | 1 | 6 | 1 | 3 | |||
| BA Thread ends | 10 | 1 | |||||
| DB Run-off stitching | 1 | 1 | 1 | 3 | 2 |
Found 45 times (109 pcs, 09/07–10/08) in earlier stages; latest Pre-final (09/18) still has 1 major
Found 33 times (51 pcs, 09/07–10/08) in earlier stages; latest Pre-final (09/18) still has 3 major
Found 69 times (848 pcs, 09/07–10/08) in earlier stages; latest Pre-final (09/18) still has 6 major
Found 71 times (532 pcs, 09/07–10/08) in earlier stages; latest Pre-final (09/18) still has 6 major
Found 25 times (44 pcs, 09/12–10/07) in earlier stages; latest Pre-final (09/18) still has 2 major
AA Fabric defect (Pre-final 09/18): first found in later stages, never recorded before
CG Grinning 1, CF Pulling yarn 1, EC Asymmetry 2, CE Broken seam 1, EI Inaccurate/skewed stitching 2, AC Fabric hole 2 pcs (later stages total)
QC 1st Bundle 1, Pre-final 1; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 8); zero in QC Endline records
09/16 CS20 261514 (defective pcs 31 > defects 30)
Only QA 1st Bundle: DF Twisted seam/skewing (3 Major), EC Asymmetry (2 Major), ED Gathering crease (1 Major); Only QC 1st Bundle: DI High-low/uneven (1), DA Exceed seam allowance (1), GB Missing sewing operation (1), CG Grinning (1), CB Broken stitch (1); Both: EA Unsmooth/puckering/bubbling (3/11), BA Thread ends (4/2), CF Pulling yarn (2/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 100.0%
CC Skip stitch (335), EB Measurement issue (55), DF Twisted seam/skewing (35), DA Exceed seam allowance (34), DB Run-off stitching (19) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 75.0% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 40 reports required on prod. days 40/54 (74%) | — | 75.1% |
| QC Endline | 27 days | — | 14.5% |
| QA Inline | 3 reports | 3 | 49.0% |
| Shipment Sample | 1 reports | 0 | — |
| Pre-final | 1 reports | 1 | 7.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS20 | 14.5% 10623 / 27 days | 49.0% | — | 09/07–10/08 | BA Thread ends, ED Gathering crease, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS20 | 27 | 54 | 40 (74%) | 12 | 2 | 09/15, 09/16, 09/17, 09/18, 09/19 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 2 | 184 | 655 | 3 | 1 | 6 |
| ED Gathering crease | 1 | 91 | 435 | 5 | 2 | 6 | |
| CC Skip stitch | 1 | 334 | |||||
| EA Unsmooth/puckering/bubbling | 3 | 11 | 90 | 5 | 2 | 1 | |
| CB Broken stitch | 1 | 48 | 2 | 1 | 3 | ||
| EB Measurement issue | 55 | ||||||
| DJ Pleat | 44 | 2 | |||||
| CF Pulling yarn | 2 | 1 | 5 | 27 | 1 |
Found 3 times (10 pcs, 09/07–09/15) in earlier stages; latest Pre-final (09/21) still has 3 major
DD Thread not straight/waving (Shipment Sample 09/12), BD Snagging (Pre-final 09/15), FA Wrong material (Pre-final 09/21): first found in later stages, never recorded before
CB Broken stitch 3, DF Twisted seam/skewing 3, DE Cut to broken 1, EI Inaccurate/skewed stitching 1, EC Asymmetry 3, ED Gathering crease 1, AC Fabric hole 1, CF Pulling yarn 3, BB Missing cut seam allowance 1 pcs (later stages total)
QA 1st Bundle 2, QA Inline 8, Shipment Sample 1, Pre-final 2; cannot compare across stages
09/07 CS23 261515 (defective pcs 84 > defects 77), 09/08 CS23 261515 (defective pcs 90 > defects 81), 09/09 CS23 261515 (defective pcs 95 > defects 68), 09/10 CS23 261515 (defective pcs 58 > defects 42)
CC Skip stitch (228), DB Run-off stitching (106), EA Unsmooth/puckering/bubbling (60), CE Broken seam (32), CD Needle hole (27) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 21 reports required on prod. days 21/44 (48%) | — | 94.0% |
| QC Endline | 21 days | — | 16.2% |
| QA Inline | 3 reports | 3 | 58.3% |
| Shipment Sample | 4 reports | 0 | — |
| Pre-final | 2 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS10 | 15.4% 8100 / 16 days | 53.1% | — | 09/11–10/06 | BA Thread ends, CC Skip stitch, DB Run-off stitching |
| CS23 | 21.0% 1400 / 6 days | 68.8% | — | 09/05–09/11 | BA Thread ends, CC Skip stitch, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS10 | 16 | 32 | 19 (59%) | 11 | 2 | 09/23, 09/26, 09/28, 09/29, 10/06 |
| CS23 | 6 | 12 | 2 (17%) | 6 | 4 | 09/07, 09/08, 09/09, 09/10, 09/11 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|
| BA Thread ends | 121 | 992 | 7 | 5 | ||
| CC Skip stitch | 9 | 219 | ||||
| ED Gathering crease | 19 | 90 | 1 | |||
| DB Run-off stitching | 18 | 88 | ||||
| EA Unsmooth/puckering/bubbling | 58 | 2 | ||||
| CB Broken stitch | 6 | 40 | 4 | 3 | ||
| AC Fabric hole | 13 | 31 | 4 | 1 | ||
| EI Inaccurate/skewed stitching | 3 | 41 | 1 | 1 |
Found 26 times (500 pcs, 09/15–09/30) in earlier stages; latest Final Random (10/06) still has 3 major
AD Fabric stains (Pre-final 09/21): first found in later stages, never recorded before
QA Inline DHU 75.0% vs QC Endline 8.5% (09/15–10/01, 14 days, 9600 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
CF Pulling yarn 4 pcs (later stages total)
QC 1st Bundle 10, QA 1st Bundle 2, QC Inline 111, QA Inline 5; cannot compare across stages
09/21 CS13 261516 (defective pcs 78 > defects 73), 09/22 CS13 261516 (defective pcs 84 > defects 81), 09/23 CS13 261516 (defective pcs 86 > defects 85)
Only QA 1st Bundle: ED Gathering crease (3 Major), BB Missing cut seam allowance (1 Major), AC Fabric hole (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: CB Broken stitch (4), DJ Pleat (3); Both: CE Broken seam (4/1), BA Thread ends (3/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 50.0%
CC Skip stitch (122), AC Fabric hole (49), CB Broken stitch (48), DB Run-off stitching (38), CE Broken seam (12) did not reach later stages
EI Inaccurate/skewed stitching, EA Unsmooth/puckering/bubbling, ED Gathering crease, BD Snagging, EC Asymmetry: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 0.0% |
| QA 1st Bundle | 1 reports | — | 50.0% |
| QC Inline | 19 reports required on prod. days 19/28 (68%) | — | 0.0% |
| QC Endline | 14 days | — | 8.5% |
| QA Inline | 1 reports | 1 | 75.0% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 1 reports | 0 | 3.5% |
| Final Random | 1 reports | 0 | 2.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS13 | 8.5% 9600 / 14 days | 75.0% | PASS | 09/15–10/01 | BA Thread ends, ED Gathering crease, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS13 | 14 | 28 | 19 (68%) | 7 | 2 | 09/22, 09/26, 09/29, 09/30, 10/01 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 3 | 1 | 45 | 449 | 2 | 3 | 8 | |
| ED Gathering crease | 3 | 25 | 169 | 2 | ||||
| Others (no detail) | 10 | 2 | 111 | 5 | ||||
| CC Skip stitch | 8 | 114 | ||||||
| AC Fabric hole | 1 | 3 | 45 | |||||
| CB Broken stitch | 4 | 41 | 3 | |||||
| DB Run-off stitching | 4 | 34 | ||||||
| CE Broken seam | 4 | 1 | 4 | 3 |
10 major: ED Gathering crease 1, CG Grinning 1, CB Broken stitch 1, EC Asymmetry 1, ED Gathering crease 1, EI Inaccurate/skewed stitching 1, DF Twisted seam/skewing 1, AD Fabric stains 1, BB Missing cut seam allowance 1, EI Inaccurate/skewed stitching 1
CB Broken stitch (Shipment Sample 10/03), BB Missing cut seam allowance (Shipment Sample 10/03), CF Pulling yarn (Pre-final 10/05): first found in later stages, never recorded before
Pre-final DHU 13.8% vs QC Endline 10.7% (09/25–10/08, 5 days, 1130 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
CG Grinning 1 pcs (later stages total)
Shipment Sample 1; cannot compare across stages
Only QA 1st Bundle: CE Broken seam (4 Major), CG Grinning (2 Major); Only QC 1st Bundle: DJ Pleat (2), EC Asymmetry (2); Both: DF Twisted seam/skewing (3/6), AD Fabric stains (3/4), ED Gathering crease (3/4); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
EC Asymmetry, AD Fabric stains, DI High-low/uneven, DD Thread not straight/waving, CE Broken seam, GB Missing sewing operation, FA Wrong material, EI Inaccurate/skewed stitching, EA Unsmooth/puckering/bubbling, DF Twisted seam/skewing, ED Gathering crease: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 4 reports required on prod. days 4/10 (40%) | — | — |
| QC Endline | 5 days | — | 10.7% |
| Shipment Sample | 5 reports | 2 | — |
| Pre-final | 1 reports | 1 | 13.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS07 | 10.8% 1120 / 4 days | — | — | 09/25–09/29 | AD Fabric stains, BA Thread ends, DF Twisted seam/skewing |
| CS13 | 0.0% 10 / 1 days | — | — | 10/08–10/08 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS07 | 4 | 8 | 4 (50%) | 2 | 2 | 09/25, 09/29 |
| CS13 | 1 | 2 | 0 (0%) | 1 | 1 | 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|
| AD Fabric stains | 3 | 4 | 8 | 61 | 5 | 5 |
| DF Twisted seam/skewing | 3 | 6 | 36 | 16 | 3 | 5 |
| BA Thread ends | 24 | 2 | ||||
| ED Gathering crease | 3 | 4 | 6 | 8 | 3 | |
| EC Asymmetry | 2 | 2 | 10 | |||
| GB Missing sewing operation | 6 | 2 | ||||
| CE Broken seam | 4 | 1 | ||||
| EI Inaccurate/skewed stitching | 4 |
Found 18 times (88 pcs, 09/19–09/25) in earlier stages; latest Final Random (10/08) still has 3 major
IA 2nd operation issue (Pre-final 09/23), EI Inaccurate/skewed stitching (Shipment Sample 09/28): first found in later stages, never recorded before
Latest Final Random (10/08): AD Fabric stains 1 (earlier 4 times), EH Poor lamination/bonding 2 (earlier 4 times)
CB Broken stitch 1, AB Shading 2 pcs (later stages total)
QA 1st Bundle 5, QC Inline 51, QA Inline 8; cannot compare across stages
09/26 CS06 262151 (defective pcs 3 > defects 1), 10/08 CS06 262151 (defective pcs 4 > defects 2)
Only QA 1st Bundle: DE Cut to broken (2 Major), CG Grinning (1 Major); Both: ED Gathering crease (9/1), EC Asymmetry (2/2), CB Broken stitch (1/1); DHU QC 1st Bundle — / QA 1st Bundle 60.0%
ED Gathering crease (103), DF Twisted seam/skewing (85), EA Uneven seam allowance (44), CC Skip stitch (34), EA Unsmooth/puckering/bubbling (25) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 9 reports required on prod. days 9/18 (50%) | — | 24.0% |
| QC Endline | 9 days | — | 10.5% |
| QA Inline | 2 reports | 2 | 34.4% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 0 | 4.0% |
| Final Random | 1 reports | 0 | 3.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS06 | 10.5% 5982 / 9 days | 34.4% | PASS | 09/19–10/08 | BA Thread ends, ED Gathering crease, DF Twisted seam/skewing |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS06 | 9 | 18 | 9 (50%) | 7 | 4 | 09/22, 09/26, 09/29, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 16 | 185 | 4 | 5 | ||||
| ED Gathering crease | 9 | 1 | 6 | 86 | 1 | |||
| EC Asymmetry | 2 | 2 | 24 | 57 | 3 | 1 | 4 | 3 |
| DF Twisted seam/skewing | 85 | |||||||
| Others (no detail) | 5 | 51 | 8 | |||||
| EA Uneven seam allowance | 44 | |||||||
| AB Shading | 32 | 2 | ||||||
| CC Skip stitch | 33 | 1 |
Found 5 times (43 pcs, 09/22–09/29) in earlier stages; latest Final Random (10/06) still has 3 major
BD Snagging (Pre-final 09/23): first found in later stages, never recorded before
Latest Final Random (10/06): ED Gathering crease 2 (earlier 23 times), IA 2nd operation issue 2 (earlier 4 times)
EC Asymmetry 4, EA Unsmooth/puckering/bubbling 4, CB Broken stitch 2 pcs (later stages total)
09/30 CS09 262235 (defective pcs 3 > defects 1)
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (5 Major), DF Twisted seam/skewing (3 Major), BA Thread ends (1 Major); Only QC 1st Bundle: DB Run-off stitching (2), DJ Pleat (1), EI Inaccurate/skewed stitching (1), EC Asymmetry (1); Both: ED Gathering crease (3/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
AB Shading (50), DB Run-off stitching (18), EB Measurement issue (10), EI Inaccurate/skewed stitching (9), DJ Pleat (7) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 10 reports required on prod. days 10/20 (50%) | — | — |
| QC Endline | 7 days | — | 12.6% |
| QA Inline | 3 reports | 3 | 28.1% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 1 | 5.1% |
| Final Random | 1 reports | 0 | 2.9% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS09 | 12.4% 11103 / 7 days | 28.1% | PASS | 09/22–09/30 | BA Thread ends, ED Gathering crease, EC Asymmetry |
| CS10 | 26.1% 138 / 1 days | — | — | 09/30–09/30 | BA Thread ends |
| CS06 | 0.0% 33 / 2 days | — | — | 09/22–09/26 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS09 | 7 | 14 | 10 (71%) | 3 | 1 | 09/22, 09/23, 09/30 |
| CS06 | 2 | 4 | 0 (0%) | 2 | 2 | 09/22, 09/26 |
| CS10 | 1 | 2 | 0 (0%) | 1 | 1 | 09/30 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 1 | 8 | 1110 | 3 | 5 | 7 | ||
| ED Gathering crease | 3 | 1 | 51 | 144 | 1 | 9 | 2 | |
| EC Asymmetry | 1 | 52 | 99 | 8 | 4 | |||
| EA Unsmooth/puckering/bubbling | 5 | 48 | 7 | 4 | ||||
| AB Shading | 39 | 11 | ||||||
| CC Skip stitch | 4 | 39 | 3 | |||||
| IA 2nd operation issue | 18 | 2 | ||||||
| DB Run-off stitching | 2 | 8 | 8 |
CB Broken stitch (Final Random 09/25): first found in later stages, never recorded before
Latest Final Random (09/25): EC Asymmetry 1 (earlier 11 times), ED Gathering crease 1 (earlier 8 times)
CC Skip stitch 1, AD Fabric stains 1 pcs (later stages total)
Only QA 1st Bundle: CC Skip stitch (3 Major), BA Thread ends (3 Major), ED Gathering crease (2 Major), DE Cut to broken (2 Major), DJ Pleat (2 Major), EI Inaccurate/skewed stitching (1 Major), CE Broken seam (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: CH Incorrect stitch density (4), EA Unsmooth/puckering/bubbling (3), BB Missing cut seam allowance (1); Both: EC Asymmetry (5/4); DHU QC 1st Bundle 65.0% / QA 1st Bundle 95.0%
EA Unsmooth/puckering/bubbling (55), DJ Pleat (11), EB Measurement issue (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 65.0% |
| QA 1st Bundle | 1 reports | — | 95.0% |
| QC Inline | 1 reports required on prod. days 1/12 (8%) | — | 34.4% |
| QC Endline | 6 days | — | 11.5% |
| QA Inline | 2 reports | 2 | 35.9% |
| Final Random | 2 reports | 0 | 2.9% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP14 | 11.5% 3184 / 6 days | 35.9% | PASS | 09/08–09/14 | BA Thread ends, ED Gathering crease, AD Fabric stains |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP14 | 6 | 12 | 1 (8%) | 6 | 5 | 09/09, 09/10, 09/11, 09/12, 09/14 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| BA Thread ends | 3 | 139 | 3 | 12 | ||
| ED Gathering crease | 2 | 3 | 81 | 2 | 1 | |
| AD Fabric stains | 63 | 4 | 1 | |||
| EA Unsmooth/puckering/bubbling | 3 | 51 | 1 | |||
| EC Asymmetry | 5 | 4 | 4 | 13 | 5 | 1 |
| CC Skip stitch | 3 | 10 | 1 | |||
| DJ Pleat | 2 | 4 | 5 | |||
| EB Measurement issue | 6 |
QA Inline DHU 43.8% vs QC Endline 6.3% (09/16–09/19, 4 days, 1891 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
Latest Final Random (09/25): EC Asymmetry 1 (earlier 5 times), DJ Pleat 2 (earlier 6 times)
CB Broken stitch 2 pcs (later stages total)
EC Asymmetry (QA 5); zero in QC Endline records
Only QA 1st Bundle: CG Grinning (4 Major), DF Twisted seam/skewing (3 Major), HA Poor pressing (1 Major); Only QC 1st Bundle: EC Asymmetry (7), ED Gathering crease (2), CB Broken stitch (1); Both: DJ Pleat (7/3), BA Thread ends (2/2), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 70.0%
CC Skip stitch (29), ED Gathering crease (24), EB Measurement issue (22), EA Unsmooth/puckering/bubbling (15) did not reach later stages
QGR2642809 Final Random (09/25) CP10; actual production line(s) CP14 (cards show production lines only)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 70.0% |
| QC Inline | 0 reports required on prod. days 0/8 (0%) | — | — |
| QC Endline | 4 days | — | 6.3% |
| QA Inline | 1 reports | 1 | 43.8% |
| Final Random | 1 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP14 | 6.3% 1891 / 4 days | 43.8% | — | 09/16–09/19 | BA Thread ends, CC Skip stitch, EB Measurement issue |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP14 | 4 | 8 | 0 (0%) | 4 | 4 | 09/16, 09/17, 09/18, 09/19 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|
| BA Thread ends | 2 | 2 | 39 | 1 | 5 |
| CC Skip stitch | 28 | 1 | |||
| ED Gathering crease | 2 | 19 | 3 | ||
| EB Measurement issue | 22 | ||||
| EA Unsmooth/puckering/bubbling | 1 | 1 | 12 | 1 | |
| DJ Pleat | 7 | 3 | 1 | 2 | |
| EC Asymmetry | 7 | 4 | 1 | ||
| CG Grinning | 4 |
CB Broken stitch (Final Random 09/25): first found in later stages, never recorded before
QA Inline DHU 34.4% vs QC Endline 4.4% (09/19–09/23, 4 days, 1052 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
DJ Pleat 2 pcs (later stages total)
Only QA 1st Bundle: EC Asymmetry (3 Major), BA Thread ends (2 Major), DA Exceed seam allowance (1 Major), EI Inaccurate/skewed stitching (1 Major), EG Wrong panel assembly (1 Major); Only QC 1st Bundle: DJ Pleat (6), CG Grinning (2), DB Run-off stitching (2), DF Twisted seam/skewing (1), DE Cut to broken (1); Both: ED Gathering crease (7/2), EA Unsmooth/puckering/bubbling (4/3); DHU QC 1st Bundle — / QA 1st Bundle 65.0%
ED Gathering crease (18), EA Unsmooth/puckering/bubbling (15), AC Fabric hole (8), CC Skip stitch (6) did not reach later stages
QGR2642811 Final Random (09/25) CP13; actual production line(s) CP14 (cards show production lines only)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 65.0% |
| QC Inline | 0 reports required on prod. days 0/8 (0%) | — | — |
| QC Endline | 4 days | — | 4.4% |
| QA Inline | 1 reports | 1 | 34.4% |
| Final Random | 1 reports | 0 | 3.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP14 | 4.4% 1052 / 4 days | 34.4% | — | 09/19–09/23 | BA Thread ends, AC Fabric hole, EA Unsmooth/puckering/bubbling |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP14 | 4 | 8 | 0 (0%) | 4 | 4 | 09/19, 09/21, 09/22, 09/23 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|
| BA Thread ends | 2 | 17 | 4 | ||
| ED Gathering crease | 7 | 2 | 3 | 6 | |
| EA Unsmooth/puckering/bubbling | 4 | 3 | 8 | ||
| DJ Pleat | 6 | 2 | |||
| AC Fabric hole | 8 | ||||
| CC Skip stitch | 6 | ||||
| EB Measurement issue | 4 | ||||
| EC Asymmetry | 3 |
CB Broken stitch (Final Random 09/26), AD Fabric stains (Final Random 09/30): first found in later stages, never recorded before
EB Measurement issue 1 pcs (later stages total)
Only QA 1st Bundle: GA Missing bartack/button (1 Major); Only QC 1st Bundle: DI High-low/uneven (5), DJ Pleat (2), EA Unsmooth/puckering/bubbling (1), DE Cut to broken (1); Both: BA Thread ends (5/1), ED Gathering crease (3/2), CG Grinning (1/4), EI Inaccurate/skewed stitching (1/3), EC Asymmetry (1/1); DHU QC 1st Bundle — / QA 1st Bundle 60.0%
CC Skip stitch (25), AC Fabric hole (15), ED Gathering crease (10), CG Grinning (8), EA Unsmooth/puckering/bubbling (7) did not reach later stages
QGR2643338 Final Random (09/26) CP11; actual production line(s) CP14 (cards show production lines only)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 0 reports required on prod. days 0/6 (0%) | — | — |
| QC Endline | 3 days | — | 12.0% |
| QA Inline | 1 reports | 1 | 40.6% |
| Final Random | 2 reports | 0 | 2.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP14 | 12.0% 1241 / 3 days | 40.6% | PASS | 09/22–09/26 | BA Thread ends, EB Measurement issue, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP14 | 3 | 6 | 0 (0%) | 3 | 3 | 09/22, 09/23, 09/26 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|
| BA Thread ends | 5 | 1 | 55 | 2 | 12 |
| EB Measurement issue | 44 | 1 | |||
| CC Skip stitch | 25 | ||||
| AC Fabric hole | 15 | ||||
| ED Gathering crease | 3 | 2 | 1 | 4 | |
| CG Grinning | 1 | 4 | 3 | ||
| EA Unsmooth/puckering/bubbling | 1 | 5 | 1 | ||
| DI High-low/uneven | 5 |
FC Wrong label (Shipment Sample 09/07): first found in later stages, never recorded before
Latest Final Random (09/18): CC Skip stitch 1 (earlier 5 times), CB Broken stitch 2 (earlier 4 times)
AC Fabric hole 1, AD Fabric stains 2, BD Snagging 2, ED Gathering crease 2, DF Twisted seam/skewing 2 pcs (later stages total)
QA 1st Bundle 3, Pre-final 5, Final Random 1; cannot compare across stages
09/03 CS17 261222 (defective pcs 34 > defects 33)
Only QA 1st Bundle: EC Asymmetry (2 Major), CH Incorrect stitch density (1 Major), CC Skip stitch (1 Major), DE Cut to broken (1 Major), AD Fabric stains (1 Major), AC Fabric hole (1 Major), DG Fastening loose/misplaced (1 Major), GB Missing sewing operation (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: BD Snagging (2); Both: BA Thread ends (4/3), DJ Pleat (5/1), EI Inaccurate/skewed stitching (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 90.0%
DB Run-off stitching (23), DJ Pleat (17), EI Inaccurate/skewed stitching (12), EC Asymmetry (11), EB Measurement issue (9) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 90.0% |
| QC Inline | 3 reports required on prod. days 3/16 (19%) | — | 21.2% |
| QC Endline | 8 days | — | 11.5% |
| QA Inline | 3 reports | 3 | 29.2% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 1 | 7.2% |
| Final Random | 1 reports | 0 | 4.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS17 | 11.5% 1790 / 8 days | 29.2% | PASS | 09/02–09/12 | BA Thread ends, ED Gathering crease, DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS17 | 8 | 16 | 3 (19%) | 8 | 5 | 09/05, 09/07, 09/08, 09/09, 09/12 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 3 | 10 | 103 | 7 | 12 | 8 | |
| ED Gathering crease | 3 | 54 | 1 | 2 | ||||
| DB Run-off stitching | 2 | 21 | ||||||
| DJ Pleat | 5 | 1 | 8 | 3 | ||||
| CC Skip stitch | 1 | 14 | 1 | |||||
| EI Inaccurate/skewed stitching | 2 | 1 | 2 | 7 | ||||
| EC Asymmetry | 2 | 3 | 1 | 5 | ||||
| Others (no detail) | 3 | 1 | 5 | 1 |
GA Missing bartack/button (Pre-final 09/05): first found in later stages, never recorded before
DJ Pleat 1, CE Broken seam 2, CG Grinning 1 pcs (later stages total)
QC 1st Bundle 8, QA 1st Bundle 3, QC Inline 60, QA Inline 4; cannot compare across stages
08/26 CS11 261223-S (defective pcs 14 > defects 12), 09/03 CS11 261223-S (defective pcs 22 > defects 20), 09/05 CS11 261223-S (defective pcs 5 > defects 4)
Only QA 1st Bundle: AC Fabric hole (2 Major), CG Grinning (2 Major), CB Broken stitch (2 Major), CA Thread tension (1 Major), DJ Pleat (1 Major), CE Broken seam (1 Major); Only QC 1st Bundle: BA Thread ends (4); Both: DD Thread not straight/waving (4/2); DHU QC 1st Bundle 0.0% / QA 1st Bundle 70.0%
EB Measurement issue (13), DD Thread not straight/waving (8), GB Missing sewing operation (8), FC Wrong label (8), EI Inaccurate/skewed stitching (5) did not reach later stages
CB Broken stitch, DF Twisted seam/skewing, EE Raw edge, CC Skip stitch, ED Gathering crease: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 0.0% |
| QA 1st Bundle | 1 reports | — | 70.0% |
| QC Inline | 6 reports required on prod. days 6/26 (23%) | — | 12.2% |
| QC Endline | 12 days | — | 16.1% |
| QA Inline | 3 reports | 2 | 17.7% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 2 reports | 2 | 15.6% |
| Final Random | 1 reports | 0 | 3.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS11 | 16.2% 2390 / 12 days | 17.7% | PASS | 08/26–09/11 | CC Skip stitch, BA Thread ends, ED Gathering crease |
| CS10 | 0.0% 10 / 1 days | — | — | 08/29–08/29 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS11 | 12 | 24 | 6 (25%) | 12 | 6 | 09/04, 09/05, 09/07, 09/08, 09/11 |
| CS10 | 1 | 2 | 0 (0%) | 1 | 1 | 08/29 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| CC Skip stitch | 190 | 1 | 1 | |||||
| BA Thread ends | 4 | 17 | 140 | 2 | 17 | 8 | ||
| Others (no detail) | 8 | 3 | 60 | 4 | ||||
| ED Gathering crease | 39 | 1 | 1 | 5 | 2 | |||
| CB Broken stitch | 2 | 10 | 4 | 1 | 1 | |||
| EB Measurement issue | 13 | |||||||
| DJ Pleat | 1 | 9 | 1 | 1 | ||||
| DD Thread not straight/waving | 4 | 2 | 2 |
CF Pulling yarn (Pre-final 09/10), BD Snagging (Pre-final 09/10): first found in later stages, never recorded before
Latest Final Random (09/17): AD Fabric stains 2 (earlier 18 times), DF Twisted seam/skewing 2 (earlier 7 times)
CB Broken stitch 1, EA Unsmooth/puckering/bubbling 3, ED Gathering crease 4, EI Inaccurate/skewed stitching 1, DJ Pleat 1, CC Skip stitch 1, DE Cut to broken 1 pcs (later stages total)
Final Random 1; cannot compare across stages
09/10 CS24 261231 (defective pcs 20 > defects 18)
Only QA 1st Bundle: BA Thread ends (2 Major), CG Grinning (1 Major), CE Broken seam (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: ED Gathering crease (3); Both: AD Fabric stains (6/2), EI Inaccurate/skewed stitching (4/1), EA Unsmooth/puckering/bubbling (2/2), DF Twisted seam/skewing (2/2), CB Broken stitch (3/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 65.0%
DB Run-off stitching (45), EC Asymmetry (15), BB Missing cut seam allowance (12), CD Needle hole (11), EB Measurement issue (10) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 65.0% |
| QC Inline | 6 reports required on prod. days 6/24 (25%) | — | 60.8% |
| QC Endline | 11 days | — | 17.7% |
| QA Inline | 3 reports | 3 | 31.2% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 1 | 13.6% |
| Final Random | 1 reports | 0 | 4.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS24 | 17.8% 2788 / 11 days | 31.2% | PASS | 09/03–09/21 | BA Thread ends, CC Skip stitch, AD Fabric stains |
| CS19 | 0.0% 10 / 1 days | — | — | 09/05–09/05 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS24 | 11 | 22 | 6 (27%) | 11 | 5 | 09/10, 09/11, 09/12, 09/14, 09/21 |
| CS19 | 1 | 2 | 0 (0%) | 1 | 1 | 09/05 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 245 | 4 | 7 | 8 | |||
| AD Fabric stains | 6 | 2 | 14 | 88 | 3 | 2 | 2 | |
| CC Skip stitch | 4 | 89 | 1 | |||||
| DB Run-off stitching | 4 | 36 | 5 | |||||
| DF Twisted seam/skewing | 2 | 2 | 20 | 1 | 2 | 2 | ||
| EI Inaccurate/skewed stitching | 4 | 1 | 14 | 6 | 1 | |||
| EA Unsmooth/puckering/bubbling | 2 | 2 | 18 | 3 | ||||
| CB Broken stitch | 3 | 1 | 19 | 1 |
BB Missing cut seam allowance (Pre-final 09/01), CF Pulling yarn (Pre-final 09/01): first found in later stages, never recorded before
Latest Final Random (09/17): ED Gathering crease 2 (earlier 15 times), CB Broken stitch 1 (earlier 13 times), AD Fabric stains 1 (earlier 10 times)
EC Asymmetry 3, CC Skip stitch 1, DC Join stitching 1, EA Unsmooth/puckering/bubbling 2, AC Fabric hole 2 pcs (later stages total)
QC Inline 6, Final Random 1; cannot compare across stages
EC Asymmetry (QA 5); zero in QC Endline records
Only QA 1st Bundle: ED Gathering crease (2 Major), DJ Pleat (1 Major), CG Grinning (1 Major), DF Twisted seam/skewing (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: BA Thread ends (4), DC Join stitching (3), FC Wrong label (2); Both: CC Skip stitch (4/1), DB Run-off stitching (3/1), EC Asymmetry (2/2); DHU QC 1st Bundle 90.0% / QA 1st Bundle 50.0%
DB Run-off stitching (137), DJ Pleat (30), EB Measurement issue (22), DD Thread not straight/waving (11), CG Grinning (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 90.0% |
| QA 1st Bundle | 1 reports | — | 50.0% |
| QC Inline | 8 reports required on prod. days 8/28 (29%) | — | 30.9% |
| QC Endline | 14 days | — | 23.4% |
| QA Inline | 2 reports | 2 | 35.9% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 1 | 12.0% |
| Final Random | 1 reports | 0 | 4.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS22 | 23.4% 2395 / 14 days | 35.9% | PASS | 08/28–09/15 | BA Thread ends, CC Skip stitch, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS22 | 14 | 28 | 8 (29%) | 14 | 6 | 09/08, 09/09, 09/10, 09/14, 09/15 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 52 | 142 | 5 | 7 | 6 | ||
| CC Skip stitch | 4 | 1 | 9 | 132 | 1 | |||
| ED Gathering crease | 2 | 6 | 127 | 2 | 1 | 2 | ||
| DB Run-off stitching | 3 | 1 | 22 | 111 | ||||
| CB Broken stitch | 1 | 33 | 1 | 3 | 1 | |||
| AD Fabric stains | 9 | 21 | 1 | 1 | ||||
| DJ Pleat | 1 | 24 | 5 | |||||
| EB Measurement issue | 22 |
QA Inline DHU 42.2% vs QC Inline 12.8%; QC Inline may be missing defects
Latest Final Random (09/28): CB Broken stitch 1 (earlier 5 times), ED Gathering crease 2 (earlier 10 times), AD Fabric stains 2 (earlier 7 times)
EA Unsmooth/puckering/bubbling 3, CC Skip stitch 1 pcs (later stages total)
QA 1st Bundle 2, QA Inline 7; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records
Only QA 1st Bundle: ED Gathering crease (4 Major), CB Broken stitch (2 Major), CC Skip stitch (1 Major), CE Broken seam (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: DJ Pleat (2); Both: EC Asymmetry (5/3), EA Unsmooth/puckering/bubbling (3/1); DHU QC 1st Bundle 12.5% / QA 1st Bundle 75.0%
EC Asymmetry (57), DF Twisted seam/skewing (8), CG Grinning (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 12.5% |
| QA 1st Bundle | 1 reports | — | 75.0% |
| QC Inline | 5 reports required on prod. days 5/14 (36%) | — | 12.8% |
| QC Endline | 7 days | — | 15.5% |
| QA Inline | 2 reports | 2 | 42.2% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 2 reports | 0 | 4.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS02 | 15.5% 2015 / 7 days | 42.2% | PASS | 09/07–09/14 | AD Fabric stains, BA Thread ends, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS02 | 7 | 14 | 5 (36%) | 7 | 2 | 09/09, 09/10, 09/11, 09/12, 09/14 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|
| AD Fabric stains | 3 | 108 | 1 | 3 | |||
| BA Thread ends | 8 | 76 | 5 | 10 | |||
| EC Asymmetry | 5 | 3 | 4 | 43 | 2 | ||
| ED Gathering crease | 4 | 6 | 44 | 3 | |||
| CC Skip stitch | 1 | 4 | 35 | 2 | 1 | ||
| EA Unsmooth/puckering/bubbling | 3 | 1 | 8 | 2 | 1 | 2 | |
| Others (no detail) | 2 | 7 | |||||
| DF Twisted seam/skewing | 5 | 3 |
CF Pulling yarn (Final Random 09/19): first found in later stages, never recorded before
Latest Final Random (09/19): DB Run-off stitching 1 (earlier 12 times), CB Broken stitch 2 (earlier 6 times), CC Skip stitch 2 (earlier 8 times)
ED Gathering crease 7, AC Fabric hole 1 pcs (later stages total)
QC Inline 4, Pre-final 3; cannot compare across stages
09/12 CS23 261569 (defective pcs 54 > defects 48), 09/15 CS23 261569 (defective pcs 79 > defects 69), 09/16 CS23 261569 (defective pcs 97 > defects 55), 09/17 CS23 261569 (defective pcs 110 > defects 77)…
Only QA 1st Bundle: DA Exceed seam allowance (2 Major), DF Twisted seam/skewing (2 Major), EC Asymmetry (2 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: DB Run-off stitching (4), BA Thread ends (4); Both: DJ Pleat (1/1), CB Broken stitch (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 45.0%
DF Twisted seam/skewing (79), CE Broken seam (27), EC Asymmetry (20), DD Thread not straight/waving (18), DJ Pleat (13) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 45.0% |
| QC Inline | 6 reports required on prod. days 6/18 (33%) | — | 28.2% |
| QC Endline | 9 days | — | 16.5% |
| QA Inline | 2 reports | 2 | 28.1% |
| Pre-final | 1 reports | 1 | 14.4% |
| Final Random | 1 reports | 0 | 4.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS23 | 16.5% 2293 / 9 days | 28.1% | PASS | 09/11–09/21 | BA Thread ends, CC Skip stitch, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS23 | 9 | 18 | 6 (33%) | 9 | 3 | 09/16, 09/17, 09/18, 09/19, 09/21 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 29 | 84 | 3 | 7 | 7 | |
| ED Gathering crease | 5 | 69 | 4 | 7 | |||
| CC Skip stitch | 3 | 76 | 1 | 2 | |||
| DF Twisted seam/skewing | 2 | 10 | 61 | 6 | |||
| AC Fabric hole | 32 | 1 | |||||
| DB Run-off stitching | 4 | 17 | 6 | 2 | 1 | ||
| CE Broken seam | 27 | ||||||
| EC Asymmetry | 2 | 10 | 6 | 2 |
CD Needle hole (Shipment Sample 09/04), EI Inaccurate/skewed stitching (Shipment Sample 09/04), BD Snagging (Final Random 09/08), DJ Pleat (Final Random 09/16): first found in later stages, never recorded before
Latest Final Random (10/02): AD Fabric stains 1 (earlier 26 times)
EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, GA Missing bartack/button 1, ED Gathering crease 4, CB Broken stitch 2, CC Skip stitch 1 pcs (later stages total)
QA Inline 8, Final Random 1; cannot compare across stages
EA Uneven seam allowance (26), EB Measurement issue (12), DB Run-off stitching (6) did not reach later stages
QGR2639216 Final Random (09/08) CP12; actual production line(s) CP02/CP03 (cards show production lines only)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 55.0% |
| QC Inline | 0 reports required on prod. days 0/32 (0%) | — | — |
| QC Endline | 15 days | — | 12.8% |
| QA Inline | 3 reports | 3 | 46.9% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 4 reports | 0 | 3.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP02 | 12.5% 5556 / 14 days | 46.9% | PASS | 09/02–10/03 | EC Asymmetry, ED Gathering crease, AD Fabric stains |
| CP03 | 15.7% 515 / 2 days | — | — | 10/02–10/03 | BA Thread ends, CC Skip stitch, EA Uneven seam allowance |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP02 | 14 | 28 | 0 (0%) | 14 | 14 | 09/12, 09/14, 09/15, 09/26, 10/03 |
| CP03 | 2 | 4 | 0 (0%) | 2 | 2 | 10/02, 10/03 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|
| ED Gathering crease | 217 | 1 | 2 | 2 | |
| EC Asymmetry | 1 | 212 | 6 | 1 | |
| AD Fabric stains | 3 | 116 | 4 | 1 | 4 |
| BA Thread ends | 1 | 93 | 2 | 4 | |
| CC Skip stitch | 62 | 1 | |||
| EA Unsmooth/puckering/bubbling | 5 | 31 | 20 | 1 | |
| EA Uneven seam allowance | 26 | ||||
| EB Measurement issue | 12 |
DB Run-off stitching (Final Random 09/25): first found in later stages, never recorded before
Latest Final Random (10/06): EC Asymmetry 1 (earlier 12 times)
DJ Pleat 1, CB Broken stitch 2, ED Gathering crease 1 pcs (later stages total)
Final Random 2; cannot compare across stages
09/14 CP07 261448A (defective pcs 8 > defects 7)
Only QA 1st Bundle: EC Asymmetry (7 Major), EA Unsmooth/puckering/bubbling (2 Major), DE Cut to broken (1 Major), GB Missing sewing operation (1 Major), DJ Pleat (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: DF Twisted seam/skewing (4), CG Grinning (3); Both: DD Thread not straight/waving (8/6), CE Broken seam (4/1); DHU QC 1st Bundle 95.0% / QA 1st Bundle 100.0%
BA Thread ends (67), EB Measurement issue (61), CE Broken seam (44), DF Twisted seam/skewing (43), CC Skip stitch (33) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 95.0% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 1 reports required on prod. days 1/16 (6%) | — | 28.0% |
| QC Endline | 8 days | — | 32.2% |
| QA Inline | 1 reports | 1 | 21.9% |
| Final Random | 2 reports | 0 | 5.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP07 | 32.2% 1250 / 8 days | 21.9% | PASS | 09/11–09/28 | ED Gathering crease, BA Thread ends, EB Measurement issue |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP07 | 8 | 16 | 1 (6%) | 8 | 7 | 09/15, 09/16, 09/17, 09/21, 09/28 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| ED Gathering crease | 113 | 1 | ||||
| BA Thread ends | 67 | |||||
| EB Measurement issue | 61 | |||||
| EC Asymmetry | 7 | 44 | 1 | 1 | ||
| CE Broken seam | 4 | 1 | 3 | 35 | 1 | |
| DF Twisted seam/skewing | 4 | 3 | 36 | |||
| CC Skip stitch | 33 | |||||
| DD Thread not straight/waving | 8 | 6 | 3 |
DB Run-off stitching (Shipment Sample 09/28): first found in later stages, never recorded before
Latest Final Random (10/05): AD Fabric stains 2 (earlier 18 times), AC Fabric hole 1 (earlier 4 times)
CC Skip stitch 2, DD Thread not straight/waving 2, CB Broken stitch 2 pcs (later stages total)
QA 1st Bundle 3; cannot compare across stages
ED Gathering crease (105), EB Measurement issue (23), CE Broken seam (13), EA Uneven seam allowance (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 0 reports required on prod. days 0/30 (0%) | — | — |
| QC Endline | 12 days | — | 12.0% |
| QA Inline | 3 reports | 3 | 26.0% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 0 | 2.0% |
| Final Random | 1 reports | 0 | 2.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB36 | 12.1% 3562 / 12 days | 26.0% | PASS | 09/23–10/07 | CC Skip stitch, ED Gathering crease, AD Fabric stains |
| CB29 | 0.0% 10 / 1 days | — | — | 10/05–10/05 | — |
| CB30 | 0.0% 10 / 1 days | — | — | 10/07–10/07 | — |
| CB32 | 0.0% 10 / 1 days | — | — | 09/25–09/25 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB36 | 12 | 24 | 0 (0%) | 12 | 12 | 10/02, 10/03, 10/05, 10/06, 10/07 |
| CB29 | 1 | 2 | 0 (0%) | 1 | 1 | 10/05 |
| CB30 | 1 | 2 | 0 (0%) | 1 | 1 | 10/07 |
| CB32 | 1 | 2 | 0 (0%) | 1 | 1 | 09/25 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|
| CC Skip stitch | 124 | 3 | 2 | |||
| ED Gathering crease | 2 | 98 | 5 | |||
| AD Fabric stains | 1 | 90 | 5 | 2 | 2 | 2 |
| BA Thread ends | 1 | 60 | 9 | 7 | ||
| EB Measurement issue | 23 | |||||
| CE Broken seam | 13 | |||||
| AC Fabric hole | 7 | 1 | ||||
| DD Thread not straight/waving | 3 | 2 |
EH Poor lamination/bonding (Pre-final 09/26): first found in later stages, never recorded before
QA Inline DHU 25.0% vs QC Endline 3.1% (09/18–09/28, 8 days, 2395 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects; Pre-final 5.6%
Latest Final Random (10/01): ED Gathering crease 1 (earlier 5 times), CC Skip stitch 1 (earlier 10 times)
CG Grinning 1, EC Asymmetry 5, AD Fabric stains 4, EI Inaccurate/skewed stitching 2, CE Broken seam 2 pcs (later stages total)
EC Asymmetry (QA 6); zero in QC Endline records
09/18 CS08 261653 (defective pcs 8 > defects 4), 09/19 CS08 261653 (defective pcs 13 > defects 9), 09/21 CS08 261653 (defective pcs 24 > defects 12), 09/22 CS08 261653 (defective pcs 14 > defects 9)…
Only QA 1st Bundle: ED Gathering crease (4 Major), BA Thread ends (1 Major), AD Fabric stains (1 Major), GC Missing pocket/label (1 Major), EI Inaccurate/skewed stitching (1 Major), EG Wrong panel assembly (1 Major), DI High-low/uneven (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), FB Material defect (3), CA Thread tension (2), CG Grinning (2), FC Wrong label (1); Both: EC Asymmetry (2/2); DHU QC 1st Bundle — / QA 1st Bundle 65.0%
CB Broken stitch (41), FB Material defect (5), EG Wrong panel assembly (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 65.0% |
| QC Inline | 10 reports required on prod. days 10/16 (62%) | — | — |
| QC Endline | 8 days | — | 3.1% |
| QA Inline | 2 reports | 2 | 25.0% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 2 reports | 1 | 5.6% |
| Final Random | 1 reports | 0 | 3.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS08 | 3.1% 2395 / 8 days | 25.0% | PASS | 09/18–09/28 | BA Thread ends, CC Skip stitch, EB Measurement issue |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS08 | 8 | 16 | 10 (62%) | 5 | 1 | 09/18, 09/19, 09/21, 09/22, 09/28 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 1 | 4 | 42 | 2 | 11 | 4 | ||
| CB Broken stitch | 1 | 39 | 1 | |||||
| CC Skip stitch | 3 | 26 | 1 | 1 | 1 | |||
| EA Unsmooth/puckering/bubbling | 3 | 15 | 2 | 1 | 3 | 1 | ||
| ED Gathering crease | 4 | 10 | 1 | 1 | ||||
| EC Asymmetry | 2 | 2 | 1 | 1 | 4 | |||
| AD Fabric stains | 1 | 2 | 4 | |||||
| FB Material defect | 3 | 2 |
BC Sticker left (Pre-final 09/17), IA 2nd operation issue (Pre-final 09/17): first found in later stages, never recorded before
Latest Final Random (10/03): EC Asymmetry 1 (earlier 12 times), ED Gathering crease 1 (earlier 5 times), AD Fabric stains 2 (earlier 13 times), CC Skip stitch 1 (earlier 9 times)
EI Inaccurate/skewed stitching 1, CB Broken stitch 1, DF Twisted seam/skewing 5, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)
EC Asymmetry (QA 14), DF Twisted seam/skewing (QA 7); zero in QC Endline records
Only QA 1st Bundle: CG Grinning (2 Major), ED Gathering crease (1 Major); Only QC 1st Bundle: DJ Pleat (2), CE Broken seam (2); Both: EC Asymmetry (6/2), EI Inaccurate/skewed stitching (3/2), CB Broken stitch (3/2); DHU QC 1st Bundle 80.0% / QA 1st Bundle 45.0%
DB Run-off stitching (29), DJ Pleat (10), CE Broken seam (9) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 80.0% |
| QA 1st Bundle | 1 reports | — | 45.0% |
| QC Inline | 5 reports required on prod. days 5/24 (21%) | — | 82.9% |
| QC Endline | 12 days | — | 11.3% |
| QA Inline | 2 reports | 2 | 31.2% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 1 | 7.5% |
| Final Random | 1 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS24 | 11.3% 2499 / 12 days | 31.2% | PASS | 09/12–10/02 | BA Thread ends, CC Skip stitch, DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS24 | 12 | 24 | 5 (21%) | 12 | 7 | 09/21, 09/22, 09/25, 09/29, 10/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 174 | 3 | 9 | 6 | ||||
| CC Skip stitch | 3 | 67 | 1 | |||||
| AD Fabric stains | 16 | 19 | 3 | 2 | ||||
| EC Asymmetry | 6 | 2 | 15 | 4 | 1 | 8 | 1 | |
| DB Run-off stitching | 8 | 21 | ||||||
| CB Broken stitch | 3 | 2 | 19 | 2 | 1 | |||
| DF Twisted seam/skewing | 19 | 2 | 5 | |||||
| EI Inaccurate/skewed stitching | 3 | 2 | 11 | 1 |
IA 2nd operation issue (Pre-final 10/05), DJ Pleat (Pre-final 10/05): first found in later stages, never recorded before
Latest Pre-final (10/07): CB Broken stitch 1 (earlier 22 times), EC Asymmetry 1 (earlier 4 times)
CF Pulling yarn 5, EI Inaccurate/skewed stitching 1 pcs (later stages total)
CF Pulling yarn (QA 7); zero in QC Endline records
QGR2645198 have multiple reports with different content
Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), AA Fabric defect (2 Major), CF Pulling yarn (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (1), DD Thread not straight/waving (1); Both: EC Asymmetry (1/3), CB Broken stitch (2/1), DI High-low/uneven (1/1), DB Run-off stitching (1/1); DHU QC 1st Bundle — / QA 1st Bundle 60.0%
DB Run-off stitching (94), CC Skip stitch (92), ED Gathering crease (87), DI High-low/uneven (11), AA Fabric defect (8) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 7 reports required on prod. days 7/14 (50%) | — | — |
| QC Endline | 6 days | — | 24.3% |
| QA Inline | 1 reports | 1 | 25.0% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 2 reports | 0 | 4.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS22 | 24.5% 1641 / 6 days | 25.0% | — | 10/01–10/07 | BA Thread ends, CC Skip stitch, ED Gathering crease |
| CS23 | 0.0% 11 / 1 days | — | — | 10/05–10/05 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS22 | 6 | 12 | 7 (58%) | 3 | 2 | 10/01, 10/06, 10/07 |
| CS23 | 1 | 2 | 0 (0%) | 1 | 1 | 10/05 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 1 | 130 | 2 | 10 | |||
| DB Run-off stitching | 1 | 1 | 8 | 82 | 2 | ||
| CC Skip stitch | 92 | ||||||
| ED Gathering crease | 87 | ||||||
| CB Broken stitch | 2 | 1 | 38 | 1 | 2 | ||
| DI High-low/uneven | 1 | 1 | 9 | ||||
| CF Pulling yarn | 1 | 2 | 1 | 4 | |||
| AA Fabric defect | 2 | 6 |
DJ Pleat (Pre-final 10/02), AC Fabric hole (Pre-final 10/02): first found in later stages, never recorded before
Latest Pre-final (10/02): CB Broken stitch 1 (earlier 12 times)
CF Pulling yarn 2, ED Gathering crease 2 pcs (later stages total)
CF Pulling yarn (QA 3); zero in QC Endline records
Only QA 1st Bundle: AD Fabric stains (1 Major), CF Pulling yarn (1 Major), FB Material defect (1 Major); Both: DE Cut to broken (2/3), DI High-low/uneven (2/1), CB Broken stitch (1/2), DB Run-off stitching (1/1), EC Asymmetry (1/1); DHU QC 1st Bundle — / QA 1st Bundle 55.0%
CC Skip stitch (60), DB Run-off stitching (53), EC Asymmetry (7), DI High-low/uneven (6), DE Cut to broken (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 55.0% |
| QC Inline | 4 reports required on prod. days 4/10 (40%) | — | — |
| QC Endline | 5 days | — | 21.4% |
| QA Inline | 1 reports | 1 | 28.1% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 0 | 6.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS22 | 21.4% 1050 / 5 days | 28.1% | — | 09/26–10/01 | CC Skip stitch, ED Gathering crease, BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS22 | 5 | 10 | 4 (40%) | 3 | 3 | 09/26, 09/28, 10/01 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 10 | 55 | 2 | 4 | |||
| CC Skip stitch | 4 | 56 | |||||
| ED Gathering crease | 56 | 2 | |||||
| DB Run-off stitching | 1 | 1 | 51 | ||||
| CB Broken stitch | 1 | 2 | 13 | 2 | 1 | ||
| EC Asymmetry | 1 | 1 | 4 | 1 | |||
| DI High-low/uneven | 2 | 1 | 2 | 1 | |||
| DE Cut to broken | 2 | 3 | 1 |
CF Pulling yarn (Shipment Sample 09/21): first found in later stages, never recorded before
Latest Final Random (10/05): AD Fabric stains 2 (earlier 9 times), DF Twisted seam/skewing 2 (earlier 3 times)
CC Skip stitch 1, CB Broken stitch 2, BB Missing cut seam allowance 1, ED Gathering crease 4, CG Grinning 1, BD Snagging 1, AC Fabric hole 1 pcs (later stages total)
DF Twisted seam/skewing (QA 10); zero in QC Endline records
09/19 CS19 261493 (defective pcs 33 > defects 32)
Only QA 1st Bundle: CH Incorrect stitch density (1 Major), DF Twisted seam/skewing (1 Major), ED Gathering crease (1 Major), BB Missing cut seam allowance (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: BA Thread ends (2), BC Sticker left (2), CC Skip stitch (1), DD Thread not straight/waving (1), GA Missing bartack/button (1), CB Broken stitch (1); Both: EC Asymmetry (7/2), AD Fabric stains (1/2), DI High-low/uneven (1/1), CE Broken seam (1/1); DHU QC 1st Bundle 45.0% / QA 1st Bundle 55.0%
EC Asymmetry (53), DB Run-off stitching (45), EB Measurement issue (17), DD Thread not straight/waving (14), DI High-low/uneven (10) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 2 reports | — | 45.0% |
| QA 1st Bundle | 1 reports | — | 55.0% |
| QC Inline | 8 reports required on prod. days 8/24 (33%) | — | 28.3% |
| QC Endline | 12 days | — | 10.8% |
| QA Inline | 3 reports | 3 | 31.2% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 2 reports | 1 | 5.9% |
| Final Random | 1 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS19 | 10.8% 2651 / 12 days | 31.2% | PASS | 09/11–09/26 | BA Thread ends, CC Skip stitch, DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS19 | 12 | 24 | 8 (33%) | 11 | 5 | 09/18, 09/19, 09/22, 09/25, 09/26 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 46 | 123 | 4 | 19 | 6 | ||
| CC Skip stitch | 1 | 9 | 64 | 3 | 1 | |||
| EC Asymmetry | 7 | 2 | 36 | 4 | 4 | |||
| DB Run-off stitching | 1 | 4 | 38 | 2 | ||||
| AD Fabric stains | 1 | 2 | 3 | 25 | 3 | 2 | 2 | |
| EB Measurement issue | 17 | |||||||
| CB Broken stitch | 1 | 7 | 5 | 2 | ||||
| DD Thread not straight/waving | 1 | 13 |
Final Random 09/16 QGR2640953 (FAIL); please check if the report was completed
QA Inline DHU 54.7% vs QC Endline 8.6% (09/02–10/03, 26 days, 14080 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects; Pre-final 32.0%
Latest Final Random (10/06): CB Broken stitch 1 (earlier 34 times), AC Fabric hole 1 (earlier 12 times), CE Broken seam 1 (earlier 6 times), CF Pulling yarn 1 (earlier 4 times)
DJ Pleat 3, ED Gathering crease 3, DD Thread not straight/waving 3, EA Unsmooth/puckering/bubbling 6, DF Twisted seam/skewing 1, EC Asymmetry 2, GA Missing bartack/button 1, CG Grinning 4, CC Skip stitch 2, AA Fabric defect 1, BD Snagging 2 pcs (later stages total)
QA 1st Bundle 2, QA Inline 7, Final Random 3; cannot compare across stages
EC Asymmetry (QA 18); zero in QC Endline records
Only QA 1st Bundle: DF Twisted seam/skewing (8 Major), EA Unsmooth/puckering/bubbling (6 Major), EC Asymmetry (2 Major), DA Exceed seam allowance (2 Major); Only QC 1st Bundle: CB Broken stitch (6), DB Run-off stitching (3), DD Thread not straight/waving (2), ED Gathering crease (2), EI Inaccurate/skewed stitching (1), DJ Pleat (1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 100.0%
DB Run-off stitching (92), DA Exceed seam allowance (29), DI High-low/uneven (19), DE Cut to broken (15), CA Thread tension (15) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 75.0% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 45 reports required on prod. days 44/90 (49%) | — | 42.4% |
| QC Endline | 26 days | — | 8.6% |
| QA Inline | 4 reports | 4 | 54.7% |
| Shipment Sample | 1 reports | 0 | — |
| Pre-final | 1 reports | 1 | 32.0% |
| Final Random | 3 reports | 1 | 2.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS16 | 6.4% 7225 / 26 days | 57.8% | PASS | 09/02–10/03 | BA Thread ends, ED Gathering crease, CC Skip stitch |
| CS27 | 10.8% 6695 / 18 days | 51.6% | PASS | 09/08–09/29 | BA Thread ends, ED Gathering crease, CC Skip stitch |
| CS17 | 16.9% 160 / 1 days | — | — | 09/08–09/08 | BA Thread ends, ED Gathering crease, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS16 | 26 | 52 | 24 (46%) | 21 | 7 | 09/23, 09/29, 09/30, 10/02, 10/03 |
| CS27 | 18 | 36 | 20 (56%) | 14 | 2 | 09/18, 09/19, 09/26, 09/28, 09/29 |
| CS17 | 1 | 2 | 0 (0%) | 1 | 1 | 09/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 145 | 588 | 8 | 3 | 9 | |||
| ED Gathering crease | 2 | 103 | 294 | 9 | 1 | 2 | ||
| CC Skip stitch | 14 | 263 | 1 | 1 | 1 | |||
| EA Unsmooth/puckering/bubbling | 6 | 83 | 8 | 3 | 1 | 3 | 2 | |
| DB Run-off stitching | 3 | 64 | 25 | |||||
| CG Grinning | 61 | 12 | 1 | 3 | ||||
| CB Broken stitch | 6 | 60 | 3 | 2 | ||||
| DJ Pleat | 1 | 61 | 3 | 3 |
FA Wrong material (Shipment Sample 09/14), EC Asymmetry (Shipment Sample 09/14), EG Wrong panel assembly (Shipment Sample 09/14), DD Thread not straight/waving (Shipment Sample 09/14), CE Broken seam (Shipment Sample 09/14), CF Pulling yarn (Shipment Sample 09/14), EB Measurement issue (Shipment Sample 09/14), BD Snagging (Pre-final 09/16), CG Grinning (Shipment Sample 09/16), EA Unsmooth/puckering/bubbling (Shipment Sample 09/16): first found in later stages, never recorded before
Latest Pre-final (09/22): ED Gathering crease 2 (earlier 10 times)
CB Broken stitch 3, EI Inaccurate/skewed stitching 2, DF Twisted seam/skewing 1, AD Fabric stains 1 pcs (later stages total)
QA 1st Bundle 3; cannot compare across stages
EC Asymmetry (QA 6); zero in QC Endline records
09/11 CS07 261517-1 (defective pcs 23 > defects 22), 09/14 CS07 261517-1 (defective pcs 11 > defects 10), 09/15 CS07 261517-1 (defective pcs 33 > defects 21), 09/16 CS07 261517-1 (defective pcs 2 > defects 1)…
Only QA 1st Bundle: CE Broken seam (6 Major), CG Grinning (2 Major), BD Snagging (1 Major), CC Skip stitch (1 Major), EI Inaccurate/skewed stitching (1 Major), BB Missing cut seam allowance (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: AB Shading (3), DB Run-off stitching (2), EC Asymmetry (1); Both: BA Thread ends (6/2), BC Sticker left (6/2), ED Gathering crease (1/4), DD Thread not straight/waving (3/1), DF Twisted seam/skewing (1/3); DHU QC 1st Bundle 176.9% / QA 1st Bundle 70.0%
CC Skip stitch (37), GB Missing sewing operation (18), BC Sticker left (13), DB Run-off stitching (8), HA Poor pressing (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 2 reports | — | 176.9% |
| QA 1st Bundle | 2 reports | — | 70.0% |
| QC Inline | 3 reports required on prod. days 3/20 (15%) | — | 15.0% |
| QC Endline | 10 days | — | 11.9% |
| Shipment Sample | 6 reports | 1 | — |
| Pre-final | 2 reports | 0 | 5.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS07 | 7.2% 1030 / 8 days | — | — | 09/10–09/21 | BA Thread ends, CC Skip stitch, ED Gathering crease |
| CP19 | 38.4% 185 / 2 days | — | — | 10/07–10/08 | CC Skip stitch, GB Missing sewing operation, DD Thread not straight/waving |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS07 | 8 | 16 | 3 (19%) | 8 | 5 | 09/14, 09/15, 09/16, 09/19, 09/21 |
| CP19 | 2 | 4 | 0 (0%) | 2 | 2 | 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|
| BA Thread ends | 6 | 2 | 3 | 51 | 4 | |
| CC Skip stitch | 1 | 36 | ||||
| ED Gathering crease | 1 | 4 | 6 | 12 | 2 | 4 |
| GB Missing sewing operation | 5 | 13 | ||||
| DD Thread not straight/waving | 3 | 1 | 11 | 2 | ||
| CE Broken seam | 6 | 5 | 4 | |||
| BC Sticker left | 6 | 2 | 5 | |||
| DF Twisted seam/skewing | 1 | 3 | 6 | 1 | 1 |
EI Inaccurate/skewed stitching (Shipment Sample 09/22), AD Fabric stains (Pre-final 09/23), HA Poor pressing (Pre-final 09/23), DJ Pleat (Final Random 10/06), IA 2nd operation issue (Final Random 10/06): first found in later stages, never recorded before
Latest Final Random (10/06): EC Asymmetry 1 (earlier 4 times)
DF Twisted seam/skewing 1, CB Broken stitch 3, CC Skip stitch 2 pcs (later stages total)
QA 1st Bundle 4, Pre-final 1; cannot compare across stages
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (2 Major), BA Thread ends (1 Major); Only QC 1st Bundle: DF Twisted seam/skewing (2), EC Asymmetry (2); Both: ED Gathering crease (2/3), CB Broken stitch (1/2); DHU QC 1st Bundle — / QA 1st Bundle 60.0%
DB Run-off stitching (14), ED Gathering crease (12) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 1 reports required on prod. days 1/4 (25%) | — | — |
| QC Endline | 2 days | — | 7.4% |
| Shipment Sample | 2 reports | 0 | — |
| Pre-final | 1 reports | 1 | 4.8% |
| Final Random | 1 reports | 0 | 4.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS09 | 7.4% 2003 / 2 days | — | PASS | 09/21–09/22 | BA Thread ends, EC Asymmetry, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS09 | 2 | 4 | 1 (25%) | 2 | 1 | 09/21, 09/22 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 1 | 86 | 11 | 5 | |||
| EC Asymmetry | 2 | 4 | 36 | 1 | |||
| DB Run-off stitching | 3 | 11 | |||||
| CC Skip stitch | 12 | 1 | 1 | ||||
| ED Gathering crease | 2 | 3 | 6 | 1 | |||
| CB Broken stitch | 1 | 2 | 2 | 1 | |||
| DF Twisted seam/skewing | 2 | 2 | 1 | ||||
| Others (no detail) | 4 | 1 |
Latest Final Random (09/25): DE Cut to broken 1 (earlier 4 times), AD Fabric stains 1 (earlier 3 times)
CB Broken stitch 2, DJ Pleat 1 pcs (later stages total)
Only QA 1st Bundle: EC Asymmetry (4 Major), DJ Pleat (2 Major), DF Twisted seam/skewing (2 Major), BA Thread ends (1 Major), CD Needle hole (1 Major), AD Fabric stains (1 Major), EI Inaccurate/skewed stitching (1 Major), GA Missing bartack/button (1 Major), CG Grinning (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: DG Fastening loose/misplaced (5), DA Exceed seam allowance (3), CB Broken stitch (1); Both: ED Gathering crease (6/2), CC Skip stitch (4/1), DE Cut to broken (1/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%
ED Gathering crease (51), EC Asymmetry (16), CC Skip stitch (15), EB Measurement issue (13), EI Inaccurate/skewed stitching (6) did not reach later stages
QGR2642807 Final Random (09/25) CP06; actual production line(s) CP14 (cards show production lines only)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 0 reports required on prod. days 0/8 (0%) | — | — |
| QC Endline | 4 days | — | 8.0% |
| QA Inline | 1 reports | 1 | 31.2% |
| Final Random | 2 reports | 0 | 3.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP14 | 8.0% 2692 / 4 days | 31.2% | PASS | 09/14–09/17 | BA Thread ends, ED Gathering crease, AD Fabric stains |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP14 | 4 | 8 | 0 (0%) | 4 | 4 | 09/14, 09/15, 09/16, 09/17 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|
| BA Thread ends | 1 | 96 | 8 | ||
| ED Gathering crease | 6 | 2 | 43 | ||
| AD Fabric stains | 1 | 40 | 3 | ||
| EC Asymmetry | 4 | 9 | 3 | ||
| CC Skip stitch | 4 | 1 | 10 | ||
| EB Measurement issue | 13 | ||||
| DE Cut to broken | 1 | 2 | 2 | 1 | |
| EI Inaccurate/skewed stitching | 1 | 5 |
Latest Final Random (10/07): EA Unsmooth/puckering/bubbling 1 (earlier 33 times), ED Gathering crease 1 (earlier 105 times), AD Fabric stains 1 (earlier 50 times)
AC Fabric hole 1, CB Broken stitch 1, DJ Pleat 1 pcs (later stages total)
QA 1st Bundle 1, QA Inline 3, Pilot Run 1; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 14); zero in QC Endline records
Only QA 1st Bundle: ED Gathering crease (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: AD Fabric stains (2), CE Broken seam (2), DJ Pleat (1), CB Broken stitch (1); Both: EA Unsmooth/puckering/bubbling (1/4), EC Asymmetry (4/1), DD Thread not straight/waving (4/1), CG Grinning (2/1); DHU QC 1st Bundle 130.8% / QA 1st Bundle 76.9%
EC Asymmetry (153), CC Skip stitch (120), CE Broken seam (98), DD Thread not straight/waving (35), DB Run-off stitching (33) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| Pilot Run | 6 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 130.8% |
| QA 1st Bundle | 1 reports | — | 76.9% |
| QC Inline | 33 reports required on prod. days 33/68 (49%) | — | 58.8% |
| QC Endline | 27 days | — | 14.4% |
| QA Inline | 6 reports | 6 | 24.5% |
| Final Random | 3 reports | 0 | 2.7% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB06 | 15.2% 7956 / 25 days | 25.0% | PASS | 09/07–10/07 | ED Gathering crease, BA Thread ends, AD Fabric stains |
| CB16 | 10.3% 1480 / 6 days | 21.9% | — | 10/02–10/08 | ED Gathering crease, BA Thread ends, AD Fabric stains |
| CB30 | 0.0% 20 / 2 days | — | — | 09/17–09/30 | — |
| CB05 | 0.0% 10 / 1 days | — | — | 09/14–09/14 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB06 | 25 | 50 | 25 (50%) | 19 | 6 | 10/01, 10/02, 10/03, 10/05, 10/07 |
| CB16 | 6 | 12 | 8 (67%) | 2 | 2 | 10/07, 10/08 |
| CB30 | 2 | 4 | 0 (0%) | 2 | 2 | 09/17, 09/30 |
| CB05 | 1 | 2 | 0 (0%) | 1 | 1 | 09/14 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | Pilot Run | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|---|
| ED Gathering crease | 9 | 1 | 185 | 485 | 3 | 3 | |
| AD Fabric stains | 2 | 50 | 227 | 4 | 2 | ||
| BA Thread ends | 3 | 258 | 3 | 7 | |||
| EC Asymmetry | 3 | 4 | 1 | 25 | 109 | 11 | |
| CC Skip stitch | 38 | 82 | |||||
| CE Broken seam | 2 | 21 | 73 | 2 | |||
| EA Unsmooth/puckering/bubbling | 2 | 1 | 4 | 52 | 11 | 3 | |
| DD Thread not straight/waving | 4 | 1 | 17 | 12 | 1 |
Latest Final Random (08/31): BA Thread ends 1 (earlier 12 times), ED Gathering crease 1 (earlier 8 times)
Only QA 1st Bundle: CG Grinning (4 Major), CB Broken stitch (1 Major), DE Cut to broken (1 Major); Only QC 1st Bundle: CC Skip stitch (2), ED Gathering crease (2), CE Broken seam (2), BA Thread ends (2); Both: EC Asymmetry (3/1), BB Missing cut seam allowance (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 61.5%
EC Asymmetry (133), CC Skip stitch (28), CG Grinning (8), CE Broken seam (7), CB Broken stitch (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 61.5% |
| QC Inline | 3 reports required on prod. days 3/22 (14%) | — | 42.7% |
| QC Endline | 11 days | — | 17.1% |
| QA Inline | 2 reports | 2 | 23.4% |
| Final Random | 1 reports | 0 | 2.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB22 | 17.1% 2310 / 11 days | 23.4% | PASS | 08/11–08/25 | BA Thread ends, EC Asymmetry, Others (no detail) |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB22 | 11 | 22 | 3 (14%) | 11 | 8 | 08/18, 08/19, 08/20, 08/22, 08/25 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 3 | 166 | 3 | ||
| EC Asymmetry | 3 | 1 | 8 | 120 | 1 | |
| ED Gathering crease | 2 | 9 | 40 | 2 | 1 | |
| Others (no detail) | 49 | |||||
| CC Skip stitch | 2 | 5 | 20 | 1 | ||
| CG Grinning | 4 | 4 | ||||
| CE Broken seam | 2 | 4 | 1 | |||
| CB Broken stitch | 1 | 2 | 2 |
Final Random 2; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 4); zero in QC Endline records
09/18 CB17 261362-L (defective pcs 37 > defects 36)
QGR2643971 have multiple reports with different content
Only QA 1st Bundle: BA Thread ends (1 Major), FA Wrong material (1 Major), EA Unsmooth/puckering/bubbling (1 Major), DC Join stitching (1 Major), DJ Pleat (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (2), CA Thread tension (2); Both: EC Asymmetry (4/4), CC Skip stitch (1/2), CE Broken seam (1/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 100.0%
CC Skip stitch (41), DB Run-off stitching (18), AD Fabric stains (11), CG Grinning (10), DA Exceed seam allowance (9) did not reach later stages
DI High-low/uneven, EA Unsmooth/puckering/bubbling, EC Asymmetry, CE Broken seam, ED Gathering crease, BB Missing cut seam allowance: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| Pilot Run | 2 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 76.9% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 4 reports required on prod. days 4/10 (40%) | — | 35.0% |
| QC Endline | 5 days | — | 16.9% |
| QA Inline | 1 reports | 1 | 46.9% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 2 reports | 0 | 5.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB17 | 16.9% 1000 / 5 days | — | PASS | 09/16–09/21 | EC Asymmetry, CC Skip stitch, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB17 | 5 | 10 | 4 (40%) | 4 | 2 | 09/16, 09/17, 09/19, 09/21 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | Pilot Run | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|---|
| EC Asymmetry | 3 | 4 | 4 | 31 | 35 | 2 | 2 | |
| ED Gathering crease | 2 | 31 | 4 | 1 | 4 | |||
| CC Skip stitch | 1 | 2 | 3 | 35 | ||||
| BA Thread ends | 1 | 6 | 18 | 2 | ||||
| CE Broken seam | 1 | 1 | 19 | 1 | ||||
| DB Run-off stitching | 18 | |||||||
| AD Fabric stains | 6 | 5 | ||||||
| CG Grinning | 1 | 8 | 1 |
Latest Final Random (09/29): AD Fabric stains 2 (earlier 10 times), CB Broken stitch 2 (earlier 4 times), CE Broken seam 1 (earlier 4 times)
EC Asymmetry 3, EI Inaccurate/skewed stitching 2 pcs (later stages total)
EC Asymmetry (QA 6); zero in QC Endline records
Only QA 1st Bundle: EI Inaccurate/skewed stitching (4 Major), DA Exceed seam allowance (3 Major), CC Skip stitch (1 Major), DE Cut to broken (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (1); Both: EC Asymmetry (6/1), BA Thread ends (3/2), AD Fabric stains (3/2), ED Gathering crease (3/1), CE Broken seam (2/2), CB Broken stitch (2/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%
ED Gathering crease (37), CC Skip stitch (35), EA Unsmooth/puckering/bubbling (12), AC Fabric hole (8) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 1 reports required on prod. days 1/14 (7%) | — | 48.0% |
| QC Endline | 6 days | — | 8.4% |
| QA Inline | 1 reports | 1 | 37.5% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 1 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP05 | 8.5% 1940 / 6 days | 37.5% | PASS | 09/17–09/25 | AD Fabric stains, BA Thread ends, ED Gathering crease |
| CP04 | 0.0% 20 / 1 days | — | — | 09/23–09/23 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP05 | 6 | 12 | 1 (8%) | 6 | 5 | 09/18, 09/19, 09/21, 09/23, 09/25 |
| CP04 | 1 | 2 | 0 (0%) | 1 | 1 | 09/23 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|---|
| AD Fabric stains | 2 | 3 | 2 | 10 | 49 | 3 | 2 | |
| BA Thread ends | 3 | 2 | 40 | 2 | 7 | |||
| ED Gathering crease | 1 | 3 | 1 | 2 | 27 | 3 | ||
| CC Skip stitch | 1 | 8 | 26 | |||||
| EC Asymmetry | 1 | 6 | 1 | 3 | 3 | |||
| EA Unsmooth/puckering/bubbling | 1 | 11 | ||||||
| CB Broken stitch | 2 | 2 | 2 | 1 | 2 | |||
| CE Broken seam | 2 | 2 | 2 | 1 | 1 |
Latest Final Random (10/02): ED Gathering crease 1 (earlier 21 times), CB Broken stitch 1 (earlier 28 times), CF Pulling yarn 1 (earlier 7 times), EI Inaccurate/skewed stitching 1 (earlier 4 times)
DJ Pleat 4, CC Skip stitch 3, AD Fabric stains 2, DF Twisted seam/skewing 1 pcs (later stages total)
QGR2640248 have multiple reports with different content
Only QA 1st Bundle: DI High-low/uneven (2 Major), BA Thread ends (2 Major), CF Pulling yarn (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (3), EC Asymmetry (3), ED Gathering crease (2), AC Fabric hole (2), DJ Pleat (2), BD Snagging (1), DB Run-off stitching (1); Both: CB Broken stitch (3/1), DD Thread not straight/waving (2/1); DHU QC 1st Bundle 95.0% / QA 1st Bundle 20.0%
DB Run-off stitching (30), DI High-low/uneven (22), CA Thread tension (16), BC Sticker left (12), EC Asymmetry (11) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 95.0% |
| QA 1st Bundle | 2 reports | — | 20.0% |
| QC Inline | 14 reports required on prod. days 14/32 (44%) | — | 57.6% |
| QC Endline | 16 days | — | 14.7% |
| QA Inline | 2 reports | 2 | 53.1% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 1 | 11.2% |
| Final Random | 1 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS15 | 14.7% 2559 / 16 days | 50.0% | PASS | 09/11–10/03 | BA Thread ends, CC Skip stitch, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS15 | 16 | 32 | 14 (44%) | 12 | 6 | 09/19, 09/21, 09/28, 09/29, 10/03 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 2 | 175 | 6 | 11 | 5 | ||
| CC Skip stitch | 4 | 87 | 1 | 2 | ||||
| ED Gathering crease | 2 | 13 | 62 | 5 | 6 | 1 | ||
| CB Broken stitch | 3 | 1 | 46 | 2 | 2 | 1 | ||
| DJ Pleat | 2 | 28 | 1 | 4 | ||||
| DB Run-off stitching | 1 | 14 | 15 | |||||
| AD Fabric stains | 4 | 19 | 2 | |||||
| CF Pulling yarn | 1 | 12 | 7 | 1 | 1 |
QA 1st Bundle 4; cannot compare across stages
10/06 CS08 262055 (defective pcs 21 > defects 12)
Only QA 1st Bundle: DF Twisted seam/skewing (1 Major), ED Gathering crease (1 Major), EA Unsmooth/puckering/bubbling (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: CA Thread tension (3), AD Fabric stains (2), BB Missing cut seam allowance (2); Both: EC Asymmetry (4/1), CB Broken stitch (2/1); DHU QC 1st Bundle — / QA 1st Bundle 50.0%
AD Fabric stains (99), BA Thread ends (48), CC Skip stitch (24), CB Broken stitch (18), DF Twisted seam/skewing (12) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 50.0% |
| QC Inline | 6 reports required on prod. days 6/10 (60%) | — | — |
| QC Endline | 5 days | — | 5.6% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS08 | 5.6% 2748 / 5 days | — | — | 10/02–10/07 | AD Fabric stains, BA Thread ends, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS08 | 5 | 10 | 6 (60%) | 2 | 2 | 10/02, 10/07 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline |
|---|---|---|---|---|
| AD Fabric stains | 2 | 10 | 87 | |
| BA Thread ends | 1 | 5 | 42 | |
| CC Skip stitch | 24 | |||
| CB Broken stitch | 2 | 1 | 15 | |
| DF Twisted seam/skewing | 1 | 11 | ||
| ED Gathering crease | 1 | 9 | ||
| EC Asymmetry | 4 | 1 | 3 | |
| BB Missing cut seam allowance | 2 | 3 |
QA 1st Bundle 4, QA Inline 4; cannot compare across stages
ED Gathering crease (367), BA Thread ends (260), EC Asymmetry (184), EA Unsmooth/puckering/bubbling (114), CC Skip stitch (77) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| Pilot Run | 2 reports | 0 | — |
| QA 1st Bundle | 1 reports | — | 70.0% |
| QC Inline | 0 reports required on prod. days 0/16 (0%) | — | — |
| QC Endline | 8 days | — | 34.5% |
| QA Inline | 1 reports | 1 | 46.9% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP01 | 34.5% 3011 / 8 days | 46.9% | — | 09/25–10/05 | ED Gathering crease, BA Thread ends, EC Asymmetry |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP01 | 8 | 16 | 0 (0%) | 8 | 8 | 09/29, 09/30, 10/01, 10/02, 10/05 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | Pilot Run | QA 1st Bundle | QC Endline | QA Inline |
|---|---|---|---|---|
| ED Gathering crease | 3 | 364 | ||
| BA Thread ends | 260 | |||
| EC Asymmetry | 4 | 179 | 1 | |
| EA Unsmooth/puckering/bubbling | 1 | 4 | 100 | 9 |
| CC Skip stitch | 77 | |||
| Q94 Glue marks | 29 | |||
| EB Measurement issue | 20 | |||
| Others (no detail) | 4 | 4 |
Latest Final Random (10/06): AD Fabric stains 2 (earlier 56 times), EA Unsmooth/puckering/bubbling 1 (earlier 15 times), AB Shading 1 (earlier 4 times), BA Thread ends 1 (earlier 21 times)
AC Fabric hole 1, BB Missing cut seam allowance 1 pcs (later stages total)
QA 1st Bundle 3, QA Inline 11; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 13), AB Shading (QA 12), CE Broken seam (QA 10); zero in QC Endline records
QGR2645353 have multiple reports with different content
Only QA 1st Bundle: CC Skip stitch (3 Major), DJ Pleat (1 Major); Only QC 1st Bundle: CE Broken seam (4), ED Gathering crease (2), AD Fabric stains (2), EC Asymmetry (2), CB Broken stitch (1); Both: CG Grinning (1/4), EA Unsmooth/puckering/bubbling (1/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%
ED Gathering crease (224), EC Asymmetry (117), EA Uneven seam allowance (52), CC Skip stitch (41), EB Measurement issue (37) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| Pilot Run | 2 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 21 reports required on prod. days 20/38 (53%) | — | 139.2% |
| QC Endline | 17 days | — | 13.7% |
| QA Inline | 7 reports | 7 | 32.6% |
| Final Random | 1 reports | 0 | 3.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB25 | 13.7% 4288 / 17 days | 32.6% | PASS | 09/18–10/08 | AD Fabric stains, BA Thread ends, ED Gathering crease |
| CB26 | 0.0% 10 / 1 days | — | — | 10/03–10/03 | — |
| CB30 | 0.0% 10 / 1 days | — | — | 10/02–10/02 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB25 | 17 | 34 | 20 (59%) | 12 | 2 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CB26 | 1 | 2 | 0 (0%) | 1 | 1 | 10/03 |
| CB30 | 1 | 2 | 0 (0%) | 1 | 1 | 10/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | Pilot Run | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|---|---|
| AD Fabric stains | 1 | 1 | 2 | 61 | 187 | 4 | 2 | |
| ED Gathering crease | 7 | 2 | 95 | 119 | 1 | |||
| BA Thread ends | 5 | 134 | 2 | |||||
| EC Asymmetry | 1 | 2 | 109 | 5 | ||||
| EA Uneven seam allowance | 52 | |||||||
| CC Skip stitch | 3 | 33 | 5 | |||||
| EB Measurement issue | 37 | |||||||
| CE Broken seam | 4 | 14 | 10 |
Latest Final Random (09/28): EC Asymmetry 2 (earlier 17 times), AD Fabric stains 1 (earlier 18 times), DB Run-off stitching 2 (earlier 4 times)
CE Broken seam 1, DJ Pleat 1 pcs (later stages total)
Pilot Run 1; cannot compare across stages
CC Skip stitch (157), Q94 Glue marks (107), ED Gathering crease (81), EA Unsmooth/puckering/bubbling (24), CG Grinning (10) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| Pilot Run | 4 reports | 0 | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 0 reports required on prod. days 0/28 (0%) | — | — |
| QC Endline | 14 days | — | 25.5% |
| QA Inline | 2 reports | 2 | 57.8% |
| Final Random | 1 reports | 0 | 3.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP01 | 25.5% 3974 / 14 days | 57.8% | PASS | 09/16–10/05 | AD Fabric stains, BA Thread ends, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP01 | 14 | 28 | 0 (0%) | 14 | 14 | 09/28, 09/29, 09/30, 10/02, 10/05 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | Pilot Run | QA 1st Bundle | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| AD Fabric stains | 2 | 3 | 344 | 3 | 1 | |
| BA Thread ends | 1 | 162 | 3 | 1 | ||
| CC Skip stitch | 1 | 4 | 146 | 6 | ||
| EC Asymmetry | 3 | 3 | 3 | 140 | 1 | 2 |
| Q94 Glue marks | 107 | |||||
| ED Gathering crease | 1 | 71 | 9 | |||
| EA Unsmooth/puckering/bubbling | 1 | 1 | 7 | 10 | 5 | |
| DB Run-off stitching | 1 | 11 | 2 |
BA Thread ends 6, CC Skip stitch 2, ED Gathering crease 3 pcs (later stages total)
QC Inline 82, QA Inline 7; cannot compare across stages
EC Asymmetry (71), DF Twisted seam/skewing (56), AD Fabric stains (51), DB Run-off stitching (37), DJ Pleat (21) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 12 reports required on prod. days 12/18 (67%) | — | — |
| QC Endline | 9 days | — | 16.5% |
| QA Inline | 3 reports | 3 | 35.4% |
| Shipment Sample | 1 reports | 0 | — |
| Pre-final | 1 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS06 | 16.5% 3010 / 9 days | 35.4% | — | 09/26–10/06 | BA Thread ends, ED Gathering crease, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS06 | 9 | 18 | 12 (67%) | 4 | 2 | 09/26, 10/01, 10/02, 10/06 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Pre-final |
|---|---|---|---|---|---|
| BA Thread ends | 2 | 25 | 136 | 4 | 6 |
| Others (no detail) | 82 | 7 | |||
| ED Gathering crease | 85 | 3 | |||
| CC Skip stitch | 12 | 63 | 9 | 2 | |
| EC Asymmetry | 12 | 57 | 2 | ||
| DF Twisted seam/skewing | 55 | 1 | |||
| AD Fabric stains | 1 | 3 | 47 | ||
| DB Run-off stitching | 4 | 33 |
Latest Shipment Sample (09/18): ED Gathering crease 1 (earlier 18 times), EC Asymmetry 2 (earlier 19 times)
BA Thread ends 7, CB Broken stitch 2, FC Wrong label 1 pcs (later stages total)
Only QA 1st Bundle: EF Cup/pocket issue (3 Major), IA 2nd operation issue (1 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: EI Inaccurate/skewed stitching (2), EA Unsmooth/puckering/bubbling (2); Both: ED Gathering crease (2/4), EC Asymmetry (1/3), BA Thread ends (1/2); DHU QC 1st Bundle 40.0% / QA 1st Bundle 70.0%
DB Run-off stitching (64), CC Skip stitch (57), EA Unsmooth/puckering/bubbling (19), EB Measurement issue (14), EI Inaccurate/skewed stitching (7) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 40.0% |
| QA 1st Bundle | 1 reports | — | 70.0% |
| QC Inline | 7 reports required on prod. days 7/20 (35%) | — | 290.0% |
| QC Endline | 8 days | — | 15.8% |
| QA Inline | 1 reports | 1 | 37.5% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 0 | 1.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS09 | 15.7% 6722 / 7 days | 37.5% | — | 09/16–10/01 | BA Thread ends, EC Asymmetry, CC Skip stitch |
| CS10 | 19.1% 298 / 2 days | — | — | 09/30–10/01 | BA Thread ends |
| CS06 | 0.0% 11 / 1 days | — | — | 09/22–09/22 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS09 | 7 | 14 | 7 (50%) | 4 | 3 | 09/16, 09/21, 09/30, 10/01 |
| CS10 | 2 | 4 | 0 (0%) | 2 | 2 | 09/30, 10/01 |
| CS06 | 1 | 2 | 0 (0%) | 1 | 1 | 09/22 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 1 | 2 | 10 | 850 | 4 | 7 | |
| EC Asymmetry | 1 | 3 | 27 | 101 | 3 | 2 | |
| ED Gathering crease | 2 | 4 | 29 | 49 | 1 | ||
| DB Run-off stitching | 8 | 56 | |||||
| CC Skip stitch | 56 | 1 | |||||
| EA Unsmooth/puckering/bubbling | 2 | 15 | 2 | ||||
| EB Measurement issue | 14 | ||||||
| FC Wrong label | 11 | 1 |
4 major: AD Fabric stains 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, ED Gathering crease 1
Found 12 times (44 pcs, 10/01–10/08) in earlier stages; latest Shipment Sample (10/06) still has 1 major
Found 10 times (84 pcs, 10/02–10/08) in earlier stages; latest Shipment Sample (10/06) still has 1 major
Found 24 times (207 pcs, 10/01–10/08) in earlier stages; latest Shipment Sample (10/06) still has 1 major
EA Unsmooth/puckering/bubbling 1 pcs (later stages total)
QGR2644512 have multiple reports with different content
BA Thread ends (180), CE Broken seam (121), EB Measurement issue (79), DB Run-off stitching (74), DJ Pleat (57) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 92.3% |
| QC Inline | 15 reports required on prod. days 14/20 (70%) | — | — |
| QC Endline | 7 days | — | 28.3% |
| QA Inline | 2 reports | 2 | 42.2% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB22 | 33.2% 1830 / 7 days | 42.2% | — | 10/01–10/08 | BA Thread ends, AD Fabric stains, ED Gathering crease |
| CB23 | 15.4% 700 / 3 days | — | — | 10/06–10/08 | AD Fabric stains, BA Thread ends, DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB22 | 7 | 14 | 10 (71%) | 3 | 1 | 10/02, 10/03, 10/08 |
| CB23 | 3 | 6 | 4 (67%) | 2 | 0 | 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|
| AD Fabric stains | 2 | 27 | 171 | 7 | 1 |
| BA Thread ends | 1 | 174 | 5 | ||
| CE Broken seam | 43 | 78 | |||
| ED Gathering crease | 2 | 82 | 1 | ||
| EB Measurement issue | 1 | 78 | |||
| DB Run-off stitching | 20 | 54 | |||
| DJ Pleat | 2 | 52 | 3 | ||
| CG Grinning | 51 | 3 |
13 major: EA Unsmooth/puckering/bubbling 1, Others (no detail) 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, Others (no detail) 1, EA Unsmooth/puckering/bubbling 1, AD Fabric stains 1, Others (no detail) 1, CG Grinning 1, Others (no detail) 1, DH Pressing mark 1, CC Skip stitch 1, ED Gathering crease 1
Found 15 times (32 pcs, 09/21–10/08) in earlier stages; latest Shipment Sample (09/28) still has 2 major
Found 34 times (125 pcs, 09/28–10/08) in earlier stages; latest Shipment Sample (09/28) still has 1 major
EI Inaccurate/skewed stitching 1 pcs (later stages total)
Shipment Sample 4; cannot compare across stages
Only QA 1st Bundle: EB Measurement issue (2 Major), DA Exceed seam allowance (2), ED Gathering crease (2 Major), EC Asymmetry (2 Major), EE Raw edge (1 Major), DD Thread not straight/waving (1 Major); Only QC 1st Bundle: CB Broken stitch (4), AD Fabric stains (3), CE Broken seam (2); Both: EA Unsmooth/puckering/bubbling (3/1); DHU QC 1st Bundle — / QA 1st Bundle 69.2%
BA Thread ends (157), EB Measurement issue (46), CB Broken stitch (23), DJ Pleat (15), DB Run-off stitching (15) did not reach later stages
EC Asymmetry, CG Grinning, DH Pressing mark, CC Skip stitch, ED Gathering crease: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 69.2% |
| QC Inline | 9 reports required on prod. days 9/20 (45%) | — | — |
| QC Endline | 10 days | — | 19.9% |
| QA Inline | 3 reports | 3 | 32.3% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB04 | 19.9% 2236 / 10 days | 32.3% | — | 09/28–10/08 | BA Thread ends, ED Gathering crease, AD Fabric stains |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB04 | 10 | 20 | 9 (45%) | 8 | 3 | 10/02, 10/03, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 155 | 2 | |||||
| AD Fabric stains | 3 | 29 | 92 | 1 | 1 | ||
| ED Gathering crease | 2 | 20 | 93 | 5 | 1 | ||
| EB Measurement issue | 2 | 2 | 42 | ||||
| EA Unsmooth/puckering/bubbling | 1 | 3 | 1 | 19 | 5 | 3 | 2 |
| CC Skip stitch | 6 | 19 | 2 | 1 | |||
| CB Broken stitch | 4 | 18 | 1 | ||||
| DJ Pleat | 15 |
12 major: ED Gathering crease 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, AD Fabric stains 1, ED Gathering crease 1, CF Pulling yarn 1, EC Asymmetry 1, EC Asymmetry 1, DE Cut to broken 1, ED Gathering crease 1, ED Gathering crease 1, EC Asymmetry 1
Found 21 times (192 pcs, 09/28–10/08) in earlier stages; latest Shipment Sample (10/06) still has 1 major
Found 13 times (126 pcs, 09/29–10/08) in earlier stages; latest Shipment Sample (10/06) still has 4 major
Found 9 times (16 pcs, 09/29–10/05) in earlier stages; latest Shipment Sample (10/06) still has 4 major
Found 4 times (7 pcs, 09/29–10/02) in earlier stages; latest Shipment Sample (10/06) still has 1 major
CF Pulling yarn (Shipment Sample 10/06), DE Cut to broken (Shipment Sample 10/06): first found in later stages, never recorded before
Only QA 1st Bundle: DF Twisted seam/skewing (3 Major), DB Run-off stitching (1 Major), DD Thread not straight/waving (1 Major), CA Thread tension (1 Major), CG Grinning (1 Major); Only QC 1st Bundle: CC Skip stitch (1), DA Exceed seam allowance (1), ED Gathering crease (1), CE Broken seam (1); Both: EA Unsmooth/puckering/bubbling (2/2), AD Fabric stains (1/2), EC Asymmetry (2/1), DJ Pleat (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
CE Broken seam (117), BA Thread ends (98), DF Twisted seam/skewing (59), CC Skip stitch (50), EI Inaccurate/skewed stitching (8) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 4 reports required on prod. days 4/16 (25%) | — | — |
| QC Endline | 8 days | — | 35.4% |
| QA Inline | 2 reports | 2 | 42.2% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB24 | 35.4% 1644 / 8 days | 42.2% | — | 09/30–10/08 | AD Fabric stains, ED Gathering crease, CE Broken seam |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB24 | 8 | 16 | 4 (25%) | 8 | 4 | 10/03, 10/05, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| AD Fabric stains | 1 | 1 | 2 | 8 | 174 | 6 | 1 |
| ED Gathering crease | 1 | 4 | 120 | 1 | 4 | ||
| CE Broken seam | 1 | 12 | 102 | 2 | |||
| BA Thread ends | 2 | 96 | |||||
| DF Twisted seam/skewing | 1 | 3 | 3 | 48 | 4 | ||
| CC Skip stitch | 1 | 5 | 42 | 2 | |||
| EC Asymmetry | 2 | 1 | 12 | 1 | 4 | ||
| EI Inaccurate/skewed stitching | 2 | 6 |
9 major: EC Asymmetry 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, ED Gathering crease 1, CG Grinning 1, AD Fabric stains 1, EC Asymmetry 1, EC Asymmetry 1
Found 30 times (206 pcs, 09/16–10/08) in earlier stages; latest Shipment Sample (09/28) still has 1 major
Found 34 times (101 pcs, 09/16–10/08) in earlier stages; latest Shipment Sample (09/28) still has 5 major
Found 8 times (14 pcs, 09/25–10/02) in earlier stages; latest Shipment Sample (09/28) still has 1 major
Found 6 times (13 pcs, 09/26–10/08) in earlier stages; latest Shipment Sample (09/28) still has 1 major
Found 6 times (17 pcs, 09/28–10/05) in earlier stages; latest Shipment Sample (09/28) still has 1 major
Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), GA Missing bartack/button (1 Major), DD Thread not straight/waving (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: CC Skip stitch (2), CA Thread tension (2), DI High-low/uneven (1), DJ Pleat (1); Both: EC Asymmetry (1/4), AD Fabric stains (1/2), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle 90.0% / QA 1st Bundle 92.3%
CE Broken seam (143), BA Thread ends (123), CC Skip stitch (29), EI Inaccurate/skewed stitching (15), AC Fabric hole (14) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 90.0% |
| QA 1st Bundle | 1 reports | — | 92.3% |
| QC Inline | 8 reports required on prod. days 8/24 (33%) | — | — |
| QC Endline | 11 days | — | 19.2% |
| QA Inline | 3 reports | 3 | 36.5% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB09 | 19.3% 2794 / 11 days | 36.5% | — | 09/26–10/08 | AD Fabric stains, CE Broken seam, BA Thread ends |
| CB10 | 0.0% 20 / 1 days | — | — | 09/26–09/26 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB09 | 11 | 22 | 8 (36%) | 10 | 4 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CB10 | 1 | 2 | 0 (0%) | 1 | 1 | 09/26 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| AD Fabric stains | 1 | 1 | 2 | 12 | 184 | 6 | 1 |
| CE Broken seam | 11 | 132 | |||||
| BA Thread ends | 118 | 5 | |||||
| EC Asymmetry | 2 | 1 | 4 | 38 | 52 | 4 | 5 |
| CC Skip stitch | 2 | 6 | 21 | ||||
| ED Gathering crease | 14 | 3 | 1 | ||||
| EA Unsmooth/puckering/bubbling | 1 | 1 | 7 | 2 | 3 | 1 | |
| EI Inaccurate/skewed stitching | 2 | 7 | 6 |
6 major: EC Asymmetry 1, CA Thread tension 1, Others (no detail) 1, EC Asymmetry 1, DE Cut to broken 1, EC Asymmetry 1
Found 8 times (11 pcs, 09/19–09/30) in earlier stages; latest Shipment Sample (09/30) still has 3 major
CA Thread tension (Shipment Sample 09/30), DE Cut to broken (Shipment Sample 09/30): first found in later stages, never recorded before
Shipment Sample 1; cannot compare across stages
EC Asymmetry (QA 4); zero in QC Endline records
Only QA 1st Bundle: DF Twisted seam/skewing (2 Major), DD Thread not straight/waving (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: CG Grinning (2), CE Broken seam (2); Both: CC Skip stitch (2/2), EC Asymmetry (2/2), DA Exceed seam allowance (2/1), CB Broken stitch (1/2); DHU QC 1st Bundle — / QA 1st Bundle 84.6%
ED Gathering crease (92), CE Broken seam (86), CC Skip stitch (63), EB Measurement issue (54), BA Thread ends (52) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 84.6% |
| QC Inline | 5 reports required on prod. days 5/22 (23%) | — | — |
| QC Endline | 10 days | — | 17.1% |
| QA Inline | 1 reports | 1 | 28.1% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB05 | 17.2% 2200 / 10 days | 28.1% | — | 09/28–10/08 | ED Gathering crease, CE Broken seam, EB Measurement issue |
| CB04 | 0.0% 10 / 1 days | — | — | 10/02–10/02 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB05 | 10 | 20 | 5 (25%) | 10 | 5 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CB04 | 1 | 2 | 0 (0%) | 1 | 1 | 10/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| ED Gathering crease | 10 | 82 | |||||
| CE Broken seam | 2 | 17 | 66 | 1 | |||
| CC Skip stitch | 2 | 2 | 6 | 51 | 2 | ||
| EB Measurement issue | 1 | 1 | 52 | ||||
| BA Thread ends | 50 | 2 | |||||
| GB Missing sewing operation | 24 | ||||||
| Q61 Lace raw edge or broken lace | 23 | ||||||
| DF Twisted seam/skewing | 2 | 12 | 1 |
12 major: Others (no detail) 1, CE Broken seam 1, EC Asymmetry 1, EC Asymmetry 1, Others (no detail) 1, EC Asymmetry 1, ED Gathering crease 1, EC Asymmetry 1, Others (no detail) 1, DB Run-off stitching 1, EI Inaccurate/skewed stitching 1, Others (no detail) 1
Found 36 times (87 pcs, 09/15–10/07) in earlier stages; latest Shipment Sample (09/25) still has 4 major
Found 17 times (63 pcs, 09/16–10/07) in earlier stages; latest Shipment Sample (09/25) still has 1 major
Found 14 times (21 pcs, 09/22–10/07) in earlier stages; latest Shipment Sample (09/25) still has 1 major
Found 12 times (26 pcs, 09/17–10/08) in earlier stages; latest Shipment Sample (09/25) still has 1 major
Found 18 times (229 pcs, 09/17–10/08) in earlier stages; latest Shipment Sample (09/25) still has 1 major
Shipment Sample 4; cannot compare across stages
09/19 CP10 261508-3 (defective pcs 9 > defects 3), 09/21 CP08 261508-3 (defective pcs 10 > defects 7), 09/23 CP10 261508-3 (defective pcs 10 > defects 7)
Only QA 1st Bundle: EI Inaccurate/skewed stitching (7 Major), EA Unsmooth/puckering/bubbling (6 Major), CB Broken stitch (4 Major), GA Missing bartack/button (3 Major), ED Gathering crease (2 Major), DA Exceed seam allowance (1 Major), AC Fabric hole (1 Major), CE Broken seam (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: CC Skip stitch (3), DB Run-off stitching (1), DE Cut to broken (1); Both: EC Asymmetry (9/4), BA Thread ends (2/7), DJ Pleat (4/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 65.0%
BA Thread ends (634), CC Skip stitch (288), EB Measurement issue (216), EA Unsmooth/puckering/bubbling (81), DF Twisted seam/skewing (47) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 3 reports | — | 65.0% |
| QC Inline | 7 reports required on prod. days 7/146 (5%) | — | 141.0% |
| QC Endline | 20 days | — | 12.0% |
| QA Inline | 8 reports | 8 | 34.8% |
| Shipment Sample | 2 reports | 2 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP16 | 10.2% 5000 / 11 days | 75.0% | — | 09/17–09/30 | CC Skip stitch, BA Thread ends, EB Measurement issue |
| CP15 | 32.2% 2854 / 6 days | 44.8% | — | 10/02–10/08 | BA Thread ends, ED Gathering crease, EB Measurement issue |
| CP09 | 0.0% 1260 / 14 days | 14.1% | — | 09/16–10/06 | — |
| CP19 | 1.7% 1140 / 13 days | — | — | 09/21–10/08 | BA Thread ends, CC Skip stitch, ED Gathering crease |
| CP11 | 2.4% 840 / 9 days | 15.6% | — | 09/15–10/02 | BA Thread ends |
| CP10 | 4.5% 620 / 8 days | — | — | 09/19–10/02 | BA Thread ends |
| CP18 | 1.2% 520 / 6 days | 25.0% | — | 09/15–10/07 | CC Skip stitch, BA Thread ends |
| CP20 | 0.0% 160 / 3 days | — | — | 09/18–09/29 | — |
| CP08 | 8.8% 80 / 1 days | — | — | 09/21–09/21 | BA Thread ends, DB Run-off stitching, CC Skip stitch |
| CP13 | 0.0% 80 / 2 days | — | — | 09/29–10/08 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP09 | 14 | 28 | 0 (0%) | 14 | 14 | 10/01, 10/02, 10/03, 10/05, 10/06 |
| CP19 | 13 | 26 | 0 (0%) | 13 | 13 | 10/02, 10/05, 10/06, 10/07, 10/08 |
| CP16 | 11 | 22 | 7 (32%) | 11 | 4 | 09/25, 09/26, 09/28, 09/29, 09/30 |
| CP11 | 9 | 18 | 0 (0%) | 9 | 9 | 09/28, 09/29, 09/30, 10/01, 10/02 |
| CP10 | 8 | 16 | 0 (0%) | 8 | 8 | 09/28, 09/29, 09/30, 10/01, 10/02 |
| CP15 | 6 | 12 | 0 (0%) | 6 | 6 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CP18 | 6 | 12 | 0 (0%) | 6 | 6 | 09/16, 09/21, 09/23, 09/25, 10/07 |
| CP20 | 3 | 6 | 0 (0%) | 3 | 3 | 09/18, 09/19, 09/29 |
| CP13 | 2 | 4 | 0 (0%) | 2 | 2 | 09/29, 10/08 |
| CP08 | 1 | 2 | 0 (0%) | 1 | 1 | 09/21 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 7 | 6 | 598 | 21 | ||
| CC Skip stitch | 3 | 7 | 277 | 1 | |||
| ED Gathering crease | 2 | 224 | 3 | 1 | |||
| EB Measurement issue | 216 | ||||||
| EC Asymmetry | 3 | 9 | 4 | 46 | 9 | 16 | 10 |
| EA Unsmooth/puckering/bubbling | 2 | 6 | 2 | 66 | 5 | ||
| DB Run-off stitching | 1 | 8 | 54 | 1 | |||
| DF Twisted seam/skewing | 1 | 15 | 30 | 1 |
11 major: EI Inaccurate/skewed stitching 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, EC Asymmetry 1, CA Thread tension 1, EC Asymmetry 1, CE Broken seam 1, GA Missing bartack/button 1, EI Inaccurate/skewed stitching 1, EC Asymmetry 1
Found 57 times (150 pcs, 09/17–10/08) in earlier stages; latest Shipment Sample (10/05) still has 5 major
Found 6 times (9 pcs, 09/17–10/07) in earlier stages; latest Shipment Sample (10/05) still has 2 major
Found 9 times (14 pcs, 09/17–10/08) in earlier stages; latest Shipment Sample (10/05) still has 1 major
Found 31 times (74 pcs, 09/25–10/08) in earlier stages; latest Shipment Sample (10/05) still has 1 major
CA Thread tension (Shipment Sample 10/05), GA Missing bartack/button (Shipment Sample 10/05): first found in later stages, never recorded before
QC Inline 3; cannot compare across stages
Only QA 1st Bundle: EI Inaccurate/skewed stitching (3 Major), EA Unsmooth/puckering/bubbling (2 Major), DE Cut to broken (2 Major), EB Measurement issue (1 Major), EG Wrong panel assembly (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (4); Both: EC Asymmetry (6/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 84.6%
CC Skip stitch (139), ED Gathering crease (62), BA Thread ends (51), DA Exceed seam allowance (46), DJ Pleat (46) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 84.6% |
| QC Inline | 17 reports required on prod. days 13/18 (72%) | — | 306.0% |
| QC Endline | 9 days | — | 32.7% |
| QA Inline | 3 reports | 3 | 35.4% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB10 | 32.7% 777 / 9 days | 35.4% | — | 09/29–10/08 | CC Skip stitch, ED Gathering crease, BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB10 | 9 | 18 | 13 (72%) | 5 | 0 | 10/02, 10/03, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| EC Asymmetry | 2 | 6 | 2 | 107 | 28 | 5 | 5 |
| CC Skip stitch | 38 | 98 | 3 | ||||
| CE Broken seam | 44 | 30 | 1 | ||||
| ED Gathering crease | 1 | 8 | 50 | 3 | |||
| BA Thread ends | 6 | 38 | 7 | ||||
| DA Exceed seam allowance | 4 | 40 | 2 | ||||
| DJ Pleat | 45 | 1 | |||||
| EA Unsmooth/puckering/bubbling | 1 | 2 | 6 | 5 | 1 |
Found 20 times (45 pcs, 09/22–10/06) in earlier stages; latest Shipment Sample (09/26) still has 4 major
PP Sample 1; cannot compare across stages
EC Asymmetry (QA 10); zero in QC Endline records
QGR2645240 have multiple reports with different content
Only QA 1st Bundle: CH Incorrect stitch density (2 Major), EE Raw edge (2 Major), BA Thread ends (2 Major), EA Unsmooth/puckering/bubbling (2 Major), EI Inaccurate/skewed stitching (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: CG Grinning (3), CC Skip stitch (1), EB Measurement issue (1), IA 2nd operation issue (1), ED Gathering crease (1); Both: DJ Pleat (1/2), EC Asymmetry (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 100.0%
ED Gathering crease (317), CE Broken seam (222), EB Measurement issue (214), BA Thread ends (79), CC Skip stitch (24) did not reach later stages
DF Twisted seam/skewing, CB Broken stitch, CG Grinning: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 6 reports required on prod. days 5/18 (28%) | — | — |
| QC Endline | 8 days | — | 55.5% |
| QA Inline | 3 reports | 3 | 37.5% |
| Shipment Sample | 1 reports | 0 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB13 | 56.3% 1438 / 8 days | 37.5% | — | 09/30–10/08 | ED Gathering crease, EB Measurement issue, CE Broken seam |
| CB15 | 0.0% 20 / 1 days | 37.5% | — | 10/05–10/05 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB13 | 8 | 16 | 5 (31%) | 8 | 3 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CB15 | 1 | 2 | 0 (0%) | 1 | 1 | 10/05 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| ED Gathering crease | 1 | 312 | 4 | ||||
| CE Broken seam | 22 | 200 | |||||
| EB Measurement issue | 1 | 1 | 6 | 206 | |||
| BA Thread ends | 2 | 71 | 6 | ||||
| EC Asymmetry | 3 | 2 | 1 | 33 | 6 | 4 | |
| CC Skip stitch | 1 | 1 | 2 | 20 | |||
| CG Grinning | 3 | 18 | 1 | 1 | |||
| EI Inaccurate/skewed stitching | 1 | 1 | 10 | 1 |
12 major: EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, EA Unsmooth/puckering/bubbling 1, EA Unsmooth/puckering/bubbling 1, AD Fabric stains 1, EC Asymmetry 1, EC Asymmetry 1, EC Asymmetry 1, ED Gathering crease 1, CB Broken stitch 1, EI Inaccurate/skewed stitching 1, CG Grinning 1
Found 3 times (3 pcs, 10/06–10/08) in earlier stages; latest Shipment Sample (10/06) still has 4 major
EA Unsmooth/puckering/bubbling 3 pcs (later stages total)
AD Fabric stains, ED Gathering crease, CB Broken stitch, EI Inaccurate/skewed stitching, CG Grinning: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| Shipment Sample | 1 reports | 1 | — |
| Defect | PP Sample | QC 1st Bundle | Shipment Sample |
|---|---|---|---|
| EC Asymmetry | 2 | 1 | 4 |
| EA Unsmooth/puckering/bubbling | 1 | 3 | |
| AD Fabric stains | 2 | 1 | |
| CG Grinning | 2 | 1 | |
| DB Run-off stitching | 1 | 1 | |
| CB Broken stitch | 1 | 1 | |
| CH Incorrect stitch density | 1 | ||
| DD Thread not straight/waving | 1 |
Found 7 times (15 pcs, 09/29–10/05) in earlier stages; latest Final Random (10/03) still has 3 major
Latest Final Random (10/03): CB Broken stitch 2 (earlier 5 times), CC Skip stitch 2 (earlier 11 times)
Shipment Sample 1; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 9); zero in QC Endline records
10/02 CP12 261559 (defective pcs 70 > defects 69), 10/06 CP12 261559 (defective pcs 168 > defects 165)
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), BB Missing cut seam allowance (2 Major), CE Broken seam (1 Major); Only QC 1st Bundle: DB Run-off stitching (3), DJ Pleat (2), GA Missing bartack/button (2), DA Exceed seam allowance (1), EI Inaccurate/skewed stitching (1); Both: BA Thread ends (5/3), ED Gathering crease (2/4), EC Asymmetry (3/2), CB Broken stitch (1/1); DHU QC 1st Bundle — / QA 1st Bundle 80.0%
EB Measurement issue (290), AA Fabric defect (77), DK Twisted shoulder strap (18), EA Uneven seam allowance (9), GB Missing sewing operation (8) did not reach later stages
ED Gathering crease, EI Inaccurate/skewed stitching, DE Cut to broken, EA Unsmooth/puckering/bubbling, EC Asymmetry: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 80.0% |
| QC Inline | 2 reports required on prod. days 2/20 (10%) | — | — |
| QC Endline | 10 days | — | 11.8% |
| QA Inline | 4 reports | 4 | 35.9% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 1 reports | 0 | 2.9% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP12 | 11.8% 10580 / 10 days | 35.9% | PASS | 09/28–10/08 | BA Thread ends, EB Measurement issue, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP12 | 10 | 20 | 2 (10%) | 10 | 8 | 10/03, 10/05, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 5 | 3 | 616 | 10 | 12 | ||
| EB Measurement issue | 290 | ||||||
| CC Skip stitch | 4 | 180 | 2 | ||||
| AA Fabric defect | 77 | ||||||
| ED Gathering crease | 2 | 4 | 42 | 2 | 1 | ||
| AD Fabric stains | 4 | 10 | 1 | 3 | |||
| DK Twisted shoulder strap | 18 | ||||||
| EC Asymmetry | 3 | 2 | 1 | 10 | 1 |
Found 9 times (24 pcs, 09/16–09/23) in earlier stages; latest Final Random (10/06) still has 3 major
HA Poor pressing (Pre-final 09/19), EI Inaccurate/skewed stitching (Shipment Sample 09/23): first found in later stages, never recorded before
Latest Final Random (10/06): DF Twisted seam/skewing 2 (earlier 32 times), EA Unsmooth/puckering/bubbling 1 (earlier 10 times)
CB Broken stitch 2, DI High-low/uneven 1, DB Run-off stitching 1 pcs (later stages total)
QA 1st Bundle 1, QA Inline 2; cannot compare across stages
09/16 CS07 261560 (defective pcs 9 > defects 8), 09/18 CS07 261560 (defective pcs 25 > defects 22), 09/21 CS07 261560 (defective pcs 34 > defects 31)
Only QA 1st Bundle: ED Gathering crease (2 Major), CB Broken stitch (2 Major), EA Unsmooth/puckering/bubbling (1 Major), DJ Pleat (1 Major), AA Fabric defect (1 Major), DI High-low/uneven (1 Major); Only QC 1st Bundle: EC Asymmetry (1); Both: DF Twisted seam/skewing (10/2), CC Skip stitch (2/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 65.0%
CC Skip stitch (19), CE Broken seam (13), DJ Pleat (6), EC Asymmetry (5), EB Measurement issue (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 65.0% |
| QC Inline | 7 reports required on prod. days 7/20 (35%) | — | — |
| QC Endline | 10 days | — | 9.9% |
| QA Inline | 3 reports | 3 | 39.6% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 1 reports | 1 | 9.6% |
| Final Random | 1 reports | 0 | 4.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS07 | 9.9% 1877 / 10 days | 39.6% | PASS | 09/16–10/06 | BA Thread ends, DF Twisted seam/skewing, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS07 | 10 | 20 | 7 (35%) | 9 | 4 | 09/22, 09/23, 09/25, 09/28, 10/06 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| DF Twisted seam/skewing | 10 | 2 | 60 | 49 | 3 | 9 | 2 | |
| BA Thread ends | 86 | 6 | 10 | 8 | ||||
| ED Gathering crease | 2 | 20 | 2 | 1 | 3 | |||
| CB Broken stitch | 2 | 12 | 5 | 2 | ||||
| CC Skip stitch | 2 | 2 | 4 | 11 | ||||
| EA Unsmooth/puckering/bubbling | 1 | 6 | 1 | 6 | 1 | |||
| CE Broken seam | 12 | 1 | ||||||
| DB Run-off stitching | 2 | 6 | 1 | 1 |
2 major: EA Unsmooth/puckering/bubbling 1, CF Pulling yarn 1
Found 7 times (14 pcs, 09/28–10/05) in earlier stages; latest Shipment Sample (10/01) still has 1 major
DF Twisted seam/skewing 1, BA Thread ends 11, DJ Pleat 1, CB Broken stitch 1, EA Unsmooth/puckering/bubbling 1 pcs (later stages total)
QA Inline 3; cannot compare across stages
Only QA 1st Bundle: DJ Pleat (2 Major), EA Unsmooth/puckering/bubbling (1 Major), CF Pulling yarn (1 Major), CE Broken seam (1 Major), CG Grinning (1 Major), DB Run-off stitching (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DF Twisted seam/skewing (2), BD Snagging (1), EC Asymmetry (1), CA Thread tension (1); Both: BA Thread ends (2/1), BC Sticker left (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
EC Asymmetry (141), DB Run-off stitching (42), CC Skip stitch (41), ED Gathering crease (13), CA Thread tension (10) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 7 reports required on prod. days 6/14 (43%) | — | — |
| QC Endline | 7 days | — | 22.6% |
| QA Inline | 3 reports | 3 | 27.1% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 1 reports | 1 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS04 | 22.6% 1900 / 7 days | 27.1% | — | 09/28–10/05 | BA Thread ends, EC Asymmetry, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS04 | 7 | 14 | 6 (43%) | 7 | 1 | 09/30, 10/01, 10/02, 10/03, 10/05 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 1 | 14 | 208 | 4 | 11 | |
| EC Asymmetry | 1 | 137 | 3 | ||||
| DB Run-off stitching | 1 | 9 | 31 | 1 | |||
| CC Skip stitch | 2 | 37 | 2 | ||||
| DJ Pleat | 2 | 17 | 2 | 1 | |||
| CF Pulling yarn | 1 | 6 | 6 | 1 | 1 | 2 | |
| ED Gathering crease | 11 | 2 | |||||
| CB Broken stitch | 1 | 3 | 6 | 1 |
3 major: CB Broken stitch 1, CB Broken stitch 1, EI Inaccurate/skewed stitching 1
Found 8 times (19 pcs, 09/21–09/23) in earlier stages; latest Pre-final (09/29) still has 5 major
Found 6 times (9 pcs, 09/21–09/23) in earlier stages; latest Pre-final (09/29) still has 4 major
AD Fabric stains (Pre-final 09/29): first found in later stages, never recorded before
Pre-final 09/28 QGR2643578 (FAIL); please check if the report was completed
CB Broken stitch 2, EI Inaccurate/skewed stitching 1 pcs (later stages total)
ED Gathering crease (QA 8), DF Twisted seam/skewing (QA 5); zero in QC Endline records
09/22 CS24 261593-S (defective pcs 50 > defects 49), 09/23 CS24 261593-L (defective pcs 23 > defects 22)
QGR2643578 have multiple reports with different content
Only QA 1st Bundle: DD Thread not straight/waving (1 Major), CE Broken seam (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: CC Skip stitch (1), BB Missing cut seam allowance (1), DJ Pleat (1), CB Broken stitch (1); Both: DF Twisted seam/skewing (2/2), ED Gathering crease (2/2), CG Grinning (1/2), EI Inaccurate/skewed stitching (1/2); DHU QC 1st Bundle — / QA 1st Bundle 55.0%
CC Skip stitch (22), DB Run-off stitching (20), DJ Pleat (7), CE Broken seam (5), EC Asymmetry (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 55.0% |
| QC Inline | 3 reports required on prod. days 3/8 (38%) | — | — |
| QC Endline | 4 days | — | 12.2% |
| QA Inline | 2 reports | 2 | 26.6% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 2 reports | 1 | 6.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS24 | 12.2% 1010 / 4 days | 26.6% | — | 09/21–09/25 | BA Thread ends, CC Skip stitch, DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS24 | 4 | 8 | 3 (38%) | 3 | 2 | 09/21, 09/23, 09/25 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 10 | 82 | 4 | 12 | |||
| ED Gathering crease | 2 | 2 | 12 | 3 | 5 | ||
| CC Skip stitch | 1 | 21 | |||||
| EI Inaccurate/skewed stitching | 1 | 2 | 16 | 2 | 1 | ||
| DB Run-off stitching | 20 | ||||||
| CB Broken stitch | 1 | 10 | 2 | ||||
| DF Twisted seam/skewing | 2 | 2 | 4 | 1 | 4 | ||
| DJ Pleat | 1 | 6 |
9 major: EC Asymmetry 1, GA Missing bartack/button 2, EI Inaccurate/skewed stitching 1, AD Fabric stains 1, EC Asymmetry 1, CE Broken seam 1, EA Unsmooth/puckering/bubbling 1, EA Unsmooth/puckering/bubbling 1
QA 1st Bundle 5, QA Inline 2; cannot compare across stages
CE Broken seam (QA 3); zero in QC Endline records
10/03 CP01 260356A (defective pcs 43 > defects 40), 10/07 CP01 260356A (defective pcs 200 > defects 109), 10/08 CP01 260356A (defective pcs 71 > defects 28)
ED Gathering crease (118), BA Thread ends (110), CC Skip stitch (61), EB Measurement issue (33), DB Run-off stitching (15) did not reach later stages
EC Asymmetry, GA Missing bartack/button, EI Inaccurate/skewed stitching, AD Fabric stains, CE Broken seam, EA Unsmooth/puckering/bubbling: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 95.0% |
| QC Inline | 0 reports required on prod. days 0/14 (0%) | — | — |
| QC Endline | 6 days | — | 36.2% |
| QA Inline | 1 reports | 1 | 59.4% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP01 | 36.4% 2499 / 6 days | 59.4% | — | 10/02–10/08 | EA Unsmooth/puckering/bubbling, AD Fabric stains, EC Asymmetry |
| CP15 | 25.0% 40 / 1 days | — | — | 10/03–10/03 | ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP01 | 6 | 12 | 0 (0%) | 6 | 6 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CP15 | 1 | 2 | 0 (0%) | 1 | 1 | 10/03 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|
| EA Unsmooth/puckering/bubbling | 4 | 268 | 6 | 2 |
| AD Fabric stains | 3 | 198 | 1 | 1 |
| ED Gathering crease | 3 | 113 | 2 | |
| EC Asymmetry | 110 | 2 | ||
| BA Thread ends | 107 | 3 | ||
| CC Skip stitch | 1 | 60 | ||
| EB Measurement issue | 33 | |||
| DB Run-off stitching | 14 | 1 |
Found 26 times (85 pcs, 09/07–10/08) in earlier stages; latest Final Random (10/05) still has 3 major
Latest Final Random (10/05): CC Skip stitch 2 (earlier 49 times)
EA Unsmooth/puckering/bubbling 2, EB Measurement issue 1, EC Asymmetry 5, CB Broken stitch 2, EI Inaccurate/skewed stitching 1, DJ Pleat 3, ED Gathering crease 1, CA Thread tension 1 pcs (later stages total)
QA Inline 1; cannot compare across stages
DD Thread not straight/waving (QA 19); zero in QC Endline records
10/07 CB30 260758 (defective pcs 31 > defects 27)
Only QA 1st Bundle: EI Inaccurate/skewed stitching (4 Major), EB Measurement issue (2 Major), BA Thread ends (2 Major), DA Exceed seam allowance (1 Major); Only QC 1st Bundle: CC Skip stitch (2), CG Grinning (2), CH Incorrect stitch density (1), DJ Pleat (1), AA Fabric defect (1), BB Missing cut seam allowance (1), CB Broken stitch (1); Both: EC Asymmetry (3/1), DB Run-off stitching (1/2), DD Thread not straight/waving (1/2), CE Broken seam (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 75.0%
DB Run-off stitching (795), CE Broken seam (226), EA Uneven seam allowance (148), DD Thread not straight/waving (82), CG Grinning (75) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 2 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 75.0% |
| QC Inline | 54 reports required on prod. days 51/94 (54%) | — | 97.9% |
| QC Endline | 28 days | — | 20.0% |
| QA Inline | 9 reports | 8 | 30.2% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 2 reports | 0 | 2.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB20 | 15.4% 7605 / 23 days | 31.2% | PASS | 09/05–10/06 | DB Run-off stitching, CC Skip stitch, ED Gathering crease |
| CB30 | 25.0% 7016 / 24 days | 29.7% | PASS | 09/09–10/08 | BA Thread ends, DB Run-off stitching, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB30 | 24 | 48 | 29 (60%) | 13 | 6 | 09/19, 10/02, 10/03, 10/05, 10/08 |
| CB20 | 23 | 46 | 22 (48%) | 14 | 10 | 09/16, 09/17, 09/30, 10/01, 10/06 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 20 | 841 | 8 | 12 | |||
| DB Run-off stitching | 1 | 1 | 2 | 72 | 706 | 13 | ||
| CC Skip stitch | 2 | 57 | 369 | 1 | 2 | |||
| ED Gathering crease | 412 | 4 | 1 | |||||
| CE Broken seam | 1 | 2 | 1 | 141 | 75 | 6 | ||
| EB Measurement issue | 1 | 2 | 10 | 175 | 1 | |||
| EC Asymmetry | 3 | 1 | 137 | 6 | 9 | 5 | ||
| EA Uneven seam allowance | 148 |
13 major: EI Inaccurate/skewed stitching 1, CB Broken stitch 1, CB Broken stitch 1, DE Cut to broken 2, DA Exceed seam allowance 3, CE Broken seam 4, CA Thread tension 1
EI Inaccurate/skewed stitching (Final Random 09/29), CB Broken stitch (Final Random 09/29), DE Cut to broken (Final Random 09/29), DA Exceed seam allowance (Final Random 09/29), CA Thread tension (Final Random 09/29), BB Missing cut seam allowance (Final Random 09/29): first found in later stages, never recorded before
CE Broken seam 4, BA Thread ends 6 pcs (later stages total)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QA Inline | 1 reports | 1 | 8.8% |
| Final Random | 1 reports | 1 | 6.5% |
| Defect | PP Sample | QA Inline | Final Random |
|---|---|---|---|
| BA Thread ends | 4 | 6 | |
| BB Missing cut seam allowance | 6 | ||
| CE Broken seam | 1 | 4 | |
| EA Unsmooth/puckering/bubbling | 3 | ||
| EE Raw edge | 3 | ||
| DA Exceed seam allowance | 3 | ||
| FA Wrong material | 2 | ||
| DF Twisted seam/skewing | 2 |
8 major: DE Cut to broken 3, CB Broken stitch 2, EA Unsmooth/puckering/bubbling 3
CB Broken stitch (Final Random 09/30), GA Missing bartack/button (Final Random 09/30): first found in later stages, never recorded before
DE Cut to broken 3, EA Unsmooth/puckering/bubbling 3, BA Thread ends 8, EE Raw edge 7 pcs (later stages total)
DI High-low/uneven (14) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QA 1st Bundle | 2 reports | — | 31.2% |
| Final Random | 1 reports | 1 | 4.0% |
| Defect | PP Sample | QA 1st Bundle | Final Random |
|---|---|---|---|
| DI High-low/uneven | 14 | ||
| BA Thread ends | 5 | 8 | |
| EE Raw edge | 3 | 7 | |
| EA Unsmooth/puckering/bubbling | 3 | 3 | |
| DE Cut to broken | 1 | 3 | |
| GA Missing bartack/button | 3 | ||
| FA Wrong material | 2 | ||
| CB Broken stitch | 2 |
28 major: FA Wrong material 1, FA Wrong material 1, FC Wrong label 1, FC Wrong label 1, FC Wrong label 1, FC Wrong label 1, ED Gathering crease 1, EI Inaccurate/skewed stitching 1, DB Run-off stitching 1, GB Missing sewing operation 1, EA Unsmooth/puckering/bubbling 1, GB Missing sewing operation 1, ED Gathering crease 1, EA Unsmooth/puckering/bubbling 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 1, GB Missing sewing operation 1, EA Unsmooth/puckering/bubbling 1, AD Fabric stains 1, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, EI Inaccurate/skewed stitching 1, EI Inaccurate/skewed stitching 1, EA Unsmooth/puckering/bubbling 1, FA Wrong material 1, Others (no detail) 1, EC Asymmetry 1
Found 73 times (475 pcs, 08/26–10/08) in earlier stages; latest Shipment Sample (09/01) still has 3 major
Found 19 times (56 pcs, 08/26–10/06) in earlier stages; latest Shipment Sample (09/01) still has 1 major
Found 16 times (60 pcs, 08/26–10/02) in earlier stages; latest Shipment Sample (09/01) still has 5 major
FA Wrong material (Shipment Sample 09/01), FC Wrong label (Shipment Sample 09/01), ED Gathering crease (Shipment Sample 09/01), GB Missing sewing operation (Shipment Sample 09/01), AD Fabric stains (Shipment Sample 09/01): first found in later stages, never recorded before
EI Inaccurate/skewed stitching 5 pcs (later stages total)
Shipment Sample 1; cannot compare across stages
DD Thread not straight/waving (QA 9); zero in QC Endline records
Only QA 1st Bundle: EB Measurement issue (5 Major), EE Raw edge (2 Major), FB Material defect (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (3), DB Run-off stitching (2), CB Broken stitch (2), BB Missing cut seam allowance (1); Both: CE Broken seam (2/3), EC Asymmetry (2/2), EA Unsmooth/puckering/bubbling (1/2), BA Thread ends (1/2); DHU QC 1st Bundle 107.7% / QA 1st Bundle 90.0%
BA Thread ends (1167), EB Measurement issue (297), CD Needle hole (176), BB Missing cut seam allowance (122), CE Broken seam (118) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 2 reports | — | 107.7% |
| QA 1st Bundle | 1 reports | — | 90.0% |
| QC Inline | 45 reports required on prod. days 43/78 (55%) | — | 104.6% |
| QC Endline | 36 days | — | 23.2% |
| QA Inline | 5 reports | 5 | 38.8% |
| Shipment Sample | 1 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB21 | 23.4% 9438 / 35 days | 38.8% | — | 08/25–10/08 | BA Thread ends, EC Asymmetry, EB Measurement issue |
| CB30 | 0.0% 80 / 3 days | — | — | 09/14–10/03 | — |
| CB22 | 0.0% 20 / 1 days | — | — | 09/17–09/17 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB21 | 35 | 70 | 43 (61%) | 22 | 5 | 09/15, 09/16, 09/17, 09/19, 09/23 |
| CB30 | 3 | 6 | 0 (0%) | 3 | 3 | 09/14, 09/18, 10/03 |
| CB22 | 1 | 2 | 0 (0%) | 1 | 1 | 09/17 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|
| BA Thread ends | 1 | 2 | 64 | 1095 | 5 | |
| EC Asymmetry | 2 | 2 | 126 | 331 | 14 | 3 |
| EB Measurement issue | 5 | 289 | 3 | |||
| AD Fabric stains | 34 | 236 | 3 | 1 | ||
| CD Needle hole | 176 | |||||
| BB Missing cut seam allowance | 1 | 121 | ||||
| CE Broken seam | 2 | 3 | 92 | 19 | 2 | |
| CB Broken stitch | 2 | 66 | 6 |
10 major: DE Cut to broken 1, CC Skip stitch 2, CB Broken stitch 1, BB Missing cut seam allowance 1, EI Inaccurate/skewed stitching 2, AD Fabric stains 1, BA Thread ends 1, DB Run-off stitching 1
Found 100 times (181 pcs, 09/01–10/08) in earlier stages; latest Pre-final (10/02) still has 1 major
Found 49 times (1126 pcs, 09/01–10/08) in earlier stages; latest Pre-final (10/02) still has 4 major
Found 32 times (91 pcs, 09/01–10/08) in earlier stages; latest Pre-final (10/02) still has 2 major
Found 50 times (375 pcs, 09/01–10/08) in earlier stages; latest Pre-final (10/02) still has 1 major
Found 3 times (4 pcs, 09/03–09/29) in earlier stages; latest Pre-final (10/02) still has 14 major
Found 31 times (149 pcs, 09/16–10/08) in earlier stages; latest Pre-final (10/02) still has 2 major
CF Pulling yarn (Shipment Sample 09/19): first found in later stages, never recorded before
Shipment Sample 09/19 QGR2642959 (FAIL); please check if the report was completed
DJ Pleat 7, ED Gathering crease 1, DB Run-off stitching 3, AC Fabric hole 1, EI Inaccurate/skewed stitching 5, GA Missing bartack/button 1, BB Missing cut seam allowance 7, EA Unsmooth/puckering/bubbling 3 pcs (later stages total)
DD Thread not straight/waving (QA 34); zero in QC Endline records
09/15 CS21 260764 (defective pcs 72 > defects 59)
Only QA 1st Bundle: BB Missing cut seam allowance (3 Major), EA Unsmooth/puckering/bubbling (2 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: EI Inaccurate/skewed stitching (1), AC Fabric hole (1), CE Broken seam (1), GA Missing bartack/button (1), DB Run-off stitching (1); Both: EC Asymmetry (3/4), BA Thread ends (2/3), CB Broken stitch (3/1), ED Gathering crease (1/1), DJ Pleat (1/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 80.0%
DD Thread not straight/waving (48), CE Broken seam (39), CG Grinning (36), DA Exceed seam allowance (24), CA Thread tension (11) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 75.0% |
| QA 1st Bundle | 1 reports | — | 80.0% |
| QC Inline | 43 reports required on prod. days 42/62 (68%) | — | 52.7% |
| QC Endline | 31 days | — | 12.2% |
| QA Inline | 14 reports | 14 | 23.1% |
| Shipment Sample | 3 reports | 2 | — |
| Pre-final | 4 reports | 2 | 5.4% |
| Final Random | 2 reports | 1 | 3.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS21 | 12.2% 15429 / 31 days | 23.1% | FAIL | 09/01–10/08 | BA Thread ends, CC Skip stitch, DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS21 | 31 | 62 | 42 (68%) | 18 | 2 | 09/17, 09/18, 09/19, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 3 | 50 | 1045 | 26 | 22 | 10 | |
| CC Skip stitch | 30 | 339 | 6 | 1 | 2 | |||
| DB Run-off stitching | 1 | 45 | 176 | 4 | 2 | 1 | ||
| ED Gathering crease | 1 | 1 | 49 | 138 | 3 | 1 | ||
| CB Broken stitch | 3 | 1 | 167 | 10 | 1 | 1 | ||
| AD Fabric stains | 20 | 122 | 7 | 2 | 6 | 1 | ||
| EC Asymmetry | 3 | 4 | 14 | 50 | 20 | 6 | 3 | |
| DJ Pleat | 1 | 1 | 67 | 7 | 2 | 3 | 2 |
12 major: GA Missing bartack/button 2, DE Cut to broken 1, CE Broken seam 1, CB Broken stitch 3, CC Skip stitch 2, AD Fabric stains 3
Found 25 times (122 pcs, 09/05–09/18) in earlier stages; latest Final Random (09/22) still has 3 major
Found 74 times (687 pcs, 09/05–09/28) in earlier stages; latest Final Random (09/22) still has 2 major
Found 21 times (32 pcs, 09/05–09/22) in earlier stages; latest Final Random (09/22) still has 1 major
Found 7 times (17 pcs, 09/05–09/25) in earlier stages; latest Final Random (09/22) still has 1 major
Found 18 times (39 pcs, 09/07–09/25) in earlier stages; latest Final Random (09/22) still has 3 major
09/05 CP20 260765-S (defective pcs 30 > defects 6), 09/07 CP20 260765-S (defective pcs 54 > defects 51), 09/08 CP20 260765-L (defective pcs 18 > defects 9), 09/09 CP12 260765-S (defective pcs 16 > defects 11)…
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (2 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: CB Broken stitch (3), DA Exceed seam allowance (2), CE Broken seam (2), GA Missing bartack/button (2), BD Snagging (1), ED Gathering crease (1), GC Missing pocket/label (1); Both: BA Thread ends (9/2), CC Skip stitch (2/4), DE Cut to broken (2/4), EC Asymmetry (4/2), AD Fabric stains (2/2), DJ Pleat (2/1), BB Missing cut seam allowance (1/2); DHU QC 1st Bundle 85.0% / QA 1st Bundle 100.0%
ED Gathering crease (275), EB Measurement issue (193), AA Fabric defect (73), EA Uneven seam allowance (51), BD Snagging (39) did not reach later stages
EC Asymmetry, GA Missing bartack/button, CG Grinning, DB Run-off stitching, CF Pulling yarn: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 2 reports | — | 85.0% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 25 reports required on prod. days 25/96 (26%) | — | 49.8% |
| QC Endline | 21 days | — | 9.4% |
| QA Inline | 3 reports | 3 | 37.5% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 3 reports | 1 | 2.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP12 | 10.7% 13941 / 18 days | 31.2% | PASS | 09/09–09/30 | BA Thread ends, CC Skip stitch, EB Measurement issue |
| CP20 | 6.1% 10719 / 15 days | 25.0% | FAIL | 09/05–09/25 | BA Thread ends, CC Skip stitch, ED Gathering crease |
| CP19 | 11.6% 7892 / 13 days | — | PASS | 09/07–09/21 | BA Thread ends, DB Run-off stitching, CC Skip stitch |
| CP02 | 0.0% 20 / 1 days | — | — | 09/07–09/07 | — |
| CP16 | 0.0% 20 / 1 days | — | — | 09/15–09/15 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP12 | 18 | 36 | 6 (17%) | 18 | 12 | 09/25, 09/26, 09/28, 09/29, 09/30 |
| CP20 | 15 | 30 | 9 (30%) | 14 | 7 | 09/17, 09/18, 09/19, 09/21, 09/25 |
| CP19 | 13 | 26 | 10 (38%) | 13 | 3 | 09/16, 09/17, 09/18, 09/19, 09/21 |
| CP02 | 1 | 2 | 0 (0%) | 1 | 1 | 09/07 |
| CP16 | 1 | 2 | 0 (0%) | 1 | 1 | 09/15 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 9 | 2 | 289 | 1410 | 11 | 36 | |
| CC Skip stitch | 2 | 4 | 15 | 666 | 2 | ||
| ED Gathering crease | 1 | 272 | 2 | ||||
| DB Run-off stitching | 5 | 222 | 1 | ||||
| EB Measurement issue | 193 | ||||||
| AD Fabric stains | 2 | 2 | 23 | 95 | 5 | ||
| AA Fabric defect | 73 | ||||||
| EC Asymmetry | 4 | 2 | 37 | 2 | 7 | 5 |
Found 12 times (22 pcs, 09/07–10/02) in earlier stages; latest Pre-final (10/03) still has 5 major
Found 17 times (41 pcs, 09/07–09/30) in earlier stages; latest Pre-final (10/03) still has 2 major
Found 11 times (26 pcs, 09/09–10/02) in earlier stages; latest Pre-final (10/03) still has 1 major
GB Missing sewing operation (Pre-final 09/14): first found in later stages, never recorded before
QA Inline DHU 33.2% vs QC Endline 6.1% (09/05–10/06, 26 days, 25973 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
CB Broken stitch 2, DA Exceed seam allowance 1, EI Inaccurate/skewed stitching 1, CC Skip stitch 1 pcs (later stages total)
09/05 CS25 260766 (defective pcs 10 > defects 1), 09/07 CS25 260766 (defective pcs 129 > defects 18), 09/08 CS25 260766 (defective pcs 182 > defects 34), 09/09 CS25 260766 (defective pcs 162 > defects 28)…
Only QA 1st Bundle: ED Gathering crease (3 Major), BB Missing cut seam allowance (2 Major), BA Thread ends (1 Major), DA Exceed seam allowance (1 Major), CA Thread tension (1 Major), AD Fabric stains (1 Major), CE Broken seam (1 Major), DI High-low/uneven (1 Major); Both: CB Broken stitch (9/2), EC Asymmetry (5/1); DHU QC 1st Bundle 70.0% / QA 1st Bundle 70.0%
EB Measurement issue (63), Q10 Reject after repairing (49), CE Broken seam (21), AC Fabric hole (20), CD Needle hole (15) did not reach later stages
DB Run-off stitching, CA Thread tension, DE Cut to broken, EA Unsmooth/puckering/bubbling, GA Missing bartack/button, ED Gathering crease, EC Asymmetry, AD Fabric stains: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 70.0% |
| QA 1st Bundle | 1 reports | — | 70.0% |
| QC Inline | 33 reports required on prod. days 33/56 (59%) | — | 97.9% |
| QC Endline | 26 days | — | 6.1% |
| QA Inline | 11 reports | 11 | 33.2% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 4 reports | 2 | 4.0% |
| Final Random | 1 reports | 0 | 1.3% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS25 | 6.1% 25949 / 26 days | 33.2% | PASS | 09/05–10/06 | BA Thread ends, CC Skip stitch, ED Gathering crease |
| CS24 | 0.0% 20 / 1 days | — | — | 09/08–09/08 | — |
| CS05 | 0.0% 4 / 1 days | — | — | 09/17–09/17 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS25 | 26 | 52 | 33 (63%) | 16 | 3 | 09/18, 09/26, 10/03, 10/05, 10/06 |
| CS05 | 1 | 2 | 0 (0%) | 1 | 1 | 09/17 |
| CS24 | 1 | 2 | 0 (0%) | 1 | 1 | 09/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 1 | 23 | 536 | 9 | 21 | 11 | ||
| ED Gathering crease | 3 | 214 | 220 | 14 | 5 | 1 | ||
| CC Skip stitch | 23 | 343 | 1 | |||||
| AD Fabric stains | 1 | 59 | 215 | 11 | 1 | 7 | 2 | |
| CB Broken stitch | 9 | 2 | 202 | 7 | 2 | |||
| EC Asymmetry | 5 | 1 | 110 | 70 | 11 | 4 | ||
| EB Measurement issue | 63 | |||||||
| EA Unsmooth/puckering/bubbling | 32 | 14 | 5 | 2 | 1 |
24 major: DJ Pleat 1, EI Inaccurate/skewed stitching 1, AD Fabric stains 16, BB Missing cut seam allowance 6
Found 16 times (32 pcs, 09/08–09/21) in earlier stages; latest Final Random (10/06) still has 1 major
CB Broken stitch 3, CC Skip stitch 1, BB Missing cut seam allowance 6 pcs (later stages total)
09/08 CP08 260767 (defective pcs 88 > defects 56), 09/16 CP08 260767 (defective pcs 103 > defects 101), 09/17 CP08 260767 (defective pcs 60 > defects 56), 09/19 CP08 260767 (defective pcs 61 > defects 60)…
Only QA 1st Bundle: EG Wrong panel assembly (2 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: CB Broken stitch (3), CE Broken seam (2), CC Skip stitch (1), DD Thread not straight/waving (1), AD Fabric stains (1), DJ Pleat (1); Both: ED Gathering crease (4/3), DA Exceed seam allowance (2/4), EA Unsmooth/puckering/bubbling (3/2), BA Thread ends (2/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 70.0%
EA Uneven seam allowance (178), EB Measurement issue (100), DA Exceed seam allowance (48), DB Run-off stitching (43), GB Missing sewing operation (27) did not reach later stages
ED Gathering crease, EI Inaccurate/skewed stitching, EC Asymmetry, EA Unsmooth/puckering/bubbling, AD Fabric stains, GA Missing bartack/button: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 70.0% |
| QC Inline | 15 reports required on prod. days 15/68 (22%) | — | 35.4% |
| QC Endline | 20 days | — | 9.8% |
| QA Inline | 4 reports | 4 | 43.0% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 3 reports | 1 | 6.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP08 | 7.5% 12719 / 18 days | 40.6% | PASS | 09/07–10/01 | BA Thread ends, CC Skip stitch, EA Uneven seam allowance |
| CP10 | 12.5% 11001 / 15 days | 45.3% | FAIL | 09/11–09/29 | BA Thread ends, AD Fabric stains, CC Skip stitch |
| CP09 | 0.0% 20 / 1 days | — | — | 09/10–09/10 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP08 | 18 | 36 | 10 (28%) | 18 | 8 | 09/22, 09/23, 09/25, 09/26, 10/01 |
| CP10 | 15 | 30 | 5 (17%) | 15 | 10 | 09/23, 09/25, 09/26, 09/28, 09/29 |
| CP09 | 1 | 2 | 0 (0%) | 1 | 1 | 09/10 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 2 | 71 | 777 | 5 | 31 | |
| AD Fabric stains | 1 | 31 | 397 | 13 | 1 | 23 | |
| CC Skip stitch | 1 | 1 | 417 | 10 | 1 | ||
| ED Gathering crease | 4 | 3 | 11 | 230 | 3 | 2 | |
| EA Uneven seam allowance | 178 | ||||||
| EB Measurement issue | 100 | ||||||
| EC Asymmetry | 1 | 7 | 71 | 1 | 5 | ||
| EA Unsmooth/puckering/bubbling | 3 | 2 | 3 | 60 | 8 | 2 |
Found 9 times (12 pcs, 08/17–09/19) in earlier stages; latest Pre-final (09/29) still has 1 major
Found 15 times (35 pcs, 08/19–09/28) in earlier stages; latest Pre-final (09/29) still has 3 major
Found 10 times (17 pcs, 08/20–09/30) in earlier stages; latest Pre-final (09/29) still has 1 major
Found 11 times (24 pcs, 08/21–09/25) in earlier stages; latest Pre-final (09/29) still has 1 major
Found 33 times (335 pcs, 08/21–09/30) in earlier stages; latest Pre-final (09/29) still has 3 major
AD Fabric stains (Shipment Sample 08/24), DD Thread not straight/waving (Pre-final 09/17): first found in later stages, never recorded before
QA Inline DHU 33.1% vs QC Inline 18.4%; QC Inline may be missing defects
CB Broken stitch 8, EI Inaccurate/skewed stitching 6, DJ Pleat 1, GA Missing bartack/button 2, EA Unsmooth/puckering/bubbling 1, GB Missing sewing operation 2 pcs (later stages total)
08/25 CS03 260768 (defective pcs 147 > defects 120), 08/26 CS03 260768 (defective pcs 136 > defects 128), 08/31 CS03 260768 (defective pcs 120 > defects 93), 09/01 CS03 260768 (defective pcs 120 > defects 101)…
Only QA 1st Bundle: DA Exceed seam allowance (1 Major), DJ Pleat (1 Major); Only QC 1st Bundle: ED Gathering crease (2), DB Run-off stitching (2), DE Cut to broken (1); Both: CB Broken stitch (2/4), BA Thread ends (2/4), EI Inaccurate/skewed stitching (2/2); DHU QC 1st Bundle 34.4% / QA 1st Bundle 60.0%
AC Fabric hole (196), ED Gathering crease (105), DB Run-off stitching (52), Q61 Lace raw edge or broken lace (48), EB Measurement issue (27) did not reach later stages
QGR2641561 Final Random (09/18) CS06; actual production line(s) CS03 (cards show production lines only)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 34.4% |
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 23 reports required on prod. days 23/76 (30%) | — | 18.4% |
| QC Endline | 38 days | — | 10.1% |
| QA Inline | 12 reports | 12 | 33.1% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 4 reports | 3 | 3.8% |
| Final Random | 1 reports | 0 | 1.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS03 | 10.1% 29351 / 38 days | 33.1% | — | 08/18–10/03 | BA Thread ends, CC Skip stitch, AC Fabric hole |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS03 | 38 | 76 | 23 (30%) | 37 | 16 | 09/29, 09/30, 10/01, 10/02, 10/03 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 4 | 13 | 2131 | 32 | 39 | 20 | |
| CC Skip stitch | 11 | 323 | 1 | 6 | 2 | |||
| AC Fabric hole | 8 | 186 | 2 | |||||
| ED Gathering crease | 2 | 7 | 84 | 12 | ||||
| CB Broken stitch | 2 | 4 | 54 | 19 | 1 | 6 | 1 | |
| DB Run-off stitching | 2 | 8 | 42 | |||||
| AD Fabric stains | 7 | 28 | 5 | 3 | 6 | |||
| Q61 Lace raw edge or broken lace | 48 |
Found 7 times (14 pcs, 08/15–10/01) in earlier stages; latest Final Random (10/06) still has 4 major
Latest Final Random (10/06): EA Unsmooth/puckering/bubbling 2 (earlier 21 times), DB Run-off stitching 2 (earlier 24 times)
CG Grinning 2, ED Gathering crease 2, CC Skip stitch 1, AC Fabric hole 1 pcs (later stages total)
PP Sample 1, QA 1st Bundle 3, QA Inline 16, Final Random 4; cannot compare across stages
QGR2645430 have multiple reports with different content
CE Broken seam (116), EC Asymmetry (72), CD Needle hole (57), Q61 Lace raw edge or broken lace (25), DD Thread not straight/waving (24) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| Pilot Run | 3 reports | 0 | — |
| QA 1st Bundle | 1 reports | — | 92.3% |
| QC Inline | 25 reports required on prod. days 24/66 (36%) | — | 52.7% |
| QC Endline | 30 days | — | 16.0% |
| QA Inline | 6 reports | 6 | 27.1% |
| Final Random | 7 reports | 0 | 3.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB06 | 13.2% 6479 / 24 days | 28.1% | PASS | 08/14–09/14 | ED Gathering crease, BA Thread ends, CC Skip stitch |
| CB16 | 25.4% 1967 / 7 days | 25.0% | PASS | 09/03–10/03 | ED Gathering crease, BA Thread ends, CD Needle hole |
| CB30 | 0.0% 33 / 2 days | — | — | 09/30–10/02 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB06 | 24 | 48 | 16 (33%) | 24 | 8 | 09/07, 09/08, 09/09, 09/12, 09/14 |
| CB16 | 7 | 14 | 8 (57%) | 3 | 3 | 09/03, 10/02, 10/03 |
| CB30 | 2 | 4 | 0 (0%) | 2 | 2 | 09/30, 10/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | Pilot Run | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|---|
| ED Gathering crease | 1 | 3 | 1 | 131 | 671 | 3 | 2 |
| BA Thread ends | 259 | 10 | |||||
| CC Skip stitch | 1 | 18 | 128 | 1 | 1 | ||
| CE Broken seam | 1 | 55 | 59 | 1 | |||
| DB Run-off stitching | 13 | 71 | 3 | ||||
| EC Asymmetry | 3 | 3 | 1 | 25 | 34 | 6 | |
| EA Unsmooth/puckering/bubbling | 1 | 4 | 29 | 12 | 7 | 5 | |
| CD Needle hole | 2 | 55 |
Found 10 times (27 pcs, 09/30–10/08) in earlier stages; latest Shipment Sample (10/06) still has 6 major
FA Wrong material (Shipment Sample 10/06): first found in later stages, never recorded before
Latest Shipment Sample (10/06): CG Grinning 2 (earlier 12 times)
EA Unsmooth/puckering/bubbling 2, EI Inaccurate/skewed stitching 2 pcs (later stages total)
QA 1st Bundle 1; cannot compare across stages
EC Asymmetry (QA 6); zero in QC Endline records
QGR2645636 have multiple reports with different content
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (5 Major), EC Asymmetry (3 Major), GA Missing bartack/button (2 Major), ED Gathering crease (2 Major); Only QC 1st Bundle: CG Grinning (4), CA Thread tension (3), BD Snagging (1); Both: CC Skip stitch (2/1); DHU QC 1st Bundle — / QA 1st Bundle 70.0%
BA Thread ends (186), AD Fabric stains (121), CC Skip stitch (114), CE Broken seam (48), CA Thread tension (47) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 70.0% |
| QC Inline | 13 reports required on prod. days 13/16 (81%) | — | — |
| QC Endline | 8 days | — | 23.1% |
| Shipment Sample | 2 reports | 0 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS16 | 23.1% 1880 / 8 days | — | — | 09/30–10/08 | BA Thread ends, AD Fabric stains, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS16 | 8 | 16 | 13 (81%) | 2 | 1 | 09/30, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | Shipment Sample |
|---|---|---|---|---|---|
| BA Thread ends | 4 | 182 | |||
| AD Fabric stains | 10 | 111 | |||
| CC Skip stitch | 2 | 1 | 17 | 94 | |
| CE Broken seam | 23 | 25 | |||
| CA Thread tension | 3 | 44 | |||
| CG Grinning | 4 | 32 | 2 | ||
| EC Asymmetry | 3 | 24 | 6 | ||
| DB Run-off stitching | 16 | 4 |
Found 14 times (23 pcs, 09/21–10/06) in earlier stages; latest Shipment Sample (10/06) still has 3 major
Latest Shipment Sample (10/06): CE Broken seam 1 (earlier 14 times), DD Thread not straight/waving 1 (earlier 7 times), AD Fabric stains 1 (earlier 16 times)
BA Thread ends 10, EI Inaccurate/skewed stitching 1 pcs (later stages total)
QA 1st Bundle 3, QA Inline 3; cannot compare across stages
Only QA 1st Bundle: DD Thread not straight/waving (2 Major), EI Inaccurate/skewed stitching (1 Major), CE Broken seam (1 Major); Only QC 1st Bundle: CG Grinning (3), BD Snagging (1), CC Skip stitch (1); Both: BA Thread ends (6/2), ED Gathering crease (1/5), CB Broken stitch (3/2), DJ Pleat (3/1), EC Asymmetry (1/2), BB Missing cut seam allowance (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
CC Skip stitch (350), ED Gathering crease (184), EA Uneven seam allowance (117), DB Run-off stitching (64), CD Needle hole (47) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 8 reports required on prod. days 8/30 (27%) | — | — |
| QC Endline | 15 days | — | 17.8% |
| QA Inline | 1 reports | 1 | 43.8% |
| Shipment Sample | 1 reports | 0 | — |
| Pre-final | 1 reports | 0 | 1.6% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP19 | 17.8% 8900 / 15 days | 43.8% | — | 09/21–10/08 | BA Thread ends, CC Skip stitch, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP19 | 15 | 30 | 8 (27%) | 15 | 7 | 10/03, 10/05, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 6 | 2 | 91 | 494 | 10 | ||
| CC Skip stitch | 1 | 2 | 346 | 1 | |||
| ED Gathering crease | 1 | 5 | 1 | 177 | |||
| AD Fabric stains | 5 | 166 | 2 | 1 | 2 | ||
| EA Uneven seam allowance | 117 | ||||||
| CE Broken seam | 1 | 77 | 2 | 1 | |||
| DB Run-off stitching | 64 | ||||||
| CD Needle hole | 47 |
Found 35 times (84 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/05) still has 2 major
Found 18 times (220 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/05) still has 2 major
Found 10 times (49 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/05) still has 1 major
Found 15 times (161 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/05) still has 1 major
Found 24 times (1280 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/05) still has 2 major
DI High-low/uneven (Pre-final 10/02), DE Cut to broken (Pre-final 10/05): first found in later stages, never recorded before
EC Asymmetry 2, CC Skip stitch 8, GA Missing bartack/button 1 pcs (later stages total)
QA 1st Bundle 8, QA Inline 3, Pre-final 2; cannot compare across stages
10/08 CS03 261526-2 (defective pcs 179 > defects 159)
Only QA 1st Bundle: CG Grinning (2 Major), DA Exceed seam allowance (1 Major), EI Inaccurate/skewed stitching (1 Major), AC Fabric hole (1 Major), CE Broken seam (1 Major); Only QC 1st Bundle: DJ Pleat (2), EA Unsmooth/puckering/bubbling (2); Both: EC Asymmetry (5/4), CB Broken stitch (3/4), AD Fabric stains (5/1), BA Thread ends (2/3), CA Thread tension (2/2), BB Missing cut seam allowance (1/2); DHU QC 1st Bundle — / QA 1st Bundle 75.0%
EB Measurement issue (152), ED Gathering crease (49), CD Needle hole (47), GB Missing sewing operation (44), DJ Pleat (32) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 2 reports | — | — |
| QA 1st Bundle | 2 reports | — | 75.0% |
| QC Inline | 19 reports required on prod. days 19/34 (56%) | — | — |
| QC Endline | 11 days | — | 31.6% |
| QA Inline | 1 reports | 1 | 28.1% |
| Pre-final | 2 reports | 2 | 7.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS03 | 17.0% 3967 / 6 days | — | — | 10/02–10/08 | BA Thread ends, EB Measurement issue, GB Missing sewing operation |
| CS24 | 48.9% 3347 / 11 days | 28.1% | — | 09/26–10/08 | BA Thread ends, CC Skip stitch, AD Fabric stains |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS24 | 11 | 22 | 14 (64%) | 7 | 1 | 09/29, 10/03, 10/05, 10/07, 10/08 |
| CS03 | 6 | 12 | 5 (42%) | 6 | 1 | 10/03, 10/05, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Pre-final |
|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 3 | 11 | 1262 | 2 | 17 |
| CC Skip stitch | 7 | 379 | 8 | |||
| AD Fabric stains | 5 | 1 | 1 | 213 | 2 | |
| DB Run-off stitching | 9 | 152 | 2 | |||
| EB Measurement issue | 152 | |||||
| CB Broken stitch | 3 | 4 | 75 | 2 | 5 | |
| AC Fabric hole | 1 | 10 | 37 | 1 | 1 | |
| ED Gathering crease | 37 | 12 |
6 major: CG Grinning 1, DJ Pleat 1, CB Broken stitch 1, EC Asymmetry 1, DE Cut to broken 1, EA Unsmooth/puckering/bubbling 1
Found 10 times (31 pcs, 09/14–10/08) in earlier stages; latest Shipment Sample (10/03) still has 1 major
Found 11 times (44 pcs, 09/14–10/07) in earlier stages; latest Shipment Sample (10/03) still has 1 major
Found 15 times (63 pcs, 09/16–10/08) in earlier stages; latest Shipment Sample (10/03) still has 1 major
Found 14 times (61 pcs, 09/14–10/05) in earlier stages; latest Shipment Sample (10/03) still has 1 major
DE Cut to broken (Pre-final 09/18), BB Missing cut seam allowance (Pre-final 09/18): first found in later stages, never recorded before
AD Fabric stains 2, CG Grinning 1, BA Thread ends 15 pcs (later stages total)
QC 1st Bundle 14, QA 1st Bundle 4, QC Inline 221, Pre-final 2; cannot compare across stages
Only QA 1st Bundle: DA Exceed seam allowance (4 Major), CB Broken stitch (4 Major); Only QC 1st Bundle: ED Gathering crease (10); Both: EA Unsmooth/puckering/bubbling (5/8); DHU QC 1st Bundle 0.0% / QA 1st Bundle 100.0%
CC Skip stitch (507), ED Gathering crease (164), DB Run-off stitching (33), AC Fabric hole (21), GB Missing sewing operation (10) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 0.0% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 33 reports required on prod. days 33/42 (79%) | — | 25.7% |
| QC Endline | 21 days | — | 13.0% |
| QA Inline | 1 reports | 1 | 31.2% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 1 reports | 1 | 11.1% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS11 | 13.0% 10340 / 21 days | 31.2% | — | 09/14–10/08 | BA Thread ends, CC Skip stitch, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS11 | 21 | 42 | 33 (79%) | 8 | 1 | 09/23, 09/26, 09/29, 10/01, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 47 | 616 | 15 | ||||
| CC Skip stitch | 30 | 476 | 1 | ||||
| Others (no detail) | 14 | 4 | 221 | 2 | |||
| ED Gathering crease | 10 | 22 | 132 | ||||
| AD Fabric stains | 16 | 77 | 2 | ||||
| DJ Pleat | 60 | 3 | 1 | 11 | |||
| EC Asymmetry | 55 | 6 | 1 | 3 | |||
| CB Broken stitch | 4 | 40 | 1 |
Found 8 times (21 pcs, 09/18–10/07) in earlier stages; latest Shipment Sample (10/07) still has 3 major
Found 7 times (13 pcs, 09/18–10/02) in earlier stages; latest Shipment Sample (10/07) still has 1 major
Found 13 times (25 pcs, 09/19–10/07) in earlier stages; latest Shipment Sample (10/07) still has 1 major
Found 4 times (6 pcs, 09/19–10/02) in earlier stages; latest Shipment Sample (10/07) still has 1 major
DC Join stitching (Shipment Sample 10/07): first found in later stages, never recorded before
QA Inline DHU 51.6% vs QC Endline 7.6% (09/18–10/08, 17 days, 10100 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
ED Gathering crease 2, BA Thread ends 11, EI Inaccurate/skewed stitching 1, CE Broken seam 1, EA Unsmooth/puckering/bubbling 3 pcs (later stages total)
QA Inline 5, Pre-final 2; cannot compare across stages
EC Asymmetry (QA 5); zero in QC Endline records
09/19 CP20 261530 (defective pcs 31 > defects 28), 09/21 CP20 261530 (defective pcs 36 > defects 21), 09/22 CP20 261530 (defective pcs 63 > defects 58), 09/23 CP20 261530 (defective pcs 56 > defects 33)…
Only QA 1st Bundle: AD Fabric stains (3 Major), DA Exceed seam allowance (1 Major), EI Inaccurate/skewed stitching (1 Major), CE Broken seam (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: GA Missing bartack/button (2), CF Pulling yarn (1), CG Grinning (1); Both: ED Gathering crease (6/7), BA Thread ends (4/1), DJ Pleat (2/1), EC Asymmetry (2/1), BD Snagging (1/1), DE Cut to broken (1/1); DHU QC 1st Bundle — / QA 1st Bundle 95.0%
CC Skip stitch (248), CD Needle hole (23), CG Grinning (22), DJ Pleat (14), AC Fabric hole (9) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 95.0% |
| QC Inline | 10 reports required on prod. days 10/34 (29%) | — | — |
| QC Endline | 17 days | — | 7.6% |
| QA Inline | 2 reports | 2 | 51.6% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 1 reports | 0 | 1.0% |
| Final Random | 1 reports | 0 | 1.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP20 | 7.6% 10100 / 17 days | 51.6% | PASS | 09/18–10/08 | CC Skip stitch, BA Thread ends, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP20 | 17 | 34 | 10 (29%) | 17 | 7 | 10/03, 10/05, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 1 | 100 | 243 | 1 | 5 | 6 | |
| ED Gathering crease | 6 | 7 | 8 | 226 | 8 | 2 | ||
| CC Skip stitch | 245 | 3 | ||||||
| CE Broken seam | 1 | 4 | 24 | 1 | 1 | |||
| AD Fabric stains | 3 | 14 | 4 | 4 | 1 | |||
| EC Asymmetry | 2 | 1 | 16 | 2 | 3 | |||
| CD Needle hole | 23 | |||||||
| CG Grinning | 1 | 19 | 2 |
Found 13 times (22 pcs, 09/23–10/06) in earlier stages; latest Shipment Sample (09/28) still has 4 major
Found 20 times (327 pcs, 09/23–10/08) in earlier stages; latest Shipment Sample (09/28) still has 4 major
EI Inaccurate/skewed stitching (Shipment Sample 09/28): first found in later stages, never recorded before
Latest Shipment Sample (09/28): AC Fabric hole 2 (earlier 9 times), EC Asymmetry 1 (earlier 13 times), CE Broken seam 2 (earlier 12 times)
DD Thread not straight/waving 2 pcs (later stages total)
PP Sample 2, Shipment Sample 1; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 8); zero in QC Endline records
Only QA 1st Bundle: AC Fabric hole (3 Major), EI Inaccurate/skewed stitching (2 Major), CG Grinning (1 Major); Only QC 1st Bundle: DB Run-off stitching (1), DA Exceed seam allowance (1), DF Twisted seam/skewing (1), EC Asymmetry (1); Both: EA Unsmooth/puckering/bubbling (1/4), CB Broken stitch (1/2), BD Snagging (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
CC Skip stitch (72), BA Thread ends (67), EA Uneven seam allowance (53), DJ Pleat (21), EB Measurement issue (12) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 10 reports required on prod. days 10/22 (45%) | — | — |
| QC Endline | 10 days | — | 35.7% |
| QA Inline | 2 reports | 2 | 25.0% |
| Shipment Sample | 4 reports | 0 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB32 | 35.9% 1600 / 10 days | 25.0% | — | 09/28–10/08 | ED Gathering crease, CC Skip stitch, BA Thread ends |
| CB30 | 0.0% 10 / 1 days | — | — | 10/02–10/02 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB32 | 10 | 20 | 10 (50%) | 9 | 1 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CB30 | 1 | 2 | 0 (0%) | 1 | 1 | 10/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| ED Gathering crease | 1 | 30 | 296 | 4 | |||
| CC Skip stitch | 2 | 70 | |||||
| BA Thread ends | 67 | ||||||
| EA Uneven seam allowance | 53 | ||||||
| CE Broken seam | 7 | 34 | 2 | ||||
| EC Asymmetry | 1 | 11 | 22 | 3 | 1 | ||
| CB Broken stitch | 1 | 2 | 25 | 1 | 1 | ||
| EA Unsmooth/puckering/bubbling | 1 | 1 | 4 | 12 | 4 | 4 |
5 major: AD Fabric stains 1, DE Cut to broken 1, ED Gathering crease 1, EC Asymmetry 1, ED Gathering crease 1
Found 15 times (126 pcs, 09/26–10/08) in earlier stages; latest Shipment Sample (10/07) still has 2 major
Found 6 times (14 pcs, 09/28–10/07) in earlier stages; latest Shipment Sample (10/07) still has 1 major
AD Fabric stains (Pre-final 10/01): first found in later stages, never recorded before
QA Inline DHU 59.4% vs QC Endline 9.1% (09/26–10/08, 11 days, 7200 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
BA Thread ends 4, EC Asymmetry 1 pcs (later stages total)
QA 1st Bundle 1, QA Inline 3; cannot compare across stages
10/03 CP09 261535 (defective pcs 32 > defects 31), 10/08 CP09 261535 (defective pcs 76 > defects 74)
Only QA 1st Bundle: CG Grinning (1 Major); Only QC 1st Bundle: BD Snagging (2), ED Gathering crease (2), DE Cut to broken (2), EI Inaccurate/skewed stitching (2), DI High-low/uneven (2), DF Twisted seam/skewing (2), DB Run-off stitching (1), CB Broken stitch (1); Both: BA Thread ends (2/7), DJ Pleat (3/2), EA Unsmooth/puckering/bubbling (1/4); DHU QC 1st Bundle — / QA 1st Bundle 75.0%
DB Run-off stitching (162), CC Skip stitch (81), DJ Pleat (23), DI High-low/uneven (22), CE Broken seam (22) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 75.0% |
| QC Inline | 6 reports required on prod. days 6/24 (25%) | — | — |
| QC Endline | 11 days | — | 9.1% |
| QA Inline | 1 reports | 1 | 59.4% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 1 reports | 0 | 1.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP09 | 9.2% 7180 / 11 days | 59.4% | — | 09/26–10/08 | BA Thread ends, DB Run-off stitching, ED Gathering crease |
| CP07 | 0.0% 20 / 1 days | — | — | 10/03–10/03 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP09 | 11 | 22 | 6 (27%) | 11 | 5 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CP07 | 1 | 2 | 0 (0%) | 1 | 1 | 10/03 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 7 | 10 | 271 | 3 | 4 | |
| DB Run-off stitching | 1 | 161 | |||||
| ED Gathering crease | 2 | 4 | 110 | 10 | 2 | 2 | |
| CC Skip stitch | 3 | 78 | |||||
| DJ Pleat | 3 | 2 | 18 | ||||
| DI High-low/uneven | 2 | 20 | |||||
| CE Broken seam | 22 | ||||||
| DE Cut to broken | 2 | 12 | 1 |
6 major: GA Missing bartack/button 1, EI Inaccurate/skewed stitching 1, DF Twisted seam/skewing 1, ED Gathering crease 1, EI Inaccurate/skewed stitching 1, CE Broken seam 1
Found 38 times (158 pcs, 09/29–10/08) in earlier stages; latest Shipment Sample (10/07) still has 1 major
DI High-low/uneven (Pre-final 10/05), AD Fabric stains (Pre-final 10/05): first found in later stages, never recorded before
BA Thread ends 11, CF Pulling yarn 1, GA Missing bartack/button 1, EI Inaccurate/skewed stitching 2, DJ Pleat 1, CE Broken seam 1 pcs (later stages total)
QA 1st Bundle 9, QC 1st Bundle 9, QC Inline 68, QA Inline 2; cannot compare across stages
10/02 CS07 261536-1 (defective pcs 40 > defects 34), 10/05 CS07 261536-1 (defective pcs 49 > defects 48), 10/06 CS07 261536-1 (defective pcs 52 > defects 50)
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), BA Thread ends (2 Major), EC Asymmetry (2 Major), CF Pulling yarn (1 Major), GA Missing bartack/button (1 Major); Both: DF Twisted seam/skewing (16/4), ED Gathering crease (5/3); DHU QC 1st Bundle — / QA 1st Bundle 62.5%
CC Skip stitch (108), GB Missing sewing operation (49), AC Fabric hole (23), DB Run-off stitching (18), FC Wrong label (6) did not reach later stages
EA Unsmooth/puckering/bubbling, ED Gathering crease, EC Asymmetry, CB Broken stitch, BD Snagging: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 3 reports | — | — |
| QA 1st Bundle | 2 reports | — | 62.5% |
| QC Inline | 20 reports required on prod. days 20/34 (59%) | — | — |
| QC Endline | 9 days | — | 11.5% |
| QA Inline | 2 reports | 2 | 45.3% |
| Shipment Sample | 2 reports | 2 | — |
| Pre-final | 2 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS13 | 14.2% 4656 / 7 days | 43.8% | — | 10/01–10/08 | BA Thread ends, ED Gathering crease, CC Skip stitch |
| CS07 | 8.5% 4096 / 9 days | 46.9% | — | 09/29–10/08 | BA Thread ends, DF Twisted seam/skewing, ED Gathering crease |
| CS04 | 0.0% 10 / 1 days | — | — | 10/05–10/05 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS07 | 9 | 18 | 12 (67%) | 4 | 2 | 09/29, 09/30, 10/01, 10/07 |
| CS13 | 7 | 14 | 8 (57%) | 5 | 1 | 10/01, 10/05, 10/06, 10/07, 10/08 |
| CS04 | 1 | 2 | 0 (0%) | 1 | 1 | 10/05 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 22 | 499 | 11 | 11 | ||
| ED Gathering crease | 5 | 3 | 57 | 192 | 3 | 4 | 1 |
| DF Twisted seam/skewing | 16 | 4 | 71 | 67 | 1 | 1 | |
| CC Skip stitch | 108 | ||||||
| Others (no detail) | 9 | 9 | 68 | 2 | |||
| GB Missing sewing operation | 14 | 35 | |||||
| CF Pulling yarn | 1 | 46 | 1 | ||||
| EC Asymmetry | 2 | 15 | 18 | 4 | 1 | 3 |
Found 15 times (761 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/01) still has 15 major
Found 5 times (10 pcs, 09/26–10/05) in earlier stages; latest Pre-final (10/01) still has 1 major
Found 12 times (164 pcs, 09/26–10/08) in earlier stages; latest Pre-final (10/01) still has 1 major
DE Cut to broken (Pre-final 10/01): first found in later stages, never recorded before
Pre-final 5; cannot compare across stages
EC Asymmetry (793), ED Gathering crease (296), CC Skip stitch (79), EA Uneven seam allowance (15), EB Measurement issue (13) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 0 reports required on prod. days 0/24 (0%) | — | — |
| QC Endline | 11 days | — | 17.9% |
| QA Inline | 4 reports | 4 | 53.1% |
| Pre-final | 1 reports | 1 | 11.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP02 | 18.0% 13480 / 11 days | 53.1% | — | 09/26–10/08 | EC Asymmetry, AD Fabric stains, BA Thread ends |
| CP18 | 0.0% 20 / 1 days | — | — | 09/30–09/30 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP02 | 11 | 22 | 0 (0%) | 11 | 11 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CP18 | 1 | 2 | 0 (0%) | 1 | 1 | 09/30 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Endline | QA Inline | Pre-final |
|---|---|---|---|---|
| EC Asymmetry | 2 | 761 | 30 | |
| AD Fabric stains | 6 | 748 | 7 | 15 |
| BA Thread ends | 1 | 344 | 6 | 4 |
| ED Gathering crease | 293 | 3 | ||
| EA Unsmooth/puckering/bubbling | 1 | 162 | 1 | 1 |
| CC Skip stitch | 79 | |||
| EA Uneven seam allowance | 15 | |||
| EB Measurement issue | 13 |
9 major: AD Fabric stains 1, DD Thread not straight/waving 1, DA Exceed seam allowance 1, CG Grinning 1, EA Unsmooth/puckering/bubbling 1, AD Fabric stains 1, EI Inaccurate/skewed stitching 1, AC Fabric hole 1, CB Broken stitch 1
PP Sample 6; cannot compare across stages
AD Fabric stains, DD Thread not straight/waving, DA Exceed seam allowance, CG Grinning, EA Unsmooth/puckering/bubbling, EI Inaccurate/skewed stitching, AC Fabric hole, CB Broken stitch: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| Pilot Run | 2 reports | 0 | — |
| Shipment Sample | 1 reports | 1 | — |
| Defect | PP Sample | Pilot Run | Shipment Sample |
|---|---|---|---|
| Others (no detail) | 6 | ||
| AD Fabric stains | 1 | 2 | |
| CG Grinning | 2 | 1 | |
| DD Thread not straight/waving | 1 | 1 | |
| AC Fabric hole | 1 | 1 | |
| EC Asymmetry | 1 | 1 | |
| ED Gathering crease | 2 | ||
| DA Exceed seam allowance | 1 |
Found 11 times (65 pcs, 09/15–09/21) in earlier stages; latest Final Random (09/26) still has 3 major
DB Run-off stitching (Final Random 09/26): first found in later stages, never recorded before
DJ Pleat 1, BA Thread ends 4 pcs (later stages total)
QA 1st Bundle 2; cannot compare across stages
EC Asymmetry (190), ED Gathering crease (110), EA Unsmooth/puckering/bubbling (25), CB Broken stitch (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 65.0% |
| QC Inline | 0 reports required on prod. days 0/14 (0%) | — | — |
| QC Endline | 7 days | — | 12.4% |
| QA Inline | 1 reports | 1 | 50.0% |
| Final Random | 2 reports | 0 | 2.9% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP02 | 12.4% 3222 / 7 days | 50.0% | PASS | 09/15–09/22 | EC Asymmetry, ED Gathering crease, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP02 | 7 | 14 | 0 (0%) | 7 | 7 | 09/17, 09/18, 09/19, 09/21, 09/22 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|
| EC Asymmetry | 1 | 188 | 1 | |
| ED Gathering crease | 3 | 106 | 1 | |
| CC Skip stitch | 61 | 4 | 3 | |
| EA Unsmooth/puckering/bubbling | 4 | 21 | ||
| BA Thread ends | 15 | 4 | ||
| CB Broken stitch | 5 | |||
| CG Grinning | 2 | 1 | ||
| CE Broken seam | 3 |
Found 11 times (76 pcs, 09/18–09/29) in earlier stages; latest Shipment Sample (09/30) still has 3 major
CB Broken stitch (Pre-final 09/22), BB Missing cut seam allowance (Pre-final 09/26): first found in later stages, never recorded before
Latest Shipment Sample (09/30): ED Gathering crease 1 (earlier 12 times), EA Unsmooth/puckering/bubbling 1 (earlier 7 times)
BA Thread ends 22 pcs (later stages total)
09/18 CP15 261972 (defective pcs 12 > defects 11), 09/29 CP15 261972 (defective pcs 14 > defects 11)
AC Fabric hole (44), EB Measurement issue (16), EI Inaccurate/skewed stitching (14), CC Skip stitch (10), CG Grinning (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 0 reports required on prod. days 0/20 (0%) | — | — |
| QC Endline | 10 days | — | 10.5% |
| QA Inline | 3 reports | 3 | 43.8% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 2 reports | 1 | 2.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP15 | 10.5% 2808 / 10 days | 43.8% | — | 09/18–10/03 | ED Gathering crease, AD Fabric stains, AC Fabric hole |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP15 | 10 | 20 | 0 (0%) | 10 | 10 | 09/25, 09/26, 09/28, 09/29, 10/03 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|
| ED Gathering crease | 5 | 115 | 2 | 1 | |
| AD Fabric stains | 2 | 72 | 2 | 3 | 4 |
| AC Fabric hole | 40 | 4 | |||
| EA Unsmooth/puckering/bubbling | 34 | 1 | 1 | ||
| BA Thread ends | 1 | 4 | 5 | 22 | |
| EB Measurement issue | 16 | ||||
| EI Inaccurate/skewed stitching | 4 | 10 | |||
| CC Skip stitch | 6 | 4 |
Found 19 times (40 pcs, 09/29–10/07) in earlier stages; latest Pre-final (10/06) still has 3 major
Found 14 times (22 pcs, 09/29–10/07) in earlier stages; latest Pre-final (10/06) still has 1 major
Found 22 times (241 pcs, 09/29–10/08) in earlier stages; latest Pre-final (10/06) still has 3 major
Found 12 times (99 pcs, 09/30–10/08) in earlier stages; latest Pre-final (10/06) still has 4 major
Found 7 times (32 pcs, 09/30–10/08) in earlier stages; latest Pre-final (10/06) still has 1 major
QC Inline 2; cannot compare across stages
09/29 CS23 262034 (defective pcs 21 > defects 16), 09/30 CS23 262034 (defective pcs 117 > defects 83), 10/01 CS23 262034 (defective pcs 161 > defects 123), 10/02 CS23 262034 (defective pcs 176 > defects 134)…
QGR2643947 have multiple reports with different content
Only QA 1st Bundle: DI High-low/uneven (3 Major), BA Thread ends (2 Major), DE Cut to broken (1 Major), AD Fabric stains (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: DJ Pleat (1); Both: BD Snagging (2/3), GB Missing sewing operation (2/2), CB Broken stitch (2/1); DHU QC 1st Bundle — / QA 1st Bundle 35.0%
CC Skip stitch (200), ED Gathering crease (133), DF Twisted seam/skewing (64), AC Fabric hole (48), DB Run-off stitching (39) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 2 reports | — | 35.0% |
| QC Inline | 16 reports required on prod. days 16/18 (89%) | — | — |
| QC Endline | 9 days | — | 11.8% |
| QA Inline | 5 reports | 5 | 25.0% |
| Pre-final | 2 reports | 2 | 5.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS23 | 11.8% 9371 / 9 days | 25.0% | — | 09/29–10/08 | BA Thread ends, AD Fabric stains, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS23 | 9 | 18 | 16 (89%) | 1 | 1 | 09/29 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Pre-final |
|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 24 | 316 | 10 | 16 | |
| AD Fabric stains | 1 | 17 | 215 | 8 | 3 | |
| CC Skip stitch | 10 | 190 | ||||
| ED Gathering crease | 5 | 128 | ||||
| EC Asymmetry | 91 | 8 | 6 | |||
| DF Twisted seam/skewing | 64 | |||||
| AC Fabric hole | 48 | |||||
| CB Broken stitch | 2 | 1 | 35 | 2 | 6 |
3 major: EC Asymmetry 1, AD Fabric stains 2
Found 20 times (64 pcs, 08/08–08/22) in earlier stages; latest Pre-final (08/26) still has 3 major
Found 16 times (95 pcs, 08/08–08/24) in earlier stages; latest Pre-final (08/26) still has 2 major
Found 4 times (6 pcs, 08/10–08/17) in earlier stages; latest Pre-final (08/26) still has 2 major
HA Poor pressing (Pre-final 08/26): first found in later stages, never recorded before
EC Asymmetry 1, AC Fabric hole 1 pcs (later stages total)
QC Inline 2; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 7); zero in QC Endline records
08/10 CS19 261381 (defective pcs 17 > defects 16)
Only QA 1st Bundle: DE Cut to broken (3 Major), EA Unsmooth/puckering/bubbling (1 Major), AC Fabric hole (1 Major), DF Twisted seam/skewing (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: BA Thread ends (4), CC Skip stitch (3), CG Grinning (1), GA Missing bartack/button (1); Both: ED Gathering crease (2/4), AD Fabric stains (3/2); DHU QC 1st Bundle 70.0% / QA 1st Bundle 65.0%
DD Thread not straight/waving (10), CC Skip stitch (9), DI High-low/uneven (9), EA Unsmooth/puckering/bubbling (8), DB Run-off stitching (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 70.0% |
| QA 1st Bundle | 1 reports | — | 65.0% |
| QC Inline | 4 reports required on prod. days 4/30 (13%) | — | 24.7% |
| QC Endline | 15 days | — | 10.0% |
| QA Inline | 2 reports | 2 | 29.7% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 1 reports | 1 | 7.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS19 | 10.0% 2184 / 15 days | 29.7% | — | 08/08–10/06 | BA Thread ends, AD Fabric stains, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS19 | 15 | 30 | 4 (13%) | 15 | 11 | 08/21, 08/22, 08/24, 09/01, 10/06 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 24 | 79 | 10 | |||
| AD Fabric stains | 3 | 2 | 13 | 74 | 3 | 2 | 2 |
| ED Gathering crease | 2 | 4 | 16 | 40 | 2 | 3 | |
| Others (no detail) | 2 | 14 | |||||
| DD Thread not straight/waving | 10 | ||||||
| CC Skip stitch | 3 | 6 | |||||
| DI High-low/uneven | 8 | 1 | |||||
| EA Unsmooth/puckering/bubbling | 1 | 7 |
GB Missing sewing operation (Final Random 09/02), EI Inaccurate/skewed stitching (Final Random 09/02): first found in later stages, never recorded before
QA Inline DHU 32.3% vs QC Inline 21.1%; QC Inline may be missing defects
Latest Final Random (09/09): CB Broken stitch 2 (earlier 3 times), AD Fabric stains 2 (earlier 10 times)
EC Asymmetry 1, EE Raw edge 1, EA Unsmooth/puckering/bubbling 1, ED Gathering crease 1, AC Fabric hole 2 pcs (later stages total)
EC Asymmetry (QA 5); zero in QC Endline records
08/07 CB25 261119 (defective pcs 30 > defects 18), 08/08 CB25 261119 (defective pcs 28 > defects 18), 08/10 CB25 261119 (defective pcs 23 > defects 15), 08/11 CB25 261119 (defective pcs 16 > defects 12)…
Only QA 1st Bundle: CH Incorrect stitch density (2 Major), EE Raw edge (2 Major), AD Fabric stains (2 Major), CC Skip stitch (1 Major), DJ Pleat (1 Major), CE Broken seam (1 Major), DI High-low/uneven (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: BA Thread ends (3), DA Exceed seam allowance (2), DE Cut to broken (2); Both: EC Asymmetry (5/2); DHU QC 1st Bundle 92.3% / QA 1st Bundle 100.0%
BA Thread ends (419), Q94 Glue marks (116), EA Uneven seam allowance (77), EH Poor lamination/bonding (34), CD Needle hole (27) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 92.3% |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 7 reports required on prod. days 7/42 (17%) | — | 21.1% |
| QC Endline | 20 days | — | 11.3% |
| QA Inline | 3 reports | 3 | 32.3% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 3 reports | 0 | 3.7% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB25 | 11.3% 8651 / 20 days | 32.3% | PASS | 08/07–08/31 | BA Thread ends, ED Gathering crease, Q94 Glue marks |
| CB30 | 0.0% 10 / 1 days | — | — | 08/26–08/26 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB25 | 20 | 40 | 7 (18%) | 20 | 13 | 08/25, 08/26, 08/28, 08/29, 08/31 |
| CB30 | 1 | 2 | 0 (0%) | 1 | 1 | 08/26 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 3 | 15 | 397 | 4 | |||
| ED Gathering crease | 4 | 192 | 1 | 1 | |||
| Q94 Glue marks | 116 | ||||||
| Others (no detail) | 98 | ||||||
| EA Uneven seam allowance | 77 | ||||||
| AD Fabric stains | 2 | 8 | 29 | 5 | |||
| EC Asymmetry | 5 | 2 | 28 | 4 | 1 | ||
| EH Poor lamination/bonding | 33 | 1 |
AC Fabric hole (Final Random 10/05): first found in later stages, never recorded before
QA Inline DHU 55.0% vs QC Endline 9.6% (09/29–10/08, 9 days, 6018 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
10/06 CP11 261512 (defective pcs 127 > defects 124), 10/07 CP18 261512 (defective pcs 24 > defects 15), 10/08 CP18 261512 (defective pcs 36 > defects 22)
CC Skip stitch (154), EB Measurement issue (54), EA Unsmooth/puckering/bubbling (34), EA Uneven seam allowance (24), DK Twisted shoulder strap (21) did not reach later stages
EI Inaccurate/skewed stitching, EC Asymmetry, ED Gathering crease, CB Broken stitch, CF Pulling yarn: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 90.0% |
| QC Inline | 2 reports required on prod. days 2/22 (9%) | — | — |
| QC Endline | 9 days | — | 9.6% |
| QA Inline | 5 reports | 5 | 55.0% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 1 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP11 | 10.5% 5158 / 9 days | 57.0% | PASS | 09/29–10/08 | BA Thread ends, CC Skip stitch, ED Gathering crease |
| CP18 | 4.3% 860 / 2 days | 46.9% | — | 10/07–10/08 | ED Gathering crease, BA Thread ends, EA Uneven seam allowance |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP11 | 9 | 18 | 2 (11%) | 9 | 7 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CP18 | 2 | 4 | 0 (0%) | 2 | 2 | 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|
| BA Thread ends | 186 | 12 | 12 | |||
| CC Skip stitch | 4 | 148 | 2 | |||
| ED Gathering crease | 3 | 5 | 77 | 1 | 2 | |
| EC Asymmetry | 6 | 17 | 34 | 3 | ||
| EB Measurement issue | 54 | |||||
| EA Unsmooth/puckering/bubbling | 2 | 31 | 1 | |||
| EI Inaccurate/skewed stitching | 4 | 2 | 20 | 4 | 3 | |
| EA Uneven seam allowance | 24 |
Shipment Sample 09/17 QGR2641464 (FAIL); please check if the report was completed
QA Inline 4; cannot compare across stages
EC Asymmetry (QA 10); zero in QC Endline records
Only QA 1st Bundle: BD Snagging (2 Major); Only QC 1st Bundle: DA Exceed seam allowance (2), DJ Pleat (2), CB Broken stitch (1); Both: AD Fabric stains (2/2), EC Asymmetry (1/2), DB Run-off stitching (1/1); DHU QC 1st Bundle — / QA 1st Bundle 53.8%
BA Thread ends (181), CC Skip stitch (141), EB Measurement issue (111), DB Run-off stitching (86), DA Exceed seam allowance (59) did not reach later stages
EI Inaccurate/skewed stitching, EA Unsmooth/puckering/bubbling, ED Gathering crease, EC Asymmetry: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 53.8% |
| QC Inline | 26 reports required on prod. days 20/26 (77%) | — | — |
| QC Endline | 8 days | — | 11.8% |
| QA Inline | 3 reports | 3 | 46.9% |
| Shipment Sample | 2 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB26 | 13.9% 2158 / 6 days | 50.0% | — | 10/01–10/08 | CC Skip stitch, EB Measurement issue, BA Thread ends |
| CB28 | 9.6% 2121 / 7 days | 45.3% | — | 09/29–10/06 | BA Thread ends, DB Run-off stitching, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB28 | 7 | 14 | 13 (93%) | 1 | 1 | 10/06 |
| CB26 | 6 | 12 | 7 (58%) | 3 | 2 | 10/03, 10/06, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 5 | 176 | |||||
| CC Skip stitch | 141 | ||||||
| EB Measurement issue | 109 | 2 | |||||
| DB Run-off stitching | 1 | 1 | 1 | 48 | 34 | 1 | |
| EC Asymmetry | 1 | 1 | 2 | 60 | 9 | 1 | |
| DA Exceed seam allowance | 2 | 57 | |||||
| DJ Pleat | 2 | 44 | 2 | ||||
| AD Fabric stains | 1 | 2 | 2 | 29 | 8 | 2 |
HA Poor pressing (Final Random 10/02): first found in later stages, never recorded before
Latest Final Random (10/02): CB Broken stitch 1 (earlier 18 times), DF Twisted seam/skewing 1 (earlier 6 times), CC Skip stitch 1 (earlier 12 times), DB Run-off stitching 1 (earlier 11 times), AC Fabric hole 1 (earlier 7 times)
EC Asymmetry 7, DJ Pleat 1, DI High-low/uneven 1 pcs (later stages total)
Pre-final 6; cannot compare across stages
09/26 CS22 261570 (defective pcs 46 > defects 44)
Only QA 1st Bundle: CG Grinning (2 Major), DI High-low/uneven (2 Major), CC Skip stitch (1 Major), EA Unsmooth/puckering/bubbling (1 Major), DE Cut to broken (1 Major), CF Pulling yarn (1 Major), EI Inaccurate/skewed stitching (1 Major); Only QC 1st Bundle: DJ Pleat (3), ED Gathering crease (2), CB Broken stitch (2); Both: EC Asymmetry (5/4), BA Thread ends (4/3), DF Twisted seam/skewing (2/1); DHU QC 1st Bundle 90.0% / QA 1st Bundle 85.0%
EB Measurement issue (20), DD Thread not straight/waving (14), EI Inaccurate/skewed stitching (8), DA Exceed seam allowance (8) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 90.0% |
| QA 1st Bundle | 1 reports | — | 85.0% |
| QC Inline | 12 reports required on prod. days 12/20 (60%) | — | 89.8% |
| QC Endline | 10 days | — | 24.1% |
| QA Inline | 3 reports | 3 | 34.4% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 1 reports | 1 | 11.2% |
| Final Random | 1 reports | 0 | 4.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS22 | 24.1% 2599 / 10 days | 34.4% | PASS | 09/16–09/28 | BA Thread ends, CC Skip stitch, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS22 | 10 | 20 | 12 (60%) | 6 | 2 | 09/17, 09/18, 09/19, 09/26, 09/28 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 3 | 57 | 194 | 6 | 7 | 3 | |
| CC Skip stitch | 1 | 2 | 143 | 1 | 1 | |||
| ED Gathering crease | 2 | 124 | 1 | |||||
| DB Run-off stitching | 3 | 122 | 1 | |||||
| EC Asymmetry | 5 | 4 | 32 | 17 | 8 | 1 | 6 | |
| CB Broken stitch | 2 | 34 | 1 | 1 | 1 | |||
| DJ Pleat | 3 | 19 | 3 | 1 | ||||
| EB Measurement issue | 15 | 5 |
HA Poor pressing (Pre-final 09/22), CF Pulling yarn (Shipment Sample 09/25), DA Exceed seam allowance (Final Random 10/06): first found in later stages, never recorded before
Latest Final Random (10/06): AD Fabric stains 2 (earlier 18 times), ED Gathering crease 2 (earlier 9 times)
CB Broken stitch 2, CC Skip stitch 1, DF Twisted seam/skewing 5 pcs (later stages total)
QA 1st Bundle 1, QA Inline 1, QC Inline 4; cannot compare across stages
Only QA 1st Bundle: BA Thread ends (2 Major), DI High-low/uneven (1 Major), ED Gathering crease (1 Major), CG Grinning (1 Major), DB Run-off stitching (1 Major); Only QC 1st Bundle: EB Measurement issue (2), EC Asymmetry (1); Both: DF Twisted seam/skewing (3/2), AD Fabric stains (2/2), CC Skip stitch (2/1), CB Broken stitch (1/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 65.0%
EC Asymmetry (78), DB Run-off stitching (42), DI High-low/uneven (17) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 2 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 65.0% |
| QC Inline | 6 reports required on prod. days 6/20 (30%) | — | — |
| QC Endline | 10 days | — | 20.4% |
| QA Inline | 3 reports | 3 | 35.4% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 1 | 12.0% |
| Final Random | 1 reports | 0 | 4.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS04 | 20.4% 2100 / 10 days | 35.4% | PASS | 09/17–10/03 | BA Thread ends, AD Fabric stains, EC Asymmetry |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS04 | 10 | 20 | 6 (30%) | 9 | 5 | 09/22, 09/25, 09/26, 09/28, 10/03 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 143 | 3 | 5 | 7 | |||
| AD Fabric stains | 2 | 2 | 7 | 115 | 4 | 2 | 2 | |
| EC Asymmetry | 1 | 2 | 72 | 3 | ||||
| CC Skip stitch | 2 | 1 | 2 | 42 | 6 | 1 | ||
| DB Run-off stitching | 1 | 3 | 37 | 1 | ||||
| ED Gathering crease | 1 | 4 | 19 | 2 | 2 | 2 | ||
| CB Broken stitch | 1 | 1 | 12 | 6 | 2 | |||
| DI High-low/uneven | 1 | 14 | 2 |
GA Missing bartack/button (Pre-final 09/26): first found in later stages, never recorded before
Latest Final Random (10/07): ED Gathering crease 2 (earlier 16 times), DJ Pleat 2 (earlier 7 times), CF Pulling yarn 1 (earlier 5 times), AD Fabric stains 1 (earlier 8 times)
CB Broken stitch 6, DE Cut to broken 2, CC Skip stitch 1 pcs (later stages total)
QC Inline 1; cannot compare across stages
09/19 CS23 261572 (defective pcs 26 > defects 23), 09/21 CS23 261572 (defective pcs 95 > defects 82), 09/22 CS23 261572 (defective pcs 56 > defects 51), 09/23 CS23 261572 (defective pcs 99 > defects 66)…
Only QA 1st Bundle: ED Gathering crease (2 Major), CF Pulling yarn (2 Major), DB Run-off stitching (1 Major), DE Cut to broken (1 Major), EI Inaccurate/skewed stitching (1 Major), DJ Pleat (1 Major), CG Grinning (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: DI High-low/uneven (3), CB Broken stitch (2), BD Snagging (1); Both: EC Asymmetry (1/2); DHU QC 1st Bundle — / QA 1st Bundle 60.0%
DD Thread not straight/waving (41), DF Twisted seam/skewing (39), AC Fabric hole (28), EC Asymmetry (25), DI High-low/uneven (24) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 11 reports required on prod. days 11/18 (61%) | — | — |
| QC Endline | 9 days | — | 22.2% |
| QA Inline | 2 reports | 2 | 23.4% |
| Shipment Sample | 1 reports | 0 | — |
| Pre-final | 1 reports | 1 | 15.2% |
| Final Random | 1 reports | 0 | 4.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS23 | 22.2% 2243 / 9 days | 23.4% | PASS | 09/19–09/30 | CC Skip stitch, BA Thread ends, AD Fabric stains |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS23 | 9 | 18 | 11 (61%) | 4 | 3 | 09/19, 09/28, 09/29, 09/30 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 43 | 108 | 2 | 4 | 7 | ||
| CC Skip stitch | 120 | 1 | |||||
| AD Fabric stains | 96 | 3 | 1 | ||||
| ED Gathering crease | 2 | 8 | 47 | 2 | 2 | 2 | |
| CB Broken stitch | 2 | 37 | 2 | 6 | |||
| DD Thread not straight/waving | 14 | 25 | 2 | ||||
| DF Twisted seam/skewing | 1 | 37 | 1 | ||||
| AC Fabric hole | 27 | 1 |
CB Broken stitch (Pre-final 10/06), EF Cup/pocket issue (Pre-final 10/06): first found in later stages, never recorded before
Latest Shipment Sample (10/06): EC Asymmetry 2 (earlier 25 times), EA Unsmooth/puckering/bubbling 1 (earlier 11 times)
BA Thread ends 7, CC Skip stitch 1 pcs (later stages total)
QC 1st Bundle 6, QC Inline 70; cannot compare across stages
10/01 CS12 262019 (defective pcs 58 > defects 19), 10/02 CS12 262019 (defective pcs 51 > defects 22), 10/03 CS12 262019 (defective pcs 69 > defects 23), 10/05 CS12 262019 (defective pcs 59 > defects 28)…
QGR2644567 have multiple reports with different content
Only QA 1st Bundle: BA Thread ends (2 Major), EA Unsmooth/puckering/bubbling (2 Major), DI High-low/uneven (1 Major), ED Gathering crease (1 Major), CG Grinning (1 Major), DF Twisted seam/skewing (1 Major); Only QC 1st Bundle: DC Join stitching (4); Both: EC Asymmetry (3/2); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
ED Gathering crease (89), FC Wrong label (10), CG Grinning (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 11 reports required on prod. days 11/16 (69%) | — | — |
| QC Endline | 8 days | — | 6.5% |
| QA Inline | 3 reports | 2 | 22.9% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 1 | 6.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS12 | 6.5% 2743 / 8 days | — | — | 09/30–10/08 | BA Thread ends, ED Gathering crease, EC Asymmetry |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS12 | 8 | 16 | 11 (69%) | 4 | 1 | 09/30, 10/01, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| EC Asymmetry | 3 | 2 | 54 | 34 | 9 | 2 | 4 |
| ED Gathering crease | 1 | 23 | 59 | 6 | |||
| Others (no detail) | 6 | 70 | |||||
| BA Thread ends | 2 | 59 | 2 | 7 | |||
| EA Unsmooth/puckering/bubbling | 2 | 26 | 3 | 1 | |||
| CC Skip stitch | 24 | 1 | |||||
| FC Wrong label | 10 | ||||||
| CG Grinning | 1 | 4 |
IA 2nd operation issue (Final Random 10/01), DK Twisted shoulder strap (Final Random 10/01), GA Missing bartack/button (Final Random 10/01): first found in later stages, never recorded before
CB Broken stitch 2, EE Raw edge 4, BA Thread ends 6 pcs (later stages total)
DI High-low/uneven (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QA 1st Bundle | 1 reports | — | 18.8% |
| QA Inline | 1 reports | 1 | 10.0% |
| Final Random | 1 reports | 0 | 1.5% |
| Defect | PP Sample | QA 1st Bundle | QA Inline | Final Random |
|---|---|---|---|---|
| BA Thread ends | 3 | 6 | ||
| EE Raw edge | 3 | 4 | ||
| DI High-low/uneven | 6 | |||
| CB Broken stitch | 2 | 2 | ||
| EI Inaccurate/skewed stitching | 3 | |||
| BB Missing cut seam allowance | 3 | |||
| EA Unsmooth/puckering/bubbling | 1 | 2 | ||
| IA 2nd operation issue | 3 |
AD Fabric stains (Shipment Sample 09/12), AC Fabric hole (Pre-final 09/14): first found in later stages, never recorded before
Latest Final Random (10/06): DJ Pleat 1 (earlier 32 times), DE Cut to broken 1 (earlier 16 times), CC Skip stitch 2 (earlier 48 times), DF Twisted seam/skewing 1 (earlier 4 times)
EA Unsmooth/puckering/bubbling 7, EC Asymmetry 7, ED Gathering crease 1, CB Broken stitch 6, BB Missing cut seam allowance 10, DB Run-off stitching 6, EI Inaccurate/skewed stitching 3, CG Grinning 2, GB Missing sewing operation 1, CE Broken seam 1, DD Thread not straight/waving 1 pcs (later stages total)
Shipment Sample 2; cannot compare across stages
09/16 CS26 260760-S (defective pcs 56 > defects 48)
Only QA 1st Bundle: CB Broken stitch (3 Major), DA Exceed seam allowance (1 Major), BB Missing cut seam allowance (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: DJ Pleat (3), ED Gathering crease (3); Both: EC Asymmetry (5/4), EA Unsmooth/puckering/bubbling (3/2); DHU QC 1st Bundle 70.0% / QA 1st Bundle 60.0%
DI High-low/uneven (29), DA Exceed seam allowance (22), CA Thread tension (19), GA Missing bartack/button (7) did not reach later stages
QGR2640439 Pre-final (09/14) CS25; actual production line(s) CS26 (cards show production lines only)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 70.0% |
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 36 reports required on prod. days 36/70 (51%) | — | 54.1% |
| QC Endline | 35 days | — | 18.3% |
| QA Inline | 8 reports | 8 | 35.2% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 5 reports | 3 | 3.7% |
| Final Random | 1 reports | 0 | 2.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS26 | 18.3% 14406 / 35 days | 35.2% | PASS | 08/28–10/08 | BA Thread ends, CC Skip stitch, DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS26 | 35 | 70 | 36 (51%) | 28 | 6 | 10/01, 10/05, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 1 | 66 | 1069 | 11 | 37 | 7 | ||
| CC Skip stitch | 5 | 905 | 3 | 2 | ||||
| DB Run-off stitching | 46 | 341 | 4 | 6 | ||||
| AD Fabric stains | 31 | 110 | 4 | 1 | 7 | |||
| ED Gathering crease | 3 | 6 | 122 | 1 | 1 | |||
| CB Broken stitch | 3 | 105 | 8 | 1 | 5 | |||
| EC Asymmetry | 5 | 4 | 57 | 10 | 17 | 7 | ||
| DJ Pleat | 3 | 78 | 7 | 3 | 4 | 1 |
BD Snagging (Final Random 09/07): first found in later stages, never recorded before
Latest Final Random (09/22): BA Thread ends 2 (earlier 25 times), CB Broken stitch 1 (earlier 11 times)
AD Fabric stains 1, ED Gathering crease 1 pcs (later stages total)
QA 1st Bundle 2, QA Inline 1; cannot compare across stages
Only QA 1st Bundle: BB Missing cut seam allowance (2 Major), EC Asymmetry (2 Major); Only QC 1st Bundle: DA Exceed seam allowance (4), DJ Pleat (4), EA Unsmooth/puckering/bubbling (3); Both: AD Fabric stains (4/2); DHU QC 1st Bundle 115.4% / QA 1st Bundle 61.5%
EB Measurement issue (310), EA Unsmooth/puckering/bubbling (206), DB Run-off stitching (141), EC Asymmetry (103), DJ Pleat (38) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| Pilot Run | 2 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 115.4% |
| QA 1st Bundle | 1 reports | — | 61.5% |
| QC Inline | 13 reports required on prod. days 13/38 (34%) | — | 47.4% |
| QC Endline | 19 days | — | 29.4% |
| QA Inline | 5 reports | 5 | 30.6% |
| Final Random | 3 reports | 0 | 2.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB04 | 29.4% 5023 / 19 days | 28.9% | PASS | 08/15–09/11 | AD Fabric stains, EB Measurement issue, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB04 | 19 | 38 | 13 (34%) | 19 | 6 | 09/02, 09/03, 09/04, 09/10, 09/11 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | Pilot Run | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|---|
| AD Fabric stains | 4 | 2 | 47 | 331 | 8 | 1 | |
| EB Measurement issue | 1 | 309 | |||||
| ED Gathering crease | 4 | 236 | 8 | 1 | |||
| EA Unsmooth/puckering/bubbling | 1 | 3 | 50 | 146 | 6 | ||
| BA Thread ends | 2 | 186 | 6 | 11 | |||
| DB Run-off stitching | 10 | 131 | |||||
| EC Asymmetry | 2 | 2 | 17 | 75 | 7 | ||
| DJ Pleat | 4 | 34 |
AF Crushed foam cup (Final Random 09/21): first found in later stages, never recorded before
Final Random 09/21 QGR2642166 (FAIL); please check if the report was completed
Latest Final Random (09/21): ED Gathering crease 1 (earlier 18 times), EA Unsmooth/puckering/bubbling 1 (earlier 6 times), AD Fabric stains 1 (earlier 14 times)
PP Sample 1, Final Random 1; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records
QGR2642166 have multiple reports with different content
Only QA 1st Bundle: EC Asymmetry (6 Major), DJ Pleat (1 Major), DH Pressing mark (1 Major); Only QC 1st Bundle: ED Gathering crease (5), CG Grinning (2), CA Thread tension (2), EA Unsmooth/puckering/bubbling (1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 61.5%
BA Thread ends (97), CE Broken seam (55), DB Run-off stitching (46), EC Asymmetry (29), CC Skip stitch (25) did not reach later stages
QGR2642166 Final Random (09/21) CB06; actual production line(s) CB16 (cards show production lines only)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 76.9% |
| QA 1st Bundle | 1 reports | — | 61.5% |
| QC Inline | 5 reports required on prod. days 5/12 (42%) | — | 91.0% |
| QC Endline | 6 days | — | 26.1% |
| QA Inline | 1 reports | 1 | 28.1% |
| Final Random | 2 reports | 1 | 2.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB16 | 26.1% 1582 / 6 days | 28.1% | PASS | 09/16–10/08 | BA Thread ends, ED Gathering crease, AD Fabric stains |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB16 | 6 | 12 | 5 (42%) | 5 | 2 | 09/16, 09/17, 09/18, 09/19, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|---|
| ED Gathering crease | 5 | 24 | 84 | 3 | 1 | ||
| AD Fabric stains | 20 | 83 | 1 | ||||
| BA Thread ends | 97 | ||||||
| CE Broken seam | 2 | 53 | |||||
| DB Run-off stitching | 2 | 44 | |||||
| EC Asymmetry | 2 | 6 | 10 | 10 | 1 | ||
| CC Skip stitch | 4 | 21 | |||||
| CD Needle hole | 17 |
CB Broken stitch (Final Random 09/03): first found in later stages, never recorded before
QA Inline DHU 53.1% vs QC Inline 25.0%; QC Inline may be missing defects
QA Inline DHU 53.1% vs QC Endline 8.1% (08/05–08/08, 4 days, 1168 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
AD Fabric stains 1 pcs (later stages total)
QA 1st Bundle 1, QA Inline 1; cannot compare across stages
HA Poor pressing (QA 5); zero in QC Endline records
Only QA 1st Bundle: DA Exceed seam allowance (2 Major), ED Gathering crease (2 Major); Only QC 1st Bundle: CG Grinning (3), EC Asymmetry (3), HA Poor pressing (2), DI High-low/uneven (2); Both: BA Thread ends (4/5), AD Fabric stains (1/1); DHU QC 1st Bundle 75.0% / QA 1st Bundle 55.0%
EC Asymmetry (17), ED Gathering crease (11), DI High-low/uneven (8), HA Poor pressing (7), CG Grinning (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 75.0% |
| QA 1st Bundle | 1 reports | — | 55.0% |
| QC Inline | 1 reports required on prod. days 1/8 (12%) | — | 25.0% |
| QC Endline | 4 days | — | 8.1% |
| QA Inline | 1 reports | 1 | 53.1% |
| Final Random | 2 reports | 0 | 3.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS19 | 8.1% 1168 / 4 days | 53.1% | PASS | 08/05–08/08 | BA Thread ends, Others (no detail), ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS19 | 4 | 8 | 1 (12%) | 4 | 3 | 08/05, 08/06, 08/07, 08/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 5 | 6 | 47 | 4 | |
| Others (no detail) | 1 | 21 | 1 | |||
| EC Asymmetry | 3 | 6 | 1 | 7 | ||
| AD Fabric stains | 1 | 1 | 9 | 1 | ||
| ED Gathering crease | 2 | 9 | ||||
| DI High-low/uneven | 2 | 5 | 1 | |||
| HA Poor pressing | 2 | 5 | ||||
| CG Grinning | 3 | 2 |
Shipment Sample 10/01 QGR2645776 (FAIL); please check if the report was completed
QA Inline DHU 75.0% vs QC Endline 8.5% (10/02–10/08, 6 days, 2872 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
QA 1st Bundle 2, QA Inline 3; cannot compare across stages
Only QA 1st Bundle: CG Grinning (4 Major), BA Thread ends (2 Major), CA Thread tension (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (7), EA Unsmooth/puckering/bubbling (2), CB Broken stitch (2), ED Gathering crease (1), CE Broken seam (1); Both: AD Fabric stains (7/1); DHU QC 1st Bundle — / QA 1st Bundle 50.0%
BA Thread ends (75), CC Skip stitch (43), CE Broken seam (36), DD Thread not straight/waving (15), CG Grinning (12) did not reach later stages
EI Inaccurate/skewed stitching, EC Asymmetry, CA Thread tension, AD Fabric stains, ED Gathering crease, EA Unsmooth/puckering/bubbling, CB Broken stitch: before 1st bundle/inline started, for reference only
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 50.0% |
| QC Inline | 3 reports required on prod. days 3/14 (21%) | — | — |
| QC Endline | 6 days | — | 8.5% |
| QA Inline | 1 reports | 1 | 75.0% |
| Shipment Sample | 2 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP07 | 8.6% 2832 / 6 days | 75.0% | — | 10/02–10/08 | BA Thread ends, ED Gathering crease, CC Skip stitch |
| CP02 | 0.0% 40 / 1 days | — | — | 10/06–10/06 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP07 | 6 | 12 | 3 (25%) | 6 | 3 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CP02 | 1 | 2 | 0 (0%) | 1 | 1 | 10/06 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 73 | |||||
| ED Gathering crease | 1 | 1 | 4 | 49 | 6 | 1 | |
| CC Skip stitch | 5 | 37 | 1 | ||||
| CE Broken seam | 1 | 3 | 31 | 1 | |||
| AD Fabric stains | 1 | 7 | 1 | 12 | 7 | 2 | |
| EA Unsmooth/puckering/bubbling | 2 | 21 | 2 | 1 | |||
| EC Asymmetry | 1 | 21 | 2 | ||||
| CB Broken stitch | 1 | 2 | 12 | 3 | 1 |
EI Inaccurate/skewed stitching (Shipment Sample 09/22): first found in later stages, never recorded before
Latest Final Random (09/30): CB Broken stitch 1 (earlier 9 times), AD Fabric stains 1 (earlier 21 times)
EA Unsmooth/puckering/bubbling 1, ED Gathering crease 1, EC Asymmetry 1 pcs (later stages total)
PP Sample 1; cannot compare across stages
09/14 CP04 261529 (defective pcs 44 > defects 39)
Only QA 1st Bundle: BA Thread ends (4 Major), CG Grinning (3 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (5), GA Missing bartack/button (3), AD Fabric stains (1), DC Join stitching (1); Both: CC Skip stitch (6/1), CB Broken stitch (2/2), DJ Pleat (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 60.0%
CC Skip stitch (338), AC Fabric hole (138), EB Measurement issue (57), GB Missing sewing operation (42), DJ Pleat (13) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 3 reports required on prod. days 3/34 (9%) | — | 51.8% |
| QC Endline | 16 days | — | 13.7% |
| QA Inline | 2 reports | 2 | 32.8% |
| Shipment Sample | 1 reports | 1 | — |
| Pre-final | 1 reports | 0 | 0.6% |
| Final Random | 1 reports | 0 | 0.6% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP04 | 13.7% 11820 / 16 days | 32.8% | PASS | 09/11–09/30 | BA Thread ends, CC Skip stitch, AD Fabric stains |
| CP17 | 0.0% 20 / 1 days | — | — | 09/17–09/17 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP04 | 16 | 32 | 3 (9%) | 16 | 13 | 09/25, 09/26, 09/28, 09/29, 09/30 |
| CP17 | 1 | 2 | 0 (0%) | 1 | 1 | 09/17 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 18 | 519 | 5 | 5 | 3 | |||
| CC Skip stitch | 6 | 1 | 9 | 322 | |||||
| AD Fabric stains | 1 | 7 | 241 | 2 | 1 | 1 | |||
| ED Gathering crease | 182 | 2 | 1 | ||||||
| AC Fabric hole | 137 | 1 | |||||||
| EC Asymmetry | 2 | 75 | 1 | ||||||
| EB Measurement issue | 57 | ||||||||
| EA Unsmooth/puckering/bubbling | 5 | 4 | 33 | 1 |
EE Raw edge (Shipment Sample 09/30), EI Inaccurate/skewed stitching (Shipment Sample 09/30): first found in later stages, never recorded before
Latest Final Random (10/02): ED Gathering crease 1 (earlier 29 times), AD Fabric stains 1 (earlier 30 times), CB Broken stitch 2 (earlier 13 times), BA Thread ends 1 (earlier 26 times), DJ Pleat 1 (earlier 4 times), CF Pulling yarn 1 (earlier 3 times)
AB Shading 2, DK Twisted shoulder strap 1 pcs (later stages total)
QA 1st Bundle 3; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records
10/08 CS25 261531-2 (defective pcs 94 > defects 64)
Only QA 1st Bundle: AB Shading (4 Major), CE Broken seam (3 Major), CF Pulling yarn (1 Major), EI Inaccurate/skewed stitching (1 Major), GA Missing bartack/button (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: DI High-low/uneven (2), DB Run-off stitching (2); Both: DF Twisted seam/skewing (11/12), AD Fabric stains (6/6), ED Gathering crease (3/2), BA Thread ends (1/2); DHU QC 1st Bundle — / QA 1st Bundle 90.0%
DF Twisted seam/skewing (256), EC Asymmetry (138), CC Skip stitch (87), DB Run-off stitching (24), EA Uneven seam allowance (22) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 2 reports | — | — |
| QA 1st Bundle | 2 reports | — | 90.0% |
| QC Inline | 21 reports required on prod. days 21/32 (66%) | — | — |
| QC Endline | 12 days | — | 17.1% |
| QA Inline | 1 reports | 1 | 65.6% |
| Shipment Sample | 4 reports | 1 | — |
| Final Random | 1 reports | 0 | 3.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS02 | 14.4% 4848 / 12 days | 65.6% | PASS | 09/25–10/08 | BA Thread ends, AD Fabric stains, ED Gathering crease |
| CS25 | 26.8% 1366 / 4 days | — | — | 10/05–10/08 | AD Fabric stains, ED Gathering crease, BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS02 | 12 | 24 | 17 (71%) | 6 | 1 | 09/26, 09/30, 10/01, 10/02, 10/08 |
| CS25 | 4 | 8 | 4 (50%) | 3 | 1 | 10/05, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|
| AD Fabric stains | 6 | 6 | 30 | 229 | 3 | 4 | 1 |
| DF Twisted seam/skewing | 11 | 12 | 63 | 166 | 4 | ||
| BA Thread ends | 1 | 2 | 16 | 217 | 4 | 4 | |
| ED Gathering crease | 3 | 2 | 34 | 179 | 1 | 1 | |
| EC Asymmetry | 30 | 106 | 2 | ||||
| CC Skip stitch | 2 | 85 | |||||
| CB Broken stitch | 1 | 25 | 1 | 2 | |||
| DB Run-off stitching | 2 | 7 | 15 |
AD Fabric stains (Final Random 10/02), EI Inaccurate/skewed stitching (Shipment Sample 10/02): first found in later stages, never recorded before
Shipment Sample 10/02 QGR2645791 (FAIL); please check if the report was completed
Latest Shipment Sample (10/02): EA Unsmooth/puckering/bubbling 1 (earlier 18 times), EC Asymmetry 1 (earlier 22 times), DE Cut to broken 1 (earlier 3 times)
CB Broken stitch 1, DJ Pleat 2, BA Thread ends 10 pcs (later stages total)
QA 1st Bundle 3, QA Inline 1; cannot compare across stages
09/28 CP05 261534 (defective pcs 269 > defects 245), 10/02 CP04 261534 (defective pcs 24 > defects 23), 10/07 CP05 261534 (defective pcs 68 > defects 65), 10/08 CP05 261534 (defective pcs 109 > defects 98)
Only QA 1st Bundle: CG Grinning (4 Major), CC Skip stitch (1 Major); Only QC 1st Bundle: EC Asymmetry (4), DE Cut to broken (2), DF Twisted seam/skewing (1), ED Gathering crease (1), DI High-low/uneven (1), DB Run-off stitching (1); Both: EA Unsmooth/puckering/bubbling (3/8), DJ Pleat (5/2), CB Broken stitch (2/2); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
CC Skip stitch (419), ED Gathering crease (273), DB Run-off stitching (199), AC Fabric hole (110), CE Broken seam (44) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 6 reports required on prod. days 6/34 (18%) | — | 228.0% |
| QC Endline | 15 days | — | 15.9% |
| QA Inline | 1 reports | 1 | 53.1% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 1 reports | 0 | 0.3% |
| Final Random | 1 reports | 0 | 1.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP05 | 16.2% 10740 / 15 days | 53.1% | PASS | 09/21–10/08 | CC Skip stitch, BA Thread ends, ED Gathering crease |
| CP04 | 12.9% 1020 / 2 days | — | — | 10/01–10/02 | BA Thread ends, CC Skip stitch, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP05 | 15 | 30 | 6 (20%) | 15 | 9 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CP04 | 2 | 4 | 0 (0%) | 2 | 2 | 10/01, 10/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 434 | 5 | 5 | 5 | ||||
| CC Skip stitch | 1 | 2 | 415 | 1 | ||||
| ED Gathering crease | 1 | 15 | 255 | 2 | ||||
| EC Asymmetry | 4 | 14 | 227 | 1 | ||||
| DB Run-off stitching | 1 | 13 | 185 | |||||
| EA Unsmooth/puckering/bubbling | 3 | 8 | 4 | 153 | 1 | |||
| AC Fabric hole | 4 | 106 | ||||||
| DJ Pleat | 5 | 2 | 35 | 3 | 1 | 1 |
CF Pulling yarn (Shipment Sample 09/22), AA Fabric defect (Shipment Sample 09/22): first found in later stages, never recorded before
Latest Shipment Sample (09/22): DF Twisted seam/skewing 2 (earlier 7 times), EC Asymmetry 1 (earlier 11 times), CE Broken seam 1 (earlier 11 times), CB Broken stitch 2 (earlier 13 times)
BA Thread ends 5, ED Gathering crease 1, EA Unsmooth/puckering/bubbling 2, BB Missing cut seam allowance 1 pcs (later stages total)
QA 1st Bundle 1, Shipment Sample 1, QA Inline 1; cannot compare across stages
10/08 CP16 261630A (defective pcs 88 > defects 82)
Only QA 1st Bundle: DI High-low/uneven (4 Major), DE Cut to broken (3 Major), DF Twisted seam/skewing (1 Major), EA Unsmooth/puckering/bubbling (1 Major); Only QC 1st Bundle: CB Broken stitch (8), CC Skip stitch (5), DJ Pleat (1), CA Thread tension (1); Both: BA Thread ends (3/3), ED Gathering crease (1/4), EC Asymmetry (1/1); DHU QC 1st Bundle — / QA 1st Bundle 90.0%
CC Skip stitch (285), DB Run-off stitching (106), EB Measurement issue (64), GB Missing sewing operation (33), DI High-low/uneven (26) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 90.0% |
| QC Inline | 8 reports required on prod. days 8/28 (29%) | — | 139.0% |
| QC Endline | 13 days | — | 13.4% |
| QA Inline | 3 reports | 3 | 47.6% |
| Shipment Sample | 3 reports | 0 | — |
| Pre-final | 1 reports | 0 | 0.3% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP16 | 14.3% 7100 / 8 days | 55.8% | — | 09/30–10/08 | BA Thread ends, CC Skip stitch, ED Gathering crease |
| CP06 | 8.8% 1500 / 5 days | 34.4% | — | 09/11–09/16 | CC Skip stitch, BA Thread ends, ED Gathering crease |
| CP17 | 10.0% 40 / 1 days | — | — | 10/06–10/06 | CC Skip stitch, EA Unsmooth/puckering/bubbling, BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP16 | 8 | 16 | 6 (38%) | 8 | 2 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CP06 | 5 | 10 | 2 (20%) | 5 | 3 | 09/11, 09/12, 09/14, 09/15, 09/16 |
| CP17 | 1 | 2 | 0 (0%) | 1 | 1 | 10/06 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 3 | 3 | 372 | 2 | 5 | ||
| CC Skip stitch | 5 | 280 | |||||
| ED Gathering crease | 1 | 4 | 14 | 231 | 5 | 1 | |
| DB Run-off stitching | 2 | 104 | |||||
| EB Measurement issue | 64 | ||||||
| EA Unsmooth/puckering/bubbling | 1 | 24 | 9 | 2 | |||
| CB Broken stitch | 8 | 19 | 3 | 5 | |||
| GB Missing sewing operation | 33 |
BD Snagging (Pre-final 10/05), GB Missing sewing operation (Pre-final 10/05): first found in later stages, never recorded before
Latest Pre-final (10/06): EA Unsmooth/puckering/bubbling 2 (earlier 42 times), BB Missing cut seam allowance 2 (earlier 4 times), AD Fabric stains 2 (earlier 13 times)
ED Gathering crease 1, DJ Pleat 1, CB Broken stitch 3, CC Skip stitch 1, CE Broken seam 1 pcs (later stages total)
EA Unsmooth/puckering/bubbling (QA 71); zero in QC Endline records
10/07 CS10 261811 (defective pcs 18 > defects 7)
QGR2645008, QGR2645529 have multiple reports with different content
Only QA 1st Bundle: BA Thread ends (2 Major), HA Poor pressing (1 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: EC Asymmetry (3), DD Thread not straight/waving (2); Both: EA Unsmooth/puckering/bubbling (5/8), ED Gathering crease (2/2), EI Inaccurate/skewed stitching (1/1); DHU QC 1st Bundle — / QA 1st Bundle 75.0%
DB Run-off stitching (298), EI Inaccurate/skewed stitching (37), EC Asymmetry (31), DD Thread not straight/waving (30), DF Twisted seam/skewing (18) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 75.0% |
| QC Inline | 14 reports required on prod. days 14/26 (54%) | — | — |
| QC Endline | 12 days | — | 11.2% |
| QA Inline | 11 reports | 11 | 22.7% |
| Pre-final | 4 reports | 1 | 3.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS10 | 11.3% 22195 / 12 days | 22.7% | — | 09/23–10/07 | BA Thread ends, ED Gathering crease, DB Run-off stitching |
| CS13 | 0.0% 20 / 1 days | — | — | 10/05–10/05 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS10 | 12 | 24 | 14 (58%) | 7 | 3 | 09/26, 09/28, 09/30, 10/01, 10/07 |
| CS13 | 1 | 2 | 0 (0%) | 1 | 1 | 10/05 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Pre-final |
|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 56 | 1468 | 31 | 22 | |
| ED Gathering crease | 2 | 2 | 42 | 374 | 15 | 1 |
| DB Run-off stitching | 19 | 279 | ||||
| CC Skip stitch | 18 | 215 | 4 | 1 | ||
| AD Fabric stains | 31 | 144 | 4 | 2 | ||
| EA Unsmooth/puckering/bubbling | 5 | 8 | 89 | 59 | 12 | |
| EI Inaccurate/skewed stitching | 1 | 1 | 30 | 5 | ||
| EC Asymmetry | 3 | 15 | 2 | 11 |
DI High-low/uneven (Shipment Sample 10/06): first found in later stages, never recorded before
Latest Shipment Sample (10/06): EC Asymmetry 2 (earlier 13 times)
QA 1st Bundle 2, QA Inline 3; cannot compare across stages
Only QA 1st Bundle: AB Shading (1 Major); Only QC 1st Bundle: EA Unsmooth/puckering/bubbling (1); Both: ED Gathering crease (2/5), BB Missing cut seam allowance (2/1), BA Thread ends (2/1), EC Asymmetry (1/1); DHU QC 1st Bundle — / QA 1st Bundle 84.6%
BA Thread ends (1028), ED Gathering crease (197), CC Skip stitch (102), DB Run-off stitching (41), Q93 Heat seal logo peeling off (15) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 84.6% |
| QC Inline | 4 reports required on prod. days 4/8 (50%) | — | — |
| QC Endline | 4 days | — | 29.2% |
| QA Inline | 1 reports | 1 | 28.1% |
| Shipment Sample | 2 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS09 | 29.2% 5142 / 4 days | 28.1% | — | 10/05–10/08 | BA Thread ends, ED Gathering crease, EC Asymmetry |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS09 | 4 | 8 | 4 (50%) | 3 | 1 | 10/05, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample |
|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 1 | 5 | 1018 | 2 | |
| ED Gathering crease | 2 | 5 | 22 | 168 | ||
| EC Asymmetry | 1 | 1 | 18 | 161 | 2 | 2 |
| CC Skip stitch | 102 | |||||
| DB Run-off stitching | 9 | 32 | ||||
| Q93 Heat seal logo peeling off | 15 | |||||
| BB Missing cut seam allowance | 2 | 1 | 11 | |||
| CB Broken stitch | 13 | 1 |
GA Missing bartack/button (Shipment Sample 09/01), BB Missing cut seam allowance (Final Random 09/09), HA Poor pressing (Final Random 10/03): first found in later stages, never recorded before
ED Gathering crease 2, EC Asymmetry 1, EI Inaccurate/skewed stitching 1, CB Broken stitch 2, EA Unsmooth/puckering/bubbling 2, CC Skip stitch 1, AD Fabric stains 4, CE Broken seam 2, DB Run-off stitching 1 pcs (later stages total)
QA 1st Bundle 3; cannot compare across stages
08/25 CP03 261171A (defective pcs 21 > defects 14), 08/26 CP03 261171A (defective pcs 60 > defects 58), 08/28 CP03 261171A (defective pcs 65 > defects 56), 09/01 CP03 261171A (defective pcs 63 > defects 58)
Only QA 1st Bundle: CG Grinning (4 Major), EI Inaccurate/skewed stitching (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: EC Asymmetry (3), DD Thread not straight/waving (2), ED Gathering crease (2), AC Fabric hole (2), DF Twisted seam/skewing (2); Both: BA Thread ends (7/5), DJ Pleat (2/1); DHU QC 1st Bundle 100.0% / QA 1st Bundle 75.0%
EA Uneven seam allowance (118), DD Thread not straight/waving (12), DJ Pleat (7), CG Grinning (7), DE Cut to broken (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| Pilot Run | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 75.0% |
| QC Inline | 3 reports required on prod. days 3/28 (11%) | — | 212.5% |
| QC Endline | 14 days | — | 13.2% |
| QA Inline | 3 reports | 3 | 41.2% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 3 reports | 0 | 2.7% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP03 | 13.2% 5855 / 14 days | 41.2% | PASS | 08/25–10/03 | BA Thread ends, CC Skip stitch, EA Uneven seam allowance |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP03 | 14 | 28 | 3 (11%) | 14 | 11 | 09/29, 09/30, 10/01, 10/02, 10/03 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 7 | 5 | 8 | 207 | 13 | 5 | |
| CC Skip stitch | 4 | 165 | 8 | 1 | |||
| ED Gathering crease | 2 | 2 | 116 | 8 | 2 | ||
| EA Uneven seam allowance | 118 | ||||||
| EC Asymmetry | 3 | 21 | 76 | 4 | 1 | ||
| AD Fabric stains | 8 | 81 | 1 | 1 | 3 | ||
| DD Thread not straight/waving | 2 | 10 | |||||
| DB Run-off stitching | 8 | 1 |
QA Inline DHU 46.9% vs QC Endline 5.7% (09/22–10/02, 9 days, 4580 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
Latest Final Random (10/03): CB Broken stitch 2 (earlier 5 times)
EC Asymmetry 1 pcs (later stages total)
QC 1st Bundle 1; cannot compare across stages
09/25 CP08 261521 (defective pcs 43 > defects 41), 09/29 CP08 261521 (defective pcs 32 > defects 23), 10/01 CP08 261521 (defective pcs 22 > defects 19)
Only QA 1st Bundle: BB Missing cut seam allowance (3 Major), CA Thread tension (2 Major), ED Gathering crease (1 Major), DC Join stitching (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (3), AD Fabric stains (3), CC Skip stitch (1), EI Inaccurate/skewed stitching (1), CE Broken seam (1), EC Asymmetry (1); Both: BA Thread ends (3/7), CB Broken stitch (3/3), DJ Pleat (2/2), DI High-low/uneven (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
ED Gathering crease (57), EA Uneven seam allowance (46), CC Skip stitch (34), DB Run-off stitching (17), DA Exceed seam allowance (14) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 3 reports required on prod. days 3/20 (15%) | — | — |
| QC Endline | 9 days | — | 5.7% |
| QA Inline | 1 reports | 1 | 46.9% |
| Shipment Sample | 1 reports | 0 | — |
| Pre-final | 1 reports | 0 | 1.5% |
| Final Random | 1 reports | 0 | 1.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP08 | 5.8% 4560 / 9 days | 46.9% | PASS | 09/22–10/02 | BA Thread ends, ED Gathering crease, EA Uneven seam allowance |
| CP13 | 0.0% 20 / 1 days | — | — | 09/30–09/30 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP08 | 9 | 18 | 3 (17%) | 9 | 6 | 09/28, 09/29, 09/30, 10/01, 10/02 |
| CP13 | 1 | 2 | 0 (0%) | 1 | 1 | 09/30 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 3 | 7 | 14 | 79 | 2 | 6 | 5 | |
| ED Gathering crease | 1 | 2 | 51 | 3 | ||||
| EA Uneven seam allowance | 46 | |||||||
| CC Skip stitch | 1 | 33 | ||||||
| DB Run-off stitching | 17 | |||||||
| DA Exceed seam allowance | 3 | 11 | ||||||
| CB Broken stitch | 3 | 3 | 4 | 2 | 2 | |||
| EC Asymmetry | 1 | 4 | 7 | 1 |
DE Cut to broken (Shipment Sample 09/30): first found in later stages, never recorded before
Latest Final Random (10/05): EA Unsmooth/puckering/bubbling 1 (earlier 30 times), ED Gathering crease 2 (earlier 46 times)
EC Asymmetry 1, DB Run-off stitching 1, CF Pulling yarn 1, CB Broken stitch 1, CE Broken seam 1, CD Needle hole 1, DK Twisted shoulder strap 1 pcs (later stages total)
PP Sample 3, QA 1st Bundle 1, QA Inline 8; cannot compare across stages
Only QA 1st Bundle: EI Inaccurate/skewed stitching (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: CC Skip stitch (1); Both: EC Asymmetry (6/3), EA Unsmooth/puckering/bubbling (1/3), ED Gathering crease (2/1); DHU QC 1st Bundle 76.9% / QA 1st Bundle 76.9%
CC Skip stitch (313), DF Twisted seam/skewing (104), Q61 Lace raw edge or broken lace (76), EB Measurement issue (62), AC Fabric hole (49) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 76.9% |
| QA 1st Bundle | 1 reports | — | 76.9% |
| QC Inline | 26 reports required on prod. days 26/42 (62%) | — | 93.5% |
| QC Endline | 20 days | — | 17.9% |
| QA Inline | 4 reports | 4 | 35.9% |
| Shipment Sample | 3 reports | 0 | — |
| Pre-final | 1 reports | 0 | 1.3% |
| Final Random | 1 reports | 0 | 1.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB02 | 17.9% 7752 / 20 days | 35.9% | PASS | 09/15–10/08 | CC Skip stitch, BA Thread ends, ED Gathering crease |
| CB30 | 0.0% 10 / 1 days | — | — | 09/17–09/17 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB02 | 20 | 40 | 26 (65%) | 9 | 5 | 09/29, 10/03, 10/05, 10/07, 10/08 |
| CB30 | 1 | 2 | 0 (0%) | 1 | 1 | 09/17 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|---|---|
| BA Thread ends | 3 | 307 | 3 | 5 | |||||
| CC Skip stitch | 1 | 312 | |||||||
| ED Gathering crease | 2 | 1 | 70 | 130 | 2 | 2 | 3 | 2 | |
| EC Asymmetry | 6 | 3 | 46 | 60 | 8 | 1 | |||
| DB Run-off stitching | 14 | 106 | 1 | ||||||
| DF Twisted seam/skewing | 16 | 87 | 1 | ||||||
| EA Unsmooth/puckering/bubbling | 1 | 3 | 72 | 5 | 1 | 3 | 1 | ||
| Q61 Lace raw edge or broken lace | 76 |
CF Pulling yarn (Final Random 10/05): first found in later stages, never recorded before
QA Inline DHU 62.5% vs QC Endline 11.2% (09/17–10/05, 12 days, 4947 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
Latest Final Random (10/05): EA Unsmooth/puckering/bubbling 1 (earlier 8 times), CC Skip stitch 1 (earlier 17 times), CB Broken stitch 1 (earlier 3 times)
ED Gathering crease 1, BA Thread ends 6 pcs (later stages total)
QA Inline 2; cannot compare across stages
09/23 CP03 261187C (defective pcs 4 > defects 3)
Only QA 1st Bundle: AC Fabric hole (1 Major), BA Thread ends (1 Major); Only QC 1st Bundle: CC Skip stitch (1), DD Thread not straight/waving (1), CE Broken seam (1); Both: EC Asymmetry (5/5), ED Gathering crease (5/3), EA Unsmooth/puckering/bubbling (3/5), AD Fabric stains (4/2); DHU QC 1st Bundle 100.0% / QA 1st Bundle 85.0%
EC Asymmetry (140), EA Uneven seam allowance (53), DB Run-off stitching (26), DD Thread not straight/waving (7), CE Broken seam (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 100.0% |
| QA 1st Bundle | 1 reports | — | 85.0% |
| QC Inline | 2 reports required on prod. days 2/24 (8%) | — | 98.0% |
| QC Endline | 12 days | — | 11.2% |
| QA Inline | 1 reports | 1 | 62.5% |
| Final Random | 3 reports | 0 | 3.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP03 | 11.2% 4947 / 12 days | 62.5% | PASS | 09/17–10/05 | EC Asymmetry, BA Thread ends, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP03 | 12 | 24 | 2 (8%) | 12 | 10 | 09/26, 09/28, 09/29, 10/02, 10/05 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| EC Asymmetry | 5 | 5 | 9 | 116 | 5 | |
| BA Thread ends | 1 | 114 | 4 | 6 | ||
| ED Gathering crease | 5 | 3 | 7 | 93 | 4 | 1 |
| CC Skip stitch | 1 | 4 | 79 | 1 | ||
| AD Fabric stains | 4 | 2 | 8 | 56 | 4 | |
| EA Uneven seam allowance | 53 | |||||
| DB Run-off stitching | 26 | |||||
| EA Unsmooth/puckering/bubbling | 3 | 5 | 7 | 3 | 1 |
DJ Pleat (Pre-final 10/05), CF Pulling yarn (Pre-final 10/05), CB Broken stitch (Pre-final 10/05): first found in later stages, never recorded before
EA Unsmooth/puckering/bubbling 2, BA Thread ends 5, EC Asymmetry 3 pcs (later stages total)
QA 1st Bundle 1, Pre-final 2; cannot compare across stages
BB Missing cut seam allowance (5), ED Gathering crease (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QA 1st Bundle | 1 reports | — | 130.0% |
| Pre-final | 1 reports | 1 | 12.0% |
| Defect | QA 1st Bundle | Pre-final |
|---|---|---|
| BA Thread ends | 10 | 5 |
| BB Missing cut seam allowance | 5 | |
| ED Gathering crease | 5 | |
| EA Unsmooth/puckering/bubbling | 2 | 2 |
| EC Asymmetry | 1 | 3 |
| DJ Pleat | 4 | |
| Others (no detail) | 1 | 2 |
| CB Broken stitch | 3 |
AC Fabric hole (Final Random 09/21): first found in later stages, never recorded before
Latest Final Random (09/23): CG Grinning 2 (earlier 4 times), EA Unsmooth/puckering/bubbling 1 (earlier 6 times)
QA 1st Bundle 2, QA Inline 2; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 5); zero in QC Endline records
Only QA 1st Bundle: BB Missing cut seam allowance (2 Major), CG Grinning (1 Major), DB Run-off stitching (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: ED Gathering crease (3), AD Fabric stains (2), DJ Pleat (2); Both: EB Measurement issue (3/5), EC Asymmetry (3/2); DHU QC 1st Bundle 65.0% / QA 1st Bundle 70.0%
EC Asymmetry (91), ED Gathering crease (41), AD Fabric stains (20), EB Measurement issue (8), CC Skip stitch (7) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 65.0% |
| QA 1st Bundle | 1 reports | — | 70.0% |
| QC Inline | 4 reports required on prod. days 4/24 (17%) | — | 35.4% |
| QC Endline | 10 days | — | 16.3% |
| QA Inline | 1 reports | 1 | 28.1% |
| Final Random | 2 reports | 0 | 4.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB22 | 16.8% 1993 / 9 days | 28.1% | PASS | 08/19–09/10 | BA Thread ends, EC Asymmetry, Others (no detail) |
| CB23 | 0.0% 20 / 1 days | — | — | 08/18–08/18 | — |
| CB24 | 0.0% 20 / 1 days | — | — | 08/20–08/20 | — |
| CB21 | 0.0% 17 / 1 days | — | — | 08/22–08/22 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB22 | 9 | 18 | 4 (22%) | 9 | 5 | 08/24, 08/25, 08/26, 09/01, 09/10 |
| CB21 | 1 | 2 | 0 (0%) | 1 | 1 | 08/22 |
| CB23 | 1 | 2 | 0 (0%) | 1 | 1 | 08/18 |
| CB24 | 1 | 2 | 0 (0%) | 1 | 1 | 08/20 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|---|---|
| BA Thread ends | 7 | 163 | 3 | |||
| EC Asymmetry | 3 | 2 | 11 | 74 | 1 | |
| Others (no detail) | 2 | 50 | 2 | |||
| ED Gathering crease | 3 | 9 | 29 | |||
| AD Fabric stains | 2 | 4 | 14 | |||
| EA Unsmooth/puckering/bubbling | 10 | 2 | 3 | |||
| CG Grinning | 1 | 8 | 3 | |||
| EB Measurement issue | 3 | 5 |
BD Snagging (Final Random 08/25), CB Broken stitch (Final Random 08/25), GB Missing sewing operation (Final Random 09/23), BB Missing cut seam allowance (Final Random 09/26): first found in later stages, never recorded before
QA Inline DHU 28.1% vs QC Endline 1.8% (08/12–09/17, 14 days, 6361 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
Latest Final Random (09/26): AD Fabric stains 1 (earlier 3 times)
DE Cut to broken 2, AC Fabric hole 2 pcs (later stages total)
AC Fabric hole (QA 3); zero in QC Endline records
08/15 CB21 261199 (defective pcs 9 > defects 6)
Q95 HTL position incorrect (37), EC Asymmetry (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 75.0% |
| QC Inline | 0 reports required on prod. days 0/34 (0%) | — | — |
| QC Endline | 14 days | — | 1.8% |
| QA Inline | 1 reports | 1 | 28.1% |
| Final Random | 4 reports | 0 | 3.9% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB21 | 1.3% 3637 / 10 days | — | — | 08/12–08/22 | BA Thread ends, AD Fabric stains, Others (no detail) |
| CB25 | 2.6% 2644 / 4 days | — | — | 09/14–09/17 | Q95 HTL position incorrect, BA Thread ends, AD Fabric stains |
| CB04 | 0.0% 40 / 2 days | — | — | 08/17–08/21 | — |
| CB30 | 0.0% 40 / 1 days | — | — | 08/19–08/19 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB21 | 10 | 20 | 0 (0%) | 10 | 10 | 08/18, 08/19, 08/20, 08/21, 08/22 |
| CB25 | 4 | 8 | 0 (0%) | 4 | 4 | 09/14, 09/15, 09/16, 09/17 |
| CB04 | 2 | 4 | 0 (0%) | 2 | 2 | 08/17, 08/21 |
| CB30 | 1 | 2 | 0 (0%) | 1 | 1 | 08/19 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Endline | QA Inline | Final Random |
|---|---|---|---|---|
| BA Thread ends | 59 | 2 | 7 | |
| Q95 HTL position incorrect | 37 | |||
| AD Fabric stains | 14 | 3 | ||
| EC Asymmetry | 6 | |||
| BD Snagging | 6 | |||
| Others (no detail) | 5 | |||
| DB Run-off stitching | 2 | 1 | ||
| DE Cut to broken | 1 | 2 |
EA Unsmooth/puckering/bubbling (Pre-final 09/10): first found in later stages, never recorded before
AC Fabric hole 1, DE Cut to broken 2, CB Broken stitch 2, DJ Pleat 1, CC Skip stitch 1 pcs (later stages total)
QC 1st Bundle 4, QA 1st Bundle 7, QC Inline 33, QA Inline 3, Pre-final 1; cannot compare across stages
09/07 CS11 261447A (defective pcs 15 > defects 14)
Only QA 1st Bundle: DE Cut to broken (4 Major), AC Fabric hole (2 Major), CG Grinning (1 Major); Only QC 1st Bundle: BA Thread ends (6), ED Gathering crease (5); DHU QC 1st Bundle 0.0% / QA 1st Bundle 70.0%
ED Gathering crease (23), EB Measurement issue (14), EC Asymmetry (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 0.0% |
| QA 1st Bundle | 1 reports | — | 70.0% |
| QC Inline | 4 reports required on prod. days 4/18 (22%) | — | 0.0% |
| QC Endline | 9 days | — | 17.2% |
| QA Inline | 1 reports | 1 | 46.9% |
| Pre-final | 1 reports | 0 | 6.2% |
| Final Random | 2 reports | 0 | 4.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS11 | 17.2% 1000 / 9 days | 46.9% | PASS | 09/07–09/21 | BA Thread ends, CC Skip stitch, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS11 | 9 | 18 | 4 (22%) | 9 | 5 | 09/11, 09/12, 09/16, 09/19, 09/21 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Pre-final | Final Random |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 6 | 21 | 105 | 6 | 2 | 4 | |
| Others (no detail) | 4 | 7 | 33 | 3 | 1 | ||
| CC Skip stitch | 32 | 1 | |||||
| ED Gathering crease | 5 | 18 | |||||
| EB Measurement issue | 14 | ||||||
| AC Fabric hole | 2 | 3 | 1 | ||||
| DE Cut to broken | 4 | 1 | 1 | ||||
| EC Asymmetry | 5 |
EA Unsmooth/puckering/bubbling (Pre-final 08/18), BD Snagging (Pre-final 08/18), CB Broken stitch (Final Random 08/28): first found in later stages, never recorded before
Pre-final DHU 12.5% vs QC Endline 7.9% (08/01–08/11, 6 days, 1031 pcs checked). QA checks goods already passed by QC Endline, so QC Endline is missing or under-recording defects
EC Asymmetry 2, HA Poor pressing 1, ED Gathering crease 3 pcs (later stages total)
QA 1st Bundle 3, Final Random 2; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 3); zero in QC Endline records
Only QA 1st Bundle: DA Exceed seam allowance (2 Major); Only QC 1st Bundle: DI High-low/uneven (3), EC Asymmetry (2); Both: BA Thread ends (4/3), DJ Pleat (4/1), CG Grinning (2/2); DHU QC 1st Bundle 75.0% / QA 1st Bundle 55.0%
DB Run-off stitching (11), DJ Pleat (9), DI High-low/uneven (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 75.0% |
| QA 1st Bundle | 1 reports | — | 55.0% |
| QC Inline | 1 reports required on prod. days 1/12 (8%) | — | 23.8% |
| QC Endline | 6 days | — | 7.9% |
| Pre-final | 1 reports | 1 | 12.5% |
| Final Random | 2 reports | 0 | 3.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS19 | 7.9% 1031 / 6 days | — | PASS | 08/01–08/11 | BA Thread ends, Others (no detail), DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS19 | 6 | 12 | 1 (8%) | 6 | 5 | 08/03, 08/04, 08/05, 08/06, 08/11 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | Pre-final | Final Random |
|---|---|---|---|---|---|---|
| BA Thread ends | 4 | 3 | 7 | 39 | 6 | |
| Others (no detail) | 3 | 15 | 2 | |||
| ED Gathering crease | 9 | 2 | 1 | |||
| DB Run-off stitching | 11 | |||||
| DJ Pleat | 4 | 1 | 4 | |||
| EC Asymmetry | 2 | 3 | 2 | |||
| DI High-low/uneven | 3 | 2 | ||||
| CG Grinning | 2 | 2 |
PP Sample 1, QA Inline 1; cannot compare across stages
EC Asymmetry (QA 11); zero in QC Endline records
Only QA 1st Bundle: DE Cut to broken (2 Major), EI Inaccurate/skewed stitching (1 Major), EA Unsmooth/puckering/bubbling (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: AD Fabric stains (2); Both: EC Asymmetry (6/2), CC Skip stitch (2/1), CE Broken seam (2/1); DHU QC 1st Bundle 92.3% / QA 1st Bundle 45.0%
BA Thread ends (412), EB Measurement issue (335), EA Unsmooth/puckering/bubbling (192), CC Skip stitch (146), AD Fabric stains (144) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | 92.3% |
| QA 1st Bundle | 1 reports | — | 45.0% |
| QC Inline | 27 reports required on prod. days 27/44 (61%) | — | 106.1% |
| QC Endline | 22 days | — | 23.2% |
| QA Inline | 5 reports | 5 | 41.9% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB03 | 23.2% 6015 / 22 days | 41.9% | — | 09/12–10/08 | BA Thread ends, EB Measurement issue, EA Unsmooth/puckering/bubbling |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB03 | 22 | 44 | 27 (61%) | 14 | 3 | 10/02, 10/03, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|---|
| BA Thread ends | 8 | 400 | 4 | |||
| EB Measurement issue | 331 | 4 | ||||
| EA Unsmooth/puckering/bubbling | 1 | 1 | 43 | 141 | 6 | |
| CC Skip stitch | 1 | 2 | 1 | 23 | 114 | 5 |
| AD Fabric stains | 1 | 2 | 34 | 104 | 3 | |
| DB Run-off stitching | 130 | 1 | ||||
| ED Gathering crease | 104 | 6 | ||||
| EC Asymmetry | 6 | 2 | 88 | 11 |
Only QA 1st Bundle: EC Asymmetry (4 Major), EE Raw edge (2 Major), CC Skip stitch (1 Major); Only QC 1st Bundle: DA Exceed seam allowance (2), BA Thread ends (2), CG Grinning (1); Both: EA Unsmooth/puckering/bubbling (3/2), CB Broken stitch (1/1); DHU QC 1st Bundle — / QA 1st Bundle 76.9%
EC Asymmetry (373), DB Run-off stitching (350), CC Skip stitch (256), CE Broken seam (251), EA Unsmooth/puckering/bubbling (168) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 76.9% |
| QC Inline | 38 reports required on prod. days 36/40 (90%) | — | — |
| QC Endline | 14 days | — | 24.2% |
| QA Inline | 3 reports | 3 | 35.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB17 | 20.9% 4537 / 14 days | 37.5% | — | 09/22–10/08 | DB Run-off stitching, EC Asymmetry, CE Broken seam |
| CB20 | 36.2% 1262 / 6 days | 31.2% | — | 10/02–10/08 | CC Skip stitch, DB Run-off stitching, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB17 | 14 | 28 | 26 (93%) | 2 | 0 | 09/22, 10/08 |
| CB20 | 6 | 12 | 10 (83%) | 1 | 1 | 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|---|
| EC Asymmetry | 4 | 178 | 184 | 7 | ||
| DB Run-off stitching | 1 | 31 | 316 | 2 | ||
| CC Skip stitch | 1 | 10 | 245 | |||
| CE Broken seam | 77 | 174 | ||||
| EA Unsmooth/puckering/bubbling | 2 | 3 | 2 | 120 | 36 | 5 |
| EB Measurement issue | 29 | 137 | 2 | |||
| ED Gathering crease | 1 | 7 | 139 | 2 | ||
| BA Thread ends | 2 | 49 | 48 | 7 |
Latest Final Random (09/29): CE Broken seam 1 (earlier 80 times), CB Broken stitch 2 (earlier 64 times)
AD Fabric stains 5, DJ Pleat 2, EC Asymmetry 6, EI Inaccurate/skewed stitching 1, CG Grinning 1, EA Unsmooth/puckering/bubbling 2, DB Run-off stitching 1, DD Thread not straight/waving 1, GA Missing bartack/button 1 pcs (later stages total)
QC Inline 2, QA Inline 7, Final Random 2; cannot compare across stages
09/08 CB19 260757-S1 (defective pcs 57 > defects 30), 09/10 CB19 260757-S1 (defective pcs 51 > defects 30), 09/11 CB19 260757-L1 (defective pcs 15 > defects 10), 09/11 CB19 260757-S1 (defective pcs 93 > defects 70)…
Only QA 1st Bundle: EE Raw edge (2 Major), BA Thread ends (2 Major), AD Fabric stains (2 Major), GC Missing pocket/label (2 Major), DJ Pleat (2 Major), GB Missing sewing operation (1 Major), AC Fabric hole (1 Major); Only QC 1st Bundle: DD Thread not straight/waving (2); Both: BB Missing cut seam allowance (2/3), EC Asymmetry (2/2), CE Broken seam (1/1); DHU QC 1st Bundle 87.5% / QA 1st Bundle 90.0%
CC Skip stitch (499), ED Gathering crease (366), EB Measurement issue (356), AC Fabric hole (194), Q61 Lace raw edge or broken lace (177) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 87.5% |
| QA 1st Bundle | 1 reports | — | 90.0% |
| QC Inline | 89 reports required on prod. days 78/144 (54%) | — | 90.4% |
| QC Endline | 33 days | — | 17.2% |
| QA Inline | 13 reports | 13 | 44.7% |
| Shipment Sample | 1 reports | 1 | — |
| Final Random | 2 reports | 0 | 1.4% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB23 | 10.1% 10835 / 32 days | 61.3% | PASS | 08/28–10/08 | BA Thread ends, AC Fabric hole, CC Skip stitch |
| CB19 | 14.2% 3790 / 18 days | 31.8% | PASS | 09/08–10/06 | BA Thread ends, DF Twisted seam/skewing, ED Gathering crease |
| CB18 | 56.2% 2275 / 20 days | 42.2% | — | 09/15–10/08 | BA Thread ends, EB Measurement issue, CC Skip stitch |
| CB22 | 0.0% 20 / 1 days | — | — | 10/03–10/03 | — |
| CB30 | 0.0% 20 / 1 days | — | — | 09/11–09/11 | — |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB23 | 32 | 64 | 25 (39%) | 29 | 10 | 10/03, 10/05, 10/06, 10/07, 10/08 |
| CB18 | 20 | 40 | 34 (85%) | 5 | 1 | 09/15, 09/16, 09/17, 10/03, 10/08 |
| CB19 | 18 | 36 | 19 (53%) | 10 | 7 | 09/16, 09/17, 10/02, 10/05, 10/06 |
| CB22 | 1 | 2 | 0 (0%) | 1 | 1 | 10/03 |
| CB30 | 1 | 2 | 0 (0%) | 1 | 1 | 09/11 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Final Random |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 29 | 927 | 18 | 28 | ||
| CC Skip stitch | 99 | 399 | 1 | ||||
| ED Gathering crease | 39 | 317 | 10 | ||||
| EB Measurement issue | 4 | 347 | 5 | ||||
| CE Broken seam | 1 | 1 | 240 | 72 | 7 | 1 | |
| EC Asymmetry | 2 | 2 | 71 | 151 | 20 | 6 | |
| DJ Pleat | 2 | 201 | 24 | 2 | |||
| DB Run-off stitching | 94 | 102 | 5 | 1 |
DF Twisted seam/skewing (QA 7); zero in QC Endline records
09/28 CP15 261662 (defective pcs 5 > defects 4)
QGR2644194 have multiple reports with different content
EA Unsmooth/puckering/bubbling (81), BA Thread ends (32), CC Skip stitch (23), EB Measurement issue (21), ED Gathering crease (11) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QA 1st Bundle | 1 reports | — | 90.0% |
| QC Inline | 0 reports required on prod. days 0/10 (0%) | — | — |
| QC Endline | 5 days | — | 23.3% |
| QA Inline | 2 reports | 1 | 18.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP15 | 23.3% 675 / 5 days | 18.8% | — | 09/28–10/02 | EA Unsmooth/puckering/bubbling, BA Thread ends, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP15 | 5 | 10 | 0 (0%) | 5 | 5 | 09/28, 09/29, 09/30, 10/01, 10/02 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QA 1st Bundle | QC Endline | QA Inline |
|---|---|---|---|---|
| EA Unsmooth/puckering/bubbling | 1 | 5 | 73 | 2 |
| BA Thread ends | 2 | 2 | 28 | |
| CC Skip stitch | 2 | 21 | ||
| EB Measurement issue | 21 | |||
| ED Gathering crease | 11 | |||
| DF Twisted seam/skewing | 7 | |||
| EC Asymmetry | 1 | 1 | 1 | |
| DI High-low/uneven | 1 | 2 |
Only QA 1st Bundle: EI Inaccurate/skewed stitching (2 Major), DF Twisted seam/skewing (2 Major), FA Wrong material (1 Major), DD Thread not straight/waving (1 Major), DA Exceed seam allowance (1 Major), DJ Pleat (1 Major), AC Fabric hole (1 Major), EG Wrong panel assembly (1 Major), BC Sticker left (1 Major); Only QC 1st Bundle: GC Missing pocket/label (1), DK Twisted shoulder strap (1); Both: DB Run-off stitching (1/2), CE Broken seam (2/1), EC Asymmetry (1/2), EA Unsmooth/puckering/bubbling (1/1); DHU QC 1st Bundle — / QA 1st Bundle 85.0%
BA Thread ends (55), DB Run-off stitching (30), EB Measurement issue (19), DK Twisted shoulder strap (14), BB Missing cut seam allowance (11) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 85.0% |
| QC Inline | 3 reports required on prod. days 3/8 (38%) | — | — |
| QC Endline | 4 days | — | 36.9% |
| QA Inline | 1 reports | 1 | 53.1% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS17 | 36.9% 287 / 4 days | 53.1% | — | 10/05–10/08 | BA Thread ends, EB Measurement issue, DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS17 | 4 | 8 | 3 (38%) | 4 | 1 | 10/05, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|
| BA Thread ends | 5 | 50 | |||
| DB Run-off stitching | 1 | 2 | 7 | 16 | 4 |
| EB Measurement issue | 19 | ||||
| DK Twisted shoulder strap | 1 | 4 | 9 | ||
| BB Missing cut seam allowance | 11 | ||||
| DF Twisted seam/skewing | 2 | 8 | |||
| CB Broken stitch | 7 | 1 | |||
| CC Skip stitch | 7 |
09/29 CS05 261685 (defective pcs 3 > defects 2)
Only QA 1st Bundle: CC Skip stitch (1 Major), GC Missing pocket/label (1 Major), ED Gathering crease (1 Major), DC Join stitching (1 Major); Both: EC Asymmetry (4/2), CG Grinning (3/2), EA Unsmooth/puckering/bubbling (1/2), GB Missing sewing operation (1/1), DB Run-off stitching (1/1), CB Broken stitch (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
CG Grinning (10), EC Asymmetry (9), DB Run-off stitching (8), EA Unsmooth/puckering/bubbling (6), Q94 Glue marks (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 1 reports required on prod. days 1/12 (8%) | — | — |
| QC Endline | 5 days | — | 28.3% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS05 | 12.5% 48 / 3 days | — | — | 09/28–10/07 | Q94 Glue marks |
| CS04 | 45.5% 44 / 3 days | — | — | 10/06–10/08 | BA Thread ends, DB Run-off stitching, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS04 | 3 | 6 | 1 (17%) | 3 | 2 | 10/06, 10/07, 10/08 |
| CS05 | 3 | 6 | 0 (0%) | 3 | 3 | 09/28, 09/29, 10/07 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline |
|---|---|---|---|---|
| CG Grinning | 3 | 2 | 5 | |
| EC Asymmetry | 4 | 2 | 3 | |
| DB Run-off stitching | 1 | 1 | 2 | 4 |
| EA Unsmooth/puckering/bubbling | 1 | 2 | 3 | |
| Q94 Glue marks | 6 | |||
| BA Thread ends | 6 | |||
| CB Broken stitch | 1 | 1 | 2 | |
| CC Skip stitch | 1 | 3 |
DI High-low/uneven (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| Defect | QC 1st Bundle |
|---|---|
| DI High-low/uneven | 6 |
| HA Poor pressing | 3 |
| DJ Pleat | 3 |
| EA Unsmooth/puckering/bubbling | 3 |
| EC Asymmetry | 2 |
| CB Broken stitch | 2 |
| DC Join stitching | 1 |
PP Sample 8; cannot compare across stages
Only QA 1st Bundle: DB Run-off stitching (3 Major), BB Missing cut seam allowance (2 Major), BA Thread ends (1 Major); Only QC 1st Bundle: CC Skip stitch (2), CG Grinning (2), DJ Pleat (2), ED Gathering crease (2); Both: EA Unsmooth/puckering/bubbling (4/6), EC Asymmetry (2/1), DE Cut to broken (1/2); DHU QC 1st Bundle — / QA 1st Bundle 75.0%
EA Unsmooth/puckering/bubbling (29), BA Thread ends (17), ED Gathering crease (11), CC Skip stitch (10) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 75.0% |
| QC Inline | 0 reports required on prod. days 0/4 (0%) | — | — |
| QC Endline | 2 days | — | 30.6% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP13 | 30.6% 180 / 2 days | — | — | 10/07–10/08 | EA Unsmooth/puckering/bubbling, BA Thread ends, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP13 | 2 | 4 | 0 (0%) | 2 | 2 | 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | QC 1st Bundle | QA 1st Bundle | QC Endline |
|---|---|---|---|---|
| EA Unsmooth/puckering/bubbling | 4 | 6 | 19 | |
| BA Thread ends | 1 | 16 | ||
| ED Gathering crease | 2 | 9 | ||
| CC Skip stitch | 2 | 8 | ||
| Others (no detail) | 8 | |||
| EC Asymmetry | 1 | 2 | 1 | |
| BB Missing cut seam allowance | 1 | 2 | ||
| DE Cut to broken | 1 | 2 |
Pilot Run 2, PP Sample 4; cannot compare across stages
EC Asymmetry (17), CE Broken seam (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| Pilot Run | 3 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QC Inline | 0 reports required on prod. days 0/2 (0%) | — | — |
| QC Endline | 1 days | — | 13.6% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB14 | 13.6% 110 / 1 days | — | — | 10/08–10/08 | EC Asymmetry, CE Broken seam |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB14 | 1 | 2 | 0 (0%) | 1 | 1 | 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | PP Sample | Pilot Run | QC 1st Bundle | QC Endline |
|---|---|---|---|---|
| EC Asymmetry | 2 | 3 | 2 | 10 |
| CE Broken seam | 1 | 5 | ||
| Others (no detail) | 4 | 2 | ||
| ED Gathering crease | 2 | 2 | ||
| FA Wrong material | 3 | |||
| AC Fabric hole | 2 | |||
| EI Inaccurate/skewed stitching | 2 | |||
| CG Grinning | 2 |
QA 1st Bundle 3, QA Inline 1; cannot compare across stages
Only QA 1st Bundle: ED Gathering crease (2 Major), BD Snagging (1 Major), CG Grinning (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: EC Asymmetry (7), CC Skip stitch (2), DJ Pleat (2), CB Broken stitch (2), CA Thread tension (1), DE Cut to broken (1), CE Broken seam (1); Both: EA Unsmooth/puckering/bubbling (2/1), BA Thread ends (1/2), DD Thread not straight/waving (1/1); DHU QC 1st Bundle — / QA 1st Bundle 60.0%
CC Skip stitch (235), DB Run-off stitching (150), BA Thread ends (140), ED Gathering crease (135), EC Asymmetry (123) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 8 reports required on prod. days 8/22 (36%) | — | — |
| QC Endline | 11 days | — | 15.0% |
| QA Inline | 1 reports | 1 | 46.9% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP17 | 15.0% 6355 / 11 days | 46.9% | — | 09/26–10/08 | CC Skip stitch, DB Run-off stitching, BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP17 | 11 | 22 | 8 (36%) | 11 | 3 | 10/03, 10/05, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|
| CC Skip stitch | 2 | 22 | 205 | 6 | |
| DB Run-off stitching | 2 | 148 | |||
| BA Thread ends | 1 | 2 | 1 | 131 | 5 |
| ED Gathering crease | 2 | 33 | 100 | ||
| EC Asymmetry | 7 | 27 | 89 | ||
| EA Unsmooth/puckering/bubbling | 2 | 1 | 8 | 74 | |
| DF Twisted seam/skewing | 51 | ||||
| EB Measurement issue | 1 | 47 |
QA 1st Bundle 2; cannot compare across stages
10/05 CP10 261350A (defective pcs 124 > defects 121), 10/06 CP10 261350A (defective pcs 125 > defects 122), 10/07 CP10 261350B (defective pcs 29 > defects 28)
Only QA 1st Bundle: CG Grinning (4 Major), BA Thread ends (3 Major), BB Missing cut seam allowance (1 Major); Only QC 1st Bundle: DB Run-off stitching (4), DD Thread not straight/waving (3), DE Cut to broken (2), EC Asymmetry (2), CC Skip stitch (1), CE Broken seam (1); Both: ED Gathering crease (4/4), CB Broken stitch (1/5), DJ Pleat (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
BA Thread ends (339), EB Measurement issue (318), CC Skip stitch (294), ED Gathering crease (292), EA Uneven seam allowance (151) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 3 reports required on prod. days 3/24 (12%) | — | — |
| QC Endline | 12 days | — | 22.6% |
| QA Inline | 1 reports | 1 | 40.6% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP10 | 22.6% 6367 / 12 days | 40.6% | — | 09/25–10/08 | BA Thread ends, EB Measurement issue, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP10 | 12 | 24 | 3 (12%) | 12 | 9 | 10/03, 10/05, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|
| BA Thread ends | 3 | 4 | 328 | 4 | |
| EB Measurement issue | 318 | ||||
| CC Skip stitch | 1 | 293 | |||
| ED Gathering crease | 4 | 4 | 2 | 281 | 1 |
| EA Uneven seam allowance | 151 | ||||
| Others (no detail) | 2 | 50 | |||
| CB Broken stitch | 1 | 5 | 8 | 2 | |
| DB Run-off stitching | 4 | 8 | 3 |
QA Inline 1, Pilot Run 2; cannot compare across stages
10/08 CB15 261357A-L (defective pcs 10 > defects 9)
QGR2644882, QGR2645298 have multiple reports with different content
Only QA 1st Bundle: DJ Pleat (4 Major), EC Asymmetry (3 Major); Only QC 1st Bundle: CG Grinning (2), CC Skip stitch (1), ED Gathering crease (1), BA Thread ends (1); Both: EI Inaccurate/skewed stitching (2/2), EA Unsmooth/puckering/bubbling (2/1), AD Fabric stains (1/1); DHU QC 1st Bundle — / QA 1st Bundle 84.6%
BA Thread ends (203), EC Asymmetry (124), EB Measurement issue (91), CC Skip stitch (74), ED Gathering crease (65) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| Pilot Run | 2 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 84.6% |
| QC Inline | 5 reports required on prod. days 5/14 (36%) | — | — |
| QC Endline | 7 days | — | 55.9% |
| QA Inline | 1 reports | 1 | 31.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CB15 | 55.9% 1219 / 7 days | 31.2% | — | 10/01–10/08 | BA Thread ends, EC Asymmetry, EB Measurement issue |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CB15 | 7 | 14 | 5 (36%) | 6 | 3 | 10/02, 10/03, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | Pilot Run | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|---|
| BA Thread ends | 1 | 6 | 196 | |||
| EC Asymmetry | 9 | 3 | 19 | 88 | 5 | |
| EB Measurement issue | 2 | 6 | 83 | |||
| CC Skip stitch | 1 | 73 | ||||
| ED Gathering crease | 2 | 1 | 62 | |||
| AC Fabric hole | 62 | |||||
| EA Unsmooth/puckering/bubbling | 3 | 2 | 1 | 2 | 46 | 1 |
| AD Fabric stains | 1 | 1 | 16 |
QA 1st Bundle 9, QA Inline 4; cannot compare across stages
EC Asymmetry (QA 6); zero in QC Endline records
10/02 CS19 261452A (defective pcs 42 > defects 41)
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (3 Major), AD Fabric stains (2 Major); Only QC 1st Bundle: DI High-low/uneven (2), CB Broken stitch (2), DB Run-off stitching (1), DD Thread not straight/waving (1); Both: EC Asymmetry (1/3); DHU QC 1st Bundle — / QA 1st Bundle 85.0%
BA Thread ends (246), CC Skip stitch (71), AD Fabric stains (42), DD Thread not straight/waving (37), ED Gathering crease (37) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 85.0% |
| QC Inline | 12 reports required on prod. days 12/18 (67%) | — | — |
| QC Endline | 9 days | — | 14.9% |
| QA Inline | 1 reports | 1 | 56.2% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS19 | 14.9% 2590 / 9 days | 56.2% | — | 09/29–10/08 | BA Thread ends, CC Skip stitch, AD Fabric stains |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS19 | 9 | 18 | 12 (67%) | 3 | 3 | 09/29, 09/30, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|
| BA Thread ends | 61 | 185 | |||
| CC Skip stitch | 6 | 65 | |||
| AD Fabric stains | 2 | 39 | 1 | ||
| DD Thread not straight/waving | 1 | 20 | 16 | ||
| ED Gathering crease | 3 | 34 | |||
| DI High-low/uneven | 2 | 32 | |||
| EC Asymmetry | 1 | 3 | 17 | 6 | |
| DB Run-off stitching | 1 | 24 |
QA 1st Bundle 1, QA Inline 4; cannot compare across stages
Only QA 1st Bundle: DD Thread not straight/waving (4 Major), CC Skip stitch (1 Major), ED Gathering crease (1 Major), DA Exceed seam allowance (1 Major), EC Asymmetry (1 Major); Only QC 1st Bundle: DJ Pleat (5), CA Thread tension (3), DB Run-off stitching (2), CE Broken seam (2); Both: CG Grinning (3/7), AD Fabric stains (2/1), CB Broken stitch (1/1); DHU QC 1st Bundle — / QA 1st Bundle 90.0%
BA Thread ends (316), AD Fabric stains (112), CC Skip stitch (99), EC Asymmetry (75), DA Exceed seam allowance (50) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 90.0% |
| QC Inline | 15 reports required on prod. days 15/20 (75%) | — | — |
| QC Endline | 9 days | — | 15.9% |
| QA Inline | 1 reports | 1 | 75.0% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS27 | 14.8% 3330 / 9 days | 75.0% | — | 09/29–10/08 | BA Thread ends, AD Fabric stains, CC Skip stitch |
| CS26 | 90.0% 50 / 1 days | — | — | 10/08–10/08 | BA Thread ends, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS27 | 9 | 18 | 14 (78%) | 4 | 1 | 09/29, 10/01, 10/02, 10/08 |
| CS26 | 1 | 2 | 1 (50%) | 1 | 0 | 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|
| BA Thread ends | 14 | 302 | |||
| AD Fabric stains | 2 | 1 | 8 | 101 | |
| CC Skip stitch | 1 | 11 | 87 | ||
| EC Asymmetry | 1 | 72 | 2 | ||
| DA Exceed seam allowance | 1 | 46 | 3 | ||
| DB Run-off stitching | 2 | 8 | 20 | ||
| DJ Pleat | 5 | 22 | |||
| CA Thread tension | 3 | 19 | 2 |
Latest Shipment Sample (10/03): EC Asymmetry 1 (earlier 17 times), DF Twisted seam/skewing 1 (earlier 10 times), EA Unsmooth/puckering/bubbling 1 (earlier 9 times)
DJ Pleat 1, CF Pulling yarn 1, AD Fabric stains 1, CE Broken seam 2, CB Broken stitch 1, CC Skip stitch 1, BA Thread ends 3 pcs (later stages total)
QA 1st Bundle 3, Pre-final 2, QA Inline 2; cannot compare across stages
EA Unsmooth/puckering/bubbling (QA 13), CE Broken seam (QA 8); zero in QC Endline records
10/01 CS01 261528 (defective pcs 66 > defects 65)
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (9 Major), AD Fabric stains (2 Major), CF Pulling yarn (2 Major); Only QC 1st Bundle: EC Asymmetry (4), DF Twisted seam/skewing (3), DJ Pleat (1); Both: CG Grinning (5/2), BB Missing cut seam allowance (2/2); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
DB Run-off stitching (134), ED Gathering crease (133), CG Grinning (40), BB Missing cut seam allowance (15), DK Twisted shoulder strap (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 24 reports required on prod. days 24/30 (80%) | — | — |
| QC Endline | 15 days | — | 20.6% |
| QA Inline | 1 reports | 1 | 87.5% |
| Shipment Sample | 2 reports | 0 | — |
| Pre-final | 1 reports | 0 | 3.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS01 | 20.6% 4253 / 15 days | 87.5% | — | 09/21–10/08 | CC Skip stitch, BA Thread ends, DB Run-off stitching |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS01 | 15 | 30 | 24 (80%) | 5 | 1 | 09/21, 09/22, 09/23, 09/26, 10/07 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| CC Skip stitch | 21 | 274 | 1 | ||||
| BA Thread ends | 25 | 246 | 3 | 3 | |||
| DB Run-off stitching | 2 | 132 | |||||
| ED Gathering crease | 12 | 119 | 2 | ||||
| AD Fabric stains | 2 | 13 | 53 | 2 | 1 | ||
| EC Asymmetry | 4 | 7 | 45 | 2 | 1 | ||
| CG Grinning | 5 | 2 | 33 | ||||
| CB Broken stitch | 39 | 1 |
Only QA 1st Bundle: DJ Pleat (4 Major), DD Thread not straight/waving (1 Major), CG Grinning (1 Major), BB Missing cut seam allowance (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: CA Thread tension (2), CC Skip stitch (1), DF Twisted seam/skewing (1); Both: ED Gathering crease (4/3), EC Asymmetry (4/3), BA Thread ends (4/1), DB Run-off stitching (1/3), EI Inaccurate/skewed stitching (1/2); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
BA Thread ends (281), CC Skip stitch (202), ED Gathering crease (84), EB Measurement issue (65), DB Run-off stitching (55) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 4 reports required on prod. days 4/18 (22%) | — | — |
| QC Endline | 9 days | — | 16.9% |
| QA Inline | 5 reports | 5 | 28.7% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP13 | 16.9% 4036 / 9 days | 28.7% | — | 09/28–10/08 | BA Thread ends, CC Skip stitch, EB Measurement issue |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP13 | 9 | 18 | 4 (22%) | 9 | 5 | 10/02, 10/03, 10/05, 10/06, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|
| BA Thread ends | 4 | 1 | 268 | 8 | |
| CC Skip stitch | 1 | 6 | 195 | ||
| ED Gathering crease | 4 | 3 | 15 | 56 | 6 |
| EB Measurement issue | 65 | ||||
| DB Run-off stitching | 1 | 3 | 18 | 33 | |
| EC Asymmetry | 4 | 3 | 12 | 14 | 16 |
| CB Broken stitch | 1 | 23 | 4 | ||
| DK Twisted shoulder strap | 26 |
QC 1st Bundle 6, QA 1st Bundle 1, QC Inline 21; cannot compare across stages
Only QA 1st Bundle: BB Missing cut seam allowance (2 Major), ED Gathering crease (1 Major), EC Asymmetry (1 Major), BA Thread ends (1 Major); Both: EA Unsmooth/puckering/bubbling (4/5), CB Broken stitch (3/1); DHU QC 1st Bundle — / QA 1st Bundle 60.0%
ED Gathering crease (30), BA Thread ends (26), EA Unsmooth/puckering/bubbling (22), EC Asymmetry (16), DF Twisted seam/skewing (11) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 60.0% |
| QC Inline | 3 reports required on prod. days 3/6 (50%) | — | — |
| QC Endline | 3 days | — | 20.1% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS06 | 20.1% 437 / 3 days | — | — | 10/06–10/08 | ED Gathering crease, BA Thread ends, DF Twisted seam/skewing |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS06 | 3 | 6 | 3 (50%) | 2 | 1 | 10/06, 10/07 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline |
|---|---|---|---|---|
| ED Gathering crease | 1 | 4 | 25 | |
| Others (no detail) | 6 | 1 | 21 | |
| BA Thread ends | 1 | 2 | 23 | |
| EA Unsmooth/puckering/bubbling | 4 | 5 | 7 | 6 |
| EC Asymmetry | 1 | 8 | 7 | |
| DF Twisted seam/skewing | 11 | |||
| CC Skip stitch | 5 | |||
| CB Broken stitch | 3 | 1 |
10/01 CP08 262185 (defective pcs 103 > defects 69), 10/02 CP08 262185 (defective pcs 71 > defects 56), 10/05 CP08 262185 (defective pcs 124 > defects 115), 10/06 CP08 262185 (defective pcs 105 > defects 102)…
Only QA 1st Bundle: CG Grinning (4 Major), CC Skip stitch (3 Major); Only QC 1st Bundle: DI High-low/uneven (3), BA Thread ends (3), EI Inaccurate/skewed stitching (1), EA Unsmooth/puckering/bubbling (1); Both: AD Fabric stains (5/4), EC Asymmetry (3/5), DJ Pleat (1/3), CB Broken stitch (3/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
BA Thread ends (236), AD Fabric stains (208), EA Uneven seam allowance (188), ED Gathering crease (82), CC Skip stitch (53) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 6 reports required on prod. days 6/16 (38%) | — | — |
| QC Endline | 8 days | — | 10.1% |
| QA Inline | 3 reports | 3 | 36.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP08 | 10.1% 7820 / 8 days | 36.5% | — | 09/30–10/08 | BA Thread ends, EA Uneven seam allowance, AD Fabric stains |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP08 | 8 | 16 | 6 (38%) | 8 | 2 | 10/03, 10/05, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|
| BA Thread ends | 3 | 233 | |||
| AD Fabric stains | 5 | 4 | 24 | 169 | 6 |
| EA Uneven seam allowance | 188 | ||||
| ED Gathering crease | 2 | 79 | 1 | ||
| CC Skip stitch | 3 | 50 | |||
| EC Asymmetry | 3 | 5 | 7 | 28 | 9 |
| DI High-low/uneven | 3 | 30 | |||
| CB Broken stitch | 3 | 1 | 19 | 3 |
Latest Shipment Sample (10/08): EA Unsmooth/puckering/bubbling 1 (earlier 3 times)
BA Thread ends (174), ED Gathering crease (56), EC Asymmetry (22), CC Skip stitch (8) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QC Inline | 0 reports required on prod. days 0/2 (0%) | — | — |
| QC Endline | 1 days | — | 42.1% |
| Shipment Sample | 2 reports | 1 | — |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS09 | 42.1% 624 / 1 days | — | — | 10/08–10/08 | BA Thread ends, ED Gathering crease, EC Asymmetry |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS09 | 1 | 2 | 0 (0%) | 1 | 1 | 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QC Endline | Shipment Sample |
|---|---|---|---|
| BA Thread ends | 174 | ||
| ED Gathering crease | 56 | ||
| EC Asymmetry | 1 | 21 | |
| CC Skip stitch | 8 | ||
| EA Unsmooth/puckering/bubbling | 3 | 1 | |
| DB Run-off stitching | 4 | ||
| FC Wrong label | 1 | ||
| EB Measurement issue | 1 |
QA 1st Bundle 4; cannot compare across stages
10/07 CS08 262218 (defective pcs 52 > defects 27), 10/08 CS08 262218 (defective pcs 30 > defects 18)
Only QA 1st Bundle: ED Gathering crease (1 Major), DB Run-off stitching (1 Major), CA Thread tension (1 Major); Only QC 1st Bundle: EC Asymmetry (5); Both: EA Unsmooth/puckering/bubbling (3/1); DHU QC 1st Bundle — / QA 1st Bundle 40.0%
BA Thread ends (34), CC Skip stitch (11), EC Asymmetry (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 40.0% |
| QC Inline | 0 reports required on prod. days 0/4 (0%) | — | — |
| QC Endline | 2 days | — | 3.1% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS08 | 3.1% 1467 / 2 days | — | — | 10/07–10/08 | BA Thread ends, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS08 | 2 | 4 | 0 (0%) | 2 | 2 | 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Endline |
|---|---|---|---|
| BA Thread ends | 34 | ||
| CC Skip stitch | 11 | ||
| EC Asymmetry | 5 | ||
| EA Unsmooth/puckering/bubbling | 3 | 1 | |
| Others (no detail) | 4 | ||
| ED Gathering crease | 1 | ||
| CA Thread tension | 1 | ||
| DB Run-off stitching | 1 |
10/08 CS08 262219 (defective pcs 9 > defects 4)
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QC Inline | 0 reports required on prod. days 0/2 (0%) | — | — |
| QC Endline | 1 days | — | 2.5% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS08 | 2.5% 160 / 1 days | — | — | 10/08–10/08 | BA Thread ends, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS08 | 1 | 2 | 0 (0%) | 1 | 1 | 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QC Endline |
|---|---|---|
| ED Gathering crease | 4 | |
| CA Thread tension | 3 | |
| BA Thread ends | 3 | |
| DF Twisted seam/skewing | 2 | |
| EA Unsmooth/puckering/bubbling | 2 | |
| AC Fabric hole | 2 | |
| CC Skip stitch | 1 |
QC 1st Bundle 8, QC Inline 59; cannot compare across stages
HA Poor pressing (QA 7); zero in QC Endline records
QGR2645078 have multiple reports with different content
Only QA 1st Bundle: EC Asymmetry (3 Major), CB Broken stitch (2 Major), BD Snagging (1 Major), EB Measurement issue (1 Major), BA Thread ends (1 Major), EA Unsmooth/puckering/bubbling (1 Major), EI Inaccurate/skewed stitching (1 Major), CE Broken seam (1 Major), EG Wrong panel assembly (1 Major); Only QC 1st Bundle: ED Gathering crease (4), DB Run-off stitching (4); Both: DJ Pleat (2/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
CC Skip stitch (190), BA Thread ends (182), ED Gathering crease (170), EC Asymmetry (121), DB Run-off stitching (53) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 9 reports required on prod. days 9/12 (75%) | — | — |
| QC Endline | 6 days | — | 15.8% |
| QA Inline | 4 reports | 4 | 18.6% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS05 | 15.8% 4550 / 6 days | 18.6% | — | 10/02–10/08 | CC Skip stitch, BA Thread ends, ED Gathering crease |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS05 | 6 | 12 | 9 (75%) | 2 | 1 | 10/02, 10/07 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|
| CC Skip stitch | 190 | ||||
| BA Thread ends | 1 | 5 | 167 | 9 | |
| ED Gathering crease | 4 | 4 | 160 | 2 | |
| EC Asymmetry | 3 | 16 | 94 | 8 | |
| Others (no detail) | 8 | 59 | |||
| DB Run-off stitching | 4 | 4 | 40 | 5 | |
| AC Fabric hole | 52 | ||||
| DJ Pleat | 2 | 1 | 12 | 5 |
Latest Shipment Sample (10/05): EC Asymmetry 1 (earlier 17 times), ED Gathering crease 1 (earlier 15 times)
BA Thread ends 10, CB Broken stitch 4, IA 2nd operation issue 4 pcs (later stages total)
QGR2645059 have multiple reports with different content
Only QA 1st Bundle: DD Thread not straight/waving (1 Major), DB Run-off stitching (1 Major), CA Thread tension (1 Major); Only QC 1st Bundle: CB Broken stitch (1); Both: BA Thread ends (2/3), EA Unsmooth/puckering/bubbling (1/2), ED Gathering crease (1/1), EC Asymmetry (1/1); DHU QC 1st Bundle — / QA 1st Bundle 100.0%
CC Skip stitch (76), EA Unsmooth/puckering/bubbling (35), EB Measurement issue (20), Q93 Heat seal logo peeling off (15), DB Run-off stitching (13) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| QC Inline | 6 reports required on prod. days 6/14 (43%) | — | — |
| QC Endline | 6 days | — | 14.6% |
| QA Inline | 1 reports | 1 | 37.5% |
| Shipment Sample | 2 reports | 1 | — |
| Pre-final | 2 reports | 0 | 3.7% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS09 | 14.0% 7527 / 6 days | 37.5% | — | 09/30–10/06 | BA Thread ends, EC Asymmetry, CC Skip stitch |
| CS10 | 22.3% 606 / 1 days | — | — | 10/01–10/01 | BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS09 | 6 | 12 | 6 (50%) | 4 | 2 | 09/30, 10/01, 10/05, 10/06 |
| CS10 | 1 | 2 | 0 (0%) | 1 | 1 | 10/01 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline | Shipment Sample | Pre-final |
|---|---|---|---|---|---|---|---|
| BA Thread ends | 2 | 3 | 10 | 956 | 3 | 10 | |
| EC Asymmetry | 1 | 1 | 29 | 88 | 2 | 1 | 4 |
| ED Gathering crease | 1 | 1 | 38 | 43 | 1 | 1 | |
| CC Skip stitch | 76 | ||||||
| EA Unsmooth/puckering/bubbling | 1 | 2 | 28 | 4 | |||
| EB Measurement issue | 20 | ||||||
| Q93 Heat seal logo peeling off | 15 | ||||||
| IA 2nd operation issue | 9 | 1 | 4 |
QA 1st Bundle 1, QA Inline 1; cannot compare across stages
Only QA 1st Bundle: DE Cut to broken (2 Major), GA Missing bartack/button (1 Major), DJ Pleat (1 Major), EB Measurement issue (1 Major); Only QC 1st Bundle: EC Asymmetry (6), ED Gathering crease (2), DB Run-off stitching (2); Both: EA Unsmooth/puckering/bubbling (10/5); DHU QC 1st Bundle — / QA 1st Bundle 55.0%
ED Gathering crease (114), CC Skip stitch (97), BA Thread ends (71), EA Uneven seam allowance (65), EB Measurement issue (29) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 55.0% |
| QC Inline | 1 reports required on prod. days 1/10 (10%) | — | — |
| QC Endline | 5 days | — | 17.9% |
| QA Inline | 1 reports | 1 | 21.9% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP03 | 17.9% 2341 / 5 days | 21.9% | — | 10/03–10/08 | ED Gathering crease, CC Skip stitch, BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP03 | 5 | 10 | 1 (10%) | 5 | 4 | 10/03, 10/05, 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|
| ED Gathering crease | 2 | 111 | 1 | ||
| CC Skip stitch | 3 | 93 | 1 | ||
| BA Thread ends | 71 | ||||
| EA Uneven seam allowance | 65 | ||||
| EB Measurement issue | 1 | 28 | |||
| AD Fabric stains | 2 | 21 | 1 | ||
| EA Unsmooth/puckering/bubbling | 10 | 5 | 7 | ||
| CA Thread tension | 21 |
QA 1st Bundle 1; cannot compare across stages
BA Thread ends (6) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QA 1st Bundle | 1 reports | — | 45.0% |
| Defect | QA 1st Bundle |
|---|---|
| BA Thread ends | 6 |
| DF Twisted seam/skewing | 4 |
| BB Missing cut seam allowance | 2 |
| EA Unsmooth/puckering/bubbling | 2 |
| Others (no detail) | 1 |
QC 1st Bundle 1; cannot compare across stages
QGR2645724 have multiple reports with different content
Only QA 1st Bundle: EA Unsmooth/puckering/bubbling (4 Major), AD Fabric stains (4 Major), BA Thread ends (2 Major), EI Inaccurate/skewed stitching (2 Major), DJ Pleat (2 Major), DI High-low/uneven (2 Major); Only QC 1st Bundle: DD Thread not straight/waving (1), ED Gathering crease (1); Both: CB Broken stitch (1/4), EC Asymmetry (2/2), GB Missing sewing operation (1/2); DHU QC 1st Bundle — / QA 1st Bundle 60.0%
AD Fabric stains (78), BA Thread ends (48), CC Skip stitch (36), ED Gathering crease (24), DB Run-off stitching (19) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 2 reports | — | 60.0% |
| QC Inline | 2 reports required on prod. days 2/4 (50%) | — | — |
| QC Endline | 2 days | — | 50.9% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS22 | 50.9% 383 / 2 days | — | — | 10/07–10/08 | AD Fabric stains, BA Thread ends, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS22 | 2 | 4 | 2 (50%) | 1 | 1 | 10/07 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline |
|---|---|---|---|---|
| AD Fabric stains | 4 | 4 | 70 | |
| BA Thread ends | 2 | 46 | ||
| CC Skip stitch | 36 | |||
| ED Gathering crease | 1 | 23 | ||
| DB Run-off stitching | 19 | |||
| CB Broken stitch | 1 | 4 | 10 | |
| EC Asymmetry | 2 | 2 | 2 | |
| DD Thread not straight/waving | 1 | 4 |
CE Broken seam (QA 3); zero in QC Endline records
Only QA 1st Bundle: GA Missing bartack/button (1 Major), ED Gathering crease (1 Major), CB Broken stitch (1 Major); Only QC 1st Bundle: AD Fabric stains (3), EB Measurement issue (1); Both: EC Asymmetry (4/2), EA Unsmooth/puckering/bubbling (3/2), EI Inaccurate/skewed stitching (2/1), BA Thread ends (1/2); DHU QC 1st Bundle — / QA 1st Bundle 50.0%
BA Thread ends (445), ED Gathering crease (112), CC Skip stitch (81), DB Run-off stitching (31), AD Fabric stains (17) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | — |
| QA 1st Bundle | 1 reports | — | 50.0% |
| QC Inline | 1 reports required on prod. days 1/6 (17%) | — | — |
| QC Endline | 3 days | — | 25.8% |
| QA Inline | 1 reports | 1 | 28.1% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS10 | 25.8% 2602 / 3 days | 28.1% | — | 10/06–10/08 | BA Thread ends, ED Gathering crease, CC Skip stitch |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS10 | 3 | 6 | 1 (17%) | 3 | 2 | 10/06, 10/07, 10/08 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | QA Inline |
|---|---|---|---|---|---|
| BA Thread ends | 1 | 2 | 5 | 436 | 1 |
| ED Gathering crease | 1 | 8 | 102 | 1 | |
| CC Skip stitch | 81 | ||||
| DB Run-off stitching | 2 | 29 | |||
| AD Fabric stains | 3 | 13 | 1 | ||
| EC Asymmetry | 4 | 2 | 3 | ||
| EA Unsmooth/puckering/bubbling | 3 | 2 | 2 | 1 | |
| DD Thread not straight/waving | 5 |
Latest Final Random (09/17): ED Gathering crease 1 (earlier 5 times)
CB Broken stitch 3, HA Poor pressing 2 pcs (later stages total)
QC 1st Bundle 11, QC Inline 16; cannot compare across stages
09/07 CS12 261449A (defective pcs 27 > defects 11), 09/07 CS12 261449B (defective pcs 3 > defects 1), 09/08 CS12 261449A (defective pcs 22 > defects 13), 09/09 CS12 261449A (defective pcs 11 > defects 6)…
Only QA 1st Bundle: BA Thread ends (2 Major), HA Poor pressing (2 Major), DC Join stitching (1 Major), DJ Pleat (1 Major), EI Inaccurate/skewed stitching (1 Major); Both: CB Broken stitch (5/1); DHU QC 1st Bundle 0.0% / QA 1st Bundle 40.0%
DF Twisted seam/skewing (13) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QC 1st Bundle | 1 reports | — | 0.0% |
| QA 1st Bundle | 1 reports | — | 40.0% |
| QC Inline | 2 reports required on prod. days 2/14 (14%) | — | 0.0% |
| QC Endline | 7 days | — | 5.4% |
| Pre-final | 1 reports | 0 | 3.8% |
| Final Random | 2 reports | 0 | 3.8% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CS12 | 5.4% 1000 / 7 days | — | PASS | 09/07–09/15 | ED Gathering crease, DF Twisted seam/skewing, BA Thread ends |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CS12 | 7 | 14 | 2 (14%) | 7 | 5 | 09/09, 09/10, 09/11, 09/12, 09/15 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QC 1st Bundle | QA 1st Bundle | QC Inline | QC Endline | Pre-final | Final Random |
|---|---|---|---|---|---|---|
| Others (no detail) | 11 | 16 | 2 | |||
| BA Thread ends | 2 | 7 | 10 | 3 | 4 | |
| ED Gathering crease | 18 | 1 | 1 | |||
| DF Twisted seam/skewing | 13 | |||||
| CB Broken stitch | 5 | 1 | 1 | 2 | ||
| HA Poor pressing | 2 | 2 | ||||
| EC Asymmetry | 4 | |||||
| GB Missing sewing operation | 2 |
QA 1st Bundle 1; cannot compare across stages
EC Asymmetry (65), ED Gathering crease (51), EA Unsmooth/puckering/bubbling (28), BA Thread ends (20), CC Skip stitch (16) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| QA 1st Bundle | 1 reports | — | 95.0% |
| QC Inline | 0 reports required on prod. days 0/14 (0%) | — | — |
| QC Endline | 7 days | — | 11.3% |
| Line | QC Endline DHU pcs / days | QA Inline DHU (same line) | Latest final (same line) | Last 10 days with records | Top 3 QC Endline defects |
|---|---|---|---|---|---|
| CP02 | 11.3% 1522 / 7 days | — | — | 09/21–10/01 | EC Asymmetry, ED Gathering crease, EA Unsmooth/puckering/bubbling |
Red: QA Inline DHU on the same line is more than 2× QC Endline (and ≥ 10%).
| Line | Prod. days | Required | Actual | Days with < 2 | Days with 0 | Recent short days |
|---|---|---|---|---|---|---|
| CP02 | 7 | 14 | 0 (0%) | 7 | 7 | 09/23, 09/25, 09/26, 09/28, 10/01 |
Production day = a day with ETS QC Endline records on that line. Red: less than half of required.
| Defect | QA 1st Bundle | QC Endline |
|---|---|---|
| EC Asymmetry | 3 | 62 |
| ED Gathering crease | 1 | 50 |
| EA Unsmooth/puckering/bubbling | 9 | 19 |
| BA Thread ends | 1 | 19 |
| CC Skip stitch | 16 | |
| DK Twisted shoulder strap | 5 | |
| CE Broken seam | 1 | |
| DE Cut to broken | 1 |
QA 1st Bundle 1; cannot compare across stages
BB Missing cut seam allowance (5) did not reach later stages
| Stage | Count | FAIL | DHU |
|---|---|---|---|
| PP Sample | 1 reports | 0 | — |
| QA 1st Bundle | 1 reports | — | 100.0% |
| Defect | QA 1st Bundle |
|---|---|
| BB Missing cut seam allowance | 5 |
| ED Gathering crease | 4 |
| AD Fabric stains | 3 |
| DJ Pleat | 2 |
| DF Twisted seam/skewing | 2 |
| EC Asymmetry | 2 |
| EA Unsmooth/puckering/bubbling | 1 |
| Others (no detail) | 1 |
QA Inline checks goods already passed by QC Endline, yet in 463 of 487 POs with both data its DHU is higher (median 35.9% vs 12.1%). QC Endline is widely missing or under-recording defects. 21 active POs with the largest gaps are marked 🟠; in 50 POs the main QA defects were never recorded by QC Endline.
Active POs require 4302 reports (2 per line per production day); actual 1603. Lowest lines: CP02 0/90, CP01 0/66, CP15 0/56, CB36 0/24, CP18 1/28, CP11 2/38
128 active POs have both. Most common: EI Inaccurate/skewed stitching (38 PO), BA Thread ends (37 PO), EA Unsmooth/puckering/bubbling (35 PO), CG Grinning (33 PO), ED Gathering crease (31 PO), EC Asymmetry (27 PO)
Rework pcs exceed defect count in ETS, which is impossible; please check how QC enters the data.
These cannot be compared across stages; suggest making a description mandatory for "Others".
| Defect | POs |
|---|---|
| BA Thread ends | 106/159 |
| CB Broken stitch | 97/159 |
| AD Fabric stains | 84/159 |
| ED Gathering crease | 81/159 |
| EC Asymmetry | 80/159 |
| EA Unsmooth/puckering/bubbling | 74/159 |